    Design and development of the beamline for a proton therapy system

    2022-01-19 09:14:30BinQinXuLiuQuShanChenDongLiWenJieHanPingTanZhongQiZhangChongZhouAoTeChenYiChengLiaoWeiWang
    Nuclear Science and Techniques 2021年12期

    Bin Qin?Xu Liu?Qu-Shan Chen?Dong Li?Wen-Jie Han?Ping Tan?Zhong-Qi Zhang?Chong Zhou?Ao-Te Chen?Yi-Cheng Liao?Wei Wang

    Abstract A proton therapy(PT)facility with multiple treatment rooms based on the superconducting cyclotron scheme is under development at Huazhong University of Science and Technology(HUST).This paper attempts to describe the design considerations and implementation of the PT beamline from a systematic viewpoint.Design considerations covering beam optics and the influence of high-order aberrations,beam energy/intensity modulation,and beam orbit correction are described.In addition to the technical implementation of the main beamline components and subsystems,including the energy degrader,fast kicker,beamline magnets,beam diagnostic system,and beamline control system are introduced.

    Keywords Proton therapy?Beamline?Beam optics?Beam energy/intensity modulation

    1 Introduction

    For a cyclotron-based proton therapy(PT)facility,the beamline is an important system that‘optimally’transports the proton beam from the point of extraction from the accelerator to the treatment nozzle[1,2].In general,a PT beamline can be divided into several function sections,including an energy selection section that modulates the beam energy and intensity,beam switch and period sections that can deliver the beam to specific treatment rooms,and a fixed beamline(horizontal,vertical,or specific project angles)/gantry beamline that delivers the beam to the treatment nozzles.Because the rotating gantry is capable of bending a fixed horizontal proton beam in any direction perpendicular to the irradiation plane at the iso-center,it is a standard and essential configuration in modern PT facilities.

    The main functions of the beamline before the gantry are as follows:(1)beam energy modulation using an energy degrader according to the treatment plan,and beam quality(beam emittance and momentum spread)recovery with downstream collimators and an energy slit;(2)beam switch/distribution to a specific treatment room following the command from the treatment control system(TCS);(3)optical matching of beam size and lattice function at some critical positions to maintain highly efficient beam transportation and minimum beam loss.The gantry beamline transports a‘round’beam from the coupling point,which is located at the entrance of the gantry,to the nozzle and isocenter.The variation in the beam size at the iso-center should be confined to within a limit for all beam energies and rotation angles.

    A PT facility based on a superconducting cyclotron is under construction at Huazhong University of Science and Technology(HUST-PTF)[3,4].The overall layout is illustrated in Fig.1,and the main specifications are listed in Table 1.In the beam transport line,an energy selection system(ESS)is capable of modulating the proton beam energy and intensity according to the requirements of clinical treatment.After the ESS,three identical switch sections can deliver the beam to one horizontal fixed beamline and two downstream 360°gantry beamlines.Each switch section uses a double-bend achromatic(DBA)lattice,which consists of two dipoles with 30°bending angles and seven quadrupoles.

    Fig.1 (Color online)Overall layout of HUST-PTF

    Table 1 Main specifications ofHUST-PTF

    2 Design considerations on beam optics

    The beam optics of the HUST-PTF beamline was calculated and matched using the Transport code[5].Figure 2 shows a 2σbeam envelope from the cyclotron exit to the iso-center of the first gantry.From previous experiences,the linear beam optics calculated by the Transport code will match well,especially when the momentum dispersion is small(e.g.,Δp/p=±0?6%)and cross-talk effects between beamline magnets are not dominant.However,in order to investigate high-order aberrations and the influence of fringe fields on beam optics,we used COSY Infinity[6]and OPERA-3D[7]for validating the beam behavior in realistic situations.

    2.1 Modulation of beam energy and intensity

    For cyclotron-based PT,one drawback is the fixed beam energy extracted from the accelerator.To deliver various energy proton beams for different deposit depths,an ESS that consists of an energy degrader and a downstream DBA section with an energy slit is required.

    To precisely evaluate beam transmission in an ESS,the Monte Carlo code Geant4[8]with the capability to simulate beam-material interactions is applied.Detailed works can be found in[9].Owing to multiple Coulomb scatterings in the carbon material during energy degradation,the beam quality in terms of the energy spread and the beam emittance deteriorates and needs to be recovered by collimators located downstream of the degrader wedge and an energy slit located at the center of the DBA.The beam loss due to this recovery process will lead to a significant difference in the transmission of the beam energy in the range of 70–230 MeV.As shown in Fig.4,the overall transmission was below 0.1%for 70 MeV and 14%for 230 MeV.However,it should be noted that minor disagreements regarding the beam transmission exist between the Monte Carlo simulation and the measured data[10],and corrections should be made based on experimental studies.

    Fig.2 (Color online)2σbeam(?x,y=28πmm?mrad,Δp/p=±0?6%)envelope from the exit of the cyclotron to the iso-center of the first gantry,calculated and fitted by the Transport code

    An investigation was performed to determine the natural intensity configuration of a proton beam so that is could be matched to the calculated overall transmission.We used the Geant4 code to simulate the dose rate in one liter of water:each energy plane was set to an area of 100 mm×100 mm with a 5 mm spot interval.For a 100 mm depth axis,it contained 21 energy layers in intervals of 5 mm.The total beam switch time for one energy layer is estimated to be 690 ms,which includes a 250 ms energy switch time and 440 ms of switch time for spot scanning(2 ms for line switch,and 1 ms for spot switch).The overall transmission shown in Fig.4 was applied to calculate the beam intensity for each energy layer.As an example,for a SOBP 230–330 mm(corresponding to 186.6 MeV–230 MeV),a dose rate of 6.86 Gy/min/L can be achieved when beam intensity is 4 nA at 230 MeV.With this method,the relationship between the dose rate and the maximum beam intensity at the far end of the SOBP can be established.

    By using these data,and to overcome the large variance in beam transmission across the total energy range,we developed an intensity modulation strategy for the extracted proton beam of the isochronous cyclotron by adjusting the inflector voltage in the central region.As shown in Fig.5,three settings were applied:220 nA for 70–170 MeV,80 nA for 170–210 MeV,and 35 nA for energies higher than 210 MeV.With this setup,a minimum dose rate of 2.61 Gy/min/L at the shallow SOBP(42–142 mm,70–141 MeV)and a maximum dose rate of 8.36 Gy/min/L at SOBP(230–330 mm)could be achieved.

    Fig.5 (Color online)Three stage intensity modulation with variable cyclotron extraction current for final treatment

    The system also provides a beam intensity suppression method for achieving a smooth and continuous beam intensity across the full energy range.As shown in Fig.3,when the beam intensity in the higher energy region exceeds the limit,two quadrupoles,Q10E and Q11E after B2E,will be tuned to‘defocus’the beam and cut off some portion of the beam.A detailed implementation can be found in Ref.[11].This technique was first applied to the PSI gantry 3[12].

    Fig.3 (Color online)Layout of the ESS

    We reserve this beam intensity suppression method as a backup mechanism for when the extracted beam intensity is constant during operation.However,when applying this method,the beam emittance will decrease significantly for a defocused high-energy beam,which will increase the complexity of the treatment plan.Additionally,the extra focusing strength adjustment of Q10E and Q11E will also increase the beamline complexity and uncertainties.

    Fig.4(Color online)Beam transmission after the energy degrader and collimator#2(solid line),and overall transmission after the energy slit of DBA with momentum selection ofΔp/p=±0?6%+10%beam loss in the downstream beamline(dashed line)

    2.2 Influence of high order aberrations and fringe fields on gantry beamline

    For the downstream scanning gantry beamline,image optics is applied to achieve a 1:1 magnification factor between the entrance coupling point and the iso-center.It consists of five regular quadrupoles,one long quadrupole,two dipoles with a bending angle of 57°,and a bending angle of 90°.The design details can be found in Ref.[4].

    Considering the sensitivity and stability requirements of the rotation gantry beamline,a more sophisticated study on beam optics beyond the linear optics results calculated by the Transport code should be performed.We used Cosy Infinity to investigate the influence of high-order aberrations and fringe magnetic fields on the beam optics and beam profiles[13].

    The Enge function[14]is used to fit the realistic fringe fields of all gantry beamline magnets to coefficients that can be input into Cosy Infinity with the fringe field mode FR 2.5.The fitted beam optics from the Transport code are used as a baseline for Cosy Infinity,but the field gradients of all six quadrupoles were re-fitted using the realistic Enge coefficients.For the optimized optics parameters,there are minor adjustments for the quadrupole strength compared with the baseline parameters,with a maximum deviation of±8%.The multi-particle ray-tracing results up to the fifth order are illustrated in Fig.6.The beam size at the isocenter was well-controlled for a momentum dispersion of±0?6%.

    Fig.6 (Color online)Multi-particle ray-tracing of beam trajectory in the gantry beamline,using fifth order optics in Cosy Infinity:(top)X(dispersive)plane motion;(bottom)Y(non-dispersive)plane motion.The blue lines representΔp/p=+0?6%,and the red lines represent Δp/p=-0?6% protons with an energy of 230 MeV.(Color figure online)

    2.3 Beam orbit simulation and correction

    Beam orbit correction is an indispensable procedure in accelerator commissioning and operation.A beamline usually contains various errors due to issues in the manufacture and installation of the magnets,with the primary contributions coming from misalignments and field perturbations.These errors lead to a deviation in the beam trajectory from the design orbit and influence the beam quality.For a PT facility,the maximum beam offset at the treatment terminal must be controlled to within±1 mm according to the clinical treatment criteria.To accurately evaluate the beam orbit deviation,we performed a simulation using the ELEGANT code[16]and added the following error terms to the simulation,as listed in Table 2.

    Table 2 Error settings in the simulation

    Using the beamline to the first gantry room in the HUST-PTF as an example,the beam orbit deviation is presented in Fig.7).The maximum root-mean-square(RMS)value is approximately 25 mm in the horizontal direction and 17 mm in the vertical direction,which is unacceptable for beam transmission.We adopted the response matrix method and placed a series of steerer magnets to correct the beam orbit.The correction strategy is global correction,which simultaneously minimizes the beam offset at the iso-center and along the beamline.To achieve the optimal correction effect,all candidate positions for placing steerers were numbered,and the best layout was determined using a genetic algorithm[15].With the optimal configuration of steerers,the orbit deviation can be reduced to less than 2 mm(RMS value),and the maximum beam offset at the iso-center is limited to 0.3 mm.

    Fig.7 (Color online)RMS value of the beam orbit deviation before and after correction from the exit of the degrader to the iso-center in the first gantry room.The lattice structure is plotted at the top:the quadrupole and dipole magnets are colored green and blue,respectively,and the black dot indicates the position of the BPM.(Color figure online)

    3 Features of beamline elements

    3.1 Multi-wedge energy degrader

    To realize continuous and fast beam energy modulation,a multi-wedge-style degrader was adopted.High-density isotropic graphite was chosen for the degrader material considering the relatively lowerZand easy machining of the wedge shape.The main tested parameters of graphite are listed in Table 3).Figure 8 a shows one machined and processed graphite wedge unit,with wedge number 2.5 and a wedge angle of 30°.

    Table 3 Tested parameters of the graphite

    Figure 8 b shows the uncovered structural top view of the degrader system.The vacuum chamber is made of aluminum to minimize the activation level during the energy degradation process.Inside the main vacuum chamber,a Faraday cup is placed upstream of the graphite wedge pair.The nominal center position of the Faraday cup is 18 mm offset with respect to the beam axis in the vertical direction in order to receive the proton beam deflected by a fast kicker magnet upstream and fulfill both functions of beam dump and intensity measurement.In the emergency status,this Faraday cup can be driven to the beamaxis by a pneumatic actuator for beam safety,with an action time of less than 1 s.Downstream of the graphite wedge,two collimators(Col.#1,Col.#2)are installed to‘re-define’the rms beam emittance to the selected values of 5π/7π/10π mm?mrad.The degrader has been manufactured and tested without a beam load.The positioning errors of the graphite wedge and the collimators are less than 10μm,and the wedge movement time corresponding to a single energy layer is less than 200 ms.

    Fig.8 (Color online)a One machined graphite wedge unit;b Uncovered structural model of the multi-wedge energy degrader

    3.2 Kicker for fast beam switch

    For the purpose of fast ON/OFF beam switching during an energy layer change and lateral spot scanning,a fast kicker magnet will be installed upstream of the energy degrader.The switch time is required to be less than 100 μs,and the maximum repetition rate should be up to 500 Hz.The main specifications of the kicker magnet are listed in Table 4.The design,fabrication,and testing of this fast kicker magnet and the associated pulsed power supply have been accomplished[17,18].For a specific design of the pulsed power supply,the kicker magnet can also be operated in the long-term DC mode,adhering to safety requirements by deflecting the beam to the downstream Faraday cup for a time duration longer than 5 s.

    Table 4 Main specifications of the kicker magnet

    To obtain the dynamic response feature of the magnetic field,a measurement system based on a printed circuit board(PCB)searching coil array scheme was developed[19],as shown in Fig.9).Figure 10 shows the measured result of the dynamic magnetic field,which is approximately 63μs.The integral magnetic field can reach 25.2 T?mm with an excitation current of 510 A,which fulfills the design specifications.

    Fig.9 (Color online)Dynamic magnetic field measurement platform based on PCB technique

    Fig.10 (Color online)Measured dynamic response and lag effect of the integral magnetic fields

    3.3 Tapered scanning magnet

    A pencil beam scanning(PBS)nozzle with two mutually perpendicular dipole magnets is applied to deflect the proton beam and form a radiation field that is conformal with the tumor.To effectively reduce the required excitation current while accommodating the envelope of the scanning proton beam,the pole gap of the second magnet SMX was designed to be tapered from 110 mm to 72 mm,while the pole gap of the SMY was kept constant at 60 mm.The design details can be found in Ref.[20].

    For a verification of the performance of the tapered scanning magnet,beam tracking was performed to simulate the behavior of the beam in the PBS nozzle.Figure 11 a shows the tapered SMX model.Because the field size is 30 cm×30 cm,a maximum offset of 15 cm for a 70 MeV proton beam at the iso-center was simulated.Figures 11 b and c show the beam spot at the entrance of the nozzle and at the iso-center,respectively.The variations in beam size and center of the beam spot are less than 0.1 mm compared with those using a constant 110 mm pole gap,while the excitation current could be reduced from 276.8 A to 228.2 A.

    3.4 Beamline magnets

    The beamline contains 59 quadrupoles,14 dipoles,and 31 correctors.The main specifications are listed in Table 5.All magnets,excluding those at the second gantry beamline,were manufactured,and the magnetic field quality fulfilled the specifications.Figure 12 shows the measured results of the regular quadrupoles,with three operation currents ranging from 10%to 100%.The sextupole components (n=3) and other main multipole errors(n=4,6,10)were measured and controlled to within five units.Figure 13 shows the measured integral field homogeneity of two 57°dipoles and one 90°dipole affiliated with the first gantry beamline,with operation currents of 245 A and 501 A for central magnetic fields of 0.82 T and 1.62 T,respectively.A field homogeneity of±0?03%at the mid-plane corresponding to a magnetic field range of 50%and 100%was achieved.All dipoles and quadrupoles have a relatively good linearity in terms of field excitations.

    Table 5 Specifications for beamline magnets

    Fig.11 (Color online)a Tapered SMX scanning magnet model;b 70 MeV beam profile at the entrance of the nozzle;c 70 MeV beam profile at the iso-center

    4 Beam diagnostics and beamline control

    4.1 Beam diagnostic system

    The beam diagnostic system(BDS)is essential for beam commissioning and routine operation.The main purposes of the BDS are(1)beam intensity measurements,(2)beam position measurements for orbit correction,and(3)beam profile measurements for optics studies.Owing to the ultralow intensity beam current downstream of the ESS,it would be very challenging to use an inductive or nondestructive detector and obtain an effective signal.As a compromise between cost and effectiveness there are three types of commonly used detectors,a scintillation screen(SC),an ionization chamber(IC),and a Faraday cup(FC).Figure 14 shows the SC,FC and thick IC of HUSTPTF.

    Fig.12 (Color online)Measured multipole components(n≥3)of regular quadrupoles at operation currents of 26.3 A(1.8 T/m),134.5 A(9.3 T/m)and 266.8 A(18.0 T/m)

    Fig.13 (Color online)Measured integral field homogeneity of two 57°dipoles and one 90°dipole affiliated with the first gantry beamline at operation currents of 245 A and 501 A for central magnetic fields of 0.82 T and 1.62 T,respectively

    One FC is installed at the entrance of the energy degrader for beam collection during‘Kicker ON’and it is the only one equipped with water cooling.The others are installed downstream of the ESS to measure the beam intensity,as well as the beam stop in emergency cases.The cup was made of oxygen-free copper.An electrode with a bias voltage of–100 V was placed at the entrance of the cup to repel secondary electrons.The entire structure was optimized to ensure that more than 98%of the protons and secondary particles could be collected by the cup.

    The beam position and profile were measured by the SCs and ICs.The SCs were installed in the fixed beamlines,while thick ICs were installed in the gantry beamlines.The main consideration behind this deployment is that it is easier to maintain and replace the CCD camera of the SC in fixed beamlines than in the gantry beamlines.The screen material of the SC is Al2O3:Cr,designed by the Institute of Modern Physics,Chinese Academy of Sciences.Offline tests showed that the optical resolution of the SC was 0.08 mm/pixel.The thick IC has a double-stack configuration and can simultaneously measure the horizontal and vertical distributions.The chamber used clean dry air at standard atmospheric temperature and pressure,and the highest anode voltage was 2 kV.

    Apart from the retractable detectors,there are three fixed and thin ICs(IC64-6 from Pyramid Technical Consultants Inc.)installed in the air gaps before each treatment room for online beam monitoring.They can provide an interlock signal to the machine control system when an abnormal signal is detected.The numbers of each type of detector are summarized in Table 6.For security considerations,all retractable detectors are set to be pushed in when the pneumatic actuator is powered off and pulled out when the actuator is powered on.A prototype of each type of detector was manufactured and tested.More detailed design and testing results of the BDS can be found in Ref.[21].

    Table 6 Detectors and their numbers used in the beamline

    4.2 Beamline control system

    The beamline control system(BCS)is the‘core’of the beamline with the following major functions:(1)Full control access and management to all low-level hardware modules of the beamline,which includes the power supplies of all dipoles,quadrupoles,steerers,kicker,energy degrader,and beam diagnostic modules;(2)mode switch between beam commissioning and routine beam treatment;(3)to provide a fast response and data exchange interface for external software components of PT,such as the treatment control system(TCS);(4)to provide a unified and friendly user interface(UI)for operators;and(5)data acquisition,logging,and supervision during beam commissioning and treatment procedures.

    As shown in Fig.15,the BCS adopts the OPC UA framework to ensure high safety and reliability and consists of three layers:a device layer,a server layer,and a GUI layer.To unify the communication protocol,special OPC UA servers are developed for each category of device,which act as a gateway to the server layer.In the server layer,the configuration service provides the actual operation parameters for devices from the database,for example,the currents for the magnet power supplies.The responsibility of the operation service is to direct the flow of the operations of the entire BCS.Each manager is in charge of an actual control of the corresponding devices.

    Fig.15 (Color online)Framework of BCS

    To date,BCS has completed an operation workflow test based on a virtual simulation platform.BCS can achieve parallel monitoring of the subsystem status up to 1500 Hz,which meets the energy switching requirements.

    Fig.14 (Color online)SC,FC and thick IC of HUST-PTF.All detectors are driven by pneumatic actuators

    5 Discussion and conclusions

    Compared with accelerator and beamline facilities used in scientific research,the main task of a PT beamline is to deliver a stable proton beam at a fixed treatment position or rotating gantry iso-center,to fulfill the requirements of treatment plans with acceptable deviations in beam size,intensity,and energy.Design considerations and technical implementations of the HUST-PTF beamline are reviewed from a systematic viewpoint,and some details can be found in the published literature.

    The HUST-PTF beamline will be installed this year.For more efficient beam commissioning and precise dose delivery,the following studies will be performed:

    1. From our experiences in gantry beamline modeling,the beam behavior differs between a linear optics model and a realistic model considering high order aberrations and fringe fields.To provide a more accurate prediction of the beam transportation,it is essential to build a high-fidelity beamline model from start to end,including beam material interactions with beam loss evaluation,and nonlinear effects using highorder optics calculations or particle tracking in realistic magnetic fields.Related works have recently been initiated and studied in PSI and IBA[22,23].

    2. For an important potential application,by training the pre-constructed high fidelity beamline model with machine learning algorithms such as neural networks,it is possible to construct more efficient surrogate models which can be embedded into the BCS to perform beam parameter prediction,correction and commissioning with an almost‘real-time’response performance.

    AcknowledgementsThe authors would like to acknowledge Li-Zhen Ma,Qing-Gao Yao,and Wenjie Yang at IMP(CAS,China)and Chang-Dong Deng and Yu-Wen Wu at IHEP(CAS,China)for their support and fruitful discussions related to the design and field measurements of prototype magnets.In addition,we would like to thank Rui-Shi Mao and his team at IMP(CAS,China)for their help and contributions to the construction of the beam diagnostic system.We would also like to acknowledge Marco Schippers at PSI and Luciano Calabretta at INFN for their valuable suggestions and comments on this project.

    Author ContributionsAll authors contributed to the study conception and design.Material preparation,data collection and analysis were performed by Bin Qin,Xu Liu,Qu-Shan Chen,Dong Li,Wen-Jie Han,Ping Tan,Zhongqi Zhang,Chong Zhou,Ao-Te Chen,Yi-Cheng Liao and Wei Wang.The first draft of the manuscript was written by Bin Qin and all authors commented on previous versions of the manuscript.All authors read and approved the final manuscript.

    久久精品国产亚洲av香蕉五月| 国内久久婷婷六月综合欲色啪| 69av精品久久久久久| 88av欧美| 亚洲av成人不卡在线观看播放网| 久久久久久久久免费视频了| 免费在线观看亚洲国产| 69av精品久久久久久| 亚洲人成77777在线视频| 欧美激情 高清一区二区三区| 亚洲成人久久性| 亚洲色图av天堂| 看片在线看免费视频| 精品午夜福利视频在线观看一区| 99riav亚洲国产免费| 丝袜美腿诱惑在线| 国产在线观看jvid| 国产视频一区二区在线看| 99久久99久久久精品蜜桃| 美女扒开内裤让男人捅视频| 亚洲一卡2卡3卡4卡5卡精品中文| 亚洲精品中文字幕一二三四区| 国产高清激情床上av| 老熟妇仑乱视频hdxx| 搞女人的毛片| 亚洲欧美日韩高清在线视频| 欧美丝袜亚洲另类 | 69av精品久久久久久| 久久久精品欧美日韩精品| 精品国产美女av久久久久小说| 亚洲 国产 在线| 老汉色∧v一级毛片| 亚洲精品一卡2卡三卡4卡5卡| 夜夜躁狠狠躁天天躁| av片东京热男人的天堂| tocl精华| 亚洲国产欧洲综合997久久, | 日韩大码丰满熟妇| 国内毛片毛片毛片毛片毛片| 黄色视频不卡| 99热只有精品国产| 欧美黄色片欧美黄色片| 色综合亚洲欧美另类图片| 啦啦啦免费观看视频1| 女人高潮潮喷娇喘18禁视频| 欧美一区二区精品小视频在线| 国产精品亚洲一级av第二区| 国产精品99久久99久久久不卡| 久久久久国产精品人妻aⅴ院| 超碰成人久久| 男女那种视频在线观看| 国产亚洲欧美精品永久| 精品无人区乱码1区二区| 这个男人来自地球电影免费观看| 欧美在线一区亚洲| 听说在线观看完整版免费高清| 久久精品影院6| 久久久久久大精品| 日韩av在线大香蕉| 久久精品国产亚洲av高清一级| 性欧美人与动物交配| a在线观看视频网站| 中文字幕人妻熟女乱码| 男人的好看免费观看在线视频 | 天堂动漫精品| 99久久99久久久精品蜜桃| 欧美一级a爱片免费观看看 | 热99re8久久精品国产| 18美女黄网站色大片免费观看| 日本a在线网址| 波多野结衣高清无吗| 欧美日韩瑟瑟在线播放| 日韩欧美在线二视频| www国产在线视频色| 18禁黄网站禁片午夜丰满| 久久久久国内视频| 亚洲av第一区精品v没综合| 成人免费观看视频高清| 亚洲av美国av| 亚洲精品久久成人aⅴ小说| 人人妻人人澡欧美一区二区| 12—13女人毛片做爰片一| 女同久久另类99精品国产91| 国产亚洲精品一区二区www| 啦啦啦韩国在线观看视频| 最新美女视频免费是黄的| 亚洲国产中文字幕在线视频| 国产欧美日韩一区二区三| 天天躁狠狠躁夜夜躁狠狠躁| 一区二区三区激情视频| 又黄又爽又免费观看的视频| 亚洲午夜理论影院| 国产激情欧美一区二区| 国产精品久久视频播放| 国产一区二区三区在线臀色熟女| 黄色视频不卡| 亚洲av电影在线进入| 一个人观看的视频www高清免费观看 | 免费看日本二区| 亚洲美女黄片视频| 不卡一级毛片| 最好的美女福利视频网| avwww免费| 欧美黑人欧美精品刺激| 女生性感内裤真人,穿戴方法视频| 色综合站精品国产| 淫秽高清视频在线观看| 国产成年人精品一区二区| 90打野战视频偷拍视频| 俄罗斯特黄特色一大片| 黄片大片在线免费观看| 欧美日韩中文字幕国产精品一区二区三区| 成在线人永久免费视频| 51午夜福利影视在线观看| tocl精华| cao死你这个sao货| 香蕉丝袜av| 久久亚洲真实| 又大又爽又粗| 午夜免费激情av| 中国美女看黄片| 亚洲一卡2卡3卡4卡5卡精品中文| 可以免费在线观看a视频的电影网站| 好男人在线观看高清免费视频 | 女性被躁到高潮视频| 亚洲成人久久性| 免费看a级黄色片| 男女做爰动态图高潮gif福利片| 久久精品影院6| av有码第一页| 国产成人精品久久二区二区91| 国产黄a三级三级三级人| 亚洲性夜色夜夜综合| 久久性视频一级片| 国产日本99.免费观看| svipshipincom国产片| 色综合婷婷激情| 老司机在亚洲福利影院| 在线观看66精品国产| 精品不卡国产一区二区三区| 白带黄色成豆腐渣| 久久国产精品影院| 无遮挡黄片免费观看| 国产精品,欧美在线| 日本a在线网址| 两个人视频免费观看高清| 欧美人与性动交α欧美精品济南到| 色综合欧美亚洲国产小说| 亚洲在线自拍视频| 9191精品国产免费久久| 又紧又爽又黄一区二区| 嫩草影视91久久| 国产欧美日韩精品亚洲av| 国产成人精品久久二区二区91| 国产成人影院久久av| 在线av久久热| 亚洲精品av麻豆狂野| 亚洲精品在线美女| 亚洲第一青青草原| 国产伦人伦偷精品视频| 亚洲五月婷婷丁香| 特大巨黑吊av在线直播 | 日韩精品免费视频一区二区三区| 欧美黑人欧美精品刺激| 亚洲欧美一区二区三区黑人| 久9热在线精品视频| 国产精品久久电影中文字幕| 亚洲av片天天在线观看| 国产激情偷乱视频一区二区| 9191精品国产免费久久| 亚洲一区二区三区不卡视频| 不卡av一区二区三区| 亚洲国产欧美日韩在线播放| 成人国产综合亚洲| 999久久久精品免费观看国产| 国产精品久久久av美女十八| 亚洲av成人av| 婷婷六月久久综合丁香| 国产高清激情床上av| 黄片小视频在线播放| 中文字幕另类日韩欧美亚洲嫩草| 少妇裸体淫交视频免费看高清 | 身体一侧抽搐| 精品电影一区二区在线| 国内揄拍国产精品人妻在线 | 日韩大码丰满熟妇| 欧美人与性动交α欧美精品济南到| 精品无人区乱码1区二区| 久久草成人影院| 亚洲精品国产一区二区精华液| 国产高清videossex| 真人做人爱边吃奶动态| 在线十欧美十亚洲十日本专区| 亚洲专区国产一区二区| 一区二区三区高清视频在线| 国产三级在线视频| 日本 av在线| www.999成人在线观看| 亚洲狠狠婷婷综合久久图片| 亚洲av熟女| 香蕉国产在线看| 99热6这里只有精品| 精品欧美一区二区三区在线| 啦啦啦观看免费观看视频高清| 国产熟女xx| 亚洲欧美精品综合一区二区三区| 亚洲三区欧美一区| 天天躁夜夜躁狠狠躁躁| 国产精品国产高清国产av| 精品少妇一区二区三区视频日本电影| 免费无遮挡裸体视频| 黄色 视频免费看| 99re在线观看精品视频| 91成年电影在线观看| 夜夜爽天天搞| 别揉我奶头~嗯~啊~动态视频| 国产v大片淫在线免费观看| 男男h啪啪无遮挡| 亚洲国产精品合色在线| 亚洲中文字幕日韩| 国产av在哪里看| 两个人免费观看高清视频| 久久久久久久久久黄片| 免费高清在线观看日韩| 在线观看午夜福利视频| 可以免费在线观看a视频的电影网站| 成人欧美大片| 成人特级黄色片久久久久久久| 人人妻人人澡欧美一区二区| 亚洲国产欧洲综合997久久, | 黄色a级毛片大全视频| 在线十欧美十亚洲十日本专区| 成年版毛片免费区| 亚洲 国产 在线| 国产欧美日韩一区二区三| av在线天堂中文字幕| 欧美成狂野欧美在线观看| 看免费av毛片| 999久久久精品免费观看国产| 丰满的人妻完整版| 亚洲av第一区精品v没综合| 免费在线观看成人毛片| 九色国产91popny在线| 日韩国内少妇激情av| 亚洲五月色婷婷综合| 欧美在线黄色| 日韩av在线大香蕉| 中出人妻视频一区二区| 免费观看精品视频网站| 男女那种视频在线观看| www日本在线高清视频| 色哟哟哟哟哟哟| 亚洲国产毛片av蜜桃av| 久久香蕉国产精品| 久久九九热精品免费| 日本在线视频免费播放| 国产激情偷乱视频一区二区| 亚洲va日本ⅴa欧美va伊人久久| 国产av在哪里看| 日韩欧美三级三区| 国产精品av久久久久免费| 国产精品久久视频播放| 日本撒尿小便嘘嘘汇集6| 国产人伦9x9x在线观看| 中文资源天堂在线| 12—13女人毛片做爰片一| 香蕉av资源在线| 一级片免费观看大全| 国产激情久久老熟女| 国产精品国产高清国产av| 欧美av亚洲av综合av国产av| 视频区欧美日本亚洲| 久99久视频精品免费| 国内精品久久久久精免费| 久久久久久免费高清国产稀缺| 日韩欧美三级三区| 国产精品自产拍在线观看55亚洲| 中国美女看黄片| 亚洲成a人片在线一区二区| 91老司机精品| 老熟妇乱子伦视频在线观看| 久久久久久九九精品二区国产 | 亚洲全国av大片| 1024香蕉在线观看| 最近最新中文字幕大全免费视频| 一级作爱视频免费观看| 日韩欧美在线二视频| 女性被躁到高潮视频| 色哟哟哟哟哟哟| 久久久久久久久久黄片| 成人午夜高清在线视频 | 精品福利观看| 国产野战对白在线观看| 在线天堂中文资源库| 在线观看午夜福利视频| 91麻豆av在线| 美女国产高潮福利片在线看| 国产精品久久久久久亚洲av鲁大| 亚洲熟妇中文字幕五十中出| 桃红色精品国产亚洲av| 高清在线国产一区| 亚洲专区字幕在线| 日韩精品青青久久久久久| 国产精品久久久久久精品电影 | 伦理电影免费视频| 日韩精品中文字幕看吧| 97人妻精品一区二区三区麻豆 | 给我免费播放毛片高清在线观看| 国内久久婷婷六月综合欲色啪| 国产精品乱码一区二三区的特点| 午夜福利在线在线| 天堂√8在线中文| 中国美女看黄片| 色综合站精品国产| 1024手机看黄色片| 国产aⅴ精品一区二区三区波| 国产精品一区二区精品视频观看| 亚洲国产精品sss在线观看| 国产一区二区激情短视频| 久久久久九九精品影院| 午夜成年电影在线免费观看| 色老头精品视频在线观看| 亚洲片人在线观看| tocl精华| 成人一区二区视频在线观看| 国产一区二区三区视频了| 亚洲男人天堂网一区| 成人手机av| 亚洲在线自拍视频| 国产爱豆传媒在线观看 | 美女午夜性视频免费| 俄罗斯特黄特色一大片| 最新在线观看一区二区三区| 91在线观看av| 三级毛片av免费| 久久午夜综合久久蜜桃| 久久久久久免费高清国产稀缺| 变态另类丝袜制服| 久久久精品国产亚洲av高清涩受| 韩国av一区二区三区四区| 人人妻,人人澡人人爽秒播| 亚洲狠狠婷婷综合久久图片| xxxwww97欧美| 久久精品亚洲精品国产色婷小说| 黄片小视频在线播放| 欧美乱妇无乱码| 脱女人内裤的视频| 韩国精品一区二区三区| 久久中文字幕人妻熟女| xxxwww97欧美| netflix在线观看网站| 99re在线观看精品视频| 亚洲成人久久爱视频| 亚洲va日本ⅴa欧美va伊人久久| 亚洲自拍偷在线| 亚洲人成77777在线视频| 老司机福利观看| 免费在线观看影片大全网站| 黄频高清免费视频| 精品久久久久久久久久免费视频| 午夜福利高清视频| 91av网站免费观看| 男女那种视频在线观看| 午夜影院日韩av| tocl精华| 老熟妇乱子伦视频在线观看| 久久香蕉国产精品| 欧美中文日本在线观看视频| 一二三四在线观看免费中文在| 好男人电影高清在线观看| 久久亚洲真实| 可以在线观看毛片的网站| 99re在线观看精品视频| 桃红色精品国产亚洲av| 热re99久久国产66热| 久久久国产欧美日韩av| 18禁裸乳无遮挡免费网站照片 | 两个人看的免费小视频| 国产黄片美女视频| 日本五十路高清| 亚洲精华国产精华精| 欧美国产日韩亚洲一区| 精品电影一区二区在线| 久久久久久久精品吃奶| 夜夜躁狠狠躁天天躁| 婷婷精品国产亚洲av在线| 最近最新中文字幕大全免费视频| 人妻久久中文字幕网| 又黄又爽又免费观看的视频| 精品乱码久久久久久99久播| 美女 人体艺术 gogo| 日韩精品中文字幕看吧| 亚洲熟妇中文字幕五十中出| 亚洲人成伊人成综合网2020| 亚洲专区字幕在线| 巨乳人妻的诱惑在线观看| 久久性视频一级片| 99国产精品99久久久久| 女人高潮潮喷娇喘18禁视频| 叶爱在线成人免费视频播放| 亚洲一区高清亚洲精品| 婷婷精品国产亚洲av| 午夜福利一区二区在线看| 三级毛片av免费| 一边摸一边做爽爽视频免费| 亚洲性夜色夜夜综合| 欧美另类亚洲清纯唯美| 在线观看免费视频日本深夜| 两个人视频免费观看高清| 男女那种视频在线观看| 亚洲av成人不卡在线观看播放网| 极品教师在线免费播放| 精品久久久久久久久久久久久 | 亚洲激情在线av| e午夜精品久久久久久久| 久久国产精品影院| 欧美日韩中文字幕国产精品一区二区三区| 亚洲成国产人片在线观看| 国语自产精品视频在线第100页| 长腿黑丝高跟| 女人被狂操c到高潮| 国产视频一区二区在线看| 90打野战视频偷拍视频| 啦啦啦观看免费观看视频高清| 国产亚洲精品一区二区www| 亚洲av中文字字幕乱码综合 | 精品一区二区三区四区五区乱码| 在线观看免费视频日本深夜| 免费观看人在逋| 日韩大尺度精品在线看网址| avwww免费| aaaaa片日本免费| 久久久久国产精品人妻aⅴ院| 欧美黑人欧美精品刺激| 午夜福利成人在线免费观看| 午夜福利在线在线| 男人操女人黄网站| 美女国产高潮福利片在线看| 久久中文字幕人妻熟女| 高潮久久久久久久久久久不卡| 国产不卡一卡二| 两性夫妻黄色片| 欧美性长视频在线观看| 老汉色av国产亚洲站长工具| 国产99久久九九免费精品| 亚洲国产精品999在线| 日韩有码中文字幕| 麻豆成人av在线观看| 国产精品av久久久久免费| 我的亚洲天堂| 午夜a级毛片| 日本撒尿小便嘘嘘汇集6| 动漫黄色视频在线观看| 99国产精品一区二区蜜桃av| 精品久久久久久久人妻蜜臀av| 午夜日韩欧美国产| 一级毛片高清免费大全| 男女下面进入的视频免费午夜 | 人人妻人人澡人人看| 又紧又爽又黄一区二区| 国产精品av久久久久免费| 男女那种视频在线观看| 在线视频色国产色| 青草久久国产| 777久久人妻少妇嫩草av网站| 久久人妻福利社区极品人妻图片| 国产99久久九九免费精品| 亚洲成人国产一区在线观看| e午夜精品久久久久久久| 亚洲国产欧美日韩在线播放| 欧美成人一区二区免费高清观看 | 一个人观看的视频www高清免费观看 | 国产激情偷乱视频一区二区| 国内揄拍国产精品人妻在线 | 久久久久免费精品人妻一区二区 | 国产真实乱freesex| 美女国产高潮福利片在线看| 日本a在线网址| 欧美一级a爱片免费观看看 | 亚洲国产精品999在线| 精品欧美国产一区二区三| 757午夜福利合集在线观看| 国产亚洲欧美在线一区二区| 久久久久久久久免费视频了| 国产又色又爽无遮挡免费看| 三级毛片av免费| 精品国产亚洲在线| 久久中文字幕人妻熟女| 一区二区三区国产精品乱码| av有码第一页| 国产成人精品久久二区二区免费| 国产成年人精品一区二区| www.熟女人妻精品国产| 18禁黄网站禁片免费观看直播| 国产成人av教育| 大型黄色视频在线免费观看| 麻豆国产av国片精品| 变态另类成人亚洲欧美熟女| 欧美日韩乱码在线| 久久国产亚洲av麻豆专区| 国产欧美日韩一区二区三| 国产精品 欧美亚洲| 成人三级黄色视频| 无人区码免费观看不卡| 亚洲精品国产区一区二| 亚洲黑人精品在线| 亚洲自偷自拍图片 自拍| or卡值多少钱| 国内精品久久久久精免费| 日韩欧美一区二区三区在线观看| 欧美丝袜亚洲另类 | 男人舔女人下体高潮全视频| 中亚洲国语对白在线视频| 精品人妻1区二区| 欧美色视频一区免费| 欧美精品亚洲一区二区| 日本免费a在线| 波多野结衣巨乳人妻| 国产精品免费一区二区三区在线| 亚洲欧美精品综合久久99| 国产精品久久久久久亚洲av鲁大| 欧美成狂野欧美在线观看| 在线观看免费视频日本深夜| 午夜亚洲福利在线播放| 黑人操中国人逼视频| 久久久水蜜桃国产精品网| 丰满人妻熟妇乱又伦精品不卡| 国产精品久久久av美女十八| 免费在线观看成人毛片| 12—13女人毛片做爰片一| 又大又爽又粗| 欧美国产精品va在线观看不卡| 欧美日韩中文字幕国产精品一区二区三区| 91大片在线观看| 久久婷婷人人爽人人干人人爱| 成年女人毛片免费观看观看9| 神马国产精品三级电影在线观看 | 99国产精品一区二区蜜桃av| 欧美乱码精品一区二区三区| 天堂动漫精品| 国产高清videossex| 久久婷婷人人爽人人干人人爱| 欧美丝袜亚洲另类 | 午夜免费成人在线视频| 别揉我奶头~嗯~啊~动态视频| 亚洲电影在线观看av| 久久精品91无色码中文字幕| 欧美 亚洲 国产 日韩一| 俄罗斯特黄特色一大片| 免费一级毛片在线播放高清视频| 亚洲精品国产精品久久久不卡| 黄色丝袜av网址大全| 少妇被粗大的猛进出69影院| 国产精品 欧美亚洲| 国产高清激情床上av| 国产精品永久免费网站| 两个人免费观看高清视频| 欧美日韩亚洲国产一区二区在线观看| 精品人妻1区二区| 无人区码免费观看不卡| 999久久久国产精品视频| 两性夫妻黄色片| 丝袜在线中文字幕| 法律面前人人平等表现在哪些方面| 午夜福利18| 亚洲成a人片在线一区二区| 午夜免费成人在线视频| 亚洲成a人片在线一区二区| 亚洲自拍偷在线| 国产97色在线日韩免费| 亚洲成人精品中文字幕电影| 国产亚洲欧美精品永久| 中文字幕人成人乱码亚洲影| 亚洲成国产人片在线观看| 国产三级在线视频| 亚洲成a人片在线一区二区| 午夜福利18| 亚洲一区高清亚洲精品| 国产一区在线观看成人免费| 久久久国产成人精品二区| 巨乳人妻的诱惑在线观看| 国产精品 欧美亚洲| 草草在线视频免费看| 日本三级黄在线观看| 国内揄拍国产精品人妻在线 | 99久久99久久久精品蜜桃| 丝袜美腿诱惑在线| 熟妇人妻久久中文字幕3abv| 久久中文字幕一级| 国产伦一二天堂av在线观看| 中文字幕另类日韩欧美亚洲嫩草| 老司机深夜福利视频在线观看| 亚洲精品中文字幕一二三四区| 曰老女人黄片| 1024视频免费在线观看| 少妇 在线观看| 日韩高清综合在线| 成人特级黄色片久久久久久久| 桃红色精品国产亚洲av| 男人舔女人的私密视频| 可以在线观看的亚洲视频| 欧美又色又爽又黄视频| 欧美一级毛片孕妇| 一区二区日韩欧美中文字幕| 国产高清videossex| 长腿黑丝高跟| 中文字幕精品免费在线观看视频| av超薄肉色丝袜交足视频| 久久精品91蜜桃| 男人操女人黄网站| 国产男靠女视频免费网站| 亚洲av美国av| 精品一区二区三区av网在线观看| 色综合亚洲欧美另类图片| 99久久99久久久精品蜜桃|