    Roughness evaluation in shotcrete-lined water tunnels with invert concrete based on cases from Nepal

    2018-03-01 03:16:14ChhatraBahadurBasnetKrishnaKantaPanthi
    關鍵詞:專題討論詩歌朗誦緬懷

    Chhatra Bahadur Basnet,Krishna Kanta Panthi

    Department of Geosciences and Petroleum,Norwegian University of Science and Technology,Sem Saelands Vei 1,NO-7491,Trondheim,Norway

    1.Introduction

    The waterway tunnels represent the most significant source of construction cost for hydropower projects,especially for run-of the-river plants.Reducing and optimizing the cost of waterway systems is therefore a major issue to make hydropower projects financially attractive.One of the economic solutions is to use unlined or shotcrete-lined pressuretunnels orcombination of both for the waterway system if the rock mass and applied shotcrete and/or systematic bolting guarantee long-term stability and safety(Panthi,2015).Originally,the application of unlined shafts and tunnels as waterway systems came in practice in Norway with the philosophy that accepts minor falls of rock blocks during the operation period provided that head loss is within permissible limits(Broch,1982).The basic criteria to be satisfied for unlined or shotcrete-lined pressure shafts and tunnels are safety against hydraulic splitting,hydraulic efficiency(frictional head loss)and long-term stability(Brekke and Ripley,1987;Benson,1989).Frictional head loss depends on both cross-sectional area and roughness of tunnel periphery in consideration(Rahm,1958),because rougher tunnel wall surfaces will result in higher head loss and larger cross-sectional areas result in smaller head loss.An alternative way to reduce the head loss can be the use of concrete or steel lining to make the tunnel surfaces smoother without increasing tunnel size.However,lining a tunnel with concrete or steel will demand considerable additional cost(Huval,1969;Westfall,1996).

    Tunnel shape also influences hydraulic efficiency of the water tunnel.In tunnel boring machine(TBM)tunneling,the tunnel cross-section is circular(i.e.hydraulically ideal shape)with smooth rock surfaces.However,it is not always feasible to use TBM as an excavation method since the success of TBM application is largely dependent on the geological conditions and length of the tunnel to be excavated.Hence,the drill-and-blast method of tunnel excavation is popular and extensively used due to flexibility in making decisions if unforeseen geological conditions arise and it can be used in any length of tunnel to be excavated,provided that ventilation requirements during construction are met.However,tunnel walls excavated using drill-and-blast method have an undulating surface of varying smoothness and the shape of tunnel will be determined mostly by construction necessities and easiness(Lysne et al.,2003).The most practical tunnel shapes in drill-and-blast tunneling are inverted D and horse-shoe(Cuesta,1988;Panthi,2015).In waterway tunnels,excavated tunnel profiles may either be left unlined or shotcrete-lined or concrete/steel-lined(or a combination of different linings).The shotcrete-lined tunnels end up more or less with the excavated shape and surface as shown in Fig.1.

    As seen in Fig.1,there are undulations in the contour surface in a tunnel excavated using the drill-and-blast method due to the presence of grooves and projections.The frequency distribution and amplitude of these undulations signify resistance to water flow and are defined by the term surface/physical roughness.These undulations are the result of over-break of the rock mass beyond the designed tunnel profile(Maerz et al.,1996).The larger the overbreak area is,the more the tunnel surface will be undulated and rough.Hence,over-break is the key parameter to define roughness of the tunnel surface.According tovarious researches,over-break in drill-and-blast tunnels is the result of look-out and deviation in contour holes,blasting energy,rock mass condition and in situ stress situation(Nilsen and Thidemann,1993;Mandal and Singh,2009;Kim and Bruland,2015).Longer blast rounds develop greater longitudinal over-break leading to an increase in roughness of the tunnel surface.Similarly,the rock mass condition influences over-break intensity and roughness.In Fig.2a,the blasted tunnel surface is relatively smooth in the case of a homogeneous rock mass,whereas,if rock mass is jointed,the surface roughness is partially determined by the jointing pattern(Fig.2b).In addition,there might be some localized enlarged over-break due to the presence of faults or weakness zones(Figs.1b and 2c),which will further increase the roughness.Fig.2a is seldom achieved in the jointed rock mass,thus Fig.2b and c represents the most common contour profile types in blasted tunnels.Over-break in Fig.2a and b may be defined as normal over-break,whereas localized enlarged area in Fig.2c may be expressed as excessive over-break.Such localized enlarged areas may also be formed due to stress induced rock spalling and bursting in hard rock(Panthi,2012).

    Now the question arises as how the physical roughness can be used to calculate frictional head loss along the waterway tunnel.Both the Darcy-Weisbach and Manning formulae use coefficient of resistance,known as hydraulic roughness,in order to calculate frictional head loss.However,the hydraulic roughness in the equations is not equivalent to the physical roughness directly measured from the tunnel surface.Before 1980,according to Bishwakarma(2012),it was a common practice to calculate hydraulic roughness from the relative variation of cross-sectional area along the tunnel length using different methods proposed by Rahm(1958),Priha(1969),Reinius (1970),Wright(1971)and others.Later in the 1990s,the concept was updated with the introduction of physical roughness of the tunnel,which is related to both surface undulations and are a variation(Bruland and Solvik,1987;Ronn and Skog,1997),and the physical roughness was converted to the hydraulic roughness in order to fit into the head loss equations.It is a common practice to calculate hydraulic roughness using the relationship proposed by Colebrook(1958)considering physical roughness as equivalent sand roughness.Bruland and Solvik(1987)extended their research and proposed a new relationship between physical roughness and hydraulic roughness where the physical roughness in their definition does not correspond to the sand roughness.On the other hand,the total physical roughness defined by Ronn and Skog(1997)corresponds to the sand roughness and fits into Colebrook(1958)’s equation.More recently,attempts have also been made to relate measured physical roughness to hydraulic roughness for bored tunnels(Pegram and Pennington,1998;Hákonardóttir et al.,2009).Regardless of the type of method used,a correct definition of physical roughness and its relation with hydraulic roughness are the key issues to define unlined or shotcrete-lined tunnel hydraulics.

    Existing methods of estimating tunnel roughness are used only after the tunnel is excavated and the geometrical data of actual tunnel surface are available.In parallel to these methods,attempts have also been made to predict tunnel roughness before tunnel excavation based on over-break in tunnels(Colebrook,1958;Huval,1969;Priha,1969;Kim,2009),even though it is difficult to define over-break intensity and its relation to physical roughness.In this perspective,this article attempts to establish a new relationship between physical roughness and over-break thickness by analyzing actual tunnel profiles of the shotcrete-lined headrace tunnel of the Chilime hydropower project(CHP)in Nepal.Similarly,the article also attempts to establish a correlation between physical roughness and the Manning coefficient(hydraulic roughness)and proposes modifications on the methods proposed by Colebrook(1958)and Solvik(1984).Furthermore,the modified equations are used to predict roughness and hence the head loss and results are compared with the head loss measured at both headrace tunnels of the CHP and Modi Khola hydropower project(MKHP),respectively.

    Fig.1.Tunnel contour quality after blasting and shotcreting.

    Fig.2.Quality of tunnel contour in different geological conditions.

    2.Relevant theory

    In the waterway system of hydropower projects,part of the potential energy is lost while transferring water from the headwater system to the powerhouse.There are mainly two reasons for this energy loss.First,the flowing water experiences resistance from the surface in which it flows due to a boundary layer developed in the interface of fluid and flow surface.The boundary layer is essentially formed due to viscosity of the fluid and condition of the surface.An energy loss is then produced by shear stress along the said boundary layer,which is called friction loss(Hager,2010).In addition,a part of energy is also lost as a singular loss,due to obstructions to the flow from different essential structural components built across the waterway system.Hence,the total energy loss,i.e.total head loss(H1),in the waterway system consists of two components:

    whereHfis the frictional head loss andHsis the singular loss.The frictional head loss depends on flow surface condition and length of waterway system.On the other hand,singular loss typically consists of entrance loss,loss due to changes in cross-sections in the direction of flow,bend loss,exit loss and losses due to local disturbances caused by gates,trash racks,niches,rock traps,etc.

    2.1.Roughness and frictional head loss

    The flow surface of a waterway system is typically made up of different materials,such as gravel,concrete,rock,steel,and plastic.The resistance to flow is more pronounced in rough surfaces which have large undulations such as unlined or shotcrete-lined tunnel surfaces.The extent of undulations(protrusions and grooves)which has resistance to water flow can be expressed as the term roughness.Because of the spatial variation of these undulations along the surface,the roughness shall be generalized as equivalent roughness and is denoted as ‘ε’in this article.Since ‘ε’represents physical undulations of the surface,it is considered as physical roughness in the case of unlined or shotcrete-lined tunnel surfaces.However,the frictional head loss is calculated considering a coefficient of resistance called hydraulic roughness(forM),which depends upon physical roughness and/or hydraulic radius.It is important to note here that the friction factor(f)and the Manning coefficient(M)are hydraulic roughness,‘ε’in steel and concrete is equivalent sand roughness and ‘ε’in an unlined or shotcrete-lined tunnel is physical roughness that corresponds with equivalent sand roughness.Hence,in this article,the term roughness in general refers to all of the mentioned roughnesses.

    As summarized in Table 1,the Darcy-Weisbach formula(Eq.(2))is used to calculate frictional head loss in any pressurized waterway.While using Eq.(2),the friction factor(f)is calculated by using different formulae for different flow conditions.According to Colebrook(1958),Eq.(3)can be used to calculate friction factor for the pipe flow when the Reynold’s number isR2300,whereas Eq.(4)is used in case of flow in rough pipesis the hydraulic radius).Alternatively,equivalent sand roughness of steel pipes and concrete conduits can be back-calculated by using Eqs.(2)and(3)if the frictional head loss is known beforehand.Colebrook(1958)also emphasized that unlined or shotcrete-lined tunnel hydraulics can be represented by the flow in hydraulically rough pipes.On the other hand,the Manning formula(Eq.(5))is mainly used in unlined or shotcrete-lined tunnels due to its simplicity where the Manning coefficient can be calculated by using different relationships such as Eq.(6).If carefully used,the Manning formula shows a good correlation with the Darcy-Weisbach formula,but this applies only for a specific range of applications according to Solvik(1984).Following the study of Colebrook(1958),Solvik(1984)developed Eq.(7)giving an application range of the Manning formula for frictional head loss calculation based on the inverse of relative roughness(4Rh/ε)of the closed conduit.

    2.2.Singular losses

    Different types of singular losses across the waterway system of hydropower projects are caused by entrance loss,trash rack loss,gate loss,bend loss,transition loss,niche loss,rock trap loss,exit loss and other similar factors.Table 2 shows all the equations that are relevant to calculating these singular losses.Each of these losses can be expressed as the function of velocity head and the coefficient ξ as defined by Eq.(8),where ξiis the head loss coefficient for a particular singular loss andviis the velocity of flow at the location considered.The total singular loss in whole waterway system is the sum of total number(n)of singular losses presented in the system(Eq.(9)).

    Table 1List of equations for the calculation of friction loss and roughness.

    For entrance and exit losses,the coefficients(ξ1and ξ2)will be equal to 0.4-0.5 and 1,respectively(Lysne et al.,2003).Similarly,the coefficient of loss due to trash rack can be calculated using Eq.(10)suggested by Penche(2004).The typical arrangement of trash rack and rack types that are being used at the inlet and other locations of the water way system and their respective coefficients are shown in Fig.3 for the readers’reference.

    In addition,there will be head loss at the gate location due to the presence of gate slots.The gate loss coefficient can be calculated using the relationship given by Hager(2010)for slide gates.The discharge coefficient(Cd)and the head loss coefficient(ξ4)of thegate with flat edge(i.e.edge roundingrvis zero)can be calculated using Eqs.(11)and(12),respectively,where?is the relative opening of the gate as shown in Fig.4.

    Table 2List of equations for singular losses calculation.

    Also,bend loss is one of the significant parts of singular losses along the waterway system and it is even more pronounced in sharp bends with small radius.Fig.5 shows the bend loss coefficient(ξ90)as the function of ratio between bend radius(Rb)and width of the tunnel at bend(D)for 90?bend(Lysne et al.,2003).For bends with other angles,a reduction factor has also been proposed(Fig.5,right).The bend loss coefficient for different bend angles can be calculated by multiplying bend loss coefficient of 90?bend with a reduction factor described by Eq.(13).

    The waterway systems have changes in cross-sectional area due to different shapes and tunnel linings.These changes result in transitions between two different sections and both expansion and contraction transitions are present as typically indicated in Fig.6a and b,respectively.In Fig.6,HL is the head loss from section 1 to section 2 and the velocity in smaller sections is considered to calculate head loss due to both expansion and contraction.According to Hager(2010),the loss coefficient in expansion can be expressed by Eq.(14),where experimentally measured values of φe(δ)are represented as a function of angle δ(Eqs.(15)and(16)).Similarly,Hager(2010)proposed a relationship for loss coefficient in contraction(Eq.(17)).

    Additional niches are excavated in certain intervals along the headrace tunnel length in order to provide an extra space for laybys,vehicle parking,turning,storage of immediate construction materials and equipment.Lysne et al.(2003)studied the head loss due to niches and proposed a chart for head loss coefficient of niches,which is termed as loss coefficient due to the expansion of tunnel,ξ7(Fig.7).

    In general,there is a rock trap at the end of unlined or shotcretelined tunnels in order to trap fallen rock blocks and coarse sand particles produced along the tunnel length and transported by the flow.The rock trap is constructed with the expansion of tunnel area at the invert.Therefore,it is considered similar to the niche in terms of head loss coefficient and the same chart(Fig.7)is used in the analysis.

    3.Methodology for roughness evaluation

    Initially,data and information from two hydropower projects(MKHP and CHP)were collected.Both projects have low-pressure headrace tunnels up to SSs.The remaining waterway segments from the SSs to the powerhouses are high-pressure shafts and tunnels.The CHP has a steel-lined penstock shaft and the MKHP has a combination of a concrete-lined horizontal pressure tunnel,a concrete-lined vertical shaft and a steel-lined horizontal penstock tunnel.The authors carried out head loss measurement in December 2015 at both low-pressure headrace tunnels and highpressure shafts and tunnels in both projects.

    Fig.3.Head loss coefficient in trash rack(drawn based on Penche,2004).

    Fig.4.Slide type gate arrangement in the conduit.

    Fig.8 shows the methodology used in predicting the roughness of tunnels at these two hydropower projects.As a first step of analysis(inside the black dotted rectangle in Fig.8),the roughnesses of the steel,concrete and shotcrete-lined sections of the tunnel and shaft(including invert concrete lining)have been backcalculated using the equations presented in Tables 1 and 2.In the back calculation,the measured head loss,discharge and geometry are known parameters and roughness is an unknown parameter.The calculated roughnesses of steel-and concrete-lined tunnels are considered as fixed entities for calculating the roughness of shotcrete-lined headrace tunnels with invert concrete as and when necessary.From the results of this back calculation,a new relationship between the Manning coefficient and physical roughness of a shotcrete-lined tunnel with invert concrete is proposed.

    Fig.7.Head loss coefficient in tunnel expansion(drawn based on Lysne et al.,2003).

    Fig.5.Bend loss coefficient chart(drawn based on Lysne et al.,2003).

    Fig.6.Transition between different sections(expansion and contraction).v1and v2represent the flow velocities at sections 1 and 2,respectively;and D1and D2represent the diameters at sections 1 and 2,respectively.

    Fig.8.Methodology for roughness prediction in shotcrete-lined tunnels with invert concrete lining.

    In the second step,statistical analysis is carried out to determine the extent of undulations in the surface of shotcrete-lined tunnel by using geometrical information of the selected cross-sections of the CHP.As a result of the analysis,a relationship has been developed between the physical roughness and over-break in the walls and the crown of the shotcrete-lined tunnel.By using this relationship,the physical roughness has been calculated from the data of actually measured over-break of all shotcrete-lined sections of the headrace tunnel documented in the as-built drawing of both projects.Since both headrace tunnels have shotcrete sections with invert concrete,the composite physical roughness of the whole cross-section is calculated as the weighted average of the shotcrete and concrete-lined sections.Further,the Manning coefficient(hydraulic roughness)is calculated from the physical roughness for each section using the proposed equation.Finally,frictional head loss in shotcrete-lined tunnels with invert concrete for both projects is calculated by using Eq.(5)and the established Manning coefficient.A new roughness prediction method is then proposed after verification of this calculated head loss with the one measured in the field.

    4.Case studies

    Fig.9.Project locations in geological map of the Nepal Himalaya.

    The locations of two hydropower projects are shown in the geological map of Nepal(Fig.9).As seen in the figure,both the CHP and MKHP are located in the Lesser Himalaya meta-sedimentary rock formations.The drill-and-blast method of excavation was used for the construction of all underground works of both projects.

    4.1.Modi Khola hydroelectric project

    The MKHP is located in central-west part of Nepal at Nayapul,Parbat district,which is about 45 km to the northwest of Pokhara(Fig.9).Water from Modi Khola at Nayapul is diverted to the right bank and all project components are built on the same bank.The headworks components of this project consist of a diversion weir,an open concrete canal,desanding basins and a regulating poundage.The regulating poundage is used for head and discharge regulation.From the poundage to the powerhouse,water is transferred through a headrace tunnel,a vertical pressure shaft and a horizontal pressure tunnel and to the semi-underground powerhouse located at Patichaur.The project has a surface powerhouse with an installed capacity of 14.7 MW generated by utilizing 27.5 m3/s design discharge and a gross head of 71 m.The main rock types in the project area are quartzite and phyllitic schist(Shrestha and Panthi,2014).The headrace tunnel mainly passes through quartzite.

    The total length of the headrace tunnel is 1507m,which extends from the regulating pond(RP)to the surge shaft(SS)of the project.The headrace tunnel is composed of different sections of concrete linings and shotcrete linings(Fig.10).The designed shape of the headrace tunnel is an inverted D.The cross-sectional area of concrete-lined section is very close to constant.On the other hand,the cross-sectional area of shotcrete-lined section varies due to blasting effect.However,the invert of the whole headrace tunnel is lined with concrete.

    As shown in Fig.10,there are three stretches of tunnel downstream of the SS,i.e.a 42 m long horizontal inverted D shaped headrace tunnel,connecting the SS with the top of the vertical shaft,a vertical shaft of circular shape with a transition between horizontal tunnel,a circular tunnel before the start of the curve at the top,and a pressure tunnel from the bottom of vertical shaft to the powerhouse.The pressure tunnel consists of a circular concrete-lined tunnel and a circular steel-lined tunnel.Typical cross-sections of the tunnel with different lining conditions are shown in Fig.11.

    Each of three different linings indicated in Fig.11 has different roughnesses against water flow.Even though this article mainly focuses on the roughness of shotcrete-lined tunnel with invert concrete,it is necessary to find out the roughness of both concrete and steel linings for calculation of the roughness from measured head loss.

    4.2.Chilime hydroelectric project

    The CHP is located in Chilime and Syabrubesi Village Development Committees in Rasuwa District in Central Nepal(Fig.9).The project has an installed capacity of 22.1 MW with the design discharge of 7.5 m3/s and gross head of 345 m.Water from Chilime River is diverted to the right bank of the river and reaches the regulating pound followed bydesanding basin,conduits and canals.The main purpose of the poundage is to regulate water level and to function as peaking reservoir.Water from the poundage to underground powerhouse is transported through the underground headrace system consisting of a pressure conduit,headrace tunnel and inclined penstock shaft.The water is then discharged back to the Bhotekoshi River through a tailrace tunnel(Fig.12).Geologically,the project area lies in the Lesser Himalaya meta-sediments and the main rock types in the project area are quartzite and mica schist(CHC,2005).

    There exists a 425 m long pressure conduit with a syphon from the inlet gate downstream of the RP to the headrace tunnel inlet portal,of which 395 m is concrete box and the rest is circular steel pipe.The total length of headrace tunnel(HRT)from inlet portal to SS is 2827 m.The headrace tunnel consists of tunnel segments with concrete lining and shotcrete lining with invert concrete,and steel lining.Concrete lining segments of the headrace tunnel have two different shapes,i.e.horse-shoe and inverted D shapes.The inclined shaft and pressure tunnel from SS to powerhouse are embedded with steel penstock pipe,which has a total length of 650 m.

    Fig.13 shows typical sections of the headrace system representing each lining system.These sections are the basis for the calculation of flow velocity and hydraulic radius of each headrace system,which are used chainage-wise as lining types for head loss calculation.

    5.Analysis of roughness

    Fig.10.Plan and profile along the MKHP,Nepal(drawn based on Shrestha and Panthi,2014).masl represents meter above sea level.

    Fig.11.Typical sections at different stretches of tunnel in the MKHP(unit in meter)(drawn based on Sharma,2001).

    Shotcrete-lined pressure tunnels are feasible only if the economic loss caused by the friction head loss is much less than the cost needed for full concrete or steellining.The head loss and hence the friction loss have to be measured once the hydropower project enters to the operation phase and the loss has to be verified whether it is within the design limit.The roughness of different linings in tunnels can be back-calculated from measured head loss.However,roughness needs to be predicted before and during the excavation of the tunnel in order to cope with design and contractual issues.

    5.1.Head loss measurement

    Fig.12.Plan and profile along waterway alignment of the CHP(Source:Chilime Hydropower Company Ltd.).

    Fig.13.Typical sections at different stretches of waterway systems of the CHP(unit in meter).

    Fig.14.Typical sketch of head loss measurement locations and details.

    Head loss measurement was carried out in both the MKHP and CHP.In each project,the head loss has been measured in two stretches:one is from the RP to the SS and another is from the SS to the upstream of powerhouse inlet valve(USPIV).The schematic diagram of measurement locations including project components is shown in Fig.14.The water level at the SS was measured multiple times using a floating ball hanging from the invert of the aeration tunnel at the SS.At the time of measurement,the water level at the RP and pressure at the USPIV were recorded from the data monitoring system of the projects and maintained constant throughout the measurement.The constant values were achieved by maintaining constant discharge and constant power production.

    Head loss in different stretches has been calculated using the equations listed in Table 3.Head loss from the RP to the SS is calculated using Eq.(18),whereH1is the water level difference between the RP and the SS(Eq.(19))andV1is the velocity of water in the tunnel at the location of the SS(Eq.(20)),Qis the water discharge in m3/s andA1is the cross-sectional area of the tunnel at the SS location in m2.

    Water level at the SS is calculated using Eq.(21),whereELis the elevation at the invert of aeration tunnel andhis the vertical heightbetweenWL2andEL,which is measured with the help of a floating ball hanging as shown in Fig.14b.ELis taken from as-built drawing of the SS provided from the respective projects.Furthermore,the head loss from the SS to USPIV is calculated by using Eq.(22),whereCLis the center elevation level at the USPIV(Fig.14c),Pris the pressure in bar at the USPIV,V2is the flow velocity at the USPIV and γwis the unit weight of water(9.81 kN/m3).Finally,Eq.(23)is used to calculateV2from the discharge at the USPIV(Q1)and pipe diameter(d).Even though both projects have two turbine units,only one unit was in operation in the MKHP at the time of measurement.This givesQ1in the MKHP as the total discharge of the plant.

    Table 3List of equations used to calculate head loss at different stretches.

    During the measurement,total power production(Pw)was also recorded from the control panel at the powerhouse.Using Eqs.(18)-(23)and input data in Table 4,bothHL1andHL2are calculated for each measurement for both projects(Table 5).As one can see in Table 5,there were 8 measurements at the MKHP and 12 measurements at the CHP.

    5.2.Roughness from measured head loss

    One of the major parameters to calculate the roughness from measured head loss is frictional head loss.The frictional head loss in the considered tunnel stretch has been calculated after subtracting all other losses from total measured head loss.Once the frictional head loss,water discharge and tunnel geometry are known,roughness is the only parameter to be calculated which is unknown in the head loss equations(Eqs.(2)and(5)).As shown in Fig.12,at the CHP,there is a steel penstock lining from the SS to the USPIV.The roughness of the steel penstock lining is back-calculated from this section.At the MKHP,both steel and concrete linings are used in part of pressure tunnel and vertical shaft(Fig.10).In this stretch,the roughness of the concrete-lined tunnel is back-calculated with the help of the established roughness of the steel lining.By fixing the roughness of the concrete and steel linings,the roughness of shotcrete-lined tunnel with invert concrete sections is calculated along the headrace tunnels of both the CHP and MKHP.

    5.2.1.Roughness for steel lining

    There are altogether three bends in the penstock,but along unit#1 in the powerhouse,there is no bend from Y-furcation.As shown in Fig.12,the SS itself is along the bend and loss due to this bend is considered in penstock part.Unit#1 is taken into account in the calculation and hence effective bends in the penstock are bends#6,#7 and#8(Table 7).

    Based on Tables 6 and 7,the total singular loss(Hsin Eq.(9))in this particular case will be 0.197 m(=0.161 m+0.036 m).Furthermore,friction loss in steel-lined part(Hfs)is calculated by subtractingHsfrom each value ofHL2in Table 5.Eqs.(2)and(3)are merged and the roughness for steel lining(εs)is established for the first friction loss for the given length of tunnel,geometry of tunnel and discharge(ε in Eq.(3)is εs).Here,εsis considered as a constant parameter irrespective of the size of tunnel,but the friction factor ofsteel pipefsslightly changes with the size and again Eq.(3)is used to calculatefsfor different sizes.Similarly,Manning coefficient of steel pipeMsis calculated by using Eq.(6)for eachfsand the result is shown in Table 8.

    Table 6Bellmouth,reducers and Y-furcation losses from the SS to the USPIV of CHP.Total head loss=0.161 m.

    Table 4Input data for the head loss measurement of both MKHP and CHP.

    Table 5Head loss(in meter)at the waterway systems of both MKHP and CHP.

    Following the same calculation steps as in Table 8,εsfor all head loss measurements(Hfs)is calculated and presented in Table 9.The table also shows average values offsandMsfor each length and size of the penstock pipe for all measurements.Further,the mean value of εsshown in Table 9 will be used as the fixed roughness for steel lining.

    5.2.2.Roughness for concrete lining

    As shown in Fig.10,the MKHP has both concrete lining and steel lining from the SS to the USPIV.In this stretch,friction loss inconcrete-lined tunnel(Hfc)is calculated by subtracting singular losses and friction loss in steel-lined tunnel fromHL2.For singular losses,the calculation process is the same as that for the previous case.Calculated values of reducer loss,bend loss and Y-furcation loss are presented in Table 10.

    Table 7Bend loss calculation in the stretch from the SS to the USPIV of CHP.Total head loss=0.036 m.

    Table 8Roughness of steel lining(εs=0.551 mm)between the SS and the USPIV of CHP for the first measurement.Total Hfs=1.84 m.

    Table 9Roughness of steel lining(εs)between the SS and the USPIV of CHP.

    Friction loss in the steel-lined pressure tunnel of the MKHP is calculated for the given length,size and established roughness of steel lining.The roughness of steel-lined pressure tunnel is equal to 0.526 mm(mean value of εsin Table 9)and friction loss is equal to 0.2 m.Total fixed loss is then 0.605 m,which is the sum of total singular loss and friction loss in steel-lined tunnel.Furthermore,friction loss in the concrete lining(Hfc)section is calculated by subtracting the total fixed loss frommeasured head loss(HL2)of the MKHP.For given geometry and length of concrete-lined tunnel,the roughness of the concrete lining(εc)is back-calculated fromHfcby using Eqs.(2)and(3),following the same calculation steps as in Table 8 for each measurement ofHfc.In addition to this,average values offcandMcare also calculated as that in Table 8 and shown in Table 11.

    Table 11 shows the final result of the roughness of the concretelined tunnel of the MKHP for all eight measurements.The final value of εcis the average of all eight measurements and is used as afixed value for further calculations.

    5.2.3.Roughness for shotcrete-lined tunnel

    與此同時,要創(chuàng)新活動形式。課堂上思政內容的學習是一方面,另一方面,可以配合課堂內容開展如政策專題討論、黨史知識競賽、演講比賽、詩歌朗誦等活動。在一些重要紀念日可以帶領學生走出校園,參觀紀念館、烈士陵園等,緬懷革命先烈,對學生進行“情境教育”,引導學生牢記歷史。

    Both the CHP and MKHP have shotcrete-lined headrace tunnels with invert concrete(Figs.11b and 13e).Roughness of shotcretelined tunnel is back-calculated from frictional head loss for stretches with shotcrete lining.The back-calculated roughness is the equivalent roughness of shotcrete linings in the walls and crown and concrete lining in the invert.

    Since the headrace tunnel of the MKHP has both concrete lining and shotcrete lining,the total head lossHL1is the sum of friction losses in shotcrete and concrete-lined tunnels and singularlosses in the system.The total singular losses and friction loss in concretelined segment are considered as fixed losses for the given discharge.Table 12 shows input data required to calculate head loss in trash rack,gate,niches,rock trap and bends.

    In addition,there are a total of 18 transitions between concrete to shotcrete and shotcrete to concrete linings.The loss coefficients of these transitions are estimated by using Eqs.(14)and(17).The detailed calculations of head loss due to transitions are made and the final results with all other singular losses are presented in Table 13.

    Another fixed loss in the system,the frictional loss in the concrete-lined tunnel(Hfc),is calculated using Eqs.(2)and(3)with the established value of εcand given geometry and length of concretelinings.The totalHfcis equal to0.197 m and the total fixed loss,including singular losses,becomes 0.275 m.Finally,friction loss in shotcrete-lined tunnel(HR)is calculated by subtracting the total fixed loss from measured head loss(HL1)of the MKHP.A chainagewise calculation spreadsheet for 18 shotcrete-lined tunnel sections is prepared with input parameters to calculate εR,fRandMRfor eachHRfollowing exactly the same calculation process as given earlier inconcrete and steel linings,which are calculated as 0.18 m,0.13 m and 0.64 m,respectively.These losses are calculated in detail by using project data and information and previous calculation procedures.By subtracting the fixed losses fromHL1,the friction loss in the shotcrete-lined tunnel(HR)is calculated,which is shown in Table 14.In order to calculate the roughness of shotcrete-lined tunnel,a chainage-wise calculation spreadsheet is prepared for 299 tunnel cross-sections and the same calculation process is also employed as that for the MKHP.

    Table 10The singular losses in the SS to the USPIV of MKHP.Total singular losses=0.405 m.

    Table 11Roughness of concrete-lined tunnel of MKHP.

    As shown in Table 14,the hydraulic roughness fromboth Darcy-Weisbach(Eqs.(2),(4)and(6))and Manning for mulae(Eqs.(5)and(7)) corresponds very well in both projects.Table 14 also shows the minimum,maximum and mean values of different roughnesses.Table 8,where Eq.(3)is replaced by Eq.(4).The outcome of these calculations is presented in Table 14.Additionally,MRand εRare also calculated by using Eqs.(5)and(7),respectively,and the results from the two different approaches are compared.

    Table 12Geometrical and technical data for singular losses in the HRT of MKHP.

    In the case of the CHP,the total head loss(HL1)is the sum of singular losses and friction losses in concrete box culvert,steel pipe,steel-lined tunnel,concrete-lined tunnel and shotcrete-lined tunnel.Fixed losses in this case are singular losses and friction losses in

    5.2.4.Manning coefficient and physical roughness

    The physical roughness,εR,from both the Darcy-Weisbach and Manning approaches in Table 14,has some deviation in the results for both projects,which indicates that modification in Eq.(7)is needed in order to define εRas a physical roughness equivalent to sand roughness given by Eq.(4).In this endeavor,an attempt is made to establish a modified relationship between Manning coefficient(MR)from Eq.(5)and equivalent sand roughness(εR)derived from the Darcy-Weisbach and Colebrook relationships(Eqs.(2)and(4))using 20 results presented in Table 14(Fig.15).

    As Fig.15 indicates,in comparison to theMRvalues for shotcrete-lined tunnel with invert concrete lining back-calculated in Table 14,Eq.(7)gives lowerMRvalues for the same values of εR.Therefore,the authors suggest that the relationship betweenMRand εRfor shotcrete-lined tunnels with invert concreteis defined by Eq.(24),which shows a good fit in Fig.15:

    Table 13Singular losses in the HRT of MKHP.Total singular loss=0.078 m.

    Table 14Roughness of shotcrete-lined tunnel with invert concrete in the HRT of CHP and MKHP.

    Fig.15.Relationships between MRand εRbased on different approaches.

    The benefit of this equation is its simplicity in comparison to the one with Darcy-Weisbach and Colebrook equations.Moreover,Darcy-Weisbach and Colebrook equations do not consider different lining scenarios in the same cross-section of the tunnel.However,the authors emphasize that Eq.(24)is derived based on 20 datasets from two shotcrete-lined tunnels with invert concrete and it should be tested with many other tunnels with similar lining conditions,which are becoming more common in the Himalayan region and other part of the world such as the Andes.

    5.3.Physical roughness in relation to over-break

    If a correlation between the average over-break thickness and the undulations in actual tunnel profile is established,it may be possible to predict roughness.With this concept in mind,an attempt has been made to find a correlation between roughness and mean over-break thickness using actual cross-section data of the headrace tunnel of the CHP where the tunnel cross-sections are mapped at either every 5 m or 10 m.These records of tunnel crosssections are used to establish a correlation between over-break and physical roughness of the tunnel surface.The achieved correlation is further tested with the over-break and roughness properties of the MKHP headrace tunnel.

    The cross-section profile of a blasted tunnel seldom meets the profile assumed in a design profile and differs from it with an undulating wall surface as shown in Fig.16.A shotcrete-lined tunnel follows almost similar surface conditions as in an unlined tunnel and hence has similar undulation along the tunnel periphery excluding the invert,which is mostly concrete-lined in the Himalayan water tunnels.

    Hence,the roughness of a shotcrete lining(walls and crown in Fig.16)can be calculated using undulation depth measured from the minimum area profile as shown in Fig.16.In case of excavated tunnel sections,the minimum area profile may or may not coincide with the designed area profile depending on the quality of the contour blast.However,the shape of the minimum area profile is the same as that of designed profile(i.e.inverted D in this article).Since the minimum area profile follows innermost projections of the excavated profile or the shotcrete-lined profile,the undulation depth(Xi),which is measured perpendicular to the minimum area profile,is always equal to or greater than zero.There is statistical variation of undulation depth around the tunnel profile which demands that a single representative value of undulation depth is needed to estimate the equivalent sand roughness.According to Adams et al.(2012),depending on the type of undulating surface,different statistical parameters(calculated from the undulation depth)can be used to convert the undulation depth to the equivalent sand roughness.One of such parameters is the square root of variance of the undulation depth(Pegram and Pennington,1998;Adams et al.,2012).In this article,the square root of the variance ofXiis assumed to be equal to the physical roughness(equivalent sand roughness)of the unlined or shotcrete-lined profile of the tunnel in question and is expressed by

    wherenis the number of undulation depths,andXis the average of undulation depths.

    The mean area(Am)shown in Fig.16 is equal to the actually excavated area or area after shotcrete lining(Ae)of the tunnel in question.The mean area profile of the tunnel can be drawn to match the profile of the minimum area(Amin)maintaining uniform thickness(tm)around walls and crown.The thickness(tm)is therefore the mean over-break thickness for the cross-sectional profile in question and is calculated by

    Fig.16.Roughness of unlined or shotcrete-lined tunnel with invert concrete.

    wherepminis the perimeter of walls and crown of the minimum area profile andΔAis the over-break area(=Ae?Amin).

    At the CHP,299 tunnel cross-section profiles were surveyed at either every 5 m or every 10 m of shotcrete-lined headrace tunnel with invert concrete lining.Out of these cross-sectional profiles,68 sections from chainage 0+105 m to 0+490 m are taken as representative cases for the measurement of roughness in walls and crown.The tunnel stretch is selected as representative considering the fact that it is the longest tunnel stretch where shotcrete lining is continuous.In this stretch,Xiis measured in each cross-section and the number of measurements is governed by the extent of undulations presented in the profile in question and varied from 11 to 16 measurements for each section.εscandtmare calculated for each section by using Eqs.(25)and(26),respectively,and the values are used to find out whether there exists any correlation between these two properties(Fig.17).

    As Fig.17 indicates,the correlation between εscandtmis found satisfactory with a regression coefficient(R2)exceeding 80%.More importantly,Eq.(27)is proposed based on the result achieved,

    Fig.17.Correlation between roughness and mean over-break thickness.

    which is slightly modified with the one shown in Fig.17,to improve the readability of the equation without any impact on the calculation results:

    It is important to note that Eq.(27)represents only the walls and crown of a shotcrete-lined tunnel.Since there is concrete lining in the invert,the whole cross-section becomes composite lining,which should be analyzed accordingly.In this respect,the roughness of the composite lining is considered as the weighted average with respect to perimeter and can be defined by where the roughness of invert concrete lining εcis equal to 3.34 mm,i.e.the same as that of a concrete-lined tunnel(mean value in Table 11).It is considered as a fixed parameter over the entire length of the shotcrete-lined tunnel.

    The proposed Eqs.(24)and(27)are further used in all shotcretelined sections of headrace tunnels of both the MKHP and CHP to calculate both physical and hydraulic roughnesses.In this regard,all 299 measured cross-sectional profiles from the CHP and 18 cross-section profiles from the MKHP are exploited.For each section,εscis first calculated by using Eq.(27)for respective measuredtm.Furthermore,Eq.(28)is used to calculate εRand finallyMRis calculated using Eq.(24)suggested by the authors.Furthermore,frictional head loss is calculated by using Eq.(5)and exploiting respectiveMRvalues,cross-sections and length of tunnel(Table 15).

    As Table 15 indicates,there is fairly good match between measured and calculated head losses with approximately 15%deviation at the CHP.However,the results obtained for the MKHP are extremely good with a deviation of only 3%.

    Furthermore,Eq.(24)is inserted in the chart drawn by Solvik(1984),for both the Manning and Darcy-Weisbach formulae as shown in Fig.18.As Fig.18 indicates,the proposed Manning formula for shotcrete-lined tunnel with invert concrete fits very well with the Darcy-Weisbach equations for the inverse of relative physical roughness range between 20 and 100,which is verylogical since the Manning coefficient for shotcrete-lined tunnels with invert concrete in general should vary between 35 and 50 depending on the quality of tunnel contour excavation.

    Hence,it is concluded that the proposed equations,such as Eq.(24),can be used in shotcrete-lined tunnels with invert concrete to estimate the Manning coefficient and Eq.(27)can be used to predict physical roughness of shotcrete-lined surface.However,the authors highlight that the suggested equations are based on only two waterway systems and recommend that these equations are further verified using data from other projects.

    Fig.18.Comparison of Darcy-Weisbach and Manning formulae(updated in Solvik,1984).

    Table 15Head loss and roughness of shotcrete-lined tunnel with invert concrete of both CHP and MKHP,calculated using proposed equations.

    5.4.Roughness from existing methods

    The existing methods,such as those proposed by Rahm(1958),Priha(1969)and Reinius(1970),for calculating tunnel roughness were also tested to calculate the roughness of shotcrete-lined tunnel of the CHP.Altogether,299 cross-sections of shotcretelined tunnel are used for the calculation.Regarding the MKHP,available cross-sections are not enough to apply these existing methods.Hence,Table 16 shows only the result for the CHP.

    The roughness obtained from the existing methods is higher than that from the actual head loss measurement at the CHP.It is important to highlight that the existing methods(Rahm,1958;Priha,1969;Reinius,1970)of roughness calculation were mainly established using data sources from unlined tunnels,and hence result in higher roughness predictions than appropriate for the tunnels with shotcrete and invert concrete lining.On the other hand,roughness obtained by using the equations proposed by the authors is closer to the back-calculated value based on the measured head loss of the CHP.Therefore,we claim that,for the composite lining consisting shotcrete and invert concrete,the proposed equations(Eqs.(24)and(27))have better reliability.

    6.Over-break(excavation)vs.rock mass quality

    The extent of over excavation on the tunnel excavated using the drill-and-blast method depends upon the quality of rock mass along the tunnel in question,type of blast methods(wedge cut/burn cut),length of drill holes,type and amount of explosive used and professional quality and awareness of the tunneling team involved in tunnel excavation work.As discussed above,the tunnel roughness is greatly influenced by the quality of excavation.In the following,the authors try to assess to what extent the rock mass quality influences the over-break thickness expressed bytm.The average or smoothened over-break thickness(tm)of 299 and 77 excavated tunnel cross-sections for the CHP and MKHP,respectively,has been calculated.The calculated over-break thickness(tm)is then plotted against mapped values of rock mass class defined by Q-system of rock mass classification(Fig.19).

    As Fig.19 indicates,there is no clear correlation between over break thickness(tm)and rock mass quality class.Even though the rock types along these two headrace tunnels are similar and represented by jointed quartzite,the variation intmvalues at the CHP is found to be more pronounced in all rock mass classes than that at the MKHP.This is most likely related to professional quality and awareness of the tunneling team involved during the excavation.However,Fig.19 depicts one very important piece of information,which explains that the variation in over-break thickness in poor rock mass(Class IV)is higher than that of other rock mass quality classes.The authors believe that this is quite logical since the rock mass with Class IV according to Q-system typically has more than three joint sets and is blocky in nature.On the other hand,Class V represents very poor quality rock mass,where blasting length in each round is reduced(in general less than 1.5 m)to make sure that there is no tunnel collapse immediately after blasting.Lowerblasting round length reduces protrusion depth and therefore a reducedtmvalue.Another finding of this analysis is that the average over-break thickness seems to be between 0.1 m and 0.2 m in the blasted tunnels excavated using the drill-and-blast tunneling technique.

    Table 16Roughness of shotcrete-lined tunnel with invert concrete using existing methods in CHP.

    Fig.19.Smoothened over-break thickness(tm)against rock quality class according to Q-system of rock mass classification at CHP and MKHP.

    7.Cost optimization

    Traditionally,using a fully concrete-lined waterway system has been proven to be a costly solution due to extra need for construction resources and time.Therefore,innovative solutions are needed to reduce the fully concrete-lined length of the pressure tunnel system(in particular,low-to medium-pressure headrace and tailrace tunnels).On the other hand,innovative applied solutions must guarantee long-term stability and sustainability,cost effectiveness and construction time savings.Tunnel rock support,consisting of sprayed concrete and systematic bolting,is applied to almost all waterway tunnels constructed today in the Himalayan region.This is mainly to secure tunnel stability and also to guarantee the safety of working crew at the tunnel face.Hence,applied support should be capable of withstanding any type of tunnel collapses including block fall(Panthi,2015).

    The basis of cost optimization is hence the use of shotcrete-lined headrace and tailrace tunnels with invert concrete instead of traditional concrete-lined tunnels.However,the construction cost of such tunnels should guarantee reduced construction cost and time.In addition,the waterway system should also be able to generate similar or higher financial revenue than that of concretelined tunnels.Regarding the waterway system,the main long-term revenue loss can be related to the frictional head loss.To evaluate this economic impact,in the following,a range of hydraulic roughness values for shotcrete and concrete-lined tunnels have been chosen for each lining type.Hydraulic roughness in concrete lining(Mc)is considered to vary from 60 to 75 and in a shotcretelined tunnel with invert concrete(MR),it is considered to range from 35 to 50.The shape of the tunnel was chosen as inverted D with equal width and height for both concrete-lined and shotcretelined tunnels in order to ensure a hydraulically efficient shape of the tunnel(Lysne et al.,2003).The ratio between the area of a concrete-lined tunnel(Ac)and the area of a shotcrete-lined tunnel with invert concrete(Asc)for equal head loss can be expressed by

    Fig.20.Area ratio(Ac/Asc)for different roughness values for the same hydraulic head loss.

    The area ratio is calculated for all possible combinations within the given range of roughness,as presented in Fig.20.The contour lines in the figure are an area ratio that helps to find equivalent area of concrete-lined tunnel for a known area of shotcrete-lined tunnel and vice versa.

    After having equivalent areas,the quantities of excavation and rock support have been calculated for each lining case.It is considered that there is a need for initial rock support consisting of sprayed concrete and systematic bolting to achieve construction safety in the tunnel.Even though the extent of this initial support is dependent on the quality of rock mass,it is considered that on average,10 cm fiber reinforced shotcrete and rock bolts(3 m long@1.5 m×1.5 m spacing)are required as initial tunnel support.The final lining required for shotcrete-lined tunnel is assumed as 40 cm thick reinforced concrete lining in the invert and 5 cm extra shotcrete lining and 20%extra rock bolts.The concrete-lined tunnel on the other hand is assumed to have 40 cm thick reinforced concrete along the tunnel periphery including tunnel invert.For cost calculation,the unit rate for each item has been fixed based on present market rates prevailing in Nepal(Himal Hydro,2016)and adjusted with global market rates based on international experience.Table 17 shows the adjusted unit rate for different main items.

    All possible area and roughness ratios have been calculated within the given range of roughness.Construction cost per meter tunnel is calculated for both shotcrete-lined and concrete-lined tunnels with varying area ratio where the area of shotcrete-lined tunnel varies from 10 m2to 80 m2.Fig.21 shows the possible cost saving as a fraction of excavation cost per meter shotcretelined tunnel with invert concrete for different area ratios and roughness ratios.

    As Fig.21a indicates,a cost saving is possible to achieve for all sized shotcrete-lined tunnels against concrete-lined tunnels as long as the area ratio is over 0.5.The figure also indicates that the cost savings are more pronounced in tunnels with smaller crosssectional area.Fig.21b indicates the cost savings for different tunnel cross-sectional areas in the form of ratio of roughness for shotcrete-lined and concrete-lined tunnels,which may also be used as a basis for cost optimization.

    Table 17Unit rate of different support items.

    8.Conclusions

    Fig.21.Contour lines showing possible cost saving as a fraction of excavation cost per meter of shotcrete-lined tunnel with invert concrete.(a)Area ratio,and(b)Roughness ratio.

    As has been demonstrated in this article,shotcrete-lined waterway tunnels(both headrace and tailrace tunnels)with invert concrete will be innovative and optimal cost effective options for the future hydropower projects in the Himalayan region.However,one should make sure that the long-term stability and safety of the waterway system are achieved and tunnel segments crossing serious weakness/fault zones are fully concrete-lined.Suggested relationships between the Manning coefficient(hydraulic roughness)and the physical roughness(Eq.(24)),and between the physical roughness and the over-break thickness(Eq.(27))of tunnels excavated using drill-and-blast methods can be used to predict head loss along the shotcrete-lined tunnels with invert concrete. These relationships may be used for predicting tunnel roughness both before and after excavation of a waterway tunnel in question.The strength of the suggested relationships is their simplicity and the relationships are directly linked with the roughness of actual tunnel periphery.However,the authors note that the proposed equations are based on only two tunnel cases and hence assume that there may be some discrepancies in the outcome of the proposed method compared to the reality.Similarly,it is also concluded that there is no distinct correlation between over-break thickness(directly linked with the roughness of the tunnel periphery)and rock mass quality class defined by Q-system of rock mass classification.However,the study indicates that the rock mass quality under Class IV(poor rock mass)seems more vulnerable to the deviation on the over-break thickness.Finally, the study demonstrates the financial attractiveness of the use of shotcrete-lined waterway tunnels with invert concrete lining versus fully concrete-lined tunnels.

    Conflicts of interest

    The authors wish to confirm that there are no known conflicts of interest associated with this publication and there has been no significant financial support for this work that could have influenced its outcome.

    Acknowledgements

    The authors are grateful to the project operation team of the Modi Khola and Chilime hydroelectric projects for giving access to measure the head loss and for providing project background data and information and also giving permission to use these two projects as cases for this research,which will be a milestone in the use of unlined or shotcrete-lined pressure tunnel concept in the Himalayan region.

    Notations

    Adams T,Grant C,Watson H.A simple algorithm to relate measured surface roughness to equivalent sand-grain roughness.International Journal of Mechanical Engineering and Mechatronics 2012;1(2):66-71.

    Benson R.Design of unlined and lined pressure tunnels.Tunneling and Underground Space Technology 1989;4(2):155-70.

    Bishwakarma MB.Computation of head losses in hydropower tunnels.Dam Engineering 2012;23(2):1-15.

    Brekke TL,Ripley B.Design guidelines for pressure tunnels and shafts.1987.Research Project 1745-17,EPRI,Section 5-Detailed design.Technical Report.

    Broch E.The development of unlined pressure shafts and tunnels in Norway.In:ISRM international symposium.International society for rock mechanics;1982.

    Bruland A,Solvik ?.Analysis of roughness in unlined tunnels.In:Proceedings of the international conference on underground hydropower plants;1987.p.22-5.

    Chilime Hydropower Company Ltd.(CHC).Project completion report.CHC;2005.

    Colebrook CF.The flow of water in unlined,limed and partly lined rock tunnels.Proceedings of the Institution of Civil Engineers 1958;11(1):103-32.

    Cuesta L.Unlined hydroelectric tunnels.In:ISRM international symposium.Isrm;1988.

    Hager WH.Wastewater hydraulics:theory and practice.Springer;2010.

    Hákonardóttir KM,Tómasson GG,Kaelin J,Stefánsson B.The hydraulic roughness of unlined and shotcreted TBM-bored tunnels in volcanic rock:In Situ observations and measurements at Kárahnjúkar Iceland.Tunnelling and Underground Space Technology 2009;24(6):706-15.

    Huval CJ.Hydraulic design of unlined rock tunnels.Journal of the Hydraulics Division 1969;95(4):1235-46.

    Himal Hydro.Archive of the present market rate of tunneling works in the Himalaya.Himal Hydro and General Construction Ltd.;2016.

    Kim Y.Tunnel contour quality index in a drill and blast tunnel:definition,analysis and effects.Norwegian University of Science and Technology;2009.PhD Thesis.

    Kim Y,Bruland A.A study on the establishment of tunnel contour quality index considering construction cost.Tunnelling and Underground Space Technology 2015;50:218-25.

    Lysne DK,Glover B,St?le H,Tesaker E.Hydraulic design.Department of hydraulic and environmental engineering.Norwegian University of Science and Technology;2003.

    Maerz N,Ibarra J,Franklin J.Overbreak and underbreak in underground openings,Part 1:measurement using the light sectioning method and digital image processing.Geotechnical&Geological Engineering 1996;14(4):307-23.

    Mandal S,Singh M.Evaluating extent and causes of overbreak in tunnels.Tunnelling and Underground Space Technology 2009;24(1):22-36.

    Mosonyi E.Water power development.Akademiai Kiado;1965.

    Nilsen B,Thidemann A.Rock engineering.Division of Hydraulic Engineering,Norwegian Institute of Technology;1993.

    Panthi KK.Evaluation of rock bursting phenomena in a tunnel in the Himalayas.Bulletin of Engineering Geology and the Environment 2012;71(4):761-9.

    Panthi KK.Himalayan rock mass and possibility of limiting concrete-lined pressure tunnel length in hydropower projects in the Himalaya.Geosystem Engineering 2015;18(1):45-50.

    Pegram GGS,Pennington MS.Hydraulic roughness of bored tunnels.Journal of the South African Institution of Civil Engineering 1998;40(4):9-14.

    Penche C.Guide on how to develop a small hydropower plant.European Small Hydropower Association;2004.

    Priha S.Hydraulic properties of small unlined rock tunnels.Journal of the Hydraulics Division 1969;95(4):1181-210.

    Rahm L.Friction losses in Swedish rock tunnels.In:International water power&dam construction;1958.p.457-64.

    Reinius E.Head losses in unlined rock tunnels.In:International water power&dam construction;1970.p.246-52.

    Ronn P,Skog M.New method for estimation of head loss in unlined water tunnels.In:Proceedings of the 3rd international conference on hydropower.Rotterdam:A.A.Balkema;1997.p.675-82.

    Sharma RH.Modi Khola hydroelectric project.Construction report.Himal Hydro and General Construction Ltd.;2001.

    Shrestha PK,Panthi KK.Groundwater effect on faulted rock mass:an evaluation of Modi Khola pressure tunnel in the Nepal Himalaya.Rock Mechanics and Rock Engineering 2014;47(3):1021-35.

    Solvik O.Unlined tunnel hydraulics.In:Hard rock underground engineering.Olso,Norway:Furuholmen-Astrup H?yer-Selmer(FHS);1984.

    Westfall DE.Water conveyance tunnels.In:Tunnel engineering handbook.Springer;1996.p.298-310.

    Wright DE.The hydraulic design of unlined and lined-invert rock tunnels.Construction Industry Research and Information Association;1971.

    猜你喜歡
    專題討論詩歌朗誦緬懷
    不忘初心,繼續(xù)前進紀念紅軍長征勝利八十周年詩歌朗誦會舉行
    當代科學哲學的唯物論轉向(專題討論)
    學習與探索(2016年4期)2016-08-21 12:36:36
    Migrant Worker Poets Recite Works in Hangzhou
    文化交流(2016年2期)2016-03-18 06:27:07
    深切的緬懷
    全球化(2015年9期)2015-02-28 12:40:13
    紀念世界反法西斯戰(zhàn)爭勝利七十周年
    ——中韓詩人詩歌朗誦會
    揚子江詩刊(2015年4期)2015-01-06 05:38:34
    緬懷先烈 傳承文明 親近自然
    中國火炬(2014年5期)2014-07-24 14:15:49
    2014年《電焊機》雜志專題討論
    電焊機(2014年4期)2014-03-12 06:51:44
    2014年《電焊機》雜志專題討論
    電焊機(2014年3期)2014-03-12 06:51:44
    2014年《電焊機》雜志專題討論
    電焊機(2014年2期)2014-03-12 06:50:24
    清明祭奠 緬懷先烈
    中國火炬(2013年5期)2013-07-25 09:51:44
    亚洲精品456在线播放app | 97超级碰碰碰精品色视频在线观看| 这个男人来自地球电影免费观看| 亚洲av电影在线进入| 九九热线精品视视频播放| 亚洲熟妇中文字幕五十中出| 久久精品影院6| 九色成人免费人妻av| 色综合站精品国产| 欧美性猛交╳xxx乱大交人| 亚洲性夜色夜夜综合| 少妇裸体淫交视频免费看高清| 免费大片18禁| 男插女下体视频免费在线播放| 在线免费观看不下载黄p国产 | 听说在线观看完整版免费高清| 别揉我奶头~嗯~啊~动态视频| www.熟女人妻精品国产| 成人国产综合亚洲| 在线视频色国产色| 免费观看人在逋| x7x7x7水蜜桃| 在线观看舔阴道视频| 18禁观看日本| 女生性感内裤真人,穿戴方法视频| 亚洲色图 男人天堂 中文字幕| 久久人妻av系列| 黄色成人免费大全| 欧美黑人欧美精品刺激| 欧美色视频一区免费| 国产高清三级在线| 日韩欧美 国产精品| 五月玫瑰六月丁香| 亚洲国产色片| 亚洲中文av在线| 夜夜爽天天搞| 欧美日韩亚洲国产一区二区在线观看| 天天一区二区日本电影三级| 男女做爰动态图高潮gif福利片| 国产成人精品久久二区二区91| 国产单亲对白刺激| 韩国av一区二区三区四区| 999久久久国产精品视频| 九色成人免费人妻av| 后天国语完整版免费观看| 国产高清三级在线| 国产精品综合久久久久久久免费| 国产一区二区三区在线臀色熟女| 老司机午夜十八禁免费视频| 99国产精品99久久久久| 久久欧美精品欧美久久欧美| 制服丝袜大香蕉在线| 国产亚洲欧美98| 黑人操中国人逼视频| 神马国产精品三级电影在线观看| a级毛片a级免费在线| 操出白浆在线播放| 国产成人精品久久二区二区免费| 亚洲欧美日韩无卡精品| 老鸭窝网址在线观看| 国产精品久久电影中文字幕| 亚洲熟女毛片儿| 精品乱码久久久久久99久播| 成人av在线播放网站| 国产探花在线观看一区二区| 神马国产精品三级电影在线观看| 免费观看人在逋| 亚洲欧美精品综合久久99| 不卡av一区二区三区| 97人妻精品一区二区三区麻豆| 在线观看美女被高潮喷水网站 | 少妇裸体淫交视频免费看高清| 性欧美人与动物交配| 成人永久免费在线观看视频| 18禁黄网站禁片免费观看直播| 国产伦人伦偷精品视频| 国产精品久久电影中文字幕| 欧美日韩黄片免| 亚洲18禁久久av| tocl精华| 一级毛片精品| 天天躁狠狠躁夜夜躁狠狠躁| 亚洲aⅴ乱码一区二区在线播放| 熟女少妇亚洲综合色aaa.| 老熟妇乱子伦视频在线观看| 丰满人妻一区二区三区视频av | 免费在线观看成人毛片| 又黄又粗又硬又大视频| 婷婷六月久久综合丁香| 真人一进一出gif抽搐免费| 欧美最黄视频在线播放免费| 好男人电影高清在线观看| 亚洲无线在线观看| 成人三级做爰电影| 国产伦在线观看视频一区| 亚洲 欧美 日韩 在线 免费| 哪里可以看免费的av片| 欧美丝袜亚洲另类 | 国产精品 国内视频| 亚洲男人的天堂狠狠| 变态另类成人亚洲欧美熟女| 久久精品影院6| 午夜激情福利司机影院| 岛国在线观看网站| 亚洲激情在线av| 久久性视频一级片| 成人特级av手机在线观看| 国产私拍福利视频在线观看| 视频区欧美日本亚洲| 露出奶头的视频| 久久久久久久精品吃奶| 亚洲欧美激情综合另类| 99精品在免费线老司机午夜| av天堂在线播放| 91av网站免费观看| 午夜久久久久精精品| 亚洲中文字幕一区二区三区有码在线看 | 国产一区二区三区在线臀色熟女| 午夜成年电影在线免费观看| 精品国产亚洲在线| 偷拍熟女少妇极品色| 亚洲欧美精品综合久久99| 国产精品1区2区在线观看.| 在线免费观看的www视频| 成人av在线播放网站| 国产亚洲精品av在线| 搡老岳熟女国产| 国产精品久久久久久人妻精品电影| 日本在线视频免费播放| 亚洲专区中文字幕在线| 日韩欧美免费精品| 最近最新中文字幕大全电影3| 老汉色∧v一级毛片| 欧美性猛交黑人性爽| 最新在线观看一区二区三区| 看免费av毛片| 亚洲成人中文字幕在线播放| 日本一二三区视频观看| 欧美乱码精品一区二区三区| 国产免费av片在线观看野外av| 欧美乱妇无乱码| 亚洲中文日韩欧美视频| 草草在线视频免费看| 午夜福利视频1000在线观看| 香蕉久久夜色| 宅男免费午夜| 欧美黄色淫秽网站| 全区人妻精品视频| 免费大片18禁| 欧美一级a爱片免费观看看| www.自偷自拍.com| 久久精品91无色码中文字幕| 中文字幕久久专区| 18禁黄网站禁片免费观看直播| 在线观看午夜福利视频| 可以在线观看毛片的网站| 人人妻人人澡欧美一区二区| 欧美xxxx黑人xx丫x性爽| 亚洲欧美日韩高清在线视频| 国产成人系列免费观看| a在线观看视频网站| 99热精品在线国产| 久久久久亚洲av毛片大全| 狠狠狠狠99中文字幕| 99久久成人亚洲精品观看| 人妻夜夜爽99麻豆av| 国产精品av久久久久免费| 精品久久久久久成人av| 国产乱人视频| 亚洲国产欧美一区二区综合| 91在线观看av| 日本精品一区二区三区蜜桃| 精品久久蜜臀av无| ponron亚洲| 男女之事视频高清在线观看| 怎么达到女性高潮| 亚洲自拍偷在线| 成人无遮挡网站| 丁香六月欧美| 国产不卡一卡二| 免费观看的影片在线观看| 在线国产一区二区在线| 亚洲国产看品久久| 美女 人体艺术 gogo| 成人国产综合亚洲| 噜噜噜噜噜久久久久久91| 美女扒开内裤让男人捅视频| 99国产极品粉嫩在线观看| 中亚洲国语对白在线视频| 国产欧美日韩精品一区二区| 国产精品久久久人人做人人爽| 操出白浆在线播放| 女同久久另类99精品国产91| 亚洲av电影在线进入| 日本三级黄在线观看| 日韩欧美 国产精品| 日日干狠狠操夜夜爽| 久久人妻av系列| 欧美日本亚洲视频在线播放| 最近在线观看免费完整版| 国产成+人综合+亚洲专区| 国产私拍福利视频在线观看| 在线看三级毛片| 一二三四在线观看免费中文在| 国产一区二区激情短视频| 熟女少妇亚洲综合色aaa.| 国产精品综合久久久久久久免费| 麻豆av在线久日| 波多野结衣巨乳人妻| avwww免费| 欧美色视频一区免费| 超碰成人久久| 综合色av麻豆| svipshipincom国产片| 久久久久久九九精品二区国产| 欧美成人性av电影在线观看| 丁香六月欧美| 97超视频在线观看视频| 午夜福利成人在线免费观看| 国产男靠女视频免费网站| 性色avwww在线观看| 9191精品国产免费久久| 国产高清视频在线观看网站| 国产精品 欧美亚洲| 97碰自拍视频| 99在线视频只有这里精品首页| 国产免费男女视频| 亚洲av日韩精品久久久久久密| 国产精品 欧美亚洲| 国产精品久久久久久亚洲av鲁大| 精品久久久久久久末码| 又黄又粗又硬又大视频| or卡值多少钱| 两个人看的免费小视频| 搡老岳熟女国产| 成人性生交大片免费视频hd| 熟女电影av网| 国产精品av久久久久免费| 亚洲av成人精品一区久久| 成人三级黄色视频| x7x7x7水蜜桃| 999久久久国产精品视频| 99国产综合亚洲精品| 精品日产1卡2卡| 成人高潮视频无遮挡免费网站| 亚洲乱码一区二区免费版| 淫秽高清视频在线观看| 精品熟女少妇八av免费久了| 99久久精品一区二区三区| 久久精品人妻少妇| 九色成人免费人妻av| 非洲黑人性xxxx精品又粗又长| 欧美乱码精品一区二区三区| 美女免费视频网站| 久久久久久久精品吃奶| 日韩欧美在线二视频| 成年女人看的毛片在线观看| 亚洲av美国av| 99精品久久久久人妻精品| 久久久久久久久中文| 亚洲欧美日韩无卡精品| 午夜福利在线观看吧| 淫妇啪啪啪对白视频| 最新中文字幕久久久久 | 久久香蕉精品热| 91在线精品国自产拍蜜月 | 波多野结衣高清无吗| 久久性视频一级片| 熟女电影av网| 欧美成人一区二区免费高清观看 | 俺也久久电影网| 欧美日本视频| 欧美日韩中文字幕国产精品一区二区三区| 亚洲av成人精品一区久久| 少妇丰满av| 精品一区二区三区四区五区乱码| 999久久久国产精品视频| a在线观看视频网站| 亚洲国产精品合色在线| 黄色视频,在线免费观看| 精品国内亚洲2022精品成人| 99热只有精品国产| 欧美中文综合在线视频| 一级a爱片免费观看的视频| 狂野欧美白嫩少妇大欣赏| 日本黄色视频三级网站网址| 俺也久久电影网| 婷婷亚洲欧美| 亚洲欧美日韩卡通动漫| 欧美日韩国产亚洲二区| 国产精品爽爽va在线观看网站| 亚洲av成人精品一区久久| 国产精品电影一区二区三区| 在线永久观看黄色视频| 日本在线视频免费播放| 热99在线观看视频| 法律面前人人平等表现在哪些方面| 亚洲精品在线观看二区| 99精品久久久久人妻精品| 中文亚洲av片在线观看爽| 69av精品久久久久久| 在线观看舔阴道视频| 国产黄a三级三级三级人| 国产又黄又爽又无遮挡在线| 一进一出好大好爽视频| 欧美日韩亚洲国产一区二区在线观看| 美女免费视频网站| 久久久久国产一级毛片高清牌| 波多野结衣高清无吗| 国产真实乱freesex| 国产精品1区2区在线观看.| 日本a在线网址| 91九色精品人成在线观看| 九色成人免费人妻av| 国产高清三级在线| 97超视频在线观看视频| 久久热在线av| 免费电影在线观看免费观看| 午夜久久久久精精品| 久久亚洲精品不卡| www.精华液| 五月伊人婷婷丁香| 国产v大片淫在线免费观看| 99国产极品粉嫩在线观看| 熟女人妻精品中文字幕| 大型黄色视频在线免费观看| 女警被强在线播放| 97碰自拍视频| 国内精品久久久久久久电影| 久久久久亚洲av毛片大全| 国产精品美女特级片免费视频播放器 | 十八禁网站免费在线| 午夜久久久久精精品| 男女做爰动态图高潮gif福利片| 精品午夜福利视频在线观看一区| 美女免费视频网站| 成人亚洲精品av一区二区| 国产成人系列免费观看| 欧美一级毛片孕妇| avwww免费| 色av中文字幕| 男女下面进入的视频免费午夜| 成年女人毛片免费观看观看9| 2021天堂中文幕一二区在线观| 午夜激情欧美在线| 波多野结衣高清无吗| 国产成人av教育| 日韩免费av在线播放| av女优亚洲男人天堂 | av片东京热男人的天堂| 久久久国产欧美日韩av| 狂野欧美激情性xxxx| av中文乱码字幕在线| 国产麻豆成人av免费视频| 久久久久久九九精品二区国产| 好男人在线观看高清免费视频| 精品一区二区三区视频在线观看免费| 好男人在线观看高清免费视频| 国产99白浆流出| 国产精华一区二区三区| 国产一区二区三区视频了| 俺也久久电影网| 国产亚洲av高清不卡| 成人无遮挡网站| 变态另类成人亚洲欧美熟女| 午夜免费激情av| 全区人妻精品视频| 久久九九热精品免费| 精品国产亚洲在线| 午夜精品久久久久久毛片777| 国内精品美女久久久久久| 午夜精品在线福利| 国产精品综合久久久久久久免费| 三级毛片av免费| 此物有八面人人有两片| 国产97色在线日韩免费| 精华霜和精华液先用哪个| 久久精品国产99精品国产亚洲性色| 亚洲欧美日韩无卡精品| 校园春色视频在线观看| 国产蜜桃级精品一区二区三区| 国产精品永久免费网站| 国产私拍福利视频在线观看| 最近最新中文字幕大全电影3| 黄片小视频在线播放| 观看免费一级毛片| 国产成人福利小说| 亚洲国产日韩欧美精品在线观看 | 国产亚洲欧美98| 日韩欧美精品v在线| 久久久久国产一级毛片高清牌| www日本黄色视频网| 成人三级做爰电影| 精品国产美女av久久久久小说| av黄色大香蕉| 亚洲国产欧洲综合997久久,| 国产激情偷乱视频一区二区| 舔av片在线| 亚洲一区二区三区不卡视频| 亚洲欧美一区二区三区黑人| 亚洲色图av天堂| 午夜福利在线观看吧| 国产亚洲精品久久久久久毛片| 桃红色精品国产亚洲av| 国内少妇人妻偷人精品xxx网站 | 久久99热这里只有精品18| 级片在线观看| 亚洲精品美女久久久久99蜜臀| 欧美最黄视频在线播放免费| 亚洲狠狠婷婷综合久久图片| 成人高潮视频无遮挡免费网站| 日韩av在线大香蕉| 亚洲 欧美 日韩 在线 免费| 18禁黄网站禁片午夜丰满| 精品人妻1区二区| 性欧美人与动物交配| 99re在线观看精品视频| 天堂影院成人在线观看| 国产黄a三级三级三级人| 在线国产一区二区在线| 日日干狠狠操夜夜爽| 老司机在亚洲福利影院| 亚洲国产精品成人综合色| 国产熟女xx| 99在线人妻在线中文字幕| 欧美黄色淫秽网站| 在线观看免费视频日本深夜| 九九热线精品视视频播放| 久久热在线av| avwww免费| 亚洲一区高清亚洲精品| 每晚都被弄得嗷嗷叫到高潮| 久久久久国内视频| 不卡av一区二区三区| 噜噜噜噜噜久久久久久91| 一级毛片女人18水好多| 国产精品免费一区二区三区在线| 人妻久久中文字幕网| 最好的美女福利视频网| 一级作爱视频免费观看| 久久精品91蜜桃| 天天躁日日操中文字幕| 免费看光身美女| 亚洲九九香蕉| 天堂av国产一区二区熟女人妻| 亚洲av免费在线观看| 国产精品久久电影中文字幕| 成人三级黄色视频| 亚洲av电影不卡..在线观看| 久久中文看片网| 可以在线观看毛片的网站| 黄色视频,在线免费观看| 岛国在线观看网站| 给我免费播放毛片高清在线观看| 男人的好看免费观看在线视频| 久久香蕉精品热| 国产真实乱freesex| 国产男靠女视频免费网站| 成人亚洲精品av一区二区| 1024香蕉在线观看| 麻豆一二三区av精品| 精品国产乱码久久久久久男人| 亚洲午夜精品一区,二区,三区| a在线观看视频网站| 国产精品综合久久久久久久免费| 久久久国产成人精品二区| 午夜a级毛片| 久久午夜综合久久蜜桃| 国产一区二区在线av高清观看| 亚洲一区二区三区不卡视频| 欧美成人一区二区免费高清观看 | aaaaa片日本免费| 欧美在线黄色| 黑人欧美特级aaaaaa片| 精品久久久久久久毛片微露脸| 少妇熟女aⅴ在线视频| 国模一区二区三区四区视频 | 免费看日本二区| 色综合亚洲欧美另类图片| 99热这里只有是精品50| 听说在线观看完整版免费高清| 手机成人av网站| 久久九九热精品免费| 午夜福利在线在线| 精品99又大又爽又粗少妇毛片 | 国产午夜精品论理片| 男女视频在线观看网站免费| 黄色 视频免费看| 欧美色欧美亚洲另类二区| 国产高清激情床上av| 亚洲在线观看片| 久久中文字幕人妻熟女| 一级黄色大片毛片| 狂野欧美白嫩少妇大欣赏| 99re在线观看精品视频| 天堂网av新在线| 国产精品女同一区二区软件 | 欧美日韩福利视频一区二区| 亚洲真实伦在线观看| 色尼玛亚洲综合影院| 国产一区二区在线av高清观看| 两性午夜刺激爽爽歪歪视频在线观看| 嫁个100分男人电影在线观看| 日韩欧美国产一区二区入口| 美女扒开内裤让男人捅视频| 国产黄a三级三级三级人| 日本熟妇午夜| 国产亚洲精品久久久com| 亚洲真实伦在线观看| 丰满人妻熟妇乱又伦精品不卡| 女生性感内裤真人,穿戴方法视频| 在线十欧美十亚洲十日本专区| 国产亚洲精品久久久com| 亚洲真实伦在线观看| 国产精品永久免费网站| 久久久久久大精品| 亚洲色图av天堂| 在线观看免费午夜福利视频| 少妇丰满av| 亚洲 欧美一区二区三区| 日本a在线网址| 亚洲一区二区三区色噜噜| 成人鲁丝片一二三区免费| 美女黄网站色视频| 亚洲一区二区三区不卡视频| 亚洲五月婷婷丁香| 精品久久久久久,| 一本精品99久久精品77| 欧美性猛交╳xxx乱大交人| 小说图片视频综合网站| aaaaa片日本免费| 香蕉av资源在线| 中文字幕高清在线视频| 欧美xxxx黑人xx丫x性爽| 此物有八面人人有两片| 在线播放国产精品三级| 综合色av麻豆| 国产精品亚洲一级av第二区| 97超级碰碰碰精品色视频在线观看| 欧美午夜高清在线| 中文资源天堂在线| 国产精华一区二区三区| 亚洲国产精品sss在线观看| xxx96com| 欧美日韩乱码在线| 黄色 视频免费看| 老司机福利观看| 久久久水蜜桃国产精品网| 国产精品国产高清国产av| 精品熟女少妇八av免费久了| 热99在线观看视频| 亚洲av成人一区二区三| 嫁个100分男人电影在线观看| 午夜影院日韩av| 亚洲av成人精品一区久久| 搡老妇女老女人老熟妇| 一区二区三区高清视频在线| 欧洲精品卡2卡3卡4卡5卡区| 久久久久久大精品| 中文亚洲av片在线观看爽| 欧美丝袜亚洲另类 | 国产亚洲精品av在线| 久久久久九九精品影院| 成人三级黄色视频| 国产激情欧美一区二区| 色精品久久人妻99蜜桃| 人人妻人人澡欧美一区二区| 亚洲在线自拍视频| 欧美激情在线99| 伊人久久大香线蕉亚洲五| 99久久成人亚洲精品观看| 国产精品av久久久久免费| 不卡一级毛片| 精品午夜福利视频在线观看一区| 成年女人永久免费观看视频| 黄色成人免费大全| 国产69精品久久久久777片 | 国产亚洲精品一区二区www| 俺也久久电影网| 美女大奶头视频| 国产av麻豆久久久久久久| 久久天躁狠狠躁夜夜2o2o| 男女午夜视频在线观看| 亚洲欧美日韩高清在线视频| 日韩av在线大香蕉| 精品人妻1区二区| 久久久精品大字幕| 亚洲黑人精品在线| 99国产极品粉嫩在线观看| 亚洲av成人精品一区久久| 久久久久久久精品吃奶| 日韩欧美国产一区二区入口| xxx96com| 91久久精品国产一区二区成人 | 久久精品aⅴ一区二区三区四区| 亚洲午夜理论影院| 精品欧美国产一区二区三| 热99在线观看视频| 好看av亚洲va欧美ⅴa在| 99在线视频只有这里精品首页| 男女做爰动态图高潮gif福利片| 香蕉久久夜色| 99精品久久久久人妻精品| 丰满的人妻完整版| 99国产精品一区二区三区| bbb黄色大片| 国产精品免费一区二区三区在线| 成人高潮视频无遮挡免费网站| 午夜激情欧美在线| 亚洲av免费在线观看| 成年版毛片免费区| 日本黄色片子视频| 国产av不卡久久| 免费av不卡在线播放| 免费看日本二区|