• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    A Robust MPPT Control Based on Double Ended Forward Converter Architecture

    2022-11-09 08:13:16UsmanKhanHasanFaisalMurtazaUsmanandHadeedSher
    Computers Materials&Continua 2022年1期

    M.Usman Khan,K.M.Hasan,A.Faisal Murtaza,H.M.Usman and Hadeed A.Sher

    1University of Engineering&Technology,Lahore,54000,Pakistan

    2University of Central Punjab,Lahore,54000,Pakistan

    3Ghulam Ishaq Khan Institute of Engineering Sciences and Technology,Swabi,23430,Pakistan

    Abstract: In this paper,a stand-alone photovoltaic (PV) system based on a Double Ended Forward Converter(DEFC)is presented.The proposed converter is specified for 48 V,100 W applications as most of the equipment used in telecommunication and aircraft fall in this range.The literature has limited potential application of DEFC in PV systems.The research work deals with an in-depth study of DEFCand proposes an improved DEFC for PV applications with battery backup.Besides,a bi-directional dc-dc converter for the battery is integrated to track the Maximum Power Point(MPP)of the PV generator.The converter is examined under variable irradiance and load conditions,and the analytical analysis of boundary conditions are implemented.The converter’s architecture also ensures built-in I-V curve tracing for the identification of MPP of PV generator.It offers low voltage stresses across switches and avoids sinking power supply and core resetting circuits.The topology’s behavior is analyzed based on MPP achievement and maintaining output under different conditions of battery backup availability,environmental,and load conditions.The PV system architecture is designed and analyzed theoretically and verified with simulations on the PSIM software.

    Keywords: Photovoltaic;power converter;forward converter;double ended forward converter;bi-directional dc-dc converter;MPP;I-V curve tracing

    1 Introduction

    Energy demands are multiplying as the technology evolves without any boundary limits in the modern era.The demand in the energy sector is forecasted to rise by 56% from 2010 to 2050,which certainly will increase the pollution factor due to carbon dioxide emissions [1].PV energy is a type of renewable energy that has several advantages compared to other renewable energy sources.These systems are easy to install and do not demand any kind of topological studies,as in the case of wind and hydro energy.PV systems have more applications than any other renewable source such as more electric aircraft,solar vehicles,parking stations,telecommunication,and building integrated PV systems [2].Stand-alone PV systems are vital in remote and agriculture areas where infrastructure is less developed.This paper is primarily related to stand-alone PV systems.

    A typical stand-alone PV system integrated with battery backup is presented in Fig.1.The major problem related to a stand-alone PV system is dynamic weather,as its output depends on solar irradiance.Passing clouds and unavailability of solar irradiance during the night time are significant concerns that emphasize the use of energy storage elements like a battery.A standalone PV system with battery backup ensures an uninterruptable power supply to the load.Furthermore,in stand-alone PV systems,Maximum Power Point Tracking (MPPT) is attainable only in the case of battery backup [3].In the literature,a number of researches have been carried out to extract maximum power under dynamic weather conditions.The basic algorithm of MPPT is Perturb and Observe (P&O),which tracks the MPP by simply measuring voltage and current from the PV array [4].This method works pretty well under uniform weather conditions but collapses in changing weather.Another well-known MPP algorithm is Incremental Conductance(IC),which has the same disadvantages as P&O [5].These two basic algorithms also suffer in terms of tracking efficiency.The concept of variable step size is instigated to increase the tracking efficiency [6].Some other renowned algorithms are Open Circuit Voltage (OCV) and Short Circuit Current (SCC) algorithms [7].The disadvantage with these algorithms is the complexity of the hardware.These methods are used in common with other algorithms like an artificial neural network [8],evolutionary algorithm [9],fuzzy logic based [10],and genetic algorithm [11] to increase efficiency and performance.

    Figure 1:Typical stand-alone PV system

    A stand-alone PV system with battery backup,having the ability to track MPP is proposed [12].It has the disadvantage of using dump loads to dissipate excess energy.A stand-alone PV system having high voltage gain and high efficiency is presented [13].The drawback of this architecture is the absence of battery backup hence resulting in no electrical MPPT.A dc-dc boost converter for stepping up the PV voltage and a bi-directional dc-dc converter for battery backup is introduced [14].This topology is unable to extract MPP from the PV generator under dynamic weather and load conditions.An upgraded MPPT based PV system architecture involves dc-dc converter,and H-bridge inverter is discussed [15].This architecture offers improved performance;however,it collapses under severe irradiance conditions due to the absence of the Battery Energy Storage System (BESS).Hybrid control of MPPT and Desired Power Control (DPC) for retaining the State of Charge (SOC) of the battery is analyzed in [16].The drawback of this architecture is the complexity of the controlling algorithm and hardware components.

    The dc-dc converters are categorized as isolated and non-isolated converters depending on isolation.In isolated converters,inductors and transformers are used to offer galvanic isolation between input and output,whereas,in non-isolated converters,both sides have common ground [17].Isolated converters employ high-frequency transformers for high voltage gain and offer more safety and can provide multiple outputs compared to the coupled inductor of non-isolated converters.A fly-back converter is the most commonly used isolated converter.Its subtypes are active clamp fly-back converter,an inverted fly-back converter,a fly-back converter with RCD snubber,two switches fly-back converter,and dual ac-dc fly-back converter [18].A hybrid converter consists of a push-pull circuit on the output side,and a full-bridge circuit on the input side is proposed [19].It has the disadvantage of circuit complexity and current ripples.

    Coupled inductor converters have low rating components,low current stresses,and uncomplicated winding [20].Interleaved type of dc-dc converters is utilized in the applications requiring high power.These inductor based dc-dc converters offer low efficiency because of high leakage inductance during off time causing high voltage spikes and during off time causing current spikes across the switches.Passive and active clamp circuits are introduced to diminish the effects of leakage inductance.Active clamp circuits contain switches along with passive circuit elements compared to only passive components of passive clamp circuits.Passive clamp circuits offer greater efficiency as they are free of conduction losses across the switch [21].To increase efficiency and voltage gain,a coupled inductor type dc-dc converter with a passive clamp circuit is proposed [22].Coupled inductors are integrated with an intermediate capacitor and voltage multiplier to attain high voltage gain [23].A variable inductance based buck converter is proposed for micro-grids having a wide range of voltage operation and higher efficiency [24].The primary disadvantage of this converter is high voltage stresses across switching devices and high ripples.

    From the preceding discussion,the following drawbacks of conventional dc-dc converters are concluded:

    · Due to the high current flow at the transformer’s primary side,the inductor gets affected and results in severe losses.

    · High voltage spikes start appearing across the switches.Consequently,not only the breakdown voltage rating of the switching devices becomes stringent,but the conduction losses also become higher.

    · Snubber circuits and sinking supplies are essential to dissipate excess energy from magnetic components.

    · Due to multiple switches and magnetic components,the staircase effect arises,resulting in flux imbalance.

    · To trace the I-V curve for the identification of MPP,extra circuits are necessary,which results in the complexity of the control and system architecture.

    · In stand-alone PV systems,dump loads are critical components to avoid overcharging of the battery.

    The proposed PV system architecture offers the following features:

    · The proposed system architecture offers a built-in I-V curve tracing for the identification of MPP.Since the PV generator is predominantly a current source,an extra capacitorCin,needs to be installed at the input.The proposed topology employs the same capacitor in the I-V curve tracing.

    · Since the forward converter requires a sinking supply at the input side,the PV generator and the installment ofCinprovide the mean of that sinking supply.

    · The presented power conditioning circuit offers Required Power Tracking (RPT) depending on the load requirement,weather conditions,and state of the battery to avoid dump loads.

    · The given converter has low voltage stresses across the switches and low inductive spikes because of the input capacitor and the converter architecture.

    · The proposed converter topology eliminates the staircase effect and flux imbalance caused by magnetic components.

    The paper is organized as follows,Section 2 presents the proposed converter topology and its working mode follows up by overall control operation with battery backup in Section 3.Sections 4 offers the mathematical designing of the components.Simulation results are presented in Sections 5 and 6 presents concluding remarks.

    2 Converter Topology and Operation

    Fig.2 presents the proposed PV system architecture,which comprises a DEFC and a bidirectional dc-dc converter with battery backup.

    Figure 2:Proposed PV system architecture

    DEFC contains two switches (S1&S2),a transformer with the ratio ofNs/Np,two input diodes (D1&D2),two output diodes (D3&D4),an inductor (L1),an output capacitor (Co) and the load (RL).Similarly,a bi-directional dc-dc converter consists of an inductor (L2),a battery(B),and the two switches (S3&S4).An input capacitor (Cin) is employed with the PV source for curve tracing.The simultaneous switching ofS1andS2results in on-mode and off-mode of the system as presented in Figs.3a and 3b.

    On-Mode: In on-mode,S1andS2are turned on simultaneously,resulting in the forwarding of power from the PV generator to the load.The diodesD1andD2are reverse biased,and the current directions are presented in Fig.3a.The transformer’sNpwinding gets charged from the PV source,and the same power is delivered at the secondary side.TheD3gets forward biased and provides the path to chargeL1,at the same time,satisfies the load.

    Figure 3:Different modes of the proposed topology (a) On-mode (b) Off-mode

    In the given DEFC topology,the switchesS1andS2are turned on simultaneously,and also the output side of DEFC is a buck topology,the following equation is valid.

    whereVpvis the voltage across the PV generator,Ns/Npis the transformer ratio,andD1is the duty cycle of the DEFC converter.

    The optimal value for theRLis designed by using impedance modeling.

    Putting Eq.(1) in Eq.(2),RLis calculated as,

    Off-Mode:In off-mode,S1andS2are turned off,result in reversing the polarity and the current direction in theNpwinding of the transformer,as presented in Fig.3b.TheD1andD2provide a freewheeling path to theNpwinding of the transformer,which discharges intoCin,thus avoiding any snubber circuit and sinking supply.At the secondary side,D4provides freewheeling toL1,maintaining the output at the load side.

    Bi-directional dc-dc converter:The bi-directional dc-dc converter also operates in two modes resulted by alternative switching ofS3andS4.The functioning of the bi-directional dc-dc converter depends on (1) state of the battery,(2) load conditions,and (3) weather conditions.The parameters mentioned above are strongly linked with each other.If the power required by the load is greater than the power generated by PV,then battery discharges depending on its discharge voltage (VD) and vice versa happens if the power required is less than the generated power.

    I-V curve tracing:The proposed PV system architecture offers a built-in I-V curve tracing for the identification of MPPT,as shown in Fig.4a.The curve is traced with the assist ofCinby isolating both the converters from the PV generator for a limited time interval.During this interval,power is delivered to the load byL1.

    Figure 4:(a) I-V curve tracing using proposed topology (b) Scanning of PV with Cin

    3 Control Operation and Overall Operating Modes of Architecture with the Battery Setup

    As shown in the flow chart in Fig.5,to initialize the tracing process,the duty cycle of theS1andS2is increased to a greater value,say 1,which assists in transferring the operating point at the start of the curve,as shown in Fig.4b.

    The required output power is estimated by calculating the value ofRLusing Eq.(3),whereD1=1,IpvandVpvare instantaneous values from the PV generator.In the next step,both the converters are isolated from the PV generator by turning offS1-S3.At this instant,Cinstarts charging from a value (near zero) toVoc,resulting in curve tracing.During the charging of the capacitor,the peak is identified by power subroutines returning MPP of the PV generator,as shown in Fig.4b.The corresponding duty cycle for the identified MPP is calculated by modifying Eq.(3),and the operating point of the PV generator is shifted accordingly.

    As shown in the flow chart in Fig.5,the next step to I-V curve tracing is examining the output voltage status.When the output voltage is maintained at a level of 48 V means no change is essential inD1,the algorithm waits for a change in weather conditions.

    Contrarily,if the output voltage drops from 48 V,the battery voltage (VB) status is investigated.WheneverVBis greater thanVD,the battery discharges,and the load is maintained by battery and PV generator combine.On the other hand,ifVBis less thanVD,the system continues to operate only ifVois in ±10% range;otherwise,the system shuts down.In case thatVois not less than or equals to 48 V,battery status is checked.SupposeVBis less thanVD,battery charges from the additional power extracted from the PV generator.Whereas,givenVBgreater thanVD,the control shifts to RPT,which extracts only that much power required by the load.In this way,overcharging of the battery and the use of dump loads is avoided.

    Battery Stages: Every stand-alone PV system subjects to variable environmental and load conditions.To sustain the output and track the MPP,energy storage elements like batteries become the integrating part of the PV system.In this section,different stages according to the availability of battery,as presented in Fig.6,are discussed.

    Figure 5:Flowchart of the control mechanism

    Figure 6:Battery backup stages

    Stage-1:Considering this stage when there is no battery for power backup;hence PV array is the only source to satisfy the load demand.The objective is to sustain the output voltage of 48 V and to attain MPP.Eqs.(1) and (3) are used to formulate the relation betweenVo,Vmpp,andRL.

    When the optimal value ofRLis connected and has no battery backup provided,Voand MPP are attained at designedD1.

    Stage-2:In this stage,the battery is available for both charging and discharging.In the case of battery Eq.(6) can be modified to,

    whereIBis the battery current,which can be positive or negative depending on the charging and discharging mode of the battery.

    Due to variation in irradiance and load,the following scenarios can occur,

    · Under standard testing conditions (STC),if the load resistance decreases or increases,to any value between 0 to 100%,the Eq.(6) states that the additional current is provided or stored in the battery to attain the output and MPP at the same time,as shown in Tab.1.

    Stage-3:In this stage,the battery is available for charging,which meansIBis always negative in the Eq.(6).

    · Under STC,when the load resistance drops to any value between 0% to 100%,the battery is not available to meet the power demand.So,in this case,it is impossible to maintain the output;however,MPP is attained,as shown in Tab.1.

    · When irradiance drops to any value between 0% to 50% and the load resistance increases or decreases,to any value between 0% to 100%,in this case,only MPP is attainable,as shown in Tab.1.

    Stage-4: In this stage,the battery is available only for discharging,which means output is maintained in all the cases;however,MPP is impossible to attain.

    · At STC or in case of irradiance drop to any value between 0% to 50%,along with the increase in load resistance to any value between 0% to 100%,the output is always maintainable by varying the duty cycle;however,MPP is not attainable as shown in Tab.1.

    Boundary Analysis: Considering battery stages,variation in irradiance,and load conditions,all the scenarios that can happen practically are presented in Tab.1.The boundary conditions are defined as the irradiance level can increase or decrease by 50%,whereasRLcan increase or decrease by 100%.Depending on these conditions,the control mechanism generates a respectiveD1based on MPPT and RPT algorithms to attain the MPP output.The results prove that MPP andVoare maintained when the battery is available for both charging and discharging;nevertheless,load and irradiance vary within boundary conditions.Whenever the battery is fully discharged,the proposed control ensures MPP but trade-offVo.Similarly,when the battery is fully charged,Vois always achievable regardless of MPP achievement.

    Table 1:Boundary analysis

    4 Design Analysis

    This section presents the design of the proposed PV system architecture.All the components used are assumed to be ideal.The optimal value for the RLis designed in Eq.(3).

    L1: To ensure continuous conduction mode (CCM) of the converter,theD1can vary from 0.05 to 0.4.Therefore,during the interval ofTon,the inductor equationVL1=is valid,whereVL1=-Vo,Tis the total time period,anddiis the current ripple across the inductor,which is assumed to be 20% of the output current to ensure CCM.Using the inductor equation and Eq.(1),L1is defined as,

    When they reached it the Caliph turned to the owl, and said with much feeling: Deliverer of my friend and myself, as a proof of my eternal gratitude97, accept me as your husband

    Co: Due to the existence of an inductor in both the modes,the current through the output capacitor is a changing current,which means that ΔI×Δt=Co×ΔVo.Using the definition of current,it is modified to,

    The value for ΔQis calculated from the ripple current by using the area of the triangle formed by current ripple,which gives,

    Using Eqs.(9) and (10),the value of the output capacitor is defined as,

    where ΔVois the ripple in output voltage,considering ΔVo=0.5%Voand current ripple ΔiL=0.2Io,to ensure CCM,using these assumptions Eq.(11) is modified to,

    Cin: During the off mode of the converter,the current throughCinis assumed to be 1.1×Impp,considering the discharge ofNpwinding in the capacitor,as shown in Fig.3b and assuming a ripple of 0.5%×Vmppacross the capacitor,the capacitor equation can be written as,

    L2: Considering the mode whenS4is turned on,in this case,inductor voltage will be identical as the battery voltages,considering the inductor ripple of ΔiL2=0.2IB,the inductor equation is written as,

    whereVBis the battery voltage,D2is the duty cycle of the converter.The bi-directional dc-dc converter is a buck-boost converter having a relation,

    B: The battery used in the bi-directional dc-dc converter is considered to operate at 6 V for the better life and low maintenance.The battery size is given by,

    5 Simulation Results

    This section presents the simulation results on PSIM software;the solar panel specification is shown in Tab.2.The simulation parameters are calculated using equations derived in Section 4 and are shown in Tab.3.

    Table 2:Solar panel specification

    Table 3:Simulation parameters

    All the scenarios that can happen practically considering the weather,load,and battery conditions are simulated on PSIM,and the results are presented in Tab.1.From all the scenarios,simulation results of 5 cases are presented in this section.

    Figure 7:Simulation results when irradiance drops by 50% &the battery is available

    Fig.7 presents the scenario when the battery is available,and irradiance falls from the standard condition of 1000 W/m2.Initially,the proposed system architecture operates under the standard irradiance level and the optimal value ofRL.During this period,Voand MPP both are maintained as substantiated in Fig.7.At t=0.03 s,the cloud appears on the sky,and irradiance drops by 50%.In the meantime,I-V curve tracing initiates,and the novel MPP is tracked by applying the procedure described in the flowchart of Fig.5.At t=0.06 s,the status of the battery is inspected;in this case,the battery is available for both charging and discharging.As the power produced by the PV generator is insufficient to fulfill the load demand,therefore the battery is activated by modulating the batter duty cycle at t=0.06 s to attainVoand MPP.The need of 100 W by the load is satisfied by the PV generator and the battery together.Due to activation of the battery,Voand MPP are achieved during this interval,as presented in Fig.7.

    Fig.8 exhibits the case when the battery is available,and theRLdrops from the designed value.At the start,the presented topology is functioning under the standard irradiance level and the designed value ofRL.At t=0.03 s,the value ofRLat the user end rises by 100%,thus decreases the power demand at the output side.Meanwhile,I-V curve tracing instigates,and the new MPP is traced,as presented in Fig.8.At t=0.06 s,the status of the battery is examined;in this case,the battery is available for both charging and discharging.As the power generated by the PV array is surplus,the battery is activated to store surplus power by modulating its duty cycle at t=0.06 s.PV array produces 100 W of power,from which 50 W is stored in the battery,and 50 W is delivered to the load.Due to activation of the battery,Voand MPP are attained during this interval,as shown in Fig.8.

    Figure 8:Simulation results when RL increases by 100% &the battery is available

    Fig.9 shows the scenario when the battery is fully discharged,and theRLfalls from the proposed value.At t=0.03 s,the value ofRLat the user end drops by 50%,thus increases the power demand at the output side.In the meantime,I-V curve tracing initiates,and the new MPP is found by employing the procedure described in the flowchart of Fig.5.At t=0.06 s,the status of the battery is reviewed;in this case,the battery is in a fully discharged state.As the power demanded by the load is greater than the power generated by the PV array,and the battery is fully discharged;consequently,it is impossible to maintain theVoat the output side.Nonetheless,the MPP is tracked effectively by modulating the converter’s duty cycle,as presented in Fig.9.

    Figure 9:Simulation results when RL decreases by 50% &the battery is fully discharged

    Fig.10 presents the scenario when the battery is in a fully charged state,and the value ofRLincreases,whereas irradiance reduces from the standard value.In the beginning,the proposed converter architecture is operative under the standard irradiance level and the proposed value ofRL.During this interval,Voand MPP both are retained,as shown in Fig.10.At t=0.03 s,the value ofRLrises by 100%,and at the same time,the irradiance level drops by 50%.Meanwhile,I-V curve tracing begins,and the new MPP is traced,as substantiated in Fig.10.In the described scenario,the PV generator’s power decreases,and the load demand decreases simultaneously.At t=0.06 s,the status of the battery is inspected,and the battery is in a fully charged state.The duty cycle of the converter is modulated to attain the required output voltage.However,it is impossible to achieve MPP as the battery is unavailable to store excess power,as presented in Fig.10.

    Figure 10:Simulation results when RL increases by 50%,irradiance decreases by 100%,and the battery is fully charged

    Figure 11:Simulation results when RL increases by 100% &the battery is fully charged

    Fig.11 shows the scenario when the battery is fully charged,and the value of RL rises from the designed value.At the start,the proposed power conversion architecture is significant under the standard irradiance level and the designed value ofRL.During this interlude,Voand MPP both are retained,as shown in Fig.11.At t=0.03 s,the value ofRLincreases by 100%,thus reduces the power demand by the load.In the meantime,I-V curve tracing instigates,and the new MPP is hunted as presented in Fig.11.At t=0.06 s,the status of the battery is inspected,and the battery is in a fully charged state.In the described scenario,the power produced by the PV generator is greater than the load demand;therefore,RPT works by extracting the only required power to avoid overcharging of the battery.The duty cycle of the converter is modulated to attain the required output voltage;however,it is impossible to achieve MPP as the battery is unavailable to store surplus power as substantiated in Fig.11.

    6 Conclusion

    This paper describes a stand-alone PV system based on DEFC having built-in I-V curve tracing to identify MPP with the assist of battery backup.The proposed architecture ensures MPPT without using any external hardware and complex control strategy.A comprehensive study is carried out to design the proposed topology parameters,and the boundary conditions are defined depending on irradiance,load,and battery availability.The proposed architecture offers low voltage stresses across switches and avoids sinking power supply and core resetting circuits.To prolong battery life,overcharging and deep discharging are eluded by replacing conventional MPPT by RPT,which extracts only required power.RPT prevents the extraction of excessive power from the PV generator and the use of dump loads.All the scenarios that can happen practically considering the weather,load,and battery conditions are simulated.The results prove that MPP andVoare maintained when the battery is available for both charging and discharging;nevertheless,load and irradiance vary within boundary conditions.Whenever the battery is fully discharged,the proposed control ensures MPP but trade-offVo.Likewise,when the battery is fully charged,Vois always achievable regardless of MPP achievement.

    Funding Statement: The authors received no specific funding for this study.

    Conflicts of Interest: The authors declare that they have no conflicts of interest to report regarding the present study.

    国产av一区在线观看免费| 一个人观看的视频www高清免费观看 | 少妇 在线观看| 久久性视频一级片| 国产99白浆流出| 性少妇av在线| 日韩 欧美 亚洲 中文字幕| 久久国产精品人妻蜜桃| 视频区欧美日本亚洲| 亚洲中文av在线| 老司机深夜福利视频在线观看| 久久久久九九精品影院| 在线视频色国产色| 两个人看的免费小视频| 99国产精品免费福利视频| 亚洲国产欧美网| 国产精品 国内视频| 女人高潮潮喷娇喘18禁视频| 欧美丝袜亚洲另类 | 日本vs欧美在线观看视频| 国产精品久久久人人做人人爽| 亚洲av片天天在线观看| www.www免费av| 亚洲片人在线观看| 欧美绝顶高潮抽搐喷水| 久99久视频精品免费| 久久亚洲精品不卡| 国产aⅴ精品一区二区三区波| 少妇裸体淫交视频免费看高清 | 中国美女看黄片| 国产欧美日韩一区二区三区在线| 精品久久久久久成人av| 狠狠狠狠99中文字幕| 久久国产乱子伦精品免费另类| 国产精品野战在线观看| 操出白浆在线播放| 亚洲成人国产一区在线观看| 成人欧美大片| 电影成人av| 女性被躁到高潮视频| 免费观看人在逋| 成年版毛片免费区| 99久久综合精品五月天人人| 亚洲性夜色夜夜综合| 91字幕亚洲| 色综合婷婷激情| 无人区码免费观看不卡| 欧美激情 高清一区二区三区| 50天的宝宝边吃奶边哭怎么回事| 中国美女看黄片| 97人妻精品一区二区三区麻豆 | 好男人电影高清在线观看| 日日爽夜夜爽网站| 精品欧美国产一区二区三| 日韩欧美一区二区三区在线观看| 色综合婷婷激情| 制服诱惑二区| 国产欧美日韩精品亚洲av| 757午夜福利合集在线观看| 国产成人一区二区三区免费视频网站| av视频免费观看在线观看| 欧美不卡视频在线免费观看 | 亚洲成a人片在线一区二区| 露出奶头的视频| 日韩成人在线观看一区二区三区| 99久久99久久久精品蜜桃| 操出白浆在线播放| 亚洲无线在线观看| 亚洲av成人不卡在线观看播放网| netflix在线观看网站| 狂野欧美激情性xxxx| 国产精品精品国产色婷婷| 涩涩av久久男人的天堂| 欧美乱色亚洲激情| 国产片内射在线| 国产成人一区二区三区免费视频网站| 一个人观看的视频www高清免费观看 | 亚洲av成人不卡在线观看播放网| 亚洲欧美精品综合一区二区三区| 久久 成人 亚洲| 色av中文字幕| 午夜福利在线观看吧| 国产私拍福利视频在线观看| 成人特级黄色片久久久久久久| 国产精品爽爽va在线观看网站 | 男男h啪啪无遮挡| 精品国产一区二区久久| 国产精品九九99| 欧美日本亚洲视频在线播放| 少妇熟女aⅴ在线视频| 国内久久婷婷六月综合欲色啪| 亚洲五月天丁香| 国产主播在线观看一区二区| 国产亚洲精品久久久久久毛片| 国内久久婷婷六月综合欲色啪| 精品国产乱码久久久久久男人| 国产精品久久久久久亚洲av鲁大| 9191精品国产免费久久| 两性午夜刺激爽爽歪歪视频在线观看 | 午夜福利欧美成人| 女人高潮潮喷娇喘18禁视频| 免费一级毛片在线播放高清视频 | 亚洲欧美精品综合久久99| 一本久久中文字幕| 亚洲熟妇熟女久久| 亚洲 国产 在线| 亚洲一区中文字幕在线| 欧美成人免费av一区二区三区| 一级,二级,三级黄色视频| 亚洲精品美女久久久久99蜜臀| 伊人久久大香线蕉亚洲五| 又黄又粗又硬又大视频| 久久精品国产99精品国产亚洲性色 | 99久久久亚洲精品蜜臀av| 亚洲一区二区三区不卡视频| 国产区一区二久久| 亚洲精品久久国产高清桃花| 亚洲精品粉嫩美女一区| 美女午夜性视频免费| 久久精品91蜜桃| 亚洲专区字幕在线| 国产成人欧美在线观看| 丝袜人妻中文字幕| 国产成人精品在线电影| 久久精品aⅴ一区二区三区四区| 黑人欧美特级aaaaaa片| 操美女的视频在线观看| 久久人妻福利社区极品人妻图片| 日韩欧美一区二区三区在线观看| 亚洲专区中文字幕在线| 岛国在线观看网站| 亚洲 欧美一区二区三区| 大码成人一级视频| 99香蕉大伊视频| 国产精品爽爽va在线观看网站 | 欧美色视频一区免费| 亚洲欧美一区二区三区黑人| 一二三四社区在线视频社区8| 99久久久亚洲精品蜜臀av| 女性被躁到高潮视频| 国产99久久九九免费精品| 午夜福利成人在线免费观看| 给我免费播放毛片高清在线观看| 免费搜索国产男女视频| 国产精品二区激情视频| 国产在线精品亚洲第一网站| 麻豆av在线久日| 国产三级黄色录像| 久久婷婷人人爽人人干人人爱 | 涩涩av久久男人的天堂| 欧美乱色亚洲激情| 久久 成人 亚洲| 狂野欧美激情性xxxx| 在线观看免费午夜福利视频| 一级,二级,三级黄色视频| 性色av乱码一区二区三区2| 久久久久久久午夜电影| 黄色女人牲交| 美女大奶头视频| 免费看a级黄色片| 久久久久久免费高清国产稀缺| 欧美日韩精品网址| 日韩精品中文字幕看吧| 两性午夜刺激爽爽歪歪视频在线观看 | 女人精品久久久久毛片| 一区在线观看完整版| 99riav亚洲国产免费| 12—13女人毛片做爰片一| 老司机深夜福利视频在线观看| 欧美一级毛片孕妇| 久久午夜亚洲精品久久| 国产91精品成人一区二区三区| 精品人妻在线不人妻| 国产又爽黄色视频| 无遮挡黄片免费观看| 99国产极品粉嫩在线观看| ponron亚洲| 99国产极品粉嫩在线观看| 亚洲全国av大片| 国产高清视频在线播放一区| 在线观看www视频免费| 久久精品91蜜桃| 亚洲熟女毛片儿| 在线观看免费视频日本深夜| 97人妻天天添夜夜摸| 国产乱人伦免费视频| 成人国产综合亚洲| 超碰成人久久| 一本大道久久a久久精品| 女人爽到高潮嗷嗷叫在线视频| 男男h啪啪无遮挡| 国产亚洲精品综合一区在线观看 | 日本免费一区二区三区高清不卡 | 男女下面插进去视频免费观看| 亚洲七黄色美女视频| 男女下面插进去视频免费观看| 日韩av在线大香蕉| 一级片免费观看大全| 一级,二级,三级黄色视频| 18禁裸乳无遮挡免费网站照片 | 国产欧美日韩一区二区三| 亚洲成人国产一区在线观看| 亚洲av成人av| 久久香蕉国产精品| 国产精品av久久久久免费| 久久精品国产亚洲av高清一级| 夜夜爽天天搞| 十八禁人妻一区二区| 欧美成狂野欧美在线观看| 国产国语露脸激情在线看| 最新在线观看一区二区三区| 精品欧美一区二区三区在线| 老司机福利观看| 午夜久久久久精精品| 天天一区二区日本电影三级 | 一边摸一边做爽爽视频免费| 欧美不卡视频在线免费观看 | 男女之事视频高清在线观看| 久久久国产成人免费| 久久久久久亚洲精品国产蜜桃av| 人妻久久中文字幕网| 免费不卡黄色视频| 精品无人区乱码1区二区| 国产成人欧美在线观看| 国产精品 欧美亚洲| 制服人妻中文乱码| 黄色a级毛片大全视频| 久久热在线av| 中文字幕av电影在线播放| 91精品国产国语对白视频| 久久精品亚洲精品国产色婷小说| 美女国产高潮福利片在线看| 亚洲欧美激情在线| 黄网站色视频无遮挡免费观看| 国产午夜福利久久久久久| 每晚都被弄得嗷嗷叫到高潮| 日韩精品青青久久久久久| 巨乳人妻的诱惑在线观看| 91麻豆精品激情在线观看国产| 99国产精品免费福利视频| 国产精品九九99| 色综合站精品国产| 脱女人内裤的视频| 在线国产一区二区在线| 色婷婷久久久亚洲欧美| 又紧又爽又黄一区二区| 黄网站色视频无遮挡免费观看| 亚洲专区中文字幕在线| 日本欧美视频一区| 在线免费观看的www视频| 国产一区二区三区在线臀色熟女| 大型av网站在线播放| 久久久久九九精品影院| 国产国语露脸激情在线看| 99久久综合精品五月天人人| 最新美女视频免费是黄的| 在线国产一区二区在线| 老熟妇乱子伦视频在线观看| 久久精品91蜜桃| 国产男靠女视频免费网站| 久久精品国产亚洲av香蕉五月| 99精品欧美一区二区三区四区| 大陆偷拍与自拍| 日韩高清综合在线| 日本vs欧美在线观看视频| 国内久久婷婷六月综合欲色啪| 亚洲精品av麻豆狂野| 欧美激情久久久久久爽电影 | 国产成人精品久久二区二区91| 一个人观看的视频www高清免费观看 | 咕卡用的链子| 精品福利观看| 日韩免费av在线播放| 日本欧美视频一区| 天堂√8在线中文| 免费观看人在逋| 男人的好看免费观看在线视频 | 国产成人欧美| 美女免费视频网站| 88av欧美| 日本a在线网址| 久久久国产成人免费| 欧美另类亚洲清纯唯美| 亚洲精品av麻豆狂野| 国产精品1区2区在线观看.| 韩国精品一区二区三区| 国产精品久久久久久精品电影 | 在线天堂中文资源库| 母亲3免费完整高清在线观看| 国产成人av教育| 午夜久久久久精精品| 国产成+人综合+亚洲专区| 黑人巨大精品欧美一区二区蜜桃| av视频免费观看在线观看| 亚洲成人国产一区在线观看| 午夜福利高清视频| 国产真人三级小视频在线观看| 亚洲精品美女久久久久99蜜臀| 51午夜福利影视在线观看| 国产极品粉嫩免费观看在线| 午夜久久久在线观看| 色播在线永久视频| 国产一级毛片七仙女欲春2 | 亚洲 国产 在线| 欧美老熟妇乱子伦牲交| 久久人妻熟女aⅴ| 操出白浆在线播放| 正在播放国产对白刺激| 又黄又粗又硬又大视频| 少妇粗大呻吟视频| 日韩欧美一区二区三区在线观看| 俄罗斯特黄特色一大片| 久久九九热精品免费| 欧美中文综合在线视频| 香蕉久久夜色| 午夜精品国产一区二区电影| av视频免费观看在线观看| 极品教师在线免费播放| 波多野结衣一区麻豆| 国产av一区在线观看免费| 熟妇人妻久久中文字幕3abv| 亚洲专区中文字幕在线| 黄片小视频在线播放| а√天堂www在线а√下载| 非洲黑人性xxxx精品又粗又长| 黄色a级毛片大全视频| 国语自产精品视频在线第100页| 久久欧美精品欧美久久欧美| 91精品三级在线观看| 国产精品久久久久久人妻精品电影| 性少妇av在线| 精品国产乱子伦一区二区三区| 一级黄色大片毛片| 久久狼人影院| 欧美日韩亚洲综合一区二区三区_| 99香蕉大伊视频| 黑人欧美特级aaaaaa片| 亚洲精品一卡2卡三卡4卡5卡| 国产在线观看jvid| 天天添夜夜摸| 国产精品美女特级片免费视频播放器 | 日本a在线网址| 桃色一区二区三区在线观看| 国产激情欧美一区二区| 夜夜看夜夜爽夜夜摸| 国产蜜桃级精品一区二区三区| 国产高清有码在线观看视频 | 大香蕉久久成人网| 日本在线视频免费播放| 女性被躁到高潮视频| 精品久久久久久,| 大陆偷拍与自拍| 法律面前人人平等表现在哪些方面| 天天躁夜夜躁狠狠躁躁| 午夜亚洲福利在线播放| 欧美最黄视频在线播放免费| avwww免费| 一级作爱视频免费观看| 亚洲专区国产一区二区| 国产精品精品国产色婷婷| 人妻丰满熟妇av一区二区三区| av欧美777| 两人在一起打扑克的视频| 国产成人欧美| 国产午夜精品久久久久久| 99在线视频只有这里精品首页| 亚洲欧美日韩高清在线视频| 亚洲国产高清在线一区二区三 | 日韩精品中文字幕看吧| 亚洲第一av免费看| 性色av乱码一区二区三区2| 国产97色在线日韩免费| 亚洲av成人一区二区三| 乱人伦中国视频| 视频区欧美日本亚洲| 久99久视频精品免费| 窝窝影院91人妻| 欧美日韩黄片免| 天堂动漫精品| 波多野结衣一区麻豆| 亚洲天堂国产精品一区在线| 亚洲欧美精品综合一区二区三区| 久久亚洲精品不卡| 老鸭窝网址在线观看| 夜夜夜夜夜久久久久| 精品国产国语对白av| 日本五十路高清| 国产一区二区三区在线臀色熟女| 精品一区二区三区四区五区乱码| 麻豆一二三区av精品| 此物有八面人人有两片| 久久久精品欧美日韩精品| 久久这里只有精品19| 在线观看舔阴道视频| 丁香欧美五月| 男女下面插进去视频免费观看| 一卡2卡三卡四卡精品乱码亚洲| 日韩精品中文字幕看吧| 一区福利在线观看| 两性夫妻黄色片| 国产精品98久久久久久宅男小说| 日韩视频一区二区在线观看| 午夜久久久久精精品| 少妇粗大呻吟视频| av在线天堂中文字幕| 三级毛片av免费| 亚洲国产日韩欧美精品在线观看 | 亚洲人成电影免费在线| 国产1区2区3区精品| 神马国产精品三级电影在线观看 | 一边摸一边抽搐一进一出视频| 丰满的人妻完整版| 给我免费播放毛片高清在线观看| 精品一区二区三区av网在线观看| 免费在线观看影片大全网站| videosex国产| 亚洲成国产人片在线观看| 欧美乱色亚洲激情| 一区福利在线观看| 国产成人影院久久av| 欧美一级a爱片免费观看看 | 国产熟女午夜一区二区三区| 成人精品一区二区免费| 国产av在哪里看| 亚洲一码二码三码区别大吗| 国产高清videossex| 麻豆久久精品国产亚洲av| 成人免费观看视频高清| 国产97色在线日韩免费| 国产精品国产高清国产av| 色综合亚洲欧美另类图片| 亚洲五月婷婷丁香| 日本精品一区二区三区蜜桃| 亚洲色图 男人天堂 中文字幕| 国产精品一区二区免费欧美| 天天躁狠狠躁夜夜躁狠狠躁| www.www免费av| 欧美一级a爱片免费观看看 | 麻豆国产av国片精品| 在线国产一区二区在线| 国产又爽黄色视频| 十八禁人妻一区二区| 看片在线看免费视频| 亚洲国产精品999在线| 中亚洲国语对白在线视频| 高潮久久久久久久久久久不卡| 97碰自拍视频| 两个人视频免费观看高清| 亚洲精品国产色婷婷电影| 丝袜在线中文字幕| 丝袜美腿诱惑在线| 国产精品 欧美亚洲| 丝袜在线中文字幕| 丝袜美腿诱惑在线| 成人18禁在线播放| 欧美一区二区精品小视频在线| 91av网站免费观看| 亚洲欧洲精品一区二区精品久久久| 黄色 视频免费看| 中文字幕另类日韩欧美亚洲嫩草| 成人18禁在线播放| 纯流量卡能插随身wifi吗| 18禁黄网站禁片午夜丰满| 香蕉久久夜色| 日韩欧美一区二区三区在线观看| 亚洲一卡2卡3卡4卡5卡精品中文| 国产伦一二天堂av在线观看| 国产av一区二区精品久久| 一级作爱视频免费观看| 欧美 亚洲 国产 日韩一| 亚洲激情在线av| 久久这里只有精品19| 欧美精品亚洲一区二区| 亚洲熟妇熟女久久| 91麻豆av在线| 欧美亚洲日本最大视频资源| 日本免费a在线| 亚洲欧洲精品一区二区精品久久久| 精品电影一区二区在线| 国产成人精品无人区| 啦啦啦观看免费观看视频高清 | 黄色片一级片一级黄色片| 手机成人av网站| 久久香蕉国产精品| 亚洲av电影不卡..在线观看| 每晚都被弄得嗷嗷叫到高潮| 日本a在线网址| 久久青草综合色| 久久狼人影院| 日韩有码中文字幕| 国语自产精品视频在线第100页| 国产黄a三级三级三级人| 校园春色视频在线观看| 日本五十路高清| 欧美色欧美亚洲另类二区 | 免费在线观看黄色视频的| 亚洲自偷自拍图片 自拍| 久久久水蜜桃国产精品网| 中文字幕色久视频| 亚洲成人久久性| 亚洲欧美一区二区三区黑人| 精品国产乱子伦一区二区三区| 一级a爱片免费观看的视频| 后天国语完整版免费观看| 岛国在线观看网站| 视频区欧美日本亚洲| 级片在线观看| 精品久久久久久,| 99在线视频只有这里精品首页| 成人国产综合亚洲| 淫秽高清视频在线观看| 欧美大码av| 巨乳人妻的诱惑在线观看| av福利片在线| 麻豆成人av在线观看| 亚洲狠狠婷婷综合久久图片| 九色国产91popny在线| 一级a爱片免费观看的视频| 操出白浆在线播放| 久久香蕉精品热| 欧美成人性av电影在线观看| 中文字幕av电影在线播放| 日韩欧美一区二区三区在线观看| av片东京热男人的天堂| 身体一侧抽搐| 久久亚洲真实| av电影中文网址| 老汉色av国产亚洲站长工具| 多毛熟女@视频| 无遮挡黄片免费观看| 欧美日韩福利视频一区二区| 又紧又爽又黄一区二区| 精品免费久久久久久久清纯| 一区二区三区国产精品乱码| 欧美激情 高清一区二区三区| 久久精品国产99精品国产亚洲性色 | 国产免费男女视频| 国产黄a三级三级三级人| 多毛熟女@视频| 国产在线观看jvid| 很黄的视频免费| 午夜视频精品福利| 在线观看午夜福利视频| 欧美国产精品va在线观看不卡| 久久久国产精品麻豆| 黄色a级毛片大全视频| 国产精品久久久久久精品电影 | 黄色片一级片一级黄色片| 国产一级毛片七仙女欲春2 | 叶爱在线成人免费视频播放| 亚洲精品av麻豆狂野| 亚洲av美国av| 正在播放国产对白刺激| 国产精品香港三级国产av潘金莲| 夜夜夜夜夜久久久久| 91字幕亚洲| 99香蕉大伊视频| 国产99白浆流出| 高清毛片免费观看视频网站| 国产乱人伦免费视频| 久久人妻熟女aⅴ| 精品久久久精品久久久| 天堂√8在线中文| 久久久久久久久免费视频了| 婷婷六月久久综合丁香| 久久午夜综合久久蜜桃| 深夜精品福利| 两个人看的免费小视频| АⅤ资源中文在线天堂| 波多野结衣巨乳人妻| 亚洲熟妇熟女久久| 人妻丰满熟妇av一区二区三区| 国产精品免费一区二区三区在线| 日本在线视频免费播放| 免费少妇av软件| 欧美中文日本在线观看视频| 亚洲少妇的诱惑av| 国内精品久久久久久久电影| 成人国产一区最新在线观看| 真人一进一出gif抽搐免费| 精品国产亚洲在线| 亚洲五月婷婷丁香| 亚洲中文字幕日韩| 18禁裸乳无遮挡免费网站照片 | 午夜福利成人在线免费观看| 97人妻精品一区二区三区麻豆 | 亚洲人成77777在线视频| 99国产精品99久久久久| 国产亚洲欧美在线一区二区| 日日夜夜操网爽| 亚洲精品粉嫩美女一区| 久久青草综合色| 黄色视频不卡| 久久 成人 亚洲| 色综合站精品国产| 亚洲中文日韩欧美视频| 色综合站精品国产| 亚洲av片天天在线观看| or卡值多少钱| 国产伦一二天堂av在线观看| 欧美激情高清一区二区三区| 国产免费男女视频| 久久人妻福利社区极品人妻图片| 女人爽到高潮嗷嗷叫在线视频| 国产一区二区激情短视频| www.精华液| 亚洲国产精品sss在线观看| 国产单亲对白刺激| 99久久久亚洲精品蜜臀av| 免费人成视频x8x8入口观看| 9热在线视频观看99| 18美女黄网站色大片免费观看| 亚洲欧美日韩另类电影网站| 一本久久中文字幕| 亚洲中文字幕一区二区三区有码在线看 |