• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    Analysis of working behavior of Jinping-I Arch Dam during initial impoundment

    2016-04-18 10:34:56*
    Water Science and Engineering 2016年3期

    *

    Yalong River Hydropower Development Company,Ltd.,Chengdu 610051,China

    Analysis of working behavior of Jinping-I Arch Dam during initial impoundment

    Shi-yong Wu*,Wei Cao,Jiang Zheng

    Yalong River Hydropower Development Company,Ltd.,Chengdu 610051,China

    Available online 9 November 2016

    To study the stress,deformation,and seepage pressure during the initial impoundment of the Jinping-I Arch Dam,monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014.The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli(E)of the dam body and foundation,using a three-dimensional finite element model for the linear elastic material of the arch dam.The main monitoring indices presented insignif i cant changes in the late period of the initial impoundment,and the results of feedback analysis were consistent with monitoring results.Analysis results also show that the deformations of the dam body and dam foundation were within the design range;the dam stress distributions were normal,with values lower than the design control criteria;and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house,demonstrating that the Jinping-I Arch Dam was in good working condition,and the initial impoundment had been successfully completed.The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects.

    Dam safety monitoring;Working behavior;Elastic modulus;Dam impoundment;Jinping-I hydropower project

    1.Introduction

    During the dam's initial impoundment,monitoring indices change with the water load and other factors,so impoundment is crucial to dam safety.Many engineering accidents occur in the initial impoundment period,so it is important to analyze the working behavior of a dam during this period to ensure the dam's safe operation.

    China has several of the world's highest dams,for example the Shuangjiangkou hydropower project,with a maximum height of 314 m,which is the highest dam under construction in the world,and the Jinping-I hydropower project,with a maximum height of 305 m,which is the highest completed dam in the world.Basic information on some large hydropower projects in China is given in Table 1.As some large hydropower projects,such as the Shuibuya,Laxiwa,Xiaowan, and Xiluodu hydropower stations,have been put into operation,the safety evaluation of hydropower projects during the initial impoundment has been extensively carried out in China (Wu,2003;Hu et al.,2012;Jin et al.,2011).Monitoring and analysis of the dam foundation deformation,stress-strain,and seepage pressure during the initial impoundment,using an automatic observation system,have been carried out for the Laxiwa and Xiaowan hydropower projects(Li et al.,2009; Han et al.,2010;Wang et al.,2003,2010;Huang et al., 2006).The monitoring results show that the dam deformation is closely related to the reservoir water level,and the deformation in the upper part of the dam is more sensitive tothe water load than that in the lower part.Based on prototype monitoring results,a finite element model has been used to carry out feedback analysis of the working behaviors of the Shuibuya and Xiluodu hydropower projects,and to perform safety assessment of the dams in the late operation stage(Zhou et al.,2011;Zhang and Yin,2014;Zhang et al.,2016).According to analysis results,dam deformations appear downstream and towards the banks under the water load.The dam deformation during the initial impoundment is consistent with the variation of the reservoir water level.According to the comprehensive analysis results,the dams are in a safe condition during the initial impoundment.

    Table 1Basic information on high dams in China.

    With regards to the Jinping-I hydropower project,Zhou and Rao(2014)launched seepage control research,dam safety monitoring analysis,structural stress and deformation analysis,and safety assessment of the dam during the reservoir impoundment according to the construction progress and monitoring information.Chen and Ruan(2014)and Yang and Dong(2015)carried out preliminary analyses of the working behavior of the dam based on the monitoring results during the initial impoundment.The deformation,stress-strain,and seepage pressure of the dam meet general rules,with their values within the range of design control indices,and the performances of the structures are normal overall.Based on relevant research achievements,two methods,monitoring analysis and numerical calculation,were used in the working behavior analysis of the dam in this study.The working behavior of the dam during the initial impoundment,such as the stress,deformation,and seepage pressure,was evaluated through monitoring result analysis and feedback analysis,so as to provide a technical foundation for comprehensive study of dam performance,successful completion of the initial impoundment,and safe operation of hydropower projects.

    2.Impoundment process and monitoring design of Jinping-I Arch Dam

    2.1.Project overview

    Located on the main stream of the Yalong River in Yanyuan County and Muli County,in the Liangshan Yi Autonomous Prefecture in Sichuan Province,the Jinping-I hydropower project is a controlling reservoir downstream of the Yalong River,with signif i cant compensative regulation effect on downstream cascade hydropower stations.

    The project consists of a water-retaining structure,a f l ood discharge and energy dissipation structure,and power generation facilities,with a total installed capacity of 3600 MW. The water-retaining structure is a concrete double-curvature arch dam with a maximum height of 305 m,and is the highest completed arch dam in the world.The dam is composed of 26 sections from the left bank to right bank,poured with concrete without longitudinal joints,and the concrete material is divided into three areas known,respectively,as A,B,and C, with area A being a strong constraint area and area C a weak constraint area.The partition of dam sections and zoning design of the concrete material are shown in Fig.1.The normal water storage level of the reservoir is 1880 m,the dead water level is 1800 m,and the total storage capacity is 7.76 km3.The project construction started in 2005,and the fi rst two generation units were put into operation in August 2013.All the units had been put into operation by July 2014.

    2.2.Initial impoundment process

    The Jinping-I hydropower project is large in scale with complicated geological conditions.The initial impoundment was divided into four stages.In November 2012,the right bank diversion tunnel was closed for impoundment.In December,the diversion bottom outlet was opened,and the water level in front of the dam reached 1707 m,the impoundment goal of the first stage.In July 2013,the reservoir water level reached the design dead water level,1800 m, completing the second stage of the initial impoundment.In September 2013,the diversion bottom outlet was closed,and the water level reached 1840 m in October,the impoundment goal of the third stage.The fourth stage of the initial impoundment was started in July 2014.In August 2014,the reservoir reached the normal water storage level,1880 m, which meant the completion of the fourth stage of the initial impoundment.In order to comprehensively evaluate the working behavior of the dam during the initial impoundment, this study focused on the working behavior of the dam just after the completion of the fourth stage of the initial impoundment,from August 2014 to the end of November 2014,which is called the late period of the initial impoundment in this paper.During this period,the water level was kept between 1876 m and 1880 m,close to the normal water storage level.In contrast to the late period,the period that consists of the four stages of the initial impoundment is calledthe early stage of the initial impoundment.The initial impoundment process of the dam is shown in Fig.2.

    Fig.1.Partition of dam sections and zoning design of concrete material.

    2.3.Dam monitoring design

    Key technical issues related to the impoundment safety of high dams include the dam structural stress and deformation, as well as seepage control.In order to guarantee the safe operation of the dam in the initial impoundment period, comprehensive monitoring measures of the Jinping-I hydropower project were designed,with a monitoring range covering the dam body,dam foundation,pedestal,dam outlets, plunge pool,and subsidiary dam.The main monitoring items included the deformation,stress-strain,seepage pressure, temperature,environmental parameters,and special factors (Wu and Cao,2014).By November 30,2014,a total of 3450 sets of monitoring instruments had been installed(Deng and Dong,2014).

    3.Analysis of working behavior of dam

    Fig.2.Initial impoundment process.

    The study focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014.Monitoring data obtained during this period include the radial horizontal deformation with positive values downstream and negative values upstream,the tangential horizontal deformation with positive values towards the left bank and negative values towards the right bank,the chord length variation with positive values for elongation and negative values for shortening,the vertical deformation with positive values for settling and negative values for upraising,the joint opening with positive values for enlargement and negative values for shrinkage,and the stress with positive values for tensile stresses and negative values for compressive stresses.

    3.1.Monitoring results

    3.1.1.Monitoring results during early period of initial impoundment

    The arrangement of plumb lines for deformation monitoring of the dam is shown in Fig.3,where PL means the plumb line,IP means the inverted plumb line,the subscripts L and R mean the left and right banks,respectively,and the other subscripts mean the numbers of the dam section and plumb line in each section,respectively.

    The monitoring results of the maximum deformation and seepage of the Jinping-I Arch Dam before and after each stage in the early period of the initial impoundment are shown in Table 2.The statistical results show that they are positively correlated with the reservoir water level.

    3.1.2.Monitoring results during late period of initial impoundment

    During the late period of the initial impoundment,the relevant monitoring results can be described as follows:

    (1)Dam foundation deformation

    Fig.3.Monitoring arrangement of plumb lines.

    Thecalculatedresultsofthemaximumradialdeformationand tangential deformation of the dam foundation obtained from the arch-cantilever method,with values of 27.2 mm and 22.5 mm, respectively,were taken as the reference control standards.

    According to the monitoring results,the maximum radial deformation was 14.24 mm,and the maximum tangential deformation was 2.36 mm.The measured values were within the design range.

    The dam foundation joints were in a compressive state. When the water level reached 1880 m at the end of the early period of the initial impoundment,the opening variation of the dam foundation joints was less than 0.1 mm,and the value was less than 0.2 mm during the late period of the initial impoundment,demonstrating that the dam foundation joints were in a safe condition.

    (2)Dam body deformation

    The dam body deformation includes the horizontal deformation,vertical deformation,chord length variation,and joint opening variation.The calculated results of the maximum radial deformation and tangential deformation of the dam body obtained from the arch-cantilever method,with values of 85.0 mm and 24.3 mm,respectively,were taken as the reference control standards.

    According to the monitoring results from November 2014, the horizontal deformation of the dam body appeared downstream and towards both banks of the river.The radial deformation of the dam body appeared downstream.The maximum value appeared in the middle section,and the deformation decreased gradually towards both banks.The largest radial deformation occurred in the#13 dam section at an elevation of 1730 m,leading to a displacement value of 40.75 mm (Fig.4(a)).The tangential deformation of the dam body pointed to the left on the left bank,and to the right on the right bank.The largest tangential deformation on the left bank occurred in the#11 dam section at an elevation of 1730 m, leading to a displacement value of 8.31 mm;the largest tangential deformation on the right bank occurred in the #16 dam section at an elevation of 1829 m,leading to a deformation value of-4.72 mm(Fig.4(b)).The radial displacement graph of the#13 dam section and the tangential displacement graph of the#11 dam section during the initial impoundment are shown in Fig.5.According to the monitoring results,the dam body deformation had a strong correlation with thereservoirwaterlevel,and theoveralldeformation was insignif i cant.All measured values were within the design range.

    Table 2Comparison of monitoring results of maximum deformation and seepage before and after four stages in early period of initial impoundment.

    Fig.4.Contour maps of horizontal deformation of dam body in November 2014(units:mm).

    Fig.5.Horizontal deformation graphs for#11 and#13 dam sections at different elevations during initial impoundment.

    The vertical deformation of the dam body presented the following characteristics:the largest deformation of 12.04 mm in November 2014 appeared at the arch crown,and the deformation decreased gradually towards both banks.

    The chord length of the dam body was shortened for approximately 4—7 mm during the early period of the initial impoundment.However,the chord length was then extended approximately 1—2 mm during the late period.The horizontal joints of the dam were under compression,with a variation of less than 0.2 mm.

    In general,the distribution patterns of the radial,tangential, and verticaldisplacements complied with the design expectations.

    (3)Dam stress

    According to the current arch dam design code,concrete strength control standards were determined by categorized factors.The concrete material of the Jinping-I Arch Dam was divided into three sections,and their concrete strength control standards are shown in Table 3.

    According to stress calculations,the strain gauge groups should be arranged at the locations with large tensile and compressive stresses,the locations at 1/4 of the dam length from the two ends,the locations at 1/4 of the arch ring from the two ends,the representative arch crowns,and the two ends of the abutments.According to industry standards,the uniaxial,f i ve-direction,and nine-direction strain gauge sets as well as the non-stress meter were adopted in monitoring.The monitoring points of stress-strain of the dam body are shown in Fig.6.

    During the late period of the initial impoundment,the upstream water level was basically unchanged,and the dam stress monitoring results obtained in November 2014 can be described as follows:

    The dam heel and dam toe were in strong constraint areas, close to the dam foundation(area A).They were in a compressive state in general.The maximum vertical compressive stress of 4.57 MPa appeared at the dam heel in the#12 dam section.The maximum vertical tensile stress of 0.1 MPa appeared at the dam heel in the#2 dam section.The maximum tangential compressive stress of 5.13 MPa appeared at the dam toe in the#21 dam section.The maximum tangential tensile stress of 0.26 MPa appeared at the dam toe in the#4 dam section.The maximum radial compressive stress of 4.76 MPa appeared at the dam toe in the#9 dam section. The maximum radial tensile stress of 0.83 MPa appeared at the dam heel in the#2 dam section.The stress graphs for the arch abutment heel in the#12 dam section,the arch abutment toe in the#21 dam section,and arch abutment toe in the#9 dam section during the initial impoundment are shown in Fig.7.

    The dam body(areas B and C)was generally in a compressivestate,withouttensile stressdetected.The maximum vertical compressive stress of 5.93 MPa appeared in the middle part of the#11 dam section at an elevation of 1720 m.The maximum tangential compressive stress of 6.94 MPa appeared downstream of the#13 dam section at anelevation of 1684 m and in the middle part of the#11 dam section at an elevation of 1720 m.The maximum radial compressive stress of 4.76 MPa appeared downstream of the #9 dam section at an elevation of 1648 m.

    Table 3Compressive and tensile strength control standards of concrete material of dam body.

    Fig.6.Monitoring arrangement of stress-strain of dam body.

    Fig.7.Stress graphs recorded by f i ve-direction strain gauges at arch abutment heel or arch abutment toe in different dam sections during initial impoundment.

    Basically,the arch dam was in a compressive state,the stress distribution of the dam could be considered normal,and all values were less than the design control criteria.

    (4)Seepage pressure

    According to the Design Specif i cation for Concrete Arch Dams(DL/T 5346—2006)and engineering practices,the uplift pressure reduction coeff i cients are set mainly based on the pros and cons of the geological conditions of the dam foundation,seepage proofcurtain,and drainage facilities. Considering the actual situation of the Jinping-I Arch Dam, the relevant design control criteria for seepage proof structures were set as follows:the uplift pressure reduction coeff i cient for the seepage proof curtain of the dam foundation was a1≤0.4,the uplift pressure reduction coeff i cient for the main drainage curtain of the dam foundation was a2≤0.2,and the design drainage capacity of the deep-well pump house was 450 m3/h.

    The curtain and drainage effects,determined by the uplift pressure reduction coeff i cient,were studied.As the water level downstream of the Jinping-I hydropower project was lower than the bedrock elevation,the following formula for the uplift pressure reduction coeff i cient was adopted:

    where H1is the upstream water level,H4is the bedrock elevation,and Hiis the actual water level at the measurement location i.

    The arch dam foundation curtain showed a strong antiseepage performance.The maximum reduction coeff i cient was 0.29 behind the seepage proof curtain,and 0.08 behind the drainage curtain,less than the design value of the reduction coeff i cient.

    The practically measured seepage flow through the dam body and dam foundation corridors was 64.34 L/s.The total seepage flow through the left bank dam foundation was 54.36 L/s,and the total seepage flow through the right bank dam foundation was 9.99 L/s.These values were lower than the design drainage capacity of the deep-well pump house.

    According to the monitoring results,the working behavior of the dam body and dam foundation was basically normal at the water level of 1880 m,and seepage controlling works operated normally.The dam was in an elastic state during the late period of the initial impoundment.

    3.2.Feedback analysis

    Feedback analysis is an effective complementary analysis approachfortestresultanalysis.Toobtaintheaccurateresultsof deformation and stress and provide a more comprehensive evaluation of the working behavior of the arch dam,feedback calculation of the deformation and stress of the arch dam,based on inversion of the elastic moduli(E)of the dam body and dam foundation,was carried out by means of a statistical model and fi nite element model.In the feedback analysis,a representative period and a target point for re fl ecting deformation characteristics of the arch dam were selected,and the observed displacement at the target point was taken as the target value. The elastic moduli of the dam body and dam foundation were adjusted repeatedly so that the computed deformation at the target point approached its observed value.The mean square deviation between the observed displacement and computed displacement was used to check their agreement,and the elastic modulus leading to the minimum mean square deviation was taken as the best feedback parameter.

    3.2.1.Numerical model

    Basedontheengineeringdesignandgeologicaldata,a threedimensional finite element model for the linear elastic material of the Jinping-I Arch Dam was established.The model used the centerline of the arch dam as a reference,from which a range of 900monbothsideswasincluded.Themodelalsousedtheorigin ofthecrestasareference,fromwhicharangeof750mupstream and downstream was included,respectively.A range of 700 m below the foundation surfacewas covered as well.In the model, the slope of the rock mass above the crest was cut to the natural boundary elevation;for the mountains on both banks,a range of 2.5 times the dam height was extended upstream and downstream,and one dam height was extended upwards from the crest.Thefiniteelementmodelwasusedtosimulatethecomplex faults f2,f5,f8,f42-9,f13,f14,and f18(Fig.3),lamprophyre veins, and other weak structural planes,as well as the terrain and stratum partitions in the project area.The faults f8and f42-9are not shown in Fig.3.The fault f8was a subfault near the hanging wall ofthefaultf5,andthefaultf42-9was locatedontheleftdam abutment.Simulation was also carried out of the engineering measures,such as the pedestal,concrete plug,shear force transmissiontunnel,replacementofconcretegrillage,subsidiary dam,plunge pool,and grouting.The classif i cation of rock mass qualityinthedamfoundationisshowninFig.8.Themechanical parameters of rocks and structural planes are shown in Table 4. The three-dimensional finite element model is shown in Fig.9.

    3.2.2.Inversion of elastic modulus

    Fig.8.Classif i cation of rock mass quality in dam foundation.

    Table 4Mechanical parameters of rocks and structural planes.

    Fig.9.Three-dimensional finite element model.

    Feedback analysis was first performed for the duration from the starting of the water level monitoring on December 1,2011 to the completion of the fourth stage of the initial impoundment on August 24,2014 for inversion of the elastic modulus. The load that was taken into account mainly consisted of the dead weight and water pressure.Comparisons of test results and design values of the elastic moduli of the dam body and dam foundation with those obtained from the feedback analysis are shown in Tables 5 and 6.In the arch dam design, the long-term elastic modulus of dam body concrete was used, which was only 0.6—0.7 times the instantaneous elastic modulus,leading to a signif i cant difference between the design values of the elastic modulus and those from the feedback analysis.Meanwhile,the age of concrete for laboratory tests and in situ tests of the elastic modulus was only 180 d,far less than the actual age of concrete under the water load.Thus,the elastic modulus increment after the age of 180 d was not included in the tests.Therefore,the elastic moduli of the dam body from the feedback analysis are greater than the design values and experimental values,and the values from the feedback analysis,ranging from 36.6 to 38.2 GPa,are deemed consistent with the actual situation.For the elastic moduli of the dam foundation,the design values were determined based on the most unfavorable situation,while,in the feedback analysis,the deformation parameters that most probably occurred in the actual situation,instead of the parameters that might occur in the most unfavorable situation,were used.Moreover,the elastic modulus of boreholes would increase after consolidation grouting of the dam foundation. Due to these factors,the elastic moduli of the dam foundation from the feedback analysis are also greater than the design values,and the values from the feedback analysis are generally considered reasonable.

    Table 5Comparison of test results and design values of elastic modulus of dam body with those obtained from feedback analysis.

    Table 6Comparison of design values of elastic modulus of dam foundation with those obtained from feedback analysis.

    3.2.3.Feedback analysis of dam deformation and stress

    The deformation and stress of the arch dam at the normal water storage level were analyzed based on inversion of the elastic moduli of the dam body and foundation.Analysis results are shown below:

    (1)Feedback analysis of dam deformation

    At the normal water storage level,radial deformation appeared towards the inner side of the arch dam,with the maximum value occurring in the middle sections,while tangential deformation appeared towards the two banks.The maximum radial deformation was 48.8 mm,which appeared in the#12 dam section at an elevation of 1870 m(Fig.10(a)). The maximum tangential deformation was 13.9 mm,which appeared towards the right bank at an elevation of 1875 m in the#18 dam section(Fig.10(b)).The overall deformation pattern was basically consistent with the monitoring results, and the calculated results were within the design range.

    (2)Feedback analysis of structural stress

    At the normal water storage level,key sections of the arch dam in the upper and lower reaches were in a compressive state.On the upstream face,the maximum hoop compressive stress was 5 MPa,the maximum arch compressive stress was 8 MPa,and the maximum tensile stress was 1.47 MPa.These values were lower than the design control standards.On the downstream face,the maximum hoop compressive stress was 9 MPa,and the maximum tensile stress was 1.2 MPa,which also met the design requirements.

    In conclusion,feedback analysis results show that the deformation and stress distribution patterns of the arch dam were normal,and the arch dam operated normally at the normal water storage level.

    Fig.10.Dam deformation at normal water storage level obtained from feedback analysis.

    4.Conclusions and suggestions

    (1)The monitoring results show that the observed deformation values of the dam body and foundation were lower than the design values;the total seepage flows through the dam body and foundation were lower than the design drainage capacity of the deep-well pump house;the dam stress distributions were normal,with values lower than the design control criteria;and the arch dam was basically in a compressive state during the initial impoundment.The results of the dam deformation and stress distribution from the feedback analysis were basically consistent with the monitoring results,and the values were within the design range.The working behavior of the Jinping-I Arch Dam was normal during the initial impoundment.

    (2)The two approaches,monitoring analysis and numerical calculation,supplement and prove each other in the comprehensive analysis and evaluation of the working behavior of the dam in terms of stress,deformation,and seepage pressure.The results of analysis and evaluation provide a technical foundation for safe operation of the dam in the future,and can provide a reference for similar high dam projects.

    (3)Thesafe operation of high dams during impoundment isa long-term dynamic process.Thus it is necessary to carry out long-term safety monitoring and analysis based on monitoring, tracing,and feedback,and pay close attention to the working behavior of the dam,so as to provide reliable technical support for the long-term safe operation of projects.

    Chen,X.P.,Ruan,Y.S.,2014.Analysis on the vertical monitoring results of the initial impoundment for the arch dam of Jinping-I hydropower station. Sichuan Water Power33(s1),128—131.http://dx.doi.org/10.3969/ j.issn.1001-2184.2014.z1.037(in Chinese).

    Deng,J.H.,Dong,Y.J.,2014.Report on Safety Monitoring Analysis of Jinping-I Hydropower Project during Fourth-stage Impoundment.Jinping Construction and Administration Bureau,Chengdu(in Chinese).

    Han,S.D.,Zhao,B.,Liao,Z.Y.,Xia,J.H.,2010.Analysis and evaluation of monitoring data by plumb lines in early impoundment period of Xiaowan Arch Dam.Dam Saf.(3),44—47.http://dx.doi.org/10.3969/j.issn.1671-1092.2010.03.012(in Chinese).

    Hu,B.,Wu,Z.R.,Liu,G.B.,Zhao,B.,Xu,B.,2012.Safety evaluation of replacement reinforcement quality in abutment contact zones of ultra-high arch dam in first impoundment period based on prototype monitoring. Water Sci.Eng.5(2),210—218.http://dx.doi.org/10.3882/j.issn.1674-2370.2012.02.009.

    Huang,X.C.,Tang,L.,Zhao,W.,2006.Deformation monitoring design for Goupitan hydropower station.Yangtze River 37(3),48—50.http:// dx.doi.org/10.3969/j.issn.1001-4179.2006.03.018(in Chinese).

    Jin,F.,Hu,W.,Pan,J.W.,Yang,J.,Wang,J.T.,Zhang,C.H.,2011.Comparative study procedure for the safety evaluation of high arch dams.Comput.Geotechnics 38(3),306—317.http://dx.doi.org/10.1016/j.compgeo.2010.10.008.

    Li,P.J.,Wei,P.,Zhang,Q.,2009.Behavior of Laxiwa Arch Dam in the period of first impounding.Hydropower Stn.35(11),12—15.http://dx.doi.org/ 10.3969/j.issn.0559-9342.2009.11.005(in Chinese).

    Wang,Z.H.,Hu,Q.Y.,Yu,X.H.,Duan,G.X.,2010.Analysis of operation condition of Goupitan Hydropower Station arch dam in initial impoundment period.Yangtze River 41(22),29—31.http://dx.doi.org/10.3969/ j.issn.1001-4179.2010.22.008(in Chinese).

    Wang,Z.Y.,Yang,H.,Huang,H.D.,2003.Analysis on dam deformation during initial impoundment period of Dachaoshan hydropower station. Hydropower Automation Dam Monit.27(5),57—60.http://dx.doi.org/ 10.3969/j.issn.1671-3893.2003.05.018(in Chinese).

    Wu,S.Y.,Cao,W.,2014.AnalysisonworkingbehaviorsofJinping-Ihydropower project during initial impoundment period.In:Proceedings of 2014 Academic Annual Conference of Chinese National Committee on Large Dams. The Yellow River Conservancy Press,Guiyang,pp.309—318(in Chinese).

    Wu,Z.R.,2003.Safety Monitoring Theory and It's Application to Hydraulic Structures.Higher Education Press,Beijing(in Chinese).

    Yang,H.,Dong,Y.J.,2015.Analysis on monitoring data of Jinping-I hydropower dam during first impoundment.Dam Saf.(3),34—40.http:// dx.doi.org/10.3969/j.issn.1671-1092.2015.03.008(in Chinese).

    Zhang,C.,Yin,H.A.,2014.Feedback analysis of extra-high arch dam of Xiluodu in the initial impoundment phase.Hydropower Stn.Des.30(2), 7—12.http://dx.doi.org/10.3969/j.issn.1003-9805.2014.02.002(in Chinese).

    Zhang,C.,Wang,R.K.,Tang,X.J.,2016.Safety evaluation of Xiluodu ultrahigh arch dam during the initial impoundment period.J.Hydraulic Eng. 47(1),85—93.http://dx.doi.org/10.13243/j.cnki.slxb.20150404(in Chinese).

    Zhou,W.,Hua,J.J.,Chang,X.L.,Yang,Q.G.,Ma,G.,2011.Estimation of work status and deformation prediction of Shuibuya CFRD.Chin.J. Geotechnical Eng.33(s1),65—70(in Chinese).

    Zhou,Z.,Rao,H.L.,2014.Special Report on Monitoring,Analysis and Assessment of Dam and Slope Safety of Jinping-I Hydropower Project in Initial Impoundment.Power China Chengdu Engineering Corporation Limited,Chengdu(in Chinese).

    Received 7 April 2016;accepted 8 July 2016

    This work was supported by the National Key Technology Support Program(Grant No.2013BAB05B05).

    *Corresponding author.

    E-mail address:wushiyong@ylhdc.com.cn(Shi-yong Wu).

    Peer review under responsibility of Hohai University.

    http://dx.doi.org/10.1016/j.wse.2016.11.001

    1674-2370/?2016 Hohai University.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http:// creativecommons.org/licenses/by-nc-nd/4.0/).

    ?2016 Hohai University.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http:// creativecommons.org/licenses/by-nc-nd/4.0/).

    久久 成人 亚洲| 日韩视频一区二区在线观看| 免费在线观看黄色视频的| 国产高清videossex| 好看av亚洲va欧美ⅴa在| 久久久久久九九精品二区国产 | 午夜福利免费观看在线| 美女 人体艺术 gogo| 久久午夜综合久久蜜桃| 久久精品91蜜桃| avwww免费| 男女之事视频高清在线观看| 很黄的视频免费| 久久 成人 亚洲| 老司机靠b影院| 18禁国产床啪视频网站| 久久久久九九精品影院| 亚洲欧洲精品一区二区精品久久久| 不卡av一区二区三区| 免费看a级黄色片| 色综合站精品国产| 国产极品粉嫩免费观看在线| 亚洲午夜理论影院| 久久精品人妻少妇| 久久久久久国产a免费观看| 午夜精品在线福利| 国产激情欧美一区二区| 伊人久久大香线蕉亚洲五| 91麻豆精品激情在线观看国产| cao死你这个sao货| 精品久久久久久久久久久久久 | 天天添夜夜摸| 免费在线观看亚洲国产| 熟妇人妻久久中文字幕3abv| 亚洲国产精品sss在线观看| 久久久水蜜桃国产精品网| 禁无遮挡网站| 99精品在免费线老司机午夜| 成人国产一区最新在线观看| 丝袜美腿诱惑在线| 亚洲第一欧美日韩一区二区三区| 成人国产综合亚洲| 国产精品久久久久久精品电影 | 一区二区三区高清视频在线| www.999成人在线观看| 高清毛片免费观看视频网站| 天堂影院成人在线观看| 国产午夜福利久久久久久| 亚洲成人国产一区在线观看| 久久久国产成人免费| 中文字幕久久专区| 日韩欧美国产一区二区入口| 男女之事视频高清在线观看| 欧美中文日本在线观看视频| 成年版毛片免费区| 亚洲av美国av| 欧美乱妇无乱码| 国产在线精品亚洲第一网站| 久久久久久九九精品二区国产 | 99久久国产精品久久久| 中文资源天堂在线| 国产又色又爽无遮挡免费看| a在线观看视频网站| 国产aⅴ精品一区二区三区波| 少妇 在线观看| 午夜福利一区二区在线看| 亚洲五月天丁香| www.精华液| 白带黄色成豆腐渣| 日韩欧美三级三区| 中文字幕人妻熟女乱码| 国产伦在线观看视频一区| 午夜福利18| 欧美激情高清一区二区三区| 亚洲av电影不卡..在线观看| 熟女电影av网| 变态另类丝袜制服| e午夜精品久久久久久久| 韩国av一区二区三区四区| 国产三级在线视频| 老鸭窝网址在线观看| √禁漫天堂资源中文www| 国产精品99久久99久久久不卡| 日韩欧美一区二区三区在线观看| 亚洲精华国产精华精| 黄色丝袜av网址大全| 亚洲色图 男人天堂 中文字幕| 国产成人欧美在线观看| 欧美久久黑人一区二区| 美国免费a级毛片| 亚洲 欧美 日韩 在线 免费| 婷婷精品国产亚洲av在线| 日韩精品免费视频一区二区三区| 亚洲精品色激情综合| 国产精品九九99| 国产黄色小视频在线观看| 久久久久九九精品影院| 精品一区二区三区四区五区乱码| 欧美一级毛片孕妇| 亚洲国产精品久久男人天堂| 久久 成人 亚洲| 757午夜福利合集在线观看| 亚洲最大成人中文| 嫩草影视91久久| 1024香蕉在线观看| 国产亚洲精品久久久久5区| 老鸭窝网址在线观看| 亚洲成av人片免费观看| 亚洲免费av在线视频| 亚洲在线自拍视频| 一二三四在线观看免费中文在| 日韩成人在线观看一区二区三区| 亚洲av日韩精品久久久久久密| 亚洲成av人片免费观看| 国产精品一区二区免费欧美| 欧美日韩黄片免| 国产精品二区激情视频| 两性夫妻黄色片| 人人澡人人妻人| 国产精品亚洲一级av第二区| 国产av一区二区精品久久| 国产精品久久久久久人妻精品电影| 日本撒尿小便嘘嘘汇集6| 国产精品野战在线观看| 亚洲三区欧美一区| 国产精品久久久久久精品电影 | 亚洲一区中文字幕在线| 精华霜和精华液先用哪个| 性色av乱码一区二区三区2| 国产成人一区二区三区免费视频网站| 人妻丰满熟妇av一区二区三区| 国产亚洲精品久久久久久毛片| 日韩精品免费视频一区二区三区| 狠狠狠狠99中文字幕| 两人在一起打扑克的视频| 麻豆一二三区av精品| 国语自产精品视频在线第100页| 午夜视频精品福利| 日韩欧美国产一区二区入口| 国产欧美日韩一区二区三| 精品国产乱码久久久久久男人| av福利片在线| 成人18禁在线播放| 一本大道久久a久久精品| 亚洲中文字幕日韩| 成人三级黄色视频| 天堂动漫精品| 免费搜索国产男女视频| 首页视频小说图片口味搜索| netflix在线观看网站| 久久婷婷成人综合色麻豆| 久久亚洲精品不卡| 搡老妇女老女人老熟妇| 无人区码免费观看不卡| 一本精品99久久精品77| 久久国产亚洲av麻豆专区| 美女国产高潮福利片在线看| 12—13女人毛片做爰片一| 成人三级黄色视频| 欧美激情极品国产一区二区三区| 亚洲精品久久国产高清桃花| 人妻久久中文字幕网| 亚洲欧美日韩高清在线视频| 99久久综合精品五月天人人| 搡老熟女国产l中国老女人| 欧美av亚洲av综合av国产av| 国产伦人伦偷精品视频| xxxwww97欧美| 欧美乱码精品一区二区三区| 久久精品人妻少妇| 久久久国产精品麻豆| 高清毛片免费观看视频网站| 女人被狂操c到高潮| 久久 成人 亚洲| 国产精品99久久99久久久不卡| 男人舔女人下体高潮全视频| 19禁男女啪啪无遮挡网站| a在线观看视频网站| 狂野欧美激情性xxxx| 亚洲av中文字字幕乱码综合 | 一个人免费在线观看的高清视频| 久久天躁狠狠躁夜夜2o2o| 成熟少妇高潮喷水视频| 久久久久久久久中文| 两人在一起打扑克的视频| 中文在线观看免费www的网站 | 看免费av毛片| 精品不卡国产一区二区三区| 亚洲片人在线观看| 成在线人永久免费视频| 真人一进一出gif抽搐免费| 欧美一级毛片孕妇| 丁香六月欧美| 动漫黄色视频在线观看| 亚洲自拍偷在线| 淫秽高清视频在线观看| 亚洲成av人片免费观看| 99热6这里只有精品| 久久久久久久久免费视频了| 亚洲五月色婷婷综合| 久久久水蜜桃国产精品网| 特大巨黑吊av在线直播 | 亚洲成a人片在线一区二区| 国产精品1区2区在线观看.| 亚洲精品美女久久av网站| 88av欧美| 精品欧美一区二区三区在线| 日韩欧美国产一区二区入口| 精品欧美国产一区二区三| 亚洲va日本ⅴa欧美va伊人久久| 1024香蕉在线观看| 成熟少妇高潮喷水视频| 韩国精品一区二区三区| tocl精华| 国产精品1区2区在线观看.| 90打野战视频偷拍视频| 法律面前人人平等表现在哪些方面| 久久久久久人人人人人| 久久久久九九精品影院| 精品福利观看| 少妇裸体淫交视频免费看高清 | 欧美日本视频| 男女床上黄色一级片免费看| 国产精品永久免费网站| 国产在线观看jvid| 午夜老司机福利片| 动漫黄色视频在线观看| 午夜福利在线观看吧| 在线观看舔阴道视频| 亚洲成人国产一区在线观看| www.精华液| 男人舔奶头视频| 欧美成人一区二区免费高清观看 | 啦啦啦观看免费观看视频高清| 18禁黄网站禁片免费观看直播| 麻豆成人午夜福利视频| 成人特级黄色片久久久久久久| 久久中文字幕人妻熟女| 免费观看精品视频网站| 91麻豆精品激情在线观看国产| 最新在线观看一区二区三区| 成人国产一区最新在线观看| 99riav亚洲国产免费| 国产伦一二天堂av在线观看| 欧美日韩中文字幕国产精品一区二区三区| 亚洲人成网站高清观看| 男女下面进入的视频免费午夜 | 丝袜在线中文字幕| 视频在线观看一区二区三区| 色老头精品视频在线观看| 琪琪午夜伦伦电影理论片6080| 高清在线国产一区| 国产真人三级小视频在线观看| 日韩有码中文字幕| 精品一区二区三区视频在线观看免费| av超薄肉色丝袜交足视频| 黑人操中国人逼视频| 国产精品二区激情视频| 久久午夜综合久久蜜桃| 日韩欧美一区二区三区在线观看| 美女扒开内裤让男人捅视频| 成人三级黄色视频| aaaaa片日本免费| 成人特级黄色片久久久久久久| 狠狠狠狠99中文字幕| 热re99久久国产66热| 久久精品国产清高在天天线| 亚洲国产中文字幕在线视频| 亚洲第一av免费看| 十分钟在线观看高清视频www| 亚洲一区二区三区色噜噜| 亚洲国产精品成人综合色| 亚洲午夜理论影院| 欧美性猛交黑人性爽| 久久人妻av系列| 一a级毛片在线观看| 日韩一卡2卡3卡4卡2021年| 欧美三级亚洲精品| 变态另类丝袜制服| 精品一区二区三区四区五区乱码| 女人爽到高潮嗷嗷叫在线视频| 国产在线观看jvid| 久久精品成人免费网站| 淫妇啪啪啪对白视频| 丝袜在线中文字幕| 丝袜美腿诱惑在线| 在线看三级毛片| 亚洲一区中文字幕在线| 日韩欧美三级三区| 欧美成人一区二区免费高清观看 | 日韩欧美免费精品| 桃色一区二区三区在线观看| 中文资源天堂在线| 在线视频色国产色| 日本a在线网址| 最近最新中文字幕大全电影3 | 国产一区二区在线av高清观看| 99在线视频只有这里精品首页| 日日爽夜夜爽网站| 婷婷精品国产亚洲av在线| cao死你这个sao货| √禁漫天堂资源中文www| 少妇粗大呻吟视频| 日本免费a在线| 国产aⅴ精品一区二区三区波| 久久精品人妻少妇| 欧美成人性av电影在线观看| aaaaa片日本免费| 99久久精品国产亚洲精品| 一边摸一边做爽爽视频免费| 久久人妻福利社区极品人妻图片| 99热这里只有精品一区 | 伊人久久大香线蕉亚洲五| 日韩欧美免费精品| 怎么达到女性高潮| 在线视频色国产色| 欧美人与性动交α欧美精品济南到| 国产精品亚洲美女久久久| 一区二区日韩欧美中文字幕| 免费看美女性在线毛片视频| 怎么达到女性高潮| 国产主播在线观看一区二区| 国内精品久久久久久久电影| 亚洲一区中文字幕在线| 色综合站精品国产| 精品第一国产精品| 男女下面进入的视频免费午夜 | 日日夜夜操网爽| 婷婷六月久久综合丁香| 操出白浆在线播放| 岛国在线观看网站| 免费高清在线观看日韩| 日韩欧美国产在线观看| 美女大奶头视频| 午夜老司机福利片| 女同久久另类99精品国产91| 日韩视频一区二区在线观看| 精品第一国产精品| 波多野结衣av一区二区av| 99riav亚洲国产免费| 亚洲自偷自拍图片 自拍| 黄色女人牲交| 成年免费大片在线观看| 久久精品91蜜桃| 搡老妇女老女人老熟妇| 天堂影院成人在线观看| 久久久久久人人人人人| 琪琪午夜伦伦电影理论片6080| 精品卡一卡二卡四卡免费| 日韩成人在线观看一区二区三区| 国语自产精品视频在线第100页| 日日摸夜夜添夜夜添小说| 国产精品国产高清国产av| 亚洲自拍偷在线| 免费人成视频x8x8入口观看| 国产成人啪精品午夜网站| 久久精品91蜜桃| 一区二区日韩欧美中文字幕| 国产激情欧美一区二区| 婷婷亚洲欧美| 久久精品aⅴ一区二区三区四区| 国产成人精品久久二区二区91| 性欧美人与动物交配| 在线观看舔阴道视频| 欧美一区二区精品小视频在线| АⅤ资源中文在线天堂| 一级作爱视频免费观看| 久久 成人 亚洲| 久久精品人妻少妇| 90打野战视频偷拍视频| 很黄的视频免费| 亚洲一区二区三区不卡视频| 久久国产乱子伦精品免费另类| 一夜夜www| 亚洲国产中文字幕在线视频| 欧美日韩精品网址| 久久精品国产清高在天天线| 一区二区三区精品91| 欧美久久黑人一区二区| 亚洲熟女毛片儿| 18禁国产床啪视频网站| 一本一本综合久久| 亚洲 欧美一区二区三区| www.自偷自拍.com| 欧美日韩亚洲综合一区二区三区_| 桃色一区二区三区在线观看| 日本熟妇午夜| 亚洲精品一卡2卡三卡4卡5卡| 亚洲片人在线观看| 久久精品91无色码中文字幕| 午夜久久久久精精品| 国产99白浆流出| 女生性感内裤真人,穿戴方法视频| 99热6这里只有精品| 搡老熟女国产l中国老女人| 啦啦啦免费观看视频1| av超薄肉色丝袜交足视频| 久久午夜综合久久蜜桃| 久久久久久免费高清国产稀缺| 亚洲精品粉嫩美女一区| 精品无人区乱码1区二区| 国产伦在线观看视频一区| 日韩 欧美 亚洲 中文字幕| 中亚洲国语对白在线视频| 久久久久久久久免费视频了| 老熟妇仑乱视频hdxx| 亚洲九九香蕉| 欧美日韩亚洲国产一区二区在线观看| 午夜激情av网站| 岛国视频午夜一区免费看| bbb黄色大片| 日本熟妇午夜| 国产私拍福利视频在线观看| 日韩有码中文字幕| 无限看片的www在线观看| 日本 av在线| 国产亚洲av嫩草精品影院| 日日摸夜夜添夜夜添小说| 久久久国产欧美日韩av| 国产精品久久久久久人妻精品电影| 久久国产精品人妻蜜桃| 天天躁夜夜躁狠狠躁躁| 男女之事视频高清在线观看| 国产片内射在线| 日韩免费av在线播放| 香蕉丝袜av| 黄色丝袜av网址大全| 国产精品久久久久久精品电影 | 韩国av一区二区三区四区| 国产真人三级小视频在线观看| 久久久久国内视频| 日日摸夜夜添夜夜添小说| 国产成人系列免费观看| 18禁裸乳无遮挡免费网站照片 | 中文亚洲av片在线观看爽| 国产一区二区激情短视频| 婷婷丁香在线五月| 黄网站色视频无遮挡免费观看| 国产一区二区激情短视频| 精品日产1卡2卡| 日韩中文字幕欧美一区二区| av有码第一页| 亚洲av电影不卡..在线观看| 老汉色∧v一级毛片| 欧美激情高清一区二区三区| 国产精品永久免费网站| 12—13女人毛片做爰片一| 中文字幕另类日韩欧美亚洲嫩草| 黄色丝袜av网址大全| 日韩欧美国产一区二区入口| 免费搜索国产男女视频| 免费在线观看日本一区| 丁香欧美五月| 久久午夜亚洲精品久久| 女人爽到高潮嗷嗷叫在线视频| 精品国产美女av久久久久小说| 一进一出抽搐动态| 老熟妇乱子伦视频在线观看| 国产av不卡久久| 中出人妻视频一区二区| 久久精品91蜜桃| 91av网站免费观看| 成人18禁高潮啪啪吃奶动态图| 国产av在哪里看| 一本久久中文字幕| 久久久久免费精品人妻一区二区 | 国产高清有码在线观看视频 | 午夜福利视频1000在线观看| 91九色精品人成在线观看| 国产欧美日韩一区二区三| 免费在线观看亚洲国产| 又紧又爽又黄一区二区| 亚洲av电影在线进入| 黄色丝袜av网址大全| 午夜福利欧美成人| 国产视频内射| 自线自在国产av| 1024视频免费在线观看| netflix在线观看网站| 久久精品国产清高在天天线| 亚洲免费av在线视频| 999久久久精品免费观看国产| 搡老妇女老女人老熟妇| 亚洲欧美日韩高清在线视频| 久久精品aⅴ一区二区三区四区| 亚洲国产中文字幕在线视频| 国产真人三级小视频在线观看| 亚洲成国产人片在线观看| 成人三级黄色视频| 欧美一级毛片孕妇| www.自偷自拍.com| 俺也久久电影网| 亚洲va日本ⅴa欧美va伊人久久| 久久精品影院6| √禁漫天堂资源中文www| 国产精品久久久久久亚洲av鲁大| 俺也久久电影网| 天天一区二区日本电影三级| 19禁男女啪啪无遮挡网站| 丰满人妻熟妇乱又伦精品不卡| 国产三级在线视频| 真人一进一出gif抽搐免费| 老司机在亚洲福利影院| 天天添夜夜摸| 淫妇啪啪啪对白视频| 日韩 欧美 亚洲 中文字幕| 99热6这里只有精品| 999久久久精品免费观看国产| 99久久无色码亚洲精品果冻| 99久久99久久久精品蜜桃| 国产私拍福利视频在线观看| 99久久综合精品五月天人人| 久久久久久人人人人人| 日韩高清综合在线| 国产精品国产高清国产av| 黑丝袜美女国产一区| 亚洲在线自拍视频| 精品不卡国产一区二区三区| 91av网站免费观看| 精品高清国产在线一区| 精品乱码久久久久久99久播| 色综合欧美亚洲国产小说| 亚洲全国av大片| 大香蕉久久成人网| 又黄又爽又免费观看的视频| 精品久久久久久久毛片微露脸| 观看免费一级毛片| 久久精品夜夜夜夜夜久久蜜豆 | 国产精品二区激情视频| 精品久久久久久成人av| 免费看a级黄色片| 免费在线观看黄色视频的| 国产亚洲精品久久久久久毛片| 中文字幕另类日韩欧美亚洲嫩草| 精品久久久久久久人妻蜜臀av| 亚洲av美国av| 成人18禁在线播放| 亚洲国产看品久久| 首页视频小说图片口味搜索| 好男人电影高清在线观看| 一区二区三区精品91| 一级a爱视频在线免费观看| 搡老妇女老女人老熟妇| 亚洲av片天天在线观看| 19禁男女啪啪无遮挡网站| 黑人欧美特级aaaaaa片| 国内揄拍国产精品人妻在线 | 亚洲中文日韩欧美视频| 88av欧美| 日韩欧美国产在线观看| 亚洲片人在线观看| 91麻豆av在线| 亚洲欧美日韩无卡精品| 免费在线观看亚洲国产| 天天躁夜夜躁狠狠躁躁| 欧美人与性动交α欧美精品济南到| 女同久久另类99精品国产91| 欧美黑人巨大hd| 曰老女人黄片| 亚洲欧美一区二区三区黑人| 国产亚洲精品一区二区www| videosex国产| 国产精品野战在线观看| 哪里可以看免费的av片| 九色国产91popny在线| 国产91精品成人一区二区三区| 久久伊人香网站| 亚洲片人在线观看| 91麻豆av在线| 国产又爽黄色视频| 欧美中文日本在线观看视频| 午夜影院日韩av| 最新在线观看一区二区三区| 此物有八面人人有两片| bbb黄色大片| 伊人久久大香线蕉亚洲五| 在线观看免费午夜福利视频| 少妇粗大呻吟视频| 制服诱惑二区| 在线观看www视频免费| 一区二区三区精品91| 国产亚洲精品久久久久久毛片| 一边摸一边抽搐一进一小说| 亚洲专区国产一区二区| 一级片免费观看大全| 欧美不卡视频在线免费观看 | 少妇裸体淫交视频免费看高清 | 国产视频内射| 国产野战对白在线观看| 国产视频内射| 精品久久久久久,| 欧美中文日本在线观看视频| 无遮挡黄片免费观看| 国产97色在线日韩免费| 村上凉子中文字幕在线| 日本撒尿小便嘘嘘汇集6| 男女午夜视频在线观看| 欧美黄色淫秽网站| 国产又爽黄色视频| 亚洲avbb在线观看| 草草在线视频免费看| 亚洲欧洲精品一区二区精品久久久| 久久天堂一区二区三区四区| 制服人妻中文乱码| 男女床上黄色一级片免费看| 人妻丰满熟妇av一区二区三区| 19禁男女啪啪无遮挡网站| 国产精品野战在线观看| 91成年电影在线观看| 香蕉久久夜色| 18禁美女被吸乳视频| 欧美日韩精品网址| 欧美成人一区二区免费高清观看 | 丝袜人妻中文字幕| 动漫黄色视频在线观看|