    Integration of a Gas Fired Steam Power Plant with a Total Site Utility Using a New Cogeneration Targeting Procedure

    2014-07-18 11:56:12SajadKhamisAbadi,MohammadHasanKhoshgoftarManesh,MarcA.Rosen

    Integration of a Gas Fired Steam Power Plant with a Total Site Utility Using a New Cogeneration Targeting Procedure

    Sajad Khamis Abadi1, Mohammad Hasan Khoshgoftar Manesh2, Marc A. Rosen3,
    Majid Amidpour4,*and Mohammad Hosein Hamedi4
    1Department of Energy Engineering, Science and Research Branch, Islamic Azad University, Tehran 775-14515, Iran
    2Department of Mechanical Engineering, Faculty of Technology & Engineering, University of Qom, Qom 3716146611, Iran
    3Faculty of Engineering and Applied Science, University of Ontario Institute of Technology, Oshawa+1905-121-8668, Canada
    4Faculty of Mechanical Engineering, K. N. Toosi University of Technology, Tehran 19395-1999, Iran

    A steam power plant can work as a dual purpose plant for simultaneous production of steam and electrical power. In this paper we seek the optimum integration of a steam power plant as a source and a site utility system as a sink of steam and power. Estimation for the cogeneration potential prior to the design of a central utility system for site utility systems is vital to the targets for site fuel demand as well as heat and power production. In this regard, a new cogeneration targeting procedure is proposed for integration of a steam power plant and a site utility consisting of a process plant. The new methodology seeks the optimal integration based on a new cogeneration targeting scheme. In addition, a modified site utility grand composite curve (SUGCC) diagram is proposed and compared to the original SUGCC. A gas fired steam power plant and a process site utility is considered in a case study. The applicability of the developed procedure is tested against other design methods (STAR?and Thermoflex software) through a case study. The proposed method gives comparable results, and the targeting method is used for optimal integration of steam levels. Identifying optimal conditions of steam levels for integration is important in the design of utility systems, as the selection of steam levels in a steam power plant and site utility for integration greatly influences the potential for cogeneration and energy recovery. The integration of steam levels of the steam power plant and the site utility system in the case study demonstrates the usefulness of the method for reducing the overall energy consumption for the site.

    integration, steam power plant, site utility, cogeneration, optimization

    1 INTRODUCTION

    Chemical processes usually require steam at various pressures and temperatures for heating and non-heating purposes. In order to provide the steam required, the designer has to decide to provide steam under the extreme condition and then let it down to different levels or produce steams separately in separate boilers. Many industrial processes operate within total sites [1-3], where they are serviced and linked through a common central utility system. This utility system meets the demands for heat and power of individual process units via indirect heat integration. However, greater benefits in terms of energy and capital cost can be obtained by considering the entire site. Total site integration addresses the task of optimizing each process and the utility system in the context of the overall site [4]. An important task in utility system design is targeting fuel consumption and shaft work production ahead of design.

    A number of models have been proposed for the preliminary estimation of cogeneration for utility systems using steam turbines. Dhole and Linnhoff [5] proposed an exergetic model based on site source-sink profiles. Raissi [3] proposed a temperature-enthalpy model based on the Salisbury approximation [5], assuming that power is linearly proportional to the difference between the inlet and outlet saturation temperatures. Mavromatis and Kokossis [6] introduced the turbine hardware model (THM), a non-linear model based on the principle of Willans’ line, to incorporate the variation of efficiency with turbine size and operating load. Harell [7] introduced a graphical technique that utilizes the concept of extractable power and header efficiency to establish cogeneration potential, and Varbanov et al. [8] improved the turbine hardware model. Sorin and Hammache [4] developed an exergetic model based on thermodynamic insights for the Rankine cycle, showing that power is not linearly related to saturation temperature differences. Mohan and El-Halwagi [9] developed a linear algebraic approach based on the concept of extractable power and steam main efficiency. Medina-Flores and Picon-Nunez [10] presented a modified thermodynamic model by taking advantage of the THM. Bandyopadhyay et al. [11] developed a linear model based on the Salisbury approximation [5] and energy balance for steam mains. Ghannadzadeh et al. [12] presented a new shaft work targeting model, named the iterative bottom-to-top model (IBTM). Kapli et al. [13] introduced a new method to estimate cogeneration potential for site utility systems by a combination of bottom-up and top-down procedures.

    The optimal integration of a steam power plant and a site utility system remains challenging withthese approaches and improved methods are needed. This paper seeks to address this need, and its aim is to find the optimum integration of a steam power plant and a site utility system. With this objective in mind, a new cogeneration targeting model is developed.

    2 METHODOLOGY

    A new procedure for integration of a power plant with a total site for a given site utility system is proposed. The procedure includes following steps.

    Step 1 The pressure, temperature and steam generation and demand of each steam level of the site utility system is identified based on the requirements of the total site.

    Step 2 A standard steam power plant is considered in a case study for integration with the site utility. Thermodynamic and economic analyses are performed, and the specifications of each stream and the main parameters of the proposed power plant are determined.

    Step 3 Incoming streams from the power plant with the same pressure of site utility mains (from bleed steam) are identified and the flow changes that contribute to meet the target are examined. In this regard, the extracted steam from steam turbine is a candidate. However, the steam conditions must be same as the requirements of the steam levels of the site utility.

    Step 4 The heat load of incoming streams from the power plant are calculated.

    Step 5 The total sink and source profiles are generated. In this step, sink and source profiles are plotted for the site utility for a base case and for the site utility by adding incoming streams from the power plant. The total site profile (TSP) is constructed from the grand composite curves (GCCs) of individual process units for the new design and it is constructed from the individual process loads within each of the utility heat exchangers for the retrofit design [Fig. 1 (a)] [12, 14, 16]. The targets are set for site cooling requirements starting with the highest temperature cooling utility. Also, to set the targets for heating requirements, the lowest temperature heating utility is first maximized [Fig. 1 (a)]. Fig. 1 (b) shows the site composite curve (SCC) [2] for this case as the site is pinched. The residual heating requirement is satisfied using very high pressure (VHP) steam generated in the boilers, while the residual heat is rejected via cooling water (CW) [Fig. 1 (b)] [12]. Removing the site composite curves and keeping only the steam profiles [Fig. 1 (c)], all the temperature intervals of the steam profiles are shifted to the left side starting from VHP to CW, which results in the site grand composite curve (SGCC) [Fig. 1 (d)] [12, 14, 16].

    Step 6 The site utility grand composite curve (SUGCC) is generated. The proposed methodology uses the SUGCC, which represents another form of the site composite curves [14]. The SUGCCs are obtained from the site composite curves by representing temperature-enthalpy axes in each steam main by its saturation temperature and steam generation and usage loads, respectively, from the source and sinks profiles of the site composites. The differences between steam generation and steam usage set the very high pressure demand or the supply heat available at each main.

    Figure 1 TSP (a), SCC (b), steam profile (c), SGCC (d), SUGCC (e), cogeneration potential (f) for a pinched site and cogeneration potential (g) for a site violating the minimum targets [12]

    Figure 2 Schematic of the utility system layout on an SUGCC

    The SUGCC is constructed as the heat recovery across the site is removed and only the part of steam profile interacting with site utility system is retained [Fig. 1 (e)], following the approach of Ghanadzadeh et al. [12-14]. As Fig. 1 (e) relates to the location in a site that is pinched, this is only one possible setting with the maximum heat recovery, minimum heat rejection to the CW, and minimum heat demand from the boilers. However, it is not necessarily the optimum setting if the cogeneration potential [Fig. 1 (f)] [12, 16] is also taken into account. This point can be observed by considering the SUGCC shown in Fig. 1 (g), which is set such that heat recovery is not maximized. This means that an extra quantity of fuel is fired in the boilers and an extra quantity of heat is rejected to the CW [12, 14, 16]. However, the larger area between the steam profiles implies a greater cogeneration potential. Generally, more heat recovery corresponds to less power generated and less fuel required. However, the amount of overlap between the steam profiles is a degree of freedom available to the designer [16]. Detailed descriptions of total site analyses, grand composite curves and total site profiles are presented elsewhere [3, 16]. Finally, the SUGCC for base and integrated case are plotted.

    Step 7 Initial estimations are made for the boiler superheat temperature.

    Step 8 The minimum required flow rate from a steam generation unit and the levels of superheat at each steam main are calculated based on the heat loads specified by the SUGCC.

    Figure 2 shows a schematic of the utility system layout on a SUGCC diagram, where i is equal to 1, 2, 3 and 4 for very high pressure (VHP), high pressure (HP), medium pressure (MP) and low pressure (LP) steam mains, respectively. There is an expansion zone between two steam mains. Zones are indexed by Z starting from the top, i.e., Z=1 denotes the VHP-HP, and one single steam turbine is placed in each zone.

    Figure 3 shows a thermodynamic expansion of steam at two different pressures on a temperature-entropy diagram. Step1S-2S represents isentropic expansion, an ideal case with no irreversibility due to such factors as mechanical friction and heat losses. Step1S-2S′ is a better representation of what happens in reality. The outlet of the turbine is shifted to the right, which indicates an increase of entropy (state of disorder) caused by losses [17]. The isentropic efficiency represents the ratio of the enthalpy difference of step1S-2S′ to that of step1S-2S.

    Figure 3 Thermodynamic expansion of steam at two different pressure levels on a Temperature-Entropy diagramP1—turbine inlet pressure; P2—turbine outlet pressure

    Table 1 Regression coefficients used in the isentropic efficiency expression [8]

    Figure 4 Mass load balance for ith steam main [18]

    The isentropic efficiency is a function of the load and, for fixed values of flow rates, it will be better to consider the highest efficiency using turbines, for which the calculated flow rate will be the full load. In this study, the thermodynamic model of Varbanov et al. [8] is employed to estimate the isentropic efficiency (ηis) as follows

    where A and B are constants dependent on turbine, calculated by

    where a1, a2, a3and a4are the constants coefficient. values of these constants are given in Table 1 [8].

    At the boiler exit, for a given steam pressure and temperature, the enthalpy can be obtained with the aid of steam tables. The actual input enthalpies of the steam mains are usually provided from the calculations for the previous steam main. Then, the input isentropic enthalpy of steam main in the superheated region can be obtained, and the efficiency is calculated. The actual enthalpy, which serves as the input enthalpy for the next zone, is then calculated using the isentropic enthalpies and efficiency:

    In this study, the superheat temperature at each steam level is calculated with an iterative procedure based on a certain desirable amount of superheat in the LP steam main. This superheat needs to be set to 10 to 20 °C [16]. If the degree of superheat in the resulting LP steam main is less than that required, the operating condition of VHP steam is updated and the calculation is repeated until superheated conditions for the LP steam main are acceptable.

    The mass flow rate of steam expanding through the Zth turbine (mZ) can be calculated by the mass balance forith steam main [15] as follows, as shown in Fig. 4.

    HereGNEim denotes the flow rate of steam generated by the process andDEMi

    m is the flow rate of steam demanded by the process, both of which can be calculated as follows [15]:

    Here hf,idenotes the enthalpy of the saturated liquid at the pressure ofith steam main. Also, at a given level,

    where Qnet,idenotes the net load, hiis the steam main isentropic enthalpy, and hfis the saturated liquid enthalpy.

    The initial mass flow rates passing through each zone are estimated, assuming isentropic expansions throughout the levels via Eq. (9).

    Step 9 The efficiency is modified for improved accuracy using the following expression

    Figure 5 Schematic of a modified SUGCC1—VHP; 2—HP; 3—MP; 4—LP

    Step 10 For the given steam levels, the values for hiandNETim are revised for better accuracy.

    Step 11 For subsequent iterations to convergence, the steps are repeated until the stopping criterion is achieved according to the following:

    Step 12 When the first loop of algorithm terminates, the LP superheat temperature is checked. If it falls below the allowed minimum, the superheat temperature of the boiler is increased and the steps are repeated until the desired amount of superheat is achieved in the LP steam main.

    Step 13 The shaft work production in each zone of the site utility is calculated as follows.

    Step 14 Final SUGCC is generated, with values of following parameters determined: final steam temperature at each level, mass flow rate through the boiler, the steam temperature that must be generated in the boiler, the steam temperature, mass flows and the final temperatures of each steam mains.

    Step 15 The modified SUGCC is obtained, as shown in Fig. 5. The left right of horizontal axis demonstrates the temperature-enthalpy diagram of the site utility and the other side is same as the original SUGCC. The proposed modified SUGCC representation illustrates the real condition of each steam mains of the site utility in a temperature-entropy (T-S) diagram. Also, the steam generation and use, steam heat demand and shaft work production of the site utility are shown in the other side of this diagram.

    Figure 6 shows an algorithm of the new procedure.

    3 COMPUTER PROGRAM

    A computer program is developed in this study for

    (1) Simulation of the thermodynamic steam cycle;

    (2) Analysis of total site (single purpose and integrated plant);

    (3) Targeting of steam and power generation in site utility system (single purpose and integrated plant);

    (4) Economic evaluation;

    (5) Integration of site utility with the steam power plant.

    The program uses following input data:

    (1) standard pressure (P0) and temperature (T0);

    (2) fuel compositions and costs;

    (3) air composition and relative humidity;

    (4) load conditions;

    (5) gross shaft power of steam turbine;

    (6) shaft work consumption in pumps;

    (7) mass flow rate, pressure and temperature for fluid streams at the inlet and outlet of each component;

    (8) initial investment of capital cost, interest rate, salvage value factor;

    (9) configuration of feed water heaters;

    (10) process site utility data;

    (11) economic data.

    Figure 6 Algorithm of the new procedure

    With these input data, the program can be used to calculate the number of moles of combustion products, the adiabatic flame temperature, and the enthalpy (MW) and entropy (MW·K?1) rates for fluid streams at various states. Using the values of these properties, we calculate the net flow rates of various exergies and entropies, the exergy efficiencies of the components and the lost exergy in each component. The heat transfer rate from a component is calculated to satisfy the exergy balance for the component.

    Also, this code can generate TSP, SUGCC and modified SUGCC, and it can be used for integrating the steam power plant with the site utility.

    4 CASE STUDY

    We consider a 315 MW gas fired conventional steam power plant (similar to the RAMIN power plant that is located in southwest Iran in Ahvaz city). A flow diagram of this plant and its steam turbines is shown in Fig. 7. The numbers indicate streams in power plant cycle. In this case study, we consider the optimal design of a 315 MW gas fired steam power plant integrated with the site utility.

    The net plant efficiency based on low heating value (LHV) is about 38.5% (assuming a single purpose plant). The fuel flow can be modified in the integrated plant, but the net power generation by the power plant is fixed at 315 MW as a constraint.

    The assumptions used in this study are based on the optimal design of a 315 MW power plant for integration with the site utility system. In the base scenario, the streams extracted from steam turbine enter the feed water heaters. In the integrated plant, some of steam extracted from the steam turbines is fed to the process directly. The steam power plant in the coupled scenario operates at full load and the mass fuel is increased correspondingly. With this approach, there is no loss of power generation in the power plant section in the coupled plant.

    The schematic of site/source composite curve of the total site and the site utility system of a process plant is illustrated in Fig. 8, indicating the steam generation and use at each of the steam levels and the total site profile. A schematic of the site utility for thebase case is provided in Fig. 9.

    Figure 7 Schematic of a conventional gas fired steam power plant [1]FWH—feed water heater; HPT—high pressure turbine; IPT—intermediate pressure turbine; LPT—low pressure turbine; C—condenser; G—generator; CP—condenser pump; DA—deaerator

    Figure 8 Site source and sink composite curve (site utility-base case)

    Property values at various state points in the 315 MW plant under full load conditions are shown in Table 2. The required steam properties for the site utility are determined (see Table 3). Table 4 indicates the steam generation and steam use by the site utility for the base condition, as demonstrated in total site profile (Fig. 8).

    5 RESULTS

    Figure 10 shows the SUGCC of site utility of total site for the base case using the new procedure described in this article. Also provided for the SUGCC are the shaft power production by each zone, the steam generation and use for each zone, the fuel requirement, the steam temperature at the boiler outlet and the real condition of each steam main in site utility.

    The steam requirements of the site utility system at three pressure levels (VHP, MP and LP) are provided by bleed steam from the steam power plant. In this regard, the three feed water heaters are removed and the steam extracted from the steam turbines (streams 103, 104 and 107) enters the site utility at the same steam levels. A schematic of the integrated plant is shown in Fig. 11. The exiting stream properties for the power plant are indicated in Table 2. The total site profiles (TSPs) under the integrated condition areshown in Fig. 12.

    Figure 9 Schematic of site utility system of a process plant (base case)

    Table 2 Properties at various state points in a 315 MW plant under full load conditions①

    We determine the steam requirements of the site utility in the coupled plant (see Table 5) and the steam generation and use in the integrated plant for the site utility (see Table 6).

    Figure 13 shows the SUGCC and Fig. 14 shows the site utility for the integrated plant. The cogeneration potential of the site utility for the coupled plant is illustrated in Fig. 15. The fuel requirements and steam generation at the boiler in the site utility are decreased in the integrated plant relative to the base case. Also, the power generation by the site utility is decreased, and the VHP steam demand of the integrated plant for the site utility is decreases by 65%.

    Figure 10 SUGCC of the steam network (base case)

    Figure 11 The scheme of the steam power plant (integrated)FWH—feed water heater; HPT—high pressure turbine; IPT—intermediate pressure turbine; LPT—low pressure turbine; C—condenser; G—generator; CP—condenser pump; DA—deaerator

    Figure 12 Site source and sink composite curve (integrated plant)

    Table 3 Steam requirements for site utility (base case)

    Table 4 Steam generation and use (base case)

    Table 5 Steam requirements of the site utility (integrated)

    Table 6 Steam generation and use (integrated)

    The modified SUGCC of the steam network is provided in Fig. 16. The right side shows a thermodynamic expansion of steam in the steam network on a temperature-entropy diagram. Point 1 shows the actual temperature of the steam at the outlet of the boiler and points 2, 3 and 4 show actual temperatures of steam at the outlets of the VHP-HP, HP-MP and MP-LP turbines, respectively.

    Taking into account these thermodynamic insights into cogeneration in general and the Rankine cycle in particular, we propose a new representation based on a modified SUGCC in order to visualize it on the same diagram. Thus, fuel consumption, steam generation in the boiler, shaft work production, cooling targets and actual states of steam mains are obtained. Hence, the present work examines the effect including both sensible and latent heating of steam in the right side of proposed curve.

    The economic evaluation for the power plant section is presented in Table 7. The break-even electricity price of the coupled plant is decreased by 0.0301 USD·kW?1·h?1compared to the base power (uncoupled) plant. In addition, the operating cost is increased due to greater fuel consumption in the integrated plant. Three feed water heaters are removed for the integrated plant, and steam is delivered from the steam power plant section to the site utility, and the inlet steam temperature in boiler is reduced while additional fuel is needed to generate the same 315 MW power in the power plant section. The total annual profit of the plant is 115.67×106USD for the base case, while 130×106USD for in the integrated plant. In the integrated plant, the power plant generates two main products: power and process steam. However, the total investment for the integrated plant (222.81×106USD) is more than that for the base case (216.35×106USD) due to increased operating costs. The payback period is calculated as follows:

    Payback period (a)=

    total investment (USD)/profit (USD·a?1)

    As shown in Table 7, the total investment for the power plant for the base case is 216.135×106USD and the total profit is 115.67×106USD·s?1; so the payback period is 1.9 years for the power plant in the base case. The total investment in the power plant (integrated) is 222.81×106USD and the profit due to the sale of steam and electricity is about 130×106USD·a?1, yielding apayback period for the power plant (integrated) of 1.7 years.

    Figure 13 SUGCC of site utility (integrated plant)

    Figure 14 Total site utility system (integrated plant)

    An economic evaluation of site utility (integrated) is shown in Table 8. The annual fuel cost in the integrated site utility is decreased by 34% relative to the base case because the fuel consumption decreases sig-nificantly when steam requirements are satisfied by incoming streams from the power plant. In addition, power production by the site utility is decreased by 65% relative to the base case and the total investment is reduced by 33%. The total profit of site utility in integrated plant is 170.26 ×106USD·a?1and the total annualizedcost of the site utility is decreased by 24%.

    Figure 15 Cogeneration potential obtained by the new procedure (integrated plant)

    Figure 16 The modified SUGCC of steam network (integrated plant)1—VHP; 2—HP; 3—MP; 4—LP

    Table 7 Economic evaluation of the integrated power plant with the site utility (power plant section)

    Table 8 Economic evaluation of integrated site utility with power plant (site utility section)

    Table 9 Economic evaluation of the separate and integrated plants

    The economic evaluation of the separated plants accounts for the overall separate site utility and the separated power plant. The overall integrated plants (site utility power plant) are shown in Table 9. The total annualized cost of the coupled plant is decreased by 3.2% compared to the overall separated plants. The total investment in the separated plant id reduced by 5% and the total benefit is increased by 2.5% for the coupled plant. The operating cost, the capital cost and the total annualized cost related to the overall coupled plants are reduced relative to the overall separated plants. Also, the payback period of the total plant (integrated) is less than one year. The results demonstrate that the integrated plants obtained by the new procedure are more beneficial than separate plants (i.e., the base case).

    6 CONCLUSIONS

    The optimum integration of a steam power plant as a source and a site utility system as a sink of steam and power is investigated. A new cogeneration targeting procedure is developed for the integration of a steam power plant and a site utility of the process plant with a high level of accuracy. The new model is utilized for the optimum integration of a steam power plant and a site utility system. The results indicate that the integration is a good option from thermodynamic and economic viewpoints. The integration reduces the total annualized cost of the coupled plant compared with separate plants. A 315 MW gas fired conventional steam power plant and a site utility system are assessed in case study, showing that the optimum integration is economically beneficial.

    NOMENCLATURE

    H enthalpy, kJ

    h specific enthalpy, kJ·kg?1

    P pressure, Pa

    Q heat load, MW

    s specific entropy, kJ·kg?1·K?1

    T temperature, °C

    W shaft work, MW

    Z expansion zone

    Superscripts

    act actual state

    DEM process steam demand

    f liquid state

    GEN process steam generation

    i steam main

    net net heat

    REFERENCES

    1 Khoshgoftarmanesh, M.H., Hamedi, M.H., Amidpour, M., Khoshgoftar, L., “Exergoeconomic optimization of coupling MSF desalination with conventional gas fired steam power plant”, In: 23th International Conference on Efficiency, Cost, Optimization, Simulation & Environmental Impact of Energy Systems (ECOS 2010), Switzerland (2010).

    2 Dhole, V.R., Linnhoff, B., “Total site targets for fuel co-generation, emissions, and cooling”, Computers and Chemical Engineering, 17 (Supplement 1), 101-109 (1993).

    3 Raissi, K., “Total site integration”, PhD Thesis, University of Manchester (UMIST), England (1994).

    4 Sorin, M., Hammache, A., “A new thermodynamic model for shaftwork targeting on total sites”, Applied Thermal Engineering, 25, 961-972 (2005).

    5 Salisbury, J.K., “The steam-turbine regenerative cycle: An analytical approach”, Trans ASME., 64, 231-245 (1942).

    6 Mavromatis, S.P., Kokossis, A.C., “Conceptual optimisation of utility networks for operational variations—I. Targets and level optimisation”,Chemical Engineering Science, 53 (8), 1585-1608.

    7 Harell, D.A., “Resource conservation and allocation via process integration”, Ph.D. Thesis, Texas A&M University, USA (2004).

    8 Varbanov, P.S., Doyle, S., Smith, R., “Modelling and optimization of utility systems”, Chemical Engineering Research and Design, 82 (5), 561-578 (2004).

    9 Mohan, T., El-Halwagi, M.M., “An algebraic targeting approach for effective utilization of biomass in combined heat and power systems through process integration”, Clean Technology and Environment Policy, 9 (1), 13-25 (2007).

    10 Medina-Flores, J.M., Picón-Nú?ez, M., “Modelling the power production of single and multiple extraction steam turbines”, Chemical Engineering Science, 65 (9), 2811-2820 (2010).

    11 Bandyopadhyay, S., Varghese, J., Bansal, V., “Targeting for cogeneration potential through total site integration”, Applied Thermal Engineering, 30, 6-14 (2010).

    12 Ghannadzadeh, A., Perry, S., Smith, R., “Cogeneration targeting for site utility systems”, Applied Thermal Engineering, 43, 60-66 (2012).

    13 Kapil, A., Bulatov, I., Smith, R., Kim, J.K., “Site-wide low-grade heat recovery with a new cogeneration targeting method”, Chemical Engineering Research and Design, 90 (5), 677-689.

    14 Klemes, J., Dhole, V.R., Raissi, K., Perry, S.J., Puigjaner, L., “Targeting and design methodology for reduction of fuel power and CO2on total sites”, Applied Thermal Engineering, 17 (8-10), 993-1003 (1997).

    15 Al-Azri, N.A., “Integrated approaches to the optimization of process-utility systems”, Ph.D. Thesis, Texas A&M University, USA (2008).

    16 Smith, R., Chemical Process Design and Integration, Wiley, West Sussex (2005).

    17 Khoshgoftar, M.H., Amidpour, M., “Comparison of combined cycle and conventional steam power plant through energy level and the thermoeconomic analysis”, In: ASME International Mechanical Congress and Exposition, Boston, Massachusetts (2008).

    18 Khoshgoftar, M.H., KhamisAbadi, S., Amidpour, M., Hamedi, M.H.,“A new targeting method for estimation of cogeneration potential and total annualized cost in process industries”, Chemical Engineering Research and Design, 91, 1039-1049 (2013).

    19 Joint Army-Navy-Air Force Thermochemical Tables. NSRDS-N3537, National Bureau of Standard Publications, Washington, DC (1985).

    20 Wolfgan,W., Hans-Joachim, K., International Steam Tables, 2nd edition, Springer-Verlag, Berlin (2008).

    2012-11-05, accepted 2013-02-01.

    * To whom correspondence should be addressed. E-mail: amidpour@kntu.ac.ir

    国产高清国产精品国产三级 | 卡戴珊不雅视频在线播放| 亚洲国产欧美人成| 日韩av免费高清视频| 中文精品一卡2卡3卡4更新| 久久人人爽人人爽人人片va| 国产亚洲91精品色在线| 欧美另类一区| 成人影院久久| 舔av片在线| 亚洲,一卡二卡三卡| 久久午夜福利片| 亚洲四区av| 欧美丝袜亚洲另类| 亚洲无线观看免费| 一区二区三区精品91| 一级a做视频免费观看| 日本一二三区视频观看| 一级爰片在线观看| 欧美三级亚洲精品| 亚洲精品色激情综合| av国产精品久久久久影院| 99热这里只有是精品在线观看| 久久婷婷青草| 亚洲精品视频女| 亚洲内射少妇av| 高清欧美精品videossex| 老熟女久久久| 欧美日韩综合久久久久久| 五月伊人婷婷丁香| 天天躁日日操中文字幕| 高清毛片免费看| 久久久久国产网址| 亚洲美女黄色视频免费看| 草草在线视频免费看| 亚洲欧美一区二区三区黑人 | 免费观看性生交大片5| 97精品久久久久久久久久精品| 精品一区二区三卡| 午夜福利高清视频| 丰满乱子伦码专区| 成人午夜精彩视频在线观看| av网站免费在线观看视频| 亚洲精品乱码久久久久久按摩| 一级毛片 在线播放| 五月玫瑰六月丁香| 一区二区三区乱码不卡18| 老熟女久久久| 高清午夜精品一区二区三区| 亚洲av男天堂| 夜夜骑夜夜射夜夜干| 极品少妇高潮喷水抽搐| 午夜福利在线观看免费完整高清在| 亚洲国产av新网站| 亚洲综合精品二区| 联通29元200g的流量卡| 亚洲精品日韩在线中文字幕| 偷拍熟女少妇极品色| 国产乱来视频区| 18+在线观看网站| 亚洲精品亚洲一区二区| 日韩成人av中文字幕在线观看| 日本黄色片子视频| 国产精品一区二区三区四区免费观看| 成人国产麻豆网| 国产免费视频播放在线视频| 高清在线视频一区二区三区| 夜夜看夜夜爽夜夜摸| 我的女老师完整版在线观看| 在线 av 中文字幕| 人人妻人人看人人澡| 日韩av在线免费看完整版不卡| 色哟哟·www| 最近的中文字幕免费完整| 久热这里只有精品99| 高清黄色对白视频在线免费看 | 亚洲四区av| 亚洲人成网站高清观看| 久久精品人妻少妇| 亚洲av福利一区| 2021少妇久久久久久久久久久| 少妇精品久久久久久久| 边亲边吃奶的免费视频| 成人18禁高潮啪啪吃奶动态图 | 国产亚洲91精品色在线| 国内精品宾馆在线| av专区在线播放| 久久久亚洲精品成人影院| 色哟哟·www| 久久人人爽人人片av| 欧美日本视频| 久久精品国产自在天天线| 少妇猛男粗大的猛烈进出视频| 99热这里只有精品一区| 大话2 男鬼变身卡| 搡老乐熟女国产| 麻豆精品久久久久久蜜桃| 久久av网站| 久久99蜜桃精品久久| 天美传媒精品一区二区| 精品亚洲乱码少妇综合久久| 日本免费在线观看一区| 国产亚洲午夜精品一区二区久久| 如何舔出高潮| 夜夜看夜夜爽夜夜摸| 大片电影免费在线观看免费| 99热这里只有是精品在线观看| 伊人久久精品亚洲午夜| 菩萨蛮人人尽说江南好唐韦庄| 亚洲国产最新在线播放| 久久这里有精品视频免费| 亚洲精品亚洲一区二区| 国产黄片视频在线免费观看| 久久久久久久亚洲中文字幕| 这个男人来自地球电影免费观看 | 激情五月婷婷亚洲| 中文字幕亚洲精品专区| 国产高清不卡午夜福利| 日本猛色少妇xxxxx猛交久久| 少妇人妻精品综合一区二区| 国产成人一区二区在线| 精品国产三级普通话版| 精品一区二区三区视频在线| 人人妻人人爽人人添夜夜欢视频 | 精品久久久久久久久av| 99热这里只有是精品在线观看| 亚洲国产日韩一区二区| 日韩三级伦理在线观看| 超碰97精品在线观看| 三级经典国产精品| 亚洲内射少妇av| 韩国av在线不卡| 精品少妇黑人巨大在线播放| 成人国产av品久久久| 日日摸夜夜添夜夜爱| 久久精品国产亚洲av天美| 你懂的网址亚洲精品在线观看| 亚洲av福利一区| 久久久久性生活片| 国产欧美亚洲国产| 午夜激情久久久久久久| 国产欧美日韩一区二区三区在线 | 亚洲欧美日韩东京热| 少妇人妻 视频| 亚洲欧美清纯卡通| 中国美白少妇内射xxxbb| 精品久久久久久久久亚洲| 18禁在线无遮挡免费观看视频| 老女人水多毛片| 男女边摸边吃奶| 日本av手机在线免费观看| 久久精品国产亚洲av天美| 国产精品久久久久久久电影| 大片电影免费在线观看免费| 国产91av在线免费观看| 亚洲av日韩在线播放| 久久ye,这里只有精品| 国产精品久久久久久久久免| 三级经典国产精品| 精品久久久久久久久av| 精品99又大又爽又粗少妇毛片| 国产av码专区亚洲av| 国产精品免费大片| 久久精品久久久久久久性| 成人免费观看视频高清| 狂野欧美激情性xxxx在线观看| 极品教师在线视频| 两个人的视频大全免费| 一二三四中文在线观看免费高清| 男人添女人高潮全过程视频| 在线观看av片永久免费下载| 久久人人爽人人爽人人片va| videossex国产| 女性被躁到高潮视频| 国产爽快片一区二区三区| 人人妻人人看人人澡| 国产永久视频网站| 国产欧美另类精品又又久久亚洲欧美| 亚洲高清免费不卡视频| 丝瓜视频免费看黄片| 色综合色国产| 汤姆久久久久久久影院中文字幕| 国产黄色免费在线视频| 国产精品av视频在线免费观看| 成人18禁高潮啪啪吃奶动态图 | 成人亚洲欧美一区二区av| 精品一区二区免费观看| 久久国产亚洲av麻豆专区| 精品人妻熟女av久视频| 亚洲丝袜综合中文字幕| av在线蜜桃| 黑人高潮一二区| 午夜老司机福利剧场| 老熟女久久久| 免费av不卡在线播放| 日韩制服骚丝袜av| 最后的刺客免费高清国语| 免费人成在线观看视频色| 欧美日韩视频精品一区| 丝袜脚勾引网站| 日韩成人伦理影院| 少妇人妻久久综合中文| 色视频www国产| 久久女婷五月综合色啪小说| 99九九线精品视频在线观看视频| 99热这里只有是精品50| av播播在线观看一区| 最近手机中文字幕大全| 人妻制服诱惑在线中文字幕| 国国产精品蜜臀av免费| 又爽又黄a免费视频| 国产精品一区二区性色av| 超碰av人人做人人爽久久| 精品亚洲成a人片在线观看 | videos熟女内射| 男女边摸边吃奶| 久久午夜福利片| 国产成人午夜福利电影在线观看| 国产亚洲91精品色在线| 亚洲国产成人一精品久久久| 免费高清在线观看视频在线观看| 亚洲国产精品成人久久小说| 香蕉丝袜av| 人人妻人人添人人爽欧美一区卜| 精品一品国产午夜福利视频| e午夜精品久久久久久久| 日韩 亚洲 欧美在线| 亚洲av日韩精品久久久久久密 | 天天影视国产精品| 黄色片一级片一级黄色片| 亚洲专区国产一区二区| 男女免费视频国产| 黄色毛片三级朝国网站| 久久亚洲国产成人精品v| 18禁裸乳无遮挡动漫免费视频| 亚洲av综合色区一区| 国产亚洲精品久久久久5区| 久久人人爽av亚洲精品天堂| 一区福利在线观看| 成年女人毛片免费观看观看9 | 中文欧美无线码| 色婷婷久久久亚洲欧美| 香蕉丝袜av| 免费在线观看日本一区| 18禁国产床啪视频网站| 国产精品 欧美亚洲| 国产在线一区二区三区精| 一区二区三区精品91| 欧美国产精品va在线观看不卡| 欧美激情极品国产一区二区三区| 成人影院久久| 免费少妇av软件| 别揉我奶头~嗯~啊~动态视频 | 欧美变态另类bdsm刘玥| av又黄又爽大尺度在线免费看| 欧美亚洲日本最大视频资源| 久久精品成人免费网站| 黄色视频在线播放观看不卡| 国产伦人伦偷精品视频| 亚洲国产欧美网| 国产精品二区激情视频| 国产日韩一区二区三区精品不卡| 国产主播在线观看一区二区 | 久久亚洲精品不卡| 亚洲av成人精品一二三区| 亚洲中文字幕日韩| 天堂中文最新版在线下载| 脱女人内裤的视频| 在线精品无人区一区二区三| 国产视频首页在线观看| 巨乳人妻的诱惑在线观看| 精品国产乱码久久久久久小说| 久久人人爽人人片av| 亚洲七黄色美女视频| 国产成人免费无遮挡视频| 亚洲精品一二三| 日韩中文字幕视频在线看片| 日本91视频免费播放| 99精品久久久久人妻精品| 亚洲欧美精品综合一区二区三区| 男女免费视频国产| 不卡av一区二区三区| 人人妻人人澡人人爽人人夜夜| 国产亚洲午夜精品一区二区久久| 日韩 欧美 亚洲 中文字幕| 国产国语露脸激情在线看| 久久久精品区二区三区| 欧美日韩成人在线一区二区| 一级黄片播放器| 国产伦人伦偷精品视频| 婷婷色综合www| 19禁男女啪啪无遮挡网站| 久久午夜综合久久蜜桃| 蜜桃在线观看..| 色婷婷av一区二区三区视频| 久久精品亚洲熟妇少妇任你| 韩国高清视频一区二区三区| 最新在线观看一区二区三区 | 在线亚洲精品国产二区图片欧美| 免费观看av网站的网址| 久久久久精品国产欧美久久久 | 成年人午夜在线观看视频| 成人午夜精彩视频在线观看| 一区二区三区精品91| 夜夜骑夜夜射夜夜干| 人妻一区二区av| 少妇人妻 视频| 黄网站色视频无遮挡免费观看| 国产高清不卡午夜福利| 久久ye,这里只有精品| 黑人巨大精品欧美一区二区蜜桃| 久久久国产精品麻豆| 国产97色在线日韩免费| 日本五十路高清| 国产国语露脸激情在线看| 亚洲av综合色区一区| 丝袜人妻中文字幕| 波多野结衣一区麻豆| 曰老女人黄片| 高清黄色对白视频在线免费看| 日韩免费高清中文字幕av| 人人妻人人澡人人爽人人夜夜| 一区二区三区四区激情视频| 捣出白浆h1v1| 校园人妻丝袜中文字幕| 久久鲁丝午夜福利片| 久久影院123| 一区福利在线观看| 免费av中文字幕在线| 免费少妇av软件| 国产精品亚洲av一区麻豆| 91字幕亚洲| 亚洲色图 男人天堂 中文字幕| 一级黄片播放器| 欧美在线一区亚洲| 9热在线视频观看99| 国产亚洲欧美在线一区二区| 国产亚洲午夜精品一区二区久久| 免费观看a级毛片全部| 我的亚洲天堂| 精品人妻一区二区三区麻豆| 丝袜美腿诱惑在线| 久久热在线av| 男女午夜视频在线观看| 亚洲一区二区三区欧美精品| 国精品久久久久久国模美| 少妇精品久久久久久久| 久久精品成人免费网站| 午夜日韩欧美国产| 美女高潮到喷水免费观看| 人人妻人人添人人爽欧美一区卜| 日本黄色日本黄色录像| av国产精品久久久久影院| 亚洲男人天堂网一区| av天堂久久9| 热99久久久久精品小说推荐| 久久热在线av| 国产在线视频一区二区| 99国产精品99久久久久| videosex国产| 亚洲中文日韩欧美视频| 亚洲九九香蕉| 女性被躁到高潮视频| 少妇裸体淫交视频免费看高清 | 国精品久久久久久国模美| 国产精品二区激情视频| 丁香六月欧美| 久久国产精品大桥未久av| 亚洲成人手机| 美女脱内裤让男人舔精品视频| 大片免费播放器 马上看| 五月开心婷婷网| 中文字幕av电影在线播放| 国产三级黄色录像| 精品高清国产在线一区| 香蕉丝袜av| 老司机深夜福利视频在线观看 | 一边亲一边摸免费视频| 久久精品aⅴ一区二区三区四区| 男女边吃奶边做爰视频| 亚洲,欧美精品.| 黑人欧美特级aaaaaa片| 成年人免费黄色播放视频| 亚洲精品av麻豆狂野| 国产欧美亚洲国产| 久久精品国产综合久久久| 精品久久久久久久毛片微露脸 | 一边摸一边做爽爽视频免费| 在线观看免费日韩欧美大片| 婷婷成人精品国产| 国产欧美日韩综合在线一区二区| 国产在线一区二区三区精| 色婷婷av一区二区三区视频| 国产又爽黄色视频| 伦理电影免费视频| 国产欧美日韩精品亚洲av| 亚洲色图综合在线观看| 久久精品人人爽人人爽视色| 又黄又粗又硬又大视频| 永久免费av网站大全| 欧美精品亚洲一区二区| 免费高清在线观看视频在线观看| 每晚都被弄得嗷嗷叫到高潮| 日本vs欧美在线观看视频| 日本91视频免费播放| 国产精品人妻久久久影院| 亚洲第一av免费看| 国产人伦9x9x在线观看| 成年人免费黄色播放视频| 91精品伊人久久大香线蕉| 色网站视频免费| 老司机深夜福利视频在线观看 | 男女高潮啪啪啪动态图| 91精品三级在线观看| 久久国产亚洲av麻豆专区| 久久国产精品大桥未久av| 高清欧美精品videossex| 国产女主播在线喷水免费视频网站| 亚洲欧美一区二区三区国产| 日韩av不卡免费在线播放| 婷婷色综合www| 国产成人精品在线电影| 午夜免费观看性视频| 免费高清在线观看视频在线观看| av国产久精品久网站免费入址| 欧美黄色片欧美黄色片| 成人三级做爰电影| 韩国高清视频一区二区三区| 国产熟女欧美一区二区| 黄色毛片三级朝国网站| 91麻豆精品激情在线观看国产 | 日韩熟女老妇一区二区性免费视频| 青春草亚洲视频在线观看| 一个人免费看片子| 国产国语露脸激情在线看| 久久久久网色| 黄色一级大片看看| 激情五月婷婷亚洲| 国产成人系列免费观看| 黄色片一级片一级黄色片| 亚洲五月色婷婷综合| 大话2 男鬼变身卡| 色播在线永久视频| 久久精品国产亚洲av涩爱| 中文字幕最新亚洲高清| 国产精品香港三级国产av潘金莲 | 精品人妻一区二区三区麻豆| 欧美日韩福利视频一区二区| 激情视频va一区二区三区| 日韩av不卡免费在线播放| 国产男女内射视频| 亚洲欧美色中文字幕在线| 欧美另类一区| 黄色视频不卡| av电影中文网址| av网站免费在线观看视频| 啦啦啦啦在线视频资源| 亚洲av男天堂| av视频免费观看在线观看| 人人澡人人妻人| www.999成人在线观看| 久久久久精品国产欧美久久久 | 狂野欧美激情性bbbbbb| 欧美激情高清一区二区三区| 黄色毛片三级朝国网站| 热99久久久久精品小说推荐| 国产激情久久老熟女| 国产淫语在线视频| 精品第一国产精品| 成人亚洲欧美一区二区av| 国产精品久久久久久精品电影小说| 久久99精品国语久久久| 亚洲av在线观看美女高潮| 久久久久久亚洲精品国产蜜桃av| 久久久精品免费免费高清| 国产精品一区二区免费欧美 | 亚洲国产av新网站| av在线老鸭窝| 亚洲欧美成人综合另类久久久| 女人高潮潮喷娇喘18禁视频| 欧美少妇被猛烈插入视频| 成年人免费黄色播放视频| 91九色精品人成在线观看| 日韩人妻精品一区2区三区| 丝袜在线中文字幕| 日韩大片免费观看网站| 18禁国产床啪视频网站| 精品国产国语对白av| 母亲3免费完整高清在线观看| 亚洲精品国产区一区二| av片东京热男人的天堂| 另类亚洲欧美激情| 精品少妇内射三级| 交换朋友夫妻互换小说| 欧美 日韩 精品 国产| 两人在一起打扑克的视频| 日韩欧美一区视频在线观看| 脱女人内裤的视频| 大话2 男鬼变身卡| 妹子高潮喷水视频| 一级毛片 在线播放| 免费看不卡的av| 中文字幕高清在线视频| 天天操日日干夜夜撸| 精品国产超薄肉色丝袜足j| 国产麻豆69| 亚洲精品久久成人aⅴ小说| 国产成人av激情在线播放| 久久中文字幕一级| 建设人人有责人人尽责人人享有的| 精品一区二区三区四区五区乱码 | 各种免费的搞黄视频| 宅男免费午夜| 人妻人人澡人人爽人人| 免费人妻精品一区二区三区视频| 涩涩av久久男人的天堂| 久久国产精品人妻蜜桃| 国产高清不卡午夜福利| 一边摸一边做爽爽视频免费| 两人在一起打扑克的视频| 免费看不卡的av| 亚洲国产欧美网| 久久99一区二区三区| 亚洲欧美精品综合一区二区三区| 亚洲精品一二三| 国产免费福利视频在线观看| 欧美人与性动交α欧美软件| 亚洲中文av在线| 久久99热这里只频精品6学生| 国产欧美日韩一区二区三 | 亚洲黑人精品在线| 亚洲午夜精品一区,二区,三区| 男女下面插进去视频免费观看| 亚洲午夜精品一区,二区,三区| 日韩av不卡免费在线播放| 精品少妇一区二区三区视频日本电影| 欧美日韩成人在线一区二区| 亚洲av综合色区一区| 亚洲人成电影免费在线| 狠狠精品人妻久久久久久综合| 国产麻豆69| tube8黄色片| 2018国产大陆天天弄谢| 少妇被粗大的猛进出69影院| 精品一区在线观看国产| 另类亚洲欧美激情| 国产日韩一区二区三区精品不卡| 亚洲,欧美,日韩| 校园人妻丝袜中文字幕| 国产亚洲欧美在线一区二区| 女人爽到高潮嗷嗷叫在线视频| 你懂的网址亚洲精品在线观看| 亚洲欧美精品综合一区二区三区| 极品人妻少妇av视频| 国产91精品成人一区二区三区 | 中文字幕av电影在线播放| 美女大奶头黄色视频| 亚洲专区中文字幕在线| 亚洲精品国产色婷婷电影| 波野结衣二区三区在线| 国产精品国产三级国产专区5o| 性少妇av在线| 国产精品二区激情视频| a级毛片黄视频| 精品熟女少妇八av免费久了| 午夜福利一区二区在线看| 精品少妇内射三级| 免费人妻精品一区二区三区视频| 在线观看一区二区三区激情| 亚洲,一卡二卡三卡| 久久久亚洲精品成人影院| 精品人妻1区二区| 制服人妻中文乱码| 精品国产乱码久久久久久男人| 婷婷成人精品国产| www.精华液| 成在线人永久免费视频| 超碰97精品在线观看| 欧美日韩亚洲国产一区二区在线观看 | 午夜免费男女啪啪视频观看| 久久 成人 亚洲| a级毛片在线看网站| 亚洲伊人色综图| 制服人妻中文乱码| 亚洲七黄色美女视频| 欧美日韩亚洲高清精品| 男女国产视频网站| 人体艺术视频欧美日本| 热re99久久精品国产66热6| xxx大片免费视频| 亚洲av日韩精品久久久久久密 | 欧美精品一区二区大全| 亚洲av成人不卡在线观看播放网 | 免费在线观看影片大全网站 | 免费少妇av软件| 午夜福利视频精品| 在线观看免费日韩欧美大片| 亚洲国产看品久久| 99九九在线精品视频| 成人黄色视频免费在线看| 两个人免费观看高清视频| 日韩免费高清中文字幕av| 在线观看免费午夜福利视频| 午夜福利一区二区在线看| 欧美人与性动交α欧美软件| 女警被强在线播放| 免费在线观看完整版高清| 亚洲欧美中文字幕日韩二区| 精品一区二区三区四区五区乱码 | 国产高清videossex| 成年美女黄网站色视频大全免费| 三上悠亚av全集在线观看| 国产片内射在线| 最近最新中文字幕大全免费视频 | 久久久精品94久久精品|