• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    Water flooding optimization with adjoint model under control constraints*

    2014-06-01 12:29:59ZHANGKai張凱ZHANGLiming張黎明YAOJun姚軍CHENYuxue陳玉雪
    水動力學研究與進展 B輯 2014年1期
    關鍵詞:張凱原文

    ZHANG Kai (張凱), ZHANG Li-ming (張黎明), YAO Jun (姚軍), CHEN Yu-xue (陳玉雪),

    LU Ran-ran (路然然)

    School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China, E-mail: reservoirs@163.com

    Water flooding optimization with adjoint model under control constraints*

    ZHANG Kai (張凱), ZHANG Li-ming (張黎明), YAO Jun (姚軍), CHEN Yu-xue (陳玉雪),

    LU Ran-ran (路然然)

    School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China, E-mail: reservoirs@163.com

    (Received November 16, 2012, Revised March 8, 2013)

    The oil recovery enhancement is a major technical issue in the development of oil and gas fields. The smart oil field is an effective way to deal with the issue. It can achieve the maximum profits in the oil production at a minimum cost, and represents the future direction of oil fields. This paper discusses the core of the smart field theory, mainly the real-time optimization method of the injection-production rate of water-oil wells in a complex oil-gas filtration system. Computing speed is considered as the primary prerequisite because this research depends very much on reservoir numerical simulations and each simulation may take several hours or even days. An adjoint gradient method of the maximum theory is chosen for the solution of the optimal control variables. Conventional solving method of the maximum principle requires two solutions of time series: the forward reservoir simulation and the backward adjoint gradient calculation. In this paper, the two processes are combined together and a fully implicit reservoir simulator is developed. The matrixes of the adjoint equation are directly obtained from the fully implicit reservoir simulation, which accelerates the optimization solution and enhances the efficiency of the solving model. Meanwhile, a gradient projection algorithm combined with the maximum theory is used to constrain the parameters in the oil field development, which make it possible for the method to be applied to the water flooding optimization in a real oil field. The above theory is tested in several reservoir cases and it is shown that a better development effect of the oil field can be achieved.

    water flooding optimization, adjoint model, fully implicit simulation, constrained optimization, gradient projection

    Introduction

    As is well known, almost all reservoirs are heterogeneous and the injection water would rapidly break through along high-permeability channels to production wells. Therefore, the water can not drive the oil like a piston, along uneven waterlines. The conventional way is to design orthogonal experiments for different production plans to determine a reasonable start time of water flooding and the production/injection rate. However, all these different production parameters are set by hand, and the results are heavily affected by subjective factors. As a result, the chosen plan might not be the optimal one for a given reservoir. Meanwhile, the process will take a considerable amount of time and labour and is not feasible enough to determine the real-time production adjustment plan.

    In 2004, Brouwer[1]et al., Delft University of Technology, The Netherlands, proposed a new forecasting method, for the reservoir production optimal control, which combines the reservoir numerical simulation with the optimization theory. It can be used to adjust the performance of the reservoir and to obtain the optimal control rates to maximize economic profits. The main parameters to optimize include: the production rate, the injection rate and the bottomhole flowing pressure. The final objective of the optimal control is to provide the best real-time production plan in a rapid and convenient way.

    To solve the mathematical model of the optimal control for the reservoir development, there are mainly two kinds of methods as follows:

    (1) Gradient-based algorithms. Wang et al.[2]used the perturbation method to calculate the gradientof the optimal control model. The calculation of the gradient is simple but time-consuming, and each perturbation requires two reservoir simulations at least. Brouwer[1], Jansen et al.[3]and Zhang et al.[4]calculated the gradient of the model using the maximum principle. But they do not combine the two processes together and constrain the injection-production parameters. Chen et al.[5]proposed an augmented Lagrangian method for the production optimization and a way to avoid the need to convert the inequality constraints to equality constraints. Zhang et al.[6]optimized well placement and production together using gradient algorithm. Jansen[7]discussed in detail various aspects of the adjoint-based optimization of the reservoir fooding including the optimal control theory, the computational aspects and the operational use. Although the gradient-based algorithms make the fastest calculations, they are more complex than other methods and it is difficult to develop related programs.

    (2) Stochastic algorithms. Alghareeb et al.[8]and Chen et al.[9]used the genetic algorithm to optimize the injection and production strategy to find a global optimal solution through large-scale computing, but this method has a low efficiency as a result of too many iterations. Lorentzen et al.[10], Chaudhri et al.[11], Chen and Oliver[12]used the Ensemble Kalman filter (EnKF) as well as its improved methods EnOpt to complete the production optimization. Shuai et al.[13]applied the multiscale regularization to EnOpt and to the bound optimization by quadratic approximation (BOBYQA) to address the problem brought by too high or too low frequencies in the control adjustment. With the multiscale regularization, both methods can be used to obtain the net value of production (NVP) that is equal to or exceeds the unregularized optimization, with simpler well control strategies and to reach a convergence in fewer iterations. Chen[14]tested three derivative-free algorithms: VFSA, SPMI and QIM, all in good matches and verified the fact that the DFO algorithm is capable and applicable in simulators without an adjoint formulation built in. Zhao et al.[15]proposed a new derivative-free optimization algorithm (QIM-AG) for the production optimization. Although this algorithm performs better in terms of the value of NPV attained and the computational efficiency than other derivative-free algorithms tested, it still requires more simulation runs and with a lower NPV than the adjoint-based method. And in the same year, Yan and Reynolds[16]developed a more robust optimization procedure and presented several versions of SGFD-based search direction methods that combine the fnite difference approximations with the stochastic gradients.

    A great number of reservoir numerical simulations are required in this kind of study and each simulation may take several hours or even days, therefore, for the field applications of the water flooding optimization, the computing speed is an essential issue. So the gradient algorithm is chosen as our research method.

    1. The optimal control of reservoir development

    The objective of the optimal control is to let the reservoir development system reach its best working states by an optimal plan. A mathematical model of the development optimization is to be built. Because the produced amounts of oil and water are calculated by the reservoir simulator, the flow equations of each grid block in the reservoir simulation should be considered in the model. They are expressed as follows:

    The specific parameters in this model are as follows:

    (1)Jthe objective function, consists of two components, the performance indicator of the optimal control strategy,mnY(NPV) and the additional cost of expensesθ(e.g., the cost of depreciation). In this paper,Ym,nis the increment ofJduring the thnsampling period. In the reservoir production optimization,Ym,nis composed of variables like the flow rate or the function of saturation (sweep efficiency), and its specific expression is as follows

    where,ojQis the oil production rate of the thjlayer per time interval for a single well.,wjQis the water production rate of the thjlayer per time interval for a single well. ,wi jQis the injection rate of the thjlayer per time interval for a single well.oris the economical factor of the crude output.wpris the prime cost factor of the water production.wiris the prime cost factor of the water injection.tΔ is the time interval, year.bis the current interest rate.PNis the number of producing wells.INis the number of injectionwells.mis the simulation time step in each control time step.

    (2)Ltogether with the initial condition makes up the reservoir dynamic system consisting of a number of equations of the fully implicit 3-D, 3-phase black oil model (see Eq.(16)).

    (3) Equation (3) are the boundary constraints of the control variables. Other inequality constraints can also be added if, for example, the field oil production rate cannot be above the field operation limits or the economic limit cannot be higher than the Water-Oil-Ratio.

    (4)xis a dynamic variable (e.g., the pressure, the saturation, the component.).uis a control variable (the flow rate of the production or injection well).Nis the total number of control time steps.mNis the total number of simulating time steps in each control step.

    The problem can be described as follows: to achieve an optimal control strategy ()u t*and the corresponding optimal statex*for the objective functionJto take the maximum and on condition that the control variables satisfy the linear constraints Eq.(3) (e.g., the extreme value of a single well).

    2. Optimal control solution

    2.1Discrete maximum principle

    The maximum principle is a method based on the variational theory. It is a theoretical foundation of the optimal control theory and can be applied to solve reservoir production problems. Firstly, we construct the Lagrange function with Eq.(1) and Eq.(2).

    According to the maximum principle, the first order variation ofAJis

    By using the principle of integration by parts,

    In order to obtain the maximum ofAJ,AJδmust be equal to 0, which means that every item in Eq.(8) must be equal to 0. These items will be analyzed in the following manner

    (1) Adjoint equation (1st item of Eq.(8))

    The data for the initial reservoir conditions like those on the oil-water contact surface can be measured. So the initial reservoir pressure and saturation distributions of state variables (x0,0) are known. Therefore,δx0,0=0, which means that the condition Eq.(11) is automatically satisfied too.

    (4) Last boundary condition (3th item)

    The conditions of (2) and (3) are satisfied automatically. According to (1) and (4) we can establish the adjoint model.

    Theλcan be obtained by solving the adjoint model Eq.(15) backward from theNth to 1st step. and with its being substituted into Eq.(13), the gradient ?JAand the control variables can be calculated. And then the objective function is evaluated by these control variables. If ?JAis not equal to 0, these processes will be repeated. When it is equal to 0, the optimal control plan is achieved.

    2.2Calculation of variables

    According to the aforementioned method, two solutions of time series are required and are to be obtained by the forward reservoir simulation and the backward adjoint gradient calculation. Given the characteristics of the adjoint and gradient equations, a total of 4 terms need to be solved, namely ?Y/?x,?Y/?u, ?L/?xand ?L/?u.

    Fig.1 Mesh diagram

    2.2.1 Calculation of /Lx??

    The solving process of the gradient mentioned above is based on the maximum principle and the reservoir numerical simulation. The reservoir simulation is mainly used to simulate the whole process of the oil reservoir development in a numerical way and it involves the calculations of the flows of the oil, the water and the gas, due to the unbalanced pressures in the heterogeneous reservoir. Therefore, the reservoir is meshed and the pressure in each grid block needs to be solved. The basic pressure equation of the fully implicit black oil model in the reservoir simulator is

    whereLis the pressure equation of the fully implicit black oil model,ηis the accumulated items of the mass conservation equation,ψis the flux item of the mass conservation equation,Wis the flow rate of the production or injection well,Vis the volume,φis the porosity,Spis the saturation,ρpis the density,Xcpis the moles of the componentcin the phasep, Δtis the time interval,Tsis the conductivity,λpis the mobility of phasep, ΔΦpis the potential difference of the phasep,nis the time step,Ppis the grid pressure, andPwfis the bottomhole flowing pressure.

    Fig.2 Jacobian matrix

    The Jacobian matrix, containing all information for the whole reservoir, is rather huge and we will just consider a small case of 3×3 model as an example (as shown in Fig.1). There are two wells in the reservoir, one is perforated at grid 1 and grid 4, and the other at grid 8 and grid 9. The Jacobian matrix is obtained from Eq.(16), as shown in Fig.2. It is a pentadiagonal matrix and with different linearization methods, different matrices are obtained. For example, if the Newton-Raphson method is adopted, all items in the matrix should be changed into the partial derivatives of the state variables. For an easy understanding, the grid (1,1) will be taken as an example, as it contains partsA,FandWin Eq.(16). There are three phases, including the oil, the gas and the water, in the reservoir, so each grid has three independent variables for the three-phase flow equations. The partial derivatives of the three flow equations with respect to the three control variables are as follows

    wheregLis the gas flow equation,oLis the oil flow equation,wLis the water flow equation,gPis the gas pressure,gSis the gas saturation, andoSis the oil saturation.

    So the Jacobian matrix of the fully implicit reservoir simulation can be expressed as follows

    According to Eq.(16), ?Lm,n/?xm,nin model (16) should be

    In this case, ?ηm,n(xm,n)/?xm,ncan be obtained at the previous time stepn-1, which means that it is not necessary to calculate this term at thenth step and the previous result ?Lm,n/?xm,ncan be extracted directly.

    2.2.2 Calculation of /Yx??, /Yu?? and /Lu??

    We ignore the effect of the density on the change of state variables when taking derivatives with respect toxand the derivative can be expressed as follows

    where /Wx?? is just a part of /Lx?? which can be obtained directly from the Jacobian matrix by the fully implicit solution. The dimension of /Yx?? is 1Ne×. As for /Yu?? and /Lu??, they can be calculated in the process of the numerical simulation. The results of each time step are kept and then used directly in the follow-up backward gradient calculations.

    3. Constrained optimization

    The numerical reservoir simulation is a large-scale computation, involving also many constraints, related with such as the extreme values for production (WOPR) or the injection rate (WWIR) of a single well, the maximum field total production (FOPT) and injection (FWIT) rates, the field highest water cut(FWCT). Therefore, the water flooding optimization is always a rather complicated constrained optimal control.

    3.1Advantages of gradient projection

    (1) Only one adjoint gradient is needed using the maximal principle for each iteration.

    (2) During the whole optimization process, all solutions are feasible. And a large step size can be used to accelerate the optimization.

    Compared with the feasible direction method proposed by Sarma[17], this method is more suitable for the reservoir simulation with a simpler computation process, a faster speed and better outcomes.

    3.2Gradient projection algorithm

    The gradient projection algorithm is the natural extension of the steepest descent algorithm for bound constrained problems. The constrained problem is defined as

    whereAis a matrix composed ofam,uis the con-

    原文:http://www.dpm.org.cn/collection/ceramic/226720.html?hl=%E8%B1%A1%E8%80%B3%E8%BD%AC%E5%BF%83%E7%93%B6

    Pitrol variables as above mentioned (the flow rate oil production or the injection well per day),bis the total production or injection rate per day. These equations determine the lower limit of the total production and injection rate per day in a reservoir. With the results, the optimization process could maintain the formation energy and ensure the balance of the production and the injection

    Fig.3 Search sketch of projected gradient method

    The gradient projection method is used to solve the model. The basic assumption of the method is thatulies in the subspace tangent to the active constraints. If the iterative downhill search+1lgbreaches the constraint conditions, the search is to be changed along the projected gradient direction+1ld(as shown in Fig.3), wherelis the iteration step.

    In the process of the iterative uphill search, the new variables can be updated by

    where+1lαcan be obtained by the line search. Using Eq.(24) in Eq.(26),

    Comparing Eq.(21) with Eq.(22), it follows that the linear constraints can only be satisfied by requiring that

    In order to obtain the maximum NPV, it is hoped thatdl+1deviates from thegl+1as small as possible. Therefore, the new mathematical model constrained by Eq.(21) can be constructed as

    The projected gradient can be calculated by Eq.(30). P is called the projection matrix. After a search direction is determined, a one dimensional search must be carried out to determine the value ofαin Eq.(22).

    4. Procedure of optimal calculation

    (1) With the initial conditions and the working systems, the reservoir model is solved along the forward time-scale, ?W/?xand ?W/?u, as well as the Jacobian matrix are saved for each time step.

    (2) The adjoint equation is solved along the reverse time-scale by the maximum principle. With the reserved matrix for each time step, we can obtain the variables (?Y/?x, ?Y/?u, ?L/?xand ?L/?u) directly, then calculate the Lagrange multiplier for each time step.

    (3) With the Lagrange multiplier, the gradient?JA/?uis calculated corresponding to all control variables by Eq.(13).

    (5) The gradient projection algorithm is used to calculate the constrained gradient by Eq.(30).

    (6) On the basis of the gradient, we can reach a new set of the control variables by a linear search, then use the log-inverse transformation to obtain the optimized control variableu, thus design a new development plan.

    (7) The optimization process is repeated until the gradients of all the control variables approach zero.

    5. Case study

    5.1Fully implicit simulator

    Because the study mainly concerns the mixed solution of the simulator and the optimization algorithm, the preparation of the fully implicit reservoir simulator plays a key role. This implicit reservoir simulator is developed by our group, the classic SPE1 reservoir simulation model[18]is tested, and the results are compared with those of the commercial simulator Eclipse to verify the calculations made by the simulator.

    For the two simulators, the same time steps, 32 steps are used, and the number of Newton iterations of the compiled simulator is 109. The comparisons of the results between the compiled simulator and Eclipse are shown in Figs.4 and 5. Figure 4 is a comparison of the daily oil production, from which we can see that a stable production occurs after about 1 000 d. The oil production goes from the constant oil production control to the bottomhole pressure control and the oil production is gradually decreased. Figure 5 shows the comparison of the producing gas oil ratio (GOR). At the initial state of the reservoir, there is no free gas, so the GOR is constant. About 660 d later, the free gas emerges and the GOR begins to increase steadily. In the comparison, the results of the simulator and Eclipse calculations are almost identical, which lays a good foundation for the subsequent optimization of the reservoir control.

    Fig.4 Simulator results of daily oil production comparison

    Fig.5 Simulator results of GOR comparison

    Fig.6 Sketch map of two smart horizontal wells

    5.2Optimization of reservoir examples

    5.2.1 Theoretical model optimization

    The waterflood optimization is carried out for a 2-D heterogeneous reservoir as shown in Figs.6-12. The model consists of one horizontal “smart” water injector and one horizontal “smart” producer, eachwith 45 controllable segments. The reservoir is 450 m2×450 m2in width and length and 10 m in thickness. It is modeled as 45×45×1. The fluid system is in essentially incompressible oil-water two phases, in 0.1 connate water saturation and 0.1 residual oil saturation. The initial reservoir pressure is 40 MPa. Figure 7 shows the heterogeneous permeability field with two high permeability channels running from the injector (left) to the producer (right).

    Fig.7 Permeability field of theoretical model

    Fig.8 NPV in the process of optimization

    Fig.9 Comparison of accumulative oil and water before and after optimization

    For the purpose of optimization, the injector segments are placed under the rate control, and the producer segments are placed under the pressure control. The total injection constraint rate of 368.68 m3/d is distributed in 45 injector segments according tokh. The overall production lasts about 950 d, and the production strategy changes every 190 days, which means that there are 5 control steps in the whole production life. Therefore the number of control variables can be calculated as (45+45)×5=450. And this model is designed to validate the discrete maximum principle method.

    From our calculation experience, it can be justifiably concluded that the difference between the calculated gradient of a single well by the maximum theory and that by the perturbation is negligible.

    With the projected gradient method, the constrained optimization of the total injection rate for every step can be realized. Distributing the water injection for each well while setting the total injection rate as a constant value, the effectiveness of the proposed optimization technique can be testified.

    The oil price is conservatively set as 80$/bbl, the water production cost as 30$/bbl, and the water injection cost as 10$/bbl. Figure 9 shows that there is a 57.8% increase in the cumulative field oil production (FOPT) due to a better sweep, and an evident decrease in the field water production (FWPT) of 37.3% and a water cut (FWCT), leading to an increase of NPV from 1.7×107$ to 8.45×107$.

    Figure 10(a) shows that the water floods quickly along the two high-permeability channels with a regular production strategy without optimization. As a result, a large scale oil is upswept in the comparatively low-permeability zone. And the low water sweep efficiency reduces the reservoir recovery rate. The well production schedule is changed every 190 d in the whole production life according to the optimization results after 22 iterations. The ultimate saturation field is shown in Fig.10(b). From the saturation distribution of the optimization strategy as compared with that of the regular production strategy, it can be seen that most of reservoir oil can be displaced by water, leaving little peripheral oil behind. Therefore, the recovery rate is increased significantly.

    The reason behind the better sweep in the optimized case can be easily explained by analyzing the optimized trajectories of the controls-rates/BHPs of the injectors/producers, as shown in Figs.11 and 12. From Fig.11, it can be seen that the injection rates near high permeability channels are nearly zero in the first 190 d and increase gradually from the third control step. From Fig.13, it is seen that the BHPs are increased and the production rates are decreased near high permeability channels from the third control step, which can delay the water fingering caused by the injected water increase.

    Fig.10 Oil saturation distribution optimization at 0 d, 190 d, 380 d, 540 d, 730 d and 950 d

    Fig.11 Injection water rate distribution of injectors in different control steps

    Fig.12 BHP distribution of producers in different control steps

    5.2.2 Oil field applications

    The aforementioned theory is applied to the 27A block in the Shengli Chengdao oilfield, to find an optimal development design. There are five wells in this area, two of which (A1 and A5) are production wells, two (A4 and A6) are injection wells, and the well A3 is shutdown. The three main layers in this block are Ng35, Ng36 and Ng45. To search for the optimal control of this reservoir, the flowing rate of each injectors and producers drilling through these three layers is treated as one control variable and will be distributed to each layer by the fully implicit reservoir simulator automatically. Thus for the same development design, different layers may have different recovery efficiencies. The production began in February 1998, and turned into the water flooding in March 2002. The well area is divided by the driving energy into the development stage of the natural energy (1998-2-2002-3), and the water injection development stage (2002-3-present).

    Fig.13 Control map of the wells after optimization

    Table 1 Comparison of recovery rate

    Up to now, as shown in Table 1, the cumulative recovery ratio of the block has reached 15.75%. The digital-analog method is used to forecast 5-year production targets. During this time, the cumulative oil production is 49 600 t, and the recovery rate is 18.35%, While according to the aforementioned optimization control method, also forecasting five-year, with one control every six months and the optimiza-tion time is divided into 10 steps (0 d, 182 d, 365 d, 547 d, 730 d, 912 d, 1 095 d, 1 277 d, 1 460 d and 1 642 d). The initial bottom hole pressures of the production wells A1 and A5 are 10.15 MPa. The initial injection rates of A4 and A6 are 120 m3/d. The total injection rate is constrained to 240 m3/d. After optimization the recovery rate reaches 19.27%, an increase of 0.92% as compared with that before optimization. The cumulative increase of the oil production is 11 300 t, and the net present value is increased by 35%.

    Fig.14 Water cut and accumulative production of oil and water before and after optimization

    The accumulative field productions of the oil (FOPT) and the water (FWPT) before and after optimization are shown in Fig.14. We can see that after optimization, the water cut of the block is not increased noticeably. Although the FWPT increases, there is a greater increase in the accumulative production of the oil, reaching the target to increase the oil and to control the water.

    With the constant total injection rate, the effect of increasing oil is caused by the injection increase of A4 from 120 m3/d to 240 m3/d (see Fig.13). With the injection of A6 being reduced to 0 m3/d, the sweep efficiency around A4 increases, as shown in Figs.15 and 16. The injection water fingering phenomena of A6 are decreased and more oil is produced in Ng35 and Ng45 formations.

    Fig.15 Final oil saturation distribution of the reference case

    6. Conclusions

    (1) A reservoir development control optimization model is established and solved by the maximum principle method. The solved adjoint gradients are verified with a comparison with the perturbation gradients.

    (2) All iterations are feasible states, implying that the optimization may be stopped at any iteration and the final iteration can be considered a useful solution.

    (3) The projected gradient algorithm can be effectively used to constrain the FOPT, the FWIT and other parameters. While large step sizes are possible during the modified line search, a significant reduction of the objective function may be resulted by these constrained conditions.

    [1] BROUWER D. R. Dynamic water flood optimization with smart wells using optimal control theory[D]. Delft, The Netherlands: Delft University of Technology, 2004.

    [2] WANG C. H., LI G. M. and REYNOLDS A. C. Production optimization in closed-loop reservoir management[C]. SPE Annual Technical Conference and Exhibition, 109805. Anaheim, California, USA, 2007.

    [3] JANSEN J. D., DOUMA S. D. and BROUWER D. R. et al. Closed-loop reservoir management[C]. SPE Reservoir Simulation Symposium, 119098. The Woodlands, Texas, USA, 2009.

    [4] ZHANG Kai, LI Yang and YAO Jun et al. Theoretical research on production optimization of oil reservoirs[J]. Acta Petrolei Sinica, 2010, 31(1): 78-83(in Chinese).

    [5] CHEN C. H., LI G. M. and REYNOLDS A. C. Robust constrained optimization of short- and long-term net present value for closed-loop reservoir management[J]. SPE Journal, 2010, 17(3): 849-864.

    [6] ZHANG K., LI G. M. and REYNOLDS A. C. et al. Optimal well placement using an adjoint gradient[J]. Journal of Petroleum Science and Engineering, 2010, 73(3-4): 220-226.

    [7] JANSEN J. D. Adjoint-based optimization of multiphase flow through porous media–A review[J]. Computers and Fluids, 2011, 46(1): 40-51.

    [8] ALGHAREEB Z. M., HORNE R. N. and YUEN B. B.et al. Proactive optimization of oil recovery in multilateral wells using real time production data[C]. SPE Annual Technical Conference and Exhibition, 124999-MS. New Orleans, Louisiana, USA, 2009.

    [9] CHEN S. N., LI H. and YANG D. Y. Production optimization and uncertainty assessment in a CO2flooding reservoir[C]. SPE Production and Operations Symposium, 120642-MS. Oklahoma City, Oklahoma, USA, 2009.

    [10] LORENTZEN R. J., BERG A. M. and NAEVDAL G. et al. A new approach for dynamic optimization of waterflooding problems[C]. Intelligent Energy Conference and Exhibition. Amsterdam, The Netherlands, 2006.

    [11] CHAUDHRI M. M., PHALE H. A. and LIU N. An improved approach for ensemble based production optimization: Application to a field case[C]. EUROPEC/ EAGE Conference and Exhibition, 121307. Amsterdam, The Netherlands. 2009.

    [12] CHEN Y., OLIVER D. S. Localization of ensemblebased control-setting updates for production optimization[J]. SPE Journal, 2012, 17(1): 122-136.

    [13] SHUAI Y. Y., WHITE C. D. and ZHANG H. C. Using multiscale regularization to obtain realistic optimal control strategies[C]. SPE Reservoir Simulation Symposium, 142043. The Woodlands, Texas, USA, 2011.

    [14] CHEN C. H., JIN L. and GAO G. H. et al. Assisted history matching using three derivative-free optimization algorithms[C]. SPE Europec/EAGE Annual Conference, 154112. Copenhagen, Denmark, 2012.

    [15] ZHAO H., CHEN C. H. and DO S. et al. Maximization of a dynamic quadratic interpolation model for production optimization[J]. SPE Journal, 2013, 18(6): 1012-1025.

    [16] YAN X., REYNOLDS A. C. An optimization algorithm based on combining finite-difference approximations and stochastic gradients[C]. SPE Reservoir Simulation Symposium, 163613. The Woodlands, Texas, USA, 2013.

    [17] SARMA P., CHEN W. H. and DURLOFSKY L. J. et al. Production optimization with adjoint models under nonlinear control-state path inequality constraints[J]. SPE Reservoir Evaluation and Engineering, 2008, 11(2): 326-339.

    [18] AZIZ S. O. Comparison of solutions to a three dimensional black-oil reservoir simulation problem[J]. Journal of Petroleum Technology, 1981, 33(1): 13-25.

    10.1016/S1001-6058(14)60009-3

    * Project supported by the China Important National Science and Technology Specific Projects (Grant No. 2011ZX05024-002-008), the Fundamental Research Funds for the Central Universities (Grant No. 13CX02053A) and the Changjiang Scholars and Innovative Reserch Team in University (Grant No. IRT1294).

    Biography: ZHANG Kai (1980-), Male, Ph. D.,

    Associate Professor

    YAO Jun,

    E-mail: yaojunhdpu@126.com

    猜你喜歡
    張凱原文
    茄子
    基于改進Mask RCNN的俯視群養(yǎng)豬圖像的分割
    軟件(2020年3期)2020-04-20 01:44:52
    癡情追愛牽出案中案
    癡情追愛,牽出案中案
    莫愁(2019年4期)2019-02-21 09:06:46
    Pressure characteristics of hydrodynamic cavitation reactor due to the combination of Venturi tubes with multi-orifice plates *
    讓句子動起來
    嘗糞憂心
    扼虎救父
    恣蚊飽血
    賣身葬父
    欧美精品人与动牲交sv欧美| 午夜福利影视在线免费观看| 婷婷色av中文字幕| 亚洲欧美色中文字幕在线| www.999成人在线观看| 国产成人精品久久二区二区91| 亚洲人成电影免费在线| 国产av国产精品国产| 精品少妇一区二区三区视频日本电影| 国产午夜精品一二区理论片| 99国产精品一区二区蜜桃av | 久久国产精品男人的天堂亚洲| 国产伦理片在线播放av一区| 国产黄色免费在线视频| 免费av中文字幕在线| 久久精品亚洲熟妇少妇任你| 免费少妇av软件| 看十八女毛片水多多多| 在线观看免费午夜福利视频| 啦啦啦在线免费观看视频4| 国产亚洲一区二区精品| 欧美黄色片欧美黄色片| 一区二区三区精品91| 多毛熟女@视频| 亚洲精品日本国产第一区| videos熟女内射| 国产在线免费精品| 日韩伦理黄色片| 我的亚洲天堂| 亚洲国产欧美日韩在线播放| 黄色一级大片看看| 国产成人av教育| 国产99久久九九免费精品| 日韩中文字幕欧美一区二区 | 午夜免费鲁丝| 国产爽快片一区二区三区| 亚洲精品美女久久久久99蜜臀 | 嫩草影视91久久| 日韩,欧美,国产一区二区三区| 大香蕉久久成人网| 国产精品一区二区免费欧美 | 国产伦理片在线播放av一区| 精品熟女少妇八av免费久了| 男男h啪啪无遮挡| 老司机靠b影院| 亚洲av美国av| 十八禁人妻一区二区| 黑人猛操日本美女一级片| 成年人午夜在线观看视频| 亚洲国产毛片av蜜桃av| 国产福利在线免费观看视频| 自拍欧美九色日韩亚洲蝌蚪91| 一本大道久久a久久精品| 亚洲成人免费av在线播放| 90打野战视频偷拍视频| 十分钟在线观看高清视频www| 99久久综合免费| 嫩草影视91久久| 夫妻性生交免费视频一级片| 精品欧美一区二区三区在线| 久热爱精品视频在线9| 成年动漫av网址| 99国产精品一区二区蜜桃av | 老汉色av国产亚洲站长工具| 亚洲人成电影免费在线| 人妻人人澡人人爽人人| 欧美在线黄色| 亚洲精品自拍成人| 亚洲 欧美一区二区三区| 欧美亚洲日本最大视频资源| 大香蕉久久网| 极品人妻少妇av视频| 亚洲欧美一区二区三区久久| 日本欧美视频一区| 日韩av不卡免费在线播放| 国产视频首页在线观看| 国产精品久久久久久精品古装| 亚洲男人天堂网一区| 国产精品偷伦视频观看了| 久久热在线av| 91字幕亚洲| 色94色欧美一区二区| 亚洲欧洲国产日韩| 亚洲欧美一区二区三区久久| 亚洲国产毛片av蜜桃av| 国产成人影院久久av| 国产人伦9x9x在线观看| 晚上一个人看的免费电影| 日韩,欧美,国产一区二区三区| 久久精品久久久久久噜噜老黄| 日日摸夜夜添夜夜爱| 久热爱精品视频在线9| 极品少妇高潮喷水抽搐| 久久中文字幕一级| 多毛熟女@视频| 99热全是精品| 国产一区二区激情短视频 | 国产av国产精品国产| 亚洲图色成人| 国产福利在线免费观看视频| 91老司机精品| 亚洲专区中文字幕在线| 久久人妻熟女aⅴ| 婷婷丁香在线五月| 在线观看www视频免费| 在线天堂中文资源库| bbb黄色大片| 国产免费一区二区三区四区乱码| 日韩 欧美 亚洲 中文字幕| 日韩av不卡免费在线播放| 欧美久久黑人一区二区| 亚洲av成人不卡在线观看播放网 | 日韩大片免费观看网站| 国产精品一区二区精品视频观看| 国产在线视频一区二区| 爱豆传媒免费全集在线观看| 久热爱精品视频在线9| 欧美人与善性xxx| bbb黄色大片| 最近手机中文字幕大全| 国产午夜精品一二区理论片| 日本一区二区免费在线视频| 欧美国产精品va在线观看不卡| 成年动漫av网址| 超色免费av| 亚洲精品久久午夜乱码| 国产日韩欧美在线精品| 亚洲黑人精品在线| 看免费av毛片| 少妇精品久久久久久久| 1024视频免费在线观看| 国产成人免费无遮挡视频| 精品人妻1区二区| 免费观看av网站的网址| 黑人猛操日本美女一级片| 另类精品久久| 一级毛片黄色毛片免费观看视频| 亚洲欧洲国产日韩| 成年人午夜在线观看视频| 91麻豆精品激情在线观看国产 | 丁香六月欧美| 精品一品国产午夜福利视频| 婷婷色综合大香蕉| 在现免费观看毛片| 亚洲国产日韩一区二区| 亚洲免费av在线视频| 欧美 亚洲 国产 日韩一| 午夜福利视频在线观看免费| 国产成人影院久久av| 亚洲精品av麻豆狂野| av天堂在线播放| 欧美在线一区亚洲| 在线观看免费高清a一片| av在线app专区| 国产福利在线免费观看视频| 两个人看的免费小视频| 91成人精品电影| 亚洲av欧美aⅴ国产| 人人妻人人添人人爽欧美一区卜| av天堂在线播放| 亚洲黑人精品在线| 热re99久久国产66热| av在线老鸭窝| 国产成人影院久久av| 少妇猛男粗大的猛烈进出视频| 无遮挡黄片免费观看| 老鸭窝网址在线观看| 黄片播放在线免费| 日韩视频在线欧美| 国产色视频综合| 精品国产国语对白av| av欧美777| 后天国语完整版免费观看| 国精品久久久久久国模美| 天天躁狠狠躁夜夜躁狠狠躁| 国产精品一国产av| 国产片特级美女逼逼视频| 欧美黑人欧美精品刺激| 两人在一起打扑克的视频| 一边摸一边抽搐一进一出视频| 黄片小视频在线播放| 亚洲伊人久久精品综合| 啦啦啦啦在线视频资源| 男女免费视频国产| 国精品久久久久久国模美| 亚洲第一av免费看| 欧美日韩一级在线毛片| 日韩 亚洲 欧美在线| 捣出白浆h1v1| www.精华液| 在线亚洲精品国产二区图片欧美| 男女边摸边吃奶| 亚洲精品av麻豆狂野| 美女午夜性视频免费| 国产黄频视频在线观看| 下体分泌物呈黄色| 精品久久久久久久毛片微露脸 | 久久久久久久精品精品| av在线老鸭窝| 99香蕉大伊视频| 免费在线观看视频国产中文字幕亚洲 | 精品人妻1区二区| 日韩av不卡免费在线播放| 在线观看免费高清a一片| h视频一区二区三区| 精品国产乱码久久久久久小说| 我要看黄色一级片免费的| 免费看不卡的av| 精品国产一区二区久久| 激情视频va一区二区三区| 欧美日韩亚洲综合一区二区三区_| 男女国产视频网站| 巨乳人妻的诱惑在线观看| 欧美日韩视频精品一区| 精品福利观看| 免费观看av网站的网址| 亚洲中文日韩欧美视频| 久久精品国产亚洲av涩爱| 777米奇影视久久| 国产精品久久久久久精品古装| 性色av乱码一区二区三区2| 久久热在线av| 国产真人三级小视频在线观看| 亚洲天堂av无毛| 久久精品亚洲熟妇少妇任你| 亚洲久久久国产精品| 国产精品亚洲av一区麻豆| 亚洲精品国产区一区二| 99国产精品一区二区蜜桃av | 国产成人精品久久二区二区91| 免费在线观看日本一区| 亚洲精品久久成人aⅴ小说| 最黄视频免费看| 午夜激情av网站| 久久国产精品大桥未久av| 亚洲精品国产色婷婷电影| 国产日韩欧美亚洲二区| 两性夫妻黄色片| 亚洲自偷自拍图片 自拍| 老汉色av国产亚洲站长工具| 中国国产av一级| 午夜影院在线不卡| 免费不卡黄色视频| 亚洲中文字幕日韩| 国产精品久久久久久人妻精品电影 | 国产高清不卡午夜福利| 黄色a级毛片大全视频| 精品一区二区三卡| 色婷婷av一区二区三区视频| 超碰97精品在线观看| 大型av网站在线播放| 日日爽夜夜爽网站| 在线精品无人区一区二区三| 欧美少妇被猛烈插入视频| 亚洲伊人色综图| 国产成人影院久久av| av不卡在线播放| 亚洲精品美女久久av网站| 多毛熟女@视频| 国产亚洲精品第一综合不卡| 国产黄频视频在线观看| 久久亚洲精品不卡| 国产一区二区在线观看av| 国产精品国产三级国产专区5o| 中文字幕另类日韩欧美亚洲嫩草| 91精品伊人久久大香线蕉| 赤兔流量卡办理| 亚洲免费av在线视频| 欧美成人精品欧美一级黄| 亚洲国产欧美一区二区综合| 欧美 亚洲 国产 日韩一| 国产亚洲欧美在线一区二区| 黄色a级毛片大全视频| 久久亚洲精品不卡| 欧美日韩亚洲国产一区二区在线观看 | 99国产精品免费福利视频| 午夜激情久久久久久久| 午夜福利视频在线观看免费| 日韩一卡2卡3卡4卡2021年| 999精品在线视频| 男的添女的下面高潮视频| 大片免费播放器 马上看| 亚洲精品国产av蜜桃| 欧美亚洲 丝袜 人妻 在线| 老司机影院成人| 日韩熟女老妇一区二区性免费视频| 中国国产av一级| 国产精品香港三级国产av潘金莲 | 欧美变态另类bdsm刘玥| 亚洲欧洲日产国产| av在线老鸭窝| 一本色道久久久久久精品综合| 晚上一个人看的免费电影| 日韩大码丰满熟妇| 亚洲精品一卡2卡三卡4卡5卡 | 亚洲五月婷婷丁香| 亚洲欧美激情在线| 日韩一本色道免费dvd| 国产精品熟女久久久久浪| 亚洲av日韩精品久久久久久密 | 午夜福利乱码中文字幕| 一边亲一边摸免费视频| 日韩电影二区| 美女扒开内裤让男人捅视频| 国产又爽黄色视频| 国产男人的电影天堂91| 日韩视频在线欧美| 午夜激情久久久久久久| 男人添女人高潮全过程视频| 亚洲综合色网址| 精品亚洲乱码少妇综合久久| 极品人妻少妇av视频| 欧美 日韩 精品 国产| 亚洲五月婷婷丁香| 精品国产超薄肉色丝袜足j| 亚洲精品日韩在线中文字幕| 下体分泌物呈黄色| 母亲3免费完整高清在线观看| 精品久久久精品久久久| 国产精品.久久久| 国产精品一区二区免费欧美 | 只有这里有精品99| 狂野欧美激情性bbbbbb| 视频在线观看一区二区三区| 五月天丁香电影| 中文字幕另类日韩欧美亚洲嫩草| 夜夜骑夜夜射夜夜干| 波野结衣二区三区在线| 99国产精品99久久久久| 人人妻人人澡人人爽人人夜夜| 国产99久久九九免费精品| 久久av网站| 国产精品 欧美亚洲| 美女中出高潮动态图| 久久久久视频综合| 亚洲国产毛片av蜜桃av| 777米奇影视久久| 少妇精品久久久久久久| 婷婷丁香在线五月| 一区福利在线观看| 亚洲国产欧美在线一区| 免费少妇av软件| 亚洲精品乱久久久久久| 巨乳人妻的诱惑在线观看| 一本色道久久久久久精品综合| 亚洲少妇的诱惑av| 一本—道久久a久久精品蜜桃钙片| 久久人人97超碰香蕉20202| 麻豆国产av国片精品| 建设人人有责人人尽责人人享有的| 麻豆av在线久日| 久久久久网色| 国产女主播在线喷水免费视频网站| 最近手机中文字幕大全| 国产免费福利视频在线观看| 我要看黄色一级片免费的| 一级毛片黄色毛片免费观看视频| 91九色精品人成在线观看| 成人免费观看视频高清| 亚洲精品av麻豆狂野| 在线天堂中文资源库| 久久青草综合色| 高清视频免费观看一区二区| 人人澡人人妻人| 欧美老熟妇乱子伦牲交| 日本av手机在线免费观看| 99国产精品免费福利视频| 欧美日韩视频高清一区二区三区二| 一本一本久久a久久精品综合妖精| 丰满迷人的少妇在线观看| 另类亚洲欧美激情| 欧美国产精品一级二级三级| 亚洲成人国产一区在线观看 | 看十八女毛片水多多多| 久久精品国产综合久久久| 老司机影院毛片| 91九色精品人成在线观看| 国产熟女欧美一区二区| 欧美 亚洲 国产 日韩一| 国产成人精品久久久久久| 欧美乱码精品一区二区三区| 少妇裸体淫交视频免费看高清 | 又紧又爽又黄一区二区| 国产精品国产三级专区第一集| 亚洲熟女毛片儿| 成人手机av| 蜜桃国产av成人99| 亚洲av成人精品一二三区| 国产爽快片一区二区三区| 午夜老司机福利片| 新久久久久国产一级毛片| 在线av久久热| 国产真人三级小视频在线观看| 高清av免费在线| 久久亚洲精品不卡| 9色porny在线观看| 女人久久www免费人成看片| 中文字幕高清在线视频| 肉色欧美久久久久久久蜜桃| 9热在线视频观看99| 亚洲激情五月婷婷啪啪| 亚洲精品国产区一区二| 精品国产一区二区久久| 欧美精品高潮呻吟av久久| 可以免费在线观看a视频的电影网站| 在线观看人妻少妇| 日本猛色少妇xxxxx猛交久久| 日韩欧美一区视频在线观看| 日韩av免费高清视频| 精品视频人人做人人爽| 免费av中文字幕在线| 1024香蕉在线观看| 亚洲色图综合在线观看| 国产成人精品在线电影| 无限看片的www在线观看| 性色av乱码一区二区三区2| 美女国产高潮福利片在线看| 欧美亚洲 丝袜 人妻 在线| 亚洲av综合色区一区| 一区在线观看完整版| 亚洲专区中文字幕在线| 一本色道久久久久久精品综合| 精品一区二区三卡| 成人18禁高潮啪啪吃奶动态图| 黄片小视频在线播放| 看免费av毛片| 99国产综合亚洲精品| 精品少妇内射三级| 在线精品无人区一区二区三| 免费av中文字幕在线| 国产亚洲精品第一综合不卡| 国产极品粉嫩免费观看在线| a级毛片黄视频| 人人妻人人澡人人爽人人夜夜| 国产成人av激情在线播放| 久久精品aⅴ一区二区三区四区| 日本vs欧美在线观看视频| 国产精品国产三级国产专区5o| 亚洲欧美精品自产自拍| 精品国产国语对白av| 久久鲁丝午夜福利片| 成人影院久久| 青春草视频在线免费观看| e午夜精品久久久久久久| 免费在线观看影片大全网站 | 精品少妇久久久久久888优播| 国产欧美日韩一区二区三 | 欧美人与性动交α欧美精品济南到| 国产亚洲一区二区精品| 麻豆av在线久日| 亚洲精品一卡2卡三卡4卡5卡 | 国产免费福利视频在线观看| 好男人视频免费观看在线| 一区在线观看完整版| 精品少妇内射三级| 两个人免费观看高清视频| 亚洲欧美成人综合另类久久久| www日本在线高清视频| 色94色欧美一区二区| 精品第一国产精品| 欧美97在线视频| 在线av久久热| 午夜免费成人在线视频| 国产麻豆69| 韩国精品一区二区三区| 免费观看a级毛片全部| 韩国高清视频一区二区三区| 亚洲av国产av综合av卡| 色婷婷久久久亚洲欧美| 狠狠婷婷综合久久久久久88av| 真人做人爱边吃奶动态| 欧美日本中文国产一区发布| 亚洲欧洲精品一区二区精品久久久| 国产日韩欧美在线精品| 欧美黄色淫秽网站| 97在线人人人人妻| 国产成人一区二区三区免费视频网站 | 性色av一级| a级毛片在线看网站| 国产精品99久久99久久久不卡| 51午夜福利影视在线观看| 欧美精品啪啪一区二区三区 | 日本wwww免费看| 亚洲国产毛片av蜜桃av| 亚洲国产精品一区三区| 国产男女超爽视频在线观看| 狂野欧美激情性bbbbbb| 99热国产这里只有精品6| 欧美精品高潮呻吟av久久| 搡老乐熟女国产| 看十八女毛片水多多多| 欧美日韩av久久| 国产熟女午夜一区二区三区| 在线观看一区二区三区激情| 黑人欧美特级aaaaaa片| 欧美日韩亚洲综合一区二区三区_| 狂野欧美激情性bbbbbb| 人人妻人人澡人人看| 亚洲国产看品久久| 啦啦啦中文免费视频观看日本| 国产av精品麻豆| 黄色视频在线播放观看不卡| 麻豆国产av国片精品| 久久久国产欧美日韩av| 久久热在线av| 国产熟女欧美一区二区| 建设人人有责人人尽责人人享有的| 日韩制服骚丝袜av| 国产主播在线观看一区二区 | 国产免费福利视频在线观看| 婷婷色av中文字幕| 国产一区亚洲一区在线观看| 男女床上黄色一级片免费看| 天天躁日日躁夜夜躁夜夜| 美女大奶头黄色视频| 欧美亚洲日本最大视频资源| 91麻豆av在线| 国产在线视频一区二区| 欧美精品啪啪一区二区三区 | 国产精品亚洲av一区麻豆| 亚洲成人国产一区在线观看 | 1024视频免费在线观看| 久久精品国产a三级三级三级| 高清av免费在线| 成年人免费黄色播放视频| www日本在线高清视频| 后天国语完整版免费观看| 国产成人系列免费观看| 高潮久久久久久久久久久不卡| 美女脱内裤让男人舔精品视频| 国产视频一区二区在线看| 国产成人av教育| 欧美变态另类bdsm刘玥| 国产免费一区二区三区四区乱码| 这个男人来自地球电影免费观看| 女人高潮潮喷娇喘18禁视频| 久久国产精品人妻蜜桃| 免费女性裸体啪啪无遮挡网站| 热re99久久精品国产66热6| 亚洲成国产人片在线观看| 18禁国产床啪视频网站| 欧美日韩国产mv在线观看视频| 亚洲精品久久久久久婷婷小说| 极品少妇高潮喷水抽搐| 黑人欧美特级aaaaaa片| 亚洲欧美精品自产自拍| 亚洲国产欧美日韩在线播放| 欧美日韩亚洲国产一区二区在线观看 | 后天国语完整版免费观看| 免费少妇av软件| 脱女人内裤的视频| 欧美精品人与动牲交sv欧美| 亚洲av成人不卡在线观看播放网 | 丰满饥渴人妻一区二区三| 18禁裸乳无遮挡动漫免费视频| 亚洲久久久国产精品| 老司机影院成人| 精品国产乱码久久久久久小说| 欧美黑人精品巨大| 色播在线永久视频| 嫁个100分男人电影在线观看 | 国产一区二区 视频在线| 免费女性裸体啪啪无遮挡网站| 美女视频免费永久观看网站| 亚洲精品国产一区二区精华液| 视频区欧美日本亚洲| 久久人人爽人人片av| 在线av久久热| 欧美日本中文国产一区发布| 国产精品99久久99久久久不卡| 极品人妻少妇av视频| 尾随美女入室| 在线 av 中文字幕| 少妇人妻 视频| 宅男免费午夜| 最近手机中文字幕大全| 日本色播在线视频| 男女无遮挡免费网站观看| 男男h啪啪无遮挡| 欧美亚洲 丝袜 人妻 在线| 欧美精品高潮呻吟av久久| 啦啦啦在线免费观看视频4| 一级,二级,三级黄色视频| videos熟女内射| 亚洲精品久久午夜乱码| 亚洲国产欧美一区二区综合| 精品人妻一区二区三区麻豆| 高潮久久久久久久久久久不卡| 伊人亚洲综合成人网| 午夜免费成人在线视频| 色视频在线一区二区三区| 男的添女的下面高潮视频| 精品人妻1区二区| 高潮久久久久久久久久久不卡| 欧美精品人与动牲交sv欧美| 精品人妻1区二区| 精品少妇久久久久久888优播| 一级片免费观看大全| 国产野战对白在线观看| 啦啦啦中文免费视频观看日本| 男女边摸边吃奶| 天天躁狠狠躁夜夜躁狠狠躁| 中文字幕av电影在线播放| 最新的欧美精品一区二区| 国产日韩欧美在线精品| 男男h啪啪无遮挡| 久久九九热精品免费| 欧美在线黄色| 9191精品国产免费久久| 欧美日韩视频精品一区| 考比视频在线观看| 超碰成人久久| 精品国产一区二区久久| 国产精品二区激情视频| 亚洲精品一卡2卡三卡4卡5卡 |