    Preliminary design of high power magnet converter for CRAFT

    2020-05-06 05:59:38ZhongmaWANG王重馬PengFU傅鵬LianshengHUANG黃連生ZhiquanSONG宋執(zhí)權XiuqingZHANG張秀青TianbaiDENG鄧天白TaoCHEN陳濤RonglinHUANG黃榮林ZhenshangWANG王振尚XiaojiaoCHEN陳曉嬌ShiyingHE何詩英ZejingWANG王澤京andGuanghongWANG王廣紅
    Plasma Science and Technology 2020年4期

    Zhongma WANG(王重馬),Peng FU(傅鵬),Liansheng HUANG(黃連生),Zhiquan SONG(宋執(zhí)權),Xiuqing ZHANG(張秀青),Tianbai DENG(鄧天白),Tao CHEN(陳濤),Ronglin HUANG(黃榮林),Zhenshang WANG(王振尚),Xiaojiao CHEN(陳曉嬌),Shiying HE(何詩英),Zejing WANG(王澤京) and Guanghong WANG(王廣紅)

    1 Institute of Plasma Physics,Chinese Academy of Sciences,Hefei 230031,People’s Republic of China

    2 University of Science and Technology of China,Hefei 230026,People’s Republic of China

    Abstract

    Keywords: CRAFT,converter,thyristor,fast fuse,snubber

    1.Introduction

    The Comprehensive Research Facility for Fusion Technology(CRAFT) project of China is proposed for further development of nuclear fusion.High-power converter module is the key equipment to provide controllable high direct current(DC) power supply for the superconducting load [1–4].Thyristors are paralleled with the minimum number to supply the rated output current and withstand the short circuit current limited by the junction temperature and fault thermal accumulation(I2t)[5–8].Therefore,thyristor type and the parallel number are necessary to be determined by steady and fault analysis.Fast fuse is used to protect the thyristor and remove the faulty branch during short circuit cases.Parameter determination of the fast fuse is finished after faulty analysis to verify protection reliability for thyristor.In order to decrease the over-voltage caused by the inductance of rectifier transformer and alternating current (AC) busbar during thyristor commutation,the snubber parameters consisting of resistor and capacitor are derived.Based on these purposes,the thyristor type and parallel number,the fast fuse type,and the snubber resistor and capacitor parameters are given in this paper.

    2.High power converter topology

    Figure 1.Power supply system topology for CRAFT.

    In order to test the superconducting magnet performance of CRAFT,a topology of power supply system is designed (as shown in figure 1).The power supply system is supported by a 110 kV substation with 110 kV busbar.The AC voltage is reduced from 110 kV to 200 V by the step-down and the rectifier transformer.The converter with a DC reactor and switch network unit (SNU) is used to supply the required current and voltage for the superconducting magnet load.The safety,reliability and stable working of converter have a close relationship with the superconductivity load.Depending on the design requirements,the no-load DC output voltage of the converter module is 250 V,and the rated DC output current is 25 kA.The maximum short-circuit current can reach hundreds of kilo-amperes.Compared with conventional highpower converters,both the structure and design parameters have higher technical challenges [9–11].Three-phase bridge rectifier circuit is used for the CRAFT converter because of the wide application and reliable technology.Because the rated voltage converter is low,the co-phase counter parallel connection structure is adopted for reducing the electromagnetic loss,as shown in figure 1.Many thyristors are paralleled in a converter bridge to supply rated current.Each thyristor has an external series fast fuse for short circuit protection and an external paralleled snubber for overvoltage protection.The thyristor,fast fuse and snubber are the key devices of the converter that parameters and types are needed to be determined [12–14].According to the design requirements,the thyristor junction temperature must be lower than 125°C and the thyristor thermal accumulation is lower than the allowable value during the downstream short circuit of DC reactor,the fast fuse must be melted during the bridge short circuit and must not be melt during the downstream short circuit of the DC reactor,the snubber consisting of resistor and capacitor is needed to reduce the commutation over-voltage to be lower than half max repetitive peak forward voltage of thyristor.

    3.Thyristor junction temperature and I2t analysis

    3.1.Thyristor type analysis and safe threshold determination

    Because the thyristor rated voltage (200 V) is very low,the verification parameter is mainly focused on the rated current.High power phase control thyristors mainly include the alloying type and free floating type.The allowable current for the alloying type thyristor is lower than that of the free floating type in the same voltage that will be needed more paralleled thyristors in a converter bridge.Although the minimum voltage (1400 V) of the alloying type thyristor is lower than that of the free floating type (1800 V),the latter one is still preferred due to the cost and volume of the fast fuse and snubber.Meanwhile,the current balance is a serious problem when many thyristors are paralleled to share the rated current together.The converter rated current and short circuit fault current in 100 ms are used to calculate the steady and transient parameters of the thyristor.Combined with steady-state current,surge current and size,the thyristor of 5STP 50Q1800 is selected.

    The safe threshold values of voltage and current determination(Kvsfand Kisf)are the first step of thyristor selection,which are calculated as follows:

    where the Vdrmrepresents the thyristor rated voltage,the Uv0represents the thyristor working voltage.The ITAVMrepresents the thyristor average on-state current,the Nprepresents the parallel number.The Kunbis the current unbalance coefficient of the paralleled thyristor caused by device and current path distance in the converter bridge.The IT(AV)represents the actual current in thyristor at rated state.Based on the above equations with considering the symmetry of the structure,six or more thyristors are selected for parallel analysis of each bridge arm.

    3.2.Steady junction temperature analysis

    It is necessary to calculate whether the junction temperature exceeds 125°C in steady state operation,so the parallel number can be determined preliminarily.If a thyristor is in a steady state operation,the average current ITAVcan be expressed as equation(3),the power loss PTcan be expressed as equation (4),and the junction temperature Tvjcan beexpressed as equation (5),

    Table 1.Calculated steady parameters of 5STP 50Q1800.

    where the Idnis the output current of converter,Npis the parallel number of thyristor,UT0and rtare the steady voltage and resistance of the thyristor.Tais the environmental temperature.Rthjcis the thermal resistance between thyristor junction and thyristor case,Rthchis the thermal resistance between thyristor case and heat sink,Rthhais the thermal resistance between heat sink and air.The steady junction temperature parameters are calculated as given in the table 1.

    3.3.Transient junction temperature analysis under short circuit

    The steady junction temperature is used as the initial temperature during the fault.Thyristor can be equivalent to thermal resistance and heat capacity modules,as shown in figure 2,which are utilized to calculate the transient-state junction temperature.Rthis the thermal resistance of the thyristor,Tvj0is the steady state junction temperature.Pthis the transient power of thyristor.

    The fourth-order model in figure 2 can be expressed as equation (6):

    If a thyristor conducts substantial over-current iTin a short time,transient power loss Pthcan be expressed as equation (7):

    The fault current waveform is obtained by PSCAD to calculate the thyristor junction temperature curve.The number of parallel connections is determined according to the principle that the thyristor junction temperature is lower than 125°C.Short circuits at the upstream and downstream of the DC reactor are analyzed when the trigger angle of the thyristor is set as 20°.The short circuit time is set at 1.15 s for 100 ms and short circuit waveforms are shown in figure 3.

    Figure 2.Thyristor thermal resistance and heat capacity model.

    It can be seen from figure 3 that the maximum current of upstream short circuit is 366.3 kA at 1.16 s and the upstream short circuit is 150 kA at 1.25 s.The fault junction and thermal effect of the upstream and downstream short circuit of DC reactor are shown in figures 4 and 5.When the upstream of DC reactor is short-circuited with 12 paralleled thyristor in a bridge,the steady case temperature Tvjis 60°C,and the maximum transient junction temperature is 120.2°C.When the downstream of DC reactor is short-circuited with six paralleled thyristor in a bridge,the steady case temperature Tvjis 73.8°C,and the maximum transient junction temperature is 118.0°C.

    Six 5STP 50Q1800 thyristors are needed in parallel that meets the requirements of both the voltage and current safety margins which are greater than 2.5.If the transient junction temperature is less than 125°C when the reactor front end is short-circuited,12 thyristors need to be connected in parallel,while only six thyristors need to be connected when the reactor back end is short-circuited.Considering the design cost and space footprint,six thyristors are required for the parallel operation.

    4.Fuse parameter determination and overload verification

    4.1.Determination of rated parameters

    The converter rated voltage on the AC side (200 V) is the rated voltage of fast fuse.The rated current of the fuse can be calculated by equation (8):

    where,IDCis the rated output current of converter(30 kA),Keis the cooling coefficient (0.95),Ktis the temperature coefficient (0.9),Kbis the safety margin factor (0.9).When Npis 6,the rated current of the fuse is no less than 4950 A.The fuse 4 URD 233 PLAF 5000 (400 V/5000 A) is selected based on the determination of rated parameters.

    4.2.Overvoltage verification

    When the fuse arc burns,it will produce an overvoltage that must be lower than the breakdown voltage of the thyristor to prevent the thyristor from being damaged.The relationship between arc voltage and the working voltage of the fuse is illustrated in figure 6.

    When the working voltage is 200 V,the arc voltage(925 V) is less than 1800 V,so the thyristor can fully withstand the arc overvoltage of the fuse.

    Figure 3.Fault current and effective value of (a) upstream short circuit and (b) downstream short circuit.

    Figure 4.(a) Thyristor junction temperature and (b) I2t of upstream short circuit at DC reactor 2 when Np = 12.

    Figure 5.(a) Thyristor junction temperature and (b) I2t of downstream short circuit at DC reactor when Np = 6.

    4.3.Overcurrent verification with I2t

    When the bridge arm is short-circuited,the fast fuse must be melted to remove the faulty branch.When the bridge arm is short-circuited,if one thyristor is short-circuited,other thyristors will not be switched on by default.At this time,the fault current will flow through the fault branch that is an important criteria for fast fuse analysis.Moreover,the front end of the DC reactor is directly connected with one phase of rectifying transformer,so a short circuit fault is used to simulate the short circuit in the simulation model.The starting time of failure is set at 1.15 s and lasted for 100 ms with a simulation wave shown in figure 7.

    Figure 6.Relationship between applied AC voltage and peak arc voltage of 4 URD 233 PLAF 5000.

    The first wave current peak value is 273.7 kA (10 ms),and the effective value is 234.9 kA (30 ms).The current effective value of the bridge fault simulation result and the time current curve of the fuse are compared in the same coordinate system,and the intersection point is the time prearc of the fast fuse,as shown in figure 8.It can be seen from figure 8 that the pre-arc time is 5.015 ms,the effective value of the pre-arc current is 55 390 A,and the pre-arc I2t is 15.38 MA2s.

    Figure 9 shows the relationship between the total I2t of the fuse action and the working voltage.Total fuse I2t is the energy used to measure the fuse melting process,which is positively correlated with the actual working voltage.It can be seen from figure 9(a) that when the working voltage is 200 V,the correction factor (K)is 0.58.At the rated voltage,the fuse I2t = 23.1 MA2s.Therefore,when U is 200 V,the total I2tfuse= 0.58 × 23.1 = 13.4 MA2s.Figure 9(b) indicates the relationship between the total operation I2t and the total operation time of the fast fuse,and the parenthesis is the pre-arc time.When the pre-arc time is 5.01 ms,the total action time is about 10 ms.The I2t of thyristor is 20.4 MA2s when t is 10 ms that is larger than the total action time of the fast fuse I2t (13.4 MA2s),and the thyristor can be effectively protected.Thyristor explosion I2t of thyristor is generally two to three times that of the permissible I2t,far more than the total I2t of fuse in the fast melting operation,so it can be ensured that the thyristor will not explode during the operation time.

    It can be seen that the calculated results satisfy the verification criterion with a certain margin.At this time,thyristor and fast fuse will not be damaged.Therefore,the fast fuse 4 URD 233 PLAF 5000 is finally selected for the CRAFT converter.

    5.Over voltage snubber analysis and design

    When the thyristor is turned off,the reverse recovery current between the anode and cathode with the inductive load will cause an overvoltage that may damage the thyristor.Although there is junction capacitance inside the thyristor,an external snubber consisting of resistor and capacitor is needed to reduce the overvoltage to a reasonable level.Both exponential and hyperbolic models can be used to analyze the recovery current,as shown in figure 10.Compared with the exponential model,the hyperbolic model is very complex and the parameters are difficult to determine.Therefore,the exponential model is more applicable to engineering practice.

    When t > t1,the reverse recovery current and peak value of rated voltage can be expressed by

    Figure 9.(a)Relationship between total operation I2t and the working voltage.(b)Relationship between the total operation I2t and the total operation time.

    Figure 10.Exponential model and hyperbolic model of reverse recovery current.

    where,V is the peak value of the thyristor rated voltage(278.5 V).Lsis the sum of transformer leakage inductance and AC busbar inductance; LT2is leakage inductance of rectifier transformer (1.55 μH); LL2is AC busbar inductance(2 μH).

    The curves of reverse recovery charge (Qrr) and peak value of reverse recovery current (Irr) are obtained from the data sheet shown in figure 11,which is obtained form ABB company online [15].The di/dt is 7.84 A μs-1calculated by equations (9)–(11),the Qrris nearly 7500 μAs and the Irris nearly 220 A obtained from figure 11.When six thyristors are connected in parallel,the total Irris 1320 A,the total Qrris 45 000 μAs.So the reverse recovery current of thyristor can be calculated.

    Figure 11.(a) Relationship between the Qrr and di/dt.(b)Relationship between the Irr and di/dt.

    We assume that the thyristor in bridge 1 is turned off when bridges 2 and 3 are turned on.In the case of commutation overvoltage,the thyristor reverse recovery current is considered as a controlled current source.The converter with snubber can be equivalent to a simple circuit as shown in figure 12

    Figure 12.Equivalent circuit of the converter with snubber during the bridge 1 turning off.

    where α is the control angle,μ is the commutation overlap angle.When α + μ = 90°,the commutation overvoltage is the most serious,and this value is adopted for calculation.Rsand Csare the resistor and capacitor of a single thyristor snubber.Reqand Ceqare the equivalent resistor and capacitor of the converter during the phase conversion process.

    The Ceqis set to10 μF,Reqis set to 2 Ω,the thyristor reverse overvoltage curve is shown in figure 13.At 9.6 μs,the maximum overvoltage is 687.5 V that fully meets the thyristor voltage range (1800 V).Therefore,snubber parameters can comply with the requirements.According to equation (12),the single thyristor snubber resistor R and capacitor C are 20 Ω and 1 μF,respectively.

    6.Conclusion

    Based on the fault analysis of the upstream and downstream short circuit of the DC reactor,5STP 50Q1800 thyristors are selected for the converter when the parallel number Npis six under the restriction of junction temperature and I2t.The fast fuse 4 URD 233 PLAF 5000 is selected to protect the thyristor and the pre-arc time of the fast fuse is determined,the voltage and current safety margins are verified by analyzing the short circuit of the bridge arm.In order to satisfy the thyristor commutation protection,thyristor reverse recovery current is deduced based on the analysis of multiple parallel snubber equivalent circuit.Each snubber resistor and capacitor are 20 Ω and 1 μF,respectively.This work finished the parameter analysis and type determination of main devices of CRAFT converter,which will be used for the subsequent structure and electromagnetic design.

    Figure 13.Reverse overvoltage curve of thyristor when Ceq is 10 μF and Req is 2 Ω.

    Acknowledgments

    This work was supported by the National Key R&D Program of China (No.2017YFE0300504) and Comprehensive Research Facility for Fusion Technology (No.2018-000052-73-01-001228).

    ORCID iDs

    97在线人人人人妻| 黄色一级大片看看| 亚洲精品aⅴ在线观看| 精品一区二区免费观看| 91在线精品国自产拍蜜月| 国产精品一区www在线观看| 中文在线观看免费www的网站| 五月开心婷婷网| 一级,二级,三级黄色视频| 自拍欧美九色日韩亚洲蝌蚪91 | 人人妻人人澡人人爽人人夜夜| 日本与韩国留学比较| a级毛片免费高清观看在线播放| 国产精品嫩草影院av在线观看| 草草在线视频免费看| 欧美国产精品一级二级三级 | 男的添女的下面高潮视频| av免费在线看不卡| 人妻人人澡人人爽人人| 亚洲国产毛片av蜜桃av| 99精国产麻豆久久婷婷| 亚洲自偷自拍三级| 国产精品久久久久成人av| 老熟女久久久| 国产精品久久久久久久电影| 国产精品国产三级专区第一集| 有码 亚洲区| 国产老妇伦熟女老妇高清| 一个人免费看片子| 精品熟女少妇av免费看| 有码 亚洲区| 国产淫片久久久久久久久| tube8黄色片| 色网站视频免费| 成人国产麻豆网| 一区二区三区四区激情视频| 丝瓜视频免费看黄片| 久久亚洲国产成人精品v| a级毛片在线看网站| 亚洲自偷自拍三级| 久久精品夜色国产| 日韩欧美一区视频在线观看 | 啦啦啦啦在线视频资源| 日本黄色日本黄色录像| 日韩制服骚丝袜av| 欧美日韩国产mv在线观看视频| 亚洲精品一区蜜桃| 亚洲欧美一区二区三区黑人 | av在线app专区| 国产淫语在线视频| 一级爰片在线观看| 国产免费又黄又爽又色| 日韩成人伦理影院| 看免费成人av毛片| 国产精品久久久久久久电影| 亚洲伊人久久精品综合| 午夜91福利影院| 久久精品国产鲁丝片午夜精品| 免费av不卡在线播放| 草草在线视频免费看| 亚洲成人手机| 在线观看一区二区三区激情| 亚洲精品亚洲一区二区| 天美传媒精品一区二区| 亚洲国产精品国产精品| 天天操日日干夜夜撸| 国产成人精品婷婷| 在线 av 中文字幕| 人人妻人人看人人澡| 亚洲精品日韩在线中文字幕| 黄色怎么调成土黄色| 丝袜在线中文字幕| 伦理电影大哥的女人| 成人国产麻豆网| 六月丁香七月| 成年女人在线观看亚洲视频| 国产一区二区三区av在线| 黄色怎么调成土黄色| 女的被弄到高潮叫床怎么办| 少妇的逼水好多| 精品人妻熟女毛片av久久网站| 性高湖久久久久久久久免费观看| 亚洲美女黄色视频免费看| 丰满迷人的少妇在线观看| 国产中年淑女户外野战色| 国产又色又爽无遮挡免| 免费高清在线观看视频在线观看| 精品少妇久久久久久888优播| 婷婷色av中文字幕| 国产高清不卡午夜福利| 我的女老师完整版在线观看| 乱系列少妇在线播放| 午夜免费男女啪啪视频观看| 精品国产乱码久久久久久小说| 国产免费视频播放在线视频| 丝袜喷水一区| 一级,二级,三级黄色视频| 我要看日韩黄色一级片| 久久久久久久大尺度免费视频| 国产欧美亚洲国产| 18禁裸乳无遮挡动漫免费视频| 中文乱码字字幕精品一区二区三区| 日韩精品免费视频一区二区三区 | 国产精品麻豆人妻色哟哟久久| 国产成人精品久久久久久| xxx大片免费视频| 曰老女人黄片| 国产一区二区三区综合在线观看 | 蜜臀久久99精品久久宅男| 丰满迷人的少妇在线观看| 丝袜在线中文字幕| 最近中文字幕2019免费版| 亚洲精品色激情综合| 成年人午夜在线观看视频| 午夜视频国产福利| 久久精品久久久久久噜噜老黄| 99久久综合免费| 国产亚洲av片在线观看秒播厂| 中文字幕人妻丝袜制服| 国产日韩一区二区三区精品不卡 | 精品亚洲成国产av| 亚洲精品亚洲一区二区| 精品少妇内射三级| 一级毛片aaaaaa免费看小| 日韩av在线免费看完整版不卡| 成人18禁高潮啪啪吃奶动态图 | 精品亚洲成国产av| 国产精品国产三级专区第一集| 久久99热这里只频精品6学生| 内地一区二区视频在线| 中文天堂在线官网| 一二三四中文在线观看免费高清| 嘟嘟电影网在线观看| 国产成人精品一,二区| 亚洲国产毛片av蜜桃av| 久久精品熟女亚洲av麻豆精品| 亚洲性久久影院| 老司机影院毛片| 亚洲熟女精品中文字幕| 一级二级三级毛片免费看| av在线观看视频网站免费| 亚洲欧美成人综合另类久久久| 国产男女内射视频| 91在线精品国自产拍蜜月| 男男h啪啪无遮挡| 国产在视频线精品| 久久久久网色| 亚洲精品456在线播放app| 极品少妇高潮喷水抽搐| 少妇的逼水好多| h日本视频在线播放| 天天操日日干夜夜撸| 亚洲天堂av无毛| 97超视频在线观看视频| av又黄又爽大尺度在线免费看| 亚洲,一卡二卡三卡| 国产亚洲精品久久久com| 99热这里只有是精品在线观看| 丁香六月天网| 久久鲁丝午夜福利片| 午夜福利在线观看免费完整高清在| 国产熟女午夜一区二区三区 | 多毛熟女@视频| 日韩免费高清中文字幕av| 天堂俺去俺来也www色官网| 免费人成在线观看视频色| 看十八女毛片水多多多| 永久网站在线| 日韩av在线免费看完整版不卡| 久久精品国产自在天天线| 国产男人的电影天堂91| 国产黄片视频在线免费观看| av女优亚洲男人天堂| 狠狠精品人妻久久久久久综合| av在线老鸭窝| kizo精华| 国产av精品麻豆| 婷婷色综合大香蕉| 中文精品一卡2卡3卡4更新| 久久ye,这里只有精品| 久久国产亚洲av麻豆专区| 最后的刺客免费高清国语| 少妇人妻精品综合一区二区| 精品99又大又爽又粗少妇毛片| 久久精品国产鲁丝片午夜精品| 免费少妇av软件| 在线观看免费视频网站a站| a级片在线免费高清观看视频| a级片在线免费高清观看视频| 国产成人精品福利久久| 国产av精品麻豆| 久久免费观看电影| 最黄视频免费看| 国产精品秋霞免费鲁丝片| 国产一区亚洲一区在线观看| 精品久久久久久久久av| 在线观看国产h片| 亚洲国产精品成人久久小说| 成年av动漫网址| 成人美女网站在线观看视频| 日本欧美视频一区| 久久久精品免费免费高清| 高清视频免费观看一区二区| 精品酒店卫生间| 夜夜看夜夜爽夜夜摸| 成人毛片a级毛片在线播放| 国产极品天堂在线| 91aial.com中文字幕在线观看| 精品久久久久久久久亚洲| 日日撸夜夜添| 久久青草综合色| 国产老妇伦熟女老妇高清| 国产无遮挡羞羞视频在线观看| 久久久久久久亚洲中文字幕| 久久鲁丝午夜福利片| 国产女主播在线喷水免费视频网站| 国产成人91sexporn| 国模一区二区三区四区视频| 丰满饥渴人妻一区二区三| 午夜影院在线不卡| 伦理电影大哥的女人| 一区二区三区精品91| 国产精品欧美亚洲77777| 麻豆成人午夜福利视频| 日韩视频在线欧美| 亚洲av欧美aⅴ国产| 精品一区在线观看国产| 久久久久久久大尺度免费视频| 国产免费一级a男人的天堂| 91在线精品国自产拍蜜月| 精品视频人人做人人爽| 国产一区二区三区av在线| 国产av国产精品国产| 狂野欧美激情性bbbbbb| 欧美另类一区| 热99国产精品久久久久久7| 一级爰片在线观看| 22中文网久久字幕| 这个男人来自地球电影免费观看 | 中文在线观看免费www的网站| 高清午夜精品一区二区三区| 一边亲一边摸免费视频| 亚洲欧美日韩另类电影网站| 人妻夜夜爽99麻豆av| 中文字幕av电影在线播放| 日韩一区二区视频免费看| 日韩制服骚丝袜av| 在线亚洲精品国产二区图片欧美 | 夫妻午夜视频| 国产免费又黄又爽又色| 色吧在线观看| 亚洲国产精品国产精品| 又大又黄又爽视频免费| 极品教师在线视频| 欧美精品一区二区免费开放| 狂野欧美白嫩少妇大欣赏| 黑丝袜美女国产一区| 97在线人人人人妻| 亚洲激情五月婷婷啪啪| 亚洲av免费高清在线观看| 国产在线免费精品| 色视频在线一区二区三区| 久久精品熟女亚洲av麻豆精品| 亚洲欧洲国产日韩| 极品教师在线视频| 欧美精品一区二区免费开放| 日韩一区二区三区影片| 亚洲激情五月婷婷啪啪| 乱系列少妇在线播放| 99视频精品全部免费 在线| 在线观看美女被高潮喷水网站| 久久精品熟女亚洲av麻豆精品| 又大又黄又爽视频免费| 亚洲国产欧美日韩在线播放 | 嘟嘟电影网在线观看| 日韩人妻高清精品专区| 下体分泌物呈黄色| 亚洲第一区二区三区不卡| 国产成人a∨麻豆精品| 久久亚洲国产成人精品v| 一级片'在线观看视频| 久久精品国产亚洲av天美| 亚洲美女黄色视频免费看| 国产美女午夜福利| 国产精品一区二区性色av| 99久久综合免费| 99国产精品免费福利视频| 黑人猛操日本美女一级片| 欧美精品高潮呻吟av久久| 成人国产麻豆网| 国产无遮挡羞羞视频在线观看| 日韩人妻高清精品专区| 乱系列少妇在线播放| 免费观看在线日韩| 我要看黄色一级片免费的| 女性生殖器流出的白浆| 校园人妻丝袜中文字幕| 亚洲在久久综合| 狂野欧美激情性xxxx在线观看| 黄色欧美视频在线观看| 国产精品人妻久久久影院| 乱人伦中国视频| 亚洲熟女精品中文字幕| 国产精品伦人一区二区| 亚洲欧美精品专区久久| 啦啦啦啦在线视频资源| 欧美精品一区二区免费开放| 热re99久久精品国产66热6| 日韩av不卡免费在线播放| 热99国产精品久久久久久7| 黑丝袜美女国产一区| 免费观看无遮挡的男女| 精品酒店卫生间| 日韩成人av中文字幕在线观看| 欧美高清成人免费视频www| 亚洲内射少妇av| 久久久a久久爽久久v久久| 精品国产一区二区久久| 丝瓜视频免费看黄片| 婷婷色综合大香蕉| 中文字幕亚洲精品专区| 99热国产这里只有精品6| 色视频www国产| 午夜福利在线观看免费完整高清在| 在线观看国产h片| 哪个播放器可以免费观看大片| 国产男女内射视频| 在线观看www视频免费| 亚洲经典国产精华液单| 大码成人一级视频| 日韩 亚洲 欧美在线| 熟女av电影| 精品国产一区二区久久| 亚洲人成网站在线播| av免费观看日本| 免费看av在线观看网站| 欧美日韩在线观看h| 最近的中文字幕免费完整| 成人毛片60女人毛片免费| 美女cb高潮喷水在线观看| 亚洲成色77777| 国产成人免费无遮挡视频| 久久鲁丝午夜福利片| 日本av手机在线免费观看| 国产伦在线观看视频一区| 亚洲精品国产色婷婷电影| 99久久精品一区二区三区| 自拍欧美九色日韩亚洲蝌蚪91 | 老司机影院毛片| 五月玫瑰六月丁香| 国产免费视频播放在线视频| 极品教师在线视频| 久久久久国产网址| 各种免费的搞黄视频| 青春草国产在线视频| 国产男女超爽视频在线观看| 日本猛色少妇xxxxx猛交久久| 91精品国产九色| 国产午夜精品久久久久久一区二区三区| 麻豆乱淫一区二区| 只有这里有精品99| 嘟嘟电影网在线观看| 久久国产乱子免费精品| 精品99又大又爽又粗少妇毛片| av福利片在线| 午夜精品国产一区二区电影| 亚洲欧洲国产日韩| 中文在线观看免费www的网站| 久久久久久伊人网av| 国产在线一区二区三区精| 国产伦精品一区二区三区视频9| 亚洲不卡免费看| 亚洲美女视频黄频| 免费黄频网站在线观看国产| 国产亚洲欧美精品永久| 欧美变态另类bdsm刘玥| 亚洲国产精品一区三区| 亚洲欧美日韩东京热| 国精品久久久久久国模美| 欧美激情极品国产一区二区三区 | 男女边吃奶边做爰视频| 91精品一卡2卡3卡4卡| 在线观看国产h片| 尾随美女入室| 国产av国产精品国产| av有码第一页| 性色avwww在线观看| av.在线天堂| 国产亚洲精品久久久com| 日本黄大片高清| 亚洲国产色片| 午夜日本视频在线| 免费看日本二区| 日本色播在线视频| 久久精品国产a三级三级三级| 少妇人妻久久综合中文| 国产高清三级在线| 日韩av免费高清视频| 国产色婷婷99| 成人影院久久| 不卡视频在线观看欧美| av卡一久久| 日韩熟女老妇一区二区性免费视频| 六月丁香七月| 欧美xxⅹ黑人| 精品人妻熟女av久视频| 自拍偷自拍亚洲精品老妇| 热re99久久精品国产66热6| 哪个播放器可以免费观看大片| 狠狠精品人妻久久久久久综合| 99久久精品热视频| 日本欧美视频一区| 日韩强制内射视频| 国产成人freesex在线| 91久久精品国产一区二区成人| 国产白丝娇喘喷水9色精品| 99九九在线精品视频 | 韩国av在线不卡| 国产精品成人在线| 亚洲不卡免费看| 丰满人妻一区二区三区视频av| 久久久久久久亚洲中文字幕| 久久久精品94久久精品| 国产成人freesex在线| 国产成人a∨麻豆精品| 在线天堂最新版资源| 亚洲精品日本国产第一区| 亚洲激情五月婷婷啪啪| 国产精品久久久久久久久免| 国产成人91sexporn| 在线观看一区二区三区激情| 久久久精品94久久精品| 伊人久久精品亚洲午夜| 精品国产国语对白av| 国产免费福利视频在线观看| 国产中年淑女户外野战色| 午夜av观看不卡| 黑人巨大精品欧美一区二区蜜桃 | 少妇丰满av| 精品亚洲成a人片在线观看| 国产男人的电影天堂91| 国产精品不卡视频一区二区| 在线观看免费高清a一片| 日本vs欧美在线观看视频 | 国产精品一区二区在线不卡| 国产成人精品福利久久| 国产亚洲精品久久久com| 天天躁夜夜躁狠狠久久av| 国产69精品久久久久777片| 日韩伦理黄色片| 日本91视频免费播放| 大片电影免费在线观看免费| 亚洲熟女精品中文字幕| 欧美精品亚洲一区二区| 欧美精品一区二区免费开放| 国产在线一区二区三区精| 欧美精品国产亚洲| 日韩电影二区| 视频中文字幕在线观看| 欧美日韩综合久久久久久| 精品一区二区三区视频在线| 欧美精品一区二区免费开放| 又爽又黄a免费视频| 一级片'在线观看视频| 熟女av电影| 午夜福利视频精品| 午夜福利网站1000一区二区三区| 久久99热6这里只有精品| 日韩伦理黄色片| tube8黄色片| 男女国产视频网站| 五月开心婷婷网| 国产亚洲精品久久久com| 日韩av在线免费看完整版不卡| 香蕉精品网在线| 十分钟在线观看高清视频www | 免费不卡的大黄色大毛片视频在线观看| 秋霞伦理黄片| 国产av国产精品国产| 亚洲电影在线观看av| 少妇 在线观看| 亚洲美女黄色视频免费看| 久久久久久久久久久丰满| 国产成人精品婷婷| 少妇的逼水好多| 精品久久国产蜜桃| av视频免费观看在线观看| 久久久久久久精品精品| 女人久久www免费人成看片| 日本爱情动作片www.在线观看| 99re6热这里在线精品视频| 午夜老司机福利剧场| 成人毛片a级毛片在线播放| 国产精品久久久久久精品古装| 日韩制服骚丝袜av| 国产在线男女| av卡一久久| 交换朋友夫妻互换小说| 18禁动态无遮挡网站| 中国三级夫妇交换| 亚洲无线观看免费| 精品久久久精品久久久| 久久久午夜欧美精品| 亚洲图色成人| 久久久精品94久久精品| 久久久国产精品麻豆| 丝袜脚勾引网站| 精品久久久久久久久亚洲| 在线观看一区二区三区激情| 少妇裸体淫交视频免费看高清| 精品国产露脸久久av麻豆| 99热全是精品| 精品一区二区免费观看| 蜜桃在线观看..| 国产黄片视频在线免费观看| 国产探花极品一区二区| 久久综合国产亚洲精品| 99久久精品一区二区三区| 又粗又硬又长又爽又黄的视频| 日本91视频免费播放| 97超视频在线观看视频| av黄色大香蕉| 亚洲国产av新网站| 蜜桃久久精品国产亚洲av| 哪个播放器可以免费观看大片| 免费看日本二区| 美女主播在线视频| 自线自在国产av| 色吧在线观看| 成人综合一区亚洲| 成人特级av手机在线观看| 国产精品不卡视频一区二区| 色视频在线一区二区三区| www.av在线官网国产| 国产成人a∨麻豆精品| 夫妻性生交免费视频一级片| 在线观看免费高清a一片| 五月开心婷婷网| 欧美日韩国产mv在线观看视频| 天堂中文最新版在线下载| 黄色视频在线播放观看不卡| 汤姆久久久久久久影院中文字幕| 妹子高潮喷水视频| 国产极品粉嫩免费观看在线 | 日韩免费高清中文字幕av| 人妻夜夜爽99麻豆av| 在线免费观看不下载黄p国产| 亚洲精品久久久久久婷婷小说| 啦啦啦啦在线视频资源| 日本与韩国留学比较| 亚洲精品成人av观看孕妇| 日韩人妻高清精品专区| 简卡轻食公司| 在线观看av片永久免费下载| 精品一区二区三区视频在线| 91久久精品电影网| 乱系列少妇在线播放| 自拍偷自拍亚洲精品老妇| 另类精品久久| 久久久午夜欧美精品| 欧美3d第一页| 久久精品国产自在天天线| 久久久久久久国产电影| 成人国产麻豆网| 久久精品国产亚洲av天美| 七月丁香在线播放| 亚洲第一av免费看| 免费久久久久久久精品成人欧美视频 | 狂野欧美白嫩少妇大欣赏| 久久久午夜欧美精品| 欧美3d第一页| 日韩中字成人| 国产在线一区二区三区精| 亚州av有码| 青春草视频在线免费观看| 国产精品免费大片| 97超碰精品成人国产| 一级二级三级毛片免费看| 日韩,欧美,国产一区二区三区| 91精品国产国语对白视频| 内射极品少妇av片p| 91久久精品国产一区二区成人| 大陆偷拍与自拍| 老司机亚洲免费影院| 91午夜精品亚洲一区二区三区| 一级黄片播放器| 欧美日韩精品成人综合77777| 国产日韩欧美亚洲二区| 久久久久视频综合| 亚洲丝袜综合中文字幕| 搡老乐熟女国产| 女性生殖器流出的白浆| 一本一本综合久久| 国产黄色免费在线视频| 亚洲国产欧美日韩在线播放 | 99热这里只有精品一区| 十分钟在线观看高清视频www | 边亲边吃奶的免费视频| 久久精品夜色国产| 黄片无遮挡物在线观看| 亚洲av不卡在线观看| 菩萨蛮人人尽说江南好唐韦庄| 伊人久久国产一区二区| 日韩中文字幕视频在线看片| 男人添女人高潮全过程视频| 青春草亚洲视频在线观看| 女性生殖器流出的白浆| 日韩免费高清中文字幕av| 美女大奶头黄色视频| 亚洲精品在线美女| 日本vs欧美在线观看视频| 97在线人人人人妻| av网站在线播放免费| 久久天堂一区二区三区四区| 久久久久久久久免费视频了|