    General Design of Shenzhen-Zhongshan River-crossing Link Project

    2018-05-10 07:34:42XUGuopingHUANGQingfei
    隧道建設(shè)(中英文) 2018年4期
    關(guān)鍵詞:馬鞭厄運(yùn)精髓

    XU Guoping, HUANG Qingfei

    (CCCC Highway Consultants Co., Ltd., Beijing 100088, China)

    0 Introduction

    There are many bridges across China because bridge is always the first choice for river-crossing or sea-crossing projects[1-2]. Lately, with the continuous development in design and construction technology for underwater tunnel and increasingly stringent requirements on the environment, navigation and transportation, immersed tunnels have gradually exhibited their advantages. Some similar projects in China are listed as follow:

    The overall design of Weisanlu River-Crossing Link in City of Nanjing was based on the principle of foresighted plan, a ultra-large diameter shield machine was adopted and dual-tunnel double deck driveways were built by overcoming many difficult issues, such as, high water pressure, ultra-large cross section and complex geotechnical strata[3-4].

    Sanyanglu Yangtze River Tunnel in city of Wuhan is the world′s first shield tunnel with the combination of highway and railway transport. Researchers have conducted some researches and studied on several key techniques, i.e. tunnel cross section layout for both highway and railway simultaneously, construction plan for installation of internal structures and evacuation & rescue, etc[5].

    Hong Kong-Zhuhai-Macao Bridge project is the first project in China integrating bridges, islands and immersed tunnels and has an approximate length of 29.6 km. It consists of a large-span steel box girder cable-stayed bridge and segmented reinforced concrete immersed tunnels[6-7]. Its design theory, construction technologies and the engineering experience have provided a good reference for follow-up projects.

    However, with the variations on standards, design requirements, project scale, construction difficulty and site conditions, the engineering design solutions and construction technology are often different.

    Shenzhen-Zhongshan River-Crossing Link (Shenzhong Link) is the world′s first super integrated project that consists of four types of totally different structures, i.e. ultra-long and wide immersed tunnels, super-large span sea-crossing bridges, deep-water artificial islands and undersea traffic interchanges. The total length of Shenzhong Link is approximately 24 km. It is the first time that steel-shell immersed tunnel elements are adopted in China. This project has been known as the most challenging project in the world so far due to its scale, size, engineering design complexity and construction difficulty, by comparing with other similar projects.

    Based on the characteristics of Shenzhong Link project, the authors have summarized the design concept of standardization, industrialization, intelligence and integration, and discussed the overall design considerations of the project, and presented key technology innovations developed in design and construction.

    The geographical map of the project is shown in Fig. 1.

    Fig. 1 Geographical map of project

    1 Site conditions

    The project site is located in the inner Lingdingyang of the Pear River. The underwater terrain is a typical 3-shoal and 2-slot shape. The surface of the riverbed is composed of a very deep silt layer formed from fluvial deposit. In recent years, the riverbed is basically in a stable condition. While, the slot along the West Island has been partially affected by sand mining, and the topographic variation of riverbed in this area are relatively large. The tidal current is a type of irregular semi-diurnal tide and the maximum surface flow velocity exceeds 1.1 m/s during the ebb tide.

    The underwater terrain of the project area is shown in Fig. 2.

    Fig. 2 Underwater terrain of project area

    The project area is located in a typical subtropical oceanic monsoon climate zone and is affected frequently by typhoons. The maximum typhoon velocity recorded in recent years exceeds 30 m/s. Such climate has a significant impact on the project design and construction. Strata at the project site are mainly composed of Holocene silt, Late Pleistocene clay and sandy gravel. The bedrock is deeply buried in general, while, there are bedrocks exposed in some areas along the base of the proposed immersed tunnels. The regional neotectonic movement is characterized by a strong vertical fluctuation. Eleven continuous inactive strata faults run through the entire project site in north-west direction. The distribution of fracture lines in the project area is shown in Fig. 3.

    Fig. 3 Distribution of fracture lines in project area

    2 Project characteristics and challenges

    With an unprecedented scale, complex construction conditions, and comprehensive technical challenges, Shenzhong Link is another major sea-crossing transportation project and its design and construction are even more difficult than Hong Kong-Zhuhai-Macao Bridge project[8]in some ways.

    There are several similar large integrated projects in the world consisting of bridges, islands and tunnels, such as, Oresund Strait Link between Denmark and Sweden, Busan-Geoje Island Link in South Korea, and Hong Kong-Zhuhai-Macao Bridge in China. These projects are listed in Table 1 for an easy comparison[9].

    Shenzhong Link has the widest immersed tunnel (46-55.5 m long) in the world. There are two main bridges. Lingdingyang Bridge has a super-large main span of 1 666 m, which is the one of the largest span suspension bridges in the world.

    Table 1 Integrated projects consisting of bridges, islands and tunnels

    (1) Shenzhong Link adopts two-way and 8-lane highway design. The immersed tunnel has a large width of 46 to 55.5 m and the single-open drive way span reaches 18.3 to 24.0 m. Both the immersed tunnel width and span are the largest in the world. If the traditional reinforced concrete tunnel is adopted, it will be difficult to meet the stress and durability requirements. Therefore, it is very important and very difficult to select a correct structural type for the immersed tunnel and to guarantee the project quality and safety[10].

    (2) Considering the large buried depth and high water pressure on immersed tunnels, large variations in the underwater terrain and tunnel segments E1 to E5 on the West Island side in the sand mining area with extreme complex and sensitive geological conditions, how to reasonably reinforce the selected immersed tunnel base is the most difficult technical challenge of this project[11].

    (3) The main tunnel on the East Island side is open-cut cast-in-place tunnel with varied widths from 46.0 to 69.8 m. The airport interchange is an undersea interchange approach ramp with a minimum radius of 125 m and maximum slope of 3.78%. The main tunnel runs between existing highway bridge piers along the river. Some parts of the approach ramp run along or adjacent to the existing highway bridge piers and highway stretch. The minimum distance between the new tunnel structure and the existing bridge piers is only about 2 m. A big challenge of this project is how to optimize the design and how to choose correct construction methods to ensure the riverside highway daily operation during the project construction.

    (4) The main span of Lingdingyang Bridge is 1 666 m and is located about 10 km away from the coast of Zhongshan. The navigation clearance under the main bridge is 76.5 m and the design wind velocity at the bridge deck is 53.7 m/s. The bridge wind resistance design and undersea anchorage design and construction are difficult technical issues of this project.

    3 Engineering design solutions and methods

    3.1 Design principle and philosophy

    As a super integrated project, the complexity of Shenzhong Link project is far beyond any projects related to only individual tunnel, bridge or hydraulic structure. It requires to be designed and considered with crossing-domain and systematic concepts. The current construction technology and methods have to be considered as the prerequisite. In order to success, the design is required to integrate the best resources in different fields, such as tunnels, bridges hydraulic engineering, dredging, materials and equipment, etc. Also, the project design will need to be aligned with national overall industrial development level.

    The engineering design and investigation of Shenzhong Link project is premised on meeting construction conditions, guided by functional requirements, supported by scientific researches, with innovation as the spirit, and aims to achieve safe transportation, green transportation, and intelligent transportation. Based on the characteristics of this project, a principle of "standardization, industrialization, intelligence and integration" has been set up to achieve a series of high technology innovations in engineering design, construction methods and equipment, and project management, to make this project as a pioneer of the technical development related to super integrated projects.

    3.2 Plan layout and profile of Shenzhong Link

    3.2.1 Plan layout

    Shengzhong Link starts from the south of Shenzhen airport at the chainage of K5+695 (starting point of the tunnel), and it connects Phase Ⅱ of Guangzhou-Shenzhen Riverside Highway (connecting line on Shenzhen side). An airport terminal interchange is set up to connect to the airport. The Link continues westward via East Island and then converts from bridge to undersea tunnel. The undersea tunnel has a length of 6 845 m and it crosses over Dachan navigation channel, airport sub navigation channel and Fanshi navigation channel. Then, the undersea tunnel changes to bridge, Lingdingyang Bridge, at West Island. Lingdingyang Bridge, a suspension bridge with a main span of 1 666 m, crosses the Lingding navigation channel. Then, the Link turns to the northwest and passes through the downstream shoal area of Wanqingsha, where Wanqingsha interchange is reserved for future connection to Nansha New District. On the west side, Zhongshan Bridge, a cable-stayed bridge with a main span of 580 m, is designed to cross the east Hengmen waterway, then lands at Ma′an Island of Cuiheng New District and connects to Zhonshan-Kaiping Highway, where Hengmen terminal interchange is to be built. The Link ends at the chainage of K29+609.497.

    The Shenzhong Link has a total length of 23 914 m. The maximum radius of horizontal curve is 6 000 m and the minimum radius is 2 300 m. The total length of horizontal curves is 45.317% of the total link length. The Link plan layout is shown in Fig. 4.

    Fig. 4 Plan layout of Shengzhong Link

    3.2.2 Profile

    The maximum longitudinal slope of the Link is 2.98% and the length of the shortest slope is 640 m. The smallest radius of convex curve is 25 000 m, and the smallest radius of concave curve is 20 000 m. The vertical curves account for 36.551% of the total link length. The height difference between the lowest point at Fanshi Tunnel and the highest point at Lingdingyang Bridge is 124.45 m and the average longitudinal slope is 2.026%. The profile of Shenzhong Link is shown in Fig. 5.

    3.2.3 Lingdingyang Bridge

    To meet navigation clearance requirements of Lingding navigation channel and Longxue waterway, the suspension bridge spans of Lingdingyang Bridge are designed as 570 m, 1 666 m and 570 m. After the comparisons of three types of suspension bridges, i.e., single-shaft-tower monobox spatial-cable suspension bridge, A-Shape tower monobox spatial-cable suspension bridge and H-shape tower planar-cable suspension bridge, H-Shape tower planar-cable suspension bridge has been selected[12]. A 3-span full-floating system is applied to Lingdingyang Bridge. Stiffening girders are provided at the two towers with lateral wind-resistant bearings and longitudinal limited displacement dampers. Also, seismic-resistant vertical tension-compression bearings and lateral wind-resistant bearings are provided at the transition piers. The rise to span ratio is 1∶9.65 and the horizontal spacing between two main cables at tower top and anchor point are 42.1 m. Lingdingyang Bridge typical layout is shown in Fig. 6.

    (a) Island and tunnel section

    (b) Bridge sectionFig. 5 Profile design of Shenzhong Link project

    Fig. 6 Typical layout of Lingdingyang Bridge (unit: m)

    3.2.4 Zhongshan Bridge

    Zhongshan Bridge is a steel monobox girder cable-stayed bridge with a main span of 580 m and a total length of 1 170 m. It is located on a vertical curve with a radius of 25 000 m. The longitudinal slope of the bridge deck on both sides is 2.0%. The width of bridge deck is 43.5 m with a 2.5% two-way transverse slope. The bridge is a 5-span continuous structure with spans of 110 m, 185 m, 580 m, 185 m, and 110 m, respectively. The edge span to main span ratio is 0.509. A semi-floating structural system is adopted for this bridge.

    Zhongshan Bridge typical layout is shown in Fig. 7.

    Fig. 7 Typical layout of Zhongshan Bridge (unit: m)

    3.2.5 Immersed tunnel

    The starting point of the tunnel (east landing point) connects to Phase Ⅱ (connecting line on Shenzhen side) of Guangzhou-Shenzhen Riverside Highway. The end point of the tunnel connects to the non-navigation bridge on the head of West Island. The end chainage is K12+540. Total length of the tunnel is 6 845 m, including 5 035 m long immersed tunnel. The maximum longitudinal slope is 2.98% (on West Island side). The tunnel on East Island side is located on a horizontal curve with a radius of 5 003.1 m. The tunnel consists of 32 segments, including 26 standard segments with a length of 165 m and 6 non-standard segments with a length of 123.8 m. The non-standard segments include widened segments in east curve and the first segment on the west curve. The end joint is located between segments E22 and E23 and has a length of 2.2 m.

    The longitudinal section and tunnel segment layout is shown in Fig. 8.

    Fig. 8 Section and segment layout of immersed tunnel (unit: m)

    The tunnel sloped section (E1-E5) on West Island side is underlaid by a 30 m thick weak silt layer, which has been severely disturbed by the sand mining. Deep cement mixed (DCM) pile foundation is adopted for the immersed tunnel in this area after many researches and studies. Similarly, DCM foundations are used for tunnel segments E13 to E21 due to the same consideration. For the rest segments, the native subgrade can be directly used as the foundation base. A layer of 0.7 m thick rubbles and a layer of 1 m thick gravels are placed above the subgrade to provide a flat surface[13]. The evenness of leveling layer is ±0.03 m. The maximum allowable theoretical settlement of the foundation is 0.08 m and the maximum allowable theoretical differential settlement at both ends of each segment is 0.03 m.

    Tunnel foundation distribution is shown in Fig. 9.

    Fig. 9 Distribution of tunnel foundation (unit: m)

    The outside dimensions of standard tunnel segment are 46.00 m (width) × 10.60 m (height). The clear height of carriageway openings is 7.60 m and the thickness of structural slabs is 1.50 m. The cross-section of standard tunnel segment is shown in Fig. 10.

    Fig. 10 Cross-section of standard tunnel segment (unit: cm)

    3.2.6 Airport interchange tunnel

    To connect Shenzhong Link to Guangzhou-Shenzhen Riverside Highway, 4 airport interchange approach ramps (E, F, G, H) are designed on East Island side. The ramps have a designed speed limit of 60 km/h, except for Ramp H, which has a designed speed limit of 40 km/h. 2-lane traffic is designed for all four ramps, while only single-lane will be operated for Ramp E.

    Design parameters of airport interchange approach ramp mined sections are shown in Table 2. The layout of underground interchange ramps is shown in Fig. 11.

    Table 2 Mined sections of airport interchange approach ramps

    Fig. 11 Layout of underground interchange ramps

    3.3 Artificial islands

    Two artificial islands, i.e. East Island and West Island, are to be constructed for Shenzhong Link.

    The length of East Island is 930 m and the area of the island is 343 800 m2. The island has sloped rock riprap along the perimeter with sand backfill at the middle. The plan layout of East Island is shown in Fig. 12.

    The length of West Island is 625 m, and the area of the island is 137 000 m2. West Island is to be built by combining a 28 m diameter steel cylinders with a sloped rock riprap along the perimeter. The underwater sand compacted pile foundation is used for West Island. Watertight sink-in type steel cylinders, steel arc plates and fore shafts between them are used to allow the island perimeter structure watertight. Furthermore, high pressure rotary grout spray waterproof curtain with a pressure-reducing tube well program is used for water tightness at bottom. The plan layout of West Island is shown in Fig. 13.

    Fig. 12 Plan layout of East Island (unit: cm)

    Fig. 13 Plan layout of West Island (unit: cm)

    4 Key technical innovations

    4.1 Key techniques for design and construction of combined steel-shell concrete structural immersed tunnel

    In the worldwide, except for Shenzhong Link project, other projects involving steel-shell immersed tunnels are Naha Tunnel, Osaka Sakishima Tunnel, and Tokyo Port Tunnel in Japan. While, it can be seen in Table 3 that the construction difficulty and scale of Shenzhong Link surpasses all other similar projects.

    Table 3 Immersed tunnels with combined steel-shell concrete structure

    Shenzhong Link immersed tunnel has a ultra-wide tunnel section (46.0-55.5 m), a ultra-large single-opening clear span (18.3-24.0 m), and is covered by over 17 m thick siltation and has to resist over 35 m water pressure. All the factors above will induce huge structural internal forces on immersed tunnel. If the conventional reinforced concrete structure is used, a large amount of reinforcement will be required and the reinforcement will be very congested. As a consequence, the placement of concrete will become very difficult. Also, concrete cracking control and casting quality control will become extremely hard. In order to solve the structural stress problem and reduce construction risks, a combined steel-shell with concrete composite structure has been proposed creatively and chosen for the final design of this project.

    我是一匹馬,一匹一生都在奔跑的馬。我的主人是個(gè)郵遞員,馱著他,我每天穿梭在各個(gè)村莊,看一雙雙眼睛瞬間化作幻影消失在我身后的蹄聲中。我享受這樣的節(jié)奏。也許這就是馬的天性,沒有原因。其實(shí)馬并不是被主人手中的馬鞭催著跑,不是,我們?cè)谧分鹱约旱乃俣取qR一生下來就逃脫不了馳騁的本能。那些騎馬者只不過是在借助馬的速度擺脫屬于他們自己生命中的厄運(yùn)。可我卻從那些轉(zhuǎn)瞬即逝的眼神中清晰地感受到,絕大多數(shù)人都以為是他們用智慧使我們屈從。然而,那只是人類自以為是的智慧,我想。他們用自己的思想為萬物和萬物之理下定義,卻全然不顧其本身的精髓。他們不曾理解的是,大多數(shù)精髓是不需要解釋的——這才是我們馬族公認(rèn)的智慧。

    Based on the concept of combined steel-shell concrete structural immersed tunnel, a series of systematic testing and studies regarding load resistance mechanism and design methodology were conducted for the first time. The results have revealed the bending and shear resistance mechanism of the combined steel-shell concrete structure. A design calculation method has also been developed and this method is able to quantitatively analyze the impact of concrete cavitation of the steel-shell concrete structure and the load resistance capacity. The research results[9]help establish quality control criterion for concrete casting and have been applied to design of such immersed tunnel. The optimized steel-shell structure is described below:

    The steel shell of the immersed tunnel is composed of the inner and outer panels, transversal and longitudinal diaphragms, transversal and longitudinal stiffener plates and welded studs, refer to Fig. 14. Transversal diaphragms have a spacing of 3 m and longitudinal diaphragms have a spacing of 3.5 m, which form a series of closed concrete casting compartments. The inner and outer panels, as major load resistance members, resist tensile stress and compressive stress. Transversal and longitudinal diaphragms, as major shear resistance members, resist shear loads. They also connect the inner and outer panels to integrate the steel shell as an entire rigid structure. Longitudinal stiffeners made of T-section steel, steel angle and welded studs are provided to ensure the effective bond between steel panels and the concrete. Longitudinal stiffeners and transverse flat ribs work together to enhance the stiffness of the panels.

    Fig. 14 Steel-shell structure of tunnel

    Both inner and outer panels of the main structure are made of Grade Q420C steel plates and the maximum plate thickness is 40 mm. Transversal diaphragms are made of Grade Q390C steel plates and the maximum plate thickness is 30 mm. The rest are made of Grade Q345C steel. All steel compartments are filled with Grade C50 self-compacting fluidized concrete.

    4.2 Key techniques related to batching, casting and quality inspection of high-strength self-compacting fluidized concrete

    Concrete will be placed inside the closed steel-shell compartment via casting holes and it cannot be vibrated. Therefore, self-compacting fluidized concrete will have to be used. In order to improve the quality of concrete pouring and mitigate the construction risk, a systemic testing and study regarding self-compacting fluidized concrete has been performed[10]. These researches have helped develop a "Guide to Preparation of Self-Compacting Concrete for Steel-Shell Elements in Shenzhong Link Project". The relevant research results are listed as follows:

    (1)Performance requirements and key construction control parameters of self-compacting concrete of steel-shell elements;

    (2)The property stability of a large volume self-compacting concrete used in steel-shell elements;

    (3)Long-term performance prediction method for self-compacting concrete of steel-shell elements:

    (4)Quality control technology for steel-shell element self-compacting concrete;

    (5)Quality inspection technology for steel-shell element self-compacting concrete.

    4.3 Design and construction technology of DCM pile foundation for immersed tunnel

    To solve the issues of weak silt subgrade under segments E1-E5 and segments E13-E21 close to West Island, undersea deep cement mixed (DCM) pile technology has been used to reinforce the tunnel foundation for the first time in China. It has been stated in construction technical specification that an automatic DCM construction ship must be used to treat the tunnel foundtion. The control system has been re-developed so that it is capable to achieve real-time dynamic correlation and intelligent control of soil-layer parameters and cement consumption.

    4.4 Equipment technology for integration of floating transport and immersed tunnel installation

    The traditional riding, lifting and hauling method for floating transport and installation of immersed tunnels has a slow navigation speed, requires a large width of the temporary navigation channel and large dredging volume. The ship is not able to return to the harbor quickly in unexpected situations. It is not conducive to construction risk and project cost control and it may have a serious impact on the environment.

    In response to the above problems, the concept of integrated element floating transport and installation has been proposed first time for Shenzhong Link Project, and the equipment has been developed and upgraded based on the proposed concept. It can be foreseen that the application of this innovated equipment will significantly reduce the dredging volume of floating transport channels as well as the impact on current daily navigation in the construction area. It will be more environmentally friendly and can create significant economic and social benefits. The upgraded ship for integrated floating transport and installation of elements is shown in Fig. 15.

    Fig. 15 Upgraded ship for integrated floating transport and installation of elements

    4.5 Key technology for design and construction of large-scale underground interchanges

    East Island interchange of this project is a turbine-type interchange with directional ramps. Four approach ramps separate from main tunnel and merge the main tunnel underwater. The minimum space between the approach ramp tunnel and the existing riverside highway is only about 2 m. Construction site conditions are very complex and the construction risks are extremely high.

    At present, there is a lack of relevant technical standards and design specifications for highway underground interchanges in China. Based on the characteristics of this project, specific researches and studies have been carried out to obtain technical standards and specifications related to underwater interchange selection, routing alignment techniques, enclosure structure construction of underground interchange tunnel passing or next to existing structures, design and construction of large cofferdam in the sea, and enclosure structures for ultra-deep and ultra-wide foundation pits.

    4.6 Key technologies for design of flutter and wind stability of ultra-large span monobox girder suspension bridge

    Lingdingyang Bridge is a monobox girder suspension bridge and the main span is 1 666 m. The rigidity of main cable and the aerodynamic configuration of the main beam have a great influence on the bridge wind stability. The navigable clearance of the bridge is 76.5 m and the bridge flutter test wind velocity at the deck level reaches 76.7 m/s. All of these factors make the bridge to face the most server wind stability issues, by comparing with other similar suspension bridges in the world. According to design requirements on the main structure and wind resistance of Lingdingyang Bridge, some full-bridge models, especially the main beam model, have been built and tested. The Special attentions were paid to the full-bridge model similarity verification. Furthermore, theoretical analysis and wind tunnel tests have been conducted to continuously optimize the structural design of wind deflector and central stabilizer. With all the efforts mentioned above, the wind stability issue of Lingdingyang Bridge has been successfully solved.

    4.7 Key technology for design and construction of offshore anchorage in deep sea

    The height of bridge tower is 270 m and the tower is to be fixed by super large and super heavy offshore gravity anchor blocks. The water depth in the anchorage zone is 3 to 5 m and the stratum is compose of deep layer of soft silt and silty sand. After the specific researches, it is proposed for the first time that in the sea, building an island with locked steel-pipe pile as cofferdam and filling it with sand to form a terrestrial land, then building 8-shaped diaphragm wall anchor block foundation on the built land. Compared with the riprap island construction, this solution has the advantages of high construction efficiency, small environmental impact, easy site clearing after construction. The island with steel-pipe pile cofferdam is shown in Fig. 16.

    Fig. 16 Island with steel pipe pile cofferdam (unit: cm)

    5 Conclusions and discussions

    Shenzhong Link is the first super integrated project in the world that consists of four different types of structures, i.e. ultra-long and wide immersed tunnels, super large span bridges, deep-water artificial islands and undersea interchange. Such large scale immersed tunnel made of steel-shell and concrete composited structure is also first application in China, even in the world. Comprehensive design and construction difficulty of this project can be ranked as the highest in the world. According to project characteristics and technical difficulties, the design idea of the integrated project has been put forward from the overall design level, and the design concept of "standardization, industrialization, intelligence and integration" has been put it into practice. Moreover, the overall design of the project and technical solutions for main structures, such as, immersed tunnels and Lingdingyang suspension bridge, have been discussed. Key technologies and innovations in design and construction of the project have been summarized. Load-resistance mechanism and design methodology of combined steel-shell with concrete structure have been established.

    Currently, the construction of this project has been started and all the design concepts and innovations are going to be tested and checked by engineering practice, more systematic researches and studies on theoretical innovation of the combined structure, large-scale precast tunnel segments, construction techniques and equipment development, wind stability and vibration reduction of ultra-large-span bridge, operation and safety of underground traffic at interchange, etc., will be carried out in the follow-up construction. It is expected that this project can provide references and guides for design and construction of similar large projects in the future.

    [1] ZHANG Xigang. General layout of Sutong Long Span Bridge[J]. Highway, 2004(7): 1.

    [2] XU Guoping, DENG Hai. Overall design of Yangluo Long Span Bridge over Yangtze River in Wuhan city[J]. Highway, 2004(10): 1.

    [3] ZHANG Shilong. Analysis of technical difficulties in construction of Yangtze River-crossing Tunnel on Weisan Road in Nanjing[J]. Tunnel Construction, 2013, 33(2): 147.

    [4] TUO Yongfei, GUO Xiaohong. General design and key technologies of the Nanjing Weisan Road River-crossing Tunnel Project[J]. Modern Tunnelling Technology, 2015, 52(4): 1.

    [5] XIAO Mingqing, LING Handong, SUN Wenhao. Key techniques for the overall design of the rail-and-road combined Yangtze River Tunnel on Sanyang Road in Wuhan[J]. Modern Tunnelling Technology, 2014,51(4): 161.

    [6] YIN Haiqing. Key technologies applied in design and construction of artificial island and immersed tunnel of Hong Kong-Zhuhai-Macao Bridge (HZMB) Project[J]. Tunnel Construction, 2014,34(1): 60.

    [7] MENG Fanchao,LIU Xiaodong,XU Guoping. General Design of main work of Hong Kong-Zhuhai-Macao Bridge[C]// Proceedings of the Nineteenth National Conference on Bridge(volume 1). Shanghai: Bridge and Structural Engineering Branch of China Civil Engineering Society, Shanghai Construction and Traffic Committee: 2010: 21.

    [8] XU Guoping, SU Quanke, LI Zhenxin, et al. Research on key design technology of extra-long immersed tunnel in open sea [J]. Highway, 2015, 60(4): 1.

    [9] ZHANG Zhigang, LIU Hongzhou. Development and key technologies of immersed highway tunnels[J]. Tunnel Construction, 2013, 33(5): 343.

    [10] LIN Ming, LIN Wei. Principle and methods for structural-type selection of immersed tunnel[J]. China Harbour Engineering, 2016, 36(1): 1.

    [11] ZHANG Zhigang, LIU Hongzhou. Analysis and discussion on key technical problems of investigation and design of immersed tunnel [J]. Highway Tunnel, 2016(2): 1.

    [12] SU Quanke, XIE Hongbing. Summary of steel bridge construction of Hong Kong-Zhuhai-Macao Bridge[J]. China Journal of Highway and Transport, 2016,29(12): 1.

    [13] CHEN Shaozhang, SU Zongxian, CHEN Yue. New technologies used for immersed tunnel of Hong Kong-Zhuhai-Macao Bridge project[J]. Tunnel Construction, 2015, 35 (5): 396.

    猜你喜歡
    馬鞭厄運(yùn)精髓
    Fortune Cookies
    聞一多教育思想的精髓初探
    做馬鞭 甩馬鞭
    藏在靜寧“三寶”里的美食精髓
    詩的藝術(shù)精髓在“意象”與“意境”
    中華詩詞(2019年5期)2019-10-15 09:05:58
    厄運(yùn)打不垮的信念
    途經(jīng)犀牛潭
    昂貴的馬鞭
    用國學(xué)精髓為企業(yè)家“洗心凈目”
    清風(fēng)(2014年10期)2014-09-08 13:11:04
    漫畫長廊
    慈善(2008年5期)2008-08-21 07:50:36
    国产成人免费无遮挡视频| 黄色a级毛片大全视频| 免费在线观看日本一区| 九色亚洲精品在线播放| 久久国产精品男人的天堂亚洲| 国产一区二区三区综合在线观看| 高清黄色对白视频在线免费看| 视频区图区小说| 50天的宝宝边吃奶边哭怎么回事| 免费在线观看影片大全网站| 精品国产美女av久久久久小说| 99精国产麻豆久久婷婷| 操美女的视频在线观看| 又黄又粗又硬又大视频| 精品亚洲成a人片在线观看| 亚洲中文av在线| 久9热在线精品视频| 久久人妻av系列| 亚洲欧美精品综合一区二区三区| 丰满的人妻完整版| 大香蕉久久成人网| 久久影院123| 黄色成人免费大全| 久久精品国产清高在天天线| 国产色视频综合| 黑人猛操日本美女一级片| 久久精品亚洲精品国产色婷小说| 丁香欧美五月| 亚洲av日韩在线播放| 国产精品亚洲av一区麻豆| 99久久99久久久精品蜜桃| 天天躁夜夜躁狠狠躁躁| 天天添夜夜摸| 性少妇av在线| 美国免费a级毛片| 人人妻,人人澡人人爽秒播| 亚洲av日韩精品久久久久久密| 久久久国产成人免费| 伦理电影免费视频| 欧美日韩黄片免| 美女高潮喷水抽搐中文字幕| 又大又爽又粗| 我的亚洲天堂| 自线自在国产av| 国产免费现黄频在线看| 亚洲一区高清亚洲精品| 曰老女人黄片| 久热这里只有精品99| 老鸭窝网址在线观看| 午夜久久久在线观看| 亚洲色图av天堂| 日韩精品免费视频一区二区三区| 亚洲av第一区精品v没综合| 成人国语在线视频| 欧美激情久久久久久爽电影 | 精品高清国产在线一区| 人人妻,人人澡人人爽秒播| 亚洲中文av在线| 免费高清在线观看日韩| 久久性视频一级片| 免费一级毛片在线播放高清视频 | 久久精品亚洲精品国产色婷小说| 国产精品影院久久| 国产成人精品久久二区二区91| 精品欧美一区二区三区在线| 一级黄色大片毛片| 国产欧美亚洲国产| e午夜精品久久久久久久| 咕卡用的链子| 精品一品国产午夜福利视频| 超色免费av| 国产日韩一区二区三区精品不卡| 日韩制服丝袜自拍偷拍| 国产精品自产拍在线观看55亚洲 | 午夜福利视频在线观看免费| 男女下面插进去视频免费观看| 婷婷丁香在线五月| 女同久久另类99精品国产91| 亚洲熟妇中文字幕五十中出 | 国产精品电影一区二区三区 | 国产区一区二久久| 国产精品乱码一区二三区的特点 | 91字幕亚洲| 久久香蕉国产精品| 国产成人一区二区三区免费视频网站| 欧美乱码精品一区二区三区| 人妻 亚洲 视频| 中亚洲国语对白在线视频| 免费av中文字幕在线| 一级黄色大片毛片| www.999成人在线观看| 国产熟女午夜一区二区三区| 日日爽夜夜爽网站| tube8黄色片| 国产成人精品无人区| 法律面前人人平等表现在哪些方面| 水蜜桃什么品种好| 99在线人妻在线中文字幕 | 久久国产乱子伦精品免费另类| 少妇裸体淫交视频免费看高清 | 欧美精品av麻豆av| 纯流量卡能插随身wifi吗| 欧美激情极品国产一区二区三区| 日本wwww免费看| 国产在视频线精品| 一进一出好大好爽视频| 亚洲五月婷婷丁香| 亚洲精品久久午夜乱码| 99久久人妻综合| 性色av乱码一区二区三区2| 色综合欧美亚洲国产小说| 色老头精品视频在线观看| 国产免费av片在线观看野外av| 在线观看午夜福利视频| 美女福利国产在线| 久久精品熟女亚洲av麻豆精品| a级毛片在线看网站| 久久午夜综合久久蜜桃| av线在线观看网站| 黄频高清免费视频| 国产在线精品亚洲第一网站| 精品亚洲成a人片在线观看| 亚洲av熟女| 男女高潮啪啪啪动态图| 欧美+亚洲+日韩+国产| 欧美日韩亚洲综合一区二区三区_| 精品欧美一区二区三区在线| 久久婷婷成人综合色麻豆| 亚洲精品国产精品久久久不卡| 亚洲人成伊人成综合网2020| 国产精品99久久99久久久不卡| 宅男免费午夜| 最新在线观看一区二区三区| 动漫黄色视频在线观看| 久久人妻熟女aⅴ| svipshipincom国产片| 日本黄色视频三级网站网址 | 亚洲va日本ⅴa欧美va伊人久久| 久久国产乱子伦精品免费另类| 母亲3免费完整高清在线观看| 久久国产精品人妻蜜桃| 国产野战对白在线观看| 国产精品久久久久久人妻精品电影| 国产高清videossex| 999久久久精品免费观看国产| 视频区欧美日本亚洲| 久久久久视频综合| 婷婷成人精品国产| 亚洲九九香蕉| 国产精品永久免费网站| 人人妻,人人澡人人爽秒播| cao死你这个sao货| av天堂久久9| 飞空精品影院首页| 交换朋友夫妻互换小说| 国产精品一区二区免费欧美| 久久国产精品男人的天堂亚洲| 日韩大码丰满熟妇| 久久国产亚洲av麻豆专区| 国产精品久久久av美女十八| 制服诱惑二区| 又黄又粗又硬又大视频| 99国产精品免费福利视频| av片东京热男人的天堂| 天堂俺去俺来也www色官网| 久久久国产精品麻豆| 自拍欧美九色日韩亚洲蝌蚪91| 水蜜桃什么品种好| 黄色视频,在线免费观看| 老司机福利观看| 日韩中文字幕欧美一区二区| 欧美激情高清一区二区三区| 在线播放国产精品三级| videos熟女内射| 又大又爽又粗| 亚洲成人手机| 日韩 欧美 亚洲 中文字幕| 青草久久国产| 曰老女人黄片| 国产午夜精品久久久久久| 18禁裸乳无遮挡动漫免费视频| 在线观看66精品国产| 黄色视频不卡| svipshipincom国产片| 国产精品综合久久久久久久免费 | 午夜福利视频在线观看免费| 一级作爱视频免费观看| 色老头精品视频在线观看| 一本一本久久a久久精品综合妖精| 久久久精品国产亚洲av高清涩受| 国产亚洲av高清不卡| 五月开心婷婷网| 精品午夜福利视频在线观看一区| 欧美 日韩 精品 国产| e午夜精品久久久久久久| 又黄又爽又免费观看的视频| 免费高清在线观看日韩| 黄色a级毛片大全视频| 久久国产乱子伦精品免费另类| 黄片大片在线免费观看| 亚洲午夜精品一区,二区,三区| 亚洲成av片中文字幕在线观看| 日韩一卡2卡3卡4卡2021年| 亚洲欧美精品综合一区二区三区| 少妇裸体淫交视频免费看高清 | 免费一级毛片在线播放高清视频 | 欧美日韩精品网址| 老司机影院毛片| 免费av中文字幕在线| 伊人久久大香线蕉亚洲五| 交换朋友夫妻互换小说| 午夜福利影视在线免费观看| 久久久久精品人妻al黑| 丰满人妻熟妇乱又伦精品不卡| www.自偷自拍.com| 1024视频免费在线观看| 超碰成人久久| 捣出白浆h1v1| 久久久久精品国产欧美久久久| 伊人久久大香线蕉亚洲五| 久久天躁狠狠躁夜夜2o2o| 中文字幕高清在线视频| 91麻豆精品激情在线观看国产 | 天天躁日日躁夜夜躁夜夜| av欧美777| 欧美日韩福利视频一区二区| 一二三四在线观看免费中文在| 亚洲av日韩精品久久久久久密| 高清在线国产一区| 无遮挡黄片免费观看| 亚洲五月婷婷丁香| av免费在线观看网站| 亚洲av电影在线进入| 欧美精品av麻豆av| av欧美777| 精品无人区乱码1区二区| 亚洲五月色婷婷综合| 一个人免费在线观看的高清视频| 国产99久久九九免费精品| avwww免费| 18禁黄网站禁片午夜丰满| 变态另类成人亚洲欧美熟女 | 人妻一区二区av| 两人在一起打扑克的视频| 亚洲精品在线美女| 麻豆av在线久日| 女人爽到高潮嗷嗷叫在线视频| 一本一本久久a久久精品综合妖精| 老司机午夜福利在线观看视频| 每晚都被弄得嗷嗷叫到高潮| 十八禁人妻一区二区| av电影中文网址| 精品人妻熟女毛片av久久网站| 大片电影免费在线观看免费| tube8黄色片| 亚洲人成电影免费在线| 精品国产超薄肉色丝袜足j| 狠狠狠狠99中文字幕| 日日爽夜夜爽网站| 男女床上黄色一级片免费看| 在线播放国产精品三级| 精品一区二区三卡| 久久久久视频综合| 国产野战对白在线观看| 很黄的视频免费| 国产99白浆流出| 免费人成视频x8x8入口观看| 99久久99久久久精品蜜桃| 深夜精品福利| 免费av中文字幕在线| 亚洲美女黄片视频| 欧美人与性动交α欧美精品济南到| 国产乱人伦免费视频| 精品国产一区二区三区久久久樱花| 精品少妇久久久久久888优播| 国产高清激情床上av| 色婷婷av一区二区三区视频| 国产精品综合久久久久久久免费 | 亚洲男人天堂网一区| 自拍欧美九色日韩亚洲蝌蚪91| 欧美+亚洲+日韩+国产| 国产精品成人在线| 黄网站色视频无遮挡免费观看| 大型av网站在线播放| 男男h啪啪无遮挡| 欧美黄色片欧美黄色片| 成人影院久久| 两个人免费观看高清视频| 在线av久久热| 日本五十路高清| 亚洲熟女精品中文字幕| 成人特级黄色片久久久久久久| 欧美在线一区亚洲| 免费日韩欧美在线观看| 性色av乱码一区二区三区2| 男男h啪啪无遮挡| 国产精品二区激情视频| 最新美女视频免费是黄的| 久久国产精品男人的天堂亚洲| 很黄的视频免费| 成人av一区二区三区在线看| 久久久国产成人免费| 一边摸一边做爽爽视频免费| 1024视频免费在线观看| 久热爱精品视频在线9| 午夜亚洲福利在线播放| 国产成+人综合+亚洲专区| 黄色视频不卡| 久久 成人 亚洲| 免费在线观看完整版高清| 国产成人啪精品午夜网站| 无遮挡黄片免费观看| x7x7x7水蜜桃| 韩国精品一区二区三区| 人人妻人人澡人人看| 老司机靠b影院| 在线观看免费日韩欧美大片| 在线观看www视频免费| 色精品久久人妻99蜜桃| 亚洲欧美精品综合一区二区三区| 色精品久久人妻99蜜桃| 变态另类成人亚洲欧美熟女 | 免费观看人在逋| 亚洲av成人一区二区三| 黄色视频,在线免费观看| 真人做人爱边吃奶动态| 久久久久久久午夜电影 | 好男人电影高清在线观看| 欧美色视频一区免费| 女同久久另类99精品国产91| 国产成人影院久久av| 欧美日韩av久久| 亚洲av第一区精品v没综合| 精品久久久精品久久久| 欧美日韩亚洲综合一区二区三区_| 丝袜美足系列| 亚洲av电影在线进入| 99国产精品99久久久久| 亚洲av电影在线进入| 99国产精品99久久久久| 免费高清在线观看日韩| 女人爽到高潮嗷嗷叫在线视频| 91成年电影在线观看| 久久国产亚洲av麻豆专区| 在线天堂中文资源库| 9色porny在线观看| 一二三四社区在线视频社区8| 9色porny在线观看| 国产欧美日韩精品亚洲av| 91老司机精品| 国产欧美亚洲国产| 成人精品一区二区免费| 国产成人精品在线电影| 91九色精品人成在线观看| 午夜福利在线免费观看网站| 成人精品一区二区免费| 极品教师在线免费播放| 国产精品久久久久成人av| 免费观看人在逋| 中文字幕精品免费在线观看视频| 天天添夜夜摸| av不卡在线播放| 欧美日韩乱码在线| 可以免费在线观看a视频的电影网站| 99久久人妻综合| 美女 人体艺术 gogo| 日韩制服丝袜自拍偷拍| 亚洲免费av在线视频| 婷婷精品国产亚洲av在线 | 日韩精品免费视频一区二区三区| 色尼玛亚洲综合影院| 午夜福利乱码中文字幕| 高清在线国产一区| 欧美av亚洲av综合av国产av| 亚洲综合色网址| 国产淫语在线视频| 日韩欧美在线二视频 | 亚洲欧美日韩高清在线视频| 亚洲精品美女久久av网站| 看免费av毛片| 国产精品一区二区在线观看99| 99国产精品99久久久久| 叶爱在线成人免费视频播放| 国产精品乱码一区二三区的特点 | 99精国产麻豆久久婷婷| 欧美性长视频在线观看| 国产有黄有色有爽视频| 在线十欧美十亚洲十日本专区| 51午夜福利影视在线观看| 色婷婷久久久亚洲欧美| 欧美在线一区亚洲| 国产亚洲精品久久久久久毛片 | av中文乱码字幕在线| 女人精品久久久久毛片| 欧美在线黄色| 亚洲精品国产色婷婷电影| 久久天堂一区二区三区四区| 高潮久久久久久久久久久不卡| 国产精品二区激情视频| 一级毛片高清免费大全| 极品教师在线免费播放| 成年人午夜在线观看视频| 久久久久久久久久久久大奶| 建设人人有责人人尽责人人享有的| 亚洲五月婷婷丁香| 午夜精品国产一区二区电影| e午夜精品久久久久久久| 无遮挡黄片免费观看| 婷婷丁香在线五月| 欧美午夜高清在线| 91老司机精品| 91成年电影在线观看| 国产亚洲精品一区二区www | 亚洲精品中文字幕在线视频| 操出白浆在线播放| 男女午夜视频在线观看| 精品午夜福利视频在线观看一区| 另类亚洲欧美激情| 久久午夜综合久久蜜桃| 岛国毛片在线播放| 无限看片的www在线观看| 亚洲aⅴ乱码一区二区在线播放 | 一本一本久久a久久精品综合妖精| xxxhd国产人妻xxx| 亚洲精品粉嫩美女一区| 国产在视频线精品| 最近最新免费中文字幕在线| 身体一侧抽搐| 国产精品秋霞免费鲁丝片| 涩涩av久久男人的天堂| 中文字幕色久视频| 久久天堂一区二区三区四区| 窝窝影院91人妻| 国产免费现黄频在线看| www日本在线高清视频| 亚洲五月天丁香| 午夜两性在线视频| 久99久视频精品免费| 涩涩av久久男人的天堂| 法律面前人人平等表现在哪些方面| 18禁国产床啪视频网站| 啦啦啦视频在线资源免费观看| 99精国产麻豆久久婷婷| 欧美日韩精品网址| 波多野结衣一区麻豆| 国产在线一区二区三区精| 亚洲成a人片在线一区二区| 啦啦啦免费观看视频1| 国产高清videossex| 久久久久精品人妻al黑| 亚洲一区二区三区不卡视频| 欧美在线一区亚洲| 99国产精品一区二区三区| 国产欧美日韩综合在线一区二区| 日韩视频一区二区在线观看| 国产麻豆69| 国产精品99久久99久久久不卡| 日本精品一区二区三区蜜桃| 成熟少妇高潮喷水视频| 久久人人97超碰香蕉20202| 亚洲国产欧美一区二区综合| 在线观看舔阴道视频| 捣出白浆h1v1| 丰满迷人的少妇在线观看| av欧美777| 欧美黄色淫秽网站| 不卡一级毛片| 久久久久久久久久久久大奶| 女人爽到高潮嗷嗷叫在线视频| 亚洲熟妇中文字幕五十中出 | 久久久久国产一级毛片高清牌| 老熟女久久久| 午夜精品久久久久久毛片777| 在线观看免费视频日本深夜| 老鸭窝网址在线观看| 少妇猛男粗大的猛烈进出视频| 国产精品国产av在线观看| 中文字幕色久视频| av免费在线观看网站| 国产精品av久久久久免费| 窝窝影院91人妻| 亚洲精品一二三| 自拍欧美九色日韩亚洲蝌蚪91| 成人国产一区最新在线观看| 一进一出抽搐动态| 午夜视频精品福利| 欧美乱妇无乱码| 侵犯人妻中文字幕一二三四区| 国产伦人伦偷精品视频| 老司机亚洲免费影院| 日韩视频一区二区在线观看| 脱女人内裤的视频| 黄色女人牲交| 中文字幕最新亚洲高清| 久久亚洲精品不卡| 欧美成人免费av一区二区三区 | 精品国产一区二区三区久久久樱花| 精品高清国产在线一区| 久久久久久久午夜电影 | 亚洲欧美日韩高清在线视频| 80岁老熟妇乱子伦牲交| 老司机福利观看| 久久国产精品男人的天堂亚洲| 国产精品亚洲av一区麻豆| 精品亚洲成国产av| 极品人妻少妇av视频| www.自偷自拍.com| 欧美日韩一级在线毛片| 嫩草影视91久久| 人人妻人人澡人人看| 黑人巨大精品欧美一区二区蜜桃| 日本一区二区免费在线视频| 好男人电影高清在线观看| 精品国产一区二区久久| 好男人电影高清在线观看| 亚洲一卡2卡3卡4卡5卡精品中文| 黄网站色视频无遮挡免费观看| 久99久视频精品免费| 丝袜在线中文字幕| a在线观看视频网站| 日韩中文字幕欧美一区二区| 在线观看免费日韩欧美大片| 建设人人有责人人尽责人人享有的| 高清毛片免费观看视频网站 | 人人澡人人妻人| videosex国产| 久久国产亚洲av麻豆专区| 19禁男女啪啪无遮挡网站| 黑人欧美特级aaaaaa片| 精品人妻在线不人妻| 99热网站在线观看| 丰满饥渴人妻一区二区三| 十八禁人妻一区二区| 热re99久久精品国产66热6| 如日韩欧美国产精品一区二区三区| 国产99白浆流出| 欧美成狂野欧美在线观看| 国产一区二区三区视频了| 成人黄色视频免费在线看| 一级黄色大片毛片| 18在线观看网站| 精品国产亚洲在线| 桃红色精品国产亚洲av| 欧美成人午夜精品| 欧美日韩成人在线一区二区| 欧美成人午夜精品| a级毛片在线看网站| 久久青草综合色| 捣出白浆h1v1| 亚洲色图综合在线观看| 男女床上黄色一级片免费看| xxxhd国产人妻xxx| 亚洲性夜色夜夜综合| 女人爽到高潮嗷嗷叫在线视频| 久久中文字幕一级| 又黄又粗又硬又大视频| 最近最新中文字幕大全免费视频| 水蜜桃什么品种好| 国产色视频综合| 欧美亚洲日本最大视频资源| 亚洲人成电影免费在线| 亚洲精品在线观看二区| 久久久国产一区二区| 午夜免费观看网址| 啦啦啦在线免费观看视频4| 国产午夜精品久久久久久| 咕卡用的链子| 中文字幕人妻丝袜制服| 国产精品1区2区在线观看. | 国产成人av激情在线播放| 99国产精品免费福利视频| 人妻丰满熟妇av一区二区三区 | 在线观看免费午夜福利视频| 自线自在国产av| 亚洲免费av在线视频| 啦啦啦免费观看视频1| √禁漫天堂资源中文www| 国产欧美日韩一区二区三| 国产精品一区二区免费欧美| 亚洲熟妇中文字幕五十中出 | 老司机亚洲免费影院| 亚洲国产欧美一区二区综合| 日韩中文字幕欧美一区二区| 久久久国产成人免费| 国产精品影院久久| 久久久久视频综合| 国产精品香港三级国产av潘金莲| 操美女的视频在线观看| 国产又爽黄色视频| 色尼玛亚洲综合影院| 国产欧美日韩精品亚洲av| 国产成人精品久久二区二区免费| 日韩欧美免费精品| 女性被躁到高潮视频| 亚洲国产欧美一区二区综合| 国产无遮挡羞羞视频在线观看| 波多野结衣一区麻豆| 精品国产超薄肉色丝袜足j| 三级毛片av免费| 在线观看免费视频网站a站| 欧美最黄视频在线播放免费 | 久久中文字幕人妻熟女| 亚洲精品成人av观看孕妇| 亚洲人成伊人成综合网2020| av视频免费观看在线观看| 中文字幕高清在线视频| 亚洲精华国产精华精| 国产精品综合久久久久久久免费 | 中文字幕人妻丝袜一区二区| 一本综合久久免费| 国产精华一区二区三区| 精品人妻1区二区| av一本久久久久| 日韩视频一区二区在线观看| 亚洲精品成人av观看孕妇|