    Simulation Based Energy-resource Efficient Manufacturing Integrated with In-process Virtual Management

    2016-12-09 06:10:19KATCHASUWANMANEEKanetCHENGKaiandBATEMANRichard

    KATCHASUWANMANEE Kanet, CHENG Kai, , and BATEMAN Richard

    ?

    Simulation Based Energy-resource Efficient Manufacturing Integrated with In-process Virtual Management

    KATCHASUWANMANEE Kanet1, CHENG Kai1,*, and BATEMAN Richard2

    1 College of Engineering, Design and Physical Sciences, Brunel University, London UB8 3PH, UK;2 Faculty of Engineering, Environment and Computing, Coventry University, Coventry CV1 5FB, UK

    As energy efficiency is one of the key essentials towards sustainability, the development of an energy-resource efficient manufacturing system is among the great challenges facing the current industry. Meanwhile, the availability of advanced technological innovation has created more complex manufacturing systems that involve a large variety of processes and machines serving different functions. To extend the limited knowledge on energy-efficient scheduling, the research presented in this paper attempts to model the production schedule at an operation process by considering the balance of energy consumption reduction in production, production work flow (productivity) and quality. An innovative systematic approach to manufacturing energy-resource efficiency is proposed with the virtual simulation as a predictive modelling enabler, which provides real-time manufacturing monitoring, virtual displays and decision-makings and consequentially an analytical and multidimensional correlation analysis on interdependent relationships among energy consumption, work flow and quality errors. The regression analysis results demonstrate positive relationships between the work flow and quality errors and the work flow and energy consumption. When production scheduling is controlled through optimization of work flow, quality errors and overall energy consumption, the energy-resource efficiency can be achieved in the production. Together, this proposed multidimensional modelling and analysis approach provides optimal conditions for the production scheduling at the manufacturing system by taking account of production quality, energy consumption and resource efficiency, which can lead to the key competitive advantages and sustainability of the system operations in the industry.

    energy-resource efficient manufacturing, virtual manufacturing, manufacturing simulation, in-process virtual management

    1 Introduction

    Energy and resource efficiency in manufacturing has received considerable attention in sustainable manufacturing research and development[1]. These growing trends have responded to the emerging concerns in environmental issues such as declining non-renewable energy resources as well as increasingly stringent legislations and requirements for manufacturers and even higher consumer demand for environmentally friendly products[2–3]. The escalating demand for energy together with scarcity of energy resources have resulted in high costs of energy and simultaneously in a destructive impact on the ecosystems due to fossil fuels being the main sources of the overall world energy consumption. Taken together, environments, economic and society all have valuable contributions towards energy efficiency in themodern manufacturing industry[4]. Manufacturers are therefore facing great challenges, and one important way to gain competitive advantages is to deliver energy and resource efficient performance through optimal manufacturing processes[5]. In essence, the development of efficient manufacturing systems towards sustainability cannot specifically focus on an individual level, but instead they need to acknowledge and consider all applicable levels namely product, process, and system[6].

    Particularly, at the operational level of the production processes, scheduling is a significant source of impact on the cost, quality and efficiency of the production which are the three essential components towards sustainable manufacturing[7]. Variations in operations scheduling can have consequences on the emissions and resource consumption. Despite an increase of studies in the areas of scheduling, researchers can advance the existing knowledge by considering both academic and industrial needs through various methodological and strategical models[6]. Relatedly, studies on scheduling in relation to sustainability, especially on how operations scheduling can maximally reduce environmental impacts, are still limited[8–9]. The majority of existing studies have focused on energy savings from a single resource. The present paper attempts to advance the existing research on scheduling so as to lead to better management of energy consumption and production quality of the manufacturing system without compromising of the system productivity. In particular, it extends previous findings by investigating on a more complex manufacturing system reality in a multidimensional manner, which is becoming increasingly relevant to the future manufacturing industry.

    2 Energy Efficiency in Sustainable Manufacturing

    An accurate and thorough analysis of energy consumption behavior is rather requisite to the success of energy efficiency approaches[10]. Respecting production of energy, the utmost importance concerns a thorough analysis of the production equipment namely the machines. It has been established in research that different forms of energy consumption (e.g., electricity, compressed air and process gas) are dynamic which is altered according to the status of the machine and the production process[11]. This assumption is also applied regardless of the diverse types of production machines.

    Broadly, the energy profile of a particular machine is composed of different energy-consuming parts. Fig. 1 presents an example of the energy profile of a grinding machine[10]. More specifically, energy profiles consist of energy that consumes at constant and variable rates[12]. The energy consumption that is constant is typically related to machine parts that implement an operating state such as pumps, coolers and control units. On the other hand, the variable energy consumption encompasses the electrical energy that is required for the actual operations or tool positioning and handling. Therefore, constant energy consumption contributes to a large amount of the total energy consumption depending on the feature and the type of the machine along with its application. Overall, the energy profile can provide critical application on the information of the machine components and the source of measure of the energy efficient optimization for a specific, individual machine such as the energy consumption for electric motors in a modified production process[13]. The following sections review two essential perspectives within the production stage which are peak power consumption and overall energy consumption[14].

    Fig. 1. Example of an energy profile of a production machine

    2.1 Avoiding peak power consumption

    To manage peak power consumption, the system commonly focuses on strategical processes designed to avoid or minimize energy consumption at the peak load[14]. For instance, BABU, et al[15], introduced an optimization formulation by implementing a mixed integer nonlinear programming (or MINLP) to schedule the manufacturing loads and thus avoid the energy peak demand. Likewise, in a study of FANG, et al[8], a multi-objective mixed integer programming model was developed to optimize the schedule of a flowshop by varying on operations speed to reduce peak power load. NGHIEM, et al[16], introduced an algorithmic system that incorporated a peak power consumption of a hybrid automaton during the real-time scheduling process that was implemented to create a model of the control system. In addition, BRUZZONNE, et al[17], conducted an experiment of a two-step operational method to calculate the peak power consumption in flexible flowshops by which the first step focused on a planning and scheduling system in isolation of the energy consumption. Second, the following step was to perform a mixed integer programming (MIP) which aimed to increase the energy consumption without modifying the scheduling sequence. Nevertheless, the methods of avoiding peak power consumption only focus on the systems whereby the available energy and energy peaks are limited. Whilst this approach provides advantages towards sustainability, it is, however, outside the scope of the present paper.

    2.2 Reducing the overall energy consumption

    Another, possibly more prevalent, approach focuses on reduction of the overall energy consumption. In sustainable manufacturing literature, three solutions or approaches within the production system have been proposed and modelled. Fig. 2 illustrates these approaches and their relations to the broader manufacturing energy efficiency perspective[14].

    Fig. 2. Three approaches of overall energy consumption in energy efficiency

    Among the three solutions, changing the resource or the process is regarded as the traditional, or probably the simplest, approach towards energy efficiency in manufacturing[14]. As the study of KARNOUSKOS, et al[18]showed, the resources could automatically manage the energy consumption of the integrated energy monitoring system in the overall manufacturing system, such as embedded devices, resource planning and logic controller. These resources were found to reduce energy consumption if the task was not being performed on these resources. In addition to these results, the operations process was able to change due to the result of the change in the resource in an accurate manner.

    Because adapting new resources or processes can require a large investment and extensive changes of the broader manufacturing system, another approach in reducing energy consumption focuses on modification and optimization of the existing resource or process (i.e., process tuning)[1, 14]. This approach can be less costly and is less likely to involve radical changes. One example is the experiment conducted by Mori, et al[19]which examined a decrease in energy usage through modification of cutting conditions of machine tools, adaptive pecking cycle and synchronization of the spindle speed.

    Relatedly, BI, et al[20], developed the energy model of the Exechon machine tool. The results showed that through optimization of the machine setup, this strategy could reduce 67% of energy for the drilling operations which was approximately 31% of the average energy consumption of the initial setup. These studies have provided experimental evidence to support process tuning as one of the effective approaches in sustainable manufacturing. By modifying specific process parameters such as speed, depth, feed rate, forces and temperature, the overall energy consumption of the manufacturing system can be, to varying degrees, reduced. While this approach is beneficial for energy efficient system, the performance of optimization may lessen quality objectives[21]and shorten resource lifespan[14].

    Considering the potential drawbacks of the previous approaches, this last approach concerns optimization of the resource use. While existing resource and processes stay consistent, the modification is applied to the scheduling and control systems[14]. In general, an overall increase in energy can be significantly high. For instance, DEVOLDERE, et al[22], examined on the energy consumption of a milling machine and a 50-ton machine, and the resulted showed that approximately, respectively, 47% and 65% of the energy consumption were accounted by the non-production function. This study provided evidence for energy reduction through optimization of resource use.

    In general, there are two common methods within this strategy namely exact and approximated. First, the exact methods generally manage energy-related factors with fixed conditions. MATI, et al[23], addressed the scheduling problem of the two-job shop with machines of various purposes known as NP-hard (i.e., non-deterministic polynomial-time hard) by which the processing and completion times tend to be significantly long. An attempt to reduce energy consumption in the manufacturing system with NP-hard would complicate or even constrain the process further. Consistently, VALLADA, et al[24], explained that the exact methods could be impracticable for complex flowshop that involves high-volume operations. Exact methods are also problematic and less likely to be suited for the manufacturing environments with frequently disrupted operations or dynamic changes[25].

    More recent researchers have thus paid attention to approximated methods which can be broadly classified into heuristics, metaheuristics and distributed or multi-agents, and have been described as effective methods especially for a manufacturing system with a large number of machines[24, 26–27]. These methods, especially heuristics and meta-heuristics, are considered as centralized predictive methods because they involve shorter completion time than the exact methods. Rather than undertaking the optimal solutions, these methods provide better solutions within a reasonable timeframe. For instance, KUSTER, et al[28], highlighted on the control approach based on a strategy through optimization of production schedules regarding predictions of day-ahead energy prices. The optimization emphasized on the importance of the scheduling process and its management in the design of the energy efficient production systems.

    3 Resource Efficient Scheduling Based on Energy Demand

    A variety of production processes constitute a production system which comprises of different, and typically of various purposes (e.g., personnel, processing and transportation), machines. To achieve an optimal performance, the production management plans and controls the different functions of production by considering the related technical machines. The machines provide profiles of energy consumption in load curves that are cumulated during the production process. In order to conserve energy, an inactive resource should turn off the operations of the power supply when there is no relevant production nearby the resource within the time slot. Reversely, the resource needs to switch on the power supply when the product appears to be near the resource. Nonetheless, the resource needs knowledge about the relevant products in order to make the consumption behavior consistent.

    In this research, the model manages energy efficiency with the total energy consumption and manages effectiveness with time spent for each resource in order to assemble the product in various conditions or scenarios. The energy consumption of the system is analyzed from the subsequent formulas[14]. First, the energy consumption, which is expressed as, whereis the resource andis its specific state, is equal to the time production integral of the power by whichexpresses time production andexpresses power. This equation is written as:

    Following the previous denotations, the total consumption orof a resource equates the sum of the energy consumption in all states. Wheredetermines the number of states, the formula for the total consumption is written as:

    (2)

    Last, the overall energy consumption of the system, expressed as, is the sum of the total consumption of all resources. Wheredetermines the number of resources, the formula can be written as:

    4 Virtual Simulation of Energy-resource Efficient

    The present experiment follows the virtual simulation approach which demonstrates a realistic model of the production system that captures energy and resource efficient performance. The virtual simulation presents the interdependent relationships along with their dynamics of the full equipment to efficiently facilitate design and control processes of the production system. Accordingly, this approach is not intended to exhibit the operations of an individual machine or a particular manufacturing process. Instead, it integrally considers multiple functions (e.g., quantity, time and availability of the manufacturing system) in relation to the energy consumption directions by which energy-related flows, both input and output are evaluated altogether. The structure of this approach is generally presented in levels which are input, logic, user and evaluation[10].

    Another essential feature of this simulation approach is the adjustable process modules that can enhance applicability by reducing knowledge modeling and modeling efforts. The adjustment of process modules can be performed within given parameters by using accessible data. Respectively, the modules enable the simulation to demonstrate the key performance of the manufacturing process. The level of details, therefore, can be adapted depending upon the objective of the analysis. When background data are included, it may be necessary to augment minor processes into a single process module. More importantly, the energy consumption pattern can be incorporated within each process module.

    More specifically to this research, the virtual simulation system provides the virtual-friendly, real-time manufacturing presentation and facilitates real-time decision making in a systematically precise manner as possible. As illustrated in Fig. 3, this predictive simulation system acquires data (e.g., production process and scheduling data) from the factory and large manufacturing and also presents an analysis of the multi-dimensional correlation between the EWQ flows (i.e., energy flow, work flow and quality flow) in the shop floor[29]. Both data and analytical correlation comprehensively implement the performance of this virtual simulation of energy-resource efficient. The understanding of the present simulation will advance the control system development and eventually the development of optimization to better reduce energy usage.

    Fig. 3. Architecture of the energy-resource efficient virtual simulation

    As described above, a systematic approach is necessary in the development of a modelling of an industrial application in order to cover the complete aspects of the system and to successfully implement the source and prioritization of strategies. To achieve this, the experiment adopts a three-step improvement method as follows.

    Step 1: Production processes and schedules.

    The crucial task during this first step is to analyze the distinguishing mechanical and organizational features that are applicable to the processes of the production system. By including relevant information on manufacturing machines and management such as planning, material flows and cycle times, this analysis should provide a better understanding on the production system and its data that are necessary for the consequent steps.

    Step 2: Energy analysis and production.

    This second step, energy analysis and production, focuses on a more thorough and in-depth analysis by considering both input and output flows of the production machines. Therefore, it is important to analyze not only the entire process model but also to examine all the related energy input and output of the machines. First, the technical documents should be reviewed as they can be used to prioritize processes as they include basic data on energy consumption. Because the values in these data tend to be higher than the actual values, actual energy measurements are then determined for energy profiles of, at least, major manufacturing processes.

    Step 3: Integrated simulation and evaluation of production systems.

    In this last step, aspects of the entire production system along with its process chains enable the technical interdependencies among various machines and the outcomes of technical and organizational measures. The virtual simulation of this experiment is essential to manage the problem dynamics by which the data are accumulated and result in the comprehensive load curve for the complete system.

    5 Implementation and Optimization

    This experiment was established in the Brunel University Advanced Manufacturing Laboratory which was suitable to the present methodological approach as the laboratory comprised of the entire area of the machine work and its environment. The experimentation consisted of 20 aluminum tests which were performed on the CNC machine with variations of workloads. The virtual simulation programme was used to model the production at the applicable level of details. More specifically, a LabVIEW programme was run to display the real-time virtual simulation of energy and resource efficient. The virtual simulation consisted of 5 main panels which were real-time virtual simulation, Arena Simulation in manufacturing production process, overall machine utilization, production energy consumption and product quality as shown in Fig. 4. The virtual simulation development is a part of research efforts in developing energy-resource efficient factory of the future, combining the in-process analysis, analytics and real-time manufacturing decision-makings with the advanced ICT techniques[32].

    Fig. 4. Energy-resource efficient virtual simulation

    5.1 Production processes and scheduling

    The production system and scheduling simulation, as shown in the top right of Fig. 4, were displayed to monitor and utilize resources of the simulated model. The model was simulated by using Arena Simulation programme. In this simulation, the work flow changed during the period of time due to the scheduling of production line. There were three processes and three production lines in this automated simulation including 9 CNC machines. The machine status consisted of machine turn on, machine turn off and machine idle.

    5.2 Energy measurement

    To measure energy consumption, a ‘Power logger’ hardware was selected as it can establish a high level of precision measurement[30]. The Fluke 1735 power logger was specifically used to measure three phases of the power supplied in order to collect data on the total energy consumption of the processes. The measurement results were directly linked to the virtual simulation.

    5.3 Accuracy measurement

    Machining errors were then measured after the experiments of machining. The measurements were performed with a Coordinate Measuring Machine or CMM, namely MITUTOYO FN503. Since the working environment is the important factor that can fluctuate accuracy of the CMM[31], this specific measuring machine was placed in the laboratory in which the temperature was set and controlled at 20℃. Probing was carried out on the fixture of the aluminum workpieces. Machining error was calculated as the difference between the reference points in the probe deviations. Particularly, a total of 14 varied dimensions of measurement of machining error were included with 9 length and 5 depth errors and were performed on the reference points. Once the CMM code was programmed, the process was automated through a NC program on a CAD systems and operations on the measurement process on each of the 20 workpieces of aluminum. The test sheets were then created for examination and further analysis.

    6 Results and Discussion

    The collected data from the milling aluminum tests were analysed which resulted in a correlational graph of work flow about the overall energy consumption generated from the simulation as depicted in Fig. 5. The results showed that, in the work flow that ranged between 25% and 100%, a correlational relationship between work flow and energy consumption was positive, indicating a raise of energy consumption while work flow was increasing. Specifically, at 25% work flow, the system generated approximately 265 kW of energy in order to finish the processes. At 100% work flow, the machining systems then approximately generated an increasing amount of 1173 kW of energy. The correlation of work flow and energy consumption is described in Eq. (4):

    Next, a positive correlation was established between work flow and product quality measured by percentages of quality errors, shown in Fig. 5. Specifically, when work flow was at 25%, the product quality error was estimated to be at approximately 0.047 5%. However, the quality errors increased to 0.161 0% when the system was being fully operated. The correlational equation of work flow and quality error is described by Eq. (5):

    In addition, the correlation of both regression lines in Fig. 5 was shown to be positive, suggesting that more energy was being consumed and, simultaneously, more quality errors of products occurred at higher work flows. As a result of the two regression lines, the intersection was obtained at 75% of work flow. At this intersection point, the energy consumption was at 870 kW with the quality error of 0.215 935%.

    Fig. 5. Work flow and energy consumption versus quality error

    As shown in Fig. 6, the 3D correlation between the 3 flows which were work flow, energy consumption, and quality error was generated by the simulating Matlab and SigmaPlot programme. The multidimensional correlation of work flow, energy consumption and quality error can be summarized by Eq. (6):

    whereis work flow,is energy consumption, andis quality error.

    Fig. 6. 3D correlational analysis of energy

    Consumption, work flow and quality error based on this experiment, work flow in the production scheduling process should be controlled and optimized in order to optimally obtain the improved product quality together with minimizing the over energy consumption. This research identified optimization of work flow as the crucial factor that can facilitate the reduction of energy consumption and also maintain the quality of the product. The findings suggested that 75% of work flow appears to be the optimal parameter for energy efficiency in a means of overall energy consumption when product quality is also achieved. Evaluating all potential factors to gain predictive energy consumption and machining error can be a complicated task. Nevertheless, this research highlighted the role of production scheduling as the key factor that influences energy consumption and also the quality error of product in the manufacturing system.

    7 Conclusions

    In response to the issues linking to environmental concerns, a high rise in energy costs, stringent regulations and legislations, and changing preferences of consumer demands over the last decade or so, the majority of the manufacturers are increasingly moving towards sustainable manufacturing while at the same time need to gain competitive advantages and maintaining the production productivity and quality. The present research was carried out to model operations scheduling in the manufacturing system by optimizing work flow of the production processes in order to determine underlying relationships among the energy consumption, production quality and productivity flow. The virtual simulation approach was undertaken to design and present real-time manufacturing monitoring, virtual displays and responsive decision makings with the three dimensional correlation analysis in order to evaluate the energy consumption and quality error scheduling of the production system. With the three-step methodological approach, the simulation model provided technical evaluation on the scheduling process of the production system.

    The results of the analysis highlighted the importance of including effectiveness, which was indicated by quality error and efficiency, which was determined by energy consumption, criteria in a dynamic manufacturing system. Overall, the correlations between the work flow and energy consumption and the work flow and quality error are positive, suggesting that at high work flow, a great amount of energy is consumed and product quality is lowered. More importantly, the present research supports the effective scheduling process in manufacturing system where it needs to be controlled and managed accordingly in order to enhance energy efficiency and achieve the set level of product quality. The present virtual simulation further provides a systematical approach for production management particularly towards energy and resource efficient manufacturing at a manufacturing system.

    [1] Duflou J R, SUTHERLAND J W, DORNFIELD D, et al.Towards energy and resource efficient manufacturing: A processes and systems approach[J]., 2012, 61: 587–609.

    [2] ALLWOOD J M, CULLEN J M.[M]UIT Cambridge, Cambridge, 2012.

    [3] BEY N, HAUSCHILD M Z, MCALOONE TC.Drivers and barriers for implementation of environmental strategies in manufacturing companies[J]., 2013, 62:43–46.

    [4] GERETTI M, TAISCH M. Sustainable manufacturing: Trends and research challenges[J].,2012, 23:83–104.

    [5] RENTSCH R, HEINZEL C, BRINKSMEIER E. Artificial intelligence for an energy and resource efficient manufacturing chain design and operation[J]., 2015, 33:139–144.

    [6] GIRET A, TRENTESAUX D, PRABHU V. Sustainability in manufacturing operations scheduling: A state of the art review[J]., 2015, 37:126–140.

    [7] TRENTESAUX D, PRABHU V. Sustainability in manufacturing operations scheduling: stakes, approaches and trends[M]//Grabot B, Vallespir B, Gomes S, et al eds.. Springer, Heidelberg, 2014: 106–113.

    [8] FANG K, UHAN N, ZHAO F, et al. A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction[J]., 2011, 30:234–240.

    [9] PRABHU VV, JEON HW, TAISCH M. Simulation modelling of energy dynamics in discrete manufacturing systems[M]//,Springer, Heidelberg, 2013.

    [10] HERRMANN C, THIEDE S. Processchainsimulation to fosterenergyefficiency in manufacturing[J]., 2009, 1:221–229.

    [11] THIEDE S.[M]. Springer, Heidelberg, 2012.

    [12] GUTOWSKI T, DAHMUS J, THIRIEZ A. ElectricalEnergyRequirementsforManufacturingProcesses[C]//, Leuven, Belgium, May 31–June 2, 2006, 31:623–638.

    [13] DEVOLDERE T, DEWULF W, DEPREZ W, et al. Improvementpotentialforenergyconsumption in discretepartproduction machines[C]//,Tokyo, Japan, 2007: 311–316.

    [14] PACH C, BERGER T, SALLEZ Y, et al. Reactive and energy-aware scheduling of flexible manufacturing systems using potential fields[J]., 2014, 65:434–448.

    [15] BABU CA, ASHOK S.Peak load management in electrolytic process industries[J]., 2008, 23:399–405.

    [16] NGHIEM T, BEHL M, PAPPAS GJ, et al. Green scheduling: Scheduling of control systems for peak power reduction[C]//, 2011: 1–8.

    [17] BRUZZONE AAG, ANGHINOLFI D, PAOLUCCI M. Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops[J]., 2012, 61:459–462.

    [18] KARNOUSKOS S, COLUMBO AW, LASTRA JLM, et al.Towards the energy efficient future energy[C]//, 2009: 367–371.

    [19] MORI M, FUJISHIMA M, INAMASU Y, et al. A study on energy efficiency improvement for machine tools[J]., 2011, 60:145–148.

    [20] BI ZM, WANG, L. Optimization of machining processes from the perspective of energy consumption: A case study[J].2012,31:420–428.

    [21] WANG Q, LIU F, WANG X. Multi-objective optimization of machining parameters considering energy consumption[J]., 2014, 71:1133–1142.

    [22] DEVOLDERE T, DEWULF W, DEPREZ W, et al. Improvement potential for energy consumption in discrete part production machines[M]//Springer, London, 2007.

    [23] MATI Y, XIE X. A polynomial algorithm for a two-job shop scheduling problem with routing flexibility[C]//2003, 1: 157–162.

    [24] VALLADA E, RUIZ R, MINELLA G.Minimising total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics[J].2008, 35:1350–1373.

    [25] MARIK V, MCFARLANE D. Industrial adoption of agent-based technologies[J], 2005, 1: 27–35.

    [26] LEE JH, KIM CO.Multi-agent systems applications in manufacturing systems and supply chain management: A review paper[J]., 2008, 46: 233–265.

    [27] SHEN W, HAO Q, YOON HJ, et al.Applications of agent-based systems in intelligent manufacturing: An updated review[J]., 2006, 20:415–431.

    [28] KUSTER T, LUTZENBERGER M, FREUND D, et al. Distributed optimization of energy costs in manufacturing using multi-agent system technology[C]//, Maho Beach, St. Maarten, 2012.

    [29] KATCHASUWANMANEE, K, BATEMAN R, CHENG K. Development of theenergy-smartproductionmanagementsystem (e-ProMan): A big data drivenapproachanalysis and optimization[J]., 2015, 230(5): 972–978.

    [30] NOUREDDINE A, ROUVOY R, SEINTURIER L. A review of energy measurement approaches[J]., 2013, 47:42–49.

    [31] LEACH R.[M]Elsevier, Philadelphia, PA, 2014.

    [32] CHENG K, BATEMANR J. e-Manufacturing: characteristics, applications and potentials[J]., 2008, 18: 1323–1328.

    Biographical notes

    KATCHASUWANMANEE Kanet is currently a PhD candidate in manufacturing engineering atHis research interests include energy efficiency and energy management in manufacturing system.

    E-mail: kanet.katchasuwanmanee@brunel.ac.uk

    CHENG Kai is currently a professor of manufacturing engineeringHis main research interests include design of high precision machines, ultraprecision and micro machining, multiscale multi-physics based design and analysis, smart tooling and smart machining and sustainable manufacturing systems.

    E-mail: kai.cheng@brunel.ac.uk

    BATEMAN Richard is currently a senior lecturer atHis main research interests include energy efficient & energy smart manufacturing and digital manufacturing.

    E-mail: richard.bateman@coventry.ac.uk

    Supported by the EU 7th Framework ICT Programme under EuroEnergest Project (Contract No. 288102)

    ? Chinese Mechanical Engineering Society and Springer-Verlag Berlin Heidelberg 2016

    Received May 24, 2016; revised June 21, 2016; accepted July 14, 2016

    10.3901/CJME.2016.0714.080, available online at www.springerlink.com; www.cjmenet.com

    E-mail: kai.cheng@brunel.ac.uk

    国产成人一区二区三区免费视频网站| 亚洲欧美精品综合久久99| 成熟少妇高潮喷水视频| 成熟少妇高潮喷水视频| 久久人妻av系列| 看黄色毛片网站| 亚洲专区字幕在线| 精品福利观看| 久久香蕉精品热| ponron亚洲| 日韩 欧美 亚洲 中文字幕| 国产av一区二区精品久久| 欧美黄色片欧美黄色片| 久久久久久大精品| 欧美日韩亚洲综合一区二区三区_| 久久久久久久久久久久大奶| 免费看十八禁软件| 一本久久中文字幕| 久久久国产成人免费| x7x7x7水蜜桃| 精品久久久久久成人av| 丰满人妻熟妇乱又伦精品不卡| 国产精品电影一区二区三区| 午夜福利高清视频| 欧美激情极品国产一区二区三区| 国产欧美日韩综合在线一区二区| 91精品国产国语对白视频| 在线十欧美十亚洲十日本专区| 欧美+亚洲+日韩+国产| 精品乱码久久久久久99久播| 黄片大片在线免费观看| 99精品在免费线老司机午夜| 久久欧美精品欧美久久欧美| 国产亚洲精品久久久久5区| 国内精品久久久久久久电影| 99国产精品一区二区三区| 国产av在哪里看| 淫秽高清视频在线观看| 无限看片的www在线观看| av天堂在线播放| videosex国产| 狂野欧美激情性xxxx| 国产成+人综合+亚洲专区| 亚洲少妇的诱惑av| 亚洲欧美一区二区三区黑人| 黄色丝袜av网址大全| 久久国产精品影院| 欧美黄色片欧美黄色片| bbb黄色大片| 日日爽夜夜爽网站| 亚洲美女黄片视频| 俄罗斯特黄特色一大片| 精品日产1卡2卡| 欧美性长视频在线观看| 他把我摸到了高潮在线观看| 男人操女人黄网站| 成人精品一区二区免费| 久久欧美精品欧美久久欧美| av视频在线观看入口| 精品午夜福利视频在线观看一区| av免费在线观看网站| 久久亚洲精品不卡| 两性夫妻黄色片| 国产日韩一区二区三区精品不卡| 一区二区三区激情视频| 免费在线观看完整版高清| 一本久久中文字幕| 精品久久久久久久人妻蜜臀av | 黄频高清免费视频| 久久伊人香网站| 久热爱精品视频在线9| 国产蜜桃级精品一区二区三区| 久久精品91无色码中文字幕| 久久国产精品人妻蜜桃| 欧美+亚洲+日韩+国产| 免费高清在线观看日韩| 成熟少妇高潮喷水视频| 久久久久久免费高清国产稀缺| 亚洲成av片中文字幕在线观看| 男人操女人黄网站| 亚洲专区字幕在线| 亚洲激情在线av| www.www免费av| xxx96com| 亚洲精品在线观看二区| 亚洲七黄色美女视频| 亚洲男人的天堂狠狠| 一级a爱视频在线免费观看| 国产精品久久久久久精品电影 | 日韩欧美国产在线观看| 一区二区三区高清视频在线| 99在线人妻在线中文字幕| 一进一出抽搐动态| 日韩精品中文字幕看吧| 亚洲男人天堂网一区| 男人操女人黄网站| 亚洲自偷自拍图片 自拍| 美女午夜性视频免费| 老鸭窝网址在线观看| 黄色丝袜av网址大全| 中文亚洲av片在线观看爽| 国产精品,欧美在线| 久久午夜亚洲精品久久| netflix在线观看网站| 无遮挡黄片免费观看| 国产成人精品久久二区二区91| 国产精品久久电影中文字幕| 在线观看66精品国产| 国产精品,欧美在线| 久9热在线精品视频| 国产成人免费无遮挡视频| 日韩精品青青久久久久久| 久久人妻福利社区极品人妻图片| 久久久久久亚洲精品国产蜜桃av| 中文字幕高清在线视频| 亚洲电影在线观看av| 女人高潮潮喷娇喘18禁视频| 欧美午夜高清在线| 国产高清有码在线观看视频 | 亚洲一区二区三区色噜噜| 国产真人三级小视频在线观看| 国产成人精品在线电影| 69精品国产乱码久久久| 级片在线观看| 无限看片的www在线观看| 亚洲精品中文字幕在线视频| 好看av亚洲va欧美ⅴa在| 久久国产精品影院| 国产一区二区激情短视频| 99久久精品国产亚洲精品| 久久精品亚洲熟妇少妇任你| 国产精品二区激情视频| 中文字幕色久视频| 999精品在线视频| 露出奶头的视频| 很黄的视频免费| 不卡av一区二区三区| 男女做爰动态图高潮gif福利片 | 在线观看66精品国产| www.999成人在线观看| 99久久国产精品久久久| 麻豆成人av在线观看| 日本精品一区二区三区蜜桃| 久久久久国内视频| 午夜久久久久精精品| 亚洲人成伊人成综合网2020| 啦啦啦免费观看视频1| 国产伦人伦偷精品视频| 久久国产精品人妻蜜桃| 天天躁狠狠躁夜夜躁狠狠躁| av免费在线观看网站| 宅男免费午夜| 很黄的视频免费| 欧美激情久久久久久爽电影 | 亚洲 欧美一区二区三区| 国产三级在线视频| 男人的好看免费观看在线视频 | 黄片播放在线免费| 天天躁狠狠躁夜夜躁狠狠躁| 色精品久久人妻99蜜桃| 午夜日韩欧美国产| 欧美午夜高清在线| 成人国语在线视频| 久久婷婷成人综合色麻豆| 成在线人永久免费视频| 黄片播放在线免费| 精品国产一区二区三区四区第35| 在线观看日韩欧美| 国产精品免费视频内射| 日韩视频一区二区在线观看| 久久影院123| 亚洲专区中文字幕在线| 男女下面插进去视频免费观看| 欧美久久黑人一区二区| 精品久久久久久,| 中国美女看黄片| 成人欧美大片| 日本 av在线| 久久香蕉激情| 一二三四在线观看免费中文在| 19禁男女啪啪无遮挡网站| 亚洲第一欧美日韩一区二区三区| ponron亚洲| 亚洲一码二码三码区别大吗| 中文字幕高清在线视频| 亚洲av美国av| 大码成人一级视频| 天天躁夜夜躁狠狠躁躁| 国产成人影院久久av| 国产亚洲精品综合一区在线观看 | 村上凉子中文字幕在线| 男人操女人黄网站| www日本在线高清视频| 欧美激情 高清一区二区三区| 美女 人体艺术 gogo| 欧美不卡视频在线免费观看 | 欧美老熟妇乱子伦牲交| 亚洲一区高清亚洲精品| 老熟妇仑乱视频hdxx| 两个人视频免费观看高清| 午夜免费鲁丝| 国产av一区二区精品久久| bbb黄色大片| 777久久人妻少妇嫩草av网站| 久久久水蜜桃国产精品网| 老司机午夜福利在线观看视频| 久久久久久免费高清国产稀缺| 制服丝袜大香蕉在线| 久久影院123| 欧美日本亚洲视频在线播放| www.www免费av| 在线观看舔阴道视频| 宅男免费午夜| 亚洲avbb在线观看| 亚洲少妇的诱惑av| 制服诱惑二区| 亚洲欧美日韩另类电影网站| 久久人妻熟女aⅴ| 黄色a级毛片大全视频| 日韩成人在线观看一区二区三区| 国产精品美女特级片免费视频播放器 | 成人三级黄色视频| 黄色片一级片一级黄色片| 国产精品一区二区精品视频观看| 免费看美女性在线毛片视频| 波多野结衣巨乳人妻| 久久婷婷人人爽人人干人人爱 | 日韩精品免费视频一区二区三区| 日本vs欧美在线观看视频| 女同久久另类99精品国产91| 男女之事视频高清在线观看| 欧美最黄视频在线播放免费| 久久婷婷人人爽人人干人人爱 | 日韩欧美一区二区三区在线观看| 亚洲成a人片在线一区二区| 亚洲成人免费电影在线观看| 亚洲国产欧美一区二区综合| 亚洲专区字幕在线| 一个人免费在线观看的高清视频| 两个人看的免费小视频| av欧美777| 国产精品美女特级片免费视频播放器 | 久久久精品欧美日韩精品| 天堂影院成人在线观看| 国产精品香港三级国产av潘金莲| 成人国语在线视频| 亚洲精品在线观看二区| 免费在线观看黄色视频的| 又紧又爽又黄一区二区| 国产高清有码在线观看视频 | 日韩一卡2卡3卡4卡2021年| 亚洲五月色婷婷综合| 国产精品精品国产色婷婷| 国产精品一区二区免费欧美| 精品国产美女av久久久久小说| 国产97色在线日韩免费| 此物有八面人人有两片| 99香蕉大伊视频| 少妇 在线观看| 大陆偷拍与自拍| 久久人人爽av亚洲精品天堂| 91麻豆精品激情在线观看国产| 亚洲免费av在线视频| 老司机靠b影院| 一级,二级,三级黄色视频| 亚洲国产日韩欧美精品在线观看 | 99香蕉大伊视频| 曰老女人黄片| 99国产精品免费福利视频| 99久久国产精品久久久| 国产精品亚洲美女久久久| 日韩成人在线观看一区二区三区| 18禁美女被吸乳视频| 国产av一区在线观看免费| 日本黄色视频三级网站网址| 88av欧美| 99久久国产精品久久久| 一本大道久久a久久精品| 午夜福利欧美成人| 亚洲av第一区精品v没综合| 亚洲avbb在线观看| 黑人巨大精品欧美一区二区mp4| 国产精品一区二区三区四区久久 | 日韩av在线大香蕉| 9色porny在线观看| 欧美成人午夜精品| 99精品欧美一区二区三区四区| 中文字幕人妻熟女乱码| 日日爽夜夜爽网站| 欧美日本亚洲视频在线播放| 69av精品久久久久久| 国产aⅴ精品一区二区三区波| 成人手机av| 精品国内亚洲2022精品成人| 亚洲伊人色综图| 搡老妇女老女人老熟妇| 成人18禁在线播放| 每晚都被弄得嗷嗷叫到高潮| 一个人免费在线观看的高清视频| 可以免费在线观看a视频的电影网站| 国语自产精品视频在线第100页| 国产成年人精品一区二区| 美女 人体艺术 gogo| 又黄又爽又免费观看的视频| 一进一出好大好爽视频| 99香蕉大伊视频| 欧美绝顶高潮抽搐喷水| 婷婷六月久久综合丁香| 青草久久国产| 一区二区三区国产精品乱码| 亚洲国产精品999在线| 中亚洲国语对白在线视频| 欧美最黄视频在线播放免费| 久久国产精品男人的天堂亚洲| 亚洲黑人精品在线| 久久热在线av| 此物有八面人人有两片| 亚洲aⅴ乱码一区二区在线播放 | 亚洲精品中文字幕一二三四区| www.熟女人妻精品国产| 免费在线观看影片大全网站| 国产av精品麻豆| 日本在线视频免费播放| 免费在线观看影片大全网站| 一夜夜www| 国产高清videossex| 老司机靠b影院| 丝袜美腿诱惑在线| 欧洲精品卡2卡3卡4卡5卡区| 亚洲 欧美 日韩 在线 免费| 色综合站精品国产| 两人在一起打扑克的视频| 韩国av一区二区三区四区| 国产在线观看jvid| 国产色视频综合| 国产伦一二天堂av在线观看| 国产精品久久久久久精品电影 | 国产成人欧美在线观看| 亚洲成人精品中文字幕电影| 久久草成人影院| 91成人精品电影| 日本撒尿小便嘘嘘汇集6| 韩国精品一区二区三区| 老司机午夜十八禁免费视频| 日本五十路高清| 热99re8久久精品国产| 一区二区三区高清视频在线| 麻豆国产av国片精品| 精品一区二区三区视频在线观看免费| 精品欧美国产一区二区三| 精品一区二区三区视频在线观看免费| 男人操女人黄网站| 日韩免费av在线播放| av福利片在线| 成人国产一区最新在线观看| 欧美色视频一区免费| 免费无遮挡裸体视频| 免费高清视频大片| 18禁黄网站禁片午夜丰满| 午夜日韩欧美国产| 午夜福利18| 99国产精品一区二区蜜桃av| 国产成人av激情在线播放| 色在线成人网| 一本久久中文字幕| 一本大道久久a久久精品| 久久精品国产清高在天天线| 午夜久久久在线观看| 日本 av在线| 午夜久久久在线观看| 欧美黑人精品巨大| 国产精品永久免费网站| 久久精品国产清高在天天线| 国产精品一区二区免费欧美| 国产黄a三级三级三级人| 亚洲 欧美一区二区三区| 黄色视频不卡| 亚洲午夜理论影院| 黄频高清免费视频| 9热在线视频观看99| 国产精品久久久久久人妻精品电影| 天天一区二区日本电影三级 | 成人特级黄色片久久久久久久| 成人手机av| 999精品在线视频| 午夜精品久久久久久毛片777| 一进一出抽搐gif免费好疼| 一级作爱视频免费观看| 亚洲伊人色综图| 亚洲免费av在线视频| 亚洲国产精品sss在线观看| 亚洲欧美精品综合久久99| 亚洲国产看品久久| 亚洲第一电影网av| 中文字幕人妻丝袜一区二区| 日日摸夜夜添夜夜添小说| 久久久久久久午夜电影| 香蕉久久夜色| 日韩av在线大香蕉| 黄网站色视频无遮挡免费观看| 男女下面插进去视频免费观看| 精品国产国语对白av| 亚洲第一青青草原| 自拍欧美九色日韩亚洲蝌蚪91| 亚洲最大成人中文| av有码第一页| 法律面前人人平等表现在哪些方面| 大型黄色视频在线免费观看| 久久久久九九精品影院| 欧美精品啪啪一区二区三区| 色综合站精品国产| 国产精品一区二区免费欧美| 久热这里只有精品99| 亚洲精品国产色婷婷电影| 日韩欧美三级三区| 国内精品久久久久精免费| 午夜福利,免费看| 久久伊人香网站| 久久人人精品亚洲av| 制服诱惑二区| 欧美日本视频| 19禁男女啪啪无遮挡网站| 国产精品 欧美亚洲| 丝袜在线中文字幕| 电影成人av| 国产亚洲精品av在线| 午夜福利,免费看| 欧美中文综合在线视频| 成人国产一区最新在线观看| 禁无遮挡网站| 老司机在亚洲福利影院| 黄色视频,在线免费观看| 久久 成人 亚洲| 亚洲第一av免费看| 精品乱码久久久久久99久播| 成熟少妇高潮喷水视频| 最好的美女福利视频网| 如日韩欧美国产精品一区二区三区| 手机成人av网站| 99国产综合亚洲精品| 麻豆一二三区av精品| 99在线人妻在线中文字幕| 精品国产乱子伦一区二区三区| 色综合亚洲欧美另类图片| 亚洲第一欧美日韩一区二区三区| 国产精品久久久久久亚洲av鲁大| 欧美色视频一区免费| 亚洲成人免费电影在线观看| a级毛片在线看网站| 色婷婷久久久亚洲欧美| 极品教师在线免费播放| 一级毛片高清免费大全| 日本精品一区二区三区蜜桃| 亚洲国产精品久久男人天堂| 国产成人系列免费观看| 国产麻豆69| 久久精品91蜜桃| a级毛片在线看网站| 亚洲国产精品合色在线| 欧美日韩亚洲综合一区二区三区_| 一级毛片高清免费大全| 欧美在线黄色| 亚洲免费av在线视频| 久久欧美精品欧美久久欧美| 69精品国产乱码久久久| 国产一区二区三区视频了| 国产精品 国内视频| 国产精品国产高清国产av| 制服丝袜大香蕉在线| 久久精品国产综合久久久| 国产精品九九99| 免费在线观看日本一区| 日韩欧美三级三区| 亚洲精品国产色婷婷电影| 精品一品国产午夜福利视频| 老司机午夜福利在线观看视频| 免费看a级黄色片| 99精品久久久久人妻精品| 亚洲国产欧美日韩在线播放| 午夜精品在线福利| 欧美日韩福利视频一区二区| 侵犯人妻中文字幕一二三四区| 亚洲av熟女| 欧美精品啪啪一区二区三区| а√天堂www在线а√下载| 成人永久免费在线观看视频| 国产精品自产拍在线观看55亚洲| 日韩大尺度精品在线看网址 | 中文字幕人妻熟女乱码| 国产视频一区二区在线看| 亚洲国产欧美一区二区综合| 久久影院123| 精品少妇一区二区三区视频日本电影| 母亲3免费完整高清在线观看| 久久久久国产精品人妻aⅴ院| 51午夜福利影视在线观看| 搞女人的毛片| 日本a在线网址| 美女国产高潮福利片在线看| 亚洲aⅴ乱码一区二区在线播放 | 国产一区二区三区视频了| 一二三四社区在线视频社区8| tocl精华| 亚洲成人久久性| 久久久国产成人免费| 色哟哟哟哟哟哟| 亚洲色图 男人天堂 中文字幕| 在线观看www视频免费| 青草久久国产| 身体一侧抽搐| 好男人在线观看高清免费视频 | 欧美日韩黄片免| 成年人黄色毛片网站| 亚洲一区二区三区色噜噜| 精品欧美国产一区二区三| 色哟哟哟哟哟哟| 99香蕉大伊视频| 成人国产一区最新在线观看| 美女 人体艺术 gogo| 亚洲av成人不卡在线观看播放网| 国产麻豆成人av免费视频| 天天躁夜夜躁狠狠躁躁| 国产成人av教育| 此物有八面人人有两片| e午夜精品久久久久久久| 亚洲伊人色综图| 桃色一区二区三区在线观看| 亚洲欧美日韩无卡精品| 99久久综合精品五月天人人| 国产xxxxx性猛交| 一卡2卡三卡四卡精品乱码亚洲| 99re在线观看精品视频| 精品久久久久久成人av| 午夜福利一区二区在线看| 黄色丝袜av网址大全| 国产精品免费一区二区三区在线| 精品久久久久久久久久免费视频| 免费高清视频大片| 丁香六月欧美| 亚洲人成77777在线视频| 国产熟女xx| 男女之事视频高清在线观看| 久久久久国产精品人妻aⅴ院| 电影成人av| 成人特级黄色片久久久久久久| 亚洲色图 男人天堂 中文字幕| 每晚都被弄得嗷嗷叫到高潮| 黄色片一级片一级黄色片| 国产av在哪里看| 老司机午夜福利在线观看视频| 男人舔女人下体高潮全视频| 国产激情久久老熟女| 1024香蕉在线观看| 亚洲欧美日韩高清在线视频| 国产精品九九99| 欧美日本视频| av视频在线观看入口| 在线观看66精品国产| 国产色视频综合| 午夜福利高清视频| e午夜精品久久久久久久| 久久国产精品男人的天堂亚洲| 午夜成年电影在线免费观看| 国产91精品成人一区二区三区| 午夜免费鲁丝| 亚洲无线在线观看| 无限看片的www在线观看| 色播亚洲综合网| 亚洲国产高清在线一区二区三 | 色精品久久人妻99蜜桃| 亚洲精品国产区一区二| 可以在线观看的亚洲视频| 涩涩av久久男人的天堂| 精品欧美一区二区三区在线| 色综合亚洲欧美另类图片| 淫妇啪啪啪对白视频| 久久久国产精品麻豆| 欧美绝顶高潮抽搐喷水| 男女下面插进去视频免费观看| 精品少妇一区二区三区视频日本电影| 亚洲色图 男人天堂 中文字幕| 自线自在国产av| 久久草成人影院| 一进一出好大好爽视频| 免费观看精品视频网站| 日韩视频一区二区在线观看| 欧美激情久久久久久爽电影 | 在线观看www视频免费| 日本一区二区免费在线视频| 亚洲国产精品sss在线观看| 国产精品 欧美亚洲| 91精品三级在线观看| 9191精品国产免费久久| 51午夜福利影视在线观看| 侵犯人妻中文字幕一二三四区| 国产欧美日韩一区二区精品| av中文乱码字幕在线| 一卡2卡三卡四卡精品乱码亚洲| 国产精品免费一区二区三区在线| 国产成人免费无遮挡视频| 午夜亚洲福利在线播放| 黑人巨大精品欧美一区二区mp4| 欧美日韩一级在线毛片| 亚洲自拍偷在线| 国内久久婷婷六月综合欲色啪| 国产欧美日韩精品亚洲av| 女人爽到高潮嗷嗷叫在线视频| 夜夜爽天天搞| 黄色 视频免费看| 欧美黄色淫秽网站| 精品国产美女av久久久久小说| 国产精品电影一区二区三区| 精品国产乱码久久久久久男人| 欧美精品亚洲一区二区| 久久香蕉激情|