    The hydraulic characteristics of end-dump closure with the assistance of backwater-sill in diversion channel*

    2016-12-06 08:15:42HeLU陸賀ZhigenHU胡志根QuanLIU劉全Guoxuan呂國軒JianquanYE葉建群JinmingRen任金明

    He LU (陸賀), Zhi-gen HU (胡志根), Quan LIU (劉全), Guo-xuan Lü (呂國軒), Jian-quan YE (葉建群),Jin-ming Ren (任金明)

    1. The State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University,Wuhan 430072, China, E-mail: luhe_sd@whu.edu.cn

    2. Huadong Engineering Corporation Limited of Powerchina, Hangzhou 310014, China

    The hydraulic characteristics of end-dump closure with the assistance of backwater-sill in diversion channel*

    He LU (陸賀)1, Zhi-gen HU (胡志根)1, Quan LIU (劉全)1, Guo-xuan Lü (呂國軒)2, Jian-quan YE (葉建群)2,Jin-ming Ren (任金明)2

    1. The State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University,Wuhan 430072, China, E-mail: luhe_sd@whu.edu.cn

    2. Huadong Engineering Corporation Limited of Powerchina, Hangzhou 310014, China

    The river closure is a key step in the water dam construction, and the end-dump closure is a general way to cut off the river flow. The hydraulic characteristics at the closure gap are the main factors which affect the extent of closure difficulty. A method is proposed to reduce the difficulty of diversion channel closure by pre-building a closure structure called the backwater-sill at the downstream toe of the closure gap to change the flow pattern at the closure gap. The results of the physical model test and the threedimensional numerical simulation indicate that the backwater-sill has the effects of raising the water level at the downstream toe of the closure gap, decreasing the water surface gradient, and reducing the closure drop and the flow velocity at the closure gap. The schemes with different dike widths, different closure gap widths, and different backwater-sill widths and heights are simulated. The results show that the height of the backwater-sill is the key factor affecting the hydro-indicators at the closure gap, while the influence of the dike width, the closure gap width or the backwater-sill width can be ignored. The higher the backwater-sill is, the lower the hydro-indicators will be. Based on the numerical simulations and the physical model tests on the hydraulic characteristics at the closure gap of the backwater-sill assisted closure, the hydro-indicators and its calculation method are proposed to provide a theoretical support for the river closure.

    diversion channel closure, closure structure, end-dump closure, backwater-sill, hydraulic characteristics

    Introduction

    In the construction of water dam projects, the flow in the riverbed should be cut off, and then the upstream and downstream cofferdams can be filled to temporarily protect the construction pit against the river water. In this way, the hydraulic structures (dam base) can be constructed in a dry riverbed. The process of cutting off the river and leading the flow into a discharge structure is called the river closure. The closure by dike or dikes is the most frequently-used method of river closure[1], which begins with casting the riprap and other materials into the water flow, forming a closure dike, and gradually narrowing the river flow,and ultimately ends with closing the river. The closure methods of the dike can be classified into the transverse-dump, the end-dump and the transverse-end-dump,as well as the single dike, the wide dike, the double dikes and the multiple dikes. The difficulty of a closure project can be evaluated in 3-D[2]. The first dimension is the scale of the closure project, which includes the dumping quantities, the diversion structure scale and the construction intensity, and can be represented by the closure flow discharge Q. The second dimension is the construction safety, which is related to the slump scale of the dike head during the process of the closure dike construction, and can be represented by the water depth at the closure gap. The last dimension is the diameter of the closure material, which is determined by the hydro-indicators at the closure gap,such as the closure drop and the average velocity. For a particular river closure project, the first two factors can be considered to be fixed, determined by the envi-ronment where the closure project is located. Thus, the effective way to reduce the closure difficulty is to reduce the hydro-indicators at the closure gap.

    The flow pattern and the mechanical conditions of the riverbed at the closure gap determine the stability of the closure materials. The hydraulic characteristics of the closure gap is an important issue of the closure design. Meng et al.[3]and Hu et al.[4]studied the hydraulic characteristics of the closure gap in the end-dumping closure with a single dike. Wu and Molinas[5]and Chiang et al.[6]studied the discharge characteristics and the energy losses of local discontinuous contractions. Koken and Constantinescu[7]studied the hydraulic control conditions of the enddump closure with double dikes. Lu and Du[8]studied the hydraulic characteristics of the gap closing with large framed cages. Wang et al.[9]developed and integrated 1-D and 2-D mathematical models to simulate the hydraulic conditions of the TGP's third-stage open channel closure. Chen and Shen[10]studied the hydraulics characteristics of the close gap in large-scale beach reclamation works. Choi et al.[11], Ha et al.[12]and Van Der Sande[13]described the construction of the tidal dikes and predicted the real-time flow fields during the gradual closure operation in the final stage. Another important issue is the stability of the closure materials. Hoan et al.[14]studied the stone stability in non-uniform flow. Escarameia and May[15]studied stability of riprap and concrete blocks in highly turbulent flows. Das[16]studied the stability of rockfill in end-dump river closures. Elkholy and Chaudhry[17]investiga- ted on the trajectory of large sandbags in open channel flow. For the closure in a deep water, Zhou et al.[18]built a theoretical model to calculate the slump of the dike head during the process of the cofferdam construction. For the closure on a deep-thickness covering riverbed, Li et al.[19]suggested some safety control countermeasures.

    However, the above-mentioned studies mainly focused on the flow characteristics and the stability of the closure materials, without much discussions on reducing the difficulty of the closure. In a general closure design, the closure dike advancing is regarded as a main approach to break the flow, hence the selection of an appropriate closure method, with a suitable size of the riprap, a dumping intensity, and a discharge capacity of diversion structures, is the main concern,which often means high costs in general. Since all the construction conditions could be taken as the results of the construction scheme, the flow characteristics during the closure dike filling progress can be considered as a disturbance caused by the closure system. And all kinds of closure methods, such as the wide dike, the double dikes, the multiple dikes and the transverse-end-dump, are to create an intentional situation for specified flow characteristics. Therefore, it is feasible and necessary improving the hydraulic characteristics at the closure gap and decreasing the closure difficulty through a temporary closure structure.

    Following the above idea and taking account of the diversion channel conditions: with a large closure discharge, a low discharge capacity of the diversion structure, high hydro-indicators in the closure gap, a smooth channel bed and the poor stability of closure materials, a method is proposed to reduce the difficulty of the channel closure by pre-building an auxiliary closure structure called the backwater-sill, as shown in Fig.1. Before the excavation construction of the diversion channel, the upstream and downstream cofferdams will be constructed previously to ensure that the diversion channel can be constructed on a dry ground,which provides a convenient condition for the installation of the backwater-sill. There are three ways to install the backwater-sill. If the bedrock is of good quailty, the backwater-sill can be installed by reserving and reinforcing the rock ridge. If the bedrock is of loose rubble, the backwater-sill can be installed by pouring concrete or installing a rock-filled steel cage. The backwater-sill is essentially a low submerged groin, with little impact on the discharge capacity of the diversion channel in a flood season. The intention of the backwater-sill is to raise the water level at the downstream toe of the closure gap, lower the flow velocity at the closure gap, save the closure materials and finally reduce the difficulty of the channel closure.

    Fig.1 Schematic diagram of end-dump closure with the assistance of backwater-sill

    In this paper, the 3-D Reynolds Averaged Navier-Stokes equations and the two-equation RNG -kε turbulence model are employed to investigate the influence of the backwater-sill on the flow pattern at the closure gap of the end-dump closure, and the hydroindicators of the end-dump closure with the assistance of the backwater-sill and its calculation method are proposed.

    Fig.2 Water surface profile at the closure gap of the backwatersill assisted closure

    1. Analyses of hydro-indicators at the closure gap

    As shown in Fig.2, according to the energy equation between the cross sections 0-0 and 3-3,

    where H, 0α and 0v, respectively, denote the water depth, the kinetic energy correction factor and the velocity at section 0-0, g is the acceleration of gravity,P is the height of the backwater-sill,3h,3α and3v,respectively, denote the water depth, the kinetic energy correction factor and the velocity at section 3-3,1ξ is the local head loss coefficient of the closure gap inlet,2ξ is the local head loss coefficient of the backwatersill, λ is the friction factor of the head loss between sections 0-0 and 3-3.

    Let

    where0H is the total head at section 0-0, φ is the flow rate coefficient.

    From Eqs.(1)-(3), we have

    Let

    where γ is the submerged coefficient,kh is the critical depth of the cross section 3-3, q is the discharge per unit width.

    From Eqs.(4)-(7), we have

    Let

    then

    where0m is the discharge coefficient.

    According to the energy equation and the continuity equation between the cross sections 2-2 and 3-3,we have

    where2β,2α and2v, respectively, denote the nonhydrostatic coefficient, the kinetic energy correction factor and the flow velocity at section 2-2,2λ is the friction factor of the head loss between sections 2-2 and 3-3.

    From Eqs.(5), (6), (11), we have

    Let

    then

    From Eqs.(10), (12), (16), we have

    Equation (17) can be solved implicitly for2h and hence for the closure drop2Z if the total head0H,and the discharge coefficients0m and1m are known. H0is typically close to H. The affecting factors and the relationships will be developed below to determine the discharge coefficients0m and1m.The water depth at the axis section of the closure gap which is normal to the flow direction is the foundation of the calculation of other hydro-indicators. Practice shows that the factors affecting the flow depth at the axis section are complex. Zhao et al.[20]suggested that the closure drop between sections 0-0 and 1-1 should be determined by a test curve,

    then

    where1Z is the closure drop between sections 0-0 and 1-1, 1h is the flow depth at the axis section of the closure gap which is normal to the flow direction.

    2. Mathematical model and its numerical method

    2.1Mathematical model

    2.1.1Governing equations

    The flow at the closure gap is governed by the continuity and Reynolds averaged Navier-Stokes equations.

    The continuity equation is as follows

    And the Navier-Stokes equation is as follows

    wherexu,yu and zu are the velocity components in x, y and z directions, respectively,iu,iG andif,respectively, denote the velocity component, the acceleration due to gravity and the viscous forces in the i direction, where i can be the x, y and z directions,ρ is the fluid density, and p is the pressure on the fluid microelement.

    The RNG -kε model is accurate in simulating the flow with streamlines of large strain rates and large degrees of curvature, and is suitable for analyzing a complex flow with large curvature, rotation and separation[21]. This model is adopted to simulate the complex flow at the closure gap.

    Fig.3 Schematic diagram of mesh (m)

    Fig.4 The layout of measurement points at the closure gap of model test

    Fig.5 The flow pattern at the closure gap

    k-equation

    ε-equation

    Table 1 Comparison of the simulation results and experimental results

    where μ is the molecule viscosity coefficient,tμ is the turbulent viscosity coefficient, which can be obtained from the turbulent energy k and the turbulent energy dissipation rate ε, Cμ=0.0845, Gkis the production of the turbulence kinetic energy due to the velocity gradients, Gk=μt(?μi/?xj+?μj/?xi)(?μi/?xj), αk, αεare respectively, the turbulence Prandtl numbers for k and ε,==1.39,=-η(1-η/)/(1+βη3),, C, β and η are the2ε0empirical coefficients, C2ε=1.68, C1ε=1.42, β=modulus of the mean strain tensor.

    2.1.2Boundary conditions

    The interfaces between the water and the riverbed are rigid boundaries, where the boundary condition is the no-slip condition. The inflow boundary is a specified pressure boundary, and the outflow boundary is the free flow boundary or a specified pressure boundary.

    The boundary condition of the water-air interface is treated by the VOF method, which was first proposed by Hint, see Refs.[22,23]. The basic principle is to determine the position and the shape of the saturated surface by solving the function F, which is defined as the ratio of the fluid volume over the total volume in a computational cell. There are three cases for the water volume fraction, namely: =0F, =1F and 01F<<, which means, respectively, that the cell is full of gas, full of water and contains the water-air interface[24]. The saturated surface can be obtained by solving the following transport equation

    2.2Numerical method

    In the numerical simulation, structured rectangular grids are used and mesh-nesting techniques are adopted to cut down the number of grids, as shown in Fig.3. The finite volume method (FVM) is used to discretize the governing equations over the control volume, and the GMRES algorithm[25]is used to handle the coupling between the pressure and the velocity in the numerical simulation.

    2.3Validation

    To verify the accuracy of the numerical model in simulating the flow at the closure gap, a comparative analysis is performed based on the results of physical model tests and those of numerical calculations. The channel model is 2 m wide and 12 m long, with overflow weirs for discharge. The top width of the closure dike is 0.5 m and the bottom width is 0.8 m. The backwater-sill is 0.6 m long, 0.025 m high and 0.086 m wide. The flow discharge is 0.05 m3/s. In the experiment, the point velocity and the water level are measured with the handheld current meter and the level gauge.

    The measuring point layout at the closure gap is shown in Fig.4. Figure 5 is a photograph of the flowpattern at the closure gap. Only a 5 m long channel,2.5 m upstream of the closure dike axis, is taken as the computational domain. The upstream water depth and the downstream water depth of the closure gap measured in the physical model are used as boundary conditions in the numerical model. In the numerical model,the roughness of the channel, the backwater-sill and the closure dike are, respectively, 0.013, 0.013 and 0.037. A comparison between the simulation results and the experimental data is presented in Table 1 and Fig.6. The simulation results generally agree with the experimental data.

    Fig.6 Comparison of hydro-indicators at the closure gap between calculation and experiment

    2.4Conditions in the experiment

    The following analysis is related to the results of physical model tests and numerical simulation experiments. Table 2 shows the parameters evaluated. Results and discussions

    3. Results and discussions

    3.1Impact of the backwater-sill on the flow pattern at the closure gap

    In order to study the effect of the backwater-sill on the flow pattern at the closure gap, a comparative analysis of end-dump closure with or without the assistance of backwater-sill is made. The sizes of the diversion channel and the closure dike are the same as those of the physical model. The crest width of the closure gap is 0.6 m and the bottom width is 0.35 m,and the backwater-sill is 0.038 m high and 0.086 m wide. The inflow boundary of the model is a specified pressure boundary, and the water depth is 0.121 m. The outflow boundary of the model is a free flow boundary.

    Table 2 Range of parameters evaluated in study

    3.1.1Water free-surface

    The water free-surface contour maps of the single dike closure and the backwater-sill assisted closure are shown in Fig.7, where FD means flow direction and TFD means transverse to the flow direction. Along the flow path, the water level of the single dike closure always drops, while the water level of the backwatersill assisted closure first drops and then rises. The water level at the closure dike upstream the toe of the backwater-sill assisted closure is 0.115 m and the water level at the downstream toe is 0.100 m. In contrast, the water level at the closure dike upstream the toe of the single dike closure is 0.110 m and the water level at the downstream toe is 0.060 m. These results indicate that the backwater-sill is quite effective in raising the water level at the downstream toe of the closure dike while having little influence on the water level at the upstream toe. The total drops of the backwater-sill assisted closure and the single dike closure are mostly the same, approximately, 0.08 m. The dropbetween the upper toe and the downstream toe of the closure dike of the single dike closure is 0.05 m,whereas the drop of the backwater-sill assisted closure is 0.01 m. The backwater-sill has the effects of raising the water level at the downstream toe of the closure gap, dividing the closure drop into two parts and decreasing the water surface gradient at the closure gap.

    Fig.7 Contour map of water free-surface at the closure gap (m)

    Fig.8 Contour map of average depth velocity at the closure gap (m/s)

    3.1.2Average depth velocity

    The distribution of the average depth velocity at the closure gap is shown in Fig.8. The backwater-sill has little influence on the flow velocity at the upstream of the closure dike. The average depth velocity in the single dike closure increases sharply along the flow path with the average depth velocity at the dike axis which is perpendicular to the flow line of 0.9 m/s. The average depth velocity changes little at the upper section of the backwater-sill with the average depth velocity of the dike axis which is perpendicular to the flow line of 0.5 m/s. The velocity increases rapidly as the water flows over the backwater-sill where the flow field has no effect on the size and the stability of the riprap. The average depth velocity at the closure dike upstream the toe of the backwater-sill assisted closure is 0.4 m/s and the average depth velocity at the closure dike downstream the toe is 0.5 m/s. In contrast, in the single dike closure scheme, the average depth velocity at the closure dike upstream the toe is 0.55 m/s and the average depth velocity at the downstream toe is 0.95 m/s. The backwater-sill has the effect of reducing the flow velocity significantly at the closure gap, decreasing the size of the riprap required, thus reducing the difficulty of the closure.

    Fig.9 Contour map of channel-bed velocity at the closure dike (m/s)

    3.1.3Channel-bed flow velocity

    The flow velocity distribution at the channel-bed of the closure gap is shown in Fig.9. The channel-bed velocity of the single dike closure increases along the flow path, between the upper and downstream toes of the closure dike, resulting in an increase of the riprap loss and is not conducive to the stability of the riprap. The channel-bed velocity of the backwater-sill assisted closure first increases and then decreases. There is a low channel-bed flow velocity region in front of the backwater-sill that maintains the stability of the riprap. The channel-bed velocity at the closure dike downstream the toe of the backwater-sill assisted closure is0.2 m/s, which is far less than that at the single dike closure of 1.0 m/s.

    Table 3 Summary of the main hydro-indicators at the closure gap

    3.2Sensitivity analysis of backwater-sill assisted closure

    The important specifications of the closure design with backwater-sill include parameters as follows: the closure dike width (CDW), the closure gap width(CGW), the backwater-sill width (BWSW) and the backwater-sill height (BWSH). The influence of the four aforementioned factors on the difficulty of the river closure could be analyzed by changing the CDW(0.25 m, 0.50 m, 0.75 m), the CGW (with bottom width of 0.2 m, 0.35 m and 0.5 m, crest width of 0.45 m, 0.60 m and 0.75 m), the BWSW (0.043 m,0.086 m, 0.129 m, 0.172 m), and the BWSH (0 m,0.013 m, 0.025 m, 0.038 m, 0.050 m), respectively, on the basis of Section 3.1.

    As shown in Table 3 and Fig.10, where WTF means water free-surface, with the increase of the closure dike width, the water free-surface at the closure gap becomes more gentle, the water depth at the axis of the closure dike decreases slightly, the average velocity at the axis section of the closure dike increases slightly, the discharge per unit width of the closure gap and the closure drop between the upstream of the closure dike and the downstream toe of the closure dike basically stay the same. With the increase of the closure gap width, the water level at the downstream toe of the closure dike increases slightly, the closure drop between the upstream and the downstream toe of the closure dike decreases slightly, the average velocity at the axis section of the closure dike and the discharge per unit width of the closure gap basically stay the same. With the increase of the back-water-sill width,the water level at the downstream toe of the closure dike increases slightly, the closure drop between the upstream and the downstream toe of the closure dike,the average velocity at the axis section of the closure dike, and the discharge per unit width of the closure gap decrease slightly at a decreasingly slow rate. This is due to the fact that with the increase of the backwater-sill width, the behavior of the backwater-sill turns from that of a thin-plate weir to that of a broadcrested weir, while the discharge capacity decreases slightly at a decreasingly slow rate. The height of the backwater-sill has a great impact on the flow pattern at the closure gap. Higher backwater-sill results in more obvious backwater effects, gentler upstream flow patterns, and lower hydro-indicators at the closure gap.

    The results show that the height of the backwatersill is the main factor affecting the hydro-indicators at the closure gap, such as the flow discharge, the closure drop and the flow velocity, while the influences of the width of the closure dike, the width of the closure gap and the width of the backwater-sill can be ignored.

    3.3Hydraulic calculation of closure gap

    According to the above analysis, the flow pattern at the closure gap is mainly affected by the height of the backwater-sill, so are the hydro-indicators at the closure gap. The discharge coefficients0m and1m can be expressed as functions of the height of the backwater-sill P. Based on the results of numerical simulations and physical model tests in Section 2.4,the empirical formulas of the discharge coefficients m0and m1can be obtained by the regression analysis.

    Figure 11 shows the relationship between m0and P/(H-P). Using the computer program Statistical Package for Social Sciences (SPSS), v19, a non-linear regression analysis is performed. The resulting regression equation, with a coefficient of determination=0.804, is

    Fig.11 Discharge coefficient m0versus P/(H-P)

    Figure 12 shows the relationship between1m and P/(h2-P). Using the computer program statistical package for social sciences (SPSS), v19, a non-linear regression analysis is performed. The resulting regression equation, with20.721 R=, is

    Fig.12 Discharge coefficient m1versus P/(h2-P)

    Figure 13 shows the relationship between1/ZH and2/ZH. Using the computer program SPSS, v19,a non-linear regression analysis is performed. The resulting regression equation, with a coefficient of determination=0.819, is

    Fig.131/ZH versus2/ZH

    4. Conclusions

    For a particular river closure project, the hydroindicators at the closure gap are the key factors in determining the extent of the closure difficulty. The river closure is carried out under special conditions,and the hydro-indicators at the closure gap can be reduced by an auxiliary closure structure. Under the diversion channel conditions, an auxiliary closure structure is proposed, named the backwater-sill by prebuilding it at the downstream toe of the closure gap in the diversion channel to reduce the difficulty of the channel closure.

    A 3-D mathematical model is employed to simulate and analyze the influence of the backwater-sill on the flow pattern at the closure gap of the end-dump closure with a single closure dike. The simulation results agree well with the results of physical model tests. Both results show that the backwater-sill has the effect of increasing the water level at the downstream toe of the closure dike, and decreasing the water surface gradient along the flow path upstream the back-water-sill,therefore the flow pattern at the closure gap becomes gentle and the velocity decreases. The sensitive analysis of the indicators shows that the backwater-sill height is the key factor that influences the flow pattern while the influence of the widths of the closure dike,the closure gap and the backwater-sill can be ignored. The higher the backwater-sill is, the lower the hydroindicators will be.

    Discharge per unit width of the closure gap, the water depth and the velocity at the axis of the closure dike, and the closure drop between the upstream and the downstream of the closure dike are the main factors in estimating the difficulty of the closure. As the backwater-sill has the effect of increasing the water level at the downstream toe of the closure dike, the drop between the upstream of the closure dike and the downstream toe of the closure dike is employed to replace the closure drop between the upstream and the downstream of the closure dike in the hydraulic calculation. According to the theoretical analysis, the hydroindicator computational formulas of the end-dump closure with the assistance of the backwater-sill are deduced, which would provide a basis of the closure design.

    Acknowledgements

    The authors would like to thank QIU Ya-feng,ZHOU Jian, XIONG Yi, ZHENG Qiang and ZHU Wei for their help to complete the model test, and thank WANG Xin, SHU Wan for their help of proofreading the manuscript.

    References

    [1]DAI Hui-chao, HU Chang-shun and ZHU Hong-bing. The development of theory and science technology on diversion and closure of river[J]. Journal of Hydroelectric Engineering, 2005, 24(4): 78-83(in Chinese).

    [2]BO Lin, GUO Hong-min and LIU Li-zhong. An understanding of difficulty and its countermeasures in river closure with end dumping method[J]. Journal of Yangtze River Scientific Research Institute, 2001, 18(4): 7-8(in Chinese).

    [3]MENG Y., JIANG D. and JIN H. et al. Hydraulic analysis of Huaihe closure for Linhuaigang flood control project[C]. Advances in Water Resources and Hydraulic Engineering-Proceedings of 16th IAHR-APD Congress and 3rd Symposium of IAHR-ISHS. Nanjing, China, 2009, 1026-1031.

    [4]HU Zhi-gen, MENG De-qian and HUANG Tian-run et al. Experimental study on hydraulic characteristics of gap in end-dumping closure with single embankment[J]. Journal of Hydraulic Engineering, 2011, 42(4): 414-418(in Chinese).

    [5]WU B. S., MOLINAS A. Energy losses and threshold conditions for choking in channel contractions[J]. Journal of Hydraulic Research, 2005. 43(2): 139-148.

    [6]CHIANG T. P., SAU A. and HWANG R. R. Asymmetry and bifurcations in three-dimensional sudden-contraction channel flows[J]. Physical Review E Statistical, Nonlinear and Soft Matter Physics, 2011, 83(4): 1-14

    [7]KOKEN M., CONSTANTINESCU G. An investigation of the flow and scour mechanisms around isolated spur dikes in a shallow open channel: 2. Conditions corresponding to the final stages of the erosion and deposition process[J]. Water Resources Research, 2008, 66(22): 297-301.

    [8]LU Yong-jin, DU Xiao-tao. Research on the hydraulic characteristics of gap closing with large framed cages[J]. Journal of Hydrodynamics, 2010, 22(5): 975-979.

    [9]WANG G., WU B. and XIA J. Modeling of the diversion channel closure for the third stage of the Three Gorges Project[J]. International Journal of Sediment Research,2004, 19(1): 75-82.

    [10] CHEN K. F., SHEN J. Hydraulics characteristics of the close gap in large-scale beach reclamation works in radial sandbanks[J]. Applied Mechanics and Materials, 2012,204-208: 2379-2383.

    [11] CHOI B. H., HA Jae Wan and KO Kwang Oh et al. Tidal forecast for final closure of saemangeum tidal dike[J]. China Ocean Engineering, 2010, 24(3): 467-480.

    [12] HA J. W., EO D and KIM K. O. et al. Final closure of the saemangeum tidal dike, South Korea[J]. Proceedings of the Institution of Civil Engineers-Maritime Engineering, 2010, 163(4): 147-156.

    [13] Van Der SANDE M. B. Computational modeling on the final closure gaps in the Saemangeum dam[D]. Doctoral Thtsis, Delft, The Netherlands: Delft University of Technology, 2006.

    [14] HOAN N. T., STIVE M. J. F. and BOOIJ R. et al. Stone stability in non-uniform flow[J]. Journal of Hydraulic Engineering, ASCE, 2011, 137(9): 884-893..

    [15] ESCARAMEIA M., MAY R. W. P. Stability of riprap and concrete blocks in highly turbulent flows[J]. Ice Proceedings Water Maritime and Energy, 1995, 112(3): 227-237.

    [16] DAS B. P. Stability of rockfill in end-dump river closures[J]. Journal of the Hydraulics Division, 1967, 98: 1947-1967.

    [17] ELKHOLY M., CHAUDHRY M. H. Investigations on the trajectory of large sandbags in open channel flow[J]. Journal of Hydraulic Engineering, ASCE, 2012,138(12): 1060-1068.

    [18] ZHOU Hou-gui, LIU Guang-ting and WANG Guang-qian. Calculation and prediction of the dyke end slump for deep water closure of the Three Gorges Project[J]. Journal of Tsinghua University (Science and Technology), 2002,42(2): 87-89(in Chinese).

    [19] LI X., HUANG G. and CHENG Z. Deep-thickness covering layer riverbed closure difficulty and safety control countermeasures[C]. International Symposium on Hydraulic Physical Modeling and Field Investigation. Nanjing, China, 2010.

    [20] ZHAO J., ZHANG H. and CHEN Z. et al. On-the-fly measurements of large-drop water level and high flow velocity in the closure gap[J]. Flow Measurement and Instrumentation, 2015, 45: 198-206.

    [21] WANG Wen, HUAI Wen-xin and GAO Meng. Numerical investigation of flow through vegetated multi-stage compound channel[J]. Journal of Hydrodynamics, 2014. 26(3): 467-473.

    [22] ZHANG Jian-ming, CHEN Jian-gang and XU Wei-lin et al. Three-dimensional numerical simulation of aerated flows downstream sudden fall aerator expansion-in a tunnel[J]. Journal of Hydrodynamics, 2011, 23(1): 71-80.

    [23] ZHONG Deng-hua, ZHANG Xiao-xin and AO Xue-fei et al. Study on coupled 3D seepage and stress fields of the complex channel project[J]. Science China Technological Sciences, 2013, 56(8): 1906-1914.

    [24] JIANG Chang-bo, DENG Bin and HU Shi-xiong et al. Numerical investigation of swash zone hydrodynamics[J]. Science China Technological Sciences, 2013, 56(12): 3093-3103.

    [25] ZHAO L., OUYANG J. and ZHOU W. et al. The simpler GMRES method combined with finite volume method for simulating viscoelastic flows on triangular grid[J]. Advances in Engineering Software, 2015, 87: 57-67.

    (November 14, 2015, Revised April 6, 2016)

    * Project supported by the National Natural Science Foundation of China (Grant No. 51279137).

    Biography: He LU (1988-), Male, Ph. D. Candidate

    Zhi-gen HU,

    E-mail: zhigenhu@163.com

    精品久久久久久,| 下体分泌物呈黄色| 久久久久久久久免费视频了| 黄色怎么调成土黄色| 久久 成人 亚洲| 精品国产国语对白av| 免费日韩欧美在线观看| 亚洲色图av天堂| 妹子高潮喷水视频| 亚洲少妇的诱惑av| 午夜福利乱码中文字幕| 91av网站免费观看| 亚洲免费av在线视频| 亚洲中文日韩欧美视频| 欧美日韩亚洲高清精品| 一本一本久久a久久精品综合妖精| cao死你这个sao货| 精品熟女少妇八av免费久了| 狠狠狠狠99中文字幕| 亚洲精品粉嫩美女一区| 国产高清激情床上av| 精品人妻1区二区| 欧美 日韩 精品 国产| 99久久人妻综合| 在线观看一区二区三区激情| 亚洲精品久久成人aⅴ小说| 亚洲久久久国产精品| 老司机影院毛片| 日本a在线网址| 国产精品 国内视频| 国产av又大| 国产97色在线日韩免费| 在线观看舔阴道视频| 久久国产精品影院| 国产蜜桃级精品一区二区三区 | 男女高潮啪啪啪动态图| 成人特级黄色片久久久久久久| 久久久精品免费免费高清| 国产伦人伦偷精品视频| 人妻久久中文字幕网| 99国产精品一区二区三区| 涩涩av久久男人的天堂| 日韩欧美免费精品| 亚洲精品国产一区二区精华液| 欧美国产精品va在线观看不卡| 极品少妇高潮喷水抽搐| 久久99一区二区三区| 欧美成人免费av一区二区三区 | 国产精品二区激情视频| 日韩有码中文字幕| 欧美日韩国产mv在线观看视频| 老熟女久久久| 亚洲欧美一区二区三区黑人| 色尼玛亚洲综合影院| 777久久人妻少妇嫩草av网站| 亚洲国产看品久久| 69av精品久久久久久| 一级片'在线观看视频| 免费日韩欧美在线观看| 亚洲精品一二三| 18禁裸乳无遮挡免费网站照片 | 精品国产一区二区三区四区第35| 1024视频免费在线观看| 高潮久久久久久久久久久不卡| 国产无遮挡羞羞视频在线观看| 日本精品一区二区三区蜜桃| 国产欧美日韩综合在线一区二区| 成人精品一区二区免费| 国产精品久久久av美女十八| 大型av网站在线播放| 欧美成人免费av一区二区三区 | 久久中文字幕一级| 成人三级做爰电影| 日日爽夜夜爽网站| 制服人妻中文乱码| 国产精品一区二区在线观看99| 久久中文字幕一级| 叶爱在线成人免费视频播放| 亚洲av电影在线进入| 久久99一区二区三区| 一级作爱视频免费观看| 一级片'在线观看视频| 国产精品电影一区二区三区 | 高清视频免费观看一区二区| 在线看a的网站| 别揉我奶头~嗯~啊~动态视频| 大片电影免费在线观看免费| 国产1区2区3区精品| 精品福利观看| 黑人巨大精品欧美一区二区蜜桃| 国产精品免费一区二区三区在线 | 国产激情久久老熟女| 淫妇啪啪啪对白视频| 亚洲精品中文字幕在线视频| 极品教师在线免费播放| 少妇的丰满在线观看| 757午夜福利合集在线观看| 精品视频人人做人人爽| 久9热在线精品视频| 国精品久久久久久国模美| 大型黄色视频在线免费观看| 亚洲国产精品一区二区三区在线| 最近最新中文字幕大全电影3 | 午夜福利乱码中文字幕| 成人亚洲精品一区在线观看| 如日韩欧美国产精品一区二区三区| 怎么达到女性高潮| 欧美精品高潮呻吟av久久| 最近最新中文字幕大全免费视频| 黄片播放在线免费| 三上悠亚av全集在线观看| 久久精品人人爽人人爽视色| 国产成人免费观看mmmm| 超碰成人久久| 国产精品免费一区二区三区在线 | 亚洲欧美激情在线| 在线天堂中文资源库| 热99re8久久精品国产| 在线观看舔阴道视频| 啦啦啦免费观看视频1| 国产精品 国内视频| 久久久久久久久免费视频了| 老熟妇仑乱视频hdxx| 老司机影院毛片| 婷婷丁香在线五月| 精品国产超薄肉色丝袜足j| 日韩三级视频一区二区三区| 中出人妻视频一区二区| 亚洲中文字幕日韩| 久久精品人人爽人人爽视色| 可以免费在线观看a视频的电影网站| 亚洲专区字幕在线| 亚洲国产欧美日韩在线播放| 91大片在线观看| 男女之事视频高清在线观看| 一级片免费观看大全| 母亲3免费完整高清在线观看| 99香蕉大伊视频| svipshipincom国产片| 欧美性长视频在线观看| 国产日韩欧美亚洲二区| 在线天堂中文资源库| 色精品久久人妻99蜜桃| 中文字幕色久视频| 午夜日韩欧美国产| 国产高清视频在线播放一区| 另类亚洲欧美激情| 啪啪无遮挡十八禁网站| 可以免费在线观看a视频的电影网站| 午夜激情av网站| 午夜福利,免费看| bbb黄色大片| 亚洲av片天天在线观看| 另类亚洲欧美激情| 欧美丝袜亚洲另类 | 欧美国产精品一级二级三级| 伊人久久大香线蕉亚洲五| 少妇裸体淫交视频免费看高清 | 成人三级做爰电影| 日韩免费av在线播放| 国产有黄有色有爽视频| 两个人看的免费小视频| 亚洲专区中文字幕在线| 中国美女看黄片| 精品第一国产精品| 91成人精品电影| 免费人成视频x8x8入口观看| 精品第一国产精品| 久久精品国产a三级三级三级| 久久人妻福利社区极品人妻图片| 久久人人爽av亚洲精品天堂| 日本欧美视频一区| 后天国语完整版免费观看| 看黄色毛片网站| 天天影视国产精品| 18禁黄网站禁片午夜丰满| 免费在线观看视频国产中文字幕亚洲| 亚洲精品一二三| 一级作爱视频免费观看| 亚洲va日本ⅴa欧美va伊人久久| 精品国产美女av久久久久小说| 在线观看免费午夜福利视频| 变态另类成人亚洲欧美熟女 | 18禁国产床啪视频网站| 久久久国产成人精品二区 | 日韩欧美一区视频在线观看| 国产精品秋霞免费鲁丝片| 女性被躁到高潮视频| 国产免费av片在线观看野外av| av福利片在线| 免费日韩欧美在线观看| 色94色欧美一区二区| 午夜久久久在线观看| 老汉色∧v一级毛片| 91av网站免费观看| 国产在线精品亚洲第一网站| 99国产极品粉嫩在线观看| a级毛片在线看网站| 精品一区二区三区av网在线观看| tube8黄色片| 成人手机av| 精品国内亚洲2022精品成人 | 亚洲欧美激情综合另类| 曰老女人黄片| 99精国产麻豆久久婷婷| 欧美最黄视频在线播放免费 | 十八禁网站免费在线| 国产单亲对白刺激| 成人特级黄色片久久久久久久| 大陆偷拍与自拍| 国产精品永久免费网站| 国产一区有黄有色的免费视频| 国产色视频综合| 久久精品亚洲精品国产色婷小说| 中文字幕人妻丝袜一区二区| 国产精品 欧美亚洲| 大型黄色视频在线免费观看| 中文欧美无线码| 一本综合久久免费| 亚洲精品国产精品久久久不卡| 精品午夜福利视频在线观看一区| www.自偷自拍.com| 亚洲熟女精品中文字幕| 麻豆成人av在线观看| 黄色视频,在线免费观看| 国产人伦9x9x在线观看| 精品视频人人做人人爽| 久久久精品国产亚洲av高清涩受| 久久久精品区二区三区| 国产精品 国内视频| 国产成人精品久久二区二区免费| 日本精品一区二区三区蜜桃| 亚洲国产中文字幕在线视频| 精品久久久久久,| 波多野结衣一区麻豆| 色老头精品视频在线观看| 五月开心婷婷网| 国内久久婷婷六月综合欲色啪| 人人妻,人人澡人人爽秒播| 99riav亚洲国产免费| 无限看片的www在线观看| 亚洲精品美女久久久久99蜜臀| 欧美另类亚洲清纯唯美| 无遮挡黄片免费观看| 亚洲色图 男人天堂 中文字幕| 老司机深夜福利视频在线观看| 老汉色av国产亚洲站长工具| 91大片在线观看| 欧美精品高潮呻吟av久久| av福利片在线| 身体一侧抽搐| 91国产中文字幕| 久久久久国产精品人妻aⅴ院 | 色老头精品视频在线观看| 日韩熟女老妇一区二区性免费视频| 高清在线国产一区| 国产精品香港三级国产av潘金莲| 精品久久久久久电影网| 久久久久久免费高清国产稀缺| 男女免费视频国产| 中文字幕高清在线视频| 免费在线观看完整版高清| 精品欧美一区二区三区在线| 村上凉子中文字幕在线| 日本撒尿小便嘘嘘汇集6| 久久久久久免费高清国产稀缺| 99国产精品一区二区蜜桃av | 母亲3免费完整高清在线观看| netflix在线观看网站| 亚洲,欧美精品.| 中出人妻视频一区二区| 久久久国产欧美日韩av| 美女 人体艺术 gogo| 建设人人有责人人尽责人人享有的| 精品免费久久久久久久清纯 | 亚洲av欧美aⅴ国产| 日韩成人在线观看一区二区三区| 精品久久久久久电影网| 欧美+亚洲+日韩+国产| 亚洲人成电影观看| 在线观看66精品国产| 亚洲av第一区精品v没综合| 精品国产乱子伦一区二区三区| 一区二区日韩欧美中文字幕| 熟女少妇亚洲综合色aaa.| 99久久人妻综合| 成人黄色视频免费在线看| 久久国产精品影院| 久久精品91无色码中文字幕| 一边摸一边抽搐一进一出视频| 天天添夜夜摸| 久久精品国产综合久久久| 精品人妻熟女毛片av久久网站| 多毛熟女@视频| 老熟女久久久| 别揉我奶头~嗯~啊~动态视频| 久久香蕉精品热| 丝袜美腿诱惑在线| 9191精品国产免费久久| 欧美日韩中文字幕国产精品一区二区三区 | 美女视频免费永久观看网站| 青草久久国产| 久久国产精品影院| 久久99一区二区三区| 久久 成人 亚洲| 一进一出好大好爽视频| 丰满人妻熟妇乱又伦精品不卡| 国产在线观看jvid| 久久精品国产99精品国产亚洲性色 | 99久久精品国产亚洲精品| 丝袜在线中文字幕| 男人的好看免费观看在线视频 | 久久精品国产清高在天天线| 一级片'在线观看视频| 精品亚洲成国产av| 无人区码免费观看不卡| 老熟妇乱子伦视频在线观看| 97人妻天天添夜夜摸| 黑人操中国人逼视频| 老熟女久久久| 久久精品国产亚洲av高清一级| 欧美久久黑人一区二区| 日韩制服丝袜自拍偷拍| a级毛片在线看网站| 成人18禁高潮啪啪吃奶动态图| 国产成人欧美| 亚洲av日韩在线播放| 老司机午夜福利在线观看视频| 国产在视频线精品| 精品一区二区三卡| 国产精华一区二区三区| 看黄色毛片网站| 精品一品国产午夜福利视频| 亚洲熟女精品中文字幕| 亚洲一区二区三区不卡视频| av视频免费观看在线观看| 一级作爱视频免费观看| 热99国产精品久久久久久7| 亚洲第一青青草原| 国产精品秋霞免费鲁丝片| 国产精品99久久99久久久不卡| 亚洲精品国产精品久久久不卡| 无人区码免费观看不卡| 国产精品99久久99久久久不卡| 欧美激情极品国产一区二区三区| 最近最新中文字幕大全电影3 | 大香蕉久久成人网| 精品一区二区三区视频在线观看免费 | 国产成人精品在线电影| 色综合婷婷激情| 国产精品.久久久| 日日摸夜夜添夜夜添小说| 国产欧美亚洲国产| 国产激情欧美一区二区| 欧美午夜高清在线| 两个人看的免费小视频| 国产一区二区三区综合在线观看| 国精品久久久久久国模美| 国产欧美亚洲国产| 午夜日韩欧美国产| 免费观看人在逋| 又黄又粗又硬又大视频| 69av精品久久久久久| 欧美激情久久久久久爽电影 | 国产一区二区三区在线臀色熟女 | 久久久国产欧美日韩av| 精品欧美一区二区三区在线| 在线观看免费视频网站a站| 熟女少妇亚洲综合色aaa.| 精品视频人人做人人爽| www.精华液| 久久精品国产亚洲av香蕉五月 | 在线天堂中文资源库| 窝窝影院91人妻| 亚洲精品国产精品久久久不卡| 丁香六月欧美| 极品教师在线免费播放| 757午夜福利合集在线观看| 国产成人精品无人区| 又黄又爽又免费观看的视频| 麻豆av在线久日| 国产视频一区二区在线看| 99riav亚洲国产免费| 日韩中文字幕欧美一区二区| 国产欧美日韩一区二区精品| 嫩草影视91久久| 视频区图区小说| 人人妻,人人澡人人爽秒播| 日本撒尿小便嘘嘘汇集6| 国产野战对白在线观看| 久久久国产一区二区| 亚洲片人在线观看| 久久影院123| 亚洲成av片中文字幕在线观看| 黄色a级毛片大全视频| 国产精品二区激情视频| 中文字幕高清在线视频| 黄频高清免费视频| 国产乱人伦免费视频| 久久亚洲真实| 欧美乱色亚洲激情| 老鸭窝网址在线观看| 少妇 在线观看| 欧美亚洲 丝袜 人妻 在线| 亚洲精品在线美女| 视频区图区小说| 亚洲少妇的诱惑av| 欧美另类亚洲清纯唯美| 黄片小视频在线播放| 国产成人av激情在线播放| 成年人免费黄色播放视频| 一级毛片精品| 精品国产乱码久久久久久男人| 国产精品乱码一区二三区的特点 | 香蕉丝袜av| 女性被躁到高潮视频| 亚洲五月天丁香| 亚洲熟女毛片儿| 如日韩欧美国产精品一区二区三区| 老熟妇仑乱视频hdxx| 精品久久久久久电影网| 精品国产一区二区三区四区第35| 中文字幕最新亚洲高清| 久久久水蜜桃国产精品网| 午夜日韩欧美国产| 国产成人精品久久二区二区91| 青草久久国产| 极品教师在线免费播放| 亚洲欧洲精品一区二区精品久久久| 国产欧美日韩一区二区三区在线| 人人妻人人澡人人爽人人夜夜| 午夜成年电影在线免费观看| 亚洲伊人色综图| 中文欧美无线码| 久久久久久久国产电影| 国产成人免费观看mmmm| 亚洲片人在线观看| 我的亚洲天堂| 99在线人妻在线中文字幕 | 99精品欧美一区二区三区四区| 脱女人内裤的视频| 欧美激情高清一区二区三区| 国产精品久久久久成人av| 亚洲aⅴ乱码一区二区在线播放 | 99re6热这里在线精品视频| 一级片'在线观看视频| 黑人巨大精品欧美一区二区蜜桃| www.999成人在线观看| 99在线人妻在线中文字幕 | 丰满饥渴人妻一区二区三| 成在线人永久免费视频| 成人影院久久| 久久婷婷成人综合色麻豆| 久久久久久久久久久久大奶| 老司机深夜福利视频在线观看| 精品久久久久久久毛片微露脸| 亚洲色图综合在线观看| 国产不卡av网站在线观看| 久久久久久亚洲精品国产蜜桃av| 999久久久国产精品视频| 亚洲熟女精品中文字幕| 国产亚洲一区二区精品| cao死你这个sao货| 欧美 亚洲 国产 日韩一| 亚洲九九香蕉| 在线国产一区二区在线| 欧美日本中文国产一区发布| 欧美成人免费av一区二区三区 | 欧美日本中文国产一区发布| 久久久久精品国产欧美久久久| 欧美亚洲日本最大视频资源| 国产精品久久久久久人妻精品电影| 91在线观看av| 亚洲男人天堂网一区| 国产单亲对白刺激| www.自偷自拍.com| 亚洲一区二区三区欧美精品| www日本在线高清视频| 欧美日韩乱码在线| 亚洲色图综合在线观看| 老汉色av国产亚洲站长工具| 黄片播放在线免费| 免费在线观看完整版高清| av天堂久久9| a级片在线免费高清观看视频| 国产精品 欧美亚洲| 一区二区日韩欧美中文字幕| 免费久久久久久久精品成人欧美视频| 日本欧美视频一区| 大码成人一级视频| 欧美精品高潮呻吟av久久| 亚洲免费av在线视频| 久久精品国产亚洲av香蕉五月 | 亚洲性夜色夜夜综合| 国产精品99久久99久久久不卡| 久久香蕉激情| 精品国产一区二区三区四区第35| 高潮久久久久久久久久久不卡| 亚洲九九香蕉| 欧美成人午夜精品| 国产麻豆69| 日韩欧美一区视频在线观看| 免费一级毛片在线播放高清视频 | 国产精品自产拍在线观看55亚洲 | 久久香蕉激情| 美女午夜性视频免费| 久久久久久久久免费视频了| 亚洲九九香蕉| 日本黄色视频三级网站网址 | 国产精品久久久人人做人人爽| 看免费av毛片| 国产成人精品无人区| 久久婷婷成人综合色麻豆| 国产成人欧美在线观看 | 王馨瑶露胸无遮挡在线观看| 亚洲av欧美aⅴ国产| 老熟妇仑乱视频hdxx| 成熟少妇高潮喷水视频| 久久久久精品人妻al黑| 岛国在线观看网站| 国产熟女午夜一区二区三区| 国产xxxxx性猛交| 亚洲精品久久午夜乱码| 最近最新中文字幕大全免费视频| 免费在线观看影片大全网站| 成熟少妇高潮喷水视频| 亚洲精品国产精品久久久不卡| 欧美激情久久久久久爽电影 | 久久久久国内视频| 国产在线一区二区三区精| 丰满人妻熟妇乱又伦精品不卡| 久久精品人人爽人人爽视色| 一级a爱视频在线免费观看| 无人区码免费观看不卡| 丰满的人妻完整版| 欧美乱码精品一区二区三区| 在线观看免费日韩欧美大片| 亚洲国产毛片av蜜桃av| 精品一区二区三区av网在线观看| 黄频高清免费视频| 飞空精品影院首页| 国产精品免费大片| 欧美日韩中文字幕国产精品一区二区三区 | 中亚洲国语对白在线视频| 亚洲全国av大片| 日韩欧美在线二视频 | 精品福利观看| 精品无人区乱码1区二区| 国产精品国产av在线观看| 久久精品国产综合久久久| 黄片大片在线免费观看| 国产一区有黄有色的免费视频| 高潮久久久久久久久久久不卡| 久久99一区二区三区| 国产欧美日韩一区二区三区在线| 国产精品欧美亚洲77777| 露出奶头的视频| 亚洲专区国产一区二区| 亚洲成a人片在线一区二区| 在线免费观看的www视频| 免费在线观看视频国产中文字幕亚洲| 一区在线观看完整版| 日韩精品免费视频一区二区三区| 亚洲中文日韩欧美视频| 十八禁人妻一区二区| 久久久国产欧美日韩av| 免费观看精品视频网站| 亚洲黑人精品在线| 伊人久久大香线蕉亚洲五| 国产人伦9x9x在线观看| 午夜亚洲福利在线播放| 亚洲国产欧美日韩在线播放| 法律面前人人平等表现在哪些方面| 90打野战视频偷拍视频| 亚洲三区欧美一区| 自拍欧美九色日韩亚洲蝌蚪91| 大香蕉久久网| 亚洲精品一卡2卡三卡4卡5卡| 日本vs欧美在线观看视频| 人人妻人人爽人人添夜夜欢视频| 久久久久国产精品人妻aⅴ院 | 一区福利在线观看| 亚洲午夜理论影院| 午夜精品在线福利| 午夜福利乱码中文字幕| 韩国av一区二区三区四区| 如日韩欧美国产精品一区二区三区| 精品视频人人做人人爽| 精品国产国语对白av| 午夜精品在线福利| 国产在线观看jvid| 亚洲情色 制服丝袜| 国产精品一区二区在线观看99| 欧美性长视频在线观看| 18禁裸乳无遮挡免费网站照片 | 国产午夜精品久久久久久| 久久国产精品影院| 久久久久视频综合| 女性生殖器流出的白浆| 国产亚洲精品久久久久久毛片 | 天堂动漫精品| 国产精品一区二区精品视频观看| 免费不卡黄色视频| 久久久水蜜桃国产精品网| 亚洲五月色婷婷综合| 狂野欧美激情性xxxx| 五月开心婷婷网| 建设人人有责人人尽责人人享有的| 自拍欧美九色日韩亚洲蝌蚪91| 90打野战视频偷拍视频| 国产无遮挡羞羞视频在线观看| 午夜成年电影在线免费观看| 免费观看人在逋| 好男人电影高清在线观看| 国产在线精品亚洲第一网站|