    Flow hydrodynamics in embankment breach*

    2015-12-01 02:12:12ZHAOGenshengVISSERPaulRENYankaiUIJTTEWAALWimDepartmentofHydraulicEngineeringDelftUniversityofTechnology2628CNDelftTheNetherlands2FlandersHydraulicsResearchFlemishGovernmentDepartmentofMobilityandPublicWorksBerchemlei240Ant

    ZHAO Gensheng, VISSER Paul J., REN Yankai, UIJTTEWAAL Wim S. J.. Department of Hydraulic Engineering, Delft University of Technology, 2628CN, Delft, The Netherlands2. Flanders Hydraulics Research, Flemish Government Department of Mobility and Public Works,Berchemlei 5, B-240, Antwerp, Belgium, E-mail: g.zhao@tudelft.nl

    Flow hydrodynamics in embankment breach*

    ZHAO Gensheng1,2, VISSER Paul J.1, REN Yankai1, UIJTTEWAAL Wim S. J.1
    1. Department of Hydraulic Engineering, Delft University of Technology, 2628CN, Delft, The Netherlands
    2. Flanders Hydraulics Research, Flemish Government Department of Mobility and Public Works,Berchemlei 115, B-2140, Antwerp, Belgium, E-mail: g.zhao@tudelft.nl

    (Received January 21, 2015, Revised August 26, 2015)

    Breaching flow occurs during the breach development of the embankment, dike, earthen dam, landslide barrier, etc. and plays an import role in the breaching erosion as the driving force. According to the previous research, the breaching process can be classified into initiation phase, breach widening phase and breach deepening phase. Based on the breaching development classifications, the breaching flow can be seen as a special compound weir flow when the breach channel is in the relatively equilibrium condition. There were five physical flow models were designed in the hypothesis of rectangular shape and trapezoidal shape for the breach channel cross sections to study the breaching flow characteristics. The distributions of water level and velocity were measured and analysed in the breaching flows in overtopping condition and emerged condition. There were two helicoidal flows above the breach channel slopes and triangular hydraulic jump in the downstream of the breach channel in the overtopping condition and emerged condition. The hydraulic energy loss was calculated according to the breaching velocity and water level distribution in the upstream and downstream of the model. It is found that the test results of the breach flow physical model can be valuable to bring insight of the breaching process of embankment and make contributions to the validations and verifications of breach numerical models.

    embankment breach, physical model, breaching flow, helicoidal flow, hydraulic jump

    Introduction0F

    Former researchers investigated the breaching process of embankment dams using physical model,numerical model and prototype analysis[1-8]. A lot of numerical models have been developed on the basis of the former research, most of which are based on the empirical analysis and hypotheses[1-4]. The data are rare for the prototype of dam-breach and they are usually very rough. In the laboratorial scale, the researchers usually focused on the development of the breach and ignored and/ or had some difficulties to measure the hydraulic characteristics of the breach. What is more, the numerical models need to be validated and calibrated with the measurement data, especially for the breach hydraulic model.

    In the beginning of the breach, the flow usually overtops the embankment crest and starts to erode the crest surface, which is called the breach initiation. The breaching flow passes the breach initiation channel and the rest of the crest is in the initial phase of the breach. The breaching flow develops in the overtopping and/or submerged condition. It can be seen as the submerged weir flow in this phase. As the breach channel develops wider and deeper due to the erosion, the upstream water level decreases and the flow goes only in the breach channel. The breaching flow starts to develop in the emerged condition. Generally the breaching flow develops from overtopping condition in the initiation phase into emerged condition when the breach channel is enlarged due to the erosion. The overtopping condition and emerged condition can be transferred since there is a hydraulic boundary change in the upstream. The breaching flow would transfer from emerged condition into overtopping condition if there is an additional discharge into the upstream.

    In the model of Visser[1], a relatively small initial breach is assumed in the top of the dike that is so large that water flows through it starting the breach erosion process. By assuming a trapezoidal shape of initialbreach with the angle of repose, he distinguished the process of breach erosion for sand-dike into five stages (Fig.1):

    (1) Steepening of the inner slope from initial value.

    (2) Yielding a decrease of the width of the crest of the dike in the breach.

    (3) Lowering of the top of the dike in the breach,with constant angle of the critical breach side slopes,resulting in an increase of width of the breach.

    (4) Critical flow stage, in which flow is virtually critical throughout the breach and the breach continues to grow mainly laterally.

    (5) Subcritical stage, in which the breach continue to grow, mainly laterally due to the subcritical flow in the breach.

    Fig.1 Schematic illustration of breach growth in a sand dike[1]

    In the first three stages the initial breach cuts itself into the dike and most discharge through the breach happens at stage 4 and 5.

    In the process of breach, the discharge varies with different upstream water level as well as the different breach shape. The converged flow goes into the breach channel from the upstream. In the area of breach channel, there is not only critical flow but also shock wave that propagates downstream of the breach(Fig.2(a)). Eddy zones are also generated due to the non-uniform distribution of the breaching flow. The breaching flow can be seen as a type of weir flow in the breach channel. It starts as subcritical flow in the upstream, then becomes critical flow and later supercritical flow, finally changes back into subcritical flow after the hydraulic jumps when it passes through the breach (Fig.2(b)).

    Fig.2 Flow characteristics in the breach

    Generally the breaching flow is a kind of compound weir flow due to the constraints from the breach channel and the embankment. The breach crosssection shape is usually idealized as rectangular or trapezoidal, but it depends on the embankment materials as well as the hydraulic condition during the embankment breach. According to the shape of cross-section,the compound weir can be simplified into rectangular compound weir and trapezoidal compound weir. The submerged compound weir flow is called when the flow goes fully over the weir including the breach and the rest crest. The emerged compound weir flow occurs when the flow just goes through the breach.

    In the paper, a series of experiments were conducted in the flume to simulate the hydraulic characteristics of breaching flow in the overtopping and emerged conditions. The breach process was simplified into five phrases according to the physical process of breach in the laboratorial experiments, field measurement and prototype investigations. The transversal water level distribution, depth-averaged velocity as well as the hydraulic energy loss was analyzed according to the test results.

    Fig.3 Sketch of broad-crested weir with rectangular compound-section in overtopping condition

    1. Hydraulic parameters of breaching flow

    1.1 Overtopping compound weir flow

    In overtopping condition, the breaching flow goes through the rectangular compound cross section(Fig.3), the discharge can be expressed as a function of upstream water depth[9]

    where Cdis the discharge coefficient,Bis the width of weir anda is the breach depth,H0is the energy height over crest. In the equation, the control section is considered as combination of two rectangular sections over the weir crest and the breach part.

    Fig.4 Sketch of broad-crested weir with trapezoidal compoundsection in overtopping condition

    When the breach channel is of a trapezoidal shape (Fig.4), the discharge can be calculated as

    where Cdcis the discharge coefficient over the crest, Cdbis the discharge coefficient in the breach,H0cis the energy head above the weir crest,H0bis the energy head above the breach bottom. The first part on the right hand side of the formula represents the discharge over the crest and the second part represents the discharge through the breach.

    Fig.5 Sketch of broad-crested weir with rectangular compoundsection in emerged condition

    1.2 Emerged compound weir flow

    Emerged flow condition refers to the flow only passing through the breach. In order to compensate for actual flow conditions such as energy losses, non-uniformity of velocity distribution, and streamline curvature in reality, a discharge coefficient,Cd, is introduced to the weir flow formula.

    According to the relationships between weir discharge and upstream water depth in the emerged condition (Fig.5), the discharge through the rectangular compound weir can be expressed as

    where Cdis the weir discharge parameter,bis the width of the lower weir crest,H0is the upstream energy head above the weir.

    Fig.6 Sketch of broad-crested weir with trapezoidal compoundsection in emerged condition

    Bos[10]studied the flow over broad-crested weirs with trapezoidal control section (Fig.6) and the discharge formula in emerged flow condition can be written as

    wherem is the side slope,bis the width of breach bottom,dcis the water depth above the weir, and approximately equals 2/3H0in the critical weir flow condition (Visser 1998).

    2. Experiments of breaching flow

    2.1 Experiment setup

    The embankment model was built with crest length Lw=0.18 m, height P =0.13mand slope of 1V:3Hin both upstream and downstream with the breach located in the middle of the weir crest (see Fig.7).

    The breach shape does not have a regular pattern during the embankment breaching process in prototype, however, it is usually similar to rectangular or trapezoidal shapes. In this study, the breach cross sections were idealized into rectangular shape in the beginning phase of breach, and trapezoidal shapes in the other phases. According to Visser[1], five cases with different cross sections were designed (Fig.8).

    Fig.7 Side view of designed weir

    Fig.8 Sketches of the breach cross-sections

    Table 1 Breaching stages in the test

    In order to simulate the breaching process, the model was designed into 5 stages (Table 1) to express the deepening and widening process of breach (Fig.9)in the embankment breach development.

    The experiment was conducted in a flume with the dimension of 2 m×20 m (see Fig.10). The slope's influence was not considered in the breach experiment. Therefore the slope is 0 in the flume. The width is large enough to decrease the effects from the side wall. The bottom is stick by gravels with diameter from 0.005 m to 0.006 m to increase the bottom roughness.

    2.2 Hydraulic boundary conditions

    The embankment breach was modeled by a weir with a fixed profile and lateral contraction in a laboratory flume. The experiment was expected to fulfill the objective of getting insight into the characteristics and behaviors of breach flow over broad-crested weir with breach of various geometries. In order to achieve this,some tests were conducted by varying the breach geometry. The experiment was carried out in the Fluid Mechanics Laboratory of Delft University of Technology.

    There were five cases for the breach process in the experiment. The upstream boundary for each case of breach is controlled by the discharge which has the different upstream water level shown in Fig.11. Each breach has its own relationship between discharge and water level. As the upstream water level increases, the breach discharge increases. With the development of breach, the discharge increase step by step at the sameupstream water level. As for the downstream boundary, the water lever was controlled by the tailgate with water level gauge.

    Fig.9 Sketches of the breach widening and deepening process

    Fig.10 Layout of the flume

    Fig.11 Hydraulic boundary conditions for each breach case

    Fig.12 Water level in overtopping condition (Case 2)

    3. Analysis of experiment results

    3.1 Water level distribution

    In the overtopping condition, the water level keeps almost constant, but it drops above the breach slopes and increases into normal level in the middle of the breach (Case 2, Fig.12). The water level above the breach slope is lower than those in the breach and on the dam crest, since there is much turbulence along the boundary of breach, and the helicoidal flow occurs above the breach slopes. In the same boundary conditions, the total water level increases by 0.01 m if the upstream discharge increases from 30 l/s to 40 l/s.

    Fig.13 Water level in overtopping condition (Q=30l/s)

    Fig.14 Water level in overtopping condition (Q=50l/s)

    As the breach develops, the breach shapes change to adjust the breach flow. In overtopping condition, two water level valleys move as the breach widens to the breach sides (see Fig.13 and Fig.14). The water level valleys above the breach slopes drop to the breach slopes as they move toward the sides. And the water level in the middle of the breach also drops down as the breach widens towards two sides. The patterns that the water level moves are almost the same even there are changes from rectangular to trapezoid and from trapezoid to trapezoid. But the two water level valleys drop more drastically in the change from trapezoid to trapezoid than that from rectangular to trapezoid.

    Fig.15 Water level in emerged condition (Q =4l/s, Case 1)

    Fig.16 Water level in emerged condition (Q=20l/s, Case 5)

    In the emerged condition, the lateral distribution of the water level is almost constant in the breach channel of rectangular cross section (Fig.15), but the water level reduces above the breach slope (Fig.16). The water level has a peak point in the middle of the cross section and two valleys above the breach slopes,especially in the condition of trapezoid breach shapes.

    3.2 Breach discharge distribution

    Particularly in overtopping condition, it is of great interest to investigate how much water passes through the breach or over the crest. This is important to simulate the breaching process and estimate the discharge contributing to the breaching.

    Fig.17 Comparison of theory predictions and laboratory measurements on discharge distribution

    The predicted discharge distribution by Eq.(2)and test results and are plotted in Fig.17. The analytical prediction for Cases 1 and 5 is slightly underestimated compared with the experiment data and overestimated for Case 3 at low discharges. As for the other cases, the theory and laboratory results fit well. Overall, it can be concluded that the laboratory results for the five cases are in good agreement with the theoretic predictions. Based on the results of theory and experiment, it can be found that the breach conveys less compared to the total discharge with the increase of discharge for each case. It is reasonable that for high stage water the effect of breach is reduced and at the same discharge, the larger the breach size is, the more water flows through the breach.

    Fig.18 Discharge distribution in the case of subcritical flow in the breach and critical flow over the crest

    During the experiment, it can be found that the flow in the breach would become subcritical first and then the flow over the crest if gradually raising the tail gate from low level. Hence, there is a situation that at the same time. The discharge distribution in the situation is illustrated in Fig.18. The differences on the discharge distribution are small between perfect weir and imperfect weir situations in Cases 3 and 4, which indicate the influence of breach is small over the distribution. But in Case 5 which owns larger size of breach,the difference is evident. Therefore the discharge distribution is dependent on the stages of breach in the situation of subcritical flow in the breach and critical flow over the crest.

    3.3 Velocity distribution

    In the breaching process, the velocity plays an important role in the erosion and scour of the embankment, the widening and deepening process of breach,and the flood propagation process in the downstream,etc..

    Fig.19 Depth-averaged velocity distribution in breach cross section (Q =30l/s, Case 1)

    Fig.20 Depth-averaged velocity distribution in breach cross section (Q =50l/s, Case 5)

    Fig.21 Helicoidal flow in meandering channel

    In the overtopping condition of Case 1, the breaching flow goes both in the breach channel and the embankment crest, and the flow velocity in the breach channel is higher than that over the crest (Fig.19)). In Case 5 the velocity in the breach is much higher than the crest and reaches its maximum value close to the side slope (Fig.20). There are two velocity peaks just above the breach slope due to the helicoidal flow turbulence on the breach. The turbulence on the breach is triggered by the helicoidal flow. The turbulence is generated by the resistance from the breach channel bed. Between the two velocity peaks, the velocity reduces step by step, and reaches the minimum velocity in the middle of the breach. In the breach channel, the velocity above the breach slope is higher than that in the middle of the channel.

    Fig.22 Breaching flow pattern in overtopping condition (Q= 50l/s , Case 5)

    Fig.23 Depth-averaged velocity distribution in breach cross section (Q =4l/s, Case 1)

    In the meandering channel of river, there is a type of helicoidal flow, which moves as the corkscrew in a meandering flow (Fig.21). It is a contributing factor to the formation of slip-off slopes and river cliffs in a meandering section of river. The helicoidal motion of the flow aids the processes of hydraulic action and corrosion on the outside of the meander, and sweeps sediment across the floor of the meander towards its inside. The breach flow structure (Fig.22) is similar to the helicoidal flow in the fluvial channels,and it can be called breach helicoidal flow in the brea-ching process. Additionally there is a triangular hydraulic jump at the toe of the breach, which is generated by the constrictions of the breach when the flow in the breach transition from subcritical to supercritical.

    In the emerged condition, the flow only passes through the breach. In Fig.23, the flow close to the side is a bit faster than the middle in the low discharge condition. Nevertheless, by increasing the discharge to the overtopping condition (Fig.19), it can be seen that the velocity in the breach is much larger than the crest and the flow also speeds up in the near field of breach. After further increase of the incoming flow (Fig.19),the maximum velocity in the breach does not change too much. However, the flow velocity over the crest increases largely. Hence, the difference of velocity magnitude between the breach and crest is smaller compared to that with the lower discharge.

    Fig.24 Depth-averaged velocity distribution in breach cross section (Q =20l/s, Case 5)

    The transverse velocity of the breaching flow also plays an important role in the erosion of breach. Figure 24 shows the transverse velocity distribution in vertical direction of breach channel. From the surface of the breaching flow to the bottom, the transverse velocity increases and the velocity reaches the largest value at the bottom of the breach channel. The transverse breaching flow stimulates the helicoidal flow in lateral direction.

    Fig.25 Transverse flow velocity in breach channel (Q= 20l/s , Case 5)

    Fig.26 Breaching flow pattern in emerged condition (Q= 20l/s , Case 5)

    The breaching flow goes in the trapezoidal cross section (Fig.25) when the flow is in the emerged condition. The minimum depth-averaged velocity is in the middle of the cross section. The helicoidal flow happened in the breach channel in the emerged condition(Fig.26). There is a triangular hydraulic jump at the toe of the breach, which is generated by the constrictions of the breach when the flow in the breach transits from subcritical flow to supercritical flow. The eddies occurred in the downstream of the breach channel close to both sides of the channel bank downstream of the breach.

    3.4 Breach energy loss

    In imperfect situation, the upstream flow conditions have a significant influence on energy head loss for given downstream water levels. According to the energy conservation in the upstream and momentum balance in the downstream, it can be found that the energy loss can be expressed as a function of downstream water depth in imperfect weir situation.

    Fig.27 Energy head loss versus upstream discharge at given tail heights

    By applying a high tail gate for each case and gradually increasing the upstream discharge, the energy head loss against the upstream discharge is shown in Fig.27. It can be seen from the plot that the energy head loss increases with the raise of discharge and there can be observed an obvious break in slope for each curve. It is due to the discontinuity caused by the sudden change of flow control section when the flow starts overtopping. According to the curves, the discontinuity occurs one after the other from Cases 1 to 5,which depends on the size of breach. It is also worth mentioning that the energy loss increases linearly with the increase of discharge but at different rates before and after the overtopping. In emerged condition, the curve rate tends to decrease during the process of enlargement. However, the rate drops significantly after overtopping and the curves seem to be parallel to each other. Therefore, one can draw conclusions that the rate of energy loss would keep constant after overtopping.

    Fig.28 Energy head loss versus downstream water depth

    As stated above, the energy head loss can be expressed as a function of downstream water depth in highly submerged condition. In Fig.28, the relation between them is presented. And the curves are discontinuous due to the weir geometry and the transition zone can be clearly seen. In both the emerged and overtopping conditions, Case 2 may have more energy loss than Case 1 at the same downstream water depth,which indicates the top widening from rectangular to trapezoidal breach shape results in higher loss. It is the same case among Cases 2, 3 and 4. Therefore, the process of top widening and height deepening of breach dissipate more energy. Nevertheless, at the same downstream flow condition, the energy loss drops largely in Case 5 after widening the breach bottom from Case 4.

    3.5 Discharge coefficient

    As the discharge equations for emerged and overtopping flows are both derived from continuity equation and energy conservation, the corresponding discharge coefficients based on them are comparable. The discharge coefficient from emerged condition to overtopping condition regarding the upstream energy head is plotted in Fig.29.

    Fig.29 Discharge coefficient from emerged condition to overtopping condition

    The discharge coefficients increase with the rising of the upstream energy head. In merged flow, the values of Cases 1 and 2 have a relatively large increasing rate than the other three in which the changes are small. After overtopping, the discharge coefficients are more close to each other, and increase at a decreasing rate and finally reach more or less constant values. The values for emerged flow are more scattered due to the complex of three-dimensional characteristics of the flow there. However, the influence of breach reduces in the overtopping condition.

    The effect caused by breach is different between the emerged flow and overtopping flow. For instance,the discharge coefficient for Case 5 is highest in emerged flow and lowest in overtopping flow. Moreover,the difference is the smallest in the two flow conditions compared to others. It is caused by the fact that the large size of breach is dominant in breach flow. Therefore, it is reasonable to see that the values for the small-sized trapezoidal shape of breach, e.g., Case 2,are of great difference under the two flow conditions.

    4. Conclusions

    The breaching flow plays an important role in the embankment breaching process coupled with hydraulic process and sediment transport process[11-15]. During the breaching process, the flow overtops the whole of embankment crest and generates the breach channel in the initial phase of breach development[3,7]. As the breach develops, the breaching flow only goes through the breach channel due to the decrease of the upstream water level. So the breaching flow can be classified as overtopping compound weir flow and emerged compound flow, which have their own special characteristics. There are two helicoidal flowsabove two breach slopes and a triangular hydraulic jump at the toe of the breach. The helicoidal flow is generated by the roughness of the breach and the constriction from the breach boundary, which triggers water level drops and velocity jumps above the breach slopes. And the velocity distributions and water level distribution are changed by the breach hydraulic boundary. The helicoidal flow accelerates the sediment undermining at the toe of the breach slopes and widens the breach in the lateral direction of the embankment. The triangular hydraulic jump happens when the breach flow change from subcritical flow into super critical flow, with a triangular critical area at the toe of the breach. The triangular hydraulic jump works as a driving force to the head cut erosion in the breach process and scour hole development at the toe of embankment. According to the hydraulic energy loss in the breach, the discharge coefficients are analyzed from emerged condition to overtopping condition, which can be very useful in the calculation of breach discharge in the breach model.

    [1] VISSER P. J. Breach growth in sand-dikes[D]. Doctoral Thesis, Delft, The Netherlands: Delft University of Technology, 1998.

    [2] ZHU Y. H., VISSER P. J. and VRIJLING J. K. Review on embankment dam breach modeling, new developments in dam engineering[M]. London, UK:Taylor and Gracis Group, 2004.

    [3] ZHAO G., VISSER P. J. and PEETERS P. et al. Headcut migration prediction of the cohesive embankment breach[J]. Engineering Geology, 2013, 164(18): 18-25.

    [4] ZHAO G., REN Y. and VISSER P. J. et al. Hydraulics of dam breaching flow[C]. Proceedings of 24th ICOLD Congress. Kyoto, Japan, 2012.

    [5] ZHAO G., VISSER P. J. and VRIJLING J. K. Breach growth of cohesive embanks[C]. 3rd International Workshop on River and Reservoir Hydrodynamics and Morphodynamics. Lisbon, Portugal, 2012.

    [6] ZHAO G., VISSER P. J. and PEETERS P. Large scale embankment breach experiments in flume[R]. Report of Delft University of Technology, Flanders Hydraulics Research and Rijkswaterstaat, 2013.

    [7] ZHAO G., VISSER P. J. and PEETERS P. et al. Hydrodynamic erosion of cohesive embankment breach[C]. Proceedings of 7th International Conference on Scour and Erosion. Perth, Australia, 2014.

    [8] PEETERS P., ZHAO G. and De VOS L. et al. Largescale dike breaching experiment at lillo in Belgium[C]. Proceedings of 7th International Conference on Scour and Erosion. Perth, Australia, 2014.

    [9] G?GüS M., DEFNE Z. and ?ZKANDEMIR V. Broadcrested weirs with rectangular compound cross sections[J]. Journal of Irrigation and Drainage Engineering, 2006, 132(3): 272-280.

    [10] BOS M. G. Discharge measurement structures[M]. 3rd Edition, Wageningen, The Netherlands: ILRI publication, 1989, 20.

    [11] SINGH V. Dam breach modelling technology[M]. Dordrecht, The Netherlands: Kluwer Academic Publishers, 1996.

    [12] WAHL T. L. Uncertainty of prediction of embankment dam breach parameters[J]. Journal of Hydraulic Engineering, ASCE, 2004, 130(5): 389-397.

    [13] WALDER J. S., O'CONNOR J. E. Methods for predicting peak discharge of floods caused by failure of natural and constructed earthen dams[J]. Water Resources Research, 1997, 33(10): 2337-2348.

    [14] WANG P., KAHAWITA R. Modelling the hydraulics and erosion process in breach formation due to overtopping[C]. Proceedings of the Symposium held in Monte Verità. Monte Verità, Switzerland, 2002.

    [15] MORRIS M. W. IMPACT: Investigation of extreme flood processes and uncertainty[C]. Proceedings of the 40th Defra Flood and Coastal Management Conference. York, UK, 2005.

    一本久久中文字幕| 亚洲欧美中文字幕日韩二区| 国产亚洲欧美98| 老师上课跳d突然被开到最大视频| 日韩在线高清观看一区二区三区| 一进一出抽搐gif免费好疼| 自拍偷自拍亚洲精品老妇| 中文精品一卡2卡3卡4更新| 欧美xxxx黑人xx丫x性爽| 亚洲成a人片在线一区二区| 99精品在免费线老司机午夜| 国产高潮美女av| 在线免费观看的www视频| 狠狠狠狠99中文字幕| 国产日本99.免费观看| 国产探花在线观看一区二区| .国产精品久久| 又粗又爽又猛毛片免费看| 亚洲一级一片aⅴ在线观看| 99久久无色码亚洲精品果冻| 午夜精品国产一区二区电影 | 亚洲精品乱码久久久久久按摩| 国产精品久久久久久亚洲av鲁大| 国产一区二区在线av高清观看| 欧美成人一区二区免费高清观看| 老师上课跳d突然被开到最大视频| 国语自产精品视频在线第100页| 最好的美女福利视频网| 嫩草影院新地址| 麻豆乱淫一区二区| 精品少妇黑人巨大在线播放 | 中文精品一卡2卡3卡4更新| 日韩高清综合在线| 一本精品99久久精品77| 国产一级毛片七仙女欲春2| 免费观看a级毛片全部| av免费在线看不卡| 菩萨蛮人人尽说江南好唐韦庄 | 久久精品夜色国产| 精品一区二区三区视频在线| 成人av在线播放网站| 色视频www国产| 国产91av在线免费观看| 国产日韩欧美在线精品| 日韩在线高清观看一区二区三区| 久久鲁丝午夜福利片| 永久网站在线| 亚洲精品日韩在线中文字幕 | 男人狂女人下面高潮的视频| 亚洲国产精品合色在线| 五月伊人婷婷丁香| 少妇裸体淫交视频免费看高清| 一进一出抽搐动态| 在线播放无遮挡| 久久欧美精品欧美久久欧美| 观看美女的网站| 国产视频内射| 岛国毛片在线播放| 久久精品国产清高在天天线| 男人的好看免费观看在线视频| 国产大屁股一区二区在线视频| 在线a可以看的网站| 九九久久精品国产亚洲av麻豆| 欧美在线一区亚洲| 在线播放国产精品三级| 国产精品一区二区在线观看99 | 人人妻人人看人人澡| 精品人妻偷拍中文字幕| 欧美性猛交黑人性爽| 一本一本综合久久| 亚洲在线自拍视频| 亚洲精品乱码久久久久久按摩| 久久久久久大精品| 国产69精品久久久久777片| av在线亚洲专区| 免费看a级黄色片| 少妇裸体淫交视频免费看高清| 国产精品伦人一区二区| 亚洲经典国产精华液单| 久久精品国产清高在天天线| 最近2019中文字幕mv第一页| 亚洲人成网站在线播| 国产精品国产高清国产av| 久久99蜜桃精品久久| 少妇裸体淫交视频免费看高清| 女人被狂操c到高潮| 看免费成人av毛片| 男女做爰动态图高潮gif福利片| 亚洲高清免费不卡视频| 天堂网av新在线| 边亲边吃奶的免费视频| 中国国产av一级| 欧美3d第一页| 波野结衣二区三区在线| 日韩欧美一区二区三区在线观看| 成人性生交大片免费视频hd| av在线亚洲专区| 精华霜和精华液先用哪个| 夜夜爽天天搞| 高清在线视频一区二区三区 | 国产精品久久久久久亚洲av鲁大| 亚洲aⅴ乱码一区二区在线播放| 欧洲精品卡2卡3卡4卡5卡区| av在线蜜桃| 精品久久国产蜜桃| 男人狂女人下面高潮的视频| 成人特级黄色片久久久久久久| 国产国拍精品亚洲av在线观看| 最近2019中文字幕mv第一页| 老熟妇乱子伦视频在线观看| 高清日韩中文字幕在线| 99在线视频只有这里精品首页| 少妇的逼水好多| 日本与韩国留学比较| 日本爱情动作片www.在线观看| 亚洲精品乱码久久久v下载方式| 国产老妇女一区| 黑人高潮一二区| 国产真实乱freesex| 18+在线观看网站| 亚洲乱码一区二区免费版| 久久久精品94久久精品| 久久久国产成人免费| 亚洲人成网站高清观看| 大香蕉久久网| 欧美又色又爽又黄视频| 日韩精品青青久久久久久| 麻豆一二三区av精品| 悠悠久久av| 免费观看a级毛片全部| 在线观看美女被高潮喷水网站| videossex国产| 欧美成人精品欧美一级黄| 中文在线观看免费www的网站| 啦啦啦韩国在线观看视频| 亚洲国产精品合色在线| 少妇丰满av| 色综合站精品国产| 亚洲欧美日韩卡通动漫| 中文字幕制服av| 黄色一级大片看看| 少妇被粗大猛烈的视频| av视频在线观看入口| 嘟嘟电影网在线观看| 欧美高清成人免费视频www| 午夜福利高清视频| 亚洲18禁久久av| 亚洲欧美日韩高清专用| 国产探花在线观看一区二区| 国产高潮美女av| 久久久精品94久久精品| 秋霞在线观看毛片| 看片在线看免费视频| 日韩欧美 国产精品| 美女黄网站色视频| 毛片一级片免费看久久久久| 非洲黑人性xxxx精品又粗又长| 成年av动漫网址| av专区在线播放| 日本-黄色视频高清免费观看| 日韩精品有码人妻一区| 一级毛片久久久久久久久女| 国产精品电影一区二区三区| 国产老妇女一区| 色噜噜av男人的天堂激情| 欧美一区二区亚洲| 99热6这里只有精品| 国产欧美日韩精品一区二区| 夜夜看夜夜爽夜夜摸| 欧美日韩在线观看h| av黄色大香蕉| 99热精品在线国产| 国产激情偷乱视频一区二区| 身体一侧抽搐| 亚洲av男天堂| 男女视频在线观看网站免费| 一卡2卡三卡四卡精品乱码亚洲| 国产午夜精品论理片| 两个人的视频大全免费| 色吧在线观看| 亚洲aⅴ乱码一区二区在线播放| 欧美3d第一页| 免费av观看视频| 天堂中文最新版在线下载 | 国产午夜精品久久久久久一区二区三区| 国产成人a∨麻豆精品| 一级毛片aaaaaa免费看小| 国产真实伦视频高清在线观看| 能在线免费看毛片的网站| 午夜视频国产福利| 国产私拍福利视频在线观看| 极品教师在线视频| 日韩av不卡免费在线播放| 午夜亚洲福利在线播放| 国产av麻豆久久久久久久| 97人妻精品一区二区三区麻豆| 国产精品久久久久久av不卡| 日韩成人伦理影院| 91aial.com中文字幕在线观看| 在线免费观看的www视频| 美女脱内裤让男人舔精品视频 | 黄色日韩在线| 亚洲欧美成人精品一区二区| 在线天堂最新版资源| 久久精品国产自在天天线| 欧美日韩乱码在线| 少妇人妻精品综合一区二区 | 91午夜精品亚洲一区二区三区| 国产国拍精品亚洲av在线观看| 国产淫片久久久久久久久| 天堂网av新在线| 99久久久亚洲精品蜜臀av| АⅤ资源中文在线天堂| 99久国产av精品国产电影| 国产高清三级在线| 亚洲一区二区三区色噜噜| 久久精品国产清高在天天线| 99久国产av精品| 色哟哟哟哟哟哟| 校园人妻丝袜中文字幕| 少妇的逼水好多| 免费av毛片视频| 久久久久性生活片| 日韩欧美 国产精品| 久久韩国三级中文字幕| 日日摸夜夜添夜夜添av毛片| 国产av不卡久久| 国产v大片淫在线免费观看| 边亲边吃奶的免费视频| 国产精品久久视频播放| 午夜免费男女啪啪视频观看| 亚洲欧美成人综合另类久久久 | 欧美日本视频| 亚洲av男天堂| 免费黄网站久久成人精品| 精品人妻偷拍中文字幕| 久久久色成人| 精品不卡国产一区二区三区| 超碰av人人做人人爽久久| 国产高清三级在线| 国产成人91sexporn| 亚洲一区高清亚洲精品| 日韩人妻高清精品专区| 1024手机看黄色片| 人体艺术视频欧美日本| 性插视频无遮挡在线免费观看| 亚洲精华国产精华液的使用体验 | 亚洲人成网站在线观看播放| 97超视频在线观看视频| 亚洲欧美精品综合久久99| 国内少妇人妻偷人精品xxx网站| 国产精品久久视频播放| 99久久九九国产精品国产免费| 国国产精品蜜臀av免费| 黄色欧美视频在线观看| 99热网站在线观看| 99久国产av精品| 三级国产精品欧美在线观看| 最后的刺客免费高清国语| 国产午夜精品论理片| 99在线人妻在线中文字幕| 高清毛片免费看| 村上凉子中文字幕在线| 国产真实乱freesex| 亚洲成人av在线免费| 综合色丁香网| 亚洲丝袜综合中文字幕| 国产亚洲91精品色在线| 欧洲精品卡2卡3卡4卡5卡区| 五月伊人婷婷丁香| 日本黄色片子视频| 亚洲真实伦在线观看| 毛片一级片免费看久久久久| 大香蕉久久网| 一区二区三区四区激情视频 | 国产精品久久视频播放| 久久久久久久久久久免费av| 一级二级三级毛片免费看| 可以在线观看毛片的网站| 美女国产视频在线观看| 欧美高清性xxxxhd video| 亚洲欧美精品专区久久| 日本撒尿小便嘘嘘汇集6| 一区二区三区高清视频在线| 国产成人影院久久av| 久久精品国产亚洲av涩爱 | 白带黄色成豆腐渣| 中国国产av一级| 可以在线观看毛片的网站| 色吧在线观看| 老女人水多毛片| 黄片wwwwww| 99热这里只有是精品在线观看| 三级国产精品欧美在线观看| 亚洲最大成人手机在线| 你懂的网址亚洲精品在线观看 | 亚洲精品乱码久久久v下载方式| 亚洲成人精品中文字幕电影| 国产视频内射| 自拍偷自拍亚洲精品老妇| 熟女人妻精品中文字幕| 在线播放无遮挡| 亚洲欧美日韩无卡精品| 中文资源天堂在线| 国产精品久久视频播放| 婷婷色av中文字幕| 黄色一级大片看看| 亚洲国产欧美在线一区| 韩国av在线不卡| 国产精品.久久久| 久久精品国产清高在天天线| 精品人妻熟女av久视频| 国产精品乱码一区二三区的特点| 美女黄网站色视频| 99热6这里只有精品| av天堂中文字幕网| 变态另类丝袜制服| 国产一级毛片在线| 午夜福利在线观看免费完整高清在 | 搡女人真爽免费视频火全软件| 好男人在线观看高清免费视频| 日韩在线高清观看一区二区三区| 2021天堂中文幕一二区在线观| 黄色视频,在线免费观看| 国产av一区在线观看免费| 国产 一区精品| 韩国av在线不卡| 天天躁夜夜躁狠狠久久av| 亚洲四区av| 三级男女做爰猛烈吃奶摸视频| 岛国在线免费视频观看| 色5月婷婷丁香| 久久久精品94久久精品| 国产精品野战在线观看| 久久精品综合一区二区三区| 天堂av国产一区二区熟女人妻| 亚洲精品色激情综合| 99久久人妻综合| 日韩中字成人| 午夜福利成人在线免费观看| 国产一区二区在线观看日韩| 精品无人区乱码1区二区| 日韩人妻高清精品专区| 人妻少妇偷人精品九色| 12—13女人毛片做爰片一| 久久久色成人| 久久久久久九九精品二区国产| 99在线视频只有这里精品首页| 国产精品1区2区在线观看.| 亚洲18禁久久av| 欧美另类亚洲清纯唯美| 亚洲欧洲国产日韩| 久久精品国产亚洲网站| av.在线天堂| 亚洲精品久久国产高清桃花| 久久精品91蜜桃| 美女cb高潮喷水在线观看| 国产老妇女一区| 成人无遮挡网站| 亚洲成人av在线免费| 一边摸一边抽搐一进一小说| 国产精品久久久久久久电影| 日本欧美国产在线视频| 国产免费一级a男人的天堂| 久久九九热精品免费| 午夜福利在线观看免费完整高清在 | 国产伦理片在线播放av一区 | 欧美潮喷喷水| a级毛片a级免费在线| 97超碰精品成人国产| 国产高清激情床上av| 中国美女看黄片| 亚洲18禁久久av| 久久久久九九精品影院| 国产精品永久免费网站| 日韩在线高清观看一区二区三区| 亚洲综合色惰| 成年免费大片在线观看| 22中文网久久字幕| 一本一本综合久久| 夜夜看夜夜爽夜夜摸| 欧美xxxx黑人xx丫x性爽| 国产精品国产高清国产av| 日本免费a在线| 尾随美女入室| 噜噜噜噜噜久久久久久91| 99久久精品一区二区三区| 欧美精品国产亚洲| 久久人妻av系列| 亚洲av.av天堂| 国内久久婷婷六月综合欲色啪| 少妇丰满av| 精品日产1卡2卡| 日韩欧美精品v在线| 99热这里只有是精品在线观看| 此物有八面人人有两片| av女优亚洲男人天堂| 日本黄色视频三级网站网址| 久久99热这里只有精品18| 国产精品一区www在线观看| 色综合色国产| 91久久精品国产一区二区三区| 天堂影院成人在线观看| 村上凉子中文字幕在线| 麻豆成人午夜福利视频| 国产黄片美女视频| 18禁在线播放成人免费| 欧美潮喷喷水| 日韩欧美一区二区三区在线观看| 性欧美人与动物交配| 99久久久亚洲精品蜜臀av| videossex国产| 久久精品国产亚洲av涩爱 | 中文字幕免费在线视频6| av天堂在线播放| 最近手机中文字幕大全| 国产伦一二天堂av在线观看| 丝袜美腿在线中文| 国产熟女欧美一区二区| 国产淫片久久久久久久久| 波多野结衣高清无吗| 青春草国产在线视频 | 能在线免费观看的黄片| 中文欧美无线码| 欧美另类亚洲清纯唯美| 在线免费观看的www视频| 成人一区二区视频在线观看| 亚洲最大成人av| 不卡视频在线观看欧美| 美女内射精品一级片tv| 亚洲第一区二区三区不卡| 国产人妻一区二区三区在| 国产三级中文精品| 精品日产1卡2卡| 久久久久久久久大av| 免费观看精品视频网站| 欧美一区二区亚洲| 欧美最新免费一区二区三区| 亚洲国产精品成人久久小说 | 久久久久久久久久久丰满| 我的女老师完整版在线观看| 美女被艹到高潮喷水动态| 中文字幕熟女人妻在线| 黄色配什么色好看| 插阴视频在线观看视频| 欧美+亚洲+日韩+国产| 国产亚洲欧美98| avwww免费| 中文在线观看免费www的网站| 99在线人妻在线中文字幕| 在线播放无遮挡| 日日摸夜夜添夜夜爱| 亚洲人成网站在线播放欧美日韩| 国产黄色视频一区二区在线观看 | av视频在线观看入口| 亚洲人成网站在线播放欧美日韩| 午夜a级毛片| 别揉我奶头 嗯啊视频| 亚洲18禁久久av| 国产成人午夜福利电影在线观看| 69av精品久久久久久| 看免费成人av毛片| 欧美性感艳星| 国产亚洲精品av在线| 少妇的逼水好多| 久久久a久久爽久久v久久| 91av网一区二区| 欧美色欧美亚洲另类二区| 身体一侧抽搐| 天天躁日日操中文字幕| 日韩,欧美,国产一区二区三区 | 国产亚洲91精品色在线| 国产综合懂色| 国产精品久久久久久精品电影| 中文字幕制服av| av国产免费在线观看| 干丝袜人妻中文字幕| 日产精品乱码卡一卡2卡三| 国产中年淑女户外野战色| 国产精品综合久久久久久久免费| 亚洲精品国产av成人精品| 日本成人三级电影网站| 亚洲国产精品成人综合色| 九草在线视频观看| 嫩草影院新地址| 久久精品国产亚洲av涩爱 | 亚洲欧美日韩东京热| 一区二区三区免费毛片| 男女啪啪激烈高潮av片| 国产精品蜜桃在线观看 | 亚洲图色成人| 成年女人永久免费观看视频| 少妇高潮的动态图| 成人av在线播放网站| 免费观看a级毛片全部| 国产又黄又爽又无遮挡在线| 久久久精品欧美日韩精品| 三级经典国产精品| 国产淫片久久久久久久久| 深夜a级毛片| 观看免费一级毛片| 欧美一区二区国产精品久久精品| 亚洲在线观看片| 国产av不卡久久| 天堂av国产一区二区熟女人妻| 有码 亚洲区| a级一级毛片免费在线观看| 亚洲激情五月婷婷啪啪| 亚洲国产欧美人成| 老师上课跳d突然被开到最大视频| 99热网站在线观看| 尤物成人国产欧美一区二区三区| 久久精品久久久久久噜噜老黄 | 性色avwww在线观看| 两性午夜刺激爽爽歪歪视频在线观看| 免费看美女性在线毛片视频| 欧美日韩国产亚洲二区| 一个人免费在线观看电影| 伦精品一区二区三区| 在线观看美女被高潮喷水网站| 91狼人影院| 亚洲va在线va天堂va国产| 2022亚洲国产成人精品| 直男gayav资源| 欧美性猛交黑人性爽| 一个人看的www免费观看视频| 乱系列少妇在线播放| 哪个播放器可以免费观看大片| 国产综合懂色| 超碰av人人做人人爽久久| 成人特级黄色片久久久久久久| 桃色一区二区三区在线观看| 国产精品国产三级国产av玫瑰| 久久久久免费精品人妻一区二区| 国模一区二区三区四区视频| 国产av在哪里看| 亚洲天堂国产精品一区在线| av在线天堂中文字幕| 亚洲中文字幕日韩| 婷婷色av中文字幕| 亚洲av成人av| 色综合色国产| 久久精品夜色国产| 日日撸夜夜添| 国产伦在线观看视频一区| 久久国内精品自在自线图片| 97人妻精品一区二区三区麻豆| 亚洲欧美日韩高清在线视频| 精品免费久久久久久久清纯| 99久久久亚洲精品蜜臀av| 精品99又大又爽又粗少妇毛片| 一边亲一边摸免费视频| 免费无遮挡裸体视频| 欧美xxxx性猛交bbbb| 国产伦精品一区二区三区视频9| 看片在线看免费视频| 国产精品久久视频播放| 久久99精品国语久久久| 真实男女啪啪啪动态图| 一级毛片久久久久久久久女| 国产精品一区二区性色av| 亚洲av电影不卡..在线观看| 国产精品日韩av在线免费观看| 国产精品一区二区在线观看99 | 狂野欧美激情性xxxx在线观看| 三级经典国产精品| 国产日本99.免费观看| 在线免费观看的www视频| 搞女人的毛片| av女优亚洲男人天堂| 搡女人真爽免费视频火全软件| 18+在线观看网站| 最近手机中文字幕大全| 18禁黄网站禁片免费观看直播| 成人综合一区亚洲| 欧美zozozo另类| 亚洲精品乱码久久久久久按摩| 中文字幕人妻熟人妻熟丝袜美| 亚洲av一区综合| 两个人的视频大全免费| 日本三级黄在线观看| 舔av片在线| 亚洲中文字幕一区二区三区有码在线看| 国产单亲对白刺激| 亚洲欧洲日产国产| 欧美区成人在线视频| 亚洲成a人片在线一区二区| 亚洲国产欧美在线一区| 亚洲色图av天堂| a级毛色黄片| 亚洲av成人av| 欧美最新免费一区二区三区| 欧美3d第一页| 国产一区二区在线av高清观看| 夫妻性生交免费视频一级片| 成年免费大片在线观看| 哪里可以看免费的av片| 黄色日韩在线| 又爽又黄无遮挡网站| 久久人人爽人人爽人人片va| av福利片在线观看| 性欧美人与动物交配| 国产一区二区激情短视频| 熟女电影av网| 国产精品蜜桃在线观看 | 日韩视频在线欧美| 亚洲高清免费不卡视频| 国产一区二区三区av在线 | 丝袜美腿在线中文| 亚洲精品久久久久久婷婷小说 | 国产成人一区二区在线| 一本一本综合久久| 久久婷婷人人爽人人干人人爱| 熟妇人妻久久中文字幕3abv| 人妻少妇偷人精品九色|