    Optimal early refill rules for Danjiangkou Reservoir

    2014-03-15 07:15:52YunWANGShenglianGUOGuangYANGXingjunHONGTingHU
    Water Science and Engineering 2014年4期

    Yun WANG, Sheng-lian GUO*, Guang YANG, Xing-jun HONG, Ting HU

    1. State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China

    2. China Three Gorges Corporation, Yichang 443133, China

    Optimal early refill rules for Danjiangkou Reservoir

    Yun WANG1, Sheng-lian GUO*1, Guang YANG1, Xing-jun HONG1, Ting HU2

    1. State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China

    2. China Three Gorges Corporation, Yichang 443133, China

    Water levels in reservoirs are generally not allowed to exceed the flood-limited water level during the flood season, which means that huge amounts of water spill in order to provide adequate storage for flood prevention and that it is difficult to fill the reservoir fully at the end of year. Early reservoir refill is an effective method for addressing the contradiction between the needs of flood control and of comprehensive utilization. This study selected the Danjiangkou Reservoir, which is the water source for the middle route of the South-North Water Diversion Project (SNWDP) in China, as a case study, and analyzed the necessity and operational feasibility of early reservoir refill. An early reservoir refill model is proposed based on the maximum average storage ratio, optimized by the progressive optimality algorithm, and the optimal scheduling schemes were obtained. Results show that the best time of refill operation for the Danjiangkou Reservoir is September 15, and the upper limit water level during September is 166 m. The proposed early refill scheme, in stages, can increase the annual average storage ratio from 77.51% to 81.99%, and decrease spilled water from 2.439 × 109m3to 1.692 × 109m3, in comparison to the original design scheme. The suggested early reservoir refill scheme can be easily operated with significant comprehensive benefits, which may provide a good reference for scheduling decision-making.

    reservoir operation; early reservoir refill; operation rules in stages; progressive optimality algorithm; Danjiangkou Reservoir

    1 Introduction

    Reservoir operation aims at redistributing water resources, minimizing risks and consequences of water shortages and floods, and maximizing water utilization efficiency with the guidelines of operation rules. Therefore, deriving effective operation rules is essential, as they have a direct impact on a reservoir’s comprehensive benefits (Liu et al. 2006; Liu et al. 2011).

    Operating rules address the relationships among optimal release series, reservoir state variables and hydrological inputs such as storage and inflows (Bhaskar and Whitlatch 1980). Generally, operating rules are predefined at the planning stage of reservoir construction andpresented in various forms, such as operation functions, operation curves and tables. Most of them are evaluated by simulation models (Ngo et al. 2007), which have been developed widely for managing reservoir systems over last few decades (Palmer et al. 1980; Schuster 1987; Wurbs 1993). Although operating rules have become very efficient over time, it is necessary to modify the existing rules when new facilities are installed or the reservoir’s demands and objectives change (Oliveira and Loucks 1997). An effective approach combining optimization models with simulation models to derive operating rules was proposed to solve such problems (Simonovic 1992; Koutsoyiannis and Economou 2003; Celeste and Billib 2009; Rani and Moreira 2010; Guo et al. 2011). From these studies, simulation models were used to verify and analyze the performance of a reservoir under changing conditions, and optimization models were applied to determine the best sequences of releases (Liu et al. 2006).

    Due to the high-dimensional, nonlinear, and stochastic characteristics of reservoir systems, lots of optimization algorithms have been used in reservoir operation, including dynamic programming (DP), genetic algorithms (GAs), artificial neural networks (ANNs), and particle swarm optimization (PSO). Compared with these optimization techniques, the progressive optimality algorithm (POA) has an obvious advantage in reducing dimensionality difficulties for multi-state decision problems. With the advantages of computational efficiency and minimal storage requirements (Howson and Sancho 1975), POA has been successfully applied in water resources management (Turgeon 1981; Nanda et al. 1986; Xie et al.2012; Chen et al. 2013).

    Since Clark (1956) proposed the New York City (NYC) rule, operating rules have been developed in the reservoir refill field. Bower et al. (1966) proposed the space rule, as a special case of the NYC rule, which tried to leave more space in reservoirs where greater inflows are expected. Wu (1988) explored a rule that equalizes the probability of each reservoir being empty at the end of the drawdown season. Lund and Guzman (1999) developed the linear programming NYC rule, which has the ability to incorporate other linear operating constraints in the setting of short-term storage targets for each reservoir and can also incorporate other operating purposes in the objective function. Paredes and Lund (2006) presented two operating rules for the refill and drawdown seasons of reservoirs in parallel for the water supply, considering water quality. Liu et al. (2006) proposed the dynamic programming neural-network simplex (DPNS) model to derive refill operating rules for the Three Gorges Reservoir. Results showed that the optimal operating rules performed more effectively than the design rule curves. Liu et al. (2011) proposed a simulation-optimization test framework to derive the optimal refill rule curves for a multi-objective reservoir. Results indicated that the full refill probability can be improved greatly without decreasing the flood control standard and navigation probability during the refill period. Huo et al. (2011) proposed a scheme of reservoir impoundment in late September instead of early October based on the regularity in the occurrence time of the last flood of each year for the Danjiangkou Reservoir. Resultssuggested that the scheme could maintain the original flood control standard without increasing any flood risk, and be more economically beneficial than the original one. Li et al. (2013) proposed different schemes of impounding water in advance on the basis of an optimal operation and experimental water impoundment scheme for the Three Gorges Reservoir. Results showed that the best scheme was to impound water from 145 m on September 1 to 160 m on September 30 through a continuous and uniform process, which can generate 2.47 × 109kW·h extra hydropower and save 2.53 × 109m3of flood water as compared with the original scheme.

    Although intensive research has proven that the economic benefits of reservoir systems can be significantly increased through optimal operating rules, researchers such as Yeh (1985) and Panuwat et al. (2009) have realized that a gap still exists between the theoretical model and practical operation. Labadie (2004) analyzed possible reasons, including that many reservoir operators are skeptical about models’ results replacing their judgment and feel more comfortable using predefined operating rules, which are easy to comprehend and operate. Besides, many optimization models are not conducive to incorporating risk and uncertainty, which makes it difficult for reservoir managers who bear responsibility for the failure of reservoir operation to achieve optimal results. Thus, it is necessary to design operating rules with characteristics of simplicity, convenience, and strong operability, and there is a need for reservoir operators who easily accept and apply them in practical operation.

    Meanwhile, there is a conflict between flood control and comprehensive utilization for most multi-purpose reservoirs. During flood seasons, reservoir water levels generally are not allowed to exceed the flood-limited water level in order to offer adequate storage for flood control, according to the Chinese Flood Control Act (Li et al. 2010). During the refill period, reservoir water levels are needed to achieve the normal water level for hydropower generation, water supply, and irrigation. If inflow is plentiful, there is no problem in achieving reservoir operation goals. However, huge amounts of water are spilled at the end of the flood period because of the limitation of the flood-limited water level, which makes it difficult for the reservoir to meet the storage target and results in low water resources utilization and economic benefits. An effective method of solving the conflict between the goals of flood control and comprehensive utilization is to implement early reservoir refill.

    The aims of this study were to build an early reservoir refill model and derive optimal refill rules. The Danjiangkou Reservoir was selected as case study and the necessity and operational feasibility of early refill were analyzed. An early reservoir refill model is proposed under the constraints that it cannot reduce flood control standards. The best time of refill and the optimal operating rule were obtained based on the optimization-simulation test procedures. The performance of proposed early refill schemes is compared with the original design scheme.

    2 Danjiangkou Reservoir operating rules

    As shown in Fig. 1, the Danjiangkou Reservoir is located in the middle reach of the Hanjiang River, which is the largest tributary of the Yangtze River. The drainage area of thereservoir basin is 96 000 km2. The Danjiangkou Reservoir was built in 1958 and began operation in 1973, and has many engineering functions, including flood control, water supply, power generation, and navigation.

    Fig. 1 Location of Danjiangkou Reservoir in Hanjiang River Basin

    The Hanjiang River Basin lies in the southeast monsoon zone, dominated by cyclonic rain. In summer, this area is often threatened by heavy rain or rainstorms because of the influence of the western Pacific subtropical high and the India-Myanmar low. In autumn, the northern cold forces increase. Due to the mountainous regions above the Danjiangkou Reservoir, the cold air is blocked and stagnated for a period, which results in a rainfall peak in September and October. Therefore, the entire flood season can be divided into multiple sub-seasons through analysis of the rain-producing system of the Hanjiang River Basin. According to the Danjiangkou Water Conservancy Reservoir Operation Guidelines (CWRC 2012a), the flood season starts on June 21 and ends on October 10, with the period between June 21 and August 20 being the summer flood season and the period between September 1 and October 10 being the autumn flood reason.

    2.1 Danjiangkou Reservoir extension project

    The Danjiangkou Reservoir is the water source of the middle route of the South-North Water Diversion Project (SNWDP), which diverts water via new canals near the west edge of the Huang-Huai-Hai Plain to Beijing and Tianjin municipalities. The reservoir dam has been heightened since 2005. The normal water level has been raised from 157 to 170 m, and the corresponding storage capacity enlarged from 17.45 × 109to 29.05 × 109m3. The flood-limited water levels in summer and autumn are 160 m and 163.5 m, respectively. The Danjiangkou Reservoir extension project was completed in May 2013. The reservoir area has been extended by another 324 km2, affecting more than 250 000 people in Shiyan City in Hubei Province, and Xichuan County in Henan Province. The expanded Danjiangkou Reservoir will provide 9.5 × 109m3of water annually to Beijing and Tianjin municipalities, and some cities in Hebei, Henan, and Hubei provinces. It will be able to provide 13 × 109to 14 × 109m3of water by2030. The design water discharge and maximum discharge are 350 m3/s and 420 m3/s, respectively. Therefore, sufficient water in the Danjiangkou Reservoir is the primary guarantee of the middle route of the SNWDP.

    2.2 Flood control operating rules

    The Danjiangkou Reservoir employs a compensation scheduling mode to implement flood control. When the interval basin inflow from the Danjiangkou dam site to the Nianpanshan Hydrological Station is taken into consideration, reservoir outflow discharges are determined by subtracting interval basin inflow from the safety discharge of the Nianpanshan Hydrological Station. The flood control rules are as follows (CWRC 2012a):

    (1) If the inflow is equal to or less than a 10-year flood, the safety discharge of the Nianpanshan Hydrological Station is 12 000 m3/s.

    (2) If the inflow is more than a 10-year flood but does not exceed a 20-year flood, the safety discharge of the Nianpanshan Hydrological Station is 17 000 m3/s.

    (3) If the inflow is greater than a 20-year flood but does not exceed a 100-year flood, the safety discharge of the Nianpanshan Hydrological Station is 21 000 m3/s.

    (4) If the inflow is more than a 100-year flood but does not exceed a 10 000-year flood, the safety of downstream areas cannot be considered and the reservoir outflow discharge should be increased step-by-step according to the rising tendency of the forecasted inflow and water level. If the inflow is greater than a 10 000-year flood, the reservoir outflow discharge is equal to the maximum discharge capacity so as to guarantee the dam safety.

    2.3 Original design rule curves

    Original design rule curves of the Danjiangkou Reservoir are shown in Fig. 2, in which the water level is kept at 160 m (the flood-limited water level during summer) from June 21 to August 20. From August 21 to September 1, the water level is raised to 163.5 m (the flood-limited water level during autumn). Until October 10, the water level is raised gradually to the normal water level of 170 m. The water level should be kept at 170 m, as high as possible, in order to supply water until the end of next April. The water level is drawn down gradually to 160 m until June 21.

    Fig. 2 Original design rule curves of Danjiangkou Reservoir

    2.4 Operational necessity of early refill

    Before the dam is heightened, if the reservoir refill operation is implemented according to original design rule curves, the full refill probability of the Danjiangkou Reservoir is only about 23% (Hu et al. 1991). After the dam is heightened, the reservoir storage capacity more than doubles. If the refill operating rule and starting time are still based on the original design scheme, the full refill probability of the reservoir will be significantly reduced. Moreover, Chen et al. (2007) used linear regression and Mann-Kendall methods to test long-term trends of the Danjiangkou Reservoir inflow. Their results show that at the confidence level α= 0.05 the annual runoff has a significant downward trend in the period from 1953 to 2003. If successive dry years occur and the reservoir is maintained a low water level, the available water for the receiving areas of the middle route of the SNWDP will be seriously insufficient. Hence, it is vital to implement Danjiangkou Reservoir early refill and derive optimal refill rules.

    3 Operational feasibility of early refill

    3.1 Statistical analysis of precipitation during flood season

    Due to the influence of the monsoon climate, the annual precipitation in the Danjiangkou Reservoir Basin has dramatic diversity and uneven distribution. The average annual precipitation is about 700 to 1 100 mm. The maximum observed annual precipitation, which occurred in 1964, was 1 360 mm, and the minimum observed annual precipitation, which occurred in 1978, was only 504 mm. Rainstorms occur frequently in the period from July to October. Based on daily rainfall data during the flood season from 1954 to 2011, the annual average precipitation amounts of a ten-day period are listed in Table 1. It can found that the precipitation in July is the heaviest. In middle and late September, average rainfall begins to decrease significantly, which causes flood control pressure to be relatively lower. It is feasible to start to implement early refill for the Danjiangkou Reservoir in the middle of September from the annual rainfall distribution prediction.

    Table 1 Statistics of average ten-day precipitation for Danjiangkou Reservoir from 1954 to 2011

    3.2 Reservoir inflow analysis for September

    The monthly average inflow for the Danjiangkou Reservoir in September from 1954 to2011 is shown in Fig. 3, with theaverage inflow in September being 2 440 m3/s. The maximum observed monthly averageflow was 9 013 m3/s and occurred in 1964, while the minimum observed monthly average flow was 217 m3/s and occurred in 1999. Fig. 3 demonstrates that the inflow in September has a significant inter-annual fluctuation. If the operation water level of the reservoir in September is controlled uniformly by the autumn flood-limited water level, too much water will be spilled and water resources utilization efficiency will be reduced greatly. With five days selected as a time interval, the probabilities of flooding during September in each period were analyzed and are listed in Table 2. It can be seen that the probability of a large flood occurring is extremely low. During middle and late September, the frequency of a number of medium and small floods decreases, and the large peak discharge tends to drop off over time. This can create the conditions for the Danjiangkou Reservoir early refill operation.

    Fig. 3 Average monthly inflow in September from 1954 to 2011

    Table 2 Statistics of flood peaks in September for Danjiangkou Reservoir

    3.3 Reservoir flood control capacity analysis

    Many water conservancy projects have been built upstream of the Danjiangkou Reservoir Basin in the last three years, including the Shimen, Shiquan, Pankou, Ankang, Linhekou, and Huanglongtan reservoirs. The total flood prevention storage capacity of these upstream reservoirs is about 1.06 × 109m3, which has greatly reduced the flood control pressuredownstream. After the Danjiangkou Reservoir extension project was finished, the reserved flood prevention storage capacity was enlarged from a range of 55 × 109to 77.2 × 109m3to a range of 81.2 × 109to 110× 109m3, and the flood control standards of the middle and lower reaches of the Hanjiang River have been enhanced from 20-year to 100-year return periods.

    In addition, the administration bureau of the Danjiangkou Reservoir has strong technical capabilities, including its hydrological information-collecting and dispatching automation system, and professional meteorological forecasting system. The developed flood forecasting models have extended the effective lead-time significantly and provided relatively high accuracy (Chau et al. 2005; Wu et al. 2009; Taormina et al. 2012). All of these favorable conditions will provide technical support for the Danjiangkou Reservoir early refill operation.

    4 Early reservoir refill operation

    4.1 Early refill operating rules

    Assuming that the start of the refill period is advanced to September 10, the refill guide curve of the Danjiangkou Reservoir is shown in Fig. 4. The early reservoir refill is guided by the upper limited water level (ULWL) and the refill guide curve. The early refill operating rules can be described as follows:

    Fig. 4 Scheduling graph of early refill for Danjiangkou Reservoir

    (1) When the water level is below the refill guide curve (Zone III), the reservoir releases the minimum discharge determined by comprehensive utilization.

    (2) When the water level is between the ULWL and the refill guide curve (Zone II) before October, the water level is guided by the refill guide curve if no flood occurs. If a medium or small flood (equal to or smaller than a 20-year flood) occurs, the maximum outflow discharge should not exceed 17 000 m3/s and the highest water level is kept below the ULWL. After October, the operating rule is same, but the ULWL is replaced by the normal water level.

    (3) When the water level is higher than the ULWL (Zone I) and a 1 000-year seasonal design flood occurs simultaneously, the highest flood water level must be kept less than the design flood level of 172.2 m. Meanwhile, the artificial flood peak phenomenon, which iswhen the outflow is greater than the inflow, cannot occur during the process of flood control.

    Due to the stochastic characteristics of floods, various flood control projects and facilities are designed based on annual flood frequency analysis. For example, the flood prevention storage capacity of a reservoir will not be used fully for most of hydrological years when the peak discharge is less than a 1 000-year design flood. These features result in a huge amount of flood water being spilled during flood seasons, and insufficient water being refilled during the refill period. To overcome these drawbacks, a method of dividing the flood prevention storage capacity into two parts with the ULWL is proposed. The whole storage capacity is used to regulate 1 000-year seasonal design floods, while the storage capacity below the ULWL is used to regulate medium and small floods. In such a way, early reservoir refill operation is conducted when the forecasting inflow discharge is smaller than the 20-year design flood. Otherwise the reservoir is operated based on design flood control rules (Liu et al. 2011).

    4.2 Early refill operation model

    Based on these operating rules, an early reservoir refill operation model is proposed. The value of ULWL and the water level of each node in the refill guide curve can be obtained by the optimization-simulation test approach. The objective function is as follows:

    Constraints:

    (1) Water balance equation:

    (2) Reservoir water level limits:

    (3) Power generation limits:

    (4) Reservoir discharge limits:

    where Rfis the annual average storage ratio, denoting the extent of reservoir refill (%); n is the number of years; i denotes the sequence number of years; m is the length of the new refill period in days; j denotes the sequence number of days; Vhighiis the reservoir storage of the highest water level in the ith year (m3); Vminis the reservoir storage of the dead water level (m3); Vmaxis the reservoir storage of the normal pool water level (m3); Vijis the reservoir storage on the jth day of the refill period in the ith year (m3); Qinijis the reservoir inflow on the jth day of the refill period in the ith year (m3/s); Qoutijis the reservoir discharge on the jth day of the refill period in the ith year (m3/s); Δt is the time step; Zijis the water level on the jthday of the refill period in the ith year (m); Zminjis the minimum water level of the reservoir on the jth day of the refill period (m); Zmaxjis the maximum water level of the reservoir on the jth day of the refill period (m); Pijis the output power on the jth day of the refill period in the ith year (kW); Pminis the minimum power limit of the reservoir (kW); Pmaxis the maximum power limit of the reservoir (kW); Qminis the minimum flow discharge for downstream comprehensive utilization (m3/s); and ΔQ is the maximum release flow fluctuation of reservoir (m3/s).

    4.3 Solution algorithm

    Fig. 5 Calculation flow chart of early refill operation model

    The early refill model mainly consists of three modules: optimization, simulation, and a design flood test. The calculation procedures and flow chart are shown in Fig. 5. For the optimization module, the POA is used to optimize the water level of each day in the refill guide curve, and the best one/ones are chosen by maximizing the annual average storage ratiovalue. The discrete step in the POA is equal to 0.1 m. In the simulation module, the observed flow data series is simulated by proposed refill operating rules, and the evaluation indexes, such as annual average spilled water, are calculated. In the design flood test module, whether the obtained solutions can reduce the downstream flood control pressure for medium and small floods and ensure the safety of the reservoir and downstream area during large floods are tested. The test standards hold that the water level cannot exceed the design water level when the 1 000-year autumn design flood occurs and the water level cannot exceed the normal water level when the 20-year autumn design flood occurs. The rule curves have an impact on flood routing, and it is necessary to test their feasibility for flood control safety after optimization each time. Testing of the design flood can help to obtain feasible solutions, and the optimal ones can be obtained through loops of the optimization-simulation test. In this way, a test of design flood routing is integrated into the optimization for comprehensive utilization benefits. The ULWL can be determined by a combination of design flood routing and optimization techniques, achieving a best balance between flood control and comprehensive utilization benefits.

    5 Results and discussion

    5.1 Optimal scheduling results

    Based on these operational feasibilities of early refill for the Danjiangkou Reservoir, advancing the early refill time to the middle of September is reasonable. Assuming that September 10, September 15, September 20, and September 25 are the start times, different refill periods from the start time to December 31 were calculated. The typical flow hydrograph of 1964 during the refill period was selected, and the peak-amplitude method that has been reviewed and discussed in detail by Xiao et al. (2009) was used to derive 10-year, 20-year, 100-year, and 1 000-year autumn design flood hydrographs. The early refill operation model was employed to simulate reservoir scheduling with daily inflow data from 1954 to 2011. Table 3 lists reservoir scheduling results with different early refill schemes. The highest water level and the time that the reservoir was refilled fully in the typical year of 1964 are also listed in Table 3.

    Of all optimal schemes, the scheme that starts on September 15 with the value of ULWL equal to 166 m performs best. Table 3 shows that the number of years of the reservoir being refilled fully and the annual average storage ratio are 12 years and 81.91%, respectively. The optimal scheduling graph of the Danjiangkou Reservoir is shown in Fig. 6, in which the slope of the refill guide curve appears to have a decreasing trend before October 1. Since the inflow in the middle of September is relatively small, as shown in Tables 1 and 2, the refill guide curve can rise quickly to maximum comprehensive utilization benefits without increasing flood control risks. The refill guide curve increases slowly in late September in order to guarantee that the water level on October 1 is below 166 m (ULWL). During the period betweenOctober 1 and October 6, the probability of flooding is high in this basin, the reservoir has to reserve more storage capacity for flood prevention, and the refill guide curve rises slowly. Afterwards, the probability of flooding is significantly reduced, the flood control pressure decreases, and the refill guide curve rises quickly to reach the normal water level of 170 m.

    Table 3 Results of different early refill operation schemes

    Fig. 6 Optimal scheduling graph for Danjiangkou Reservoir

    5.2 Early refill in stages

    According to this early refill operation model, the optimal scheduling scheme has been obtained. This model assumes that the water level at any time in September cannot exceed ULWL. The disadvantage of this assumption is that if the inflow is large, the water level reaches ULWL quickly and the reserved flood prevention storage capacity becomes smaller in the middle of September, which might cause the adverse impact of subsequent flood control operation in late September. Therefore, the scheme of early refill in stages is suggested to ensure flood control safety in September. On the basis of the optimal scheduling scheme, the best start time of refill is September 15 and the value of ULWL is 166 m. A five-day time interval was selected to divide the early refill period into four stages, which are listed in Table 4.

    Table 4 Different schemes of early refill in stages

    All of these schemes in Table 4 were simulated with the early refill operation model. The results indicate that scheme 9 to scheme 15 are unreasonable because the highest water levels in the early refill period exceeded 166 m (ULWL) when the 20-year autumn design flood occurred. This is contrary to the operating rule that the highest water level must be kept below ULWL when the medium and small floods (equal to or smaller than a 20-year design flood) occur. Therefore, only the results of the first eight schemes are listed in Table 5, in which the water utilization efficiency of scheme 8 is the highest. Compared with the original design scheme, the year of the reservoir being refilled fully in scheme 8 increased from 5 years to 12 years and its annual average storage ratio increased from 77.51% to 81.99%. The average annual amount of spilled water was 1.692 × 109m3, which is reduced by 0.747 × 109m3. The time that the reservoir was refilled fully was advanced by 25 days. As a result, it is suggested that the Danjiangkou Reservoir begin to refill on September 15 from the flood-limited water level (163.5 m) and that the water level does not exceed 164.5 m from September 16 to September 20, does not exceed 165 m from September 21 to September 25, does not exceed165.5 m from September 26 to September 30, and does not exceed 166 m on October 1.

    Table 5 Results of different schemes of early refill in stages

    5.3 Flood control safety analysis

    The 10-year, 20-year, 100-year, and 1 000-year autumn design floods were used to test the flood control safety of the optimal scheme and schemes of early refill in stages, respectively. Table 6 shows that, for the downstream flood control requirements, all maximum outflow discharges do not exceed the safety discharge when a 100-year-or-smaller flood occurs. As for flood control requirements of the reservoir, when a 20-year-or-smaller design flood occurs, the highest water levels in September and the refill period are below ULWL (166 m) and the normal water level (170 m), respectively. This demonstrates that the refill guide curve and ULWL can control medium and small floods effectively. When 100-year and 1 000-year design floods occur, the highest water levels during the early refill period exceed 166 m. This is because the inflow is large and, if the water level is still strictly guided by the refill guide curve, the outflow will exceed the downstream safety discharge. In order to guarantee downstream safety, the reservoir has to be operated according to the rule in Zone I (Fig. 4), and the water level rises but does not exceed the design flood level 172.2 m, so reservoir safety can still be ensured by both schemes. When the optimal scheme is compared with the scheme of early refill in stages, the highest water level of the former is slightly larger than the latter, which implies that the scheme of early refill in stages is much better for flood control operation.

    Table 6 Comparison of two early refill schemes with different design floods

    5.4 Early refill scheduling process in 1983

    The largest autumn flood, corresponding to a 20-year autumn flood, was observed on October 5, 1983 in the Danjiangkou Reservoir Basin. Fig. 7 shows a scheduling process simulated by the scheme of early refill in stages, in which the water level in September was effectively controlled by the refill guide curve. After the flood peak occurred, the reservoir water level quickly rose to 170 m. For this flood event, the maximum outflow discharge was 13 900 m3/s, which did not exceed the safety discharge of the downstream area (17 000 m3/s). Fig. 7 shows that the scheme of early refill in stages can control medium and small floods effectively and maximize the reservoir comprehensive utilization benefits without reducing the flood prevention standard.

    Fig. 7 Early refill scheduling process in 1983

    6 Conclusions

    The low refill probability of the Danjiangkou Reservoir has an adverse impact on the reservoir comprehensive utilization benefits. Since the dam was heightened, the storage capacity has more than doubled and the problem of the reservoir’s incapability of being refilled has become more prominent. The operational feasibility of reservoir early refill was analyzed in terms of precipitation, inflow discharge, and reservoir flood control capacity. The early reservoir refill operation model was proposed and optimized using daily inflow data from 1954 to 2011. The 10-year, 20-year, 100-year, and 1 000-year autumn design floods were used to test flood control safety for all early refill schemes. The main conclusions of this study are as follows:

    (1) The necessity and feasibility of early refill operation for the Danjiangkou Reservoir have been demonstrated. It is recommended that the best time to start early refill operation is September 15, and the value of the upper limit water level during September is 166 m.

    (2) The best scheme of early refill in stages maintains the water level at or below 164.5 m from September 16 to September 20, at or below 165 m from September 21 to September 25, at or below 165.5 m from September 26 to September 30, and at or below 166 m on October 1.

    (3) When the best scheme of early refill in stages is compared with the original design scheme, the annual average storage ratio is increased from 77.51% to 81.99%, and the annually spilled water is reduced by 0.747 × 109m3. The occurrence of the reservoir being refilled fully is advanced by 25 days.

    The proposed scheme not only maximizes the reservoir comprehensive utilization benefits without reducing flood prevention standards, but also provides a good reference for reservoir scheduling decision making. In addition, the operational ease and safety make it possible for reservoir managers to accept optimal results and put the scheme into wide practice. However, this study does not consider flood forecasting. Combining real-time flood forecasting with early reservoir refill will be a part of our future research.

    Bhaskar, N. R., and Whitlatch, E. E. 1980. Derivation of monthly reservoir release policies. Water ResourcesResearch, 16(6), 987-993.

    Bower, B. T., Hufschmidt, M. M., and Reedy, W. W. 1966. Operating Procedures: Their Role in the Design of Water-Resource Systems by Simulation Analyses. Cambridge: Harvard University Press.

    Celeste, A. B., and Billib, M. 2009. Evaluation of stochastic reservoir operation optimization models. Advances in Water Resources, 32(9), 1429-1443. [doi:10.1016/j.advwatres.2009.06.008]

    Changjiang Water Resources Commission (CWRC). 2012a. Danjiangkou Water Conservancy Reservoir Operation Guidelines. Dankou: Administration Bureau of Danjiangkou Reservoir Press.

    Changjiang Water Resources Commission (CWRC). 2012b. The Design Flood and Operation Guideline for the Danjiangkou Reservoir. Dankou: Administration Bureau of Danjiangkou Reservoir Press.

    Chau, K. W., Wu, C. L., and Li, Y. S. 2005. Comparison of several flood forecasting models in Yangtze River. Journal of Hydrologic Engineering, 10(6), 485-491. [doi:10.1061/(ASCE)1084-0699(2005)10:6(485)]

    Chen, H., Guo, S. L., Xu, C. Y., and Singh, V. P. 2007. Historical temporal trends of hydro-climatic variables and runoff response to climate variability and their relevance in water resource management in the Hanjiang basin. Journal of Hydrology, 344(3-4), 171-184. [doi:10.1016/j.jhydrol.2007.06.034]

    Chen, J. H., Guo, S. L., Li, Y., Liu, P., and Zhou, Y. L. 2013. Joint operation and dynamic control of flood limiting water levels for cascade reservoirs. Water Resources Management, 27(3), 749-763. [doi:10.1007/s11269-012-0213-z]

    Clark, E. J. 1956. Impounding reservoirs. Journal of the American Water Works Association, 48(4), 349-354.

    Guo, S. L., Chen, J. H., Li, Y., Liu, P., and Li, T. Y. 2011. Joint operation of the multi-reservoir system of the Three Gorges and the Qingjiang cascade reservoirs. Energies, 4(7), 1036-1050. [doi:10.3390/en4071036]

    Howson, H. R., and Sancho, N. G. F. 1975. A new algorithm for the solution of multi-state dynamic programming problems. Math Program, 8(1), 104-116.

    Huo, J. J, Xu, J. J, and Zhang, L. L. 2011. Impoundment in advance at the end of flood season for danjiangkou reservoir. Journal of Yangtze River Scientific Research Institute, 28(12), 68-71. (in Chinese).

    Hu, Z. P., Feng, S. Y., and Yu, F. Q. 1991. Strategy of flood control water level for Danjiangkou reservoir. Water Resources and Hydropower Engineering, 11, 1-7. (in Chinese).

    Koutsoyiannis, D., and Economou, A. 2003. Evaluation of the parameterization-simulation-optimization approach for the control of reservoir systems. Water Resources Research, 39(6), 1-17. [doi:10.1029/2003WR002148]

    Labadie, J. 2004. Optimal operation of multireservoir systems: State-of-the-art review. Journal of Water Resources Planning and Management, 130(2), 93-111. [doi:10.1061/(ASCE)0733-9496(2004)130:2(93)]

    Li, X., Guo, S. L., Liu, P., and Chen, G. Y. 2010. Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty. Journal of Hydrology, 391(1-2), 124-132. [doi:10.1016/j.jhydrol.2010.07.011]

    Li, Y., Guo, S. L., Guo, H. J., Zhang, H. G., and Ding, S. X. 2013. Flood control risk and benefit of impounding water in advance for the Three Gorges Reservoir. Journal of Yangtze River Scientific Research Institute, 30(1), 8-14. (in Chinese).

    Liu, P., Guo, S. L., Xiong, L. H., Li, W., and Zhang, H. G. 2006. Deriving reservoir refill operating rules by using the proposed DPNS model. Water Resources Management, 20(3), 337-357. [doi:10.1007/ s11269-006-0322-7]

    Liu, X. Y., Guo, S. L., Liu, P., Chen, L., and Li, X. 2011. Deriving optimal refill rules for multi-purpose reservoir operation. Water Resources Management, 25(2), 431-448. [doi:10.1007/s11269-010-9707-8]

    Lund, J. R., and Guzman, J. 1999. Derived operating rules for reservoirs in series or in parallel. Journal of Water Resources Planning and Management, 125(3), 143-153. [doi:10.1061/(ASCE)0733-9496 (1999)125:3(143)]

    Nanda, J., Bijwa, P. R., and Kothari, D. P. 1986. Application of progressive optimality algorithm to optimal hydrothermal scheduling considering dererministic and stochastic data. Electrical Power and Energy Systems, 8(1), 61-64. [doi:10.1016/0142-0615 (86)90026-8]

    Ngo, L. L., Madsen, H., and Rosbjerg, D. 2007. Simulation and optimization modeling approach for operation of the Hoa Binh reservoir, Vietnam. Journal of Hydrology, 336(3-4), 269-281. [doi:10.1016/j.jhydrol.2007.01.003]

    Oliveira, R., and Loucks, D. P. 1997. Operating rules for multireservoir systems. Water Resources Research, 33(4), 839-852. [doi:10.1029/96WR03745]

    Palmer, R. N., Wright, J. R., Smith, J. A., Cohon, J. L., and ReVelle, C. S. 1980. Policy Analysis of Reservoir Operation in the Potomac River Basin, Volume I, Executive Summary. Baltimore: Johns Hopkins University.

    Panuwat, P., Ashim, D. G., Mukand, S. B., and Sutat, W. 2009. Improved reservoir operation using hybrid genetic algorithm and neurofuzzy computing. Water Resources Management, 23(4), 697-720. [doi:10.1007/s11269-008-9295-z]

    Paredes, J., and Lund, J. R. 2006. Refill and drawdown rules for parallel reservoirs: Quantity and quality. Water Resources Management, 20(3), 359-376. [doi:10.1007/s11269-006-0325-4]

    Rani, D., and Moreira, M. M. 2010. Simulation-optimization modeling: A survey and potential application in reservoir systems operation. Water Resources Management, 24(6), 1107-1138. [doi:10.1007/ s11269-009-9488-0]

    Schuster, R. J. 1987. Colorado River Simulation System, Executive Summary. Denver: U.S. Bureau of Reclamation, Engineering and Research Center.

    Simonovic, S. 1992. Reservoir system analysis: Closing gap between theory and practice. Journal of Water Resources Planning and Management, 118(3), 262-280. [doi:10.1061/(ASCE) 0733-9496(1992)118:3(262)]

    Taormina, R., Chau, K. W., and Sethi, R. 2012. Artificial neural network simulation of hourly groundwater levels in a coastal aquifer system of the Venice lagoon. Engineering Applications of Artificial Intelligence, 25(8), 1670-1676. [doi:10.1016/ j.engappai.2012.02.009]

    Turgeon, A. 1981. Optimal short-term hydro scheduling from the principle of progressive optimality. Water Resources Research, 17(3), 481-486. [doi:10.1029/WR017i003p00481]

    Wu, C. L., Chau, K. W., and Li, Y. S. 2009. Predicting monthly streamflow using data-driven models coupled with data-preprocessing techniques. Water Resources Research, 45(8), 1-23. [doi:10.1029/ 2007WR006737]

    Wu, R. S. 1988. Derivation of Balancing Curves for Multiple Reservoir Operation. M. E. Dissertation. NewYork: Cornell University.

    Wurbs, R. A. 1993. Reservoir-system simulation and optimization models. Journal of Water Resources Planning and Management, 119(4), 455-472. [doi:10.1061/(ASCE)0733-9496(1993)119:4(455)]

    Xiao, Y., Guo, S. L., Liu, P., Yan, B. W., and Chen, L. 2009. Design flood hydrograph based on multi-characteristic synthesis index method. Journal of Hydrologic Engineering, 14(12), 1359-1364. [doi:10.1061/(ASCE)1084-0699(2009)14:12(1359)]

    Xie, W., Ji, C. M., Yang, Z. J., and Zhang, X. X. 2012. Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm. Water Science and Engineering, 5 (1), 46-58. [doi:10.3882/j.issn.1674-2370.2012.01.005]

    Yeh, W. W. G. 1985. Reservoir management and operations models: A state-of-the-art review. Water Resources Research, 21(12), 1797-1818. [doi:10.1029/WR021i012p01797]

    (Edited by Fang WANG)

    This work was supported by the National Natural Science Foundation of China (Grant No. 51190094) and the National Key Technologies Research and Development Program of China (Grant No. 2009BAC56B02).

    *Corresponding author (e-mail: slguo@whu.edu.cn )

    Received Mar. 8, 2014; accepted Jun. 25, 2014

    亚洲电影在线观看av| 久久狼人影院| 黄色女人牲交| 国产精品av久久久久免费| 成人午夜高清在线视频 | 国产精品久久视频播放| 久久草成人影院| 欧美久久黑人一区二区| 女性被躁到高潮视频| 精品国产亚洲在线| 亚洲久久久国产精品| 久久人妻福利社区极品人妻图片| 午夜精品在线福利| 成人18禁高潮啪啪吃奶动态图| 国产精品野战在线观看| 女同久久另类99精品国产91| 久久国产乱子伦精品免费另类| 久久久久久久午夜电影| 久久精品国产亚洲av高清一级| 人人妻人人澡人人看| √禁漫天堂资源中文www| 亚洲中文日韩欧美视频| 国产视频一区二区在线看| 99re在线观看精品视频| 国产一卡二卡三卡精品| 欧美激情高清一区二区三区| 视频在线观看一区二区三区| 在线看三级毛片| 最近最新中文字幕大全电影3 | 国产亚洲精品一区二区www| 成年版毛片免费区| 美女午夜性视频免费| 变态另类丝袜制服| 老鸭窝网址在线观看| 操出白浆在线播放| 国产精品电影一区二区三区| 999精品在线视频| 中文字幕人成人乱码亚洲影| 视频区欧美日本亚洲| 亚洲五月天丁香| 91麻豆av在线| 一区二区三区国产精品乱码| 国产乱人伦免费视频| 91成人精品电影| 婷婷精品国产亚洲av在线| 国产三级黄色录像| 亚洲国产欧美一区二区综合| 女警被强在线播放| 我的亚洲天堂| 国产精品一区二区免费欧美| 亚洲午夜精品一区,二区,三区| 午夜福利高清视频| 久久精品aⅴ一区二区三区四区| a级毛片a级免费在线| 日韩大码丰满熟妇| 一本精品99久久精品77| 岛国在线观看网站| 男女午夜视频在线观看| 88av欧美| 啪啪无遮挡十八禁网站| 成人三级做爰电影| 欧美大码av| 曰老女人黄片| 亚洲国产精品999在线| 中文字幕人妻丝袜一区二区| 制服诱惑二区| 国内久久婷婷六月综合欲色啪| 久久国产亚洲av麻豆专区| 亚洲五月色婷婷综合| 好男人电影高清在线观看| 日本五十路高清| 亚洲精品美女久久av网站| 母亲3免费完整高清在线观看| 日韩一卡2卡3卡4卡2021年| 淫妇啪啪啪对白视频| 亚洲人成网站在线播放欧美日韩| 欧美在线黄色| 91av网站免费观看| 中出人妻视频一区二区| 久久精品国产综合久久久| 亚洲国产欧美日韩在线播放| 亚洲成人国产一区在线观看| 午夜福利视频1000在线观看| 精品久久久久久成人av| 99国产精品一区二区三区| 91字幕亚洲| 岛国视频午夜一区免费看| 91国产中文字幕| 日本在线视频免费播放| 又黄又爽又免费观看的视频| 午夜福利18| 国产一区二区在线av高清观看| 黄片大片在线免费观看| 日本一本二区三区精品| 麻豆成人av在线观看| 搡老岳熟女国产| 亚洲精品国产精品久久久不卡| 欧美日韩亚洲综合一区二区三区_| 国产日本99.免费观看| 怎么达到女性高潮| 亚洲中文字幕一区二区三区有码在线看 | 欧美黑人欧美精品刺激| 99riav亚洲国产免费| 久久午夜综合久久蜜桃| 亚洲专区国产一区二区| 一进一出抽搐gif免费好疼| 国产一卡二卡三卡精品| 久久精品成人免费网站| 欧美国产日韩亚洲一区| 香蕉久久夜色| 久久久国产欧美日韩av| 午夜福利免费观看在线| 人人妻人人澡人人看| 亚洲精品av麻豆狂野| 在线观看66精品国产| 久久99热这里只有精品18| 满18在线观看网站| 特大巨黑吊av在线直播 | 成人午夜高清在线视频 | 久久人人精品亚洲av| 欧美激情极品国产一区二区三区| 国产熟女午夜一区二区三区| 淫妇啪啪啪对白视频| 日韩免费av在线播放| 黑丝袜美女国产一区| 久久精品国产99精品国产亚洲性色| 不卡av一区二区三区| 免费看a级黄色片| 露出奶头的视频| 国产欧美日韩一区二区精品| 黄片播放在线免费| 亚洲国产高清在线一区二区三 | 国产色视频综合| 久久伊人香网站| 久久久久国产精品人妻aⅴ院| 神马国产精品三级电影在线观看 | 性色av乱码一区二区三区2| 视频在线观看一区二区三区| 久久午夜综合久久蜜桃| 国产午夜福利久久久久久| 亚洲熟妇中文字幕五十中出| 午夜精品在线福利| 50天的宝宝边吃奶边哭怎么回事| 久久久久久免费高清国产稀缺| 久久天堂一区二区三区四区| 久久久久九九精品影院| 最新美女视频免费是黄的| 国产视频一区二区在线看| 久久婷婷人人爽人人干人人爱| 黑丝袜美女国产一区| 国产亚洲欧美98| 黑人操中国人逼视频| 男人舔奶头视频| 亚洲人成77777在线视频| 久久这里只有精品19| 日日爽夜夜爽网站| 国产成人欧美| 亚洲精品粉嫩美女一区| 国产真实乱freesex| 99精品在免费线老司机午夜| 日本免费一区二区三区高清不卡| 老汉色av国产亚洲站长工具| 亚洲欧美激情综合另类| 不卡av一区二区三区| 91成人精品电影| 国产亚洲精品久久久久5区| 亚洲成人久久爱视频| 亚洲国产欧美网| 神马国产精品三级电影在线观看 | 一边摸一边抽搐一进一小说| 天堂影院成人在线观看| 好男人电影高清在线观看| 一个人免费在线观看的高清视频| xxxwww97欧美| 两性午夜刺激爽爽歪歪视频在线观看 | 老熟妇仑乱视频hdxx| 日韩欧美三级三区| 1024手机看黄色片| 色综合婷婷激情| 免费看a级黄色片| 黄色视频,在线免费观看| 午夜久久久在线观看| 777久久人妻少妇嫩草av网站| 男女做爰动态图高潮gif福利片| 老鸭窝网址在线观看| 精品国内亚洲2022精品成人| 999精品在线视频| 啦啦啦免费观看视频1| 黄色女人牲交| 1024视频免费在线观看| 窝窝影院91人妻| 国产精品久久久久久亚洲av鲁大| 少妇裸体淫交视频免费看高清 | 老司机福利观看| 欧美日韩精品网址| 成人三级黄色视频| 亚洲精品在线美女| 中文在线观看免费www的网站 | 精品欧美国产一区二区三| 亚洲一区高清亚洲精品| 久久久精品国产亚洲av高清涩受| 成年免费大片在线观看| 欧美久久黑人一区二区| 日本熟妇午夜| 老司机靠b影院| 国产高清激情床上av| 国产亚洲欧美在线一区二区| 国产精品久久久久久人妻精品电影| 18禁黄网站禁片午夜丰满| 国产精品 欧美亚洲| 搡老熟女国产l中国老女人| 手机成人av网站| 免费看a级黄色片| 亚洲熟妇中文字幕五十中出| 黄色视频不卡| 露出奶头的视频| 成人国语在线视频| 不卡av一区二区三区| 国产蜜桃级精品一区二区三区| 两性夫妻黄色片| 日本一本二区三区精品| 婷婷精品国产亚洲av在线| 亚洲欧美一区二区三区黑人| 国产99久久九九免费精品| 午夜视频精品福利| 免费看美女性在线毛片视频| 91老司机精品| 久久人人精品亚洲av| 男女视频在线观看网站免费 | 日韩大尺度精品在线看网址| 亚洲第一av免费看| 日韩大码丰满熟妇| 精品卡一卡二卡四卡免费| 神马国产精品三级电影在线观看 | 黄频高清免费视频| 亚洲欧洲精品一区二区精品久久久| 国产一级毛片七仙女欲春2 | 成人欧美大片| 波多野结衣高清无吗| 精品国产乱码久久久久久男人| 99热这里只有精品一区 | 亚洲性夜色夜夜综合| 欧美成人免费av一区二区三区| 一级黄色大片毛片| 亚洲精品美女久久久久99蜜臀| 欧美中文日本在线观看视频| 午夜激情福利司机影院| 午夜激情av网站| 国产精品久久久久久精品电影 | 久久精品91蜜桃| 美女高潮到喷水免费观看| 午夜成年电影在线免费观看| 一区二区三区高清视频在线| 亚洲精品中文字幕一二三四区| 久久久久精品国产欧美久久久| 日韩欧美 国产精品| 99国产综合亚洲精品| 国产精品永久免费网站| 999久久久国产精品视频| 亚洲精华国产精华精| 中文字幕av电影在线播放| 欧美av亚洲av综合av国产av| 18禁裸乳无遮挡免费网站照片 | 波多野结衣av一区二区av| 国产精品久久视频播放| 在线国产一区二区在线| 国产精品香港三级国产av潘金莲| 嫁个100分男人电影在线观看| 中文在线观看免费www的网站 | 亚洲激情在线av| 国产熟女午夜一区二区三区| 两性午夜刺激爽爽歪歪视频在线观看 | 一级黄色大片毛片| 国产一区二区在线av高清观看| 亚洲成a人片在线一区二区| 日韩中文字幕欧美一区二区| 一个人免费在线观看的高清视频| √禁漫天堂资源中文www| 一进一出抽搐gif免费好疼| 久久精品国产亚洲av高清一级| 久久国产亚洲av麻豆专区| 亚洲国产看品久久| 一级作爱视频免费观看| 岛国在线观看网站| or卡值多少钱| 久久国产精品人妻蜜桃| 日韩精品青青久久久久久| а√天堂www在线а√下载| 丁香六月欧美| 在线观看一区二区三区| 操出白浆在线播放| 午夜两性在线视频| 精品久久久久久久毛片微露脸| 日本三级黄在线观看| 午夜福利高清视频| 大香蕉久久成人网| 熟妇人妻久久中文字幕3abv| 老汉色av国产亚洲站长工具| 观看免费一级毛片| 亚洲自拍偷在线| 久久久久九九精品影院| 亚洲一区二区三区不卡视频| 黄色视频不卡| 正在播放国产对白刺激| 亚洲第一av免费看| 久久香蕉激情| 国产亚洲精品久久久久久毛片| 亚洲九九香蕉| www.熟女人妻精品国产| 国产成人系列免费观看| 99精品久久久久人妻精品| 国产亚洲精品一区二区www| 免费高清视频大片| 成人18禁在线播放| 亚洲国产看品久久| av片东京热男人的天堂| 黄色 视频免费看| 这个男人来自地球电影免费观看| 欧美 亚洲 国产 日韩一| 亚洲成av片中文字幕在线观看| 在线播放国产精品三级| 亚洲国产精品999在线| 亚洲色图 男人天堂 中文字幕| 黑人操中国人逼视频| 国产精品九九99| 亚洲精品国产一区二区精华液| 精品国产超薄肉色丝袜足j| or卡值多少钱| 欧美一级a爱片免费观看看 | 听说在线观看完整版免费高清| 亚洲欧洲精品一区二区精品久久久| 啦啦啦免费观看视频1| 女警被强在线播放| 亚洲电影在线观看av| 亚洲七黄色美女视频| 美国免费a级毛片| 免费高清视频大片| 中文字幕最新亚洲高清| 男女做爰动态图高潮gif福利片| 一进一出抽搐动态| 女性被躁到高潮视频| 亚洲精品粉嫩美女一区| 黑人欧美特级aaaaaa片| 美女午夜性视频免费| 国产精品亚洲av一区麻豆| 999精品在线视频| 黄色视频不卡| 日韩大尺度精品在线看网址| 久久精品国产清高在天天线| 成熟少妇高潮喷水视频| 国产精品久久久av美女十八| 精品无人区乱码1区二区| 成人特级黄色片久久久久久久| 中亚洲国语对白在线视频| 久久国产亚洲av麻豆专区| 久久精品影院6| 久久伊人香网站| 自线自在国产av| 母亲3免费完整高清在线观看| 99国产精品一区二区三区| 久久久久久国产a免费观看| 观看免费一级毛片| 国产91精品成人一区二区三区| 精品欧美一区二区三区在线| 国产爱豆传媒在线观看 | 国产成人精品久久二区二区91| 日日爽夜夜爽网站| 国产免费av片在线观看野外av| 中出人妻视频一区二区| 伊人久久大香线蕉亚洲五| 国产精品久久久久久人妻精品电影| 精品久久久久久久人妻蜜臀av| 亚洲精品美女久久av网站| 午夜成年电影在线免费观看| 日本黄色视频三级网站网址| 免费搜索国产男女视频| 亚洲自偷自拍图片 自拍| 国产精品一区二区三区四区久久 | 男人舔奶头视频| tocl精华| 熟女电影av网| 黄片大片在线免费观看| 老熟妇乱子伦视频在线观看| 两个人视频免费观看高清| 一本大道久久a久久精品| 成人免费观看视频高清| 高潮久久久久久久久久久不卡| 日本五十路高清| 亚洲人成伊人成综合网2020| 久久精品人妻少妇| 国产熟女午夜一区二区三区| 自线自在国产av| 精品欧美国产一区二区三| 麻豆成人av在线观看| 国产精品自产拍在线观看55亚洲| 成人精品一区二区免费| 长腿黑丝高跟| 最近最新中文字幕大全电影3 | 久久精品91无色码中文字幕| 在线观看舔阴道视频| 国产精品日韩av在线免费观看| 淫妇啪啪啪对白视频| 人人妻人人澡欧美一区二区| 免费在线观看成人毛片| 午夜视频精品福利| 香蕉国产在线看| 一边摸一边做爽爽视频免费| 午夜亚洲福利在线播放| 我的亚洲天堂| 国产91精品成人一区二区三区| 亚洲成人久久爱视频| 精品一区二区三区视频在线观看免费| 国产熟女午夜一区二区三区| 动漫黄色视频在线观看| 国产亚洲av嫩草精品影院| 一边摸一边做爽爽视频免费| 少妇裸体淫交视频免费看高清 | 女人被狂操c到高潮| 大型黄色视频在线免费观看| 91国产中文字幕| 国产精品乱码一区二三区的特点| or卡值多少钱| 国产1区2区3区精品| 日本精品一区二区三区蜜桃| 黄色丝袜av网址大全| 精华霜和精华液先用哪个| 这个男人来自地球电影免费观看| 亚洲精品一卡2卡三卡4卡5卡| 精品免费久久久久久久清纯| 天天一区二区日本电影三级| 深夜精品福利| 精品国产乱子伦一区二区三区| 亚洲片人在线观看| 亚洲avbb在线观看| 2021天堂中文幕一二区在线观 | 一本综合久久免费| 久久久久久大精品| 久久久久久久久中文| 99热只有精品国产| 亚洲国产精品久久男人天堂| 国产主播在线观看一区二区| 成人三级做爰电影| 97人妻精品一区二区三区麻豆 | 国内精品久久久久精免费| 一进一出好大好爽视频| 级片在线观看| 日韩三级视频一区二区三区| 精品国内亚洲2022精品成人| 在线天堂中文资源库| 高潮久久久久久久久久久不卡| 亚洲成人国产一区在线观看| 91大片在线观看| 国产精品免费一区二区三区在线| 国产精品一区二区免费欧美| 免费高清视频大片| 日本一本二区三区精品| 91麻豆精品激情在线观看国产| 亚洲第一欧美日韩一区二区三区| 亚洲第一av免费看| 色综合欧美亚洲国产小说| 村上凉子中文字幕在线| e午夜精品久久久久久久| 亚洲 国产 在线| 可以在线观看的亚洲视频| 999精品在线视频| 香蕉国产在线看| 精品国产超薄肉色丝袜足j| 久久九九热精品免费| 亚洲精品中文字幕在线视频| 香蕉国产在线看| 久久久久亚洲av毛片大全| 久久久久国产一级毛片高清牌| 午夜福利一区二区在线看| 高潮久久久久久久久久久不卡| 免费高清在线观看日韩| 婷婷亚洲欧美| 俄罗斯特黄特色一大片| 中文资源天堂在线| 欧美日韩亚洲综合一区二区三区_| 亚洲一区二区三区不卡视频| 日日干狠狠操夜夜爽| 黄色毛片三级朝国网站| 波多野结衣高清作品| 正在播放国产对白刺激| 国产又爽黄色视频| 国产高清videossex| 日韩欧美三级三区| 91老司机精品| 哪里可以看免费的av片| 久久久久久久久免费视频了| 亚洲国产看品久久| 精品日产1卡2卡| 天天躁夜夜躁狠狠躁躁| 亚洲片人在线观看| 中出人妻视频一区二区| 亚洲国产看品久久| 国产精品 欧美亚洲| 91麻豆精品激情在线观看国产| 久久午夜综合久久蜜桃| 香蕉av资源在线| 精品久久久久久成人av| 啦啦啦免费观看视频1| 国产v大片淫在线免费观看| 国产不卡一卡二| svipshipincom国产片| 免费av毛片视频| 久久伊人香网站| 国产av一区二区精品久久| 国产精品 欧美亚洲| 亚洲精品久久成人aⅴ小说| 国产亚洲欧美98| 一区二区三区激情视频| 日本免费a在线| 国产aⅴ精品一区二区三区波| 国产99白浆流出| 大型av网站在线播放| 精品卡一卡二卡四卡免费| 88av欧美| 免费在线观看亚洲国产| 国产99白浆流出| 91成年电影在线观看| 成年免费大片在线观看| 免费看a级黄色片| 麻豆成人午夜福利视频| 女同久久另类99精品国产91| а√天堂www在线а√下载| 在线国产一区二区在线| 久久中文看片网| svipshipincom国产片| 在线视频色国产色| 午夜激情福利司机影院| 身体一侧抽搐| 1024视频免费在线观看| 欧美乱色亚洲激情| 女生性感内裤真人,穿戴方法视频| 亚洲第一电影网av| 国产精品影院久久| 欧美在线一区亚洲| 在线国产一区二区在线| 免费看a级黄色片| 久久精品成人免费网站| 9191精品国产免费久久| 男女做爰动态图高潮gif福利片| 欧美日韩一级在线毛片| 777久久人妻少妇嫩草av网站| 天堂√8在线中文| 成人三级做爰电影| 自线自在国产av| 久久性视频一级片| 色婷婷久久久亚洲欧美| 欧美日韩亚洲综合一区二区三区_| 久久青草综合色| 一区福利在线观看| 亚洲成a人片在线一区二区| 每晚都被弄得嗷嗷叫到高潮| 久久性视频一级片| 在线观看66精品国产| а√天堂www在线а√下载| 看片在线看免费视频| 男人舔奶头视频| 成人手机av| 少妇熟女aⅴ在线视频| a级毛片a级免费在线| 久久久久精品国产欧美久久久| 国产三级在线视频| 大香蕉久久成人网| 一个人观看的视频www高清免费观看 | 看免费av毛片| 久久亚洲精品不卡| aaaaa片日本免费| 黄色 视频免费看| 男人的好看免费观看在线视频 | svipshipincom国产片| 男女午夜视频在线观看| 在线看三级毛片| 伊人久久大香线蕉亚洲五| 真人一进一出gif抽搐免费| 欧美性长视频在线观看| 久久精品夜夜夜夜夜久久蜜豆 | 99国产精品99久久久久| 日本精品一区二区三区蜜桃| 日韩欧美在线二视频| av中文乱码字幕在线| 1024手机看黄色片| 精品不卡国产一区二区三区| 久久精品国产亚洲av高清一级| 免费一级毛片在线播放高清视频| 久久香蕉国产精品| 久久国产精品人妻蜜桃| 亚洲精品久久成人aⅴ小说| 欧美一级毛片孕妇| 久久人人精品亚洲av| 日本一区二区免费在线视频| 少妇 在线观看| 女生性感内裤真人,穿戴方法视频| 99久久综合精品五月天人人| 人人妻,人人澡人人爽秒播| 亚洲人成电影免费在线| 亚洲中文字幕日韩| 国产亚洲精品久久久久5区| 中文字幕高清在线视频| 国产一区二区在线av高清观看| 亚洲欧美精品综合久久99| 久久久久久人人人人人| 两性夫妻黄色片| 亚洲国产高清在线一区二区三 | av超薄肉色丝袜交足视频| 婷婷精品国产亚洲av| 中国美女看黄片| 精品久久蜜臀av无| 丝袜在线中文字幕| 在线观看免费日韩欧美大片| 亚洲一区中文字幕在线| 91av网站免费观看| 亚洲午夜理论影院|