    Analysis of working behavior of Jinping-I Arch Dam during initial impoundment

    2016-04-18 10:34:56*
    Water Science and Engineering 2016年3期

    *

    Yalong River Hydropower Development Company,Ltd.,Chengdu 610051,China

    Analysis of working behavior of Jinping-I Arch Dam during initial impoundment

    Shi-yong Wu*,Wei Cao,Jiang Zheng

    Yalong River Hydropower Development Company,Ltd.,Chengdu 610051,China

    Available online 9 November 2016

    To study the stress,deformation,and seepage pressure during the initial impoundment of the Jinping-I Arch Dam,monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014.The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli(E)of the dam body and foundation,using a three-dimensional finite element model for the linear elastic material of the arch dam.The main monitoring indices presented insignif i cant changes in the late period of the initial impoundment,and the results of feedback analysis were consistent with monitoring results.Analysis results also show that the deformations of the dam body and dam foundation were within the design range;the dam stress distributions were normal,with values lower than the design control criteria;and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house,demonstrating that the Jinping-I Arch Dam was in good working condition,and the initial impoundment had been successfully completed.The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects.

    Dam safety monitoring;Working behavior;Elastic modulus;Dam impoundment;Jinping-I hydropower project

    1.Introduction

    During the dam's initial impoundment,monitoring indices change with the water load and other factors,so impoundment is crucial to dam safety.Many engineering accidents occur in the initial impoundment period,so it is important to analyze the working behavior of a dam during this period to ensure the dam's safe operation.

    China has several of the world's highest dams,for example the Shuangjiangkou hydropower project,with a maximum height of 314 m,which is the highest dam under construction in the world,and the Jinping-I hydropower project,with a maximum height of 305 m,which is the highest completed dam in the world.Basic information on some large hydropower projects in China is given in Table 1.As some large hydropower projects,such as the Shuibuya,Laxiwa,Xiaowan, and Xiluodu hydropower stations,have been put into operation,the safety evaluation of hydropower projects during the initial impoundment has been extensively carried out in China (Wu,2003;Hu et al.,2012;Jin et al.,2011).Monitoring and analysis of the dam foundation deformation,stress-strain,and seepage pressure during the initial impoundment,using an automatic observation system,have been carried out for the Laxiwa and Xiaowan hydropower projects(Li et al.,2009; Han et al.,2010;Wang et al.,2003,2010;Huang et al., 2006).The monitoring results show that the dam deformation is closely related to the reservoir water level,and the deformation in the upper part of the dam is more sensitive tothe water load than that in the lower part.Based on prototype monitoring results,a finite element model has been used to carry out feedback analysis of the working behaviors of the Shuibuya and Xiluodu hydropower projects,and to perform safety assessment of the dams in the late operation stage(Zhou et al.,2011;Zhang and Yin,2014;Zhang et al.,2016).According to analysis results,dam deformations appear downstream and towards the banks under the water load.The dam deformation during the initial impoundment is consistent with the variation of the reservoir water level.According to the comprehensive analysis results,the dams are in a safe condition during the initial impoundment.

    Table 1Basic information on high dams in China.

    With regards to the Jinping-I hydropower project,Zhou and Rao(2014)launched seepage control research,dam safety monitoring analysis,structural stress and deformation analysis,and safety assessment of the dam during the reservoir impoundment according to the construction progress and monitoring information.Chen and Ruan(2014)and Yang and Dong(2015)carried out preliminary analyses of the working behavior of the dam based on the monitoring results during the initial impoundment.The deformation,stress-strain,and seepage pressure of the dam meet general rules,with their values within the range of design control indices,and the performances of the structures are normal overall.Based on relevant research achievements,two methods,monitoring analysis and numerical calculation,were used in the working behavior analysis of the dam in this study.The working behavior of the dam during the initial impoundment,such as the stress,deformation,and seepage pressure,was evaluated through monitoring result analysis and feedback analysis,so as to provide a technical foundation for comprehensive study of dam performance,successful completion of the initial impoundment,and safe operation of hydropower projects.

    2.Impoundment process and monitoring design of Jinping-I Arch Dam

    2.1.Project overview

    Located on the main stream of the Yalong River in Yanyuan County and Muli County,in the Liangshan Yi Autonomous Prefecture in Sichuan Province,the Jinping-I hydropower project is a controlling reservoir downstream of the Yalong River,with signif i cant compensative regulation effect on downstream cascade hydropower stations.

    The project consists of a water-retaining structure,a f l ood discharge and energy dissipation structure,and power generation facilities,with a total installed capacity of 3600 MW. The water-retaining structure is a concrete double-curvature arch dam with a maximum height of 305 m,and is the highest completed arch dam in the world.The dam is composed of 26 sections from the left bank to right bank,poured with concrete without longitudinal joints,and the concrete material is divided into three areas known,respectively,as A,B,and C, with area A being a strong constraint area and area C a weak constraint area.The partition of dam sections and zoning design of the concrete material are shown in Fig.1.The normal water storage level of the reservoir is 1880 m,the dead water level is 1800 m,and the total storage capacity is 7.76 km3.The project construction started in 2005,and the fi rst two generation units were put into operation in August 2013.All the units had been put into operation by July 2014.

    2.2.Initial impoundment process

    The Jinping-I hydropower project is large in scale with complicated geological conditions.The initial impoundment was divided into four stages.In November 2012,the right bank diversion tunnel was closed for impoundment.In December,the diversion bottom outlet was opened,and the water level in front of the dam reached 1707 m,the impoundment goal of the first stage.In July 2013,the reservoir water level reached the design dead water level,1800 m, completing the second stage of the initial impoundment.In September 2013,the diversion bottom outlet was closed,and the water level reached 1840 m in October,the impoundment goal of the third stage.The fourth stage of the initial impoundment was started in July 2014.In August 2014,the reservoir reached the normal water storage level,1880 m, which meant the completion of the fourth stage of the initial impoundment.In order to comprehensively evaluate the working behavior of the dam during the initial impoundment, this study focused on the working behavior of the dam just after the completion of the fourth stage of the initial impoundment,from August 2014 to the end of November 2014,which is called the late period of the initial impoundment in this paper.During this period,the water level was kept between 1876 m and 1880 m,close to the normal water storage level.In contrast to the late period,the period that consists of the four stages of the initial impoundment is calledthe early stage of the initial impoundment.The initial impoundment process of the dam is shown in Fig.2.

    Fig.1.Partition of dam sections and zoning design of concrete material.

    2.3.Dam monitoring design

    Key technical issues related to the impoundment safety of high dams include the dam structural stress and deformation, as well as seepage control.In order to guarantee the safe operation of the dam in the initial impoundment period, comprehensive monitoring measures of the Jinping-I hydropower project were designed,with a monitoring range covering the dam body,dam foundation,pedestal,dam outlets, plunge pool,and subsidiary dam.The main monitoring items included the deformation,stress-strain,seepage pressure, temperature,environmental parameters,and special factors (Wu and Cao,2014).By November 30,2014,a total of 3450 sets of monitoring instruments had been installed(Deng and Dong,2014).

    3.Analysis of working behavior of dam

    Fig.2.Initial impoundment process.

    The study focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014.Monitoring data obtained during this period include the radial horizontal deformation with positive values downstream and negative values upstream,the tangential horizontal deformation with positive values towards the left bank and negative values towards the right bank,the chord length variation with positive values for elongation and negative values for shortening,the vertical deformation with positive values for settling and negative values for upraising,the joint opening with positive values for enlargement and negative values for shrinkage,and the stress with positive values for tensile stresses and negative values for compressive stresses.

    3.1.Monitoring results

    3.1.1.Monitoring results during early period of initial impoundment

    The arrangement of plumb lines for deformation monitoring of the dam is shown in Fig.3,where PL means the plumb line,IP means the inverted plumb line,the subscripts L and R mean the left and right banks,respectively,and the other subscripts mean the numbers of the dam section and plumb line in each section,respectively.

    The monitoring results of the maximum deformation and seepage of the Jinping-I Arch Dam before and after each stage in the early period of the initial impoundment are shown in Table 2.The statistical results show that they are positively correlated with the reservoir water level.

    3.1.2.Monitoring results during late period of initial impoundment

    During the late period of the initial impoundment,the relevant monitoring results can be described as follows:

    (1)Dam foundation deformation

    Fig.3.Monitoring arrangement of plumb lines.

    Thecalculatedresultsofthemaximumradialdeformationand tangential deformation of the dam foundation obtained from the arch-cantilever method,with values of 27.2 mm and 22.5 mm, respectively,were taken as the reference control standards.

    According to the monitoring results,the maximum radial deformation was 14.24 mm,and the maximum tangential deformation was 2.36 mm.The measured values were within the design range.

    The dam foundation joints were in a compressive state. When the water level reached 1880 m at the end of the early period of the initial impoundment,the opening variation of the dam foundation joints was less than 0.1 mm,and the value was less than 0.2 mm during the late period of the initial impoundment,demonstrating that the dam foundation joints were in a safe condition.

    (2)Dam body deformation

    The dam body deformation includes the horizontal deformation,vertical deformation,chord length variation,and joint opening variation.The calculated results of the maximum radial deformation and tangential deformation of the dam body obtained from the arch-cantilever method,with values of 85.0 mm and 24.3 mm,respectively,were taken as the reference control standards.

    According to the monitoring results from November 2014, the horizontal deformation of the dam body appeared downstream and towards both banks of the river.The radial deformation of the dam body appeared downstream.The maximum value appeared in the middle section,and the deformation decreased gradually towards both banks.The largest radial deformation occurred in the#13 dam section at an elevation of 1730 m,leading to a displacement value of 40.75 mm (Fig.4(a)).The tangential deformation of the dam body pointed to the left on the left bank,and to the right on the right bank.The largest tangential deformation on the left bank occurred in the#11 dam section at an elevation of 1730 m, leading to a displacement value of 8.31 mm;the largest tangential deformation on the right bank occurred in the #16 dam section at an elevation of 1829 m,leading to a deformation value of-4.72 mm(Fig.4(b)).The radial displacement graph of the#13 dam section and the tangential displacement graph of the#11 dam section during the initial impoundment are shown in Fig.5.According to the monitoring results,the dam body deformation had a strong correlation with thereservoirwaterlevel,and theoveralldeformation was insignif i cant.All measured values were within the design range.

    Table 2Comparison of monitoring results of maximum deformation and seepage before and after four stages in early period of initial impoundment.

    Fig.4.Contour maps of horizontal deformation of dam body in November 2014(units:mm).

    Fig.5.Horizontal deformation graphs for#11 and#13 dam sections at different elevations during initial impoundment.

    The vertical deformation of the dam body presented the following characteristics:the largest deformation of 12.04 mm in November 2014 appeared at the arch crown,and the deformation decreased gradually towards both banks.

    The chord length of the dam body was shortened for approximately 4—7 mm during the early period of the initial impoundment.However,the chord length was then extended approximately 1—2 mm during the late period.The horizontal joints of the dam were under compression,with a variation of less than 0.2 mm.

    In general,the distribution patterns of the radial,tangential, and verticaldisplacements complied with the design expectations.

    (3)Dam stress

    According to the current arch dam design code,concrete strength control standards were determined by categorized factors.The concrete material of the Jinping-I Arch Dam was divided into three sections,and their concrete strength control standards are shown in Table 3.

    According to stress calculations,the strain gauge groups should be arranged at the locations with large tensile and compressive stresses,the locations at 1/4 of the dam length from the two ends,the locations at 1/4 of the arch ring from the two ends,the representative arch crowns,and the two ends of the abutments.According to industry standards,the uniaxial,f i ve-direction,and nine-direction strain gauge sets as well as the non-stress meter were adopted in monitoring.The monitoring points of stress-strain of the dam body are shown in Fig.6.

    During the late period of the initial impoundment,the upstream water level was basically unchanged,and the dam stress monitoring results obtained in November 2014 can be described as follows:

    The dam heel and dam toe were in strong constraint areas, close to the dam foundation(area A).They were in a compressive state in general.The maximum vertical compressive stress of 4.57 MPa appeared at the dam heel in the#12 dam section.The maximum vertical tensile stress of 0.1 MPa appeared at the dam heel in the#2 dam section.The maximum tangential compressive stress of 5.13 MPa appeared at the dam toe in the#21 dam section.The maximum tangential tensile stress of 0.26 MPa appeared at the dam toe in the#4 dam section.The maximum radial compressive stress of 4.76 MPa appeared at the dam toe in the#9 dam section. The maximum radial tensile stress of 0.83 MPa appeared at the dam heel in the#2 dam section.The stress graphs for the arch abutment heel in the#12 dam section,the arch abutment toe in the#21 dam section,and arch abutment toe in the#9 dam section during the initial impoundment are shown in Fig.7.

    The dam body(areas B and C)was generally in a compressivestate,withouttensile stressdetected.The maximum vertical compressive stress of 5.93 MPa appeared in the middle part of the#11 dam section at an elevation of 1720 m.The maximum tangential compressive stress of 6.94 MPa appeared downstream of the#13 dam section at anelevation of 1684 m and in the middle part of the#11 dam section at an elevation of 1720 m.The maximum radial compressive stress of 4.76 MPa appeared downstream of the #9 dam section at an elevation of 1648 m.

    Table 3Compressive and tensile strength control standards of concrete material of dam body.

    Fig.6.Monitoring arrangement of stress-strain of dam body.

    Fig.7.Stress graphs recorded by f i ve-direction strain gauges at arch abutment heel or arch abutment toe in different dam sections during initial impoundment.

    Basically,the arch dam was in a compressive state,the stress distribution of the dam could be considered normal,and all values were less than the design control criteria.

    (4)Seepage pressure

    According to the Design Specif i cation for Concrete Arch Dams(DL/T 5346—2006)and engineering practices,the uplift pressure reduction coeff i cients are set mainly based on the pros and cons of the geological conditions of the dam foundation,seepage proofcurtain,and drainage facilities. Considering the actual situation of the Jinping-I Arch Dam, the relevant design control criteria for seepage proof structures were set as follows:the uplift pressure reduction coeff i cient for the seepage proof curtain of the dam foundation was a1≤0.4,the uplift pressure reduction coeff i cient for the main drainage curtain of the dam foundation was a2≤0.2,and the design drainage capacity of the deep-well pump house was 450 m3/h.

    The curtain and drainage effects,determined by the uplift pressure reduction coeff i cient,were studied.As the water level downstream of the Jinping-I hydropower project was lower than the bedrock elevation,the following formula for the uplift pressure reduction coeff i cient was adopted:

    where H1is the upstream water level,H4is the bedrock elevation,and Hiis the actual water level at the measurement location i.

    The arch dam foundation curtain showed a strong antiseepage performance.The maximum reduction coeff i cient was 0.29 behind the seepage proof curtain,and 0.08 behind the drainage curtain,less than the design value of the reduction coeff i cient.

    The practically measured seepage flow through the dam body and dam foundation corridors was 64.34 L/s.The total seepage flow through the left bank dam foundation was 54.36 L/s,and the total seepage flow through the right bank dam foundation was 9.99 L/s.These values were lower than the design drainage capacity of the deep-well pump house.

    According to the monitoring results,the working behavior of the dam body and dam foundation was basically normal at the water level of 1880 m,and seepage controlling works operated normally.The dam was in an elastic state during the late period of the initial impoundment.

    3.2.Feedback analysis

    Feedback analysis is an effective complementary analysis approachfortestresultanalysis.Toobtaintheaccurateresultsof deformation and stress and provide a more comprehensive evaluation of the working behavior of the arch dam,feedback calculation of the deformation and stress of the arch dam,based on inversion of the elastic moduli(E)of the dam body and dam foundation,was carried out by means of a statistical model and fi nite element model.In the feedback analysis,a representative period and a target point for re fl ecting deformation characteristics of the arch dam were selected,and the observed displacement at the target point was taken as the target value. The elastic moduli of the dam body and dam foundation were adjusted repeatedly so that the computed deformation at the target point approached its observed value.The mean square deviation between the observed displacement and computed displacement was used to check their agreement,and the elastic modulus leading to the minimum mean square deviation was taken as the best feedback parameter.

    3.2.1.Numerical model

    Basedontheengineeringdesignandgeologicaldata,a threedimensional finite element model for the linear elastic material of the Jinping-I Arch Dam was established.The model used the centerline of the arch dam as a reference,from which a range of 900monbothsideswasincluded.Themodelalsousedtheorigin ofthecrestasareference,fromwhicharangeof750mupstream and downstream was included,respectively.A range of 700 m below the foundation surfacewas covered as well.In the model, the slope of the rock mass above the crest was cut to the natural boundary elevation;for the mountains on both banks,a range of 2.5 times the dam height was extended upstream and downstream,and one dam height was extended upwards from the crest.Thefiniteelementmodelwasusedtosimulatethecomplex faults f2,f5,f8,f42-9,f13,f14,and f18(Fig.3),lamprophyre veins, and other weak structural planes,as well as the terrain and stratum partitions in the project area.The faults f8and f42-9are not shown in Fig.3.The fault f8was a subfault near the hanging wall ofthefaultf5,andthefaultf42-9was locatedontheleftdam abutment.Simulation was also carried out of the engineering measures,such as the pedestal,concrete plug,shear force transmissiontunnel,replacementofconcretegrillage,subsidiary dam,plunge pool,and grouting.The classif i cation of rock mass qualityinthedamfoundationisshowninFig.8.Themechanical parameters of rocks and structural planes are shown in Table 4. The three-dimensional finite element model is shown in Fig.9.

    3.2.2.Inversion of elastic modulus

    Fig.8.Classif i cation of rock mass quality in dam foundation.

    Table 4Mechanical parameters of rocks and structural planes.

    Fig.9.Three-dimensional finite element model.

    Feedback analysis was first performed for the duration from the starting of the water level monitoring on December 1,2011 to the completion of the fourth stage of the initial impoundment on August 24,2014 for inversion of the elastic modulus. The load that was taken into account mainly consisted of the dead weight and water pressure.Comparisons of test results and design values of the elastic moduli of the dam body and dam foundation with those obtained from the feedback analysis are shown in Tables 5 and 6.In the arch dam design, the long-term elastic modulus of dam body concrete was used, which was only 0.6—0.7 times the instantaneous elastic modulus,leading to a signif i cant difference between the design values of the elastic modulus and those from the feedback analysis.Meanwhile,the age of concrete for laboratory tests and in situ tests of the elastic modulus was only 180 d,far less than the actual age of concrete under the water load.Thus,the elastic modulus increment after the age of 180 d was not included in the tests.Therefore,the elastic moduli of the dam body from the feedback analysis are greater than the design values and experimental values,and the values from the feedback analysis,ranging from 36.6 to 38.2 GPa,are deemed consistent with the actual situation.For the elastic moduli of the dam foundation,the design values were determined based on the most unfavorable situation,while,in the feedback analysis,the deformation parameters that most probably occurred in the actual situation,instead of the parameters that might occur in the most unfavorable situation,were used.Moreover,the elastic modulus of boreholes would increase after consolidation grouting of the dam foundation. Due to these factors,the elastic moduli of the dam foundation from the feedback analysis are also greater than the design values,and the values from the feedback analysis are generally considered reasonable.

    Table 5Comparison of test results and design values of elastic modulus of dam body with those obtained from feedback analysis.

    Table 6Comparison of design values of elastic modulus of dam foundation with those obtained from feedback analysis.

    3.2.3.Feedback analysis of dam deformation and stress

    The deformation and stress of the arch dam at the normal water storage level were analyzed based on inversion of the elastic moduli of the dam body and foundation.Analysis results are shown below:

    (1)Feedback analysis of dam deformation

    At the normal water storage level,radial deformation appeared towards the inner side of the arch dam,with the maximum value occurring in the middle sections,while tangential deformation appeared towards the two banks.The maximum radial deformation was 48.8 mm,which appeared in the#12 dam section at an elevation of 1870 m(Fig.10(a)). The maximum tangential deformation was 13.9 mm,which appeared towards the right bank at an elevation of 1875 m in the#18 dam section(Fig.10(b)).The overall deformation pattern was basically consistent with the monitoring results, and the calculated results were within the design range.

    (2)Feedback analysis of structural stress

    At the normal water storage level,key sections of the arch dam in the upper and lower reaches were in a compressive state.On the upstream face,the maximum hoop compressive stress was 5 MPa,the maximum arch compressive stress was 8 MPa,and the maximum tensile stress was 1.47 MPa.These values were lower than the design control standards.On the downstream face,the maximum hoop compressive stress was 9 MPa,and the maximum tensile stress was 1.2 MPa,which also met the design requirements.

    In conclusion,feedback analysis results show that the deformation and stress distribution patterns of the arch dam were normal,and the arch dam operated normally at the normal water storage level.

    Fig.10.Dam deformation at normal water storage level obtained from feedback analysis.

    4.Conclusions and suggestions

    (1)The monitoring results show that the observed deformation values of the dam body and foundation were lower than the design values;the total seepage flows through the dam body and foundation were lower than the design drainage capacity of the deep-well pump house;the dam stress distributions were normal,with values lower than the design control criteria;and the arch dam was basically in a compressive state during the initial impoundment.The results of the dam deformation and stress distribution from the feedback analysis were basically consistent with the monitoring results,and the values were within the design range.The working behavior of the Jinping-I Arch Dam was normal during the initial impoundment.

    (2)The two approaches,monitoring analysis and numerical calculation,supplement and prove each other in the comprehensive analysis and evaluation of the working behavior of the dam in terms of stress,deformation,and seepage pressure.The results of analysis and evaluation provide a technical foundation for safe operation of the dam in the future,and can provide a reference for similar high dam projects.

    (3)Thesafe operation of high dams during impoundment isa long-term dynamic process.Thus it is necessary to carry out long-term safety monitoring and analysis based on monitoring, tracing,and feedback,and pay close attention to the working behavior of the dam,so as to provide reliable technical support for the long-term safe operation of projects.

    Chen,X.P.,Ruan,Y.S.,2014.Analysis on the vertical monitoring results of the initial impoundment for the arch dam of Jinping-I hydropower station. Sichuan Water Power33(s1),128—131.http://dx.doi.org/10.3969/ j.issn.1001-2184.2014.z1.037(in Chinese).

    Deng,J.H.,Dong,Y.J.,2014.Report on Safety Monitoring Analysis of Jinping-I Hydropower Project during Fourth-stage Impoundment.Jinping Construction and Administration Bureau,Chengdu(in Chinese).

    Han,S.D.,Zhao,B.,Liao,Z.Y.,Xia,J.H.,2010.Analysis and evaluation of monitoring data by plumb lines in early impoundment period of Xiaowan Arch Dam.Dam Saf.(3),44—47.http://dx.doi.org/10.3969/j.issn.1671-1092.2010.03.012(in Chinese).

    Hu,B.,Wu,Z.R.,Liu,G.B.,Zhao,B.,Xu,B.,2012.Safety evaluation of replacement reinforcement quality in abutment contact zones of ultra-high arch dam in first impoundment period based on prototype monitoring. Water Sci.Eng.5(2),210—218.http://dx.doi.org/10.3882/j.issn.1674-2370.2012.02.009.

    Huang,X.C.,Tang,L.,Zhao,W.,2006.Deformation monitoring design for Goupitan hydropower station.Yangtze River 37(3),48—50.http:// dx.doi.org/10.3969/j.issn.1001-4179.2006.03.018(in Chinese).

    Jin,F.,Hu,W.,Pan,J.W.,Yang,J.,Wang,J.T.,Zhang,C.H.,2011.Comparative study procedure for the safety evaluation of high arch dams.Comput.Geotechnics 38(3),306—317.http://dx.doi.org/10.1016/j.compgeo.2010.10.008.

    Li,P.J.,Wei,P.,Zhang,Q.,2009.Behavior of Laxiwa Arch Dam in the period of first impounding.Hydropower Stn.35(11),12—15.http://dx.doi.org/ 10.3969/j.issn.0559-9342.2009.11.005(in Chinese).

    Wang,Z.H.,Hu,Q.Y.,Yu,X.H.,Duan,G.X.,2010.Analysis of operation condition of Goupitan Hydropower Station arch dam in initial impoundment period.Yangtze River 41(22),29—31.http://dx.doi.org/10.3969/ j.issn.1001-4179.2010.22.008(in Chinese).

    Wang,Z.Y.,Yang,H.,Huang,H.D.,2003.Analysis on dam deformation during initial impoundment period of Dachaoshan hydropower station. Hydropower Automation Dam Monit.27(5),57—60.http://dx.doi.org/ 10.3969/j.issn.1671-3893.2003.05.018(in Chinese).

    Wu,S.Y.,Cao,W.,2014.AnalysisonworkingbehaviorsofJinping-Ihydropower project during initial impoundment period.In:Proceedings of 2014 Academic Annual Conference of Chinese National Committee on Large Dams. The Yellow River Conservancy Press,Guiyang,pp.309—318(in Chinese).

    Wu,Z.R.,2003.Safety Monitoring Theory and It's Application to Hydraulic Structures.Higher Education Press,Beijing(in Chinese).

    Yang,H.,Dong,Y.J.,2015.Analysis on monitoring data of Jinping-I hydropower dam during first impoundment.Dam Saf.(3),34—40.http:// dx.doi.org/10.3969/j.issn.1671-1092.2015.03.008(in Chinese).

    Zhang,C.,Yin,H.A.,2014.Feedback analysis of extra-high arch dam of Xiluodu in the initial impoundment phase.Hydropower Stn.Des.30(2), 7—12.http://dx.doi.org/10.3969/j.issn.1003-9805.2014.02.002(in Chinese).

    Zhang,C.,Wang,R.K.,Tang,X.J.,2016.Safety evaluation of Xiluodu ultrahigh arch dam during the initial impoundment period.J.Hydraulic Eng. 47(1),85—93.http://dx.doi.org/10.13243/j.cnki.slxb.20150404(in Chinese).

    Zhou,W.,Hua,J.J.,Chang,X.L.,Yang,Q.G.,Ma,G.,2011.Estimation of work status and deformation prediction of Shuibuya CFRD.Chin.J. Geotechnical Eng.33(s1),65—70(in Chinese).

    Zhou,Z.,Rao,H.L.,2014.Special Report on Monitoring,Analysis and Assessment of Dam and Slope Safety of Jinping-I Hydropower Project in Initial Impoundment.Power China Chengdu Engineering Corporation Limited,Chengdu(in Chinese).

    Received 7 April 2016;accepted 8 July 2016

    This work was supported by the National Key Technology Support Program(Grant No.2013BAB05B05).

    *Corresponding author.

    E-mail address:wushiyong@ylhdc.com.cn(Shi-yong Wu).

    Peer review under responsibility of Hohai University.

    http://dx.doi.org/10.1016/j.wse.2016.11.001

    1674-2370/?2016 Hohai University.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http:// creativecommons.org/licenses/by-nc-nd/4.0/).

    ?2016 Hohai University.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http:// creativecommons.org/licenses/by-nc-nd/4.0/).

    亚洲情色 制服丝袜| 亚洲av美国av| 国产精品久久久久久人妻精品电影| tocl精华| 亚洲色图综合在线观看| 大型黄色视频在线免费观看| 长腿黑丝高跟| 一区二区三区精品91| 99久久综合精品五月天人人| 亚洲专区字幕在线| 精品一区二区三卡| 久久精品国产亚洲av高清一级| 午夜老司机福利片| 99国产精品99久久久久| 神马国产精品三级电影在线观看 | 久久久久久久久中文| 欧美日韩黄片免| 日韩欧美一区二区三区在线观看| 久久久久国内视频| 国产成人啪精品午夜网站| 好看av亚洲va欧美ⅴa在| 亚洲全国av大片| 日本黄色日本黄色录像| 日韩有码中文字幕| 9191精品国产免费久久| 欧美+亚洲+日韩+国产| 日本黄色日本黄色录像| 国产麻豆69| 日日爽夜夜爽网站| 女人被躁到高潮嗷嗷叫费观| 色综合站精品国产| 亚洲免费av在线视频| 亚洲 欧美一区二区三区| 妹子高潮喷水视频| 女性生殖器流出的白浆| 97超级碰碰碰精品色视频在线观看| 啦啦啦在线免费观看视频4| 欧美亚洲日本最大视频资源| videosex国产| 国产欧美日韩综合在线一区二区| 国产激情久久老熟女| 成年女人毛片免费观看观看9| 精品欧美一区二区三区在线| 国产区一区二久久| 欧美另类亚洲清纯唯美| 欧美一级毛片孕妇| 久久久久国产精品人妻aⅴ院| 日韩成人在线观看一区二区三区| 在线看a的网站| 久久香蕉激情| 久久 成人 亚洲| 老熟妇仑乱视频hdxx| 国产欧美日韩精品亚洲av| 麻豆av在线久日| 级片在线观看| 变态另类成人亚洲欧美熟女 | 日本a在线网址| 老司机午夜十八禁免费视频| 不卡av一区二区三区| 国产亚洲精品第一综合不卡| 亚洲精品中文字幕一二三四区| 少妇的丰满在线观看| 精品国产国语对白av| 女人被躁到高潮嗷嗷叫费观| 天堂√8在线中文| 桃红色精品国产亚洲av| 怎么达到女性高潮| 国产深夜福利视频在线观看| 国产免费现黄频在线看| 夜夜夜夜夜久久久久| 韩国av一区二区三区四区| 黄网站色视频无遮挡免费观看| 亚洲精品成人av观看孕妇| 色在线成人网| 男女之事视频高清在线观看| 国产成人啪精品午夜网站| 欧美日韩av久久| 日韩精品免费视频一区二区三区| 嫁个100分男人电影在线观看| 亚洲欧洲精品一区二区精品久久久| 少妇 在线观看| 国产精品久久久人人做人人爽| 人成视频在线观看免费观看| 国产精品一区二区在线不卡| 久久久久久人人人人人| 久久中文字幕一级| 中文字幕色久视频| 曰老女人黄片| 久久中文看片网| 午夜免费激情av| 精品一区二区三区av网在线观看| 精品电影一区二区在线| 亚洲性夜色夜夜综合| 免费在线观看亚洲国产| av电影中文网址| 亚洲成人精品中文字幕电影 | 国产99久久九九免费精品| 久久婷婷成人综合色麻豆| 在线天堂中文资源库| 69精品国产乱码久久久| 99久久99久久久精品蜜桃| av天堂在线播放| 欧美激情高清一区二区三区| 亚洲欧美精品综合久久99| 757午夜福利合集在线观看| 久久国产精品男人的天堂亚洲| 亚洲精品中文字幕一二三四区| 成熟少妇高潮喷水视频| 日本黄色视频三级网站网址| av有码第一页| 亚洲免费av在线视频| 老司机亚洲免费影院| 欧美在线黄色| 午夜免费激情av| 亚洲 欧美一区二区三区| 好男人电影高清在线观看| 国产免费现黄频在线看| 成人亚洲精品av一区二区 | 国产国语露脸激情在线看| 久久久久久久久中文| 男女午夜视频在线观看| 香蕉丝袜av| 露出奶头的视频| 久久国产精品男人的天堂亚洲| 亚洲精品一区av在线观看| 久久香蕉国产精品| 成人手机av| 国产精品 欧美亚洲| 一边摸一边抽搐一进一出视频| 国产又爽黄色视频| 18美女黄网站色大片免费观看| 高清av免费在线| 99国产精品一区二区三区| 大型黄色视频在线免费观看| 欧美激情高清一区二区三区| 高清av免费在线| 少妇 在线观看| 黄片小视频在线播放| 高清毛片免费观看视频网站 | 丝袜美腿诱惑在线| 午夜久久久在线观看| 精品少妇一区二区三区视频日本电影| 99在线人妻在线中文字幕| 在线观看免费午夜福利视频| 9191精品国产免费久久| 精品人妻在线不人妻| 视频在线观看一区二区三区| 日日夜夜操网爽| 91字幕亚洲| 天天添夜夜摸| 久久伊人香网站| 侵犯人妻中文字幕一二三四区| 18禁国产床啪视频网站| 无人区码免费观看不卡| 两性午夜刺激爽爽歪歪视频在线观看 | 国产野战对白在线观看| 大型av网站在线播放| svipshipincom国产片| 在线观看免费视频日本深夜| 久久香蕉国产精品| 97超级碰碰碰精品色视频在线观看| 一本大道久久a久久精品| 精品国产一区二区三区四区第35| 国产精品成人在线| 又黄又粗又硬又大视频| 宅男免费午夜| 老司机午夜十八禁免费视频| 国产精品1区2区在线观看.| 午夜福利,免费看| 欧美日韩一级在线毛片| 757午夜福利合集在线观看| av欧美777| 欧美成狂野欧美在线观看| 91精品国产国语对白视频| 人人妻,人人澡人人爽秒播| 国产伦人伦偷精品视频| 国产在线精品亚洲第一网站| 午夜免费成人在线视频| 中国美女看黄片| 日韩大尺度精品在线看网址 | www.999成人在线观看| 99香蕉大伊视频| 国产成人精品久久二区二区免费| 男人舔女人下体高潮全视频| 欧美日韩视频精品一区| 国产成+人综合+亚洲专区| 国产又爽黄色视频| 午夜精品久久久久久毛片777| 美女福利国产在线| 午夜a级毛片| 一区二区三区精品91| 啦啦啦在线免费观看视频4| www.自偷自拍.com| 夜夜爽天天搞| 丁香六月欧美| 久久精品aⅴ一区二区三区四区| 亚洲人成电影观看| 在线观看舔阴道视频| 美女大奶头视频| 日韩人妻精品一区2区三区| 欧美久久黑人一区二区| 午夜影院日韩av| 69av精品久久久久久| 中文字幕最新亚洲高清| 亚洲国产精品999在线| 淫秽高清视频在线观看| 日韩欧美免费精品| 国产aⅴ精品一区二区三区波| 黄色视频,在线免费观看| 欧美午夜高清在线| 一区福利在线观看| 波多野结衣av一区二区av| 日韩精品青青久久久久久| 久久久国产欧美日韩av| 他把我摸到了高潮在线观看| 国产精品日韩av在线免费观看 | 美女国产高潮福利片在线看| 久久热在线av| www.熟女人妻精品国产| 窝窝影院91人妻| 91在线观看av| 国产精品亚洲一级av第二区| 国产精品影院久久| 91成人精品电影| 欧美乱色亚洲激情| 看黄色毛片网站| 精品国产乱子伦一区二区三区| 亚洲 欧美一区二区三区| 伦理电影免费视频| 久久 成人 亚洲| 中文字幕精品免费在线观看视频| 一边摸一边做爽爽视频免费| 一边摸一边做爽爽视频免费| 91在线观看av| 亚洲男人的天堂狠狠| 国产黄色免费在线视频| 亚洲性夜色夜夜综合| 亚洲美女黄片视频| 午夜福利影视在线免费观看| 亚洲欧美激情综合另类| 国产精品久久视频播放| 十八禁人妻一区二区| 国产欧美日韩一区二区精品| 美女 人体艺术 gogo| 欧美日韩福利视频一区二区| 一区在线观看完整版| 大型av网站在线播放| 十分钟在线观看高清视频www| 成人影院久久| 午夜激情av网站| 国产又色又爽无遮挡免费看| 91av网站免费观看| 精品一区二区三区四区五区乱码| 久久久久久久久免费视频了| 老司机在亚洲福利影院| 久久国产乱子伦精品免费另类| 国产黄a三级三级三级人| 国产成人影院久久av| 99久久综合精品五月天人人| 亚洲精品久久午夜乱码| 久久精品亚洲精品国产色婷小说| 老汉色∧v一级毛片| 国产真人三级小视频在线观看| 亚洲人成77777在线视频| 国产av又大| 亚洲欧洲精品一区二区精品久久久| 激情在线观看视频在线高清| 午夜免费成人在线视频| 黄色视频不卡| 桃红色精品国产亚洲av| bbb黄色大片| 国产片内射在线| 成年版毛片免费区| 国产亚洲精品第一综合不卡| 美女高潮喷水抽搐中文字幕| 免费人成视频x8x8入口观看| 亚洲成国产人片在线观看| 日韩免费高清中文字幕av| 婷婷精品国产亚洲av在线| 国产精品自产拍在线观看55亚洲| 久久久精品国产亚洲av高清涩受| 色综合婷婷激情| 午夜精品国产一区二区电影| 99在线人妻在线中文字幕| 国产色视频综合| 两个人看的免费小视频| 麻豆成人av在线观看| 乱人伦中国视频| 国产主播在线观看一区二区| 天堂√8在线中文| 男女下面插进去视频免费观看| 午夜老司机福利片| 久久久久久久久中文| 国产精品综合久久久久久久免费 | 欧美日韩精品网址| 巨乳人妻的诱惑在线观看| 少妇被粗大的猛进出69影院| 涩涩av久久男人的天堂| 日本精品一区二区三区蜜桃| 99国产精品一区二区蜜桃av| e午夜精品久久久久久久| 国产精品 国内视频| 欧美丝袜亚洲另类 | 女性生殖器流出的白浆| 99热国产这里只有精品6| 国产在线精品亚洲第一网站| 热99国产精品久久久久久7| 嫩草影院精品99| 欧美成人性av电影在线观看| 桃色一区二区三区在线观看| 国产精品一区二区在线不卡| 久久精品亚洲精品国产色婷小说| 妹子高潮喷水视频| 热re99久久精品国产66热6| 啦啦啦免费观看视频1| 亚洲第一青青草原| 夜夜爽天天搞| 黄色丝袜av网址大全| 曰老女人黄片| 天天影视国产精品| 欧美在线一区亚洲| 法律面前人人平等表现在哪些方面| 曰老女人黄片| 真人一进一出gif抽搐免费| 多毛熟女@视频| 欧美 亚洲 国产 日韩一| 乱人伦中国视频| 黑丝袜美女国产一区| a级毛片在线看网站| 国产97色在线日韩免费| 韩国av一区二区三区四区| 国产亚洲精品第一综合不卡| 久久久精品欧美日韩精品| 免费在线观看亚洲国产| 中文字幕高清在线视频| 激情视频va一区二区三区| 国产精品二区激情视频| 欧美日韩一级在线毛片| 久久精品国产综合久久久| 一级a爱片免费观看的视频| 欧美在线一区亚洲| 黄色丝袜av网址大全| 侵犯人妻中文字幕一二三四区| 欧美日本亚洲视频在线播放| 欧美激情高清一区二区三区| 久久久国产成人免费| 日本三级黄在线观看| 侵犯人妻中文字幕一二三四区| 午夜影院日韩av| 美女高潮喷水抽搐中文字幕| 国产精品av久久久久免费| 亚洲欧美一区二区三区黑人| 欧美久久黑人一区二区| 国产一区在线观看成人免费| 丝袜人妻中文字幕| 最近最新中文字幕大全电影3 | 老熟妇乱子伦视频在线观看| 久久精品国产清高在天天线| 麻豆国产av国片精品| 人妻丰满熟妇av一区二区三区| 91字幕亚洲| 欧美激情高清一区二区三区| 欧美另类亚洲清纯唯美| 不卡一级毛片| 国产亚洲精品久久久久5区| 老司机午夜十八禁免费视频| 国产精品乱码一区二三区的特点 | 免费在线观看影片大全网站| 久久精品国产清高在天天线| 亚洲一卡2卡3卡4卡5卡精品中文| 一级毛片高清免费大全| 久久国产精品男人的天堂亚洲| 久久精品亚洲av国产电影网| 午夜91福利影院| 两个人免费观看高清视频| 别揉我奶头~嗯~啊~动态视频| 黄色a级毛片大全视频| 日韩欧美国产一区二区入口| 丝袜美腿诱惑在线| 性欧美人与动物交配| 亚洲自偷自拍图片 自拍| 色在线成人网| 亚洲一区二区三区欧美精品| 亚洲av片天天在线观看| 一区福利在线观看| av福利片在线| 午夜激情av网站| 天堂√8在线中文| 欧美一级毛片孕妇| 黄色成人免费大全| 欧美激情极品国产一区二区三区| 国产成人欧美在线观看| 一边摸一边做爽爽视频免费| 久久精品人人爽人人爽视色| 免费久久久久久久精品成人欧美视频| 午夜精品国产一区二区电影| 欧美日韩亚洲综合一区二区三区_| 亚洲欧洲精品一区二区精品久久久| 亚洲精品中文字幕在线视频| 久久久水蜜桃国产精品网| 欧美丝袜亚洲另类 | 国产成人欧美| 久久中文字幕人妻熟女| 国产片内射在线| 国产深夜福利视频在线观看| 日韩人妻精品一区2区三区| 亚洲精品av麻豆狂野| 美女午夜性视频免费| 制服诱惑二区| 国产成人免费无遮挡视频| 亚洲成人精品中文字幕电影 | 成年女人毛片免费观看观看9| 一二三四在线观看免费中文在| 亚洲精品美女久久久久99蜜臀| 亚洲一区高清亚洲精品| 身体一侧抽搐| 日韩欧美免费精品| 亚洲精品av麻豆狂野| 国产主播在线观看一区二区| 国产成人一区二区三区免费视频网站| 国产精品一区二区精品视频观看| 久久精品人人爽人人爽视色| 久久久久精品国产欧美久久久| 亚洲精品一区av在线观看| 青草久久国产| 中文字幕精品免费在线观看视频| 亚洲久久久国产精品| 高清在线国产一区| 久久久国产欧美日韩av| 久久精品成人免费网站| 日日摸夜夜添夜夜添小说| 在线视频色国产色| 在线观看免费日韩欧美大片| 亚洲欧美一区二区三区久久| 中文字幕人妻丝袜一区二区| 国产精品亚洲av一区麻豆| 黄网站色视频无遮挡免费观看| 亚洲av第一区精品v没综合| 亚洲 欧美一区二区三区| 黄色女人牲交| 性欧美人与动物交配| 老熟妇仑乱视频hdxx| 99riav亚洲国产免费| 久久精品国产综合久久久| 岛国视频午夜一区免费看| 亚洲avbb在线观看| 18禁观看日本| 人成视频在线观看免费观看| 中文字幕高清在线视频| 两个人免费观看高清视频| e午夜精品久久久久久久| 黄色 视频免费看| 免费女性裸体啪啪无遮挡网站| 高潮久久久久久久久久久不卡| 亚洲成人免费av在线播放| 天天影视国产精品| 三级毛片av免费| 久热爱精品视频在线9| av在线天堂中文字幕 | 成年版毛片免费区| 国产精品爽爽va在线观看网站 | 婷婷精品国产亚洲av在线| 1024视频免费在线观看| 在线国产一区二区在线| 国产一卡二卡三卡精品| 91麻豆av在线| 91字幕亚洲| 真人一进一出gif抽搐免费| 亚洲专区国产一区二区| 91av网站免费观看| 成人精品一区二区免费| 国产欧美日韩精品亚洲av| 亚洲avbb在线观看| 91成人精品电影| 操美女的视频在线观看| 国产欧美日韩一区二区三区在线| 日韩高清综合在线| 亚洲自偷自拍图片 自拍| 国产亚洲欧美在线一区二区| 黑人欧美特级aaaaaa片| 日韩欧美一区二区三区在线观看| 99久久综合精品五月天人人| 国产av在哪里看| 国产成人一区二区三区免费视频网站| 女人被躁到高潮嗷嗷叫费观| 男人操女人黄网站| 一级a爱视频在线免费观看| 国内毛片毛片毛片毛片毛片| 亚洲中文日韩欧美视频| 久久久水蜜桃国产精品网| 中文字幕最新亚洲高清| 国产又爽黄色视频| 性少妇av在线| 波多野结衣高清无吗| 在线观看日韩欧美| 99久久久亚洲精品蜜臀av| 这个男人来自地球电影免费观看| 国产精品99久久99久久久不卡| 啪啪无遮挡十八禁网站| 色婷婷久久久亚洲欧美| 成人手机av| 欧美日本亚洲视频在线播放| 国产精品一区二区在线不卡| 成在线人永久免费视频| 亚洲欧美日韩另类电影网站| 日本一区二区免费在线视频| 国产真人三级小视频在线观看| 人人澡人人妻人| 天天添夜夜摸| 国产视频一区二区在线看| 国产成人一区二区三区免费视频网站| 日韩欧美一区视频在线观看| 真人做人爱边吃奶动态| 69av精品久久久久久| 亚洲国产欧美日韩在线播放| 操美女的视频在线观看| 国产91精品成人一区二区三区| 真人做人爱边吃奶动态| 国产精品 国内视频| 亚洲 国产 在线| 在线av久久热| 日韩欧美三级三区| 咕卡用的链子| 久久久久国内视频| 国产亚洲精品第一综合不卡| 丰满迷人的少妇在线观看| 国产av精品麻豆| 午夜两性在线视频| 在线av久久热| 国产又色又爽无遮挡免费看| 午夜成年电影在线免费观看| 悠悠久久av| 久久精品国产清高在天天线| 熟女少妇亚洲综合色aaa.| 亚洲伊人色综图| 桃红色精品国产亚洲av| 免费在线观看黄色视频的| 久久久久国产精品人妻aⅴ院| 欧美激情极品国产一区二区三区| 久久午夜综合久久蜜桃| 日韩三级视频一区二区三区| 丰满人妻熟妇乱又伦精品不卡| 亚洲av美国av| www.精华液| 国产精品免费一区二区三区在线| 无人区码免费观看不卡| 丰满饥渴人妻一区二区三| 视频在线观看一区二区三区| 欧美精品啪啪一区二区三区| 亚洲激情在线av| 99热国产这里只有精品6| 麻豆成人av在线观看| www.999成人在线观看| 日韩大尺度精品在线看网址 | 在线观看www视频免费| 亚洲一卡2卡3卡4卡5卡精品中文| 在线观看一区二区三区| 午夜成年电影在线免费观看| 淫秽高清视频在线观看| 免费在线观看视频国产中文字幕亚洲| 中文欧美无线码| 日韩中文字幕欧美一区二区| 夜夜夜夜夜久久久久| 免费少妇av软件| 久久人人爽av亚洲精品天堂| 在线看a的网站| 水蜜桃什么品种好| 国产成人一区二区三区免费视频网站| 精品人妻1区二区| 91老司机精品| 久久精品人人爽人人爽视色| 欧美日韩精品网址| 91国产中文字幕| 亚洲成人精品中文字幕电影 | 在线国产一区二区在线| 中文字幕另类日韩欧美亚洲嫩草| 精品国产亚洲在线| 无人区码免费观看不卡| 亚洲第一青青草原| 久久 成人 亚洲| 这个男人来自地球电影免费观看| 色哟哟哟哟哟哟| 欧洲精品卡2卡3卡4卡5卡区| 色在线成人网| 亚洲色图综合在线观看| 欧美日本中文国产一区发布| 欧美乱码精品一区二区三区| 91国产中文字幕| 97碰自拍视频| 久久久久久久久免费视频了| 99国产精品免费福利视频| 757午夜福利合集在线观看| 少妇裸体淫交视频免费看高清 | 成人三级黄色视频| 老司机福利观看| 国产亚洲欧美在线一区二区| netflix在线观看网站| 免费人成视频x8x8入口观看| 亚洲三区欧美一区| 精品久久蜜臀av无| 另类亚洲欧美激情| 两个人看的免费小视频| 69av精品久久久久久| 精品国产超薄肉色丝袜足j| 欧美另类亚洲清纯唯美| 两个人免费观看高清视频| 国产成+人综合+亚洲专区| 亚洲黑人精品在线| 波多野结衣高清无吗| 我的亚洲天堂| 淫秽高清视频在线观看| 欧美日韩黄片免| 女警被强在线播放| 99热只有精品国产| 久久久久国产精品人妻aⅴ院|