    0 Introduction

    China is a vast country with complex geological conditions. With the dramatic development of railway engineering, some slope engineering built by filling and excavation engineering inevitably reaches tens of meters in height[1-5]. Due to the complexity and uncertainty of geological and meteorological conditions, massive diseases, such as sliding collapse and poor drainage conditions, occur on the existing slopes under natural variability and anthropic effects. Such diseases can lead to increasingly poor slope stability and railway operation safety. Therefore, reinforcement measures must be taken for some existing slopes[6-8].

    One of the effective methods of increasing the stability of slopes is to improve their drainage condition[9]. At present, the most common drainage methods adopted in slope engineering are polyvinyl chloride (PVC) pipes with drilled holes, gutters, underdrains, etc. Although these measures are simple and economical in construction, they are prone to clogging-induced function loss in service[10-11]. For this reason, a new drainage structure named drainage nail, which is a PVC pipe wrapped with a capillary permeable drainage belt, was proposed. Its construction method is similar to that of the soil nail, whereas its function is to drain water inside the slope[12]. The drainage nail is composed of drainage nail segments and connectors.

    Fig. 1a shows the drainage nail segment, which is a hollow PVC pipe wrapped with a capillary permeable drainage belt, and its function is to collect, drain, and filter water. One end of the drainage nail is blocked with a plug to avoid clogging caused by surrounding soil particles. The connector is used to connect two drainage nail segments. The structure and drainage path of the drainage nail are illustrated in Fig. 1b. Drainage nails, with the advantages of simple construction, high drainage efficiency, and excellent anti-clogging performance, have been applied to treat existing railway slope diseases[13].

    Fig. 1 Drainage nail structure

    Considering the practical difficulties in the reinforcement and protection construction on the high and steep slopes of railways, such as the narrow construction site and cumbersome construction equipment movement, the traditional drilling rig and drilling rig platform are improved according to the installation and construction process of drainage nails, and a new drilling rig and drilling rig platform are developed. The specific structures of the developed drilling rig and construction platform are presented, and they have broad application prospects. Then, general provisions and preparations for drainage nail construction are described. A process of drainage nail construction is formulated, and the corresponding construction steps and operation requirements are also put forward. This study can provide a reference for the application of the developed drilling rig, drilling rig platform, and drainage nail.

    1 Difficulties in existing high and steep slope reinforcement construction

    Scaffolds need to be erected during high and steep slope reinforcement, and this scaffold erection practice is more complex than those in other construction processes. Specifically, the whole scaffold should be adjusted according to the slope shape, angle, and flatness during high and steep slope reinforcement construction. Before the scaffold erection, the bottom construction platform should be cleaned and established. The construction platform should be as flat as possible with a width of more than 4.5 m. It should also be inclined to the slope toe, with a slope angle not exceeding 3°~5° if the ground is hard and inclined outward. Protective fences shall be installed along the construction platform. The construction platform for scaffold erection is required to withstand the vibration force, pullout force, gravity, and wind force during construction, and deformation and settlement are not allowed. The height of the platform should coincide with the equipment height, inclination angle, and position of the hole to be drilled. The scaffold should be erected to a preset height to provide the platform required for drilling construction.

    The traditional scaffold construction method for slope reinforcement is demonstrated in Fig. 2. In addition to a complicated construction process, this method also has the main disadvantages of difficult construction equipment movement on the scaffold, complex loading-unloading process, long disassembly time, and resulting long construction period[14]. In this case, a new method must be proposed to reduce production costs and speed up construction to a certain extent.

    Fig. 2 Traditional scaffold construction method

    2 Platform development for drilling construction on high and steep slopes of existing railways

    The existing railways are characterized by high traffic density, short construction time, and limited construction space. The traditional construction method is to set up a platform using scaffold rods, then fix the platform on the slope by an anchor, and finally install the heavy drilling rig onto the platform. After a hole is drilled, the drilling rig is dismantled and then manually moved to the next hole for installation and fixation. The above construction process must consider both the bearing capacity and stability of the construction platform and the position accuracy of the hole drilled. This construction method has the disadvantages of difficult construction, large construction quantity, long construction period, and high production cost. Moreover, a lot of labor is required in the implementation of the construction operation, and their safety is not completely guaranteed.

    According to the process of drainage nail construction, the drilling rig and drilling rig platform are specially designed to overcome the difficulties in the traditional construction method. Specifically, a movable drilling rig platform for drilling holes on high and steep slopes of existing railways for drainage nails is designed, and it offers reduced labor intensity, improved construction efficiency, and increased safety during construction. As shown in Fig. 3, the movable platform for drainage nail construction is composed of three parts, including a hanging basket system, a drilling rig installation system, and a moving and positioning system. The hanging basket system consists of a basket base plate, fences, support rods, and position limiting devices. The drilling rig installation system consists of a drilling rig slipway, an inclination angle adjuster for the drilling rig, and connecting joints, and the moving and positioning system is composed of a wire rope, an adjusting hoist, omni-directional wheels, connecting devices, etc.

    Fig. 3 Structure of the movable drilling rig platform for drainage nail construction

    Besides, the drilling rig is improved to avoid the inconvenience caused by the large size of the traditional drilling rig and the construction of the anchor. The details are as follows: The drilling rig used to drill holes for the drainage nails is composed of a carriage assembly, a scaffold, a console assembly, a power assembly, a cylinder assembly, etc. The size of the slide scaffold and the lengths of the cylinder and the drill rod are improved. The improved slide scaffold is shown in Fig. 4, and the four improved parts of the drilling rig are mainly as follows:

    1) The size of the scaffold is reduced from 2 700 mm×400 mm×550 mm to 1 400 mm×400 mm×550 mm to avoid the impact of a rig fuselage too long or too close to the rail.

    2) The length of the drill rod is shortened from 1 000 mm to 500 mm to facilitate the addition and subtraction of the drill rod on a narrow platform at both sides of the railway.

    3) The length of the cylinder is reduced from 1 000 mm to 650 mm to match the drill rod length of 500 mm.

    4) The scaffold is redesigned according to the characteristic of the construction of railway slope reinforcement. The new scaffold is composed of nine lapped steel pipes, including two longitudinal ones on the horizontal plane and five transverse ones and two vertical ones on the vertical plane. The inclination angle of the carriage can be adjusted by changing the positions where the vertical steel pipes connect with the transverse ones of the scaffold, and the angle of the drilled hole can also be adjusted as mentioned above.

    3 Construction technology and method for drainage nails

    On the basis of the improved drilling rig and drilling rig platform mentioned above, general provisions on drainage nail construction are proposed, and technical preparations, machine preparations, and working conditions required for drainage nail construction are described as well. A process of drainage nail construction on high and steep slopes is formulated, and the corresponding construction steps and operation requirements are put forward in detail.

    3.1 General provisions on drainage nail construction

    1) If an unstable situation occurs with the retaining structures, such as retaining walls or slopes, it must be reported to the departments concerned in time. Then, the loading exerted by the upper part of the slope can be reduced by cutting the slope, but the lower part of the slope should not be disturbed as much as possible.

    2) The fissures on the sliding surface at the top of the slope should be backfilled with raw soil mixed with bentonite.

    3) The pneumatic down-the-hole (DTH) hammer without water could be used to drill the hole for the PVC pipe, but the pneumatic DTH hammer with water is strictly prohibited. Skilled workers should be assigned to ensure the drilling quality.

    4) The construction of drainage nails and anchor rods should be carried out row by row and from top to bottom. The construction sequence should be determined according to the in-situ conditions on the principle of avoiding mutual influence as much as possible.

    5) After the process of hole drilling for drainage nails is completed, the holes should be cleaned in time and the drainage nails should be installed immediately to prevent secondary drilling caused by hole collapse. After the drainage nails are installed, their pipe orifice should be protected in time to prevent clogging. During construction, the drainage nail segments and other materials should be protected to prevent material damage from affecting the drainage performance. Drainage nails should be carefully installed to avoid poor drainage performance caused by improper operation and installation. The water temporarily discharged during construction should also be drained to prevent the performance of the railway from being affected by water scouring.

    6) The construction of drainage nails and the drainage pipe network should be completed before the slope protection, such as arch support, on the slope surface is constructed. Special attention should be paid to preventing damages to the drainage nails and the drainage pipe network during the subsequent construction of the support structure. The outlets of the drainage pipe network should be as consistent as possible with the drainage spacings on the slope of the supporting structure.

    7) All the outlets of the drainage pipe network shall allow the collected seepage water to be effectively drained into the railway side ditches. If the drainage capacity of the side ditches cannot meet the requirements, the drainage ditches shall be expanded.

    8) Clay or sealing materials should be used to block the gap between the drilled hole and the drainage nail for 60 cm near the outlet of the drainage nail. The slope or wall below the outlet of the drainage nail should be reinforced to withstand scouring.

    9) Safety assurance measures should be taken during construction.①I(mǎi)n the case of geophysical prospecting operations near the existing railways, the provisions in theSafetyRegulationsforConstructionSafetyofRailwayEngineering[15]should be strictly implemented.② Prospecting operations near existing railway lines are geological engineering operations in dangerous areas. Geophysical exploration operators (including surveying and mapping staff) approaching an existing railway line should carry out their engineering work in strict accordance with the railway survey and construction operation regulations and strictly obey the command of the on-site safety officers.

    3.2 Construction preparation

    3.2.1Technical preparations

    1) The design drawings should be carefully consulted, and the requirements of relevant technical construction specifications need to be well acquainted. Then, the construction organization design should be prepared according to the in-situ conditions, and technical disclosure and safety disclosure must be declared to the construction team. Finally, the application for the commencement of sub-divisional works should be prepared and submitted to the departments and leaders concerned for approval.

    2) A supervision and protection scheme for the railway route and traffic safety should be specially formulated where the construction is adjacent to the railway route, and the scheme should be incorporated into the construction organization design. Also, special meetings should be held to publicize and assess the team members.

    3) Before the construction begins, the construction machines and tools should be reasonably configured according to the arrangement of the construction site and time, and this measure should be taken in a way that the construction would not affect or interrupt the railway operation as much as possible. In-situ construction conditions can be analyzed to determine whether to limit the speed of running trains or to clearly define the speed limit range. The above-mentioned measures shall also be reported to the relevant department for approval. The construction can be carried out only after the approval from the relevant department and the permission and implementation from the officers of the railway construction section are obtained.

    4) The safety care during the construction should be undertaken by the special personnel designated by the railway transportation management department.

    5) Construction lofting should be conducted, and the position of the drainage nail center should be determined and marked.

    3.2.2Construction machine preparations

    1) The drilling rig equipment consists of a pneumatic DTH hammer drill, a drilling bench, an air compressor, a ladder, and a winch. The installation of the drilling rig and corresponding preparations are as follows:①After the drilling rig is transported to the construction site, whether the parts and components of the drilling rig are damaged should be checked, and the drilling rig could be assembled and refueled after a confirmation that no damage has occurred is made.②The two front legs of the slide frame are in the operating position, and the support rod is adjusted to the extent that the slide frame reaches the specified angle.③The power supply should be turned off when the motor cable is connected. In principle, the motor cable should be connected before the main power supply is connected. Then, the motor should be tested to check whether its rotation direction is consistent with the controller’s. If not, the motor should be turned off immediately to reverse its rotation direction.④Whether all the bolts are connected firmly and reliably and whether all the pipes are connected firmly should be checked. Air leakage, oil leakage, and other abnormal phenomena are never allowed.⑤An appropriate amount of No.32 engine oil should be refueled in oil mist.⑥All the handles of the pneumatic control valve must be set to the “stop” position.⑦ No-load tests can be carried out after the above preparations are completed.

    2) The processing and installation equipment for drainage nail construction includes a cutting machine, an electric screwdriver, and a jack.

    3) The power and electrical equipment consists of a transformer, a generator, an air compressor, low-voltage switchgear, lighting equipment required for night construction, etc.

    4) The safety equipment contains a series of safety equipment, helmets, face masks, etc., and the equipment should be suitable for railway construction.

    3.2.3Working conditions

    As for the construction near a railway line, special consideration should be given to whether the construction machines and tools meet the requirements of railway operation safety. If the requirements are not met, the construction machines and tools need to be improved or replaced.

    1) Concerning the construction near the railway route, due consideration should be given to whether the installation length of the drainage nail segments can meet the operation safety requirements. If not, the length of the drainage nail segments should be reduced.

    2) The steel-stranded wire should be used as the anchor to ensure that the safety line of the railway would not be intruded during the anchor construction for slope reinforcement.

    3) After the scaffold is erected, slope or wall surface cleaning is required. The position of the hole to be drilled should be marked and rechecked after it is determined according to the design drawings, and its deviation should not exceed 5 cm. Then, the drilling rig can be moved to the construction face.

    4) The construction workers should have passed the professional training and taken part in the training on the technical quality and safety disclosure during drilling and drainage nail construction.

    Fig. 5 Process of drainage nail construction

    5) The tests for drainage nail construction are as follows: Before the formal construction, drainage nail processing tests shall be carried out to determine the machines, tools, and various technical parameters, and the quality of drainage nail construction should also be tested. The number of tested nails should not be less than 3.

    3.3 Process of drainage nail construction

    The process of drainage nail construction is shown in Fig. 5.

    3.4 Steps of drainage nail construction and operation requirements

    During the slope reinforcement construction near an existing railway, special attention should be paid not to damage the railway, the power supply system, and other equipment of the railway. The construction must be carried out under the supervision of the railway department. The detailed steps of drainage nail construction are as follows.

    1) Arrange and repair the existing drainage system on the ground.

    2) Clean the slope surface, loft the elevation, and mark the position of the hole to be drilled.

    3) Prepare the drilling rig platform.

    4) Drill holes for drainage nails, and the drilling can be divided into the following steps:① Drill holes for drainage nails.The workers should raise the decelerator to the upper limit position and tighten the drill rod first, turn on the motor, and slowly turn on the propelling cylinder until the no-load test is normal. Next, the drill bit shall be placed on the working face, and the propelling cylinder should be turned off. Then the drill bit could be turned on to drill slowly, and the drill bit can be impacted at full throttle until the drill bit reaches about 100 mm in depth. During drilling construction, the cylinder should be slowly switched on and off according to the speed of footage to keep the drilling bit at a certain propulsive force. Meanwhile, whether the oil atomizer supplies oil should be observed so that the oil supply quantity could be appropriately adjusted.② Extend drill rod.After the first drill rod has been constructed, the drill bit could be turned off. The reducer should be set at a lower limit position, and the drill rod in the drill support should be fixed with a fork. The decelerator should be reversed to disconnect the joint between the drill rod and the decelerator. Then, the decelerator should be raised to the upper limit position, and the second drill rod should be connected with the first one.③ Remove the drill rod.When the drill rod support is in contact with the tool unloader, the drilling construction could be stopped, and a professional round rod shall be inserted into the hole on the outside of the tool unloader. The second flat trough at the end of the drill rod could be aligned with the upper part of the tool unloader by rotating the tool unloader. The joint on the reducer could be separated from the drill rod by inserting the fork and reversing the motor. The first flat trough at the end of the drill rod should be adjusted to be aligned with the rectangular groove of the tool unloader. Another fork would be inserted, and the fork in the tool unloader should be taken out. Then, the drill rod is driven backward by the rod unloader and another fork. When the second flat groove at the end of the next drill rod is aligned with the upper part of the drill rod support, the fork could be inserted, and the motor would reverse. The last drill rod could be taken away when the connecting threads of the upper and lower drill rods are disconnected. Then, the decelerator could be put down slowly, and the rectangular groove of the rod unloader is aligned with the first flat groove at the end of the next drill rod. The above steps should be repeated to remove all the drill rods in turn.

    5) The diameter of the drilled hole should not exceed the outer diameter of the drainage nail joint by 5~10 mm. The drilled hole should be round and straight, with a depth not less than the sum of the total lengthLof the drainage nail and 50 cm. The difference between the construction and design spacings of each drainage nail should not be more than 10 cm. The deflection length at the bottom of the drilled hole should not be more than 3% of the designed length of the drilled hole, and the depth of the drilled hole should not be less than the designed value.

    6) The drainage nail is installed at the designed depth after the drainage nails are connected by the joints. Meanwhile, a PVC pipe with a length of about 1 m is installed within the outlet of the drain nail. Finally, the sleeve is pulled out.

    7) The exposed PVC pipe of each drainage nail is connected with the water-collecting pipe by the two-way and three-way methods, and drainage is thereby conducted within the slope. Finally, the collected water is led out to the side ditch by the water-collecting pipe. An elbow is installed at the end of the water-collecting pipe to prevent the subgrade from being scoured by water.

    8) Trenches should be excavated on the slope and retaining wall to install water-collecting pipes.

    4 Conclusions

    1) In view of the defects in high and steep slope reinforcement engineering, such as complex construction process, great construction difficulty, and long construction period, the drilling rig and the drilling rig platform are improved. The specific structures of the updated drilling rig and drilling rig platform are expounded. They could effectively overcome the difficulties with traditional construction equipment.

    2) On the basis of the improved drilling rig and drilling rig platform, general provisions on drainage nail construction are proposed, and the technical preparations, machine preparations, and working conditions required for drainage nail construction are described as well. Before the formal construction, a drainage nail processing test must be carried out to determine the technical parameters, and the quality of drainage nail construction should also be tested.

    3) A process of drainage nail construction is formulated, and the corresponding construction steps and operation requirements are put forward for the improved drilling rig and drilling rig platform.

    4) The improved drilling rig and drilling rig platform have broad application prospects. This research provides a new method for drainage nail construction on high and steep slopes and serves as a reference for high and steep slope reinforcement construction.

    猜你喜歡
    中南大學(xué)滄州長(zhǎng)沙
    長(zhǎng)沙之旅
    中國(guó)農(nóng)業(yè)發(fā)展銀行滄州分行
    中南大學(xué)建筑與藝術(shù)學(xué)院作品選登
    中南大學(xué)教授、博士生導(dǎo)師
    安全(2021年4期)2021-05-19 07:56:52
    中國(guó)農(nóng)業(yè)發(fā)展銀行滄州分行
    中南大學(xué)校慶文創(chuàng)產(chǎn)品設(shè)計(jì)
    湖南包裝(2020年6期)2021-01-20 02:02:10
    滄州鴻發(fā)包裝技術(shù)研究所
    我眼中的長(zhǎng)沙
    艾米莉·狄金森的自然:生態(tài)批評(píng)的解讀
    多姿多彩的“長(zhǎng)沙窯”
    大眾考古(2014年10期)2014-06-21 07:12:14
    国产毛片在线视频| 亚洲婷婷狠狠爱综合网| 亚洲精品成人av观看孕妇| 免费黄频网站在线观看国产| av有码第一页| av福利片在线| 校园人妻丝袜中文字幕| 久热久热在线精品观看| 欧美激情国产日韩精品一区| 亚洲真实伦在线观看| 国产国拍精品亚洲av在线观看| 黄色毛片三级朝国网站 | 久久国产精品大桥未久av | 国产乱人偷精品视频| 亚洲国产日韩一区二区| 亚洲精品,欧美精品| 自拍欧美九色日韩亚洲蝌蚪91 | 国产av码专区亚洲av| 日本色播在线视频| 国产高清有码在线观看视频| 亚洲av不卡在线观看| 97在线人人人人妻| 国产精品不卡视频一区二区| 中文字幕人妻丝袜制服| 国产永久视频网站| 男女边吃奶边做爰视频| 欧美精品亚洲一区二区| 在线播放无遮挡| 日韩欧美 国产精品| 久久久久精品久久久久真实原创| 91精品伊人久久大香线蕉| 秋霞在线观看毛片| 色5月婷婷丁香| 精品人妻偷拍中文字幕| 亚洲精品国产色婷婷电影| 国产成人aa在线观看| 国产精品久久久久久精品古装| 精品久久久噜噜| 高清午夜精品一区二区三区| 中文精品一卡2卡3卡4更新| 午夜91福利影院| 国产一级毛片在线| 赤兔流量卡办理| 99精国产麻豆久久婷婷| 国产成人免费观看mmmm| 免费观看的影片在线观看| 18禁动态无遮挡网站| 高清视频免费观看一区二区| 国产精品福利在线免费观看| 亚洲欧美日韩卡通动漫| 在线亚洲精品国产二区图片欧美 | 成人毛片60女人毛片免费| 亚洲一级一片aⅴ在线观看| 久久午夜福利片| 三上悠亚av全集在线观看 | 视频中文字幕在线观看| 欧美日韩亚洲高清精品| 黄色日韩在线| av又黄又爽大尺度在线免费看| 好男人视频免费观看在线| 晚上一个人看的免费电影| 国产精品99久久久久久久久| av福利片在线| 国产成人免费无遮挡视频| 国产精品久久久久久久久免| 欧美97在线视频| 日韩,欧美,国产一区二区三区| 久久久国产精品麻豆| 大陆偷拍与自拍| 欧美日韩一区二区视频在线观看视频在线| 国产黄片美女视频| 亚洲精品aⅴ在线观看| 边亲边吃奶的免费视频| 日韩中字成人| 又大又黄又爽视频免费| 又大又黄又爽视频免费| 午夜久久久在线观看| 国产亚洲午夜精品一区二区久久| 嫩草影院新地址| 亚洲高清免费不卡视频| 国产片特级美女逼逼视频| 日韩一区二区三区影片| av有码第一页| 又粗又硬又长又爽又黄的视频| 日韩欧美精品免费久久| 国产色爽女视频免费观看| 你懂的网址亚洲精品在线观看| 日日撸夜夜添| 欧美日韩av久久| 久久这里有精品视频免费| 天天操日日干夜夜撸| 国产男女内射视频| 亚洲av综合色区一区| 人妻制服诱惑在线中文字幕| 日本wwww免费看| 精品少妇内射三级| 国产免费又黄又爽又色| 亚洲一区二区三区欧美精品| 一区二区三区四区激情视频| 精品亚洲成a人片在线观看| 人体艺术视频欧美日本| √禁漫天堂资源中文www| 国产美女午夜福利| 日韩,欧美,国产一区二区三区| 最新中文字幕久久久久| 女性被躁到高潮视频| 一级毛片aaaaaa免费看小| 国产黄色免费在线视频| 少妇猛男粗大的猛烈进出视频| 高清毛片免费看| 波野结衣二区三区在线| 99久久中文字幕三级久久日本| 婷婷色综合www| 国产色婷婷99| 国产午夜精品久久久久久一区二区三区| 一级毛片久久久久久久久女| 中文字幕人妻熟人妻熟丝袜美| 中文字幕人妻丝袜制服| 丰满迷人的少妇在线观看| 欧美3d第一页| 欧美日韩一区二区视频在线观看视频在线| 在线观看国产h片| 国产无遮挡羞羞视频在线观看| 久久久久国产网址| 国产亚洲91精品色在线| 国产 精品1| 久久毛片免费看一区二区三区| 日韩人妻高清精品专区| 国产精品国产三级国产av玫瑰| 久久久国产一区二区| 亚洲av电影在线观看一区二区三区| av在线播放精品| av国产久精品久网站免费入址| 我要看黄色一级片免费的| 亚洲人与动物交配视频| 18禁动态无遮挡网站| 日韩欧美一区视频在线观看 | 久久久久人妻精品一区果冻| 久久6这里有精品| 亚洲va在线va天堂va国产| 国产精品一二三区在线看| 亚洲第一av免费看| 高清视频免费观看一区二区| 天天操日日干夜夜撸| 日韩强制内射视频| 亚洲精品一区蜜桃| 成人毛片a级毛片在线播放| 国产精品女同一区二区软件| av在线app专区| 91久久精品电影网| 成人18禁高潮啪啪吃奶动态图 | 精品亚洲成国产av| 日产精品乱码卡一卡2卡三| 免费观看无遮挡的男女| 成人美女网站在线观看视频| 国产真实伦视频高清在线观看| 国产免费视频播放在线视频| 国产伦精品一区二区三区四那| 一区二区三区精品91| 久久6这里有精品| 少妇精品久久久久久久| 欧美日韩在线观看h| 精品少妇内射三级| 久久亚洲国产成人精品v| 日韩伦理黄色片| 久久久国产一区二区| 亚洲欧美中文字幕日韩二区| www.av在线官网国产| 女人精品久久久久毛片| 国产精品久久久久久精品电影小说| 国产精品不卡视频一区二区| 一本色道久久久久久精品综合| 欧美xxxx性猛交bbbb| 国产成人freesex在线| 日本vs欧美在线观看视频 | 深夜a级毛片| 一区二区三区免费毛片| 在线播放无遮挡| 国产精品秋霞免费鲁丝片| 日韩亚洲欧美综合| 国产av一区二区精品久久| 国产真实伦视频高清在线观看| 热re99久久国产66热| 蜜桃久久精品国产亚洲av| 欧美区成人在线视频| 日韩av免费高清视频| 国产成人aa在线观看| 国产伦理片在线播放av一区| 精品国产一区二区久久| 亚洲精品第二区| 国产黄片美女视频| 一级二级三级毛片免费看| 亚洲美女搞黄在线观看| 久久免费观看电影| 精品国产国语对白av| 一级毛片aaaaaa免费看小| av免费观看日本| 大香蕉97超碰在线| 麻豆成人av视频| 99热国产这里只有精品6| 热99国产精品久久久久久7| 日韩在线高清观看一区二区三区| 九九久久精品国产亚洲av麻豆| 国产成人aa在线观看| 国产欧美亚洲国产| 成人影院久久| 乱码一卡2卡4卡精品| 国产亚洲5aaaaa淫片| 18禁在线无遮挡免费观看视频| 美女中出高潮动态图| 久久国产乱子免费精品| 欧美xxxx性猛交bbbb| 成人亚洲精品一区在线观看| 中国国产av一级| 丝瓜视频免费看黄片| 中文天堂在线官网| 国模一区二区三区四区视频| 欧美+日韩+精品| av又黄又爽大尺度在线免费看| 超碰97精品在线观看| 日本-黄色视频高清免费观看| 免费大片18禁| 男人添女人高潮全过程视频| 国产一区二区在线观看日韩| 午夜激情福利司机影院| 三级国产精品欧美在线观看| 亚洲高清免费不卡视频| av视频免费观看在线观看| 免费观看a级毛片全部| 人妻人人澡人人爽人人| 久久久久国产网址| 一级二级三级毛片免费看| 日本91视频免费播放| 日产精品乱码卡一卡2卡三| 国产在视频线精品| 伦理电影大哥的女人| 日本猛色少妇xxxxx猛交久久| 久久久久久久国产电影| 街头女战士在线观看网站| 亚洲va在线va天堂va国产| 国产成人一区二区在线| 亚洲欧洲日产国产| 精品亚洲成国产av| 国内揄拍国产精品人妻在线| 欧美3d第一页| 亚洲av国产av综合av卡| 在线 av 中文字幕| 99精国产麻豆久久婷婷| 校园人妻丝袜中文字幕| 91精品一卡2卡3卡4卡| 女人精品久久久久毛片| 亚洲美女搞黄在线观看| 精华霜和精华液先用哪个| 老司机亚洲免费影院| 十八禁网站网址无遮挡 | 80岁老熟妇乱子伦牲交| 97超视频在线观看视频| 伊人久久国产一区二区| 最黄视频免费看| 日韩 亚洲 欧美在线| 夫妻性生交免费视频一级片| 黄色怎么调成土黄色| 成人综合一区亚洲| 搡女人真爽免费视频火全软件| 最近的中文字幕免费完整| av有码第一页| 天堂8中文在线网| 中文字幕久久专区| 一本色道久久久久久精品综合| 极品教师在线视频| 男的添女的下面高潮视频| 精品少妇内射三级| 精品酒店卫生间| 免费av中文字幕在线| 精品人妻一区二区三区麻豆| 看非洲黑人一级黄片| 少妇 在线观看| 天堂中文最新版在线下载| 久久97久久精品| 久久这里有精品视频免费| 桃花免费在线播放| 亚洲国产成人一精品久久久| 亚洲熟女精品中文字幕| 日本黄色片子视频| 亚洲一区二区三区欧美精品| 乱系列少妇在线播放| 高清午夜精品一区二区三区| 丰满少妇做爰视频| 亚洲欧美日韩东京热| 日韩av免费高清视频| 嘟嘟电影网在线观看| av网站免费在线观看视频| av国产久精品久网站免费入址| 一个人看视频在线观看www免费| 啦啦啦在线观看免费高清www| 熟妇人妻不卡中文字幕| 最黄视频免费看| 三级国产精品片| 两个人的视频大全免费| 大香蕉97超碰在线| 免费观看在线日韩| 一区二区三区乱码不卡18| 免费大片黄手机在线观看| 亚洲精品国产色婷婷电影| 久久国产精品男人的天堂亚洲 | 亚洲精品久久久久久婷婷小说| 亚洲av免费高清在线观看| 日韩熟女老妇一区二区性免费视频| 成人18禁高潮啪啪吃奶动态图 | 国产伦在线观看视频一区| 有码 亚洲区| 丁香六月天网| 十分钟在线观看高清视频www | 亚洲av欧美aⅴ国产| 99九九在线精品视频 | 国产精品熟女久久久久浪| 久久久久久久久久久免费av| 91精品国产国语对白视频| 亚洲无线观看免费| 欧美性感艳星| 亚洲精品一二三| 高清av免费在线| 精品亚洲成a人片在线观看| 欧美bdsm另类| 99热这里只有精品一区| 最新中文字幕久久久久| 亚洲美女搞黄在线观看| 九九久久精品国产亚洲av麻豆| 女的被弄到高潮叫床怎么办| 日韩大片免费观看网站| 91成人精品电影| 又大又黄又爽视频免费| 自线自在国产av| 最黄视频免费看| 另类精品久久| 国产黄色免费在线视频| 韩国av在线不卡| 亚洲av欧美aⅴ国产| 热99国产精品久久久久久7| 精品国产露脸久久av麻豆| 国产成人免费无遮挡视频| 日本黄色日本黄色录像| 久久6这里有精品| 国产探花极品一区二区| av国产精品久久久久影院| 亚洲国产精品999| 亚洲精品国产成人久久av| 免费人成在线观看视频色| 精品午夜福利在线看| 极品少妇高潮喷水抽搐| 国产成人91sexporn| 蜜桃久久精品国产亚洲av| 看非洲黑人一级黄片| 久热久热在线精品观看| 精品国产乱码久久久久久小说| 丝袜在线中文字幕| 欧美bdsm另类| 黑人巨大精品欧美一区二区蜜桃 | 国产永久视频网站| 少妇 在线观看| 久久免费观看电影| 国产日韩欧美视频二区| 亚洲精品乱码久久久久久按摩| 人妻少妇偷人精品九色| 久久久亚洲精品成人影院| 丝袜脚勾引网站| 永久免费av网站大全| 男人和女人高潮做爰伦理| 精品熟女少妇av免费看| 热99国产精品久久久久久7| 亚洲第一区二区三区不卡| 亚洲va在线va天堂va国产| 人体艺术视频欧美日本| 日本欧美国产在线视频| 国产成人精品无人区| 欧美 亚洲 国产 日韩一| 久久人妻熟女aⅴ| 99久久精品国产国产毛片| 欧美三级亚洲精品| 精品一区二区三区视频在线| 欧美精品一区二区大全| 一级黄片播放器| 亚洲精品亚洲一区二区| 秋霞在线观看毛片| 国产真实伦视频高清在线观看| 久久99热6这里只有精品| 街头女战士在线观看网站| 超碰97精品在线观看| 国产 一区精品| 亚洲国产欧美日韩在线播放 | 又爽又黄a免费视频| 视频区图区小说| 三上悠亚av全集在线观看 | 国产色爽女视频免费观看| 黑人高潮一二区| 亚洲av成人精品一区久久| 国产一区亚洲一区在线观看| 夜夜爽夜夜爽视频| 一级a做视频免费观看| 免费人成在线观看视频色| 精品午夜福利在线看| 国产免费又黄又爽又色| 久久久精品94久久精品| 少妇被粗大的猛进出69影院 | 国产av精品麻豆| 国产在视频线精品| 亚洲av欧美aⅴ国产| 欧美xxxx性猛交bbbb| 欧美亚洲 丝袜 人妻 在线| 热re99久久精品国产66热6| 哪个播放器可以免费观看大片| 久久久久久久大尺度免费视频| 成人国产麻豆网| 97在线人人人人妻| 亚洲av福利一区| 国产欧美日韩精品一区二区| 狂野欧美激情性xxxx在线观看| 久久av网站| 色视频在线一区二区三区| 看免费成人av毛片| 日韩欧美精品免费久久| 国产女主播在线喷水免费视频网站| 成年人午夜在线观看视频| 男女啪啪激烈高潮av片| 亚洲精品中文字幕在线视频 | 少妇熟女欧美另类| 哪个播放器可以免费观看大片| 国产爽快片一区二区三区| 精品久久久久久电影网| 久久久久久久亚洲中文字幕| a级毛片免费高清观看在线播放| 日韩成人伦理影院| 黄色毛片三级朝国网站 | 少妇人妻精品综合一区二区| 黄片无遮挡物在线观看| 国产深夜福利视频在线观看| 爱豆传媒免费全集在线观看| 亚洲人成网站在线观看播放| 91久久精品国产一区二区三区| 日韩成人伦理影院| 午夜福利视频精品| 亚洲欧美一区二区三区黑人 | 亚洲国产成人一精品久久久| 中文天堂在线官网| 午夜福利视频精品| 亚洲无线观看免费| 国产一区亚洲一区在线观看| 久热久热在线精品观看| 亚洲av中文av极速乱| 国产亚洲精品久久久com| 成人午夜精彩视频在线观看| 精品国产乱码久久久久久小说| 最近2019中文字幕mv第一页| 一级毛片久久久久久久久女| av专区在线播放| 女人精品久久久久毛片| 美女中出高潮动态图| 噜噜噜噜噜久久久久久91| 欧美人与善性xxx| 99久久综合免费| 永久网站在线| 日韩一区二区三区影片| 成人国产麻豆网| 少妇精品久久久久久久| 狂野欧美激情性xxxx在线观看| 欧美日本中文国产一区发布| 日韩免费高清中文字幕av| 22中文网久久字幕| 啦啦啦啦在线视频资源| 九九久久精品国产亚洲av麻豆| 成人美女网站在线观看视频| 久久久久人妻精品一区果冻| 日韩熟女老妇一区二区性免费视频| 我要看黄色一级片免费的| 亚洲精品乱码久久久久久按摩| 国产精品久久久久久久久免| 亚洲精品乱久久久久久| 在线播放无遮挡| 少妇猛男粗大的猛烈进出视频| 亚洲第一区二区三区不卡| 一级黄片播放器| 少妇丰满av| 欧美精品高潮呻吟av久久| 成人特级av手机在线观看| 日韩,欧美,国产一区二区三区| 精品久久久精品久久久| 午夜日本视频在线| 亚洲精品乱码久久久v下载方式| 亚洲av福利一区| 午夜福利,免费看| 18禁在线无遮挡免费观看视频| 天天操日日干夜夜撸| 亚洲成人一二三区av| www.色视频.com| 久热这里只有精品99| 久久精品久久精品一区二区三区| 肉色欧美久久久久久久蜜桃| 少妇人妻精品综合一区二区| 亚洲欧美成人综合另类久久久| 国产亚洲av片在线观看秒播厂| 一级毛片电影观看| 五月开心婷婷网| 久久久久网色| 国产一区二区三区av在线| 乱人伦中国视频| 日本猛色少妇xxxxx猛交久久| 十八禁网站网址无遮挡 | 亚洲精品日韩在线中文字幕| 狠狠精品人妻久久久久久综合| 亚洲自偷自拍三级| 亚洲久久久国产精品| 国模一区二区三区四区视频| 午夜日本视频在线| 99久久人妻综合| 午夜久久久在线观看| 免费大片黄手机在线观看| 一本一本综合久久| 一区在线观看完整版| 99热这里只有是精品50| 视频中文字幕在线观看| 高清午夜精品一区二区三区| 久久99热6这里只有精品| 国产熟女午夜一区二区三区 | 插逼视频在线观看| 免费黄色在线免费观看| 久久久久精品久久久久真实原创| 久久婷婷青草| 亚洲色图综合在线观看| 天天操日日干夜夜撸| 久久久久久久大尺度免费视频| 在线观看三级黄色| 欧美人与善性xxx| 2021少妇久久久久久久久久久| 中文欧美无线码| 国产色爽女视频免费观看| 偷拍熟女少妇极品色| 一级毛片黄色毛片免费观看视频| 国产视频内射| 国产成人免费观看mmmm| 亚洲无线观看免费| 欧美 亚洲 国产 日韩一| 亚洲美女黄色视频免费看| av在线app专区| 亚洲国产精品一区三区| 欧美日韩一区二区视频在线观看视频在线| 丰满饥渴人妻一区二区三| 久久久久久伊人网av| 欧美老熟妇乱子伦牲交| 夜夜骑夜夜射夜夜干| 欧美精品一区二区免费开放| 国产色爽女视频免费观看| 青青草视频在线视频观看| 久久人妻熟女aⅴ| 免费看日本二区| 久久人人爽人人爽人人片va| 国产在线视频一区二区| 国产淫片久久久久久久久| 99热国产这里只有精品6| 人妻 亚洲 视频| 一区二区三区免费毛片| 亚洲精品,欧美精品| 国产日韩欧美亚洲二区| 久久ye,这里只有精品| 老司机影院毛片| 国产av码专区亚洲av| 日本黄色片子视频| 在线观看三级黄色| 国产精品一区二区三区四区免费观看| 国产淫片久久久久久久久| 最新中文字幕久久久久| 国产午夜精品一二区理论片| 男男h啪啪无遮挡| 久久久亚洲精品成人影院| 日日啪夜夜爽| 欧美性感艳星| 在线看a的网站| 国产爽快片一区二区三区| 男女国产视频网站| 99视频精品全部免费 在线| 三级国产精品片| 日韩中文字幕视频在线看片| 国产探花极品一区二区| 欧美日韩av久久| 精品一区二区免费观看| 亚洲性久久影院| 国产精品嫩草影院av在线观看| 久久国产乱子免费精品| h视频一区二区三区| 精品国产国语对白av| 黄片无遮挡物在线观看| 男人添女人高潮全过程视频| 精品少妇内射三级| 自拍偷自拍亚洲精品老妇| 黄色欧美视频在线观看| 高清不卡的av网站| 日日啪夜夜撸| 欧美精品高潮呻吟av久久| 亚洲欧美日韩卡通动漫| 亚洲精品自拍成人| 91成人精品电影| 一区二区三区四区激情视频| 日韩av在线免费看完整版不卡| 伊人久久国产一区二区| 午夜免费鲁丝| 久久久亚洲精品成人影院| 日本91视频免费播放| 亚洲,一卡二卡三卡| 天天躁夜夜躁狠狠久久av| 高清在线视频一区二区三区| 少妇裸体淫交视频免费看高清| 男的添女的下面高潮视频| 极品少妇高潮喷水抽搐| 国产黄片视频在线免费观看| 在线观看av片永久免费下载| 久久久国产欧美日韩av|