    Dynamic Scheduling and Path Planning of Automated Guided Vehicles in Automatic Container Terminal

    2022-10-29 03:28:22LijunYueandHoumingFan
    IEEE/CAA Journal of Automatica Sinica 2022年11期

    Lijun Yue and Houming Fan

    Abstract—The uninterrupted operation of the quay crane (QC)ensures that the large container ship can depart port within laytime, which effectively reduces the handling cost for the container terminal and ship owners. The QC waiting caused by automated guided vehicles (AGVs) delay in the uncertain environment can be alleviated by dynamic scheduling optimization. A dynamic scheduling process is introduced in this paper to solve the AGV scheduling and path planning problems, in which the scheduling scheme determines the starting and ending nodes of paths, and the choice of paths between nodes affects the scheduling of subsequent AGVs. This work proposes a two-stage mixed integer optimization model to minimize the transportation cost of AGVs under the constraint of laytime. A dynamic optimization algorithm, including the improved rule-based heuristic algorithm and the integration of the Dijkstra algorithm and the Q-Learning algorithm, is designed to solve the optimal AGV scheduling and path schemes. A new conflict avoidance strategy based on graph theory is also proposed to reduce the probability of path conflicts between AGVs. Numerical experiments are conducted to demonstrate the effectiveness of the proposed model and algorithm over existing methods.

    I. INTRODUCTION

    WITH the upsizing of ships and the increasing of port throughput year by year, the requirements for the handling efficiency of container terminals have increased, which has promoted the development of automatic container terminals (ACTs) built for low-risk, continuous, and collaborative operation [1]. In the past few years, some ACTs in China have been built and began commercial operations. As is known to all, the container ship named ZIM CHICAGO (333 meters long, 42.8 meters wide, and 8000 TEU deadweight) was handled at the Qingdao Automatic Container Terminal in December 2017, where the average handling efficiency of quay crane(QC) has increased to 39.6 containers per hour, compared with 28 to 32 containers per hour of traditional container terminals.

    As far as we know, there are three types of equipment that affect the handling efficiency and the completion time of the ship. The highest cost is the QC that resides at the berths where the vessel moor is used to unload inbound containers and load outbound containers [2], [3]. Another important piece of equipment is the yard crane (YC), which is responsible for stacking and handling containers in the yard [4], [5].Besides the equipment used for receiving, delivering, and transporting containers under QCs and YCs in ACTs are the automated guided vehicles (AGVs) which have greater amounts and flexibility than the other two types of equipment.The reasonable scheduling and path planning schemes of AGVs are conducive to improving the utilization of the above three equipment and reducing the mutual waiting time between them. In this paper, we will focus on optimizing the handling efficiency in ACTs from the perspective of AGV scheduling and path planning.

    Since the AGV was introduced, it has attracted the attention of many scholars [6]. The initial application of AGVs were to transport materials in manufacturing systems [7]–[10], where they still play an important role today. Gaoet al. [11] analyzed publications from 1999 to 2018 and presented a review of the latest research on swarm intelligence and evolutionary algorithms to solve flexible workshop scheduling problems.With the rapid development of ACTs in recent years, there are increasingly more papers on the optimization of AGV scheduling in the container terminal. For example, Luo and Wu [12] built a mixed integer linear optimization (MILP)model with the shortest ship berth time as the goal and solved the model by genetic algorithm to obtain the optimal AGVs scheduling plan and container storage locations. Chenet al.[13] developed a synchronous YC and AGV scheduling model based on an extended space-time network and used a marketbased alternating direction method of multipliers (ADMM)dual decomposition approach to achieve a cost-effective solution. Yueet al. [14] proposed a formulation to optimize the operational efficiency of dual-trolley quay cranes and AGVs to reduce energy consumption and proposed a constrained partial enumeration strategy to construct quay cranes schedules and a genetic algorithm to solve the AGV scheduling problem.Huet al. [15] proposed two MILP models for automated lifting vehicles (ALVs) and AGVs respectively to minimize operating cost, and improved particle swarm optimization algorithm to solve them.

    The purpose of AGV scheduling optimization is to decide the starting and ending nodes of AGVs (under QCs and YCs),while path planning is to find a collision-free path from the starting node to the ending node, such as finding the shortest path from node A to node B in a maze. Multiple AGVs are affected by each other in the process of transportation. Some scholars are committed to solving problems such as conflict[16], deadlock [17], [18], congestion [19], AGV charging, and variable speed [20] so that AGVs can reach the ending nodes as soon as possible. The scheduling scheme of AGVs is affected by the actual arrival time of AGVs. Some scholars integrated the above two problems and studied the joint optimization of AGV scheduling and path planning. Fazlollahtabar and Hassanli [21] studied the simultaneous AGV scheduling and routing problems in manufacturing systems with considered the availability of AGVs in order processing,and constructed a network mathematical model to minimize the cost and wait time of AGVs, and solved the problem using the modified network simplex algorithm. To minimize AGVs delay time, Zhonget al. [22] established a mixed integer programming model based on path planning, integrated scheduling, conflicts deadlocks, and designed a hybrid genetic algorithm-particle swarm optimization (HGA-PSO) algorithm to solve it. Intending to minimize the makespan, Yanget al. [23]established a two-layer programming model, in which the upper level model optimized the integrated scheduling of QCs, AGVs, and automated rail mounted gantry cranes(ARMGs), and the lower level model optimized the AGVs path planning and proposed a bi-level general algorithm based on the preventive congestion rule to solve it.

    The core of the path planning problem is to seek the shortest path between the starting and ending nodes. Dijkstra [24]proposed the Dijkstra algorithm, which solved the single source shortest path problem of weighted directed graphs by breadth-first search. Then, the Floyd algorithm [25] and the shortest path faster algorithm [26] were proposed. These three methods are the most widely used methods for finding the shortest path, and they are often used in combination with other algorithms. Singgihet al. [27] designed the optimal network for the automated transporters mounted on rails, and used the Dijkstra algorithm and queuing theory to solve its scheduling scheme. Guoet al. [28] established a path planning model to minimize the blocking rate of AGVs and improved the Dijkstra algorithm to calculate a conflict-free path for each AGV. To solve the AGV scheduling problem,which has been proved to be the nondeterministic polynomial hard (NP-hard) problem [29], [30], some scholars have improved the heuristic algorithm to obtain a satisfactory solution of the MILP model within finite time [31], [32]. However, it is inefficient to use MILP technology to solve largescale data, and the calculation time is very long when the MILP model has many constraints. Changes in an external environment, such as the failure of certain nodes, may make the original scheduling and path plan no longer feasible,which requires updating the plan as soon as possible. To solve large-scale optimization problems quickly, reinforcement learning (RL) algorithms have been proposed and received widespread attention [33]. Q-Learning algorithm is currently the most widely used RL algorithm, which combines dynamic programming and Monte Carlo algorithm to estimate the state value before execution according to the new state value, and has been applied to the solution of the path planning problem and the scheduling problem in recent years. To solve the path planning and obstacle avoidance problems of robots, Jianget al. [34] proposed a deep Q-Learning algorithm based on experiential replay and heuristic knowledge, which used a neural network to replace the Q table in RL. To solve the problem of semiconductor final test scheduling, Caoet al.[35] proposed a cuckoo search algorithm based on RL and agent modeling, which ensured the expected diversity and intensification of the population by controlling the parameters of RL. To solve the production scheduling problem of assembly job shops under an uncertain environment, Wang [36] proposed a method of Dual Q-Learning and designed an adaptive scheduling mechanism to enhance the adaptability to environmental changes. A summary of relevant studies is provided in Table I.

    II. PROBLEM

    Different from the traditional container terminal, the yard of ACTs are perpendicular to the coastline. Both loading and unloading containers can be placed in the same block, with the former placed on the side to the coastline and the latter placed on the side close to the gate of the container terminal, which effectively reduces the idle time of AGVs. Between the coastline and the yard, AGVs transport containers back and forth,as shown in Fig. 1. There are 5 states of AGV in operation,namely: receiving, delivering, transporting, empty running,and waiting. From Fig. 1, we can see that “receiving” means accepting containers to be loaded under YCs or accepting containers that have been unloaded under QCs. The “delivering”means waiting under QCs or YCs for the container to be lifted or picked up. The “transporting” and “empty running” respectively mean that loaded and no-load AGVs pass through the transport area to deliver and receive containers. The “waiting”means that AGVs that arrived too early have to wait in the buffer area to be served. In the process of ship loading and unloading, AGVs transport the unloaded containers to the yard and the loaded containers to the QC. The terminal operators need to formulate a scheduling plan to optimize the delivery and retrieval sequence of AGVs according to the location of QCs and the blocks where the containers to be loaded and unloaded.

    The transport process of AGV is shown in Fig. 2. We can see that if the AGV arrives earlier than the planned handle time of QC, the AGV will wait; otherwise, the QC will be delayed. Therefore, it is very important to generate a reasonable AGV scheduling scheme to avoid QCs delay. However,the exact transit time of each AGV cannot be predicted due to path conflicts or environmental changes that make some routes inaccessible. We divide all containers into container groups of a certain size, and schedule the next group of containers according to the real-time environment, to improve theapplicability of a scheduling scheme. Since the computational cost is too high to solve the dynamic scheduling problem in a disturbance environment by heuristic algorithm, we designed a rule-based heuristic algorithm composed of five scheduling principles and selected the one with the lowest marginal cost to generate the scheduling scheme.

    Fig. 1. The status of AGVs at the ACT.

    Fig. 2. The process of AGV transportation of containers.

    After obtaining the starting and ending nodes of containers from the AGV scheduling scheme, we plan the routing scheme for each AGV respectively. If the routing scheme is unreasonable, multiple AGVs will be congested in the same lane, and conflict or deadlock at the intersection of paths.There are two strategies to avoid path conflict in the transportation area. One is the conflict point waiting (CPW), which means the AGV with lower priority needs to wait for the other AGV to pass before passing a conflict point. The other is conflict point avoidance (CPA), which refers to finding other nodes on the map to replace conflict points. The transportation area of ACTs is generally set as a one-way lane, as shown in Fig. 1. Nodes with path conflicts can be divided into three types: The first kind of nodes at the swap area in front of blocks because all AGVs must pass through these two specific areas before delivering or receiving containers (Fig. 1,⑥), and the second kind of nodes at the QC operation area(Fig. 1, ⑦). The third type is the intersection of two paths,which is also the place where conflicts are most likely to occur (Fig. 1, ⑧). For different types of conflicts, the optimal way to avoid conflicts may be different. It is important to find effective ways to avoid and resolve the path conflict problem.

    III. MODEL

    In this section, a two-stage mixed integer optimization model is constructed for the dynamic scheduling and path planning of AGVs. To make the problem solvable, the following assumptions are considered in the proposed model:

    1) All containers are of standard size and can be averaged intoPcontainer groups,p=1,2,...,P.

    2) There is no difference in the handling efficiency of the same type of equipment, and the time for operating containers is averaged.

    3) All AGVs only transport containers on the same ship until all containers are loaded and unloaded.

    4) If the paths of two AGVs conflict, the one with higher priority will leave first, and the other waits for a fixed time.

    5) For YCs, the priority of loaded containers is higher than that of unloaded containers.

    A. Notations

    1) Parameters

    ω1: The unit cost of receiving and delivering time.

    ω2: The unit cost of transporting time.

    ω3: The unit cost of empty running time.

    B. Mathematical Formulation for AGV Scheduling

    To fit the real-time operating environment, all containers to be loaded and unloaded are divided intoPcontainer groups in the ascending order of planned QC operation time. We optimize the AGV scheduling scheme of the current container group based on the actual scheduling results of the previous group. The laytime for each group of containers is updated with constraint (1).

    C. Mathematical Formulation for AGV Path Planning

    The transportation area in the container terminal is abstracted into a weighted directed graphG(V,E). The intersections between paths can be represented by nodes in the graph, and paths can be represented by edges between nodes,and the length of paths can be represented by edge weights. In the case of no path conflicttna=tn, the AGV path planning model is presented as follows:

    The objective function is defined by constraints (24), which represents the shortest time to transport a container from its starting node to its ending node, or the shortest empty running time from the ending node of the last container to the starting node of the current container. Constraint (25) represents a path with one starting node, one ending node, continuous and without bifurcation. Constraints (26) defines the type of decision variables.

    Path conflicts are likely to occur when multiple AGVs are transported simultaneously. The set of conflict points δnais obtained by simulation, and the following constraint (27) is gradually added:

    where constraint (28) leads to the shorter time being selected as the actual running time of AGV from the starting node to the ending node, by comparing the strategy of CPW and CPA.Constraint (29) indicates the actual time to the destination of AGVato transport containernon a conflict-free path.

    IV. ALGORITHM

    A. Framework of Dynamic Optimization Algorithm

    Heuristic algorithms [22] are usually used to solve scheduling and path optimization problems in static environments.However, the changeable environment and unpredictable path conflicts often interrupt the initial plan, so it is necessary to design a fast repairable algorithm for short-term scheduling and path planning. Based on the existing research on dynamic packet scheduling [37], graph theory model [38], and QLearning algorithm [39], we designed a dynamic optimization algorithm, as shown in Fig. 3.

    A multi-AGVs scheduling scheme is generated by the rulebased heuristic algorithm to minimize the predicted transportation cost. The generation and update of the AGV path plan are both generated by the Hybrid Dijkstra and Q-Learning (HDQL) algorithm, where the Q-Learning algorithm for finding accessible pathways to construct a weighted directed graph and the Dijkstra algorithm for the shortest path between nodes.

    The detailed dynamic optimization process is as follows:

    Step 1:All containers to be loaded and unloaded are equally divided intoPcontainer groups of sizeN,p=1,...,P. Each container group has a constraint that the completion time of loading and unloading operations cannot exceed laytimetp

    fduring the scheduling process.

    Step 2:The planned completion time of container grouppin the conflict-free path environment can be predicted under the rule-based heuristic algorithm composed of five different scheduling principles as follows:

    Fig. 3. The framework of the dynamic optimization algorithm.

    ● Load balancing (LB): The container is preferentially allocated to the AGV with less work to balance the load of AGVs in the system.

    ● Earliest deadline first (EDF): The container with the smallest planned starting time is assigned to the earliest AGV that completed the previous container.

    ● Nearest first (NF): Allocate the closest container to the idle AGV without causing any QC delay.

    ● Higher utilization first (HUF): The container is allocated to the longest haul AGV without causing any QC delay, which is conducive to improving the utilization rate of AGVs.

    ● Shortest queue first (SQF): The container operated by QCs with a short queue is allocated to the idle AGV.

    Step 3:After comparing the predicted optimal scheduling results under different principles in Step 2, the scheduling scheme with a lower cost is selected according to the real-time state of the ACT. Based on the known scheduling scheme, the Dijkstra algorithm is used to find the shortest path of the weighted directed graph updated by the Q-Learning algorithm,so as to know the planned path of AGVs. In the process of path planning, there are two schemes to avoid the collision after predicting a conflict point. The cost of strategy CPA is compared with that of strategy CPW, and then the path with low cost is selected.

    Step 5:Output the scheduling and path schemes of all AGVs.

    B. Hybrid Dijkstra Algorithm and Q-Learning for Path Planning

    To obtain the spatial position and status of AGVs in realtime, the horizontal transportation area of the ACT is regarded as a rectangle composed of several small rectangles, where the length of each small rectangle is equal to the distance of an AGV running per unit time. Rectangles in areas that are inaccessible to AGVs, such as QC operating areas, buffer lanes,and blocks, have an infinite distance from other rectangles. In the one-way lanes of the ACT, there is only one adjacent rectangle that allows AGVs to pass, except for the intersection of two roads. Therefore, the intersection can be separated from other nodes to reduce repeated calculations. We divide the AGV transportation path into three layers: The scheduling layer, the crossing path layer, and the sub-path layer, as shown in Fig. 4.

    Fig. 4. Three-tier AGV transportation path.

    G1 represents the scheduling level, where “Starting node”and “Ending node” is distributed under QCs or YCs, are respectively, representing the receiving node and delivery node of the same container, or the delivery node of the container and the receiving node of the next container, which can be obtained according to the scheduling scheme.

    G2 represents the crossing path layer, which is a collection of nodes located at the intersection of two roads in the transportation area, where AGVs can go straight, turn right, or turn left.

    G3 represents the sub-path layer, a collection of paths consisting of adjacent rectangular areas. The starting and ending nodes of each path belong to G2, and there is only a one-way path between nodes in G3.

    The Q-Learning algorithm selects the most feasible path according to the current state, so it is suitable for solving the one-way shortest path problem between the nodes of G3 in a real-time environment, but it is less versatile for the nodes of G2 and cannot get the optimal solution every time. The Dijkstra algorithm is a kind of breadth-first search which traverses all nodes, with high complexity, and is more suitable for the environment with fewer nodes such as G2. Therefore, the HDQL algorithm is developed to solve the shortest path between G1, G2, and G3 layer nodes in the real-time environment, and its pseudocode is as follows:

    Algorithm 1 HDQL Algorithm Procedure HDQL (r, SG1, SG2, SG3, Plan_scheduling, Path_A);For n = 1: N Initialize PathG3, WG2, i←1; j←1 While i < |SG3|While j < |SG3| and[PathG3,WG2,QIte(s,a)]←Q-Learning(α,γ,r,S G2(i),S G2(j),Ite)j ≠i j = j + 1;End while i = i + 1;End while;S G1(sstart,send)←Plan_scheduling(n)Initialize , , , ;s1 ?S G2 s1 ←sstart s2 ←send Path(n)1 ←[] Path(n)2 ←[]While QIte(s1,a1)Choose a1 from s1 with the maximum value;Path(n)1 ←[Path(n)1,a1];End while While s2 ?S G2 QIte(a2,s2)Choose a2 from s2 with the maximum value;Path(n)2 ←[a2,Path(n)2];End while PathG2 ←Dijkstra(S G2,WG2,s1,s2);Path_a ←[Path_A(a),Path(n)1,PathG2,Path(n)2];For t = 1: T Path_a(t)=Path_A(t)If Update according to CPA policy;r(Path_a(t))=-inf PathCPW ← Path_a;Update according to CPW policy;PathCPW ← Path_a End Path_a ←min(PathCPW,PathCPA);Path_A(a)←Path_a;End End

    As we all know, the Q-Learning algorithm is a kind of machine learning algorithm, which selects the action with the highest expected reward value in the current state through the perception of the environment. In the beginning, we need to construct a reward matrixrto represent the action reward value from current statesto next states′. In the learning process, the agent does not know the overall environment and only knows which actions can be selected in the current state,so the Q-table that guides the agent's actions is calculated according to the reward matrixr. Finally, the agent selects the action that can obtain the greatest profit according to the Qtable. The Q values in the Q-table were updated by using the time difference method [39], as shown in constraint (30)

    wheregrepresents the iteration index,Gis the maximum iteration,sands′are the current and next-generation small rectangular areas accessible to the agent, respectively,aanda′are the selectable areas of the current and next-generation agents,respectively.ris the reward value obtained according to the action of the agent, which is equal to the distance between adjacent passable areas and infinite for unavailable nodes. α is the learning rate, and γ is the discount factor. The pseudocode is shown in Algorithm 2.

    Fig. 5. Layout of transportation route for AGVs to pick up and deliver containers.

    Algorithm 2 Q-Learning Algorithm Procedure Q-Learning ( , , r, ,G)Qg(s,a) g ←1 Initialize , ;α γ send Repeat Initialize s;Repeat Qg(s,a)Choose a from s with the maximum value;s′Take action a and observe the next area and the reward r;Qg+1(s,a)Updating in the Q-table with constraints (24);s ←s′;Until g ←g+1 s=send;Until End procedure g=G

    The Dijkstra algorithm can effectively solve the shortest path problem of the weighted directed graph. SetD=(V,A),whereVrepresents the set of nodes including the starting node, the ending node, and the crossing nodes, andArepresents the arc between the nodes. The distance between nodes is equal to the weight of arcW, which can be updated using the Q-Learning algorithm. Whenr(i,j)=-inf, nodejin G3 is not accessible, and the arc weight of the G2 layer node connected to it is infinite. If the AGV is predicted to collide with the previous AGV when passing through the nodes of the G2 layer, there are two ways to avoid conflict. If the CPA strategy is adopted, the conflicting node will not accessible to the current AGV, and then the path between the previous node and the target node will be re-planned. If the CPW strategy is adopted, the weight of the arc is not changed, but the time of passing nodes increases.

    The process of the Dijkstra algorithm as follows: Adding nodes in turn from the starting node, and update each shortest path length for each node added until all nodes in setVhave been accessed. The pseudocode is shown in Algorithm 3.

    Algorithm 3 Dijkstra Algorithm.Procedure Dijkstra ( , , , )S ←{VS tarting node}DW VS tarting nodeVEnding node Initialize ;While VEnding node ?S Update based on the real-time operating environment;v ?S WA W Select a node with the minimum , in which A is the arc from S to v;S ←{S,v};End while End procedure

    V. RESULTS AND DISCUSSION

    A. Parameters Setting

    This section presents the computational experiments based on Qingdao Automated Container Terminal. The transportation area in ACT is divided into small rectangles with a length of 4 m according to the forward direction of the AGV, as shown in Fig. 5. There is an ultra-Panamax vessel with a length of 335 m and a width of 42.5 m that can hold 5000 to 8000 containers berthing at the ACT for loading and unloading. We configure 5 double-trolley QCs and 9 YCs located in different blocks to provide loading and unloading services for the above ship.

    There should be at least one bay (12 m) between two QCs,and the movable range of each QC is set to 48 m. To maintain the stability of the ship, assuming that the QC in the middle during the loading and unloading process starts earlier than the two sides, and the left is earlier than the right, the loading and unloading status (LandU) of all QCs have the following six types. The number of containers to be loaded and unloaded for each QC in every scenario is generated proportionally.

    We make assumptions about the handling efficiency based on real-world instances. As is well known, the ZIM CHICAGO was loaded and unloaded at Qingdao ACT in December 2017, with an average efficiency of 39.6 natural containers per hour. Therefore, it is assumed thatηQC= 90 s/container, whereηQCrepresents the operating efficiency of each QC, which means that the time interval for the AGV to deliver or receive the container under the QC is at least 90 s.

    From the fact that the double 40 ft dual-trolley QC can handle 2 containers per move [40], it can be inferred that it takes 45 s for the gantry trolley to move from the platform to the AGV. After receiving or delivering the container, AGV travels at a constant speed of 4 m/s in the transportation area,which means that it takes 1sfor AGV to pass through a small rectangular area. When the AGV arrives at blocks, it takes 1 minute to receive or deliver the container from the buffer bracket. In addition to the above content, we also need to input the laytimeTf. Under the premise of knowing the ratio of allowable delay time Δ, we assume that the operation efficiency of the QC is consistent andTf=ηQC×Δ×N/Q.

    Regarding the HDQL algorithm, the parameters are set as follows:G= 80,α= 0.6, andγ= 0.9. It is also assumed that the operating cost ω1-ω4of an AGV per hour is set to 60, 45,30, and 20 yuan, respectively. For all experiments, the algorithm is compiled with MATLAB R2016b on a computer with an Intel(R) Core(TM) i7-7700 CPU @ 3.60 GHz and 16 GB of RAM running the Windows 10 professional operating system.

    B. Performance Analysis

    The ACT can operate 24/7 without interruption, and the number of containers that need to be handled varies in different periods. To ensure that the QCs in operation are not delayed, the number of AGVs should be increased or decreased in different periods to adapt to the pace of QCs. In the process of solving dynamic scheduling problems, containers need to be grouped. When the group size is small enough,dynamic scheduling can be approximated by real-time scheduling, but the optimal solution obtained is too shortsighted. When the group size is too large, a plan can not be adjusted in time according to changes in environments.

    In this section, we conduct 27 experiments to evaluate how the above uncertain input variables (the total number of containers to be loaded and unloaded (N×P), the number of AGVs(A), and the size of container groupp(N)) affect scheduling results. Table II shows the results of 27 sets of comparative experiments in which 1200–4800 containers,14–16 AGVs, 30–90 group sizes are considered.

    TABLE II SIZES AND RESULTS OF EXPERIMENTS

    Considering experiments 1–9, we can see that when the number of AGV configurations is 14, the delay time of QC(twK) is more than 40 s and the size of conflict points (δn) is about 60, but when the number of AGVs exceeds 14, there is no QC delay anymore. Similarly, experiments 13–18 and 22–27 show that when the number of containers increases, the delay time of the QC is still very small under the configuration of 15–16 AGVs, which can cover the request of the terminal. The utilization rate of AGV(η) is measured by the proportion of the sum of receiving time, delivering time, empty running time, and transporting time in the total transportation time. Comparing experiments with different container group sizes under the same number of containers and AGVs, we found that there is no inevitable rule between the utilization rate of AGVs and the size of the container group. The size of the container group that maximizes the utilization of AGVs should be obtained according to the simulation of the specific circumstance.

    Fig. 6 shows a half-hour transportation route map of all AGVs in Experiment 5, where theX-axis indicates that the number of small rectangles parallel to the coastline is 81 = 9(length of a block/4 m)×9 (number of YCs). In the same way,theY-axis represents 21 small rectangles along the direction perpendicular to the coastline, and theZ-axis indicates the time when the AGV reaches node (x,y). Taking AGV = 1 as an example, the paths of the first two containers in the twodimensional space are shown in the blue area (red dots) in Fig. 5,and its scheduling and path scheme of transporting all containers in the three-dimensional space is shown in Fig. 7.

    Fig. 6. The route map of all AGVs within half an hour.

    Fig. 7. The totaled route map of AGV1.

    C. Comparison With the Existing Algorithms

    In this section, we designed 27 sets of comparative experiments to measure the computational efficiency of the HDLQ algorithm based on the Dijkstra algorithm and the Q-Learning algorithm, and evaluate the applicability of the algorithm in real-time operations. In the process of path planning, if a node suddenly becomes impassable or a path conflict occurs, it is necessary to re-plan a feasible path for AGV. The HDLQ algorithm, Q-Learning algorithm, Dijkstra algorithm, and the optimal solution by Gurobi software are used to solve the path planning model under the constraints of (24)–(27). Table Ⅲshows the results of the 18 sets of comparative experiments in which 3–9 blocks, 1–3 failed_nodes are considered.

    It can be seen from Table III that in terms of calculation time, the time required to solve the model for each algorithm under the same size of blocks is close; the larger the number of blocks, the longer the calculation takes. The HDLQ algorithm proposed in this paper takes the shortest time, which can save 92.68%, 99.10%, and 99.94% compared to the Q-Learning algorithm, Dijkstra algorithm, and the optimal solution by Gurobi software, respectively. As far as the optimal solution is concerned, the HDLQ algorithm, Dijkstra algorithm, and Gurobi can all obtain the optimal solution, except the QLearning algorithm, as shown in Experiment 10 and Experiment 16. Therefore, it can be concluded that the path planning model proposed in this paper is effective and the HDLQ algorithm has better performance than existing algorithms.

    After the last container in each group is assigned to the AGV, the experimental environment will be updated according to the actual status of the ACT. We designed 9 sets of experiments to further verify the effectiveness of the scheduling and path planning scheme for a group of containers. Table IV shows the results of comparative experiments in which 60–180 group size, 14–16 AGVs are considered. The Dijkstra algorithm and Gurobi are no longer compared because the computation time is too long for the actual operating environment.

    From Table IV, we can see that the objective function value of the HDLQ algorithm is slightly greater than that of QLearning, but the QC waiting time corresponding to the former is much shorter than that of the latter, which shows that the HDLQ algorithm is more in line with the requirements of terminal production operations. The HDLQ algorithm shortens the computer’s running time by more than 90%, which confirms that it has better performance than the Q-Learning algorithm.

    D. Effectiveness of the Proposed Strategy

    The periodic rescheduling strategy [41] is used in this paper to solve the dynamic AGV scheduling. A rule-based heuristic algorithm is adopted to assign AGVs to the containers in the next container group according to the status of the last container in the current container group and the real-time data of ACT. The results are related to the size of the container group and the proportion of loaded containers in each group. When the container group size is set to 1, the periodic rescheduling strategy is equivalent to the real-time scheduling strategy(RTS). RTS is widely adopted in real-world ACTs, which is to select the next container in real-time for the AGV that has completed the delivery state, with the principle of minimizing transportation cost. The results of the RTS are not inferior to that of the scheduling strategy proposed in this paper when the size of the container group is small, because the rule-based heuristic algorithm can only choose the best among the five scheduling principles (LB, EDF, NF, HUF, and SQF). However, when the size of the container group is larger, the strategy proposed in this paper may be better, because the status of subsequent containers is also considered.

    In this section, we designed 40 sets of comparative experiments in which 0–100% proportion of loaded containers ineach group and 30–90 group sizes are considered. Table V and Fig. 8 show the comparison results between the proposed strategy with the real-time scheduling strategy.

    TABLE III SHORTEST TRANSPORT TIME AND CPU TIME UNDER DIFFERENT ALGORITHMS

    TABLE IV AVERAGE TRANSPORTATION COST, QC WAITING TIME, AND CPU TIME UNDER DIFFERENT ALGORITHMS

    From Table V, it can be observed that the cost obtained based on the proposed strategy is mostly lower than RTS, and the highest cost improvement percentage is 84.5%, and the average cost improvement percentages in the experiments of 30, 60 and 90 container groups are 43.8%, 48.7%, and 36.0%,respectively. As can be seen from Fig. 8 where (1–1)–(1–40)on the horizontal axis represent 40 experiments with a container group size of 30 and the container group sizes of Experiments (2–1)–(2–40) and (3–1)–(3–40) are 60 and 90, respectively, where the optimal principle is shown in Fig. 9, the strategy we proposed has a lower cost than RTS in the overall perspective. Therefore, we can conclude that the proposed strategy in this paper can significantly reduce transportation costs.

    Based on the above 40 comparative experiments, we calculated the cost of the five principles used in each experiment and took the average value to analyze the impact of the proportion of loaded containers on the scheduling results. The difference between the average costs under different scheduling principles is shown in Fig. 10.

    When the proportion of loaded containers is 60, 60, and 33,three curves representing the size of different container groups have reached their highest points. For the experiment in whichall QCs are loading or unloading, the difference between the results of the two scheduling principles is small. Therefore,under the condition that the AGVs only serve fixed QCs, both the proposed strategy and RTS can be applied in container terminal. It can be seen from Figs. 8 and 10 that the smaller the container group size, the more sensitive the result is to realtime information, and the greater the fluctuation range of the cost curve. Similarly, the larger the size of the container group, the more attention is paid to the overall transportation environment, resulting in smaller fluctuations in the cost curve and higher fluctuation frequencies.

    TABLE V THE COMPARATIVE RESULTS OF DIFFERENT SCHEDULING STRATEGY AMONG VARIOUS SCENARIOS

    Fig. 8. Comparison results of the proposed strategy and real-time scheduling strategy.

    Fig. 9. The optimal principle selected in the dynamic scheduling process.

    Fig. 10. The average costs under different scheduling strategy.

    The CPA strategy is proposed to reduce the waiting time under the CPW strategy during the AGV transportation process. We designed 12 sets of comparative experiments in which 2400–4200 containers and 14–16 AGVs are considered.Two strategies are compared in terms of total AGVs operating costs, the number of conflict points, and the average for planning conflict-free paths for each container.

    Table VI shows the results obtained from the above two strategies. In experiments of different container sizes, the cost difference based on the two scheduling strategies is very small, and in terms of calculation time, CPA is shorter than CPW in half of all experiments, but the difference was not significant. By comparing the number of conflict points under the two strategies, CPA can effectively reduce the number of AGV path conflicts compared with CPW, with a maximum reduction of 19.3% where 3000 containers and 16 AGVs were set. Therefore, we can conclude that the CPA strategy proposed in this paper can effectively reduce the probability of path conflicts.

    VI. CONCLUSIONS AND FUTURE WORK

    This paper proposes a dynamic scheduling method to find the optimal scheduling scheme and conflict-free paths for AGVs. All containers to be loaded and unloaded are divided into a fixed number of container groups, and the laytime is updated according to the number of remaining containers to be operated. Aiming at the containers in the same group, an optimization model for AGV scheduling and path planning was constructed with consideration of the constraints updated laytime, and a rule-based heuristic and a hybrid algorithm integrating Dijkstra and Q-Learning algorithm are designed to solve it. Numerical experiments show that the proposed algo-rithm can effectively reduce the calculation time. Besides,comparative experiments are designed and verified that the cost of the periodic rescheduling strategy proposed in this paper is lower than that of the real-time scheduling strategy.Also, the conflict avoidance strategy proposed in this paper reduces the number of conflict points without increasing transportation costs and calculation time. The research results can guide terminal operators to schedule and control AGV scientifically and rapidly in uncertain environments caused by path conflicts and failed path nodes.

    TABLE VI RESULTS OF DIFFERENT STRATEGIES TO HANDLE CONFLICTS

    This work can be expanded in many aspects, for only the uncertain factor of path conflicts and failed path nodes are considered in it. In fact, the uncertain factors of equipment failure, QCs and YCs handling efficiency, and unforeseen events affect the operation time of containers, too. In addition,real-time information collection can be considered to design a deep learning algorithm, which can predict and autonomically select the optimal AGV scheduling and path planning scheme.

    国产精品精品国产色婷婷| 亚洲天堂国产精品一区在线| 国产精品人妻久久久久久| 久久国产精品影院| 久久久久久久久大av| 天美传媒精品一区二区| 久久久国产成人精品二区| 老女人水多毛片| 成人高潮视频无遮挡免费网站| 日韩免费av在线播放| 亚州av有码| 亚洲av熟女| 久久国产乱子伦精品免费另类| 他把我摸到了高潮在线观看| 亚洲精品久久国产高清桃花| 在线播放国产精品三级| 成年版毛片免费区| 色综合亚洲欧美另类图片| а√天堂www在线а√下载| xxxwww97欧美| 国产午夜精品论理片| 久久热精品热| a级毛片a级免费在线| 欧美色视频一区免费| 级片在线观看| 身体一侧抽搐| 国产精品三级大全| bbb黄色大片| 成人欧美大片| 大型黄色视频在线免费观看| 亚洲最大成人av| 18禁黄网站禁片午夜丰满| 看免费av毛片| 一进一出抽搐gif免费好疼| 日韩欧美三级三区| 免费观看的影片在线观看| 久久久久精品国产欧美久久久| 国产精品一区二区三区四区免费观看 | 欧美性感艳星| 又爽又黄无遮挡网站| 麻豆一二三区av精品| 99久久久亚洲精品蜜臀av| 男女床上黄色一级片免费看| 欧美日韩福利视频一区二区| 91九色精品人成在线观看| 男人舔奶头视频| 久久久久久国产a免费观看| 亚洲国产色片| 亚洲午夜理论影院| 最好的美女福利视频网| 欧美激情在线99| 老司机福利观看| 人妻制服诱惑在线中文字幕| 91午夜精品亚洲一区二区三区 | 一夜夜www| 中亚洲国语对白在线视频| 2021天堂中文幕一二区在线观| 国产免费av片在线观看野外av| 九色成人免费人妻av| 中文字幕熟女人妻在线| 亚洲成av人片免费观看| 午夜激情欧美在线| 97超级碰碰碰精品色视频在线观看| 精品日产1卡2卡| 国产69精品久久久久777片| 直男gayav资源| 99热精品在线国产| 成人精品一区二区免费| 亚洲av五月六月丁香网| 日韩免费av在线播放| av在线蜜桃| 淫妇啪啪啪对白视频| 99热精品在线国产| 激情在线观看视频在线高清| 伦理电影大哥的女人| 国内少妇人妻偷人精品xxx网站| 每晚都被弄得嗷嗷叫到高潮| 色尼玛亚洲综合影院| 丰满人妻熟妇乱又伦精品不卡| 亚洲美女搞黄在线观看 | 能在线免费观看的黄片| 最近中文字幕高清免费大全6 | av国产免费在线观看| 日韩欧美三级三区| 最近中文字幕高清免费大全6 | 欧美一区二区亚洲| 国产成人影院久久av| 热99re8久久精品国产| 别揉我奶头 嗯啊视频| 色综合婷婷激情| 国产老妇女一区| 日本与韩国留学比较| 久久精品影院6| 亚洲欧美日韩卡通动漫| 中文字幕精品亚洲无线码一区| 日韩欧美国产在线观看| 伦理电影大哥的女人| 国产av在哪里看| 美女黄网站色视频| а√天堂www在线а√下载| 日韩av在线大香蕉| 高清日韩中文字幕在线| 久久久久久久久大av| 免费大片18禁| 成年人黄色毛片网站| 久久久国产成人免费| 人妻久久中文字幕网| 级片在线观看| 在线十欧美十亚洲十日本专区| 国产精品综合久久久久久久免费| 中文字幕av成人在线电影| 国产又黄又爽又无遮挡在线| 亚洲在线观看片| 国产在线男女| 日本成人三级电影网站| 日本与韩国留学比较| 免费高清视频大片| 国产精品久久久久久人妻精品电影| 国产麻豆成人av免费视频| av在线老鸭窝| 波野结衣二区三区在线| 亚洲内射少妇av| 亚洲人成电影免费在线| 好看av亚洲va欧美ⅴa在| 深夜a级毛片| 99国产精品一区二区蜜桃av| 天堂网av新在线| 亚洲专区中文字幕在线| 亚洲aⅴ乱码一区二区在线播放| 国产久久久一区二区三区| 亚洲成人免费电影在线观看| or卡值多少钱| 又爽又黄a免费视频| av在线蜜桃| 我要看日韩黄色一级片| 精品久久久久久久久久久久久| 亚洲成人免费电影在线观看| 偷拍熟女少妇极品色| 国产v大片淫在线免费观看| .国产精品久久| 国产欧美日韩精品亚洲av| 在线免费观看不下载黄p国产 | 变态另类成人亚洲欧美熟女| 成人特级av手机在线观看| 久久久国产成人精品二区| 国产白丝娇喘喷水9色精品| 国产私拍福利视频在线观看| 亚洲精品影视一区二区三区av| 一本久久中文字幕| 精华霜和精华液先用哪个| 欧美黑人欧美精品刺激| 久久久久国内视频| 婷婷丁香在线五月| 日日摸夜夜添夜夜添av毛片 | 九九在线视频观看精品| 成人三级黄色视频| 久久久久久久午夜电影| 一本一本综合久久| 级片在线观看| 天天一区二区日本电影三级| 国产高清视频在线播放一区| 精品久久久久久久久av| 精品久久久久久久末码| 观看免费一级毛片| 成年女人看的毛片在线观看| 精品午夜福利在线看| 欧美日韩福利视频一区二区| 免费观看精品视频网站| 精品不卡国产一区二区三区| 一区福利在线观看| 国内毛片毛片毛片毛片毛片| 欧美色欧美亚洲另类二区| 波多野结衣巨乳人妻| 午夜免费成人在线视频| 亚洲国产欧美人成| 久9热在线精品视频| 国产色爽女视频免费观看| 精品福利观看| 精品人妻视频免费看| 一个人免费在线观看的高清视频| 日韩 亚洲 欧美在线| 十八禁国产超污无遮挡网站| 亚洲色图av天堂| 欧美bdsm另类| 美女xxoo啪啪120秒动态图 | 亚洲一区二区三区色噜噜| 久久亚洲精品不卡| 两个人视频免费观看高清| 国产视频内射| 99精品在免费线老司机午夜| 在线a可以看的网站| 日本 av在线| 一夜夜www| 首页视频小说图片口味搜索| 小蜜桃在线观看免费完整版高清| 99久久久亚洲精品蜜臀av| 有码 亚洲区| 色视频www国产| 国产精品99久久久久久久久| 国产真实伦视频高清在线观看 | 一个人观看的视频www高清免费观看| 亚洲av电影不卡..在线观看| 欧美绝顶高潮抽搐喷水| 亚洲精品一区av在线观看| 亚洲av美国av| 免费大片18禁| 嫩草影院入口| 99久久精品热视频| 国产一区二区三区在线臀色熟女| 国产精华一区二区三区| 欧美另类亚洲清纯唯美| 日日夜夜操网爽| 亚洲第一区二区三区不卡| 久久中文看片网| 久久久久九九精品影院| 乱码一卡2卡4卡精品| 中文亚洲av片在线观看爽| 久久久成人免费电影| 久久亚洲真实| 高清在线国产一区| 免费av不卡在线播放| 免费av毛片视频| 久久久久九九精品影院| 国产色爽女视频免费观看| 日本黄色视频三级网站网址| 免费电影在线观看免费观看| 久久性视频一级片| 午夜免费男女啪啪视频观看 | 午夜福利在线观看免费完整高清在 | 色综合婷婷激情| 国产黄片美女视频| 国产黄片美女视频| 3wmmmm亚洲av在线观看| 国产精品精品国产色婷婷| 热99re8久久精品国产| 99久久99久久久精品蜜桃| 国产三级在线视频| 听说在线观看完整版免费高清| 美女高潮的动态| 老司机深夜福利视频在线观看| 久久久久久九九精品二区国产| 国产激情偷乱视频一区二区| 成人国产一区最新在线观看| 九色成人免费人妻av| 无人区码免费观看不卡| 韩国av一区二区三区四区| 欧美+亚洲+日韩+国产| 搡老妇女老女人老熟妇| 在线播放国产精品三级| 欧美不卡视频在线免费观看| 国内揄拍国产精品人妻在线| 观看美女的网站| 亚洲人成电影免费在线| 亚洲av中文字字幕乱码综合| 又粗又爽又猛毛片免费看| 淫秽高清视频在线观看| 亚洲精品456在线播放app | 小蜜桃在线观看免费完整版高清| 日韩欧美一区二区三区在线观看| 蜜桃亚洲精品一区二区三区| 99国产极品粉嫩在线观看| 亚洲五月婷婷丁香| 在线a可以看的网站| 国产精品女同一区二区软件 | 精品一区二区三区人妻视频| 一区二区三区免费毛片| 国产精品一区二区三区四区免费观看 | 久久精品91蜜桃| 日本a在线网址| 免费一级毛片在线播放高清视频| 久久婷婷人人爽人人干人人爱| 国产亚洲欧美98| 我的老师免费观看完整版| 天天躁日日操中文字幕| 亚洲最大成人中文| 欧美一区二区亚洲| 91在线观看av| 国产av不卡久久| 直男gayav资源| 深夜a级毛片| 国产成人aa在线观看| 又紧又爽又黄一区二区| 成人午夜高清在线视频| 伊人久久精品亚洲午夜| 亚洲无线在线观看| 免费一级毛片在线播放高清视频| 亚洲熟妇熟女久久| 日韩大尺度精品在线看网址| 国产成年人精品一区二区| 国产成人啪精品午夜网站| 久久人人精品亚洲av| 欧美色视频一区免费| 日本成人三级电影网站| 色精品久久人妻99蜜桃| 亚洲欧美日韩东京热| 久久久久久久午夜电影| 国产精品久久久久久久久免 | 国产成人av教育| 高潮久久久久久久久久久不卡| 1000部很黄的大片| 舔av片在线| 国产成人啪精品午夜网站| 不卡一级毛片| 欧美性猛交╳xxx乱大交人| 亚洲人成网站在线播| 每晚都被弄得嗷嗷叫到高潮| 在线观看美女被高潮喷水网站 | 成年女人看的毛片在线观看| 嫁个100分男人电影在线观看| 网址你懂的国产日韩在线| 日韩欧美免费精品| 欧美激情国产日韩精品一区| 日本免费a在线| 窝窝影院91人妻| 亚洲av免费在线观看| 91麻豆av在线| 亚洲成人久久性| 日本免费a在线| 欧美一级a爱片免费观看看| 欧美+亚洲+日韩+国产| 亚洲精品影视一区二区三区av| 欧美高清成人免费视频www| 国产成人福利小说| 成人美女网站在线观看视频| 九九久久精品国产亚洲av麻豆| 国产v大片淫在线免费观看| 99国产极品粉嫩在线观看| 日韩有码中文字幕| 在线观看av片永久免费下载| 简卡轻食公司| 国产乱人视频| 一进一出抽搐动态| 亚洲av成人不卡在线观看播放网| 美女 人体艺术 gogo| 国产精品一区二区性色av| 一本久久中文字幕| 午夜福利在线观看免费完整高清在 | 午夜免费男女啪啪视频观看 | 美女黄网站色视频| 亚洲第一电影网av| 国产精品av视频在线免费观看| 如何舔出高潮| 少妇人妻一区二区三区视频| 国产精品亚洲av一区麻豆| 神马国产精品三级电影在线观看| 午夜激情福利司机影院| 欧美又色又爽又黄视频| 欧美色欧美亚洲另类二区| 亚洲精品亚洲一区二区| 久99久视频精品免费| 我的老师免费观看完整版| 欧美成狂野欧美在线观看| 亚洲中文字幕日韩| 男人和女人高潮做爰伦理| 精品一区二区三区视频在线观看免费| 真人一进一出gif抽搐免费| 亚洲国产高清在线一区二区三| 欧美成人a在线观看| 黄色配什么色好看| 99久久无色码亚洲精品果冻| 婷婷亚洲欧美| 国产精品久久视频播放| 中文亚洲av片在线观看爽| a在线观看视频网站| .国产精品久久| 最近最新免费中文字幕在线| 又紧又爽又黄一区二区| 免费观看的影片在线观看| 一区二区三区激情视频| 精品一区二区三区视频在线| 久久精品人妻少妇| 99久久精品国产亚洲精品| 日本五十路高清| 中文字幕精品亚洲无线码一区| 又粗又爽又猛毛片免费看| 无人区码免费观看不卡| 亚洲乱码一区二区免费版| 久久久久性生活片| 午夜福利18| 桃色一区二区三区在线观看| 精华霜和精华液先用哪个| 欧美成人免费av一区二区三区| 国产真实伦视频高清在线观看 | 亚洲欧美日韩东京热| а√天堂www在线а√下载| 757午夜福利合集在线观看| 久久6这里有精品| 国产毛片a区久久久久| 亚洲国产精品成人综合色| 黄色一级大片看看| 久久天躁狠狠躁夜夜2o2o| 久久国产精品影院| 久久午夜亚洲精品久久| 久久热精品热| 桃色一区二区三区在线观看| 国产一区二区在线观看日韩| 丰满人妻熟妇乱又伦精品不卡| 丰满的人妻完整版| 亚洲人成网站高清观看| 长腿黑丝高跟| 人人妻人人看人人澡| 一个人免费在线观看电影| 亚洲午夜理论影院| 亚洲七黄色美女视频| 国产精品国产高清国产av| 亚洲五月天丁香| 波野结衣二区三区在线| 久久性视频一级片| 中文字幕av成人在线电影| 一级黄片播放器| 午夜福利18| 亚洲av不卡在线观看| 婷婷六月久久综合丁香| 淫妇啪啪啪对白视频| 亚洲精品粉嫩美女一区| 亚洲午夜理论影院| 嫩草影院新地址| 国产精品一区二区三区四区免费观看 | www日本黄色视频网| 99热这里只有精品一区| 日韩欧美三级三区| 精品久久久久久久人妻蜜臀av| 听说在线观看完整版免费高清| 一个人看视频在线观看www免费| 18禁黄网站禁片免费观看直播| 精品久久久久久成人av| 亚洲,欧美精品.| 国产精品电影一区二区三区| 99国产综合亚洲精品| 内射极品少妇av片p| 69av精品久久久久久| 日本成人三级电影网站| 麻豆成人午夜福利视频| 午夜影院日韩av| 欧美日韩亚洲国产一区二区在线观看| 宅男免费午夜| 国产在线男女| 日日干狠狠操夜夜爽| 国产乱人伦免费视频| 久久性视频一级片| 波多野结衣高清无吗| 免费看日本二区| 男人舔女人下体高潮全视频| 国产大屁股一区二区在线视频| 长腿黑丝高跟| 国产伦在线观看视频一区| 91久久精品国产一区二区成人| 伦理电影大哥的女人| 一本久久中文字幕| 亚洲av成人不卡在线观看播放网| 蜜桃亚洲精品一区二区三区| 国产91精品成人一区二区三区| 免费在线观看日本一区| 亚洲av一区综合| 熟妇人妻久久中文字幕3abv| 极品教师在线免费播放| 精品熟女少妇八av免费久了| 国产久久久一区二区三区| 每晚都被弄得嗷嗷叫到高潮| 男插女下体视频免费在线播放| 国内精品一区二区在线观看| 深爱激情五月婷婷| 国产伦精品一区二区三区四那| 97超视频在线观看视频| 99国产综合亚洲精品| 亚洲一区高清亚洲精品| 国产午夜福利久久久久久| 欧美xxxx黑人xx丫x性爽| 亚洲va日本ⅴa欧美va伊人久久| 热99在线观看视频| 亚洲欧美激情综合另类| 波多野结衣高清无吗| 国产麻豆成人av免费视频| 人妻夜夜爽99麻豆av| 男人和女人高潮做爰伦理| 国产老妇女一区| 毛片一级片免费看久久久久 | 亚洲国产色片| 1000部很黄的大片| 久久午夜亚洲精品久久| 欧美三级亚洲精品| 一个人免费在线观看的高清视频| 99久久精品一区二区三区| 国产精品一区二区三区四区久久| 久久人妻av系列| 精品人妻视频免费看| 国产亚洲欧美98| 国产精品影院久久| 三级毛片av免费| 亚洲精品在线美女| 国产成人影院久久av| 在线天堂最新版资源| 69av精品久久久久久| 伦理电影大哥的女人| 夜夜爽天天搞| 欧美最新免费一区二区三区 | 午夜激情福利司机影院| 一进一出抽搐gif免费好疼| 一边摸一边抽搐一进一小说| av天堂中文字幕网| 色播亚洲综合网| 在线十欧美十亚洲十日本专区| 观看美女的网站| 成人永久免费在线观看视频| 嫩草影院精品99| 中文资源天堂在线| 舔av片在线| 亚洲无线观看免费| 久久久精品欧美日韩精品| 99热精品在线国产| 久久人人爽人人爽人人片va | 天天一区二区日本电影三级| 观看美女的网站| 中文资源天堂在线| 极品教师在线免费播放| 国产午夜精品论理片| 免费看美女性在线毛片视频| 韩国av一区二区三区四区| or卡值多少钱| 丁香六月欧美| 精品久久国产蜜桃| 国产综合懂色| 他把我摸到了高潮在线观看| 欧美高清性xxxxhd video| 婷婷色综合大香蕉| 最新在线观看一区二区三区| 国产真实伦视频高清在线观看 | 亚洲男人的天堂狠狠| 欧美在线黄色| 校园春色视频在线观看| 久久精品久久久久久噜噜老黄 | 久久久久久久午夜电影| a级一级毛片免费在线观看| 十八禁网站免费在线| 夜夜躁狠狠躁天天躁| 欧美精品国产亚洲| 精品久久久久久久久久免费视频| 欧美黑人欧美精品刺激| 久久久精品大字幕| 一二三四社区在线视频社区8| 99热这里只有是精品50| 97超视频在线观看视频| 久久久久久久亚洲中文字幕 | 观看免费一级毛片| www.色视频.com| 又爽又黄a免费视频| 美女黄网站色视频| 欧美一级a爱片免费观看看| 精品久久久久久久久av| 麻豆一二三区av精品| 淫秽高清视频在线观看| 9191精品国产免费久久| 少妇裸体淫交视频免费看高清| 欧美精品啪啪一区二区三区| av国产免费在线观看| 亚洲人与动物交配视频| 精品人妻偷拍中文字幕| bbb黄色大片| 国产野战对白在线观看| 99久国产av精品| 欧美日韩福利视频一区二区| 成人特级黄色片久久久久久久| 欧美乱妇无乱码| ponron亚洲| 日本撒尿小便嘘嘘汇集6| 丁香欧美五月| 亚洲第一欧美日韩一区二区三区| 搡女人真爽免费视频火全软件 | 亚洲精品亚洲一区二区| 免费在线观看成人毛片| 自拍偷自拍亚洲精品老妇| 色综合欧美亚洲国产小说| 亚洲美女视频黄频| 尤物成人国产欧美一区二区三区| 久久精品国产清高在天天线| 真实男女啪啪啪动态图| 男女床上黄色一级片免费看| 国产精品野战在线观看| 舔av片在线| 欧美精品啪啪一区二区三区| 男女视频在线观看网站免费| 亚洲色图av天堂| 一区二区三区免费毛片| 精品一区二区三区视频在线观看免费| 99在线视频只有这里精品首页| 亚洲专区中文字幕在线| 国产亚洲欧美98| 婷婷色综合大香蕉| 高清在线国产一区| 美女黄网站色视频| 欧美最黄视频在线播放免费| 亚洲av日韩精品久久久久久密| 99久久99久久久精品蜜桃| av视频在线观看入口| 欧美日韩综合久久久久久 | 色综合亚洲欧美另类图片| 国产精品一区二区免费欧美| 深夜精品福利| 在线国产一区二区在线| 一个人免费在线观看电影| 国产乱人伦免费视频| 久久性视频一级片| 精品人妻偷拍中文字幕| 欧美黄色淫秽网站| 国产免费av片在线观看野外av| 欧美一级a爱片免费观看看| 久久久久久大精品| 天天一区二区日本电影三级| 亚洲精品久久国产高清桃花| 日韩欧美 国产精品| 久久久久性生活片| 午夜a级毛片| 啦啦啦观看免费观看视频高清| 欧美性猛交黑人性爽| 人妻制服诱惑在线中文字幕|