    Medium and small embankment dams on permafrost:A discussion of current concepts

    2014-12-15 05:55:36RudolfZhang
    Sciences in Cold and Arid Regions 2014年4期

    Rudolf V.Zhang

    Melnikov Permafrost Institute,Siberian Branch of the Russian Academy of Sciences,Yakutsk 677010,Russia

    1 Introduction

    In permafrost regions,the stability of small and medium embankment dams is largely controlled by their hydrothermal regime.The Russian building codeSNiP 2.06.05-84*(1991) provides two approaches to the design of embankment dams:

    ·Principle I involves preserving permafrost in the foundation throughout the construction and operation of the dam,and freezing the impervious zone before reservoir filling and keeping it frozen for the service life of the dam.

    ·Principle II allows the embankment to be founded on natural unfrozen materials,or the permafrost foundation to thaw to a predetermined depth before filling the reservoir;the impervious core is in the thawed condition.

    Embankment dams are classified according to the selected design approach into frozen,unfrozen,and frozen/unfrozen dams:

    ·In frozen dams the impervious core and the foundation are maintained in a frozen state to provide a solid impermeable barrier to water.No hydraulic connection exists between the upstream and downstream sides.

    ·In unfrozen dams the core and foundation,as well as part of the downstream shell,are in a thawed state and allow a limited amount of seepage to provide a hydraulic connection between the downstream and upstream.Limitations on the allowable quantity of seepage depend on stability considerations and required storage in the reservoir.

    ·In a frozen/unfrozen dam,the two approaches are combined to form a composite structure.Refrigeration devices are used at the unfrozen/frozen interfaces.Seepage is controlled by the complex thermal configuration across and along the dam.In cross section,the relative proportion of frozen and unfrozen zones is set so that a steady thermal balance would be established,ensuring the static and seepage stability of the dam.Typically,the frozen mass comprises most of the core cross section and the downstream shell,while the unfrozen zone encompasses the foundation of the upstream shell,parts of the core and downstream shell,and the foundation beneath and down the toe.The longitudinal section consists of alternating unfrozen and frozen "windows," with the steady thermal balance maintained.There is a hydraulic connection between the upstream and downstream sides of the dam.

    One more type,a seasonally freezing-thawing dam,has been identified by the present author and colleagues (Zhang,2000;Melnikov Permafrost Institute,2012).It is a seasonally operating dam in which water tightness is provided during spring floods by a seasonally frozen layer.This concept relies on the fact that thawing of the top ground layer frozen during the winter is still not complete by the time of water release from the temporary reservoir (the irrigation basin).There is therefore no need for artificial freezing of such dams.

    Thus,classification of dam types according to the thermal state is based on the hydrothermal regime of the water-retaining element during operation of the dam.

    It should be noted that no general consensus exists in the normative literature concerning the principles of constructing dams on permafrost.TheGuidelines for Design and Construction of Embankment Dams for Industrial and Domestic Water Supply in Far Northern and Permafrost Regions(Vodgeo Institute,1976) explicitly recommend that the combination of Principles I and II,as well as frozen and unfrozen designs at one dam site,be avoided.The departmental building codeVSN 30-83,Instruction for Design of Hydraulic Structures in Permafrost Regions,developed by the USSR Ministry of Energy (Minenergo SSSR,1983)and the national building codeSNiP 2.06.05-84*,Embankment Dams(Gosstroy USSR,1991) accept the combined use of two construction principles for the water barrier elements of a project.Moreover,where the river is underlain by a deep talik and the flood plain contains a thick layer of thaw-unstable permafrost,VSN 30-83recommends considering a composite design consisting of a concrete structure within the river channel flanked by earth embankments.The concrete section rests on an unfrozen foundation,while the embankment portion should be of the frozen type.It is recommended to use refrigeration systems in transition zones between the concrete section and embankment sections.

    The stability of frozen dams (Principle I) relies on the high strength and imperviousness to water of frozen ground.The frozen condition in dams and foundations can be achieved by natural or artificial freezing(Biyanov,1975;Zhang,1983;Biyanovet al.,1989).

    Dams with permanent reservoirs require artificial ground freezing.A frozen core can be created by placing the material in lifts for winter freezing,or by means of refrigeration systems operated year round or seasonally.The typical system is constructed of pipes through which a coolant is circulated.Refrigeration systems can be classified as closed or open type,and as passive or active,using natural convection or forced circulation,respectively.They use air,a liquid (e.g.,brines,kerosene),or a two-phase substance (e.g.,ammonia,freon) as the heat transfer media.

    Simple techniques from the past century still work well to maintain the frozen state of dams,such as snow removal from the crest and downstream slope,placement of a shelter on the downstream slope to keep snow off the dam surface and to provide cold air ventilation in winter and shade from the sun in summer,and using insulation on the crest and downstream slope.In recent years,new effective insulation and waterproofing materials,as well as albedo-changing techniques such as riprapping the dam crest and slopes with light-colored rocks or painting the surface white,have been used widely in combination with refrigeration systems.

    Unfrozen dams designed and constructed using Principle II require measures to protect the toe,crest,and downstream slope from freezing.The advantage of Principle II is that no special requirements are imposed on the layout of a dam relative to appurtenant structures of the development.

    VSN 30-83recommends Principle I (frozen dams)for sites where:

    ·The foundation is composed of ice-rich,thaw-unstable materials (thaw susceptibility class III,thaw strain >0.05);and/or

    ·The underflow is less than 3×10-5m/s,and the thickness of a talik is less than 15 m.

    Principle II (unfrozen dams) is preferable for sites where:

    ·The foundation consists of rocks or thaw-stable soils (thaw susceptibility class I or II,thaw strain<0.05);and/or

    ·The stream channel has a deep or open talik,while the valley slopes and flood plain consist of thaw susceptibility class I and II materials.

    Thus,embankment dams in permafrost regions operate in a complex thermal stress and hydrodynamic field.Maintaining the quasi-stable condition to provide the stability of the structure as a whole is a difficult engineering challenge.Experience in the permafrost regions with severe climate and complicated subsurface conditions has demonstrated that,quite often,embankment dams undergo a transition in thermal state,from frozen to thawed and from thawed to frozen.

    Where seepage through the embankment and foundation is low or nonexistent,the dams freeze from the surface.This was also confirmed by mathematical modelling (Zhang,1983).Among the dams which were naturally frozen during the operation period are the dams constructed in the north of the European part of Russia,Transbaikal,Yakutia,and Magadan Province for water supply and reclamation purposes(Tsvetkova,1960;Biyanovet al.,1989;Zhang,2002).The transition of embankment dams from the unfrozen to the frozen state leads to increased static and seepage stability.However,this process is associated with a number of frost-related problems.For example,freezing of the earth core may result in its cracking,while freezing of the drainage elements will increase the risk of piping due to the rise of the seepage line.The crest and slopes may be subject to frost heave and,upon thawing,to settlement,solifluction,and thermal erosion.Complicated geocryological processes result from freezing in rockfill embankments where the thermal regime is largely determined by convective heat exchange with ambient air.At the Vilyui Hydro-1,2 dam,for example,cooling of the downstream shell was so strong during the first years of dam operation that it resulted in freezing of the talik beneath the Vilyui River,making grouting of the foundation unnecessary.In summer,however,moisture condensation was found to occur in the rockfill,resulting in the formation of an ice-rock mass which impeded convective transfer and led to a reverse process of embankment warming (Kamensky,1977;Olovin and Medvedev,1980).

    Processes in frozen dams,which are the most common type constructed in permafrost regions,will be discussed in more detail below.

    The major threat to static stability and especially to seepage strength of dams is posed by their rapid transition from the frozen to the thawed state.The rate of this transition may be very high,depending on subsurface conditions.The process proceeds in an unpredictable manner in jointed bedrock with fissures filled with ice,as well as in ice-saturated rocks in zones of tectonic shattering.Ice in fissures melts slowly and seepage is not detected until continuous seepage paths develop.Resulting flow seepage leads to enhanced convective heat transfer between the water flow and surrounding ground and to impetuous growth of the thaw zone.If the project has no monitoring system,permafrost degradation is detected too late,resulting in a sudden,catastrophic increase in the seepage rate,potential failure,and the loss of system function.

    These processes have accelerated in the late twentieth and early twenty-first centuries due to climate change on the planet.Climate change is a fact:warming has occurred and continues to occur(Zubakov,2005).Although some studies demonstrate,based on air temperature frequency-amplitude analysis and observational data,that the rate of warming has recently slowed in northern European Russia,northeastern Canada,and eastern Mongolia,with some areas beginning to show a cooling trend (Pavlov and Malkova,2005).Balobaevet al.(2009) believe that the warming period will end soon and the phase of cooling will come again.Similar situations have repeatedly occurred in Earth’s history.Climate change is driven by the so-called climatic cycles close to solar activity cycles,as well as by the orbital and planetary factors related to the position of the Earth and other planets in the solar system relative to the Sun.There is widespread interest in climate change,since it has impacts on every aspect of human life.Risks associated with resource development are especially high in the vast permafrost zone,which occupies about 65% of Russia and is becoming the epicenter of accelerated economic development.Table 1 is provided to illustrate the magnitude of recent warming in permafrost regions of Russia(Pavlov and Malkova,2005).

    Table 1 Regional characteristics of the contemporary climate warming in the Russian permafrost regions

    Observed climate warming has altered the thermal regime of the upper permafrost which provides a foundation for infrastructure.It should be noted,however,that structural-stability effects of temperature changes vary with the type of infrastructure.It is common knowledge that engineering properties of frozen soils depend on temperature.For example,an increase in temperature from-4 °C to-1 °C results in a 2.5-fold reduction in adfreeze shear strength of frozen fine-grained and sandy soils (Gosstroy USSR,1990),potentially threatening the integrity of civil and industrial structures.For frozen-core dams,temperature requirements are not so stringent because the hydraulic properties remain virtually unchanged in the said temperature range.The frozen mass will be impermeable to water as long as its ice exists.The presence of ice in the soil pores is certainly dependent on the complex thermodynamic condition in the system.In practice,however,the frozen mass will remain impervious within a wide temperature range,from near 0 °C to lower values.On the other hand,stability problems resulting from faulty design,substandard construction,or poor maintenance should not be attributed to climate warming.

    2 Results and discussion

    Transition of embankment dams from the frozen to thawed state is examined below using the Myaundzha dam as a case study.The dam is located on the Myaundzha River in the town of the same name in Magadan Province,Russia (63°02′03′′N,147°10′50′′E).It was constructed between 1952 and 1955 to create a cooling water reservoir for the Arkagalinskaya Power Station.It was the first dam of the frozen type in northeastern Russia.

    The Myaundzha River flows into a tributary of the Kolyma River at its headwaters.It is fed by snow meltwater in the spring and by rainfall in the autumn.In winter the river freezes to the bottom and has no flow.The mean annual precipitation is about 270 mm,of which 75% occurs during the summer and autumn months.The snow depth is up to 350 mm.The mean annual air temperature is-12.7 °C,with the maximum temperature of +16.6 °C in June and the minimum temperature of-44 °C in January.The record minimum temperature is-55 °C.The dam site is located within the zone of continuous permafrost 180 to 200 m in thickness.The active layer is 0.5 to 3.5 m deep.A talik beneath the river channel extended to a depth of 20 m at the dam site prior to construction.

    The Myaundzha project consists of a reservoir,a frozen-core earthfill dam,and a spillway consisting of a concrete weir,a discharge channel,and a cantilever bucket.Figure 1 is a general view of the project.Figure 2 shows the location of temperature boreholes,seepage water exits,and embankment subsidence.Figure 3 is a cross section of the dam embankment at Sta.3+50.

    The reservoiris used for seasonal storage of water with an active capacity of 4,400,000 m3.The damis an earthfill structure,12.0 m high,870.0 m long at the crest,and 11.5 m wide,constructed with a mixture of cobble,gravel,and sand.The upstream face has a slope of 1:2 and the downstream face is sloped at 1:1.5.

    An impervious barrier is provided by a frozen core with a 6-m-wide cutoff of rubbly silt cut into the alluvial foundation materials.A layer of peat protected with riprap was placed on the dam slopes and crest to provide the thermal insulation for the frozen core.The shells were constructed of poorly rounded rock fragments of argillaceous sandstone of varying sizes:20%–60% cobble and coarse gravel,40%–60% fine to medium gravel,and 10%–20% sand with fines.Borrow material for the dam core consisted of 40%–50%rubble and 15%–20% particles finer than 0.25 mm,and had a plasticity index of 8.5 to 9.3.Silty clay for the dam core was excavated in the borrow area by bulldozers in layers as they thawed naturally,and it was placed in a thawed state when the air temperature was above 0 °C.The material in the lower part of the cutoff trench was compacted manually,while the following lifts were compacted with bulldozers and 10-ton rollers.

    The bedrock in the dam foundation consists of weathered basalt,andesite,and basaltic andesite.The weathered rocks are heavily fractured and the fractures are filled with ice and fines.The bedrock is overlain by alluvial and colluvial deposits with a thickness of up to 4–5 m,consisting of rubbly sandy silts and clayey silts on the slopes and gravels in the river channel.The flood plain alluvium is covered by a layer of peat and ice-rich sandy silts,reaching a thickness of 1 m.The thaw strain of the alluvium is 10%–15%.Two taliks were encountered,one beneath the main channel and the other below the side braid of the Myaundzha River,extending to a depth of 20 m.The gentle slope in the right abutment area is composed of muck and peat materials of colluvial and soliflual origin which contain numerous ice wedges.The ice wedges form polygons with 15-to 20-m side lengths and penetrate to depths of 5 to 7 m.

    The ogee concrete spillway with an overflow length of 200 m is located in bedrock on the left bank of the valley and has a discharge capacity of 338 m3/s.No measures were provided to control seepage in the spillway foundation.

    Operation and performance:To create and maintain the frozen core,two different refrigeration systems were used for the Myaundzha dam.Initially,a cold-air refrigeration system was installed to freeze the core of the dam and the riverbed talik using the cold ambient air.The system consisted of 494 vertical pipes embedded 6 to 10 m into the bedrock foundation.The pipes running the length of 330 m along the dam crest were spaced at 1.5 m in the riverbed section and 2 m apart in the remaining part.Each pipe,100 mm in diameter and 16 to 24 m in length,had an inner 57-mm-diameter pipe located concentrically inside it.The inner pipes were connected to a metal duct,from which the air was forced out by blowers with a delivery rate of 10,000 m3/h.The air flow rate through one pipe was 200 m3/h.One fan serviced 50 pipes.Forced air movement through the inner pipe drew in cold ambient air into the outer pipe,increasing the efficiency of heat removal from the unfrozen ground.Using the cold-air refrigeration system,the talik beneath the river bed was refrozen over the period of 1953 to 1954 (Tsvetkova,1960).

    Figure 1 Myaundzha Dam,a general view along the crest (Photo by S.A.Guliy,2002)

    Figure 2 Location of temperature and piezometric boreholes,and seepage water exits at the Myaundzha Dam

    By the winter of 1954–1955,the dam was 7.2 m high,but further construction was halted due to seepage detected beneath the concrete spillway in August of the same year,after the reservoir had filled to 3 m.The cause of the seepage was that no grout or frozen barrier was incorporated in the spillway design.This element of the project was designed and constructed following Principle II described above.

    From May 1955 to May 1957,the talik expanded 45 m downwards and 90–95 m towards the dam.This process was accompanied by increasing seepage rates,thus calling for special measures to mitigate the problem.A sump and a pumping station were constructed to return all seepages back into the reservoir.Up to 7,000 m3/h of water was pumped daily.Because continued thawing presented a serious threat to the structural integrity of the dam,several rehabilitation measures were undertaken,including grouting of the thawed zones in the foundation,enhancement of the refrigeration system,placement of a 0.3–0.5 m clayey silt apron in front of the spillway,and addition of riprap on the downstream slope.In late August 1957,the cold-air refrigeration system operating only in winter was replaced by a brine refrigerant system operated year-round.The liquid system was installed at 1.5-m spacing 2 m away from the cold-air pipes.

    In the end of 1959,the dam was in immediate danger of failing because of brine leakage from the refrigeration system and piping of the saline core material,resulting in the development of voids and sinkholes.The problem was resolved only in 1960–1962 by grouting the fractured bedrock below the spillway and the dam to a depth of 40 m from the crest (Vedernikov,1963).As a result,the seepage was reduced tenfold and this allowed re-creating in 1962 a frozen barrier in the dam core and down to 20 m in the foundation where there was no seepage.This was the situation with the Myaundzha dam in the late 1960s to the early 1970s.

    Conclusions drawn then were as follows.The fundamental error was the adoption of two design concepts for the water-barrier elements.The concrete spillway was constructed without any seepage control features and without preserving the permafrost in its foundation to provide an impervious barrier,while the earthfill dam was designed and constructed to maintain the dam core and foundation in a frozen state.As a result,progressive thawing of the fractured bedrock beneath the spillway began to impose a warming effect on the frozen embankment core,requiring extensive and costly remedial measures to arrest the problem.However,even after 20 years of operation the thermal regime of the dam was not adequately restored.The design flaw was that the cutoff of the dam was not deep enough to penetrate through the weak alluvial deposits into the bedrock.

    Rehabilitation works continued over the following years.In 1974–1977,the upstream shell of the dam was widened 15–34 m towards the reservoir,while the crest was raised an additional 1–2 m to reduce seepage losses and improve the thermal regime of the dam.Experience showed that the frozen impervious core should be 3 m thick to perform reliably.However,many years of efforts to restore the adequate performance of the frozen core failed,and in 1998 the refrigeration system was shut down.Since then,the dam has been operated as an unfrozen dam according to Principle II.

    Investigations and inspections conducted by the Melnikov Permafrost Institute’s research station in Magadan in the late 1990s to the early 2000s found that the dam was in a satisfactory condition and properly performed its function of providing water for the power station.The thermal regime of the dam,however,had undergone significant changes.As a result of the long-term operation,the dam had changed its state from frozen to thawed (Guliy,2011).Formal conversion of the dam to the thawed operation concept is presently under consideration.Figure 4 shows the variation in 0 °C isotherm along the longitudinal axis of the dam for the period from 1999 to 2010.Figure 5 shows the seepage zones in the dam embankment and foundation at Sta.2+00 and Sta.6+00 as of 2002 with the account of data obtained in 1988.

    Figure 3 Geological cross section,Sta.3+50,Myaundzha Dam

    Figure 4 0 °C isotherms between 1999 and 2010 along the axis of Myaundzha Dam

    Figure 5 Seepage zones in the Myaundzha dam embankment and foundation,Sta.2+00 and Sta.6+00,in 2002

    3 Conclusion

    Experience with the Myaundzha dam has provided an important scientific and practical realization that dams operating in the severe climatic and complicated permafrost conditions of eastern Siberia can transition from frozen to thawed states while still maintaining their seepage strength and structural stability.A further fundamental task is to elaborate dam construction principles for permafrost regions,which should be clearly stated in building norms and regulations.

    Balobaev VT,Skachkov YB,Shender NI,2009.Predicted changes in climate and permafrost thickness for central Yakutia to the year 2200.Geografia i Prirodnye Resursy,2:50–56.

    Biyanov GF,1975.Dams on Permafrost.Energiya,Moscow.

    Biyanov GF,Kogodovsky OA,Makarov VI,1989.Embankment Dams on Permafrost.Permafrost Institute Press,Yakutsk.

    Gosstroy USSR,1990.Building Code SNiP 2.02.04-88,Foundations in Permafrost.Gosstroy,Moscow.

    Gosstroy USSR,1991.Building Code SNiP 2.06.05-84*,Embankment Dams.Gosstroy,Moscow.

    Guliy SA,2011.Performance of an embankment dam after transition from a frozen to thawed type:The Arkagalinskaya hydroelectric dam on Myaundzha River.In:Zhang RV (ed.).Permafrost Engineering,Proceedings of the IX International Symposium.Melnikov Permafrost Institute SB RAS Press,Yakutsk,pp.238–242.

    Kamensky RM,1977.Thermal Regime of the Dam and Water Reservoir,Vilyuisk Hydro.Permafrost Institute Press,Yakutsk.

    Melnikov Permafrost Institute,2012.Small Dams on Permafrost in Yakutia:Guidelines for Design and Construction.Melnikov Permafrost Institute Press,Yakutsk.

    Minenergo SSSR,1983.VSN 30-83,Instruction for Design of Hydraulic Structures in Permafrost Regions.Minenergo SSSR,Leningrad.

    Olovin BA,Medvedev BA,1980.Temperature Field Dynamics in the Viluy Hydro Dam.Nauka,Novosibirsk.

    Pavlov AV,Malkova GV,2005.Current Climate Changes in Northern Russia.Geo,Novosibirsk.

    Tsvetkova SG,1960.Experience with dam construction in permafrost areas.In:Bondarev PD,Porkhaev GV,Tsvetkova SG(eds.).Materials to Fundamentals of Frozen Crust Studies,Vol.VI.USSR AS Press,Moscow,pp.87–110.

    Vedernikov LE,1963.Geocryological processes in the body and foundation of the dam on the Myaundzha River.Transactions of VNII-1,22:179–239.

    Vodgeo Institute,1976.Guidelines for Design and Construction of Embankment Dams for Industrial and Domestic Water Supply in Far Northern and Permafrost Regions.Stroyizdat,Moscow.

    Zhang RV,1983.Prediction of Temperature Regime of Small and Medium Embankment Dams in Yakutia,Interim Guide.Permafrost Institute Press,Yakutsk.

    Zhang RV,2000.Design,Construction,Operation and Maintenance of Small Dams in Permafrost Areas (on the Example of Yakutia).Melnikov Permafrost Institute SB RAS Press,Yakutsk.

    Zhang RV,2002.Temperature Regime and Stability of Small Dams and Earthen Canals on Permafrost.Melnikov Permafrost Institute SB RAS Press,Yakutsk.

    Zubakov VA (ed.),2005.Proceedings of Russian Conference,Climate Change in the XXI Century:Current Trends,Predicted Scenarios and Estimated Consequences.INENKO,St.Petersburg,UAS.

    中文字幕最新亚洲高清| 久久免费观看电影| 亚洲成色77777| 久久鲁丝午夜福利片| 国产极品天堂在线| 2022亚洲国产成人精品| 制服诱惑二区| 只有这里有精品99| 男的添女的下面高潮视频| 亚洲av日韩在线播放| 国产午夜精品久久久久久一区二区三区| 久久久久久久久久久久大奶| 免费观看av网站的网址| 九草在线视频观看| 日本欧美视频一区| 成人综合一区亚洲| 国产高清三级在线| 久久狼人影院| kizo精华| 91精品三级在线观看| 亚洲国产日韩一区二区| 欧美激情国产日韩精品一区| 国产欧美亚洲国产| 免费高清在线观看日韩| 国产精品 国内视频| 久久免费观看电影| 五月伊人婷婷丁香| 日韩中字成人| 哪个播放器可以免费观看大片| 街头女战士在线观看网站| 日韩精品有码人妻一区| 有码 亚洲区| 日韩成人av中文字幕在线观看| 亚洲欧美日韩卡通动漫| 高清不卡的av网站| 亚洲精品av麻豆狂野| 老司机亚洲免费影院| 日本黄色片子视频| 伊人久久国产一区二区| 男人添女人高潮全过程视频| 国产精品不卡视频一区二区| 日韩成人伦理影院| 欧美人与善性xxx| 熟女电影av网| 欧美精品人与动牲交sv欧美| 一区二区三区精品91| 欧美精品一区二区免费开放| 久久精品国产自在天天线| 亚洲精品日韩av片在线观看| 视频区图区小说| 日韩三级伦理在线观看| 激情五月婷婷亚洲| 久久青草综合色| 午夜福利视频精品| 老司机亚洲免费影院| 黄色视频在线播放观看不卡| 如何舔出高潮| 免费黄网站久久成人精品| 亚洲丝袜综合中文字幕| 久久久欧美国产精品| 人妻制服诱惑在线中文字幕| 午夜免费观看性视频| 欧美变态另类bdsm刘玥| 热99久久久久精品小说推荐| 99国产精品免费福利视频| 亚洲人成77777在线视频| 午夜福利网站1000一区二区三区| 男的添女的下面高潮视频| 最新的欧美精品一区二区| 欧美精品一区二区免费开放| 看非洲黑人一级黄片| 免费不卡的大黄色大毛片视频在线观看| 亚洲国产av影院在线观看| 十分钟在线观看高清视频www| 欧美少妇被猛烈插入视频| 日韩三级伦理在线观看| 亚洲久久久国产精品| 街头女战士在线观看网站| 精品人妻熟女毛片av久久网站| 亚洲少妇的诱惑av| 中文字幕精品免费在线观看视频 | 欧美三级亚洲精品| 久久久午夜欧美精品| 日韩伦理黄色片| 亚洲国产欧美在线一区| 丰满迷人的少妇在线观看| 9色porny在线观看| 亚洲成人手机| 曰老女人黄片| 女的被弄到高潮叫床怎么办| av线在线观看网站| 另类亚洲欧美激情| 久久久国产精品麻豆| 成人毛片a级毛片在线播放| av免费观看日本| 97超视频在线观看视频| 视频中文字幕在线观看| 女性被躁到高潮视频| 精品人妻熟女av久视频| 国产乱人偷精品视频| 久久这里有精品视频免费| 日本黄色日本黄色录像| 午夜福利网站1000一区二区三区| 少妇丰满av| 黑人猛操日本美女一级片| 久久青草综合色| 国产老妇伦熟女老妇高清| 久久精品久久久久久久性| 国产亚洲精品第一综合不卡 | 国产高清三级在线| 黄色一级大片看看| 久久国产亚洲av麻豆专区| 99久久精品国产国产毛片| 另类精品久久| 中文字幕人妻熟人妻熟丝袜美| kizo精华| 大话2 男鬼变身卡| 国产精品一国产av| 午夜久久久在线观看| 色视频在线一区二区三区| videossex国产| 国产成人aa在线观看| 老熟女久久久| 免费看不卡的av| 国产在线免费精品| 91午夜精品亚洲一区二区三区| 午夜av观看不卡| av又黄又爽大尺度在线免费看| 日本爱情动作片www.在线观看| av女优亚洲男人天堂| 国产深夜福利视频在线观看| 考比视频在线观看| 久久久久久久久久人人人人人人| 国产精品 国内视频| 日韩制服骚丝袜av| 免费av中文字幕在线| 丰满少妇做爰视频| 建设人人有责人人尽责人人享有的| 在线观看人妻少妇| 午夜福利,免费看| 两个人的视频大全免费| 国产一区二区在线观看av| 亚洲av电影在线观看一区二区三区| 国产老妇伦熟女老妇高清| 在线亚洲精品国产二区图片欧美 | 国产欧美另类精品又又久久亚洲欧美| av国产精品久久久久影院| 狂野欧美白嫩少妇大欣赏| 国产亚洲av片在线观看秒播厂| 久久亚洲国产成人精品v| 肉色欧美久久久久久久蜜桃| 亚洲美女视频黄频| 亚洲国产精品一区三区| 日韩 亚洲 欧美在线| 十八禁高潮呻吟视频| 午夜免费男女啪啪视频观看| 日日摸夜夜添夜夜添av毛片| 亚洲av欧美aⅴ国产| 七月丁香在线播放| 免费观看性生交大片5| 啦啦啦啦在线视频资源| 美女中出高潮动态图| 日本-黄色视频高清免费观看| 亚洲精品,欧美精品| 极品人妻少妇av视频| 亚洲国产精品一区三区| 欧美日韩国产mv在线观看视频| 亚洲精品中文字幕在线视频| 少妇精品久久久久久久| 看免费成人av毛片| 日韩人妻高清精品专区| 日本wwww免费看| 成人影院久久| 精品一区二区三区视频在线| av在线app专区| www.av在线官网国产| 成人毛片a级毛片在线播放| 国产精品国产三级国产av玫瑰| 王馨瑶露胸无遮挡在线观看| 内地一区二区视频在线| 人妻一区二区av| 国产免费一级a男人的天堂| 最近最新中文字幕免费大全7| 91精品国产国语对白视频| 国产日韩欧美视频二区| 久久精品熟女亚洲av麻豆精品| 国产高清不卡午夜福利| 国产熟女午夜一区二区三区 | 夜夜爽夜夜爽视频| 女人久久www免费人成看片| 亚洲激情五月婷婷啪啪| 亚洲综合色网址| 国语对白做爰xxxⅹ性视频网站| 纯流量卡能插随身wifi吗| 国产伦理片在线播放av一区| 天天躁夜夜躁狠狠久久av| 精品午夜福利在线看| 日本欧美国产在线视频| 久久精品国产亚洲av天美| 欧美激情极品国产一区二区三区 | 欧美日韩精品成人综合77777| 亚洲欧洲日产国产| 能在线免费看毛片的网站| 久久久久久久大尺度免费视频| 久久亚洲国产成人精品v| 91国产中文字幕| 黄片播放在线免费| 午夜激情av网站| 男人添女人高潮全过程视频| 国产熟女欧美一区二区| 国产精品秋霞免费鲁丝片| 高清不卡的av网站| 国产视频内射| 亚洲精华国产精华液的使用体验| 亚洲av日韩在线播放| 七月丁香在线播放| 国产免费一区二区三区四区乱码| 妹子高潮喷水视频| 赤兔流量卡办理| 满18在线观看网站| 国产国拍精品亚洲av在线观看| 最近手机中文字幕大全| 国产深夜福利视频在线观看| www.av在线官网国产| 欧美亚洲 丝袜 人妻 在线| 男女高潮啪啪啪动态图| 国产精品熟女久久久久浪| 亚洲av不卡在线观看| 人妻少妇偷人精品九色| 日本黄色片子视频| 国产一区有黄有色的免费视频| 成人亚洲欧美一区二区av| 亚洲综合色惰| 丝袜美足系列| videos熟女内射| 九九在线视频观看精品| 亚洲国产av新网站| 卡戴珊不雅视频在线播放| 女的被弄到高潮叫床怎么办| 一个人看视频在线观看www免费| 亚洲av中文av极速乱| 国产精品三级大全| 高清欧美精品videossex| 91成人精品电影| 亚洲人成77777在线视频| 极品人妻少妇av视频| 午夜91福利影院| 日本91视频免费播放| 色网站视频免费| 久久久久久久久大av| 日日摸夜夜添夜夜爱| 久久精品国产a三级三级三级| 欧美人与善性xxx| 少妇被粗大猛烈的视频| 丝袜美足系列| 亚洲少妇的诱惑av| 成人亚洲欧美一区二区av| 日日撸夜夜添| 国产精品久久久久成人av| 午夜福利视频在线观看免费| 欧美三级亚洲精品| 午夜激情久久久久久久| 99久国产av精品国产电影| 国产色婷婷99| 狠狠婷婷综合久久久久久88av| 免费不卡的大黄色大毛片视频在线观看| 丝袜美足系列| 亚洲少妇的诱惑av| 久久国产精品大桥未久av| 国产精品秋霞免费鲁丝片| 欧美日韩国产mv在线观看视频| 国产精品麻豆人妻色哟哟久久| 高清午夜精品一区二区三区| 亚洲一级一片aⅴ在线观看| 久久国内精品自在自线图片| 久久久a久久爽久久v久久| 日韩熟女老妇一区二区性免费视频| 一区二区av电影网| av卡一久久| 国产乱人偷精品视频| 国产精品一区二区在线观看99| 桃花免费在线播放| 老司机影院成人| 免费人成在线观看视频色| 亚洲av国产av综合av卡| 最近中文字幕高清免费大全6| 在线亚洲精品国产二区图片欧美 | 好男人视频免费观看在线| 精品99又大又爽又粗少妇毛片| 国产精品一区二区在线观看99| 成年美女黄网站色视频大全免费 | 久久午夜福利片| 蜜桃国产av成人99| 久久精品国产亚洲av涩爱| 一本—道久久a久久精品蜜桃钙片| 婷婷色综合www| 亚洲精品久久成人aⅴ小说 | 久久久久人妻精品一区果冻| 国产精品一二三区在线看| 看免费成人av毛片| 少妇人妻久久综合中文| 一级毛片我不卡| 国产一区有黄有色的免费视频| 亚洲av中文av极速乱| 青青草视频在线视频观看| 极品少妇高潮喷水抽搐| 久久久亚洲精品成人影院| 一级毛片电影观看| 国产一级毛片在线| 亚洲av二区三区四区| 亚洲国产精品专区欧美| 国产精品久久久久成人av| 精品一品国产午夜福利视频| 这个男人来自地球电影免费观看 | 国语对白做爰xxxⅹ性视频网站| 免费人成在线观看视频色| 国产 一区精品| 大片免费播放器 马上看| 久久久国产欧美日韩av| 边亲边吃奶的免费视频| 伦理电影免费视频| 中文字幕亚洲精品专区| 肉色欧美久久久久久久蜜桃| 男女高潮啪啪啪动态图| 如何舔出高潮| 亚洲成人av在线免费| 久久久国产一区二区| 国产亚洲一区二区精品| 久久久久久久久久久免费av| 国产精品秋霞免费鲁丝片| 国产免费一区二区三区四区乱码| 欧美精品高潮呻吟av久久| 2022亚洲国产成人精品| 亚洲情色 制服丝袜| 在线亚洲精品国产二区图片欧美 | videossex国产| 男女无遮挡免费网站观看| 2022亚洲国产成人精品| 美女xxoo啪啪120秒动态图| 国产欧美日韩一区二区三区在线 | 2021少妇久久久久久久久久久| 秋霞伦理黄片| 91国产中文字幕| 一区二区三区免费毛片| 午夜影院在线不卡| 亚洲欧美一区二区三区黑人 | 色网站视频免费| 制服人妻中文乱码| 内地一区二区视频在线| 日韩av不卡免费在线播放| 天美传媒精品一区二区| 精品99又大又爽又粗少妇毛片| 成年美女黄网站色视频大全免费 | 国产成人午夜福利电影在线观看| 亚洲天堂av无毛| av不卡在线播放| 久久精品国产亚洲av涩爱| 亚洲av.av天堂| 久久 成人 亚洲| 嘟嘟电影网在线观看| 欧美日韩综合久久久久久| 多毛熟女@视频| 在线亚洲精品国产二区图片欧美 | 热re99久久国产66热| 一区二区日韩欧美中文字幕 | 国产男女超爽视频在线观看| av又黄又爽大尺度在线免费看| 三级国产精品片| 久久鲁丝午夜福利片| 极品人妻少妇av视频| 狂野欧美白嫩少妇大欣赏| 不卡视频在线观看欧美| 亚洲av成人精品一二三区| 免费日韩欧美在线观看| 91精品一卡2卡3卡4卡| 精品久久久久久电影网| 亚洲精品第二区| 人人妻人人澡人人爽人人夜夜| 日本vs欧美在线观看视频| 九色亚洲精品在线播放| 看十八女毛片水多多多| 有码 亚洲区| 成年av动漫网址| 日韩一本色道免费dvd| 亚洲精品av麻豆狂野| 亚洲三级黄色毛片| 亚洲精品,欧美精品| 黄色毛片三级朝国网站| 亚洲三级黄色毛片| 亚洲色图 男人天堂 中文字幕 | 亚州av有码| 日本黄色片子视频| 国产高清不卡午夜福利| 亚洲精品国产色婷婷电影| 亚洲人成网站在线播| 中文天堂在线官网| 亚洲精品av麻豆狂野| 免费人成在线观看视频色| 日本午夜av视频| 国产片特级美女逼逼视频| 少妇高潮的动态图| 精品午夜福利在线看| 如何舔出高潮| 日韩一本色道免费dvd| 春色校园在线视频观看| 国产伦理片在线播放av一区| 一级毛片 在线播放| 欧美xxxx性猛交bbbb| 人体艺术视频欧美日本| 观看美女的网站| 国产精品麻豆人妻色哟哟久久| 欧美精品一区二区免费开放| 国产精品久久久久成人av| 欧美激情 高清一区二区三区| 亚洲综合色惰| 秋霞在线观看毛片| 男女免费视频国产| 免费观看无遮挡的男女| 日韩一区二区视频免费看| 69精品国产乱码久久久| 国产精品久久久久久精品电影小说| 日韩,欧美,国产一区二区三区| 大片电影免费在线观看免费| 乱人伦中国视频| 欧美亚洲 丝袜 人妻 在线| 久久 成人 亚洲| 国产日韩欧美在线精品| 五月伊人婷婷丁香| 麻豆乱淫一区二区| 天天操日日干夜夜撸| 美女cb高潮喷水在线观看| 免费看光身美女| 国产一区亚洲一区在线观看| 91精品国产九色| 22中文网久久字幕| 亚洲,一卡二卡三卡| av视频免费观看在线观看| 中国三级夫妇交换| 在线观看www视频免费| 天堂中文最新版在线下载| 黄色毛片三级朝国网站| 91精品一卡2卡3卡4卡| 国产欧美另类精品又又久久亚洲欧美| 丝袜在线中文字幕| a级毛片在线看网站| 王馨瑶露胸无遮挡在线观看| 免费看不卡的av| 十八禁高潮呻吟视频| 人体艺术视频欧美日本| 亚洲婷婷狠狠爱综合网| 一本一本久久a久久精品综合妖精 国产伦在线观看视频一区 | 春色校园在线视频观看| 高清视频免费观看一区二区| 久久久久视频综合| 国产无遮挡羞羞视频在线观看| 亚洲精品日韩在线中文字幕| 亚洲av免费高清在线观看| 日韩熟女老妇一区二区性免费视频| 欧美日韩视频高清一区二区三区二| 日韩精品免费视频一区二区三区 | 这个男人来自地球电影免费观看 | 欧美变态另类bdsm刘玥| 久久人人爽人人爽人人片va| 欧美精品高潮呻吟av久久| 亚洲欧美成人综合另类久久久| 秋霞在线观看毛片| 欧美精品一区二区大全| 夜夜骑夜夜射夜夜干| 色网站视频免费| 精品少妇内射三级| 欧美人与善性xxx| av天堂久久9| 欧美变态另类bdsm刘玥| 亚洲国产欧美在线一区| 极品少妇高潮喷水抽搐| 视频区图区小说| 国产精品久久久久久久久免| 亚洲精品亚洲一区二区| 久久国产亚洲av麻豆专区| 黄色配什么色好看| 天美传媒精品一区二区| 欧美激情 高清一区二区三区| 国产精品免费大片| 亚洲av成人精品一区久久| 七月丁香在线播放| 在线亚洲精品国产二区图片欧美 | 妹子高潮喷水视频| 日本与韩国留学比较| 51国产日韩欧美| 边亲边吃奶的免费视频| 日韩欧美精品免费久久| 人人妻人人澡人人爽人人夜夜| 黄色毛片三级朝国网站| 久久鲁丝午夜福利片| 在线观看美女被高潮喷水网站| 国产成人午夜福利电影在线观看| 亚洲欧洲日产国产| 99久久精品一区二区三区| 欧美日韩一区二区视频在线观看视频在线| av一本久久久久| 18+在线观看网站| 丰满乱子伦码专区| 日韩欧美一区视频在线观看| 精品久久蜜臀av无| 97在线人人人人妻| 国产成人91sexporn| 免费黄网站久久成人精品| 国产欧美日韩综合在线一区二区| 中文字幕制服av| 日韩伦理黄色片| 在线亚洲精品国产二区图片欧美 | 亚洲av综合色区一区| 国产精品无大码| 国产无遮挡羞羞视频在线观看| 91国产中文字幕| 亚洲精品中文字幕在线视频| 国产精品成人在线| 日本黄色片子视频| 国产一区二区三区av在线| 99热这里只有是精品在线观看| 母亲3免费完整高清在线观看 | 性高湖久久久久久久久免费观看| 色视频在线一区二区三区| 免费看不卡的av| 制服人妻中文乱码| 麻豆成人av视频| 久久人人爽av亚洲精品天堂| 91精品三级在线观看| 啦啦啦中文免费视频观看日本| 久久鲁丝午夜福利片| 高清不卡的av网站| 久久久久久久久久久免费av| 嫩草影院入口| 99精国产麻豆久久婷婷| 性色avwww在线观看| 国产有黄有色有爽视频| 亚洲欧美清纯卡通| 亚洲av日韩在线播放| 亚洲欧美中文字幕日韩二区| 中文天堂在线官网| 少妇人妻精品综合一区二区| av在线观看视频网站免费| 一级黄片播放器| 久久久亚洲精品成人影院| 97精品久久久久久久久久精品| 国产精品 国内视频| 国产黄色视频一区二区在线观看| 18在线观看网站| 免费看av在线观看网站| 婷婷色综合大香蕉| 成人二区视频| 久久久久精品久久久久真实原创| 中文字幕免费在线视频6| 3wmmmm亚洲av在线观看| 18禁观看日本| 亚洲国产av新网站| 国产色爽女视频免费观看| 啦啦啦在线观看免费高清www| 成人午夜精彩视频在线观看| 国产片内射在线| 国产伦理片在线播放av一区| 人人妻人人添人人爽欧美一区卜| 伦理电影大哥的女人| 国产精品久久久久久av不卡| 色94色欧美一区二区| 国产免费视频播放在线视频| 国产高清不卡午夜福利| 日韩免费高清中文字幕av| 制服丝袜香蕉在线| 欧美日韩av久久| 亚洲精品久久久久久婷婷小说| 日本黄色片子视频| 精品国产乱码久久久久久小说| 亚洲美女搞黄在线观看| 国产成人免费观看mmmm| 久久久久久久亚洲中文字幕| 国产欧美另类精品又又久久亚洲欧美| 夜夜爽夜夜爽视频| 一级毛片电影观看| 色5月婷婷丁香| 国精品久久久久久国模美| 亚洲经典国产精华液单| 午夜91福利影院| 夫妻性生交免费视频一级片| 日韩av免费高清视频| 国产色爽女视频免费观看| 成人国语在线视频| 久久狼人影院| 久久久精品94久久精品| 久久精品国产亚洲av涩爱| 欧美另类一区| 少妇精品久久久久久久| 久久人人爽人人爽人人片va| 欧美变态另类bdsm刘玥| 亚洲精品色激情综合| 亚洲图色成人| 亚洲综合色惰| 国产成人精品一,二区| 欧美另类一区| 国产探花极品一区二区| av卡一久久| 欧美xxⅹ黑人| 最近的中文字幕免费完整| 日本av免费视频播放| 亚洲图色成人| 大码成人一级视频| 亚洲人成网站在线观看播放| 色视频在线一区二区三区| 成人亚洲精品一区在线观看| 国内精品宾馆在线| 午夜日本视频在线| 国产欧美日韩一区二区三区在线 | 欧美成人午夜免费资源| 99久久中文字幕三级久久日本| 国产免费又黄又爽又色|