    既有鐵路高陡邊坡排水釘施工技術(shù)研究*

    2022-08-27 09:52:04聶如松雷明峰牛建東
    施工技術(shù)(中英文) 2022年14期
    關(guān)鍵詞:中南大學(xué)滄州長(zhǎng)沙

    王 風(fēng),聶如松,李 銳,雷明峰,朱 麗,牛建東

    (1.國(guó)能朔黃鐵路發(fā)展有限責(zé)任公司,河北 滄州 062350; 2.中南大學(xué)土木工程學(xué)院,湖南 長(zhǎng)沙 410075; 3.中南大學(xué)重載鐵路工程結(jié)構(gòu)教育部重點(diǎn)實(shí)驗(yàn)室,湖南 長(zhǎng)沙 410075)

    0 Introduction

    China is a vast country with complex geological conditions. With the dramatic development of railway engineering, some slope engineering built by filling and excavation engineering inevitably reaches tens of meters in height[1-5]. Due to the complexity and uncertainty of geological and meteorological conditions, massive diseases, such as sliding collapse and poor drainage conditions, occur on the existing slopes under natural variability and anthropic effects. Such diseases can lead to increasingly poor slope stability and railway operation safety. Therefore, reinforcement measures must be taken for some existing slopes[6-8].

    One of the effective methods of increasing the stability of slopes is to improve their drainage condition[9]. At present, the most common drainage methods adopted in slope engineering are polyvinyl chloride (PVC) pipes with drilled holes, gutters, underdrains, etc. Although these measures are simple and economical in construction, they are prone to clogging-induced function loss in service[10-11]. For this reason, a new drainage structure named drainage nail, which is a PVC pipe wrapped with a capillary permeable drainage belt, was proposed. Its construction method is similar to that of the soil nail, whereas its function is to drain water inside the slope[12]. The drainage nail is composed of drainage nail segments and connectors.

    Fig. 1a shows the drainage nail segment, which is a hollow PVC pipe wrapped with a capillary permeable drainage belt, and its function is to collect, drain, and filter water. One end of the drainage nail is blocked with a plug to avoid clogging caused by surrounding soil particles. The connector is used to connect two drainage nail segments. The structure and drainage path of the drainage nail are illustrated in Fig. 1b. Drainage nails, with the advantages of simple construction, high drainage efficiency, and excellent anti-clogging performance, have been applied to treat existing railway slope diseases[13].

    Fig. 1 Drainage nail structure

    Considering the practical difficulties in the reinforcement and protection construction on the high and steep slopes of railways, such as the narrow construction site and cumbersome construction equipment movement, the traditional drilling rig and drilling rig platform are improved according to the installation and construction process of drainage nails, and a new drilling rig and drilling rig platform are developed. The specific structures of the developed drilling rig and construction platform are presented, and they have broad application prospects. Then, general provisions and preparations for drainage nail construction are described. A process of drainage nail construction is formulated, and the corresponding construction steps and operation requirements are also put forward. This study can provide a reference for the application of the developed drilling rig, drilling rig platform, and drainage nail.

    1 Difficulties in existing high and steep slope reinforcement construction

    Scaffolds need to be erected during high and steep slope reinforcement, and this scaffold erection practice is more complex than those in other construction processes. Specifically, the whole scaffold should be adjusted according to the slope shape, angle, and flatness during high and steep slope reinforcement construction. Before the scaffold erection, the bottom construction platform should be cleaned and established. The construction platform should be as flat as possible with a width of more than 4.5 m. It should also be inclined to the slope toe, with a slope angle not exceeding 3°~5° if the ground is hard and inclined outward. Protective fences shall be installed along the construction platform. The construction platform for scaffold erection is required to withstand the vibration force, pullout force, gravity, and wind force during construction, and deformation and settlement are not allowed. The height of the platform should coincide with the equipment height, inclination angle, and position of the hole to be drilled. The scaffold should be erected to a preset height to provide the platform required for drilling construction.

    The traditional scaffold construction method for slope reinforcement is demonstrated in Fig. 2. In addition to a complicated construction process, this method also has the main disadvantages of difficult construction equipment movement on the scaffold, complex loading-unloading process, long disassembly time, and resulting long construction period[14]. In this case, a new method must be proposed to reduce production costs and speed up construction to a certain extent.

    Fig. 2 Traditional scaffold construction method

    2 Platform development for drilling construction on high and steep slopes of existing railways

    The existing railways are characterized by high traffic density, short construction time, and limited construction space. The traditional construction method is to set up a platform using scaffold rods, then fix the platform on the slope by an anchor, and finally install the heavy drilling rig onto the platform. After a hole is drilled, the drilling rig is dismantled and then manually moved to the next hole for installation and fixation. The above construction process must consider both the bearing capacity and stability of the construction platform and the position accuracy of the hole drilled. This construction method has the disadvantages of difficult construction, large construction quantity, long construction period, and high production cost. Moreover, a lot of labor is required in the implementation of the construction operation, and their safety is not completely guaranteed.

    According to the process of drainage nail construction, the drilling rig and drilling rig platform are specially designed to overcome the difficulties in the traditional construction method. Specifically, a movable drilling rig platform for drilling holes on high and steep slopes of existing railways for drainage nails is designed, and it offers reduced labor intensity, improved construction efficiency, and increased safety during construction. As shown in Fig. 3, the movable platform for drainage nail construction is composed of three parts, including a hanging basket system, a drilling rig installation system, and a moving and positioning system. The hanging basket system consists of a basket base plate, fences, support rods, and position limiting devices. The drilling rig installation system consists of a drilling rig slipway, an inclination angle adjuster for the drilling rig, and connecting joints, and the moving and positioning system is composed of a wire rope, an adjusting hoist, omni-directional wheels, connecting devices, etc.

    Fig. 3 Structure of the movable drilling rig platform for drainage nail construction

    Besides, the drilling rig is improved to avoid the inconvenience caused by the large size of the traditional drilling rig and the construction of the anchor. The details are as follows: The drilling rig used to drill holes for the drainage nails is composed of a carriage assembly, a scaffold, a console assembly, a power assembly, a cylinder assembly, etc. The size of the slide scaffold and the lengths of the cylinder and the drill rod are improved. The improved slide scaffold is shown in Fig. 4, and the four improved parts of the drilling rig are mainly as follows:

    1) The size of the scaffold is reduced from 2 700 mm×400 mm×550 mm to 1 400 mm×400 mm×550 mm to avoid the impact of a rig fuselage too long or too close to the rail.

    2) The length of the drill rod is shortened from 1 000 mm to 500 mm to facilitate the addition and subtraction of the drill rod on a narrow platform at both sides of the railway.

    3) The length of the cylinder is reduced from 1 000 mm to 650 mm to match the drill rod length of 500 mm.

    4) The scaffold is redesigned according to the characteristic of the construction of railway slope reinforcement. The new scaffold is composed of nine lapped steel pipes, including two longitudinal ones on the horizontal plane and five transverse ones and two vertical ones on the vertical plane. The inclination angle of the carriage can be adjusted by changing the positions where the vertical steel pipes connect with the transverse ones of the scaffold, and the angle of the drilled hole can also be adjusted as mentioned above.

    3 Construction technology and method for drainage nails

    On the basis of the improved drilling rig and drilling rig platform mentioned above, general provisions on drainage nail construction are proposed, and technical preparations, machine preparations, and working conditions required for drainage nail construction are described as well. A process of drainage nail construction on high and steep slopes is formulated, and the corresponding construction steps and operation requirements are put forward in detail.

    3.1 General provisions on drainage nail construction

    1) If an unstable situation occurs with the retaining structures, such as retaining walls or slopes, it must be reported to the departments concerned in time. Then, the loading exerted by the upper part of the slope can be reduced by cutting the slope, but the lower part of the slope should not be disturbed as much as possible.

    2) The fissures on the sliding surface at the top of the slope should be backfilled with raw soil mixed with bentonite.

    3) The pneumatic down-the-hole (DTH) hammer without water could be used to drill the hole for the PVC pipe, but the pneumatic DTH hammer with water is strictly prohibited. Skilled workers should be assigned to ensure the drilling quality.

    4) The construction of drainage nails and anchor rods should be carried out row by row and from top to bottom. The construction sequence should be determined according to the in-situ conditions on the principle of avoiding mutual influence as much as possible.

    5) After the process of hole drilling for drainage nails is completed, the holes should be cleaned in time and the drainage nails should be installed immediately to prevent secondary drilling caused by hole collapse. After the drainage nails are installed, their pipe orifice should be protected in time to prevent clogging. During construction, the drainage nail segments and other materials should be protected to prevent material damage from affecting the drainage performance. Drainage nails should be carefully installed to avoid poor drainage performance caused by improper operation and installation. The water temporarily discharged during construction should also be drained to prevent the performance of the railway from being affected by water scouring.

    6) The construction of drainage nails and the drainage pipe network should be completed before the slope protection, such as arch support, on the slope surface is constructed. Special attention should be paid to preventing damages to the drainage nails and the drainage pipe network during the subsequent construction of the support structure. The outlets of the drainage pipe network should be as consistent as possible with the drainage spacings on the slope of the supporting structure.

    7) All the outlets of the drainage pipe network shall allow the collected seepage water to be effectively drained into the railway side ditches. If the drainage capacity of the side ditches cannot meet the requirements, the drainage ditches shall be expanded.

    8) Clay or sealing materials should be used to block the gap between the drilled hole and the drainage nail for 60 cm near the outlet of the drainage nail. The slope or wall below the outlet of the drainage nail should be reinforced to withstand scouring.

    9) Safety assurance measures should be taken during construction.①I(mǎi)n the case of geophysical prospecting operations near the existing railways, the provisions in theSafetyRegulationsforConstructionSafetyofRailwayEngineering[15]should be strictly implemented.② Prospecting operations near existing railway lines are geological engineering operations in dangerous areas. Geophysical exploration operators (including surveying and mapping staff) approaching an existing railway line should carry out their engineering work in strict accordance with the railway survey and construction operation regulations and strictly obey the command of the on-site safety officers.

    3.2 Construction preparation

    3.2.1Technical preparations

    1) The design drawings should be carefully consulted, and the requirements of relevant technical construction specifications need to be well acquainted. Then, the construction organization design should be prepared according to the in-situ conditions, and technical disclosure and safety disclosure must be declared to the construction team. Finally, the application for the commencement of sub-divisional works should be prepared and submitted to the departments and leaders concerned for approval.

    2) A supervision and protection scheme for the railway route and traffic safety should be specially formulated where the construction is adjacent to the railway route, and the scheme should be incorporated into the construction organization design. Also, special meetings should be held to publicize and assess the team members.

    3) Before the construction begins, the construction machines and tools should be reasonably configured according to the arrangement of the construction site and time, and this measure should be taken in a way that the construction would not affect or interrupt the railway operation as much as possible. In-situ construction conditions can be analyzed to determine whether to limit the speed of running trains or to clearly define the speed limit range. The above-mentioned measures shall also be reported to the relevant department for approval. The construction can be carried out only after the approval from the relevant department and the permission and implementation from the officers of the railway construction section are obtained.

    4) The safety care during the construction should be undertaken by the special personnel designated by the railway transportation management department.

    5) Construction lofting should be conducted, and the position of the drainage nail center should be determined and marked.

    3.2.2Construction machine preparations

    1) The drilling rig equipment consists of a pneumatic DTH hammer drill, a drilling bench, an air compressor, a ladder, and a winch. The installation of the drilling rig and corresponding preparations are as follows:①After the drilling rig is transported to the construction site, whether the parts and components of the drilling rig are damaged should be checked, and the drilling rig could be assembled and refueled after a confirmation that no damage has occurred is made.②The two front legs of the slide frame are in the operating position, and the support rod is adjusted to the extent that the slide frame reaches the specified angle.③The power supply should be turned off when the motor cable is connected. In principle, the motor cable should be connected before the main power supply is connected. Then, the motor should be tested to check whether its rotation direction is consistent with the controller’s. If not, the motor should be turned off immediately to reverse its rotation direction.④Whether all the bolts are connected firmly and reliably and whether all the pipes are connected firmly should be checked. Air leakage, oil leakage, and other abnormal phenomena are never allowed.⑤An appropriate amount of No.32 engine oil should be refueled in oil mist.⑥All the handles of the pneumatic control valve must be set to the “stop” position.⑦ No-load tests can be carried out after the above preparations are completed.

    2) The processing and installation equipment for drainage nail construction includes a cutting machine, an electric screwdriver, and a jack.

    3) The power and electrical equipment consists of a transformer, a generator, an air compressor, low-voltage switchgear, lighting equipment required for night construction, etc.

    4) The safety equipment contains a series of safety equipment, helmets, face masks, etc., and the equipment should be suitable for railway construction.

    3.2.3Working conditions

    As for the construction near a railway line, special consideration should be given to whether the construction machines and tools meet the requirements of railway operation safety. If the requirements are not met, the construction machines and tools need to be improved or replaced.

    1) Concerning the construction near the railway route, due consideration should be given to whether the installation length of the drainage nail segments can meet the operation safety requirements. If not, the length of the drainage nail segments should be reduced.

    2) The steel-stranded wire should be used as the anchor to ensure that the safety line of the railway would not be intruded during the anchor construction for slope reinforcement.

    3) After the scaffold is erected, slope or wall surface cleaning is required. The position of the hole to be drilled should be marked and rechecked after it is determined according to the design drawings, and its deviation should not exceed 5 cm. Then, the drilling rig can be moved to the construction face.

    4) The construction workers should have passed the professional training and taken part in the training on the technical quality and safety disclosure during drilling and drainage nail construction.

    Fig. 5 Process of drainage nail construction

    5) The tests for drainage nail construction are as follows: Before the formal construction, drainage nail processing tests shall be carried out to determine the machines, tools, and various technical parameters, and the quality of drainage nail construction should also be tested. The number of tested nails should not be less than 3.

    3.3 Process of drainage nail construction

    The process of drainage nail construction is shown in Fig. 5.

    3.4 Steps of drainage nail construction and operation requirements

    During the slope reinforcement construction near an existing railway, special attention should be paid not to damage the railway, the power supply system, and other equipment of the railway. The construction must be carried out under the supervision of the railway department. The detailed steps of drainage nail construction are as follows.

    1) Arrange and repair the existing drainage system on the ground.

    2) Clean the slope surface, loft the elevation, and mark the position of the hole to be drilled.

    3) Prepare the drilling rig platform.

    4) Drill holes for drainage nails, and the drilling can be divided into the following steps:① Drill holes for drainage nails.The workers should raise the decelerator to the upper limit position and tighten the drill rod first, turn on the motor, and slowly turn on the propelling cylinder until the no-load test is normal. Next, the drill bit shall be placed on the working face, and the propelling cylinder should be turned off. Then the drill bit could be turned on to drill slowly, and the drill bit can be impacted at full throttle until the drill bit reaches about 100 mm in depth. During drilling construction, the cylinder should be slowly switched on and off according to the speed of footage to keep the drilling bit at a certain propulsive force. Meanwhile, whether the oil atomizer supplies oil should be observed so that the oil supply quantity could be appropriately adjusted.② Extend drill rod.After the first drill rod has been constructed, the drill bit could be turned off. The reducer should be set at a lower limit position, and the drill rod in the drill support should be fixed with a fork. The decelerator should be reversed to disconnect the joint between the drill rod and the decelerator. Then, the decelerator should be raised to the upper limit position, and the second drill rod should be connected with the first one.③ Remove the drill rod.When the drill rod support is in contact with the tool unloader, the drilling construction could be stopped, and a professional round rod shall be inserted into the hole on the outside of the tool unloader. The second flat trough at the end of the drill rod could be aligned with the upper part of the tool unloader by rotating the tool unloader. The joint on the reducer could be separated from the drill rod by inserting the fork and reversing the motor. The first flat trough at the end of the drill rod should be adjusted to be aligned with the rectangular groove of the tool unloader. Another fork would be inserted, and the fork in the tool unloader should be taken out. Then, the drill rod is driven backward by the rod unloader and another fork. When the second flat groove at the end of the next drill rod is aligned with the upper part of the drill rod support, the fork could be inserted, and the motor would reverse. The last drill rod could be taken away when the connecting threads of the upper and lower drill rods are disconnected. Then, the decelerator could be put down slowly, and the rectangular groove of the rod unloader is aligned with the first flat groove at the end of the next drill rod. The above steps should be repeated to remove all the drill rods in turn.

    5) The diameter of the drilled hole should not exceed the outer diameter of the drainage nail joint by 5~10 mm. The drilled hole should be round and straight, with a depth not less than the sum of the total lengthLof the drainage nail and 50 cm. The difference between the construction and design spacings of each drainage nail should not be more than 10 cm. The deflection length at the bottom of the drilled hole should not be more than 3% of the designed length of the drilled hole, and the depth of the drilled hole should not be less than the designed value.

    6) The drainage nail is installed at the designed depth after the drainage nails are connected by the joints. Meanwhile, a PVC pipe with a length of about 1 m is installed within the outlet of the drain nail. Finally, the sleeve is pulled out.

    7) The exposed PVC pipe of each drainage nail is connected with the water-collecting pipe by the two-way and three-way methods, and drainage is thereby conducted within the slope. Finally, the collected water is led out to the side ditch by the water-collecting pipe. An elbow is installed at the end of the water-collecting pipe to prevent the subgrade from being scoured by water.

    8) Trenches should be excavated on the slope and retaining wall to install water-collecting pipes.

    4 Conclusions

    1) In view of the defects in high and steep slope reinforcement engineering, such as complex construction process, great construction difficulty, and long construction period, the drilling rig and the drilling rig platform are improved. The specific structures of the updated drilling rig and drilling rig platform are expounded. They could effectively overcome the difficulties with traditional construction equipment.

    2) On the basis of the improved drilling rig and drilling rig platform, general provisions on drainage nail construction are proposed, and the technical preparations, machine preparations, and working conditions required for drainage nail construction are described as well. Before the formal construction, a drainage nail processing test must be carried out to determine the technical parameters, and the quality of drainage nail construction should also be tested.

    3) A process of drainage nail construction is formulated, and the corresponding construction steps and operation requirements are put forward for the improved drilling rig and drilling rig platform.

    4) The improved drilling rig and drilling rig platform have broad application prospects. This research provides a new method for drainage nail construction on high and steep slopes and serves as a reference for high and steep slope reinforcement construction.

    猜你喜歡
    中南大學(xué)滄州長(zhǎng)沙
    長(zhǎng)沙之旅
    中國(guó)農(nóng)業(yè)發(fā)展銀行滄州分行
    中南大學(xué)建筑與藝術(shù)學(xué)院作品選登
    中南大學(xué)教授、博士生導(dǎo)師
    安全(2021年4期)2021-05-19 07:56:52
    中國(guó)農(nóng)業(yè)發(fā)展銀行滄州分行
    中南大學(xué)校慶文創(chuàng)產(chǎn)品設(shè)計(jì)
    湖南包裝(2020年6期)2021-01-20 02:02:10
    滄州鴻發(fā)包裝技術(shù)研究所
    我眼中的長(zhǎng)沙
    艾米莉·狄金森的自然:生態(tài)批評(píng)的解讀
    多姿多彩的“長(zhǎng)沙窯”
    大眾考古(2014年10期)2014-06-21 07:12:14
    av免费在线看不卡| 最近最新中文字幕大全免费视频 | 777米奇影视久久| 丝瓜视频免费看黄片| 高清av免费在线| 久久久久久久久久成人| 国产精品久久久久久精品电影小说| 午夜激情久久久久久久| 午夜福利在线观看免费完整高清在| 免费黄网站久久成人精品| 91精品国产国语对白视频| 成人手机av| 中国美白少妇内射xxxbb| 日韩免费高清中文字幕av| 欧美日韩视频精品一区| 国产精品不卡视频一区二区| 亚洲欧美一区二区三区国产| 爱豆传媒免费全集在线观看| 中文字幕人妻熟女乱码| 男女午夜视频在线观看 | 日韩成人av中文字幕在线观看| 亚洲国产精品一区二区三区在线| 涩涩av久久男人的天堂| 日本av手机在线免费观看| 一区二区三区精品91| 久久精品国产a三级三级三级| 色视频在线一区二区三区| 午夜av观看不卡| 午夜福利乱码中文字幕| 51国产日韩欧美| 久久ye,这里只有精品| 90打野战视频偷拍视频| 18禁观看日本| 国产日韩一区二区三区精品不卡| 天天操日日干夜夜撸| 亚洲国产毛片av蜜桃av| 欧美 亚洲 国产 日韩一| 最黄视频免费看| 亚洲成色77777| 最近的中文字幕免费完整| 久久久精品94久久精品| 欧美日韩一区二区视频在线观看视频在线| 建设人人有责人人尽责人人享有的| 午夜激情久久久久久久| 欧美日韩一区二区视频在线观看视频在线| 老女人水多毛片| 成年人午夜在线观看视频| 国产男女内射视频| 黄色配什么色好看| 亚洲伊人色综图| av国产久精品久网站免费入址| 如日韩欧美国产精品一区二区三区| 亚洲精品久久成人aⅴ小说| 亚洲av免费高清在线观看| 少妇的丰满在线观看| 大陆偷拍与自拍| 男的添女的下面高潮视频| 国产毛片在线视频| 热99国产精品久久久久久7| 80岁老熟妇乱子伦牲交| 国产精品99久久99久久久不卡 | 日本av免费视频播放| 老女人水多毛片| 亚洲国产精品成人久久小说| 午夜久久久在线观看| 亚洲av日韩在线播放| 另类亚洲欧美激情| 国产亚洲一区二区精品| 两个人看的免费小视频| 亚洲精品久久久久久婷婷小说| 国产精品国产av在线观看| www日本在线高清视频| 中国三级夫妇交换| 美女大奶头黄色视频| 免费在线观看完整版高清| 97精品久久久久久久久久精品| av一本久久久久| 亚洲av欧美aⅴ国产| 免费看不卡的av| 又黄又粗又硬又大视频| 亚洲综合色网址| 菩萨蛮人人尽说江南好唐韦庄| 国产精品久久久久久久电影| 日本欧美视频一区| 少妇熟女欧美另类| 国产成人免费无遮挡视频| 啦啦啦在线观看免费高清www| 国产有黄有色有爽视频| 亚洲少妇的诱惑av| 国产免费一区二区三区四区乱码| 18禁裸乳无遮挡动漫免费视频| a级片在线免费高清观看视频| 人体艺术视频欧美日本| 丁香六月天网| 在线 av 中文字幕| 久久午夜综合久久蜜桃| 久久久久精品久久久久真实原创| 美女脱内裤让男人舔精品视频| 精品一品国产午夜福利视频| 日韩一区二区三区影片| 91在线精品国自产拍蜜月| 各种免费的搞黄视频| 蜜臀久久99精品久久宅男| 成人亚洲欧美一区二区av| av在线app专区| 老司机影院成人| 亚洲国产精品一区三区| 桃花免费在线播放| 伊人亚洲综合成人网| 99国产精品免费福利视频| 丝袜在线中文字幕| 中文字幕av电影在线播放| 一区二区av电影网| 伦理电影大哥的女人| 午夜免费观看性视频| 三级国产精品片| 午夜91福利影院| av天堂久久9| 久久久久精品久久久久真实原创| 国产免费福利视频在线观看| 日韩欧美一区视频在线观看| 丰满饥渴人妻一区二区三| 少妇人妻 视频| 捣出白浆h1v1| 欧美97在线视频| 夜夜骑夜夜射夜夜干| 大码成人一级视频| 亚洲性久久影院| 免费观看无遮挡的男女| av网站免费在线观看视频| 在线观看www视频免费| 五月伊人婷婷丁香| 国产又爽黄色视频| 人人澡人人妻人| 在线天堂中文资源库| 好男人视频免费观看在线| 这个男人来自地球电影免费观看 | 边亲边吃奶的免费视频| 欧美精品亚洲一区二区| 精品一区二区三区四区五区乱码 | 亚洲av电影在线进入| 欧美人与善性xxx| 少妇被粗大的猛进出69影院 | 麻豆乱淫一区二区| 黄片播放在线免费| 日本wwww免费看| 99热国产这里只有精品6| 纵有疾风起免费观看全集完整版| 大陆偷拍与自拍| 女人久久www免费人成看片| 亚洲精品美女久久久久99蜜臀 | 国产女主播在线喷水免费视频网站| www.av在线官网国产| 国产又色又爽无遮挡免| 人妻 亚洲 视频| 久久久国产欧美日韩av| 九九爱精品视频在线观看| 亚洲av综合色区一区| 国产精品熟女久久久久浪| 亚洲国产最新在线播放| 最近中文字幕高清免费大全6| 男女高潮啪啪啪动态图| 美女国产视频在线观看| 哪个播放器可以免费观看大片| 在线观看免费日韩欧美大片| 午夜日本视频在线| 国产成人精品久久久久久| 伦理电影大哥的女人| 国产av一区二区精品久久| 欧美日韩av久久| 精品卡一卡二卡四卡免费| 精品一区在线观看国产| 免费不卡的大黄色大毛片视频在线观看| 哪个播放器可以免费观看大片| 99精国产麻豆久久婷婷| 伦精品一区二区三区| 精品视频人人做人人爽| 999精品在线视频| 亚洲四区av| 中文字幕av电影在线播放| 亚洲精品乱久久久久久| 国产 一区精品| 日本-黄色视频高清免费观看| 精品酒店卫生间| 久久av网站| av黄色大香蕉| 欧美 亚洲 国产 日韩一| 9色porny在线观看| 免费不卡的大黄色大毛片视频在线观看| 日韩中字成人| 亚洲色图 男人天堂 中文字幕 | 亚洲人成77777在线视频| 国产av一区二区精品久久| 国产成人精品一,二区| 性色av一级| 国产精品嫩草影院av在线观看| 成人无遮挡网站| 嫩草影院入口| 色视频在线一区二区三区| 国产亚洲最大av| av片东京热男人的天堂| 久久精品久久久久久噜噜老黄| 91aial.com中文字幕在线观看| 一级,二级,三级黄色视频| 寂寞人妻少妇视频99o| 大话2 男鬼变身卡| 91午夜精品亚洲一区二区三区| 满18在线观看网站| 国产熟女欧美一区二区| 亚洲成色77777| 亚洲成人av在线免费| 国产成人一区二区在线| 免费少妇av软件| 日日啪夜夜爽| 侵犯人妻中文字幕一二三四区| 免费观看性生交大片5| 亚洲国产欧美在线一区| 香蕉国产在线看| 久久久国产精品麻豆| 国产精品不卡视频一区二区| 亚洲欧美色中文字幕在线| av在线app专区| 成人二区视频| 2021少妇久久久久久久久久久| 免费大片18禁| 制服人妻中文乱码| 日韩中字成人| 免费在线观看黄色视频的| 九九在线视频观看精品| 在线观看人妻少妇| 亚洲av在线观看美女高潮| 亚洲欧美一区二区三区国产| 亚洲综合精品二区| 99久久综合免费| 人人澡人人妻人| 亚洲综合色网址| 久久99蜜桃精品久久| 亚洲成人一二三区av| 国内精品宾馆在线| 少妇的丰满在线观看| 中文字幕人妻熟女乱码| 中国美白少妇内射xxxbb| 久久毛片免费看一区二区三区| videos熟女内射| 国产色婷婷99| 尾随美女入室| 大香蕉久久网| 一级毛片黄色毛片免费观看视频| 午夜福利在线观看免费完整高清在| 99国产综合亚洲精品| 中文字幕人妻丝袜制服| 国产在线免费精品| 精品少妇黑人巨大在线播放| 日韩熟女老妇一区二区性免费视频| 精品人妻偷拍中文字幕| 亚洲美女视频黄频| 亚洲综合色网址| 久久99热这里只频精品6学生| 久久久久久久精品精品| 久久国内精品自在自线图片| 中文字幕亚洲精品专区| 18+在线观看网站| 国产成人精品在线电影| 美女大奶头黄色视频| 欧美日韩精品成人综合77777| 精品国产一区二区久久| 97在线视频观看| 啦啦啦视频在线资源免费观看| 成人无遮挡网站| 9热在线视频观看99| 国产无遮挡羞羞视频在线观看| 久久精品国产亚洲av天美| 欧美97在线视频| 国产成人精品福利久久| 免费观看av网站的网址| 日韩中字成人| 亚洲综合色网址| 黄色毛片三级朝国网站| 国产黄色视频一区二区在线观看| 国产爽快片一区二区三区| 国产淫语在线视频| 色94色欧美一区二区| 99视频精品全部免费 在线| 欧美精品一区二区免费开放| av免费在线看不卡| 777米奇影视久久| 免费观看性生交大片5| 亚洲精品国产av成人精品| 久久99热6这里只有精品| 91成人精品电影| 亚洲精品美女久久久久99蜜臀 | 新久久久久国产一级毛片| 国产高清三级在线| 久久精品国产鲁丝片午夜精品| 亚洲精品中文字幕在线视频| 又黄又爽又刺激的免费视频.| 精品一区二区三卡| 久久精品国产a三级三级三级| 黄色 视频免费看| 水蜜桃什么品种好| 男人爽女人下面视频在线观看| 美女内射精品一级片tv| 毛片一级片免费看久久久久| 免费大片18禁| 国产视频首页在线观看| 日本猛色少妇xxxxx猛交久久| 草草在线视频免费看| 母亲3免费完整高清在线观看 | 欧美日韩视频精品一区| 日韩av在线免费看完整版不卡| 波野结衣二区三区在线| 妹子高潮喷水视频| 视频区图区小说| 22中文网久久字幕| 中文字幕人妻熟女乱码| 狂野欧美激情性xxxx在线观看| 秋霞在线观看毛片| 亚洲欧美色中文字幕在线| 成年人免费黄色播放视频| 男的添女的下面高潮视频| av福利片在线| 久久久精品94久久精品| 高清不卡的av网站| 色婷婷久久久亚洲欧美| av不卡在线播放| 在线免费观看不下载黄p国产| 黑人巨大精品欧美一区二区蜜桃 | 最近最新中文字幕大全免费视频 | 黑人巨大精品欧美一区二区蜜桃 | 免费不卡的大黄色大毛片视频在线观看| 欧美日韩视频高清一区二区三区二| 婷婷色综合www| 亚洲国产精品国产精品| 日本黄色日本黄色录像| 丝袜人妻中文字幕| 国产一区二区在线观看av| 亚洲欧洲日产国产| 18禁在线无遮挡免费观看视频| 丝袜在线中文字幕| 免费看不卡的av| 精品福利永久在线观看| 亚洲一级一片aⅴ在线观看| 嫩草影院入口| 国产欧美日韩一区二区三区在线| 99re6热这里在线精品视频| 亚洲一区二区三区欧美精品| 精品久久国产蜜桃| av电影中文网址| 伊人久久国产一区二区| 色5月婷婷丁香| 亚洲精品乱码久久久久久按摩| 爱豆传媒免费全集在线观看| 人妻 亚洲 视频| av有码第一页| 日本色播在线视频| 久久热在线av| 秋霞在线观看毛片| 日韩欧美一区视频在线观看| 亚洲一码二码三码区别大吗| 亚洲国产精品专区欧美| 国产成人a∨麻豆精品| 狠狠精品人妻久久久久久综合| 久久久久久久久久成人| 久久99精品国语久久久| 欧美少妇被猛烈插入视频| 女性被躁到高潮视频| 国产又爽黄色视频| 亚洲欧美一区二区三区黑人 | 老司机影院毛片| 午夜日本视频在线| 免费av中文字幕在线| 男人爽女人下面视频在线观看| 国产xxxxx性猛交| 寂寞人妻少妇视频99o| 国产亚洲午夜精品一区二区久久| 下体分泌物呈黄色| 青春草视频在线免费观看| 国产成人精品久久久久久| 菩萨蛮人人尽说江南好唐韦庄| 最近中文字幕高清免费大全6| 男男h啪啪无遮挡| 在现免费观看毛片| 狂野欧美激情性bbbbbb| 人妻系列 视频| 国产一级毛片在线| 在线亚洲精品国产二区图片欧美| 欧美日韩亚洲高清精品| 99久久人妻综合| 国产在线一区二区三区精| 亚洲国产毛片av蜜桃av| 免费看不卡的av| 成人免费观看视频高清| 永久网站在线| 中文欧美无线码| 国产精品国产三级国产av玫瑰| av一本久久久久| 亚洲成人手机| 欧美日韩av久久| 免费黄频网站在线观看国产| 亚洲精品美女久久av网站| 波多野结衣一区麻豆| 国产精品久久久久久av不卡| 老熟女久久久| 免费女性裸体啪啪无遮挡网站| 国产精品欧美亚洲77777| 国产黄色视频一区二区在线观看| 国产精品人妻久久久久久| 日本av免费视频播放| 看免费av毛片| 晚上一个人看的免费电影| 亚洲国产日韩一区二区| 亚洲伊人久久精品综合| 亚洲欧美一区二区三区国产| 中国美白少妇内射xxxbb| 观看av在线不卡| 人妻人人澡人人爽人人| 亚洲丝袜综合中文字幕| 亚洲av欧美aⅴ国产| 久久人人爽av亚洲精品天堂| 晚上一个人看的免费电影| 亚洲成色77777| 日韩中文字幕视频在线看片| a 毛片基地| 99re6热这里在线精品视频| 国产精品秋霞免费鲁丝片| 在线 av 中文字幕| 亚洲性久久影院| 国产成人91sexporn| 亚洲国产色片| 赤兔流量卡办理| 国产精品一国产av| 观看美女的网站| 精品人妻一区二区三区麻豆| 亚洲国产精品一区二区三区在线| 男女国产视频网站| 如何舔出高潮| 黑丝袜美女国产一区| 最近最新中文字幕免费大全7| 人妻人人澡人人爽人人| 在线观看免费视频网站a站| 欧美人与性动交α欧美精品济南到 | 成人无遮挡网站| 久久精品国产亚洲av天美| 免费av不卡在线播放| 少妇的丰满在线观看| 欧美日韩av久久| 黄色配什么色好看| 国产精品免费大片| 一边摸一边做爽爽视频免费| 九草在线视频观看| 中文乱码字字幕精品一区二区三区| 女的被弄到高潮叫床怎么办| 国产男女超爽视频在线观看| 大片电影免费在线观看免费| 亚洲成人一二三区av| 国产免费现黄频在线看| 欧美精品国产亚洲| 免费看av在线观看网站| 在线天堂最新版资源| 中文字幕最新亚洲高清| 久久久久久久国产电影| 永久网站在线| 综合色丁香网| 国产成人精品一,二区| 亚洲色图 男人天堂 中文字幕 | 国产无遮挡羞羞视频在线观看| 一级毛片黄色毛片免费观看视频| 中文精品一卡2卡3卡4更新| a级毛色黄片| 欧美日韩综合久久久久久| av一本久久久久| 99久久人妻综合| 国产成人精品无人区| 久久久久久久精品精品| videos熟女内射| 国产极品天堂在线| 久久国产亚洲av麻豆专区| 久久精品国产鲁丝片午夜精品| 免费高清在线观看日韩| av免费观看日本| 丰满乱子伦码专区| 婷婷色综合www| 国产一区二区激情短视频 | 亚洲五月色婷婷综合| 国产探花极品一区二区| 大码成人一级视频| 亚洲成人一二三区av| 在线看a的网站| 免费观看无遮挡的男女| 日韩视频在线欧美| 国产欧美日韩综合在线一区二区| 精品一区二区三区视频在线| 岛国毛片在线播放| 777米奇影视久久| 国产精品一二三区在线看| 寂寞人妻少妇视频99o| 免费观看性生交大片5| 日韩电影二区| 国产精品秋霞免费鲁丝片| 国产精品国产三级国产专区5o| 在线天堂最新版资源| 激情五月婷婷亚洲| 日日啪夜夜爽| 久久99蜜桃精品久久| 在现免费观看毛片| 伦理电影大哥的女人| 有码 亚洲区| 涩涩av久久男人的天堂| av在线观看视频网站免费| 欧美日韩国产mv在线观看视频| 国产精品国产av在线观看| av片东京热男人的天堂| 国产精品久久久久久精品古装| videosex国产| 男女高潮啪啪啪动态图| 国产精品久久久av美女十八| 欧美人与性动交α欧美精品济南到 | 宅男免费午夜| 精品久久国产蜜桃| 亚洲美女搞黄在线观看| 国产女主播在线喷水免费视频网站| 啦啦啦视频在线资源免费观看| 97超碰精品成人国产| 黑人高潮一二区| 欧美日韩亚洲高清精品| 1024视频免费在线观看| 国产精品熟女久久久久浪| 亚洲精品美女久久av网站| av一本久久久久| 精品视频人人做人人爽| av免费在线看不卡| 久久久久久人人人人人| 最近最新中文字幕大全免费视频 | 午夜激情久久久久久久| 中文字幕亚洲精品专区| 只有这里有精品99| 国产精品久久久久久精品电影小说| 夫妻性生交免费视频一级片| 黑人欧美特级aaaaaa片| 日韩一区二区视频免费看| 各种免费的搞黄视频| 狠狠精品人妻久久久久久综合| 中文欧美无线码| 亚洲精品第二区| 国产成人精品无人区| 最近手机中文字幕大全| 国产高清不卡午夜福利| 精品少妇久久久久久888优播| 在线观看免费视频网站a站| 免费不卡的大黄色大毛片视频在线观看| 精品99又大又爽又粗少妇毛片| 婷婷色麻豆天堂久久| 国产精品一区www在线观看| 国产精品久久久久久久电影| 精品少妇内射三级| 国产欧美亚洲国产| 在线观看美女被高潮喷水网站| 久久狼人影院| 国产欧美另类精品又又久久亚洲欧美| 伊人久久国产一区二区| 久久久久精品久久久久真实原创| 久热久热在线精品观看| 国产一区二区三区av在线| 国产乱来视频区| 亚洲av国产av综合av卡| 熟女人妻精品中文字幕| 成年美女黄网站色视频大全免费| 春色校园在线视频观看| 免费观看av网站的网址| 欧美人与性动交α欧美软件 | 色视频在线一区二区三区| 亚洲欧美成人精品一区二区| √禁漫天堂资源中文www| 日韩一区二区视频免费看| 精品久久国产蜜桃| h视频一区二区三区| 国国产精品蜜臀av免费| 人妻 亚洲 视频| 精品一区在线观看国产| 午夜视频国产福利| 欧美少妇被猛烈插入视频| 少妇的逼水好多| 国产高清国产精品国产三级| 国产午夜精品一二区理论片| 伦理电影免费视频| 精品人妻在线不人妻| 激情五月婷婷亚洲| 国产精品人妻久久久久久| av天堂久久9| 18禁国产床啪视频网站| 精品第一国产精品| 高清视频免费观看一区二区| 久久人人爽av亚洲精品天堂| 中国美白少妇内射xxxbb| 9色porny在线观看| 亚洲性久久影院| xxxhd国产人妻xxx| 国产欧美亚洲国产| av国产久精品久网站免费入址| 99国产综合亚洲精品| 99久久精品国产国产毛片| 最近最新中文字幕大全免费视频 | 亚洲精品国产av成人精品| 亚洲欧美精品自产自拍| 亚洲精品日本国产第一区| 中文天堂在线官网| 欧美成人午夜精品| 免费观看a级毛片全部| 日韩制服丝袜自拍偷拍| 亚洲av男天堂| 日韩视频在线欧美| 97在线视频观看| 深夜精品福利| 久久韩国三级中文字幕| 国产有黄有色有爽视频|