    Measured Performance and Analysis of the Residual Settlement of a PVD-Improved Marine Soft Ground

    2021-08-30 06:13:34KANGGichunKIMTaeHyungandYUNSeongKyu
    Journal of Ocean University of China 2021年5期

    KANG Gichun, KIM Tae-Hyung, and YUN Seong-Kyu

    Measured Performance and Analysis of the Residual Settlement of a PVD-Improved Marine Soft Ground

    KANG Gichun1), KIM Tae-Hyung2), and YUN Seong-Kyu3), *

    1) Department of Civil Engineering, College of Engineering, Gyeongsang National University, Jinju 52828, Republic of Korea 2) Department of Civil Engineering, Korea Maritime and Ocean University, Busan 606-791, Republic of Korea 3) Engineering Research Institute, Gyeongsang National University, Jinju 52828, Republic of Korea

    Prefabricated vertical drains (PVDs) are commonly used to shorten the drainage path for consolidation as part of the improvement of marine soft ground. Many studies that focus on the primary consolidation settlement of PVD-improved soft ground have been conducted; however, residual settlement has been scarcely investigated. Residual settlement is the net effect of secondary compression and the remaining primary consolidation and generally occurs while the facilities are operating. In this study, residual settlement was investigated using the measured field settlement data obtained from the surface settlement plate and multilayer settlement gauges. This study determined that PVD still hassome effect on residual settlement and can reduce the settlement times.Residual settlement is only related to the PVD-improved soil layer and only occurs significantly in the middle zone of that layer over a few months. The middle zone may be related to the time delay of excess pore water pressure dissipation. This study concluded that the remaining primary consolidation in the PVD-improved soil layer is the primary cause of residual settlement, whereas secondary compression in the PVD-improved soil layer is only a minor cause.

    residual settlement; prefabricated vertical drain (PVD); operating facilities; primary consolidation; secondary compression; marine soft ground

    1 Introduction

    Prefabricated vertical drains (PVDs) are commonly used to improve the soft ground in many large-scale projects, such as the Tianjin Port, Changi East Reclamation, Kansai Airport, Haneda Airport, Chek Lap Kok Airport, North Jakarta Waterfront Reclamation, and Incheon Airport. The PVD accelerates the consolidation of soft clay deposits (Hansbo, 1979; Chu., 2006). Numerous studies related to the PVD have included experimental and theoretical investigations of the smear zone, well resistance, installation pattern, discharge capacity, material properties, and permeability (Chai and Miura, 1999; Kiyama., 2000; Bo, 2004;Basu andPrezzi, 2007; Tripathi and Nagesha, 2010). The application efficiency, design, and various installation methods of the PVD have also been investigated (Abuel-Naga., 2006; Liu., 2008; Abuel-Naga and Bouazza, 2009; Geng., 2011; Howell., 2012).

    Although previous research has explained the performance of PVDs, the factors affecting their function, and their effect on ground improvement, few studies have investigated the residual settlement of PVD-improved soft ground (Mesri, 2001; Long, 2005). Most studies have focused on settlement due to primary consolidation during the ground improvement period in an attempt to estimate the change in the strength of soft soil and the amount of time required to remove the surcharge (Hansbo, 1981; Zeng andXie, 1989; Byun., 2009). Through the use of the vertical drain (VD) method, residual settlement of the improved soft ground can be determined on the basis of the following components in the consolidation process: 1) the remaining primary consolidation settlement under a service load of VD-improved soil layers (RSI), 2) the secondary compression of VD-improved soil layers (RSII), and 3) the remaining primary consolidation under a service load of underlying soil layers without VD improvement (RSIII) (Long., 2013). Because of the removal of the surcharge (followed by the application of operational stresses), these components can aid in the determination of residual settlement. Only the first and third components should be affected by the PVD, as they are related to the dissipation of pore water pressures. These three components of residual settlement are difficult to differentiate. Therefore, engineers follow the rule that the maximum value of residual settlement should be smaller than the value specified in the design criteria of the project.

    From the perspective of facility maintenance and management, residual settlement (also known as post-construction settlement), which occurs after the construction is complete, is no less important than primary consolidation because it is known to cause several problems and tends to occur continuously while the facility is operating. Design parameters and current design criteria often fail to consider residual settlement (Long, 2005). In some cases, significant differences between field performance and design expectations exist, particularly regarding residual settlement after construction (Long., 2013). Many researchers have conducted analytical and numerical studies (Yin and Graham, 1994; Balasubramaniam., 2010;Indraratna., 2011; Tashiro., 2011; Ghandeharioon., 2012) of residual settlement, as well as extensive laboratory and field (small-scale and large-scale) tests (Leroueil.,1985;MersriandCastro,1987;Mesri,2001;Mesri andVardhanabhuti, 2005). However, few studies of residual settlement behavior have been conducted during facility operation at a real project site because of the lack of complete instrumentation and the challenges of implementing the available instrumentation (Simons, 1957; Bjer-rum, 1967; Salem and El-Sherbiny, 2014).

    Therefore, in this study, the residual settlement behavior of soft ground improved by PVDs was investigat- ed using the settlement data collected at a container yard site (1.92 km2). The field settlement data were monitoredthroughout the entire soft ground improvement process, that is, from PVD installation to facility operation (approximately 4 years). In particular, the residual settlement data obtained from the multilayer settlement gauges after removing the surcharge load, followed by the application of the operating load, were investigated in detail to determine the effect of PVD on residual settlement, the variation of residual settlement with depth, and the soil layer that is primarily related to residual settlement.

    2 Site Description, Clay Properties, and Ground Improvement Using PVDs

    The site, which is located west of Busan City, was open-ed in 2006. This area corresponds to the lower delta plain of the Nakdong River Delta, which is covered by a thick deposit consisting of thick soft clay, sand, and gravel on the bedrock. In some areas, the thick soft clay layer is thicker than 70m. The average depth of clay ranges from DL.(?)30m to DL.(?)50m (Fig.1).

    In terms of physical and mechanical properties, the over- consolidation ratio (OCR) values of clay at depths greater than 30m are greater than unity, whereas those of clay at depths less than 30m are less than unity. Clay has a unit weight of approximately 15 to 18kNm?3, void ratio of 1.5±0.5, and water content of approximately 20% to 75%. The compression index (c) ranges from 0.3 to 1.2 (Fig.2). The specific gravity is approximately 2.7. Clay is located between the A-line and the U-line on the plasticity chart and can be categorized as CL or CH on the basis of the Unified Soil Classification System. The activity of clay is approximately=1.0 and can be inferred to include mostlyillite (=0.5–1.0) (Fig.3). On the basis of the results of the field vane shear test (FVST), unconfined compression (u), and unconsolidated undrained triaxial compression tests (uu), the undrained shear strength (u) is increased. Thevalues of the standard penetration tests of clay range between 0 and 2 in DL.(?)0 to 10m and between 2 and 8 in DL.(?)20 to 40m (Fig.4). Thevalue is the total number of blows required to drive the sampler to a depth of 30cm (Lee., 2006; Byun., 2009). This soft soil is expected to have a large degree of settlement when it is subjected to loading.

    To improve the soft ground, PVDs were installed at this site. The improved depth of soft clay was determined usingthevalue. Soil with anvalue less than 8 was improved, and its depth approximately corresponded to DL.(?)30 to 40m (Fig.1(c)). The time it took the ground to improve was 12–21months, and the applied surcharge load was 15.38–28.56tm?2. In general, ground improvement with PVDs occurs through the following steps: sand mat formation, PVD installation, surcharge preloading, and surcharge removal (Fig.5(a)). The PVD was installed on the sand mat formed to DL.(+)3.0m. After leveling the sand mat, the PVD installation positions were marked, the PVD installation equipment was assembled, and the PVD was installed. The PVD began to penetrate the ground, and the mandrel was kept vertical. When the PVD reached the required depth, the mandrel was pulled out, and the remaining 30cm of PVD was cut. Before starting the surcharge, the top of the PVD was bent and the head was arranged (Fig.5(b)). The management of PVD installation is important because it directly influences the improvement of the ground. The installation position of PVD penetration must be accurate within 10cm from its plan position. The installation depth of the PVD is approximately 30–40m. If the length of the remaining drain is shorter than the installation depth, then the remaining drain should be disposed of. Three different spacings (pitches) of 1.0, 1.2, and 1.5m were used with the square arrangement. The total length of PVDs installed at this site was approximately 32088326m.

    Compressible soil becomes consolidated as the pore water is expelled from the soil matrix. The time required for consolidation depends on the square of the distance the water must travel to exit the soil. PVDs provide short drainage paths for the water to exit the soil. Consolidating soft cohesive soils using PVDs with preloading can reduce the settlement times from years to months. Thus, settlement mostly occurs during construction, which keeps post-construction settlement to a minimum.

    The PVD used (product name VD 849) at this site was a separate-form pocket drain. In this type of PVD, the drain core and filter are separate and made from a 100% virgin polypropylene core and a nonwoven filter jacket marked as a PVD filter material. Table 1 shows the required PVD quality criteria and properties of VD 849. The most important property for PVD quality control is the drainage capacity, which should be greater than 25cm3s?1.

    3 Instruments and Monitoring

    To verify the performance and control the construction work,severaltypesofmonitoringinstruments,including49 surface settlement plates, 92 multilayer settlement gauges, 10 inclinometers, 29 pore pressure transducers, and 8 groundwater level gauges, were installed after sand mat formation (Fig.6). The ground surface settlement plates were installed to monitor the vertical settlement of the original ground. The multilayer settlement gauges with a full-scale accuracy of ±0.5% were installed to quantify the compression between the soil layers. Measurements were taken from July 2002 to July 2009.

    Table 1 Required prefabricated vertical drain (PVD) quality criteria and properties of VD 849

    Fig.1 Site description.

    Fig.2 (a) Water content (w) with liquid limits (LL) and plastic limits (PL) and (b) Compression index (Cc).

    Fig.3 (a) Plasticity chart and (b) activity.

    Fig.4 (a) Undrained shear strength (b) N value of standard penetration tests.

    Fig.5 (a) Soft ground improvement process with PVD and preloading, and (b) Schematic profile of PVD installation.

    The settlement data were only used to assess the ground improvement and determine the degree of consolidation during the loading period at this site; these are the most important monitoring readings. The use of a pore water gauge to estimate the degree of consolidation was not recommended at this site.

    Theoretically, the dissipation of excess pore water pressure can induce ground settlement, and pore water pressure gauges can estimate the degree of consolidation. How- ever, these estimations may differ from the actual induced settlement. Pore water pressure gauges do not show consistent results because of the inhomogeneity of the ground, sensor corrections for depth due to settlement, and ground- water level variations; therefore, the degree of consolidation with the depth based on these gauges may not be reliable (Chu and Yan, 2005). Thus, the degree of consolidation predicted by the pore water pressure gauges at this site was not used. For this reason, this study used Eq. (1) to calculate the degree of consolidation on the basis of the amount of settlement, as follows:

    4 Ground Settlement

    4.1 Primary Consolidation Settlement

    Primary consolidation settlement is a type of settlement that occurs mainly during the ground improvement period. As discussed in the ‘Instruments and monitoring’ section, settlement was measured by gauges that were installed after PVD installation. However, the soft ground had already begun settling when the sand mat was placed on it. The initial settlement caused by sand mat formation, which was in the range of 4–5m at this site, was estimated by groundwater level measurements and cone penetration tests. The results of both methods showed that the average initial settlement occurred at 0.6m between sand mat formation and PVD installation. The sand mat layer itself did not compress. The initial settlement was incorporated in the total settlement because it affects the total settlement and the time required for surcharge removal. The surcharge load was removed when the ground reached the required degree of consolidation or settlement.

    Fig.7 shows the measured settlement (denoted by an open square) until the time of surcharge removal at Blocks D2 and F2. The upper part of the figure shows the fill history. As illustrated in the figure, as the fill height increased, so did the settlement because of the consolidation of soft clay. The total settlement at the time of surcharge removal was approximately 4.85 and 5.53m in Blocks D2 and F2, respectively. On the basis of the measured data, back analysis was also conducted to predict settlement. The TCON program (TAGA Engineering Software, 2013), a finite difference method, was used.TCON calculates the consolidation and rate of settlement, considering both radial and vertical drainage and providing the capability to simulate sand or wick drains. To conduct back analysis, first, the input data, such as the unit weight, water content, compression index, consolidation velocity, and coefficient of consolidation, were determined for each location where measurement gauges were placed. Table 2 shows the input parameters of each subsoil layer in the PVD-improved layer for TCON analysis. The depth of each soil layer is different for each block; thus, the ranges of the soil parameters are listed. Then, the soil properties were estimated by trial and error and by comparison with the measured data, with particular focus on the coefficient of consolidation. During the design phase, the coefficient of horizontal consolidation was assumed to be two times that of the coefficient of vertical consolidation, that is,h=2v. In back analysis, the predicted settlement was similar to the measured settlement if the coefficient of horizontal consolidation was assumed to be 2.3–3.5 times that of the coefficient of vertical consolidation. The settlement predicted by TCON is also shown in Fig.7 (denoted by a dotted line).

    Table 3 shows the back analysis results predicted by TCON. The estimated settlement indicated that the time required for surcharge removal corresponded to a degree of consolidation of over 90%. For all blocks at this site, at the time the surcharge load was removed, the degree of consolidation had exceeded 94%. This degree of consolidation satisfied the target design criterion at this site (, a degree of consolidation of over 90%).

    Fig.7 Fill and settlement histories during soil improvement period until the removal of the surcharge load.

    Table 2 Input parameters for TCON analysis

    Notes: Specific gravity (s)=2.72,h=(2.3–3.5)v.

    Table 3 Back analysis results based on the elimination of surcharge for each block

    4.2 Residual Settlement During Facility Operation

    In this study, residual settlement was defined as the settlement that occurs from the time the surcharge is removed during facility operation. Therefore, residual settlementmay include some remaining primary consolidation settlement under an operating load of PVD-improved soil layers, secondary compression of PVD-improved soil layers, and remaining primary consolidation under an operating load of underlying soil layers without PVD improvement.

    After removing the surcharge load, super facilities, such as roadways and railroads, were constructed and operated on the improved area. Such super facilities influence the operating (or service) load by inducing residual ground settlement. During this period, settlement was monitored continually by the surface settlement plates and multilayer settlement gauges to observe the ground’s behavior. The monitored settlement data were used to analyze the behavior of soft soil while the facility was operating.

    4.2.1 Residual settlement on the ground’s surface

    Fig.8 shows the ground’s surface settlement histories of Blocks C2, D2, E2, and F2 after operating the facilities. Preloading was removed between February 2004 and August 2005 for Blocks C2 and D2 (Fig.8(a)) and between August 2005 and June 2006 for Blocks E2 and F2 (Fig.8(b)). Generally, settlement rapidly occurred at first and gradually evened out over time. The settlement of Blocks C2, D2, E2, and F2 reached approximately 7, 10, 10, and 18cm, respectively. The settlement of Block F2 was some- what higher than that of other blocks because the temporarily overburdened load was removed from Block E2.

    Fig.9 shows the final residual settlement contour of the ground’s surface plotted in December 2008. Block A consisted of buildings that did not have residual settlement data because the transducers were damaged after removing the surcharge load and beginning the construction of these buildings. Blocks B, C, and D exhibited more settlement than the other blocks because of differences in the amount of time that the facilities operated. These blocks experienced one more year of operating time than the other blocks.

    Fig.8 Residual settlement histories after operating the facilities at the ground surface: (a), Blocks C2 and D2; (b), Blocks E2 and F2.

    Fig.9 Contour map of final residual settlement at ground surface after operating the facilities (unit: mm).

    As expected, the measured settlements were similar to the predicted settlements because the settlements were predicted using the recalculated coefficient of consolidation (v) and compression index (c) on the basis of the measured field settlement data at the time of surcharge removal (Fig.10). The residual settlement was less than the value specified in the project’s design criteria. The measured residual settlements were similar to the residual settlements predicted by back analysis using TCON. How-ever, the differences between them were significant for Blocks E and F, which can be attributed to the smaller operating load, particularly to the design load, which is approximately 4 and 5 tons in Blocks E and F, respectively. If the correct operating load is applied, then the settlement may increase. The measurement period may also negatively influence the comparison between measured and predicted settlements. Although the prediction period is 50 years, the measurement period is only approximately 3 years, which is insufficient. Thus, the predicted settlement is larger than the measured settlement, as shown in Fig.10. Notably, the secondary compression effect is not incorporated in the TCON program, theoretically. The discussion of the comparison between prediction and measured data may not be appropriate. However, from a practical point of view, this can be ignored because Terzaghi’s theory was developed on the basis of the laboratory test. In the laboratory test, it is difficult to imagine that no secondary effects occurred during primary consolidation when secondary effects occurred under the previous load and after the primary load, thus indicating that it is a continuous phenomenon. Furthermore, even if the secondary effects follow primary consolidation, the primary effects should disappear near the drainage boundaries almost at once. Thus, the secondary effects should start in some parts of the soil sample before the primary effects have been completed everywhere in the sample.

    Fig.10 Comparison of measured and predicted residual ground settlement (Time period of prediction is 50 years and time period of measurement is about 3 years).

    4.2.2 Residual settlement of each soil layer

    Figs.11 and 12 show the residual settlement histories obtained from the multilayer settlement gauges in Blocks D2 and F2. As shown in Fig.6, five multilayer settlement gauges, that is, three in the middle of the PVD-improved soft ground (S1, S2, and S3), one on top of the soil layer having anvalue between 8 and 15 (S4), and one at the bottom of the sand and gravel layer (S5), were installed. The layers in which Gauges S4 and S5 were installed were relatively firm, unimproved ground withvalues greater than 8, as shown in Fig.1. These multilayer settlement gauges can measure the relative displacement between each layer.

    In Fig.11, which depicts the results of Block D2, Gauges S1, S2, and S3 showed residual settlements of approximately 2, 7, and 0cm, respectively. Gauges S4 and S5 did not obtain any settlement data because they were damaged.Fig.12 shows the residual settlement history obtained from the multilayer settlement gauges in Block F2. Block F2 had a residual settlement pattern similar to that of Block D2, as shown in Fig.11. The top settlement gauge (, Gauge S1) did not show much settlement during facility operation. Meanwhile, Gauges S2 and S3 measured approximately 10cm of residual settlement. Gauges S4 and S5 recorded no settlement because the layers in which they were installed consisted of relatively firm, unimproved ground withvalues greater than 8 (Fig.6).

    Fig.13 shows a plot of residual settlement with depth, as measured by gauges in Blocks D2 and F2. Althoughresidual settlement in the boundaries (, the top and bottom of the PVD-improved soil layer) barely occurred, the residual settlement measured in the middle zone of the PVD-improved soil layer was significant. The middle zone is related to the time delay of excess pore water pressure dissipation. Two important conclusions can be drawn from this figure.

    First, the residual settlement that occurred during facility operation was related only to the soil layer that had been improved by PVDs, which had anvalue less than 8. Meanwhile, no settlement occurred in the unimproved layer, which had anvalue greater than 8. At this site, the residual settlement may be only a part of the remaining primary consolidation settlement and secondary compression under an operating load of improved soil layers. In general, the contribution of the residual compression of the unimproved soil layer when compared with the totalresidual settlement depends on the compressibility of the soil layer, as well as the time and magnitude of unloading. However, the residual settlement of the unimproved soil layer was not detected at this site. Second,residual settlement mainly occurred in the middle of the improved layer, which may be related to the time delay of excess pore water pressure dissipation in the midsection of the layer. That is, the remaining primary consolidation in the PVD-improved soil layer was the primary cause of residual settlement, whereas secondary compression was only a minor cause.

    Fig.11 Residual settlement at each soil layer in block D2.

    Fig.12 Residual settlement at each soil layer in block F2.

    Fig.13 Variation of residual settlement with depth: (a) Blocks D2 and (b) Block F2.

    4.2.3 Effect of PVD on residual settlement

    PVD mainly accelerates primary consolidation because significant water movement is associated with it. However, with the consolidation of soil, the drain will buckle or deform inside the soil. Moreover, when the pores of the filter are too large, the fine-grained soils may ingress and clog the drain. The discharge capacity of the buckled and clogged drain will normally be smaller than that of a straight and unclogged drain. Thus, residual settlement (induced by the remaining primary consolidation settlement and secondary compression under a service load of PVD-improved soil layers) is not sped up by the drain. Hence, the effect of PVD on residual settlement may not be significant. That is, from the residual settlement point of view, the behavior of soil with PVD may not differ significantly from that of soils without VD. Residual settlement in soils without drains occurs for a long time, which is generally acceptable. In some clay (, Norwegian marine clay), residual settlement continues for thousands of years (Bjerrum, 1967).

    However, at this site, the measured residual settlement is slightly different. As shown in Figs.11 and 12, although residual settlement in the boundaries (, the top and bottom of PVD-improved soil layer) barely occurred, the residual settlement measured in the middle zone of the PVD-improved soil layer was significant in just a few months. This finding indicates that PVD still hassome effect on residual settlement and can reduce the time of residual settlement. The middle zone may be related to the time delay of excess pore water pressure dissipation. After removing the surcharge load, followed by the application of the operating load, the primary effects almost disappear near the drainage boundaries. However, in some parts of the soil layer (particularly in the middle part), primary consolidation has not been completed. If the soil is not improved with PVD, then it may take more time than was measured. Notably, this conclusion is only based on the settlement data obtained from the multilayer settlement gauges. In this study, the amount of residual settlement induced by PVD cannot be separated from the measured settlement because of the lack of data regarding the degree of consolidation for each subsoil layer. However, the key fact that can prove the effects of PVD on residual settlement is the significant residual settlement measured in the PVD-improved soil layer in just a short period, as shown in Fig.10.

    5 Conclusions

    This study investigated the residual settlement behavior of thick soft ground improved by PVDs. To this end, the settlement data obtained from the surface settlement plates and multilayer settlement gauges after removing the surcharge load, followed by the application of the operating load (approximately 4 years), were analyzed. Residual set- tlement can be determined on the basis of the followingcomponents: 1) some remaining primary consolidation set-tlement under an operating load of PVD-improved soil layers (RSI), 2) secondary compression of PVD-improved soil layers (RSII), and 3) the remaining primary consolida- tion under a service load of underlying soil layers without PVD improvement (RSIII).In this study, we obtained three key findings:

    1) The residual settlement that occurred at this site was smaller than the value specified in the design criteria of the project. Thus, it met the design criteria.

    2) Three components of residual settlement (, RSI, RSII, and RSIII) were differentiated. This study is the first attempt to use the settlement data measured long-term in soilimprovedwithPVD.Residualsettlementonlyoccurred in PVD-improved soil layers. This finding indicates that residual settlement is a problem that only occurs in PVD-improved soil layers (RSIand RSII), not in unimproved soil layers (RSIII).

    3) For residual settlement at a depth within the PVD-improved soil layer, althoughresidual settlement in the boundaries (, top and bottom of PVD-improved soil layer) barely occurred, the residual settlement measured in the middle zone of the PVD-improved soil layer was significant in just a few months. The middle zone may be related to the time delay of excess pore water pressure dissipation because, after removing the surcharge load, followed by the application of the operating load, primary consolidation in the middle part of the improved soil layer has not been completed. The remaining primary consolidation in the PVD-improved soil layer was the primary cause of residual settlement.

    Acknowledgements

    This research was supported by the Basic Science Research Program through the National Research Foundation of Korea (NRF) funded by the Ministry of Education (No. 2020R1I1A3067248).

    Abuel-Naga,H. M.,and, A., 2009.Equivalent diameter of a prefabricated vertical drain., 27 (3): 227-231, https://doi.org/10.1016/j.geotexmem.2008.11.006.

    Abuel-Naga, H. M.,Bergado, D.T., and Chaiprakalkem, S., 2006.Innovative thermal technique for enhancing the performance of prefabricated vertical drain during the preloading process., 24(6):359-370, https://doi.org/10.1016/j.geotexmem.2006.04.003.

    Balasubramaniam, A. S., Cai, H.,Zhu, D., Surarak, C.,and Oh, E. Y. N., 2010. Settlements of embankments in soft soils., 41 (2): 1-19.

    Basu, D., and Prezzi, M., 2007. Effect of the smear and transition zones around prefabricated vertical drains installed in a triangular pattern on the rate of soil consolidation.. 7 (1): 34-43, https://doi.org/10.1061/(ASCE)1532-3641(2007)7:1(34).

    Bjerrum, L., 1967. Engineering geology of Norwegian normally-consolidated marine clays as related to settlements of buildings., 17 (2): 83-118, https://doi.org/10.1680/geot.1967.17.2.83.

    Bo, M. W., 2004. Discharge capacity of prefabricated vertical drain and their field measurements., 22 (1-2): 37-48, https://doi.org/10.1016/S0266-1144(03)00050-5.

    Byun, Y., Ahn, B., and Chun, B., 2009. A study on the soft ground improvement in deep depth by application of PBD method using model test., 10 (6): 69-77.

    Chai, J. C., and Miura, N., 1999. Investigation on some factors affecting vertical drain behavior.,216-226, https://doi.org/10.1061/(ASCE)1090-0241(1999)125:3(216).

    Chu, J.,and Yan, S. W., 2005.Application of the vacuum preloading method in soil improvement project. In:Indraratna, B., and Chu, J. J., eds., Elsevier, London, 91-118, https://doi.org/10.1016/S1571-9960(05)80006-0.

    Chu, J., Bo, M. W., and Choa,V., 2006. Improvement of ultra-soft soil using prefabricated vertical drains., 24 (6): 339-348, https://doi.org/10.1016/j.geotexmem.2006.04.004.

    Geng, X.,Indraratna, B., and Rujikiatkamjorn,C., 2011. Effectiveness of partially penetrating vertical drains under a combined surcharge and vacuum preloading., 48 (6): 970-983, https://doi.org/10.1139/t11-011.

    Ghandeharioon, A., Indraratna, B., and Rujikiatkamjorn, C., 2012.Laboratory and finite-element investigation of soil disturbance associated with the installation of mandrel-driven prefabricated vertical drains.,138 (3): 295-308, https://doi.org/10.1061/(ASCE)GT.1943-5606.0000591.

    Hansbo, S., 1979. Consolidation of clay by band-shaped prefabricated drains.,12(5):16-25.

    Hansbo, S., 1981. Consolidation by vertical drains.,31(5):45-66, https://doi.org/10.1680/geot.1981.31.1.45.

    Howell, R., Rathje, E. M.,Kamai, R., and Boulanger, R., 2012. Centrifuge modeling of prefabricated vertical drains for liquefaction remediation.,138 (3): 262-271, https://doi.org/10.1061/(ASCE)GT.1943-5606.0000604.

    Indraratna, B., Rujikiatkamjorn, C., Ameratunga, J., and Boyle, P., 2011. Performance and prediction of vacuum combined surcharge consolidation at Port of Brisbane.,137(11):1009-1018, https://doi.org/10.1061/(ASCE)GT.1943-5606.0000519.

    Kiyama, M., Oshima, A., Kusakabe, F., and Harada, K., 2000. The new accelerated consolidation method combining the dewatering and plastic-board-drain by floating system (PDF) methods.. the Geo-Institute of the American Society of Civil Engineers. Noordwijkerhout, the Netherlands,246-258, https://doi.org/10.1061/40552(301)19.

    Lee, H.-J., Jung, J.-B., Byun, G.-J., and Yang, S.-Y., 2006. Improvement of plastic board drain method applied at the Pusan New Port project site in Korea.. San Francisco, California, 376-383.

    Leroueil, S., Kabbaj, M., Tavenas, F., and Bouchard, R., 1985. Stress-strain-strain rate relation for the compressibility of sensitive natural clays.,35(2):159-180, https://doi.org/10.1680/geot.1985.35.2.159.

    Liu, S.Y., Han, J., Zhang, D.W., and Hong, Z.S., 2008. A combined DJM-PVD method for soft ground improvement.,15(1):43-54, https://doi.org/10.1680/gein.2008.15.1.43.

    Long, P.V., 2005. Existing problems of design criteria for highway embankments on soft ground in Vietnam.. Ho Chi Minh City, 733-738.

    Long, P.V., Bergado, D.T., Nguyen, L.V., and Balasubramaniam, A.S., 2013. Design and performance of soft ground improvement using PVD with and without vacuum consolidation.,44(4):36-51.

    Mersri, G., and Castro, A., 1987. Ca/Ccconcept and K0during secondary compression.,112(3):230-247, https://doi.org/10.1061/(ASCE)0733-9410(1987)113:3(230).

    Mesri, G., 2001. Primary compression and secondary compression.Geotechnical Special Publication, ASCE, 119:122-166, https://doi.org/10.1061/40659(2003)5.

    Mesri, G., and Vardhanabhuti, B., 2005. Secondary compression.,131 (3): 398-401, https://doi.org/10.1061/(ASCE)1090-0241(2005)131:3(398).

    Salem, M., and El-Sherbiny, R., 2014. Comparison of measured and calculated consolidation settlements of thick underconsolidated clay.,53:107-117, https://doi.org/10.1016/j.aej.2013.11.002.

    Simons, N., 1957. Settlement studies on two structures in Norway.,1: 431-436.

    TAGA Engineering Software, 2013.. www.tagasoftware.com/TAGAsoft/Products/settle.

    Tashiro, M., Noda, T., Inagaki, M., Nakano, M., and Asaoka, A.,2011. Prediction of settlement in natural deposited clay groundwith risk of large residual settlement due to embankment loading.51(1):133-149, https://doi.org/10.3208/sandf.51.133.

    Tripathi, K. K., and Nagesha, M. S., 2010. Discharge capacity requirement of prefabricated vertical drains.,28 (1): 128-132, https://doi.org/10.1016/j.geo- texmem.2009.09.004.

    Yin, J.H., and Graham, J., 1994. Equivalent times and one-dimensional elastic visco-plastic modeling of time-dependent stress-strain behavior of clays.,31:42-52, https://doi.org/10.1139/t94-005.

    Zeng, G.X., and Xie, K.H., 1989. New development of the vertical drain theories.. Rio de Janeiro, Brazil, 1435-1438.

    . E-mail: tjdrb330@gnu.ac.kr

    June 9, 2020;

    December 8, 2020;

    December 29, 2020

    ? Ocean University of China, Science Press and Springer-Verlag GmbH Germany 2021

    (Edited by Xie Jun)

    bbb黄色大片| 午夜精品国产一区二区电影| 日韩电影二区| 国产亚洲精品久久久久5区| 日本av免费视频播放| 又粗又硬又长又爽又黄的视频| 久久精品久久精品一区二区三区| 妹子高潮喷水视频| 久久亚洲精品不卡| 亚洲国产精品一区二区三区在线| 精品国产一区二区久久| 在线观看免费高清a一片| 天堂俺去俺来也www色官网| 日韩视频在线欧美| 人成视频在线观看免费观看| 日本猛色少妇xxxxx猛交久久| 亚洲欧美一区二区三区久久| av线在线观看网站| 欧美日本中文国产一区发布| 这个男人来自地球电影免费观看| 在线观看国产h片| 美女国产高潮福利片在线看| 丰满饥渴人妻一区二区三| 日本91视频免费播放| 一个人免费看片子| 亚洲av电影在线进入| 国产熟女午夜一区二区三区| 精品一区二区三区av网在线观看 | 国产伦人伦偷精品视频| 男女免费视频国产| 波野结衣二区三区在线| 一区二区日韩欧美中文字幕| 精品视频人人做人人爽| 狠狠精品人妻久久久久久综合| 悠悠久久av| 777久久人妻少妇嫩草av网站| 一级毛片我不卡| 色播在线永久视频| 成人18禁高潮啪啪吃奶动态图| 熟女少妇亚洲综合色aaa.| 国产精品亚洲av一区麻豆| 亚洲情色 制服丝袜| 2021少妇久久久久久久久久久| 在线亚洲精品国产二区图片欧美| 欧美激情极品国产一区二区三区| 午夜av观看不卡| 男女国产视频网站| 丝袜脚勾引网站| 欧美在线黄色| 纵有疾风起免费观看全集完整版| 女人精品久久久久毛片| 无限看片的www在线观看| 好男人电影高清在线观看| 国产在线视频一区二区| 黄色片一级片一级黄色片| 久久久久久久精品精品| 自线自在国产av| 国产一区二区三区综合在线观看| 视频区图区小说| 国产99久久九九免费精品| 热re99久久精品国产66热6| 宅男免费午夜| 在线观看免费日韩欧美大片| 国产99久久九九免费精品| 老汉色∧v一级毛片| 91麻豆精品激情在线观看国产 | 啦啦啦在线观看免费高清www| 国产在视频线精品| 午夜影院在线不卡| 日韩av不卡免费在线播放| 欧美中文综合在线视频| 国产亚洲av高清不卡| 考比视频在线观看| 满18在线观看网站| 久久天躁狠狠躁夜夜2o2o | 人体艺术视频欧美日本| 亚洲欧美精品自产自拍| 99精品久久久久人妻精品| 男女国产视频网站| 日韩免费高清中文字幕av| 黄网站色视频无遮挡免费观看| 免费黄频网站在线观看国产| 高清视频免费观看一区二区| 日韩 欧美 亚洲 中文字幕| 久热这里只有精品99| 人妻一区二区av| 成年动漫av网址| 你懂的网址亚洲精品在线观看| 视频区欧美日本亚洲| kizo精华| 黄色毛片三级朝国网站| 午夜91福利影院| 手机成人av网站| 久久久久久免费高清国产稀缺| 男人添女人高潮全过程视频| 国产一区二区激情短视频 | 国产亚洲av高清不卡| 欧美亚洲日本最大视频资源| 日韩 亚洲 欧美在线| 亚洲精品成人av观看孕妇| 老汉色∧v一级毛片| 纯流量卡能插随身wifi吗| 亚洲伊人色综图| 纯流量卡能插随身wifi吗| 女人高潮潮喷娇喘18禁视频| 新久久久久国产一级毛片| 午夜影院在线不卡| 欧美黄色片欧美黄色片| 亚洲av电影在线进入| 亚洲精品自拍成人| 国产不卡av网站在线观看| 亚洲欧美中文字幕日韩二区| 国产一级毛片在线| 国产淫语在线视频| 亚洲av电影在线进入| 国产国语露脸激情在线看| av一本久久久久| 久久久久精品国产欧美久久久 | 国产日韩欧美在线精品| 国产一区有黄有色的免费视频| 亚洲精品一区蜜桃| 国产亚洲精品第一综合不卡| 久久久国产欧美日韩av| 国产野战对白在线观看| 午夜免费成人在线视频| 国产精品一区二区在线观看99| 极品人妻少妇av视频| 一区二区三区乱码不卡18| 国产亚洲av片在线观看秒播厂| 你懂的网址亚洲精品在线观看| 亚洲综合色网址| 精品福利观看| 亚洲国产日韩一区二区| 成年人黄色毛片网站| 大话2 男鬼变身卡| 性色av一级| 亚洲欧美一区二区三区国产| 高清欧美精品videossex| 久热爱精品视频在线9| 国产亚洲av高清不卡| 亚洲精品中文字幕在线视频| 超碰97精品在线观看| videos熟女内射| av欧美777| 捣出白浆h1v1| 国产av精品麻豆| 后天国语完整版免费观看| 成人三级做爰电影| 婷婷色av中文字幕| 国产有黄有色有爽视频| 国产片内射在线| 精品国产超薄肉色丝袜足j| 啦啦啦 在线观看视频| 极品人妻少妇av视频| 在现免费观看毛片| 中文字幕人妻丝袜一区二区| 国产成人91sexporn| 啦啦啦视频在线资源免费观看| 免费观看av网站的网址| 国产不卡av网站在线观看| 免费看不卡的av| 99re6热这里在线精品视频| 大香蕉久久网| www.av在线官网国产| 精品人妻熟女毛片av久久网站| 老汉色av国产亚洲站长工具| 人人妻人人澡人人爽人人夜夜| 国产成人精品久久二区二区91| 久久精品成人免费网站| 国产熟女午夜一区二区三区| 老司机午夜十八禁免费视频| www.精华液| 久久综合国产亚洲精品| 91精品伊人久久大香线蕉| 国产精品一区二区精品视频观看| 欧美 日韩 精品 国产| 99热全是精品| 麻豆乱淫一区二区| 国产精品99久久99久久久不卡| 亚洲精品国产av成人精品| 一边摸一边抽搐一进一出视频| 精品少妇久久久久久888优播| 亚洲av片天天在线观看| 亚洲精品日本国产第一区| 97精品久久久久久久久久精品| 91字幕亚洲| 搡老岳熟女国产| 欧美激情 高清一区二区三区| 叶爱在线成人免费视频播放| 亚洲精品日韩在线中文字幕| 欧美日韩福利视频一区二区| 老司机亚洲免费影院| 91麻豆精品激情在线观看国产 | 首页视频小说图片口味搜索 | 国产av精品麻豆| 精品久久蜜臀av无| 悠悠久久av| 免费观看av网站的网址| 日日夜夜操网爽| 一个人免费看片子| 亚洲五月婷婷丁香| 国产精品熟女久久久久浪| 国产一卡二卡三卡精品| 久久久久视频综合| 中文字幕亚洲精品专区| 日韩一本色道免费dvd| 多毛熟女@视频| 精品久久久精品久久久| 美女国产高潮福利片在线看| 久久精品久久久久久久性| 精品亚洲乱码少妇综合久久| 日韩欧美一区视频在线观看| 十八禁网站网址无遮挡| 久久女婷五月综合色啪小说| 男的添女的下面高潮视频| 99国产精品一区二区蜜桃av | 日本黄色日本黄色录像| 男女免费视频国产| 国产一区二区在线观看av| 夫妻午夜视频| 黄片播放在线免费| 97人妻天天添夜夜摸| 伊人久久大香线蕉亚洲五| 1024香蕉在线观看| 波野结衣二区三区在线| 一区二区三区精品91| 首页视频小说图片口味搜索 | 欧美精品人与动牲交sv欧美| 中文字幕高清在线视频| 免费看不卡的av| 极品人妻少妇av视频| 精品少妇一区二区三区视频日本电影| 香蕉丝袜av| 中国国产av一级| 97在线人人人人妻| 麻豆国产av国片精品| 一本久久精品| 在线天堂中文资源库| 久久久久国产一级毛片高清牌| 亚洲成人免费电影在线观看 | 狂野欧美激情性bbbbbb| 久久女婷五月综合色啪小说| 久久人人爽av亚洲精品天堂| 日韩 欧美 亚洲 中文字幕| 成人黄色视频免费在线看| 91九色精品人成在线观看| 热99久久久久精品小说推荐| 亚洲成国产人片在线观看| 精品国产超薄肉色丝袜足j| 黄色视频不卡| 久9热在线精品视频| 黄片小视频在线播放| 深夜精品福利| 激情五月婷婷亚洲| 狂野欧美激情性bbbbbb| 国产高清视频在线播放一区 | 超碰97精品在线观看| 人妻 亚洲 视频| 最新的欧美精品一区二区| 亚洲国产精品一区三区| 久热爱精品视频在线9| 成人国产一区最新在线观看 | 99re6热这里在线精品视频| 丝袜美腿诱惑在线| 狂野欧美激情性xxxx| 老司机影院成人| 午夜福利乱码中文字幕| 亚洲激情五月婷婷啪啪| 午夜久久久在线观看| 王馨瑶露胸无遮挡在线观看| 狠狠精品人妻久久久久久综合| 欧美变态另类bdsm刘玥| 亚洲欧美成人综合另类久久久| 欧美 亚洲 国产 日韩一| 久久毛片免费看一区二区三区| 午夜福利免费观看在线| 一区在线观看完整版| 99久久99久久久精品蜜桃| 亚洲成人免费av在线播放| 免费女性裸体啪啪无遮挡网站| av又黄又爽大尺度在线免费看| 国产精品久久久久久精品电影小说| 日韩精品免费视频一区二区三区| 色精品久久人妻99蜜桃| 天堂8中文在线网| 999久久久国产精品视频| 免费高清在线观看日韩| xxx大片免费视频| 亚洲午夜精品一区,二区,三区| 国产一卡二卡三卡精品| 中文字幕人妻熟女乱码| 欧美日韩国产mv在线观看视频| 国产日韩欧美在线精品| 麻豆av在线久日| 青青草视频在线视频观看| 亚洲精品一卡2卡三卡4卡5卡 | 精品少妇一区二区三区视频日本电影| 久久亚洲国产成人精品v| 亚洲一卡2卡3卡4卡5卡精品中文| 国产免费视频播放在线视频| 国产亚洲精品第一综合不卡| cao死你这个sao货| 免费av中文字幕在线| 国精品久久久久久国模美| videos熟女内射| 51午夜福利影视在线观看| 高清av免费在线| 在线 av 中文字幕| 少妇粗大呻吟视频| 在线精品无人区一区二区三| 日韩大码丰满熟妇| 成人18禁高潮啪啪吃奶动态图| 一区二区三区激情视频| 国产午夜精品一二区理论片| 狠狠婷婷综合久久久久久88av| 国产欧美日韩综合在线一区二区| 日韩中文字幕视频在线看片| 亚洲免费av在线视频| 国产在视频线精品| 中文字幕人妻丝袜一区二区| 在线观看国产h片| 一区福利在线观看| 久久久久国产一级毛片高清牌| 伊人久久大香线蕉亚洲五| 免费人妻精品一区二区三区视频| 欧美日韩精品网址| 国产成人精品久久二区二区91| 天天躁日日躁夜夜躁夜夜| 十八禁网站网址无遮挡| 亚洲情色 制服丝袜| 午夜福利乱码中文字幕| 又粗又硬又长又爽又黄的视频| 欧美日韩亚洲高清精品| 女人久久www免费人成看片| 日韩一卡2卡3卡4卡2021年| 脱女人内裤的视频| 欧美精品高潮呻吟av久久| 日韩一本色道免费dvd| 黄色a级毛片大全视频| 成年av动漫网址| 香蕉丝袜av| 成人18禁高潮啪啪吃奶动态图| 久久国产精品影院| 午夜福利视频在线观看免费| 波野结衣二区三区在线| 亚洲天堂av无毛| av国产精品久久久久影院| 亚洲av成人不卡在线观看播放网 | 亚洲av日韩精品久久久久久密 | 黄色怎么调成土黄色| 黄网站色视频无遮挡免费观看| 国产不卡av网站在线观看| 香蕉国产在线看| 亚洲欧美一区二区三区久久| 亚洲精品一二三| 婷婷丁香在线五月| 丝袜喷水一区| 操美女的视频在线观看| 十八禁高潮呻吟视频| 国产极品粉嫩免费观看在线| 自线自在国产av| 男人操女人黄网站| 久久精品久久久久久久性| 丝袜人妻中文字幕| 亚洲欧美激情在线| 超色免费av| 99热全是精品| 中国美女看黄片| 亚洲欧美一区二区三区国产| 亚洲精品自拍成人| 又紧又爽又黄一区二区| 色精品久久人妻99蜜桃| 国产亚洲av高清不卡| 男的添女的下面高潮视频| 亚洲自偷自拍图片 自拍| 午夜福利免费观看在线| 欧美日韩国产mv在线观看视频| 老汉色av国产亚洲站长工具| 啦啦啦在线免费观看视频4| www.av在线官网国产| 久久 成人 亚洲| 视频区欧美日本亚洲| 丝袜美足系列| 精品国产乱码久久久久久男人| av电影中文网址| 免费观看人在逋| 老司机深夜福利视频在线观看 | 成年女人毛片免费观看观看9 | 视频区欧美日本亚洲| 少妇人妻久久综合中文| 2021少妇久久久久久久久久久| 女性生殖器流出的白浆| 天天躁日日躁夜夜躁夜夜| 欧美激情高清一区二区三区| 老司机影院成人| 男的添女的下面高潮视频| 狂野欧美激情性bbbbbb| 欧美精品一区二区免费开放| 久久久久久人人人人人| 日韩伦理黄色片| 久久人人97超碰香蕉20202| 国产麻豆69| videos熟女内射| 国产精品人妻久久久影院| 亚洲第一av免费看| 男女国产视频网站| 十八禁网站网址无遮挡| 好男人视频免费观看在线| 国产有黄有色有爽视频| 欧美日韩精品网址| 国产色视频综合| 欧美 日韩 精品 国产| 亚洲欧美成人综合另类久久久| 女人高潮潮喷娇喘18禁视频| 久久久国产一区二区| h视频一区二区三区| av天堂久久9| 一二三四社区在线视频社区8| 50天的宝宝边吃奶边哭怎么回事| 国产亚洲欧美在线一区二区| 日韩av免费高清视频| 十八禁高潮呻吟视频| 亚洲九九香蕉| 亚洲成人手机| 国产有黄有色有爽视频| 亚洲精品国产一区二区精华液| 狠狠精品人妻久久久久久综合| 国产黄色免费在线视频| 少妇 在线观看| 波野结衣二区三区在线| 久久青草综合色| 宅男免费午夜| 免费av中文字幕在线| 18禁国产床啪视频网站| 国产男女内射视频| 蜜桃在线观看..| 美女扒开内裤让男人捅视频| 黄片小视频在线播放| 亚洲欧洲日产国产| 成人午夜精彩视频在线观看| av又黄又爽大尺度在线免费看| 男女午夜视频在线观看| 一边亲一边摸免费视频| videos熟女内射| 欧美日韩亚洲国产一区二区在线观看 | 各种免费的搞黄视频| 美女国产高潮福利片在线看| 久久狼人影院| 高清黄色对白视频在线免费看| 亚洲精品国产一区二区精华液| 在线观看www视频免费| 九草在线视频观看| 极品人妻少妇av视频| 女人爽到高潮嗷嗷叫在线视频| 欧美久久黑人一区二区| 男女午夜视频在线观看| 国产精品 欧美亚洲| 国产淫语在线视频| av又黄又爽大尺度在线免费看| 午夜免费观看性视频| 国产成人欧美在线观看 | 国产一区有黄有色的免费视频| 亚洲国产av影院在线观看| 国产精品麻豆人妻色哟哟久久| 少妇人妻 视频| 亚洲av综合色区一区| 最黄视频免费看| 国产精品久久久久久精品古装| 亚洲国产av影院在线观看| 国产精品久久久久久人妻精品电影 | 人妻人人澡人人爽人人| 亚洲av美国av| 免费在线观看黄色视频的| 国产97色在线日韩免费| www.精华液| 国产成人欧美| 叶爱在线成人免费视频播放| 亚洲av电影在线观看一区二区三区| 国产无遮挡羞羞视频在线观看| 国产成人精品在线电影| 欧美中文综合在线视频| 伊人久久大香线蕉亚洲五| 亚洲色图 男人天堂 中文字幕| 91精品伊人久久大香线蕉| 午夜免费观看性视频| 波多野结衣一区麻豆| 热99国产精品久久久久久7| 人体艺术视频欧美日本| 伦理电影免费视频| 亚洲国产精品国产精品| bbb黄色大片| 九色亚洲精品在线播放| a级毛片在线看网站| 国产男女内射视频| 老司机影院成人| 久久精品国产亚洲av高清一级| 精品久久久精品久久久| 波野结衣二区三区在线| 好男人视频免费观看在线| 欧美精品一区二区大全| 久久久久久人人人人人| 又粗又硬又长又爽又黄的视频| 国产精品二区激情视频| 欧美人与性动交α欧美软件| 成人手机av| av天堂在线播放| 国产精品免费大片| 岛国毛片在线播放| 一边摸一边抽搐一进一出视频| 久久九九热精品免费| 丁香六月天网| 国产亚洲午夜精品一区二区久久| 亚洲精品美女久久av网站| av不卡在线播放| 两性夫妻黄色片| 午夜福利视频在线观看免费| 国产日韩一区二区三区精品不卡| 99国产综合亚洲精品| 国产视频一区二区在线看| 国产国语露脸激情在线看| 精品国产超薄肉色丝袜足j| 亚洲熟女精品中文字幕| 国产xxxxx性猛交| 亚洲熟女精品中文字幕| 国产xxxxx性猛交| 精品少妇久久久久久888优播| 亚洲成av片中文字幕在线观看| 精品久久久精品久久久| 在线看a的网站| 每晚都被弄得嗷嗷叫到高潮| 女警被强在线播放| 亚洲精品久久成人aⅴ小说| 高清av免费在线| 欧美激情极品国产一区二区三区| netflix在线观看网站| 这个男人来自地球电影免费观看| 99热全是精品| 最新在线观看一区二区三区 | 另类亚洲欧美激情| 亚洲成人手机| www.av在线官网国产| 下体分泌物呈黄色| 高清黄色对白视频在线免费看| 悠悠久久av| 18禁黄网站禁片午夜丰满| 久热这里只有精品99| 国产人伦9x9x在线观看| 久久人妻福利社区极品人妻图片 | 久久人妻福利社区极品人妻图片 | 国产欧美亚洲国产| 成年女人毛片免费观看观看9 | 国产精品秋霞免费鲁丝片| 国产真人三级小视频在线观看| 国产亚洲欧美精品永久| 精品人妻在线不人妻| 美女扒开内裤让男人捅视频| 黄片小视频在线播放| 一本久久精品| 母亲3免费完整高清在线观看| 狠狠精品人妻久久久久久综合| bbb黄色大片| 久久毛片免费看一区二区三区| 国产成人免费观看mmmm| 中文字幕人妻丝袜一区二区| 久久久久网色| 大香蕉久久成人网| 国产免费又黄又爽又色| 大片电影免费在线观看免费| 少妇精品久久久久久久| 国产精品一区二区免费欧美 | 亚洲成人国产一区在线观看 | 国产精品九九99| 国产一区二区 视频在线| 欧美老熟妇乱子伦牲交| 亚洲国产中文字幕在线视频| 亚洲av日韩精品久久久久久密 | 女人精品久久久久毛片| 亚洲成av片中文字幕在线观看| 免费一级毛片在线播放高清视频 | 十八禁高潮呻吟视频| 十分钟在线观看高清视频www| 精品亚洲成a人片在线观看| 色综合欧美亚洲国产小说| 性高湖久久久久久久久免费观看| 久久国产精品人妻蜜桃| 国产精品av久久久久免费| 久久精品亚洲熟妇少妇任你| 女警被强在线播放| 黑人巨大精品欧美一区二区蜜桃| 熟女少妇亚洲综合色aaa.| 波野结衣二区三区在线| 欧美精品啪啪一区二区三区 | 两个人免费观看高清视频| 亚洲av男天堂| 人妻 亚洲 视频| 国产在视频线精品| 成人黄色视频免费在线看| 晚上一个人看的免费电影| 久久久精品94久久精品| 国产欧美日韩精品亚洲av| 国产黄色视频一区二区在线观看| 亚洲美女黄色视频免费看| 青春草视频在线免费观看| 久久久久精品国产欧美久久久 | 日韩电影二区| 热re99久久国产66热| 九草在线视频观看| 一本久久精品| 大陆偷拍与自拍| 久久久久网色| 99国产综合亚洲精品| 亚洲,一卡二卡三卡| 久久国产精品大桥未久av| 精品少妇久久久久久888优播| kizo精华|