    Multi-objective optimization scheduling for new energy power system considering energy storage participation

    2020-11-25 09:45:46YUNYunyunDONGHaiyingCHENZhaoHUANGRongDINGKun

    YUN Yun-yun, DONG Hai-ying,2, CHEN Zhao, HUANG Rong, DING Kun

    (1. School of Automation and Electrical Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China;2. School of New Energy and Power Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China;3. Electric Power Research Institute of State Grid Gansu Electric Power Company, Lanzhou 730070, China)

    Abstract: For the low utilization rate of photovoltaic power generation, taking a new energy power system constisting of concentrating solar power (CSP), photovoltaic power (PP) and battery energy storage system as an example, a multi-objective optimization scheduling strategy considering energy storage participation is proposed. Firstly, the new energy power system model is established, and the PP scenario generation and reduction frame based on the autoregressive moving average model and Kantorovich-distance is proposed. Then, based on the optimization goal of the system operation cost minimization and the PP output power consumption maximization, the multi-objective optimization scheduling model is established. Finally, the simulation results show that introducing energy storage into the system can effectively reduce the system operation cost and improve the utilization efficiency of PP.

    Key words: new energy power system; multi-objective optimization; energy storage participation; operation cost; autoregressive moving average model

    0 Introduction

    At present, for the installed capacity of new energy, the total amount of quitting the wind power and photovoltaic power (PP) is still high. Although large-scale renewable energy connected to the grid can bring certain economic benefits, its output power has the characteristic of randomness, which makes the problem of new energy consumption increasingly significant[1-3].

    In order to improve the level of new energy consumption, many scholars have solved this problem through reasonable scheduling of demand side resources[4-5]and multi-source complementation in the power generation side[6]. In Ref.[7], the errors of wind speed and solar irradiance, were modeled by related probability distribution functions. And then, by using the Latin hyper-cube sampling, the plausible scenarios of renewable generation for day-head energy and reserve scheduling were generated. A two-stage stochastic objective function aiming at minimizing the expected operational cost was implemented. In Ref.[8], electric vehicles were classified by its schedule ability, and a wind/vehicle coordination optimization strategy was proposed to achieve the goal of increasing wind power utilization efficiency. In Ref.[9], in order to reduce the adverse effects of large-scale renewable energy grid-connected power systems, a hydropower-photovoltaic-wind energy hybrid power generation system scheduling model was proposed. In Ref.[10], an optimization model to coordinate multiple generating units was proposed to improve the regulation capability to accommodate more wind power in power system. However, most of the current studies separately takes thermal power units and gas turbines as the basic power source, but there are few studies on concentrating solar power(CSP) with small environmental pollution and stable output power.

    The CSP plant equipped with a heat storage system can sustain the full operation of the plant about 15 h without irradiation[11-12], which has good scheduling characteristic. Moreover, the CSP unit has the ability to climb quickly. Therefore it has the potential to replace conventional energy as the basic power source. The battery energy storage system (BS) can release a large amount of electric energy quickly in a short time, and can be continuously discharged with small output power for a long time[13]. Therefore, the battery energy storage system can not only fill the power shortage due to the prediction error in a short time, but also improve the consumption space of the new energy through its energy storage characteristics. The above analysis shows that the battery energy storage system and the CSP plant have good complementarity.

    In order to improve the ability of new energy consumption in Northwest China, this paper presents a multi-objective optimization scheduling strategy for new energy power system considering energy storage participation. Firstly, the model of new energy power system is established. Then, the scenario generation and reduction method based on auto autoregressive moving average model and K-distance is used to simulate the uncertainty of PP output power. Based on this, a multi-objective optimization scheduling model that considers operational economy and new energy consumption level is established. Finally, the simulation shows the economic benefit and effectiveness of the model.

    1 New energy power system model

    1.1 BS output model

    The battery energy storage system has the characteristics of quickly charge and discharge, and its operating cost can be expressed as

    (1)

    The BS needs to meet the following constraints as

    (2)

    (3)

    (4)

    1.2 CSP output model

    Because CSP plant is usually equipped with large capacity thermal energy system, the instantaneous irradiance change will not directly affect the output power of CSP plant. Moreover, the change of irradiation in next day can be predicted very accurately[11]. The overall solar energy available in a day can be predicted well[14], meaning that the recovery of storage level will not be bothered by remarkable uncertainty. Therefore, for simplicity, the uncertainty can be ignored while calculating the intervals for joint power output. The predicted solar series can be directly used.

    The CSP operating cost can be expressed as

    (5)

    (6)

    (7)

    The CSP needs to meet the following constraints as

    (8)

    (9)

    (10)

    (11)

    1.3 PP output model

    Based on the photovoltaic effect, PP converts solar energy into electric power, and the output power is mainly affected by factors such as irradiation intensity and photoelectric conversion rate.

    Irradiation intensity is usually described by the Beta distribution function as

    (12)

    (13)

    (14)

    whererandrmaxare the irradiation intensity and the maximum irradiation intensity, respectively;αpandβpare the shape distribution parameters of Beta; μp and σp are the average values of the irradiation intensity and standard deviation of irradiation intensity, respectively.

    As can be seen from the above, the PP output is

    Pt,PP=SPPηPPrt,

    (15)

    whereηPPis the photoelectric transformation efficiency,SPPis the area of photovoltaic array, andrtis the irradiation intensity at timet.

    From Eqs.(1)-(4), the PP output power can be described by the Beta distribution function as

    (16)

    The output power of PP is mainly affected by the change of irradiance, therefore the decision-maker needs to obtain a representative scenario by scenario generation and reduction method to formulate a scheduling plan.

    2 Scenario generation and reduction

    Due to the uncertainty of new energy generation, it is very important to draw up the day-ahead dispatching scheduling based on the day-ahead power prediction[15]. In our work, the scenario simulation method is used to describe the uncertainty of photovoltaic power generation, including scenario generation and scenario reduction.

    The generated output power scenarios of the photovoltaic power generation by autoregressive moving average model is expressed as[16]

    (17)

    whereytis the time series value of the periodt;φiis the auto autoregressive parameter;μjis moving average parameter;αtis the normal white noise process in which the average value is 0 and the variance value isσ2.

    With the number of scenes increasing, the process of solving the multi-objective scheduling model becomes more and more tedious. Therefore, in order to reduce the computational complexity, we use the K-distance based pushback reduction method to reduce the amount of scenarios.

    Supposing thatSandS′ are two large-scale scenario sets, the K-distanceL(S,S′) can be expressed as

    (18)

    wheresands′ are any scenario in setSand setS′, respectively;δsandδs′are the occurrence probabilities of scenariosand scenarios′ in the scenario setSand scenario setS′, respectively;λ(s,s′) is the distance function;ε(s,s′) is the product of occurrence probabilities of scenariosand scenarios′.

    Based on the output power characteristics of photovoltaic power generation, it is assumed that the original photovoltaic output scenario set isSand the target photovoltaic output scenario set isS′. The above formula can be equivalent to

    (19)

    (20)

    The purpose of reducing the scenarios can be achieved by repeatedly calculating Eq.(19).

    3 Multi-objective optimization scheduling model of new energy power system

    3.1 Objective function

    In order to ensure the minimum operation cost of the system and the maximum utilization of PP, the objective function is established as

    F1=min(Cyw+CBS+Ccf),

    (21)

    (22)

    (23)

    (24)

    3.2 Constraint conditions

    1) The power balance constraint

    (25)

    2) System spinning reserve constraints

    (26)

    (27)

    3) PP operation constraint

    (28)

    The constraints also include BS operation constraints and CSP operation constraints.

    3.3 Solution of multi-objective weight coefficient

    It can be seen from the above optimization scheduling model that the model has two objective functions, which can be transformed into a single target by setting reasonable weight coefficients. In this paper, the weight coefficients of the optimization target are solved by rough set theory. Relevant knowledge is detailed in Ref.[18]. The solution process is as follows.

    1) Relational data model

    Assuming that the target weight coefficientfnof the arbitrary objective function is 1/nand the best value of multiple objective functions isF, a decision attribute set with the expressionD={F} can be obtained by usingFas the decision attribute. At this point, there exists a comprehensive optimal valueumin the set, andum=(f1m,f2m,…,fim;Fm). The sample set can be expressed asU={u1,u2,…,um} and the attributes ofumarefn(um)=anm,Fn(um)=Fm.

    2) Dependence ofRAonRD

    (29)

    whereRAandRDare knowledge bases; [F]RDis the knowledge baseRDwhich contains one value ofF;RA(·) is knowledge of the sample setUbefore deleting the indicatoran;d(·) is the rough set base.

    3) Dependence ofRAonRA-|an|

    (30)

    whereRA-|an|(·) is knowledge of the sample setUafter deleting the indicatoran.

    4) Weight coefficient

    σD=δRA(D)-δRA-|an|(D),

    (31)

    (32)

    whereσDis the importance of the goal, andθnis the weight coefficient of the objective function. Ifa1anda2are assumed to be the weighting coefficients of the minimum operation costs of the system and the maximum accommodation of PP respectively, the sum ofa1anda2is 1.

    4 Simulation

    4.1 Basic data

    The new energy power system consists of PP plant, CSP plant and BS. The installed capacity of PP is 200 MW. After generating and reducing the scenario sets, five typical PV output scenarios are obtained. Taking the average of each scenario as the PP forecast output, the load power prediction result and the photovoltaic output power prediction result are shown in Figs.1 and 2, respectively.

    Fig.1 Prediction result of load

    Fig.2 Prediction result of PP output power

    The maximum and minimum outputs of CSP are 100 MW and 10 MW, respectively. The maximum and the minimum storage levels of the thermal energy storage system are 1 000 MW and 100 MW, respectively. Other parameters can be found in Ref.[17]. The BS has a total capacity of 50 MW and its maximum charge and discharge power are 8 MW. The Light irradiation intensity is shown in Fig.3.

    Fig.3 Light irradiation intensity

    Since photovoltaic power generation can only generate electricity power during the daytime, simulation analysis only from 7:00 to 18:00 is performed. The maintenance cost of photovoltaic power generation is 30 RMB yuan/(MW·h). The maintenance costs of solar energy collector system and thermal energy system are 50 RMB yuan/(MW·h) and 40 RMB yuan/(MW·h), respectively. The penalty cost of quitting PP is 100 RMB yuan/(MW·h). The operation and maintenance cost and depreciation cost of BS are 25 RMB yuan/(MW·h) and 25 RMB yuan/(MW·h), respectively.

    According to Section 3.3, the weight coefficient of two objective functions can be calculated. The results of the minimum operation cost of the system and the maximum utilization of new energy are 0.69 and 0.31, respectively. The prediction error of photovoltaic power generation is 0.05. The model is solved by the Matlab software using the CPLEX 11.0. The solution steps are as follows.

    The first step is the problem preprocessing, which means to set the solution accuracy and feasible solution test methods.

    The second step is to relax the 0-1 discrete variable of the unit state and solve the relaxation problem. If there is no feasible solution, the software continues to search new nodes. If there exists a feasible solution, the software determines the feasibility of solution by judging whether the solution satisfies the cutting equation. Then, the optimal solution which satisfies the equation is selected as the new lower boundary value.

    The third step is to solve the integer variable problem. The relaxed optimal solution is taken as the initial point of integer segmentation optimization. If the integer condition is not feasible, return to the second step to continue the solution. If the condition is satisfied, the upper boundary value of the problem is modified according to the objective function.

    The fourth step is to judge the convergence condition. If the relaxation optimal solution and the integer optimal feasible solution satisfy the convergence condition, the calculation is ended. Otherwise, return to the second step to search for a solution that meets the requirements.

    4.2 Result analysis

    In order to verify the economic benefit and effectiveness of the model, two scenarios are set up for simulation analysis.

    Scenario 1: The basic scenario. This scenario includes the PP plant and the CSP plant.

    Scenario 2: BS scenario. This scenario includes the PP plant ,BS and CSP plant.

    The scheduling result of scenario 1 is shown in Fig.4.

    Fig.4 Scheduling result of scenario 1

    According to Fig.4, the PP output power and the CSP output power in scenario 1 are 343.7 MW·h and 516.6 MW·h, respectively. The power value of quitting PP is 108.1 MW·h. The consumption rate of photovoltaic power generation is only 76.07%. In this scenario, the CSP plant not only needs to supply electricity power to the load, but also needs to provide reserve capacity for photovoltaic power generation to prevent emergencies. In order to reduce the risk of power shortage, the system increases the power supply proportion of CSP. Although this behavior can improve the reliability of NEPS, it fails to fully exploit the economic benefits of photovoltaic power generation. The scheduling result of scenario 2 is shown in Fig.5.

    Fig.5 Scheduling result of scenario 2

    According to Fig.5, the PP output power and the CSP output power in scenario 2 are 411.4 MW·h and 469.9 MW·h, respectively. The power value of quitting PP is only 40.4 MW·h. The consumption rate of photovoltaic power generation is 91.06%. The energy storage system has two characteristics of charging and discharging. During the trough period of load power consumption and peak period of PP, the BS stores part of the electric energy and discharges the electricity power during the peak period of load power consumption and the trough period of PP, respectively. Moreover, the BS can provide reserve capacity for PP, improve the consumption space of PP, and reduce the power-supply pressure of CSP. In this way, CSP can provide more reserve capacity, which can improve scheduling flexibility of the dispatching department and reduce the risk of power shortage in the system. The power curves of the thermal energy storage in different scenarios and the CSP output curves in different scenarios are shown in Figs.6 and 7, respectively.

    Fig.7 CSP output curves in different scenarios

    According to Figs.6 and 7, the BS can reduce the power-supply pressure of CSP and increase thermal energy stored in the thermal energy system. The electricity power space generated by CSP can be supplied by PP, which improves the utilization rate of PP. The PP output curves in different scenarios are shown in Fig.8.

    According to Fig.8, the introduction of BS makes grid-connected power value of PP in each period. Moreover, the proportion of PP increases from 39.95% to 46.92%. The comparison of quitting PP in different scenarios and comparison of the system operation costs in different scenarios are shown in Figs.9 and 10, respectively.

    Fig.8 PP output curves in different scenarios

    Fig.9 Comparison of quitting photovoltaic powers in different scenarios

    Fig.10 Comparison of system operation costs in different scenarios

    According to Figs.9 and 10, the introduction of BS can reduce the system operation cost and improve the utilization rate of PP. The comparison of the scheduling results in different scenarios is shown in Table 1.

    According to Table 1, the system operating cost of scenario 2 is 1 933 RMB yuan lower than that of scenario 1, decreased by about 2.26%. The power value of quitting PP is reduced by 67.7 MW with an decrease of about 62.63%. The utilization rate of PP is increased from 76.07% to 91.06% with an increase of about 15%. The above analysis shows that the model has good economic benefit and improves the consumption rate of PP.

    Table 1 Comparison of scheduling results in different scenarios

    5 Conclusions

    Considering the minimum system operating cost and the maximum PP consumption, the new energy power system multi-objective optimization scheduling problem is studied, and the effectiveness of the model is verified in the simulation. The following conclusions are obtained.

    1) When the system contains BS, the power value of quitting PP is significantly reduced, and the output of PP reaches 46.92% of the load demand power. The BS effectively reduces the output power of CSP and improves the grid-connected space of PP. Moreover, the BS stores part of the electrical energy, which improves the scheduling flexibility of the dispatching department. Therefore, BS can effectively improve the consumption rate of PP and reduce the cost of quitting photovoltaic power.

    2) The operating cost of new energy power system with BS is 83 715 RMB yuan, while the operating cost of new energy power system without BS is 85 548 RMB yuan. It can be seen that the introduction of BS can reduce the operating cost of new energy power system and improve economic benefits.

    黄色配什么色好看| 免费观看在线日韩| 欧美成人午夜精品| 国产精品无大码| 国产亚洲一区二区精品| 欧美bdsm另类| 在线观看人妻少妇| 中文字幕av电影在线播放| 欧美激情极品国产一区二区三区| 99久久精品国产国产毛片| 在线看a的网站| 三级国产精品片| 一本一本久久a久久精品综合妖精 国产伦在线观看视频一区 | 一区二区三区激情视频| 97在线视频观看| 黄色怎么调成土黄色| 一级爰片在线观看| 一二三四中文在线观看免费高清| 精品人妻偷拍中文字幕| 男人舔女人的私密视频| 看免费av毛片| 香蕉国产在线看| 女人久久www免费人成看片| 黄色视频在线播放观看不卡| 久久久国产一区二区| 亚洲视频免费观看视频| 亚洲精品成人av观看孕妇| 一本色道久久久久久精品综合| 国产成人一区二区在线| 精品一区在线观看国产| 亚洲av中文av极速乱| 老熟女久久久| 国产熟女午夜一区二区三区| 国产精品99久久99久久久不卡 | 亚洲欧洲国产日韩| 国产老妇伦熟女老妇高清| 免费观看a级毛片全部| 久久精品国产亚洲av天美| 国产精品秋霞免费鲁丝片| 两个人免费观看高清视频| 欧美精品国产亚洲| 伦精品一区二区三区| 日本av手机在线免费观看| 国产一区二区激情短视频 | 日本91视频免费播放| 国产精品女同一区二区软件| 大香蕉久久网| 久久久久久免费高清国产稀缺| 亚洲av国产av综合av卡| 如何舔出高潮| 国产亚洲欧美精品永久| 日韩,欧美,国产一区二区三区| 女性被躁到高潮视频| 国产亚洲午夜精品一区二区久久| 少妇被粗大猛烈的视频| 欧美黄色片欧美黄色片| 99热全是精品| 亚洲内射少妇av| 国产成人精品无人区| 精品国产一区二区三区四区第35| 国产片特级美女逼逼视频| 亚洲国产精品一区三区| 免费高清在线观看视频在线观看| 久久鲁丝午夜福利片| 在线观看一区二区三区激情| 我的亚洲天堂| 亚洲一区二区三区欧美精品| 欧美变态另类bdsm刘玥| 欧美日韩亚洲高清精品| av卡一久久| 亚洲一级一片aⅴ在线观看| av有码第一页| 精品国产一区二区三区四区第35| 欧美人与性动交α欧美软件| 制服人妻中文乱码| 免费高清在线观看视频在线观看| 日韩在线高清观看一区二区三区| 欧美成人午夜免费资源| 丰满少妇做爰视频| 毛片一级片免费看久久久久| 99久久中文字幕三级久久日本| 国产黄频视频在线观看| 久久久久国产网址| 午夜免费观看性视频| 久久精品国产鲁丝片午夜精品| 在线观看免费高清a一片| 久久97久久精品| 五月开心婷婷网| 自拍欧美九色日韩亚洲蝌蚪91| 男女免费视频国产| 日本黄色日本黄色录像| 成人午夜精彩视频在线观看| 中文字幕制服av| 精品少妇一区二区三区视频日本电影 | 久久久久久久久免费视频了| freevideosex欧美| 日本免费在线观看一区| 在线天堂中文资源库| 男人添女人高潮全过程视频| 十八禁高潮呻吟视频| 亚洲欧美清纯卡通| 制服人妻中文乱码| 免费人妻精品一区二区三区视频| 亚洲av电影在线进入| 午夜免费男女啪啪视频观看| 蜜桃国产av成人99| www.自偷自拍.com| 丝瓜视频免费看黄片| h视频一区二区三区| 午夜免费观看性视频| 久久精品aⅴ一区二区三区四区 | 中文字幕人妻丝袜一区二区 | 美女主播在线视频| 免费高清在线观看视频在线观看| 男人操女人黄网站| 免费在线观看黄色视频的| 少妇被粗大猛烈的视频| 日韩制服骚丝袜av| 少妇人妻久久综合中文| 一边亲一边摸免费视频| 91久久精品国产一区二区三区| 欧美中文综合在线视频| 啦啦啦在线免费观看视频4| 国产综合精华液| 我的亚洲天堂| 91精品伊人久久大香线蕉| 午夜日韩欧美国产| 亚洲欧美中文字幕日韩二区| 亚洲欧美中文字幕日韩二区| 一区二区三区激情视频| 免费女性裸体啪啪无遮挡网站| 日本-黄色视频高清免费观看| 天天躁夜夜躁狠狠久久av| 成人毛片60女人毛片免费| 男女免费视频国产| 午夜日本视频在线| 久久久久久久久久久久大奶| 男女边摸边吃奶| 久久免费观看电影| 免费高清在线观看日韩| 日本-黄色视频高清免费观看| 丝袜美腿诱惑在线| 国产精品一区二区在线观看99| 1024香蕉在线观看| 纯流量卡能插随身wifi吗| 一级a爱视频在线免费观看| 亚洲精品av麻豆狂野| 中文字幕av电影在线播放| 一二三四中文在线观看免费高清| 99热网站在线观看| 国产精品欧美亚洲77777| 免费久久久久久久精品成人欧美视频| 成年女人毛片免费观看观看9 | 丝袜美腿诱惑在线| 美女脱内裤让男人舔精品视频| 精品亚洲成国产av| 国产精品香港三级国产av潘金莲 | 欧美变态另类bdsm刘玥| 人妻 亚洲 视频| 黄网站色视频无遮挡免费观看| 久久久久国产精品人妻一区二区| 一区二区三区四区激情视频| 婷婷色麻豆天堂久久| 少妇的逼水好多| 建设人人有责人人尽责人人享有的| 免费av中文字幕在线| 精品国产乱码久久久久久男人| 男女下面插进去视频免费观看| 国产毛片在线视频| 精品酒店卫生间| 精品国产一区二区三区四区第35| 精品国产超薄肉色丝袜足j| 毛片一级片免费看久久久久| 国产精品三级大全| 青青草视频在线视频观看| 国产片内射在线| 日韩大片免费观看网站| 满18在线观看网站| 久久久久精品人妻al黑| 麻豆乱淫一区二区| 激情视频va一区二区三区| 美女国产高潮福利片在线看| 色视频在线一区二区三区| 丝袜美足系列| 曰老女人黄片| 丰满少妇做爰视频| 夜夜骑夜夜射夜夜干| 午夜福利影视在线免费观看| 亚洲欧美一区二区三区国产| 国产黄色视频一区二区在线观看| 老司机亚洲免费影院| 水蜜桃什么品种好| 免费看av在线观看网站| 欧美亚洲日本最大视频资源| av线在线观看网站| 日韩精品免费视频一区二区三区| 亚洲第一青青草原| 亚洲精品美女久久av网站| 久久精品人人爽人人爽视色| 五月开心婷婷网| 老司机影院毛片| 亚洲av日韩在线播放| 最新的欧美精品一区二区| 电影成人av| 久久99蜜桃精品久久| 日韩一卡2卡3卡4卡2021年| 日本猛色少妇xxxxx猛交久久| 欧美日韩视频高清一区二区三区二| 热re99久久国产66热| 久久 成人 亚洲| av不卡在线播放| 久久久久网色| 秋霞在线观看毛片| 女人高潮潮喷娇喘18禁视频| 免费少妇av软件| 99re6热这里在线精品视频| 亚洲欧美精品自产自拍| 美女脱内裤让男人舔精品视频| 久久99精品国语久久久| 日韩不卡一区二区三区视频在线| 亚洲av福利一区| 久久ye,这里只有精品| 久久综合国产亚洲精品| 国产成人a∨麻豆精品| 我要看黄色一级片免费的| 黄网站色视频无遮挡免费观看| 国产日韩欧美视频二区| 免费在线观看视频国产中文字幕亚洲 | 巨乳人妻的诱惑在线观看| 久久久精品区二区三区| 天天躁日日躁夜夜躁夜夜| 成人国语在线视频| 91aial.com中文字幕在线观看| 国产精品秋霞免费鲁丝片| 久久久久国产一级毛片高清牌| 男女国产视频网站| 中文字幕色久视频| 亚洲综合色惰| 成人18禁高潮啪啪吃奶动态图| 国产精品久久久久久av不卡| 欧美日韩av久久| 久久久久久免费高清国产稀缺| 男女午夜视频在线观看| 国产一区有黄有色的免费视频| 少妇被粗大的猛进出69影院| 一区二区日韩欧美中文字幕| 欧美老熟妇乱子伦牲交| 欧美激情高清一区二区三区 | 久久女婷五月综合色啪小说| 肉色欧美久久久久久久蜜桃| 亚洲中文av在线| 亚洲成色77777| 亚洲第一区二区三区不卡| 欧美精品一区二区免费开放| 国产精品亚洲av一区麻豆 | 一级毛片 在线播放| 国精品久久久久久国模美| 一级,二级,三级黄色视频| 永久网站在线| 日韩av在线免费看完整版不卡| 满18在线观看网站| 亚洲精品日韩在线中文字幕| 如日韩欧美国产精品一区二区三区| 亚洲一区二区三区欧美精品| 午夜av观看不卡| 久久这里只有精品19| 亚洲,一卡二卡三卡| 午夜日韩欧美国产| 97人妻天天添夜夜摸| 中文字幕制服av| 国产色婷婷99| 成人亚洲欧美一区二区av| 99香蕉大伊视频| 777米奇影视久久| 9191精品国产免费久久| 精品国产超薄肉色丝袜足j| 秋霞伦理黄片| 成年美女黄网站色视频大全免费| 亚洲av男天堂| 天天躁日日躁夜夜躁夜夜| 成人二区视频| 美女午夜性视频免费| 在线精品无人区一区二区三| 久久人妻熟女aⅴ| 亚洲色图 男人天堂 中文字幕| 国产亚洲欧美精品永久| 99久国产av精品国产电影| 欧美成人午夜免费资源| 99re6热这里在线精品视频| 国产黄色免费在线视频| 免费av中文字幕在线| 一级a爱视频在线免费观看| 欧美97在线视频| 久久鲁丝午夜福利片| 亚洲精品,欧美精品| 男女高潮啪啪啪动态图| 啦啦啦视频在线资源免费观看| 亚洲精品日本国产第一区| www.自偷自拍.com| 丝袜喷水一区| 女的被弄到高潮叫床怎么办| 日韩制服丝袜自拍偷拍| 精品视频人人做人人爽| 久久婷婷青草| 看免费成人av毛片| 欧美激情 高清一区二区三区| 久久久久精品性色| 亚洲精品中文字幕在线视频| av在线app专区| 国产精品久久久av美女十八| 男人添女人高潮全过程视频| 国产色婷婷99| 欧美日本中文国产一区发布| 久久精品人人爽人人爽视色| 午夜日本视频在线| 1024视频免费在线观看| 美女国产视频在线观看| 丰满迷人的少妇在线观看| 毛片一级片免费看久久久久| 啦啦啦啦在线视频资源| 午夜福利一区二区在线看| 国产av精品麻豆| 国产福利在线免费观看视频| av免费在线看不卡| 免费观看无遮挡的男女| 在线观看美女被高潮喷水网站| 国精品久久久久久国模美| 欧美日韩精品网址| 免费看av在线观看网站| 欧美变态另类bdsm刘玥| 一级毛片黄色毛片免费观看视频| 日韩伦理黄色片| 久久久久国产一级毛片高清牌| 人人妻人人添人人爽欧美一区卜| 水蜜桃什么品种好| 国产欧美日韩一区二区三区在线| 男人添女人高潮全过程视频| 青春草视频在线免费观看| 五月开心婷婷网| 国产熟女欧美一区二区| 成年人免费黄色播放视频| 18在线观看网站| 大码成人一级视频| 看免费av毛片| 曰老女人黄片| 欧美日韩国产mv在线观看视频| 国产精品久久久久久久久免| 日日啪夜夜爽| 伦理电影大哥的女人| 日韩一本色道免费dvd| 亚洲色图 男人天堂 中文字幕| 国产精品一区二区在线不卡| 十分钟在线观看高清视频www| 亚洲精品av麻豆狂野| 亚洲欧美日韩另类电影网站| 免费黄网站久久成人精品| 日韩在线高清观看一区二区三区| 成人毛片60女人毛片免费| 少妇的丰满在线观看| 久久99热这里只频精品6学生| 久久国产亚洲av麻豆专区| 国产精品99久久99久久久不卡 | 国产精品不卡视频一区二区| 免费在线观看完整版高清| 免费在线观看完整版高清| 99re6热这里在线精品视频| 亚洲欧美一区二区三区黑人 | 免费观看av网站的网址| 交换朋友夫妻互换小说| 成人手机av| 亚洲美女黄色视频免费看| 视频区图区小说| 夫妻午夜视频| 91在线精品国自产拍蜜月| 久久精品国产综合久久久| 精品久久久精品久久久| 热99国产精品久久久久久7| 亚洲综合精品二区| 久久人人爽人人片av| 在线观看www视频免费| 九九爱精品视频在线观看| 午夜福利视频在线观看免费| 老熟女久久久| 免费少妇av软件| 国产精品一区二区在线观看99| 亚洲在久久综合| 大陆偷拍与自拍| 捣出白浆h1v1| 永久免费av网站大全| 最新中文字幕久久久久| 欧美另类一区| 最近中文字幕高清免费大全6| 亚洲婷婷狠狠爱综合网| 久久精品久久久久久久性| 免费黄频网站在线观看国产| 免费在线观看完整版高清| 欧美激情高清一区二区三区 | 亚洲av综合色区一区| 青春草亚洲视频在线观看| 亚洲成人手机| 精品亚洲乱码少妇综合久久| 一级片免费观看大全| videossex国产| 日韩视频在线欧美| 免费女性裸体啪啪无遮挡网站| xxx大片免费视频| 中文字幕精品免费在线观看视频| 极品少妇高潮喷水抽搐| 一本一本久久a久久精品综合妖精 国产伦在线观看视频一区 | 国产免费又黄又爽又色| 国产探花极品一区二区| 免费观看a级毛片全部| 搡老乐熟女国产| 啦啦啦视频在线资源免费观看| 久久人人爽人人片av| 国产精品.久久久| 欧美精品一区二区免费开放| 亚洲精品国产一区二区精华液| 人妻人人澡人人爽人人| 美女午夜性视频免费| 国产欧美日韩综合在线一区二区| 成年人午夜在线观看视频| 91成人精品电影| 成人毛片60女人毛片免费| 亚洲欧洲精品一区二区精品久久久 | 黄色一级大片看看| 人人妻人人澡人人看| 国产精品熟女久久久久浪| av视频免费观看在线观看| 亚洲天堂av无毛| 一级毛片电影观看| 超碰97精品在线观看| videosex国产| 午夜精品国产一区二区电影| 秋霞在线观看毛片| 国产一区二区激情短视频 | 视频区图区小说| 亚洲精品第二区| 久久久久国产网址| 色吧在线观看| 国产精品久久久久久精品古装| 久久人妻熟女aⅴ| 啦啦啦中文免费视频观看日本| 一级爰片在线观看| 亚洲熟女精品中文字幕| 中文字幕av电影在线播放| 一级爰片在线观看| 人成视频在线观看免费观看| 97在线视频观看| 青春草国产在线视频| 亚洲中文av在线| 亚洲综合色网址| 人妻少妇偷人精品九色| 青春草视频在线免费观看| 中文欧美无线码| 韩国av在线不卡| 精品国产一区二区三区久久久樱花| √禁漫天堂资源中文www| 成人二区视频| 亚洲国产精品一区二区三区在线| www.熟女人妻精品国产| 午夜激情av网站| 在线天堂中文资源库| 免费久久久久久久精品成人欧美视频| 晚上一个人看的免费电影| 久久99一区二区三区| 久久ye,这里只有精品| 麻豆乱淫一区二区| 久久久久久久久久人人人人人人| 中文字幕色久视频| 亚洲三区欧美一区| 大陆偷拍与自拍| 精品久久蜜臀av无| 日本av手机在线免费观看| 国产深夜福利视频在线观看| 久久久亚洲精品成人影院| 国产免费视频播放在线视频| 日韩电影二区| 亚洲中文av在线| 性少妇av在线| 丝袜美足系列| 国产在线一区二区三区精| 90打野战视频偷拍视频| 街头女战士在线观看网站| 亚洲欧洲精品一区二区精品久久久 | 青草久久国产| 女性被躁到高潮视频| 80岁老熟妇乱子伦牲交| av网站免费在线观看视频| 十分钟在线观看高清视频www| 国产在视频线精品| 久久久a久久爽久久v久久| 亚洲一码二码三码区别大吗| 制服人妻中文乱码| 久久久久久久国产电影| 中文字幕另类日韩欧美亚洲嫩草| 各种免费的搞黄视频| 国产精品久久久久久精品电影小说| 精品视频人人做人人爽| 香蕉丝袜av| 久久久久视频综合| 色婷婷久久久亚洲欧美| 秋霞伦理黄片| 2022亚洲国产成人精品| 久久午夜综合久久蜜桃| 婷婷色av中文字幕| 久久久欧美国产精品| 寂寞人妻少妇视频99o| 亚洲成国产人片在线观看| 午夜激情av网站| 国产在线视频一区二区| 成人国产av品久久久| 欧美人与性动交α欧美精品济南到 | 国产精品无大码| 久久 成人 亚洲| 97在线人人人人妻| 伊人亚洲综合成人网| 成人影院久久| 人妻系列 视频| 欧美在线黄色| 欧美激情高清一区二区三区 | 丝袜在线中文字幕| 看十八女毛片水多多多| 成年女人毛片免费观看观看9 | 久热这里只有精品99| 午夜日本视频在线| 黄色毛片三级朝国网站| 久久精品国产亚洲av天美| 亚洲成人av在线免费| 激情五月婷婷亚洲| 精品99又大又爽又粗少妇毛片| 大香蕉久久网| 国产成人精品婷婷| 婷婷色av中文字幕| 中文字幕另类日韩欧美亚洲嫩草| www.熟女人妻精品国产| www.自偷自拍.com| a级毛片在线看网站| 久久99热这里只频精品6学生| 女人高潮潮喷娇喘18禁视频| 香蕉国产在线看| 亚洲精品成人av观看孕妇| 99国产综合亚洲精品| 久久精品久久精品一区二区三区| h视频一区二区三区| 最新中文字幕久久久久| 曰老女人黄片| 成人亚洲精品一区在线观看| 综合色丁香网| 国产av一区二区精品久久| 少妇被粗大猛烈的视频| 2021少妇久久久久久久久久久| 国产不卡av网站在线观看| 大码成人一级视频| 天天影视国产精品| 久久精品久久久久久噜噜老黄| 亚洲精品国产av成人精品| 黄色配什么色好看| 亚洲情色 制服丝袜| h视频一区二区三区| 大码成人一级视频| 久久久a久久爽久久v久久| 观看av在线不卡| 女性被躁到高潮视频| 五月开心婷婷网| 久久人人爽av亚洲精品天堂| 久久久精品免费免费高清| 又粗又硬又长又爽又黄的视频| 青春草国产在线视频| 日韩欧美一区视频在线观看| 最近最新中文字幕免费大全7| 女的被弄到高潮叫床怎么办| 一级片免费观看大全| 色播在线永久视频| 欧美老熟妇乱子伦牲交| av免费在线看不卡| 亚洲精品国产av蜜桃| 国产极品天堂在线| 又黄又粗又硬又大视频| 91精品三级在线观看| 午夜免费鲁丝| 国产精品二区激情视频| 亚洲精品久久午夜乱码| 国产不卡av网站在线观看| 多毛熟女@视频| 国产免费又黄又爽又色| 桃花免费在线播放| 三上悠亚av全集在线观看| 日本av免费视频播放| 精品国产超薄肉色丝袜足j| 亚洲精品自拍成人| 韩国高清视频一区二区三区| 老鸭窝网址在线观看| 男人爽女人下面视频在线观看| 亚洲欧美一区二区三区黑人 | 亚洲国产色片| 亚洲欧美一区二区三区黑人 | 亚洲三级黄色毛片| 少妇被粗大猛烈的视频| 一级a爱视频在线免费观看| 国产免费福利视频在线观看| 亚洲欧洲日产国产| 男女午夜视频在线观看| 日本vs欧美在线观看视频| www.自偷自拍.com| 亚洲欧洲国产日韩| 久久久久久免费高清国产稀缺| 国产免费视频播放在线视频| 亚洲第一av免费看| 色吧在线观看| 男女午夜视频在线观看| av免费观看日本| 成人二区视频| 午夜福利网站1000一区二区三区| 中文字幕av电影在线播放|