    Numerical stress-deformation analysis of cut-off wall in clay-core rockfill dam on thick overburden

    2016-04-18 10:34:53ZijinWngErihBuer
    Water Science and Engineering 2016年3期

    *,Zi-jin Wng,Erih Buer

    aCollege of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210098,China

    bZhejiang Design Institute of Conservancy and Hydroelectric Power,Hangzhou 310002,China

    cInstitute of Applied Mechanics,Graz University of Technology,Graz 8010,Austria

    Numerical stress-deformation analysis of cut-off wall in clay-core rockfill dam on thick overburden

    Si-hong Liua,Liu-jiang Wanga,*,Zi-jian Wangb,Erich Bauerc

    aCollege of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210098,China

    bZhejiang Design Institute of Conservancy and Hydroelectric Power,Hangzhou 310002,China

    cInstitute of Applied Mechanics,Graz University of Technology,Graz 8010,Austria

    Available online 10 November 2016

    The cut-off wall in a clay-core rockfill dam built on a thick overburden layer is subjected to a large compressive pressure under the action of the loads such as the dead weight of both the dam and the overburden layer,the frictional force induced by the differential settlement between the cut-off wall and surrounding soils,and the water pressure.Thus,reduction of the stress of the cut-off wall has become one of the main problems for consideration in engineering design.In this paper,numerical analysis of a core rockfill dam built on a thick overburden layer was conducted and some factors inf l uencing the stress-strain behaviors of the cut-off wall were investigated.The factors include the improvement of the overburden layer,the modeling approach for interfacial contact between the cut-off wall and surrounding soils,the modulus of the cut-off wall concrete,and the connected pattern between the cut-off wall and the clay core.The result shows that improving the overburden layer, selecting plastic concrete with a low modulus and high strength,and optimizing the connection between the cut-off wall and the clay core of the dam are effective measures of reducing the deformations and compressive stresses of the cut-off wall.In addition,both the Goodman element and the mud-layer element are suitable for simulating the interfacial contact between the cut-off wall and surrounding soils.

    Overburden layer;Core rockfill dam;Cut-off wall;Numerical analysis;Stress and deformation analysis

    1.Introduction

    In recent years,the number of clay-core rockfill dams built on a thick overburden layer has been increasing gradually.The anti-seepage treatment of the thick overburden layer is very important in the design of these dam projects for ensuring safe operation.In general,there are two methods of treatment:one is to excavate the overburden deposits under the clay core,and the other is to build concrete cut-off walls inside the overburden deposits.The latter is now widely used in China(Gao, 2000).As the concrete cut-off wall is built under the clay core, it is subjected to the large dead load of the upper dam body and the water head difference between upstream and downstream water level during the construction and impounding.As a result,the stress-deformation characteristics of cut-off walls are very complex.

    A centrifugal model test,field monitoring,and the numerical analysis method have usually been used to study the behavior of cut-off walls.For example,the interaction mechanism between the cut-off wall and surrounding soils in the upstream cofferdam of the Three Gorges Project has been investigated through a centrifugal model test and numerical analysis(Bao,2007).The strain and deformation of this cut-off wall were monitored(Zhang et al.,2000;Cheng,2004). Many numerical analyses have been carried out to investigate the interaction of overburden soils and the cut-off wall,and the inf l uence of the cut-off wall's thickness,the properties of alluvium deposits,the valley boundary,and the cut-off wall construction sequence on the stress-deformation behaviors of cut-off walls(Lu and Wang,1998;Wang et al.,2006;Li et al., 2007;Jia et al.,2008;Pan et al.,2013;Ding et al.,2013).

    In this study,numerical analysis of a clay-core rockfill dam built on a deep overburden layer was conducted and some factors affecting the stress-strain behaviors of the cut-off wall were investigated comprehensively.The factors investigated include the improvementofthe overburden layer,the modeling approach for interfacial contact between the cut-off wall and its surrounding soil,the modulus of cut-off wall concrete,and the connected pattern between the cut-off wall and the clay core.

    2.Finite element analysis for rockfill dam

    In this study,two-dimensional finite element analysis was carried out on a clay-core rockfill dam,which was built on an overburden layer with a thickness ranging from 39.5 m to 81.3 m.Fig.1 shows a typical cross-section of this rockfill dam.The dam had a height of 120 m and a crest width of 12 m.Both the upstream and downstream slopes were 1:2.The slopes of the core wall,f i lter zones,and transition zones were 1:0.25.The normal water storage level of the dam reservoir is 2485 m.The overburden layer of the dam foundation is composed of sand alluvium and talus deposit.Along the depth, the overburden foundation is divided into six layers:layer 1, spreading over the river bed,is composed of sand and gravel with a loose structure and moderate permeability;layer 2 is composed of silty clay with a percentage of silt of 54%and a percentage of clay of 26%;layers 3 and 4 are composed of coarse sand that contains gravel and gravel that contains mud, with a loose structure and moderate permeability;layer 5 is composed of coarse sand that contains gravel with a percentage of silt of 32%and a percentage of clay of 8%;and layer 6 is composed of gravel that contains mud with a loose structure and moderate permeability.

    Layers 1 and 2 were excavated,and layer 3 was improved using vibro-replacement stone columns.Meanwhile,a 1.2 mthick concrete cut-off wall,embedded in the bedrock with a depth of 0.5 m,was constructed inside the overburden layer. The curtain grouting was carried out in the bedrock under the cut-off wall to ensure a reliable connection between the cut-off wall and the bedrock.The cut-off wall was connected with the clay core of the dam through a gallery.

    Static and dynamic analysis software for the dam's stress and seepage(Liu,2008;Xiang et al.,1991),which was developed on the basis of the Biot consolidation theory for saturated soils to take into account the coupling between the seepage and the stress field,was used in this study.

    The finite element mesh for the dam body and the overburden foundation consisted of 2631 elements and 2523 nodes. As shown in Fig.2,four columns of meshes were used for the 1.2 m-thick cut-off wall and 136 contact elements were arranged between the cut-off wall and surrounding soils.If the hollow junction was used for the connection between the cutoff wall and clay core,the modulus in the shadow area on the right side of Fig.2 was set to be 0.According to the processes of dam construction and impounding,34 steps were set in the fi nite element calculation.The process of dam fi lling from the dam base to an elevation of 2440.0 m was simulated in the fi rst 14 steps,which took 495 days.Then,the process of impounding from the river bed to an elevation of 2437.0 m was simulated in steps 15 to 20,which took 30 days.After that,the process of the dam filling from the elevation 2440.0 m to an elevation of 2480.0 m was simulated in steps 21—28, which took 285 days.The process of impounding from the elevation 2437.0 m to 2475.0 m was simulated in the last f i ve steps,which took 60 days.In the simulation of impounding, the water pressure and water head were applied on the upstream face of the clay core.

    The consolidated settlement of the overburden foundation has already been stable over hundreds of thousands of years. Thus,the displacement of the overburden foundation was set to zero at the beginning of the calculation.However,the initial earth stress of the overburden foundation should be considered.It was calculated using the unbalanced force iterative method.

    Fig.1.Typical cross-section of rockfill dam.

    Fig.2.Finite element mesh at top of cut-off wall.

    In the calculation,the linear elastic model was used for the concrete cut-off wall,with the elastic modulus E being 22 GPa and the Poisson's ratio being 0.167.The Duncan-Chang(E-B) model was used for rockfill materials(Duncan and Chang, 1970).The Young's modulus E and bulk modulus Btof this constitutive model are expressed as

    Under unloading and reloading conditions,the elastic modulus E is expressed as

    where σ1and σ3are the major and minor principle stresses, respectively;pais the atmosphere pressure;Rfis the failure ratio;K is the modulus number;Kbis the bulk modulus number;n and m are the exponents;Kuris the modulus number under unloading and reloading conditions;φ is the internal friction angle,and φ=φ0-Δφlg(σ3/pa),with φ0being the initial internal friction angle and Δφ being the increment of internal friction angle;and c is the cohesive strength.The parameters determined by laboratory tests are shown in Table 1,where ρ is the density and ksis the permeability coeff i cient.

    3.Results and discussion

    3.1.Stress and deformation of dam

    Fig.3 shows the contour distributions of the settlement and the major principal stress of the dam(including the overburden foundation)after impounding.The maximum settlement of the dam is 170 cm,occurring at the downstream side near the top surface of the overburden foundation.

    For the clay-core rockfill dam located on the hard bedrock, an inconsistent deformation between the clay core and its adjacent rockfill probably occurs due to their different deformation moduli.Therefore,the stress in the clay core will be partly transferred to the adjacent rockfill,this is the so-called arching effect.However,for the dam analyzed in this study, due to the large compression deformation of the overburden layer and the uplift force from the cut-off wall,the arching effect between the clay core and the adjacent rockfill is not pronounced(Fig.3).That is to say,the thick overburden layer plays an important role in reducing the arching effect.

    3.2.Effect of improvement of overburden layer on stress-strain behaviors of cut-off wall

    As the deformation modulus of the overburden layer is much lower than that of the concrete cut-off wall,the settlement of the overburden layer caused by dam filling and impounding will be larger than that of the concrete cut-off wall.Therefore,an uneven settlement exists between the cut-off wall and the foundation,resulting in friction between the cut-off wall and the surrounding foundation.This friction is the major load affecting the stress and deformation of the cut-off wall.

    To reduce this uneven settlement,the overburden layer near the surface should be reinforced.In this project,layers 1 and 2 are excavated,and layer 3,composed of coarse sand thatcontains gravel,was improved with vibro-replacement stone columns.Based on experiences from similar projects,the main parameters of the E-B model for the improved layer 3 were considered to be K=800,Kb=350,and m=0.05.Meanwhile,a scheme without improvement of layer 3 was also investigated to verify the improvement effect,and the corresponding parameters were set to be K=250,Kb=72,and m=0.26.

    Table 1Parameters in calculation.

    Fig.3.Contours of settlement and major principal stress after impounding.

    Table 2 shows the comparison of the displacements at the top of the cut-off wall with and without improvement of the overburden layer 3.Both the horizontal displacement and vertical displacement(settlement)are reduced signif i cantly after the overburden layer 3 is improved.Table 3 shows the comparison of the principal stresses of the cut-off wall with and without improvement of the overburden layer 3.Fig.4 shows the distribution of the major and minor principal stresses of the cut-off wall along the depth with and without improvement of the overburden layer 3 at completion of the dam.It can be seen that,after the improvement of the overburden layer 3,the major principal stress(compression)of the cut-off wall is reduced signif i cantly,with a mean decrease of 5—10 MPa along the depth.Therefore,the crushing of the cutoff wall can be diminished effectively with the improvement of layer 3.On the other hand,the minor principal stress of the cut-off wall changes slightly.

    Fig.4.Distribution of principal stresses of cut-off wall along depth with and without improvement of overburden layer 3 at completion of dam.

    Table 2Comparison of displacements at top of cut-off wall with and without improvement of overburden layer 3.

    Table 3Comparison of major and minor principal stresses of cut-off wall with and without improvement of overburden layer 3.

    Fig.5.Comparison of settlement of alluvium deposit with and without improvement of overburden layer 3.

    Figs.5 and 6 show the settlements and the contours of the major principal stress of the alluvium deposit with and without improvement of the overburden layer 3,respectively.As we can see from these two f i gures,the settlement in the improved overburden layer is reduced signif i cantly,while the major principal stresses in the improved foundation increase.That is to say,when the foundation is improved,the stresses caused by the dam filling and impounding increase in the overburden layer and decrease in the cut-off wall,resulting in the decrease of the arching effect between the cut-off wall and its surrounding rock/soils.Therefore,the improvement of the overburden layerisan effective measure ofreducing the deformations and compressive stresses of the cut-off wall.

    3.3.Inf l uence of interface elements between cut-off wall and surrounding soils on stress-strain behaviors of cutoff wall

    Due to the large differences in the deformation moduli for different materials,the displacements of the cut-off wall and its surrounding soilsare obviously inconsistent.Therefore, methods of simulating the interfacial contact between the cutoff wall and its surrounding soils are highly important.In the numerical study,three different interface elements were investigated:the Goodman element with a finite thickness (Goodman et al.,1968),the mud-layer element(Li et al.,2007), and the frictionless element.The Goodman element is the most widely used to simulate interfacial contact between two materials that have greatly different moduli.The thickness of this element is zero.During the construction of the cut-off wall,a mud layer is usually produced between the cut-off wall and foundation,which inf l uences the mechanical behavior of the interface and changes the loads on the cut-off wall and foundation.For the cofferdam in the Miyun Reservoir,it was found that the thickness of the mud layer at the interfacial contact between the cut-off wall and its surrounding soils was about 3—5cm,andthemudadheredtothecut-offwallwasinaplastic state with extremely low shear strength.In this analysis,the mud-layer element was adapted and the thickness of the mudlayer element was set to 3 cm.In order to evaluate the inf l uence of the friction force on the cut-off wall,a frictionless elementwasusedforcontrasting,withtheassumptionthatthere was no friction between the cut-off wall and its surrounding soils.In this study,the parameters for both the Goodman element and the mud-layer element were respectively taken from the PubugouDam(Chen et al.,2005)and the cofferdam in the Three Gorges Project(Li and Cheng,2005),as listed in Table 1.For the frictionless element,the shear modulus along the interface was set to zero.

    Table 4 shows the principal stresses of the cut-off wall simulated using three different interface elements.Fig.7 shows the distribution of the principal stresses of the cut-off wall simulated using three different interface elements at completion of the dam.The results show that the principal stresses of the cut-off wall simulated using the frictionless elements are distributed evenly along the depth and their values are lower than those simulated using other two interface elements.When the frictionless elements are used,the stresses of the cut-off wall are mainly caused by the self-weight of the dam and the water pressure;the friction between the cut-off wall and its surrounding soils is neglected.The principal stresses in the cutoff wall simulated using the Goodman elements and the mudlayer elements are almost the same,indicating that these two interface elements are suitable for simulating the contact between the cut-off wall and its surrounding soils.

    3.4.Inf l uence of elastic modulus of cut-off wall concrete on stress-strain behaviors of cut-off wall

    There are two kinds of concretes that are frequently used for cut-off walls:normal concrete and plastic concrete.The elastic modulus of normal concrete is about 25.5—36.0 GPa, which is 5—10 times larger than that of plastic concrete.In this study,three different elastic moduli of cut-off wall concrete (10 GPa,22 GPa,and 35 GPa)were selected to investigate their inf l uence on the stress-strain behavior of the cut-off wall.

    Fig.6.Contours of major principal stress in alluvium deposit with and without improvement of overburden layer 3(units:MPa).

    Table 4Major and minor principal stresses of cut-off wall simulated with different interface elements between cut-off wall and its surrounding soils.

    Fig.7.Distribution of major and minor principal stresses of cut-off wall along depth calculated by different interface elements between cut-off wall and its surrounding soils at completion of dam.

    Table 5 shows a comparison of the displacements at the top of the cut-off wall with different elastic moduli of concrete.It can be seen that the vertical displacement(settlement)of the cut-off wall increases with the decreasing elastic modulus of concrete,while the horizontal displacement of the cut-off wall changes slightly with different elastic moduli of concrete. Table 6 shows the principal stresses of the cut-off wall with different elastic moduli of concrete.Fig.8 shows the distribution of the principal stresses of the cut-off wall with different elastic moduli of concrete at the completion of the dam.The results show that the major principal stress of the cut-off wall increases with the elastic modulus of concrete, while the minor principal stress is not much affected by the elastic modulus of concrete.The reduction of the major principal stress of the cut-off wall with a low elastic modulus of concrete is mainly attributed to the decrease of the relative settlement between cut-off wall and surrounding soils.

    Fig.8.Distribution of major and minor principal stresses of cut-off wall with different elastic moduli along depth at completion of dam.

    For common concrete,the strength increases with the elastic modulus.In this case,although the compressive stress of the cut-off wall decreases when concrete with a lower elastic modulus is used,the crushing of the cut-off wall may occur if the compressive stress exceeds the compressive strength of the cut-off wall.Therefore,selection of a reasonable plastic concrete,preferably with a lower modulus andrelatively higher compressive strength,is very important in the construction of cut-off walls.

    Table 5Comparison of displacement at top of cut-off wall with different concrete elastic moduli.

    3.5.Inf l uence of connection between cut-off wall and clay core on stress-strain behavior of cut-off wall

    In addition to the interfacial friction,the weight of the dam body and the water pressure are also main loads acting on a cut-off wall.Thus,proper selection of the connection between the cut-off wall and the clay core is important to improving the stress states of the cut-off wall,especially near the connecting part.

    In practice,there may be three different connections between a cut-off wall and a clay core:the gallery junction, hollow junction,and direct plug-in connection,which induce different stresses in the cut-off wall.The gallery junction means that the top of the cut-off wall is directly connected to the bottom of a gallery.The hollow junction is meant to leave a 0.5-m space between the top of the cut-off wall and the bottom of the gallery and set the elastic modulus of the elements in the space to be zero,as shown in Fig.2.The plug-in junction is meant to directly insert the cut-off wall 12 m into the clay core.

    Fig.9 shows the distributions of the calculated principal stresses of the cut-off wall along the depth with these three connections.It can be seen that the compressive stresses are produced in the cut-off wall with these three connections,and they gradually increase with the depth.The major principal stress produced in the cut-off wall is lowest when the plug-in junction is used,and highest when the gallery junction is used. The minor principal stress produced in the cut-off wall is highest when the plug-in junction is used,and it is nearly the same when the other two junctions are used.Therefore,from the perspective of the stress of the cut-off wall,the plug-in junction is best for the connection between the cut-off wall and the clay core.However,in practical engineering,the gallery is necessary for arrangement of instrumental equipment and the foundation grouting.When the gallery is applied, the hollow junction can effectively reduce the compressive stress near the upper bottom side of the cut-off wall,but its detailed design may be very complex.Thus,selection of a proper connection is important in the real project.

    Fig.9.Distribution of principal stresses of cut-off wall along depth under different connections between cut-off wall and clay core.

    4.Conclusions

    In this paper,numerical analysis of a core rockfill dam built on a thick overburden deposit was conducted,and the effects of some factors on the stress-strain behavior of the cut-off wall were studied.The main conclusions are as follows:

    (1)There is uneven settlement between the cut-off wall and the foundation,resulting in friction between the cut-off wall and the surrounding foundation.With the improvement of the overburden layer near the surface of the dam foundation,this uneven settlement and frictional force are effectively reduced, and the compressive stress of the cut-off wall along the depth is decreased by about 5—10 MPa.

    (2)The frictional force between the cut-off wall and its surrounding soils should be considered in the simulation of the stress-strain behavior of the cut-off wall to ensure the accuracy of the stress in the cut-off wall,and both the Goodman element and mud-layer element are suitable for simulating the interfacial contact.

    (3)With the decrease of the elastic modulus of concrete, the uneven settlement and f i ctional force between the cut-off wall and its surrounding soils decrease,resulting in the reduction of the compressive stress in the cut-off wall. Therefore,the low-modulus concrete whose stiffness is close to the foundation's stiffness is recommended for use in the construction of the cut-off wall,if the compressive strength of concrete is large enough to prevent crushing.

    (4)The compressive stress of the cut-off wall changes signif i cantly when different connections between the cut-off wall and the clay core are used.Compared with the gallery junction,the plug-in junction can effectively reduce the compressive stress of the cut-off wall along the depth,and the hollow junction can reduce the compressive stress near the upper bottom side of the cut-off wall.

    Acknowledgements

    We would like to express our appreciation to Yue-min Zhang and Wen Long at Beijing Guardian Water Power Engineering Co.,Ltd.for giving some important suggestions for this paper.

    Bao,C.G.,2007.Bao Chenggang Selected Papers on Study of Geotechnical Engineering.Changjiang Press,Wuhan(in Chinese).

    Chen,G.,Ma,G.W.,Fu,X.Y.,Li,J.L.,Chen,J.Y.,2005.Research for the joint type by gallery between dam imperious wall and clay core of Pubugou Project.J.Sichuan Univ.37(5),32—36(in Chinese).

    Cheng,Z.L.,2004.Strain status of vertical impervious wall in TGP stage-2 upstream cofferdam.J.Yangtze River Sci.Res.Inst.21(6),31—37(in Chinese).

    Ding,Y.H.,Zhang,Q.G.,Zhang,B.Y.,2013.FEM analysis of stressdeformation characteristics of cut-off walls in high core rockfill dam.J. Hydroelectr.Eng.32(3),162—167(in Chinese).

    Duncan,J.M.,Chang,C.Y.,1970.Non-linear analysis of stress and strain in soils.J.Soil Mech.Found.Div.96(5),1629—1653.

    Gao,Z.P.,2000.Cutoff Wall of the Dam.China Electric Power Press,Beijing (in Chinese).

    Goodman,R.E.,Taylor,R.L.,Brekke,T.L.,1968.A model for the mechanics of jointed rock.J.Soil Mech.Found.Div.94(3),637—659.

    Jia,H.,He,S.B.,Wu,X.Y.,Zhu,J.G.,2008.Stress deformation analysis for the cutoff wall in foundation of Changheba core-rockfill dam.J.Water Resour.Water Eng.19(3),72—75(in Chinese).

    Li,N.H.,Mi,Z.K.,Sun,D.W.,2007.Study on affecting factors of stressdeformation of diaphragm walls for concrete face rockfill dams built on thickalluviumdeposit.Chin.J.GeotechnicalEng.29(1),26—31(inChinese).

    Li,Q.Y.,Cheng,Z.L.,2005.Analysis of the behaviour of stage II cofferdam of TGP.Chin.J.Geotechnical Eng.27(4),410—413(in Chinese).

    Liu,S.H.,2008.Research on the Visible Finite Element Code for Rockfill Dam.Hohai University,Nanjing(in Chinese).

    Lu,T.H.,Wang,R.D.,1998.Stress and deformation of concrete cut-off wall in Pubugou Earth-Rockfill Dam.J.Hohai Univ.(Nat.Sci.)26(2),41—44(in Chinese).

    Pan,Y.,He,Y.L.,Zhou,X.X.,Cao,X.X.,2013.Analysis of effect of canyon terrain on stress and displacement of cutoff wall in dam foundation with deep overburden.Rock Soil Mech.34(7),2023—2030(in Chinese).

    Wang,G.,Zhang,J.M.,Pu,J.L.,2006.An evaluation of the factors inf l uencing the stress and deformation of concrete diaphragm wall in dams.China Civ. Eng.J.39(4),73—77(in Chinese).

    Xiang,D.R.,Shao,S.G.,Liu,S.H.,Zhu,J.G.,1991.3D Finite Element Code TDAD for Rockfill Dam.Beijing Science and Technology Press,Beijing (in Chinese).

    Zhang,X.P.,Bao,C.G.,Zhang,J.S.,2000.The displacement and operation of impervious cores in phase-II cofferdam of Three Gorges Project.J.Hydraulic Eng.31(9),91—96(in Chinese).

    Received 12 September 2015;accepted 16 January 2016

    This work was supported by the National Natural Science Foundation of China(Grant No.51379066),the Fundamental Research Funds for the Central Universities(Grant No.2016B03514),the National Key Technology Support Program(Grant No.2015BAB07B05),and the Key Laboratory of Earth-Rock Dam Failure Mechanism and Safety Control Techniques(Grant No.YK913007).

    *Corresponding author.

    E-mail address:15850514642@163.com(Liu-jiang Wang).

    Peer review under responsibility of Hohai University.

    http://dx.doi.org/10.1016/j.wse.2016.11.002

    1674-2370/?2016 Hohai University.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http:// creativecommons.org/licenses/by-nc-nd/4.0/).

    ?2016 Hohai University.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http:// creativecommons.org/licenses/by-nc-nd/4.0/).

    国产精品电影一区二区三区| 国产亚洲精品综合一区在线观看| 国产精品一及| 午夜免费激情av| 国产伦精品一区二区三区四那| 18禁观看日本| 母亲3免费完整高清在线观看| 小蜜桃在线观看免费完整版高清| 欧美黄色片欧美黄色片| 99精品在免费线老司机午夜| 听说在线观看完整版免费高清| 亚洲人成网站高清观看| 精品久久久久久,| 欧美中文综合在线视频| 一个人免费在线观看的高清视频| 搞女人的毛片| cao死你这个sao货| 国产三级中文精品| 熟妇人妻久久中文字幕3abv| 久久天躁狠狠躁夜夜2o2o| 熟女电影av网| а√天堂www在线а√下载| 人妻夜夜爽99麻豆av| 婷婷丁香在线五月| а√天堂www在线а√下载| 日本免费一区二区三区高清不卡| 白带黄色成豆腐渣| 超碰成人久久| 99国产精品99久久久久| 欧美一级a爱片免费观看看| 老司机午夜福利在线观看视频| 两人在一起打扑克的视频| 麻豆av在线久日| 精品熟女少妇八av免费久了| 一二三四社区在线视频社区8| avwww免费| 国产男靠女视频免费网站| 男人舔女人下体高潮全视频| 宅男免费午夜| 久久久国产精品麻豆| 日本黄大片高清| 亚洲 国产 在线| 18禁观看日本| 国产精品久久久久久亚洲av鲁大| 久久精品91蜜桃| 两个人的视频大全免费| 亚洲自偷自拍图片 自拍| 国产欧美日韩精品一区二区| 国产 一区 欧美 日韩| 国产成人av教育| 亚洲色图av天堂| 久久精品亚洲精品国产色婷小说| 小蜜桃在线观看免费完整版高清| 中文字幕久久专区| 婷婷六月久久综合丁香| 九九在线视频观看精品| 国产精品99久久久久久久久| 国产精品野战在线观看| 高清在线国产一区| 亚洲第一欧美日韩一区二区三区| 中国美女看黄片| 国产99白浆流出| 久久精品亚洲精品国产色婷小说| 欧美乱色亚洲激情| 免费在线观看视频国产中文字幕亚洲| 香蕉久久夜色| 亚洲午夜理论影院| 久久精品国产综合久久久| 免费观看精品视频网站| 成人亚洲精品av一区二区| 老司机午夜十八禁免费视频| 99久久国产精品久久久| 国产麻豆成人av免费视频| 欧美黑人巨大hd| 亚洲av成人av| 男女床上黄色一级片免费看| 久久精品国产亚洲av香蕉五月| 亚洲美女视频黄频| 一a级毛片在线观看| 久久国产乱子伦精品免费另类| 欧美日本亚洲视频在线播放| 神马国产精品三级电影在线观看| 男人舔奶头视频| 日韩免费av在线播放| 国产精品99久久久久久久久| 可以在线观看毛片的网站| 久久久久国内视频| 琪琪午夜伦伦电影理论片6080| 他把我摸到了高潮在线观看| 18禁黄网站禁片免费观看直播| 国产一区二区三区视频了| 999久久久精品免费观看国产| 久久精品91蜜桃| 一区二区三区激情视频| 国产精品乱码一区二三区的特点| 国产免费男女视频| 欧美日韩瑟瑟在线播放| 精品国内亚洲2022精品成人| 美女被艹到高潮喷水动态| 精品国产乱子伦一区二区三区| 最新美女视频免费是黄的| 欧美国产日韩亚洲一区| 亚洲国产精品久久男人天堂| 欧美3d第一页| 国产69精品久久久久777片 | xxxwww97欧美| xxxwww97欧美| 观看美女的网站| 久久99热这里只有精品18| 99re在线观看精品视频| 精品一区二区三区视频在线观看免费| 亚洲专区字幕在线| 老司机午夜十八禁免费视频| 国产成人aa在线观看| 午夜精品久久久久久毛片777| 嫁个100分男人电影在线观看| 免费观看的影片在线观看| 色吧在线观看| 又紧又爽又黄一区二区| 免费无遮挡裸体视频| 又黄又粗又硬又大视频| 少妇熟女aⅴ在线视频| 搡老熟女国产l中国老女人| 一级毛片高清免费大全| 看黄色毛片网站| 三级男女做爰猛烈吃奶摸视频| 悠悠久久av| 国产一区在线观看成人免费| 最新中文字幕久久久久 | 丝袜人妻中文字幕| 别揉我奶头~嗯~啊~动态视频| 国产视频内射| 亚洲国产精品久久男人天堂| 9191精品国产免费久久| 12—13女人毛片做爰片一| 国产精品香港三级国产av潘金莲| 99在线人妻在线中文字幕| 日日干狠狠操夜夜爽| 国产精华一区二区三区| 欧美色欧美亚洲另类二区| 成人亚洲精品av一区二区| 国产精品电影一区二区三区| 精品福利观看| 无遮挡黄片免费观看| 亚洲av成人av| 午夜亚洲福利在线播放| 国产美女午夜福利| 亚洲在线观看片| 国内精品一区二区在线观看| 国产一区二区三区视频了| 淫妇啪啪啪对白视频| 欧美日韩综合久久久久久 | 国产欧美日韩精品亚洲av| 怎么达到女性高潮| 中文亚洲av片在线观看爽| 欧美一区二区国产精品久久精品| 美女免费视频网站| 波多野结衣高清作品| 亚洲国产欧美一区二区综合| 亚洲一区高清亚洲精品| 99久久精品一区二区三区| av天堂中文字幕网| 无遮挡黄片免费观看| 床上黄色一级片| 成人无遮挡网站| 校园春色视频在线观看| 国产亚洲精品一区二区www| 亚洲成人久久性| 一进一出好大好爽视频| cao死你这个sao货| 国产成人av教育| 一级毛片女人18水好多| 国产精品98久久久久久宅男小说| 男人舔女人的私密视频| 久久中文看片网| 色精品久久人妻99蜜桃| 国产单亲对白刺激| 99国产精品99久久久久| 老司机在亚洲福利影院| 国产不卡一卡二| av天堂中文字幕网| 婷婷亚洲欧美| 国产野战对白在线观看| 舔av片在线| 别揉我奶头~嗯~啊~动态视频| 国产aⅴ精品一区二区三区波| 国产精品1区2区在线观看.| 最新中文字幕久久久久 | 两人在一起打扑克的视频| 国产激情偷乱视频一区二区| 麻豆成人av在线观看| 美女午夜性视频免费| 91av网站免费观看| 熟女人妻精品中文字幕| 91老司机精品| 小说图片视频综合网站| 国产精品av视频在线免费观看| 精品乱码久久久久久99久播| 18美女黄网站色大片免费观看| 精品午夜福利视频在线观看一区| 99热精品在线国产| 免费在线观看影片大全网站| 日韩欧美一区二区三区在线观看| 日本 av在线| 久久久精品欧美日韩精品| 两性夫妻黄色片| 又爽又黄无遮挡网站| 亚洲成av人片在线播放无| 两个人的视频大全免费| 亚洲av成人av| 欧美成狂野欧美在线观看| 黑人欧美特级aaaaaa片| 黑人巨大精品欧美一区二区mp4| 一区福利在线观看| 男女之事视频高清在线观看| 国产成人一区二区三区免费视频网站| 人妻丰满熟妇av一区二区三区| 午夜福利在线观看免费完整高清在 | 国产激情久久老熟女| 成人高潮视频无遮挡免费网站| 国产男靠女视频免费网站| 视频区欧美日本亚洲| 成人性生交大片免费视频hd| 中文在线观看免费www的网站| 欧美日韩综合久久久久久 | 国产精品久久久av美女十八| 亚洲精品美女久久av网站| 好男人在线观看高清免费视频| 天堂网av新在线| 999久久久国产精品视频| 中文字幕人妻丝袜一区二区| 精品欧美国产一区二区三| 观看免费一级毛片| 欧美日韩精品网址| 99久久久亚洲精品蜜臀av| 99热只有精品国产| 国产成人精品无人区| 狂野欧美白嫩少妇大欣赏| 老司机午夜福利在线观看视频| 精品午夜福利视频在线观看一区| 一二三四在线观看免费中文在| 男女床上黄色一级片免费看| x7x7x7水蜜桃| 国产免费男女视频| 熟女电影av网| 在线视频色国产色| 视频区欧美日本亚洲| 亚洲国产欧美人成| 亚洲自偷自拍图片 自拍| ponron亚洲| 国产精品爽爽va在线观看网站| 变态另类丝袜制服| 日韩高清综合在线| 制服人妻中文乱码| 免费无遮挡裸体视频| 男女做爰动态图高潮gif福利片| 90打野战视频偷拍视频| 欧美成狂野欧美在线观看| 两个人看的免费小视频| 国产一区二区三区视频了| 色吧在线观看| 国产精品久久久久久亚洲av鲁大| 国产精品一区二区三区四区久久| 给我免费播放毛片高清在线观看| 日韩欧美在线二视频| 国产精品一区二区精品视频观看| 精品国产三级普通话版| 久久天躁狠狠躁夜夜2o2o| 午夜成年电影在线免费观看| 变态另类成人亚洲欧美熟女| 男女做爰动态图高潮gif福利片| 夜夜爽天天搞| 久久久久精品国产欧美久久久| 曰老女人黄片| 国产精品一及| 日韩高清综合在线| 人妻丰满熟妇av一区二区三区| 少妇熟女aⅴ在线视频| 国产精品,欧美在线| 好男人在线观看高清免费视频| 亚洲中文日韩欧美视频| 国产野战对白在线观看| av视频在线观看入口| 亚洲第一电影网av| 国产视频一区二区在线看| 亚洲精品美女久久久久99蜜臀| 国产美女午夜福利| 国产午夜精品论理片| 精品久久久久久,| 亚洲国产精品成人综合色| 亚洲avbb在线观看| 日本成人三级电影网站| 国产成年人精品一区二区| 国产麻豆成人av免费视频| 黑人操中国人逼视频| 久久国产乱子伦精品免费另类| 欧美激情在线99| 欧美日本亚洲视频在线播放| 日韩精品青青久久久久久| 中文字幕熟女人妻在线| 亚洲人与动物交配视频| 亚洲国产欧美网| 女人高潮潮喷娇喘18禁视频| 精品免费久久久久久久清纯| 精品午夜福利视频在线观看一区| www日本在线高清视频| 最新中文字幕久久久久 | 久久中文字幕人妻熟女| x7x7x7水蜜桃| 亚洲一区二区三区不卡视频| 99re在线观看精品视频| 啪啪无遮挡十八禁网站| 中文字幕最新亚洲高清| 两个人的视频大全免费| 色综合站精品国产| 女警被强在线播放| 99国产精品一区二区三区| 亚洲精品在线观看二区| 日韩 欧美 亚洲 中文字幕| 男人的好看免费观看在线视频| 一级毛片高清免费大全| 精品久久久久久,| 一边摸一边抽搐一进一小说| 精品国产乱子伦一区二区三区| www.自偷自拍.com| 午夜亚洲福利在线播放| 国产精品永久免费网站| 身体一侧抽搐| 久久久久久大精品| 性欧美人与动物交配| 成年女人看的毛片在线观看| 90打野战视频偷拍视频| 免费在线观看日本一区| 动漫黄色视频在线观看| 亚洲无线在线观看| 欧美一级毛片孕妇| 99视频精品全部免费 在线 | 淫妇啪啪啪对白视频| 国产三级中文精品| 亚洲av熟女| 免费在线观看日本一区| 久久人人精品亚洲av| 国产精品女同一区二区软件 | www日本在线高清视频| 欧美黑人欧美精品刺激| 欧美3d第一页| 麻豆成人av在线观看| 亚洲国产欧洲综合997久久,| 国产成人aa在线观看| 国产伦一二天堂av在线观看| avwww免费| 国产麻豆成人av免费视频| 免费无遮挡裸体视频| 麻豆国产97在线/欧美| 精品久久蜜臀av无| 国产一区二区三区视频了| 免费观看人在逋| 男女那种视频在线观看| 在线观看66精品国产| 欧美性猛交黑人性爽| 欧美中文日本在线观看视频| 国产亚洲精品久久久久久毛片| 欧美性猛交黑人性爽| 日本在线视频免费播放| 99久久久亚洲精品蜜臀av| 天堂√8在线中文| 校园春色视频在线观看| 久久久久久人人人人人| 亚洲黑人精品在线| 在线国产一区二区在线| 亚洲美女视频黄频| 国产亚洲欧美98| 国产精品亚洲一级av第二区| 欧美性猛交╳xxx乱大交人| 国内久久婷婷六月综合欲色啪| 国产精品影院久久| a在线观看视频网站| 成人精品一区二区免费| 久久久成人免费电影| tocl精华| 免费在线观看视频国产中文字幕亚洲| 亚洲精品色激情综合| 99久久国产精品久久久| 免费在线观看视频国产中文字幕亚洲| 国产欧美日韩一区二区三| 成年免费大片在线观看| 亚洲熟女毛片儿| 精品国产乱码久久久久久男人| 久久久久久久久免费视频了| 国产三级在线视频| 两性夫妻黄色片| 网址你懂的国产日韩在线| 国产精品av久久久久免费| xxx96com| 国产野战对白在线观看| 别揉我奶头~嗯~啊~动态视频| 国产精品98久久久久久宅男小说| 久久精品综合一区二区三区| 国内久久婷婷六月综合欲色啪| 亚洲真实伦在线观看| 男插女下体视频免费在线播放| 一本综合久久免费| 国产精品一区二区三区四区久久| 精品日产1卡2卡| 男人舔女人的私密视频| 成人无遮挡网站| 日韩欧美在线乱码| 男女做爰动态图高潮gif福利片| 一进一出抽搐动态| 又黄又爽又免费观看的视频| 国产成人福利小说| 特大巨黑吊av在线直播| 久久精品人妻少妇| 后天国语完整版免费观看| 婷婷精品国产亚洲av| 精品久久久久久久毛片微露脸| 制服人妻中文乱码| 丁香欧美五月| 亚洲欧美日韩高清专用| 国产精品一区二区三区四区免费观看 | 99精品久久久久人妻精品| 午夜激情欧美在线| 好看av亚洲va欧美ⅴa在| 久久国产乱子伦精品免费另类| 精品一区二区三区四区五区乱码| 亚洲熟女毛片儿| 亚洲国产欧美一区二区综合| 超碰成人久久| 综合色av麻豆| 国产高清三级在线| 亚洲美女视频黄频| 性欧美人与动物交配| 精品电影一区二区在线| 男插女下体视频免费在线播放| 婷婷亚洲欧美| 黄色视频,在线免费观看| 国产伦精品一区二区三区四那| 丰满的人妻完整版| 91麻豆av在线| av中文乱码字幕在线| 日韩有码中文字幕| 动漫黄色视频在线观看| 最近最新免费中文字幕在线| 亚洲午夜理论影院| 长腿黑丝高跟| 一本精品99久久精品77| 91av网一区二区| 一进一出抽搐动态| 亚洲成人久久性| 高清毛片免费观看视频网站| 国产午夜精品论理片| 综合色av麻豆| 黑人操中国人逼视频| 亚洲中文av在线| 国产精品电影一区二区三区| 美女黄网站色视频| 女人被狂操c到高潮| 女人高潮潮喷娇喘18禁视频| 成人av在线播放网站| 最新美女视频免费是黄的| 久久久国产欧美日韩av| 在线观看免费午夜福利视频| 老汉色∧v一级毛片| 国产亚洲精品久久久com| 又紧又爽又黄一区二区| 老鸭窝网址在线观看| 岛国在线观看网站| 国产伦人伦偷精品视频| 91在线观看av| 久久久久久大精品| 国产精品电影一区二区三区| 亚洲熟妇中文字幕五十中出| 日韩欧美国产在线观看| 日本 av在线| 色av中文字幕| 巨乳人妻的诱惑在线观看| 国产成人一区二区三区免费视频网站| 国产99白浆流出| 男插女下体视频免费在线播放| 99视频精品全部免费 在线 | 精品久久久久久久人妻蜜臀av| 中文字幕人妻丝袜一区二区| 久久热在线av| 亚洲熟妇中文字幕五十中出| 久久久久久久久免费视频了| 精品乱码久久久久久99久播| 国产高清三级在线| 中文字幕人妻丝袜一区二区| 精品国内亚洲2022精品成人| 变态另类丝袜制服| 成人一区二区视频在线观看| 19禁男女啪啪无遮挡网站| 亚洲在线自拍视频| 免费电影在线观看免费观看| 久久午夜综合久久蜜桃| 国产精品av视频在线免费观看| 国产精品久久电影中文字幕| 巨乳人妻的诱惑在线观看| 久久精品国产99精品国产亚洲性色| 午夜福利18| 国产成人欧美在线观看| 91av网一区二区| 国产日本99.免费观看| 国产野战对白在线观看| 日本黄色片子视频| 亚洲乱码一区二区免费版| 国产97色在线日韩免费| 久久国产乱子伦精品免费另类| 中出人妻视频一区二区| 搡老岳熟女国产| 成人三级做爰电影| 男女下面进入的视频免费午夜| 亚洲avbb在线观看| 亚洲片人在线观看| 亚洲国产精品久久男人天堂| 久久99热这里只有精品18| 久久伊人香网站| 日韩 欧美 亚洲 中文字幕| 老司机福利观看| 热99在线观看视频| 国产精品 欧美亚洲| 免费av毛片视频| 久久热在线av| 国产精品一区二区三区四区久久| 国产人伦9x9x在线观看| 国产精品免费一区二区三区在线| xxx96com| 国产av不卡久久| 国产探花在线观看一区二区| 欧美黄色片欧美黄色片| 91老司机精品| АⅤ资源中文在线天堂| 国产激情欧美一区二区| 国产一区二区在线av高清观看| 国产伦精品一区二区三区四那| 九九热线精品视视频播放| 99国产精品99久久久久| 黄色视频,在线免费观看| 特级一级黄色大片| 免费人成视频x8x8入口观看| 婷婷亚洲欧美| 中亚洲国语对白在线视频| av天堂中文字幕网| 桃红色精品国产亚洲av| 国产一级毛片七仙女欲春2| 欧美日韩一级在线毛片| 亚洲专区中文字幕在线| 热99re8久久精品国产| 久久久国产欧美日韩av| 亚洲avbb在线观看| 他把我摸到了高潮在线观看| 最新美女视频免费是黄的| 久久精品影院6| 国产亚洲精品综合一区在线观看| 观看美女的网站| 黄色日韩在线| 18禁裸乳无遮挡免费网站照片| 1000部很黄的大片| 非洲黑人性xxxx精品又粗又长| 男女午夜视频在线观看| 午夜福利成人在线免费观看| 在线永久观看黄色视频| 精品一区二区三区av网在线观看| 亚洲熟妇中文字幕五十中出| 成人精品一区二区免费| 在线观看美女被高潮喷水网站 | 国产高清视频在线观看网站| 国产伦精品一区二区三区四那| 香蕉丝袜av| 女同久久另类99精品国产91| 在线观看日韩欧美| 一级a爱片免费观看的视频| 伦理电影免费视频| 九色成人免费人妻av| 老司机深夜福利视频在线观看| 欧美xxxx黑人xx丫x性爽| 免费在线观看影片大全网站| 在线免费观看不下载黄p国产 | 嫩草影院入口| 悠悠久久av| 真人一进一出gif抽搐免费| 午夜视频精品福利| 非洲黑人性xxxx精品又粗又长| 欧美在线黄色| 日本一本二区三区精品| 欧美性猛交黑人性爽| 久久久久国产精品人妻aⅴ院| 国产精华一区二区三区| 男人舔奶头视频| 亚洲精品在线观看二区| 精品国产乱码久久久久久男人| 免费av不卡在线播放| 一级作爱视频免费观看| 精品久久久久久,| 伦理电影免费视频| 国产三级黄色录像| 不卡av一区二区三区| 亚洲国产欧美一区二区综合| 麻豆久久精品国产亚洲av| 99久久精品国产亚洲精品| 久久精品国产亚洲av香蕉五月| 欧美最黄视频在线播放免费| 99国产综合亚洲精品| 变态另类成人亚洲欧美熟女| 在线观看日韩欧美| 欧美在线黄色| 久久人妻av系列| 亚洲av电影在线进入| 国内精品一区二区在线观看| 免费观看的影片在线观看| 老汉色∧v一级毛片| 欧美黄色淫秽网站| 香蕉av资源在线| 亚洲av成人一区二区三| 综合色av麻豆|