      Stress Analysis of the Subsea Dynamic Riser BaseProcess Piping

      2014-04-24 02:00:28

      Offshore Oil Engineering Co., Ltd., Tianjin 300451, China

      Stress Analysis of the Subsea Dynamic Riser BaseProcess Piping

      Xuanze Ju*, Wei Fang, Hanjun Yin and Ying Jiang

      Offshore Oil Engineering Co., Ltd., Tianjin 300451, China

      Thesubsea dynamic riser base(SDRB)is an important piece of equipment for the floating production platform mooring system.One end is connected to the rigid pipeline, carrying a rigid pipeline thermal expansion load and the other end is connected to a flexible riser, carrying the dynamic load of the flexible riser, so its function is a transition connection between the flexible riser and the rigid pipeline which fixes the flexible riser on the seabed. On the other hand, as a typical subsea product, the design will satisfythe requirements of the standards for subsea products. By studying the stress analysisphilosophy of the topside piping and subsea pipeline, a physical model and procedure for piping stress analysis of the SDRB have been established.The conditions of the adverse design load have been considered, and a combination of the static load from the rigid pipeline and the dynamic load flexibility has also been optimized. And a comparative analysis between the AMSE, DNV and API standards for piping stress with the checking rules has been done.Because theSDRB belongs to the subsea pipeline terminal product, the use of DNV standards to check its process piping stress is recommended. Finally, the process piping stress of the SDRB has been calculated, and the results show that the jacket pipe and the carrier pipe stress of the SDRB process piping satisfy the DNV standards as a whole.The bulkhead cannot be accurately simulated by the AutoPIPE software which uses the FEA software ANSYS inthe detailed analysis, but the checking results will still meet the requirements of the DNV standards.

      subsea product design; subsea dynamic riser base(SDRB); process piping stress analysis; flexible riser; rigid pipeline

      1 Introduction

      The subsea dynamic riser base (SDRB) as a typical subsea productis an important piece of equipment for the floating production system. It is not only an important oil and gas transportation channel, but also is a key anchor point for the dynamic riser and cable transition to static (Fang, 2003; Liet al., 2010; Chenet al., 2011). For process piping on the SDRB, one end is connected to the rigidpipeline, carrying a rigid pipeline thermal expansion load.The other end is connected to the flexible riser(Baiet al., 2005), carrying the dynamic load of the flexible riser, which determines the complexity of the process piping stress analysis(API RP 2RD, 2009).

      Currently a mature recommended practice has not been formed and different products cannotbe simplycheckedwith a uniform standard.Studies should be done on the subsea products piping stress analysis regarding the characteristics of each product (Baiet al., 2010; Robinsonet al., 2003; Berntet al., 2007; Antaniet al., 2008; Trioloet al., 2010).Typhoonsneed to be especially considered in regard to the South China Sea because of their huge influence on the dynamic response of riser systemsregarding the motion of floating platforms, so much more attention should be paid during the SDRB piping stress analysis and the piping system on the SDRB should be optimized to stand the reactions from the riser system.

      This paper will take the SDRB for the dynamic riser of the“Lazy S” configuration as the study object that describes the process piping stress analysis method and checking criteria. Fig.1 shows the dynamic riser system of thefloating production storage and offloading (FPSO).

      Fig. 1 Dynamic riser system of the FPSO(“Lazy S”configuration)

      2 SDRB process piping stress analysis method and model

      Piping stress analysis is an important means to check whether or not there is a reasonable layout of thepiping system (Robleto and Williams, 2010).For the process pipingin the subsea product, the focus of the whole piping system should first be put on the flexibility, using the elastic deformation of the maximum absorption interface load, and it should satisfy the following design principles at the same time:(1)Use the mature technology of the piping design.(2)Obtain the shortest load transfer path.(3)Avoid interference and keep the piping layout as compact aspossible. (4)Design a type of pipingsupport structure that is reasonable.The load can be effectively transited to the infrastructure.(5) Satisfy the functional requirements of the piping, such as pigging, spare, erosion, corrosion,etc.

      2.1 Analysis procedure

      The procedure for the design of the piping engineering includes, stress analysis of the piping system’s first response to a physical model for analysis, consideration and determination of the design parameters, solutions obtained by the software, and finally post-processing of the checking results as per the standard analysis procedure shown in Fig. 2(Ellenberger, 2014; Schwarz,2004; Antaki, 2003).

      Fig. 2 Procedure for the piping stress analysis

      2.2 Analysis model

      This paper takes the SDRB (dimensions of 9.2 m×7.2 m) withthe gravity-based mudmat as the example. The 3D model is shown in Fig. 3. The design water depth is 105 m, and thereare two process pipings on the SDRB, connected to the dynamic flexible risers from the FPSO respectively.

      The transport medium in the process piping is water cut oil, with a105 °C design temperature and 5 MPa design pressure.The piping system as shown in Fig.4, is mainly composed of pipe-in-pipe(PIP)piping, PIP bend, type II bulkhead, subsea misalignment flange, subsea SPO flange and asingle pipe.For the pipe parameters refer toTable 1. The two process piping isfixed on the base via the support sleeve structures welded on the beam. In the design, considering that both ends of the piping carry different loads, different piping supports are adopted. Flexible riser ends carry the dynamic load, the fixed piping supports will be used, of which the piping and the support sleeve structure are welded together, as shown in Fig. 5. The rigid pipeline end carries the expansion load, the guide support will be used, of which the neoprene is employed between the piping and support sleeve structure, so there is no axial constraint for the guide piping support, as shown in Fig. 6. Fixed piping support and guide piping support are shown in Fig. 7.

      Fig. 3 3D model of the SDRB

      Fig. 4 Piping system

      Table 1 Parameters of PIP

      Fig. 5 Fixed piping support

      Fig. 6 Guide piping support

      Fig. 7 Fixed piping support and guide piping support

      Dynamic analysis of the proposed riser system layout leads to the following maximum response as shown in Table 2 which is evaluated to be acceptable for the riser and well within the design capacity of the end fitting.

      The expansion length and axial force of the pipeline due to thermal movement will lead to a reaction at the interface with the SDRB piping through theassociated spool piece which is not an order of magnitudecomparable with that of the riser system and will not be listed because of paper space limitations.

      Table 2 Reaction forces from riser system

      Through the analysis of the physical model, for this example, the AutoPIPE software will be used for stress analysis of the whole piping system. The verticalY-axis nominates the elevation while the positiveX-axis points to the rigid subsea pipeline.The detail finite element model is shown in Fig. 8.

      Fig. 8 AutoPIPE model of the piping stress analysis

      Because the bulkhead representedin the AutoPIPE software cannot be accurately simulated, the FEA software ANSYS will be used for the detailed analysis. For the bulkhead, the nodes at the end of the jacket pipe extension are fully fixed as shown in Fig.9. The internal pressure and external hydrostatic pressure effects are considered during all the design conditions. The node loads applied to the carrier pipe ends ofthe piping system are extracted from the AutoPIPE output. The loads’ directionwill be converted from the AutoPIPE local coordinate to the ANSYS user specified coordinate.

      Fig. 9 ANSYS model ofthebulkhead

      2.3 Loadcasecombination

      Process piping stress checkingstandard forSubsea product should follow ISO 13628-15 (International Organization for Standardization, 2010), which recommends that piping stress can be checked as per the following standards, ASME B31.4(American Society of Mechanical Engineers, 2009), ASME B31.8( American Society of Mechanical Engineers, 2010), ASME B31.3 (American Society of Mechanical Engineers, 2008), DNV-OS-F101 ( Det Norske Veritas, 2005) and API RP 1111(American Petroleum Institute, 2009) and so on.

      The design loads for the piping system mainly include: (1) Functional load, refers to the required load that the system exists, uses and disposes of under the various load conditions without considering the environmental load effect; (2) Environmental load, refers to the load acting on the piping system which is generated by the wind, waves, currents, ice and earthquakes and other environmental phenomena; (3) Accidental load, refers to the load on the piping system under abnormal and unexpected circumstances(DNV-OS-F101, 2005).According to the DNV standard requirements, combined with the actual project load, the following design load conditions need to be considered for covering the adverse load case of the subsea product process piping stress analysis: (1) Functional loads; (2) Design environmental load and functional load acting simultaneously; (3) Hydrostatic test or stop/restart. Conservativelythe safety factors as shown in Table 3 will be used in the piping stress UC check.

      Table 3 Safety factors for different load conditions

      SDRB process pipingis connected to the rigid subsea pipeline and theflexible riserthrough the flanges.Interface data such as the acting load, acting moment and acting mode need to be provided by the other system for piping stress checking. The flexible riser arrangement scheme is checked based on the extreme condition of thefloating production facilities being offset with one chain broken. Taking into account the tolerance and internal stiffness effects of the flexible pipe,the forces at the SDRBpiping flange end with dynamic response consideration are provided from the flexible riser analysis. In order to make the limit conditions cover all the subjected forces from the flexible risers, the ultimate loadsare given without direction.

      Based on the results of the analysis andassuming a rotational symmetric structural capacity, the tension, the torque, the shear force and the bending moment will be applied simultaneously.The shear force to act in the conservative direction in combination with the bending moment willobtain a total of 16 load components.

      Additionally, we took into account the different direction approaches of the waves and currents, with thermal reactions from the pipeline.There are a total of 10 load components and resultswith the 10 load combinations. Through combining piping flange end forces respectively, a total of 160 load cases exist. Considering the complexity of the project load case conditions, the model adjustment will increase the pre-processing and post-processing workloads. Based on the sub-portfolio approach to extracting the 25 load points, and further optimizing the permutations and combinations, ultimately thecompact model will achieve the purpose of reducing the workload.

      3 SDRB process piping stress analysis results

      AutoPIPE software is adopted to establish the SDRB PIP piping stress analysis model, and the bulkhead used for the PIP pipe transiting to a single pipe is simulated as the rigid connection. According to the DNV standards, the stress of the carrier pipe and the jacket pipe has been checked at the different load conditions, and the maximum stress UC of the SDRB process piping is shown in Fig. 10.The UC values have already been considered regarding the corresponding safety factors.

      Fig. 10 Stress UC distribution of the SDRB process piping

      As can be seen in Table 4, the maximum stress UC value of thecarrier pipe and jacket pipe are both less than 1, and meet the design requirements. Among them, the maximum stress UC value of thecarrier pipe is greater than thatofthejacket pipe.

      The bulkhead is a complex structure, so there may appear to be discontinuities when transferring the load, and detailed analysis of the bulkhead via the 3D finite element model is needed. As can be seen from Table 4, the maximum stress UC value of the bulkhead is 0.95, less than 1. As shown in Fig. 11, the bulkheadstress reaches the maximum UC value of 0.91 when the stress value is 273MPa, still meeting the design requirements.

      Table 4 Maximum stress UC of the SDRB process piping

      Fig. 11 Stress distribution of bulkhead

      4 Conclusions

      1) Obtained from the stress analysisphilosophy of the topside piping and subsea pipeline, the stress analysis procedure of the subsea product is given. For the PIP piping stress analysis, first check as a whole system, and then check the key components such as the bulkhead,etc., through use of the general finite element software ANSYS.

      2) Regarding the process piping for the SDRB carrying the forces from the dynamic riser system and static loads from expanding the rigid pipeline at the same time, fixing the piping support at the riser side and guidingthe piping support at the pipeline side are recommended. As typhoons should be especially considered in the South China Sea, interface loads from the riser system contribute most of the piping stress which should be paid attention to.

      3) SDRBasa subseapipeline terminal product is recommendedto carry out the process piping stress check in accordance withDNV standards.

      4) SDRB is a typical subsea product, and the stress analysis technology of theprocess piping is an important element of the product design.The design idea and method of this instance will provide reference for other similar subsea product designs.

      American Petroleum Institute (2009). Design, construction, operation, and maintenance of offshore hydrocarbon pipelines, recommended practice. API RP 1111, 12-18.

      American Petroleum Institute (2009). Design of risers for floating production systems (FPSs) and tension-leg platforms (TLPs), recommended practice. API RP 2RD, 47-110.

      American Society of Mechanical Engineers (2008). Process piping. American National Standard, ASME B31.3, 12-40.

      American Society of Mechanical Engineers (2009). Pipeline transportation systems for liquid hydrocarbons and other liquids. American National Standard, ASME B31.4, 83-84.

      American Society of Mechanical Engineers (2010). Gas transmission and distribution piping systems. American National Standard, ASME B31.8, 104-105.

      Antaki GA (2003).Piping and pipeline engineering. Marcel Dekker Inc.,New York, 104~174.

      Antani JK, Dick WT, Balch D, Van Der Leij T (2008). Fabrication and installation of the Neptune export lateral PLEMs.Offshore Technology Conference,Houston, USA, OTC 19688.

      Bai Y, Bai Q (2005).Subsea pipelines and risers. Elsevier, Oxford, 497-508.

      Bai Y, Bai Q(2010).Subsea engineering handbook. Elsevier, Oxford, 572-604.

      Bernt T, Smedsrud E (2007). Ormen lange subsea production system.Offshore Technology Conference, Houston, USA, OTC 18965.

      Chen Jinlong, Guo Hong, Qu Yan, Liu Xiaoyan, Yan Jun, Yue Qianjin, Tang Minggang(2011). Dynamic analysis of BTM mooring FPSO of subsea riser &cable system.The Fifteenth Session of China Ocean (Coast) Engineering Symposium, Beijing, 1, 117-121. (in Chinese)

      Det Norske Veritas (2005). Submarine pipeline systems. Offshore Standard, DNV-OS-F101, 37-39.

      Ellenberger JP (2014).Piping and pipeline calculations manual.Butterworth-Heinemann, Boston, 123-150.

      Fang Xiaoming(2003).The installation of stp system of wenchang project.China Offshore Oil & Gas ( Engineering), 15(1), 1-11, 38, 60. (in Chinese)

      International Organization for Standardization (2010). Petroleum and natural gas industries—Design and operation of subsea production systems—Part 15: Subsea structures and manifolds. International Standard, ISO 13628-15, 18.

      Li Peng, Li Tong, Zhang Hongkai, Liu Zhenguo, Zhu Peng, LanQingshi (2010). Fexible riser in deep water FPSO.Shipbuilding of China,51(Special 2), 378-385. (in Chinese)

      Robinson R, Grass J (2003).Design chalhnges of a 48-inch pipeline subsea manifold.Offshore Technology Conference, Houston, USA, OTC l5275.

      Robleto R,Williams J(2010).Efficiency and economy of automating displacements for FPSO pipe stress analysis.Offshore Technology Conference,Houston, USA, OTC 20868.

      Schwarz MM(2004). Flexibility analysis of the vessel-piping interface.International Journal of Pressure Vessels and Piping,81, 2,181-189.

      Triolo D, Mosness T, Jennings J, Rezende J (2010).Liwan gas project: First South China Sea deepwater completion campaign.Offshore Technology Conference,Houston, USA, OTC 23934.

      Author biographies

      Xuanze Juwas born in 1979 and got his Masters degree of Science in Engineering from China University of Petroleum (East) in 2008. He is a director engineer at the subsea system & product reserch & design institute of theOffshore Oil Engineering Co., Ltd. Engineering Company, as well as a member of the Tianjin Association for Science & Technology. His current research insterests include subsea system design, subsea product design, fabrication, testing and installation.

      WeiFangwas born in 1985 and got hisMastersdegree of Engineering andmajored in Design and Construction of Naval Architecture and Ocean Structure at Tianjin University in 2010. He is an engineer at the subsea system & product reserch & design institute of the Offshore Oil Engineering Co., Ltd. Engineering Company. His current research insterests include subsea system design, subsea product design, fabrication, testing and installation.

      Hanjun Yinwas born in 1973 and is the Directorat the subsea system & product reserch & design institute of the Offshore Oil Engineering Co., Ltd. Engineering Company. As a sennior engineer, he focuses on subsea system design, and subsea product design, fabrication, testing and installation, and especially has extensive engineering experience in subsea structure design.

      Ying Jiangwas born in 1973 and is the Vice Directorat the subsea system & product reserch & design institute of the Offshore Oil Engineering Co., Ltd. Engineering Company. As a senior engineer, she focuses on subsea system design, and subsea product design, fabrication, testing and installation, and especially has extensive engineering experience in subsea mechanical design.

      1671-9433(2014)03-0327-06

      Received date:2013-10-19.

      Accepted date:2014-05-08.

      Foundation item:This work was financially supported by Offshore Engineering Equipment Scientific Research Project–Topic on Subsea Production System Design and Key Equipment Research & Development from Ministry of Industry and Information Technology of the People′s Republic ofChina E-0813C003.

      *Corresponding author Email: juxz@mail.cooec.com.cn

      ? Harbin Engineering University and Springer-Verlag Berlin Heidelberg 2014

      浑源县| 泸溪县| 东阳市| 邳州市| 金山区| 柘荣县| 定结县| 乐清市| 板桥市| 安庆市| 宜丰县| 永安市| 勃利县| 大同县| 商都县| 彰武县| 栾城县| 宣武区| 中超| 榆林市| 小金县| 个旧市| 河池市| 永城市| 句容市| 苗栗县| 开阳县| 沙洋县| 牡丹江市| 开鲁县| 林芝县| 菏泽市| 莫力| 广元市| 和龙市| 武威市| 江永县| 峨边| 进贤县| 马关县| 宝兴县|