    Treatment design of geological defects in dam foundation of Jinping I hydropower station

    2013-07-10 12:23:42ShengwuSongXueminFengHonglingRaoHanhuaiZheng

    Shengwu Song, Xuemin Feng, Hongling Rao, Hanhuai Zheng

    ChengduHydroelectricInvestigationandDesignInstitute,ChinaHydropowerEngineeringConsultingGroupCorporation,Chengdu610072,China

    Treatment design of geological defects in dam foundation of Jinping I hydropower station

    Shengwu Song?, Xuemin Feng, Hongling Rao, Hanhuai Zheng

    ChengduHydroelectricInvestigationandDesignInstitute,ChinaHydropowerEngineeringConsultingGroupCorporation,Chengdu610072,China

    A R T I C L E I N F O

    Articlehistory:

    Received 4 March 2013

    Received in revised form 24 May 2013

    Accepted 18 June 2013

    Geological defects

    Treatment design

    Concrete cushion

    Concrete replacement grids

    Consolidation grouting

    Performance evaluation

    Jinping I hydropower station

    Jinping I hydropower station is one of the most challenging projects in China due to its highest arch dam and complex geological conditions for construction. After geological investigation into the dam foundation, a few large-scale weak discontinuities are observed. The rock masses in the left dam foundation are intensively unloaded, approximately to the depth of 150–300 m. These serious geological defects lead to a geological asymmetry on the left and right banks, and thus some major difficulties of dam construction are encountered. In this paper, the influences of geological defects on the project are analyzed, followed by the concepts and methods of treatment design. Based on the analysis, the treatment methods of the weak rock masses and discontinuities are carefully determined, including the concrete cushion, concrete replacement grids, and consolidation grouting. They work together to enhance the strength and integrity of the dam foundation. Evaluations and calibrations through geo-mechanical model tests in combination with field monitoring results in early impoundment period show that the arch dam and its foundation are roughly stable, suggesting that the treatment designs are reasonable and effective. The proposed treatment methods and concepts in the context can be helpful for similar complex rock projects.

    ? 2013 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. All rights reserved.

    1. Introduction

    Jinping I hydropower station is located in Liangshan Yi Autonomous Prefecture, Sichuan Province in Southwest China. It is built on the Yalong River as a controlling cascade hydropower station in the middle and lower reaches, with power generation as its major function. It has annual regulating capacity of water resources and provides remarkable compensation benefits for the lower cascade hydropower stations. The total reservoir capacity is 7.76 × 109m3at a normal water level of 1880 m, and the installed capacity is 3600 MW. The height of concrete double-curvature arch dam is 305 m with the bottom foundation elevation of 1580 m and dam crest elevation of 1885 m, which is the highest under construction in the world.

    The hydropower station is built in the transitional slope zone between Qinghai-Tibet Plateau and Sichuan Basin. In the project area, the river valley is sharply incised with high steep slopes on both banks. Large-scale tectonic faults with strikes of river direction are developed and rock masses in left bank are intensively unloaded with depth of 150–300 m (Liu et al., 2010; Song et al., 2011), leading to a geological asymmetry on the left and right banks. For these geological defects existing, the rock mass quality in the studied area basically cannot meet the requirements of the dam foundation construction. Consequently, the arch dam project is regarded as one of the most challenging projects with complex geological conditions and difficult foundation treatments (Liu et al., 2004; Fan et al., 2012).

    The design of Jinping I hydropower station was completed in 2003. After the excavation of dam foundation, the subsequent concrete placing of the dam started in 2009. At the end of 2012, the diversion tunnels were plugged and early impoundment of the reservoir began. At present, the concrete arch dam is constructed up to a height of 280 m, and most of the foundation treatments have been implemented. According to the schedule, the dam will be impounded and put into power generation in August 2013. In this paper, the analytical methods, design concepts, treatment measures and technical features of strengthening the geological defects in the dam foundation will be presented.

    2. Geological settings of dam foundation

    In the project region, the Yalong River flows along the direction of N25°E, with water level of 1635 m in dry season. The top elevation of the valley mountains reaches up to 3200–3600 m, andrelative height difference of topography is 1500–2000 m. High and steep slopes stand in precipitous gorges and V-shaped valleys are sharplyincised,withadeclinationof40°–90°.

    Fig. 1. Sectional diagram of geological structures across the valley in the project area.

    The outcropping strata in project region are group T2–3z, the middle–upper group of Triassic Zagunao formation, which consists of the core parts of the dam foundation and southeast branch (normal branch) of the close inversed Santan Syncline. The rocks in the region can be classified into three groups according to their lithology. The first group is green schistwhich is buried in depth under the riverbed and does not outcrop on the ground. The second one is marble of green schist interbedsIt consists of eight layers observed in both banks of the river with thickness of about 600 m. This rock group contributes to the host rocks of the damfoundation,andinterlayerbeltsdevelopinthegreenschist rock masses. The third one is metasandstone and slateconsisting of six layers, with overburden thickness of about 400 m. It is formed in the core strata of Santan Syncline and can be found in upper left abutment. Rock mass integrity of this group is not good as expected because of its lithology and formation. The strikes of those strata are almost consistent with river flowing direction, dipping toward the left bank with an inclination of about 40°. Therefore, a typical longitudinal valley is formed, with consequent slopes in right bank and inverse slopes in left bank (Fig. 1).

    Weak discontinuities, mainly in the presence of faults, are developed in the dam site, with predominating strikes of NE–NNE and dip of SE. Some large-scale weak discontinuities are of faults f5, f8, f2 and lamprophyre dyke X in left bank, faults f13, f14 in right bank, and fault f18 lying obliquely in the riverbed, which definitely control the stability of the project (Fig. 2).

    Faults f5, f8 and lamprophyre dyke X are observed outcropping in the left bank, and the width of crushed zones in the faults is basically 2–8 m. These discontinuities are mainly composed of loose tectonic breccia, mylonite and strongly weathered rocks which are easy to dissolve in water. Owing to the unloading of valley slopes, the rock masses intersected by these weak discontinuities above the elevation of 1680 m are intensively fractured and loosened. Fault f2 outcrops in the lower slope in the left bank, consisting of four or five displacing interlayer belts with broken green schist rocks. Faults f13 and f14 develop in the right bank, with breccia and mylonite as their main composition, and mud with a thickness of several centimeters can be found in the faults. Fault f18 lies in the riverbed oblique to the right bank, and it is composed of lamprophyre dyke X, strongly weathered and susceptible to water (Table 1).

    Fig. 2. Planar diagram of geological structures in the project area.

    The rock masses are intensively unloaded in the slopes of the valley. In the right bank, the depth of unloading generally reaches 30–50 m, which is within a normal unloading scope. But in the left bank, the unloading depth of rock masses is considerably large due to the impacts of geological structures and rock lithology. In middle and lower slopes, this unloading depth of marble is 150–200 m, and that of sandy slate in middle and upper slopes can reach 200–300 m and even extend 500 m along the river side. Relaxed tensile fissures resultant from original joints can be frequently encountered in the unloaded rock masses, with apertures of 10–20 cm. This special geological phenomenon is rarely reported and thereafter is named as deep unloading (Qi et al., 2004; Song et al., 2011). The unique unloading feature in this region is the primary factor leading to the geological asymmetry of both banks. According to geological investigation in the dam site, the rock quality is classi fied as listed in Table 2.

    3. Major geological defects in dam foundation and in fluences

    It is previously mentioned that the geological condition in the dam site is signi ficantly asymmetric, relatively good in the right bank but unfavorable in the left bank. Thus a series of technical challenges for the dam foundation treatment are encountered. Through detailed analysis, the geological defects in dam foundation can be classi fied into two categories. One is the rock mass of grades III2and IV affected by unloading and ripping in dam foundation and resistance blocks of left bank, the other is large-scale discontinuities developed in the dam site (Liu et al., 2010).

    According to the geological investigations and field excavations, rock masses of grades II and III1in this region account for 89.8% of rock masses of the right bank in total. In the left dam foundation, the rock mass quality of the upper part of slope is signi ficantly different from that of lower part. Below the elevation of 1780 m, the foundation surface is dominated by rock masses of grades II, III1, about 87.9%; while above that level, they are mainly of rock masses of grades IV–V, about 72.7%, and no rock masses of grade II can befound and that of grade III1only accounts for 15.1% of rock masses in total (Table 3 and Fig. 3).

    It is noted that rock masses of grades III2, IV and V cannot be utilized as the foundation host rocks directly due to their unfavorable effects on stability of the dam foundation. After effective engineering treatments, rock masses of grade III2can be considered as the foundation host rocks. However, special treatments are desired for the rock masses of grades IV and V in the dam foundation.

    Table 1 Features of main weak discontinuities (faults) in the project region.

    Table 2 Rock mass quality classification and physico-mechanical parameters in the dam site.

    Table 3 Rock mass quality assessment of different parts in the dam foundation surface.

    In the left valley slopes, the faults f5 and f8 featured with shallow overburden depth are observed, where fractured rock masses are widely distributed. The strongly unloaded rock masses outside the faults in combination of the faults exert adverse influence on the stability of the dam. Meanwhile, it is clear that the faults f5 and f8 attribute to the side boundary of potential sliding surfaces in the left abutment. Lamprophyre dyke X, buried in depth inside the slope, is strongly weathered, and its strike is almost perpendicular to the direction of the dam thrust, which also imposes unfavorable influence on the stability of the dam foundation. The lamprophyre dyke X similarly constitutes a potential boundary surface of certain sliding block in the left abutment (Song et al., 2010; Wang et al., 2012).

    In the vicinity of riverbed, the faults f2 and f18 lie in the lower part of the dam foundation (i.e. elevation 1600–1680 m). Moreover, they are located in the main bearing zones of the dam foundation, and thus have major effects on the stress distribution and seepage stability of the dam foundation. The fault f2 composes a potential bottom surface of certain sliding blocks in the left abutment,and therefore it is unfavorable for the anti-sliding stability of the dam.

    Fig. 3. Distribution diagram of rock mass quality in dam foundation surface (unit: m).

    In the right valley slopes, the faults f13 and f14 outcrop in the upper part of dam foundation. For this reason, ground water signs show the layer has good permeability. It is interesting to note that the faults are interconnected with the reservoir in the upstream, and in the downstream they pass through the underground powerhouse area. In this way, the faults impose adverse influences on the stress distribution, transferring of the arch thrust, seepage stability and surrounding rock mass stability of underground powerhouses in the right abutment. Similarly, the faults f13 and f14 also constitute the potential boundary surfaces of sliding blocks in the right abutment.

    4. Design of treatment for the geological defects

    4.1.Conceptsoftreatmentdesign

    Based on the disclosed geological conditions in the project region, effective engineering measures should be adopted to strengthen these defects and to analyze the in fluence of geological defects on the project stability. In the view of technical feasibility, concepts of treatment design for the geological defects in different locations in the dam foundation should be carefully proposed.

    (1) The strikes of large-scale faults f5 and f8 are almost in parallel with the valley slope surface. The mechanical properties of those faults are very poor, thus excavation of the upper shallow parts of the faults and the slope rock masses outside them should be considered to improve the anti-sliding stability of the dam.

    (2) The deep lamprophyre dyke X and the lower part of fault f5 are composed of very weak rock masses, which have a fairly wide in fluential zones, both of them dip toward the river. Local excavation in grids can be adopted, and after excavation it can be back filled by concrete or grouted directly, in order to improve the shear-resistance capability and the integrity of rock masses.

    (3) Fault f2 outcrops in the lower part of the dam foundation and it extrudes the displacing belts and fault f18 that lies in the right of the dam foundation. The shallow parts are considered to be excavated after slots cutting in the foundation surface, and then concrete back fill can be implemented together with flushing and grouting in certain deep areas, so that the bearing capacity and anti-seepage properties of rock masses in the vicinity of these faults can be improved.

    (4) Faults f13 and f14 are interconnected with the reservoir, and they have great impacts on stress distribution imposed on the dam foundation. Therefore, local places must be excavated and replaced with concrete. In addition, deep anti-seepage system and grouting are needed to reduce the negative in fluences of these faults on the stability of the right abutment and underground powerhouses.

    (5) In the left dam foundation, the sandy slate above elevation 1800 m and the marble in the elevations of 1730–1800 m are quite fractured and the mechanical properties are considerably poor, which are directly associated with the faults f5, f8 and dyke X. Therefore, a massive concrete replacement cushion for those strata is needed; meanwhile, effective grouting will be implemented to improve the resistant capability of host rocks in this area.

    (6) Drainage structures are considered in the downstream of the dam foundation, where anti-seepage curtains and resistance blocks are adopted.

    4.2.Mainschemesoftreatmentdesign

    4.2.1.Excavationdesignofabutments

    The slopes in the right bank are mainly composed of marble that has relatively good mechanical property. The degrees of weathering and unloading depth of the marble formation are basically in a normal range, and the unloading depth is generally less than 50 m. The rocks in the depth below 50 m are almost fresh and classi fied into grade II or III1, a good choice for host rocks of the dam foundation. In this way, the scope of slope excavation is limited within the boundaries of the weathered and unloading belts in the right abutment.

    The slopes in the left bank are roughly composed of sandy slate and marble. The rocks above the elevation 1750 m are intensively unloaded with depth more than 200 m, most of which are grades III2and IV and cannot be directly utilized as dam foundation surface. Particularly, in the elevation 1750–1730 m, fault f5 is in the vicinity of the arch abutment. The rocks around it cannot be considered as the dam foundation either for too small thickness of the layer on one hand, and on the other hand, excess excavation of the abutment will lead to large deformation of the arch dam and heterogeneous distribution of stresses in the dam (Xiang and Rao, 2008; Song et al., 2010). Therefore, the faults f5 and f8 and rocks around the faults (above elevation 1730 m) will be excavated in the left abutment.

    4.2.2.Designschemesofconcretecushionsystemforweakrocks inthefoundationsurface

    The concrete cushion in the left abutment is constructed in the elevations of 1730–1885 m. The thickness of the concrete cushion at different elevations is required according to the arch dam shape and the excavation scope of the spandrel groove.

    In order to design an optimized width of the concrete cushion foundation, sensitivity analyses by finite element method (FEM) at the representative elevations of 1750 m and 1830 m have been conducted. Six schemes with different foundation widths in the contact surface of the cushion and bedrock are selected. The ratio of the foundation width to the arch abutment thickness at the same elevation is 1.4, 1.8, 2.0, 2.2, 2.4 and 2.6, respectively. The displacements of the arch abutment in the direction of arch thrust are adopted as evaluation index. The results indicate that, the displacements of the arch abutment at the elevation 1750 m, with values from 31 mm to 34 mm, tend to be stable when the width ratio reaches 1.8. While at the elevation of 1830 m, the relative ratio is 2.2, with displacement of approximately 15 mm. Therefore, the values of 1.8 and 2.2 are selected as the optimized ratios in the design of the width of the cushion foundation at the two elevations, which can be also referred to as a design principle at other elevations.

    For the concrete cushion design, four schemes at the elevation of 1830 m have been implemented by two-dimensional (2D) FEM. Of these schemes, the width of the cushion at the side of the arch abutment is set to be 1.0, 1.5 and 2.0 times the arch abutment thickness, respectively. And different cases of slope excavation outlines of the spandrel groove are considered. Results show that the displacements of the arch abutment in the direction of river flow and the stresses in the cushion differ slightly with the width ratios of 1.5 and 2.0. The values of displacements and stresses are 18–24 mm and 1.0–1.5 MPa, respectively. However, the displacement is up to 44 mm and the principal compressive stress is up to 3.2 MPa when the ratio is 1.0. In consideration of both safety and economy, the width of the concrete is designed at 1.5 times the arch abutment thickness. The final layout of the concrete cushion is shown in Fig. 4, with average width and average thickness of 61.2 m and 49.8 m, respectively. The total concrete volume is 560.2 × 103m3.

    Fig. 4. Layout and dimensions of the concrete cushion at the elevation 1830 m.

    In the cushion foundation, the rocks on the surface are unloaded, relaxed and weak. In order to improve the force-transfer effectiveness of the arch dam and the stress distribution in the rocks, five concrete replacement galleries are designed in the cushion foundation: one at the elevation of 1829 m, two at 1785 m and two at 1730 m, with sectional dimensions of 9 m × 12 m (width × height). These force-transfer shear galleries pass through the lamprophyre dyke X are situated in the intact rock masses, which are helpful for providing additional anti-shear capability of lamprophyre dyke X.

    4.2.3.Treatmentdesignofconcretereplacementgridsforthe faultf5andlamprophyredykeX

    In the left abutment, concrete replacement grids are adopted to treat the fault f5 and lamprophyre dyke X. Firstly, for fault f5 below the cushion foundation after excavation, two concrete replacement galleries at the elevations of 1730 m and 1670 m will be constructed along the strike of the fault. The height of the two concrete replacement galleries is 10 m, but the width varies according to the thickness of the crushed zones of the faults, basically 9 m in average. At the two elevations, four inclined concrete replacement shafts are employed along the fault plane, with a space of 30–35 m and a width of 15 m. The first shaft on the upstream also acts as an anti-seepage shaft of the dam curtains for fault f5, with a smaller width of 10 m (Fig. 5).

    Secondly, for the treatment of lamprophyre dyke X, three concrete replacement galleries at the elevations of 1829 m, 1785 m and 1730 m are considered with sectional dimensions of 9 m × 12 m (width × height), which are intersected with the above-mentioned force-transfer shear galleries. In the elevations of 1829–1785 m, an inclined replacement shaft is implemented, together with the antiseepage curtains of the dam. In the elevations of 1785–1730 m, four inclined concrete replacement shafts will be constructed, with a space of 31 m and a width of 7 m (Fig. 6).

    Fig. 7 shows a three-dimensional (3D) view of the designed strengthening system. It is composed of the concrete cushion, force-transfer shear galleries, and concrete replacement grids desired for the fault f5 and lamprophyre dyke X.

    In the right abutment, fault f13 outcrops at the elevations of 1870–1885 m, with a relatively small area, which will be backfilled with concrete after open excavation. In the elevations of 1885–1601 m, inclined anti-seepage concrete replacement shafts will be constructed along the fault plane in consideration of antiseepage curtains of the dam, with a width of 5 m (Fig. 8).

    Fig. 5. Schematic diagram of the concrete replacement galleries and shafts for fault f5 in the left abutment (unit: m).

    Fig. 6. Schematic diagram of the concrete replacement galleries and shafts for lamprophyre dyke X in the left abutment (unit: m).

    Fig. 7. Three-dimensional view of the concrete cushion, replacement galleries and shafts system in left abutment (unit: m).

    Fig. 8. Schematic diagram of the concrete replacement galleries and shafts for fault f14 in the right abutment (unit: m).

    As for the fault f14, it outcrops at the elevations of 1740–1790 m, thus it will also be replaced with concrete after open excavation. Regarding of deep-seated parts of the fault, concrete replacement grids and intensive consolidation grouting will be employed, including three concrete replacement galleries at the elevations of 1670 m, 1730 m and 1785 m, respectively, with sectional size of 6.5 m × 10 m (width × height), and five inclined concrete replacement shafts (three between the elevations of 1670 m and 1730 m and two between 1730 m and 1785 m) with a width of 5 m. Intensive consolidation grouting will be implemented in rocks between the elevations of 1670 m and 1730 m, and an inclined concrete replacement shaft will be constructed in the elevations of 1601 m and 1730 m, with a width of 5 m. Thus they can function together with the anti-seepage curtain of the dam (Fig. 8).

    4.2.4.Treatmentdesignoftheslot-cuttingreplacementand groutingforthefaultsf2andf18inlowerpartofdamfoundation andriverbed

    Due to the similar conditions, the treatment measures for the faults f2 and f18 are almost the same as mentioned before. The outcropping parts of the faults will be excavated in consideration of slot-cutting and then be backfilled with concrete. Then cement grouting will be conducted in the foundation area around the deepseated parts. The design scheme of slot-cutting and excavation with an L-shape for the fault f2, as a typical case, is shown in Fig. 9. Moreover, the fault f2 imposes remarkable adverse effects on the seepage stability of the dam due to the weak and broken rocks in the crushed interlayer zones, a total thickness of 10 m. Additional measures are adopted for the site-specific fault f2, including high-pressure water flushing and grouting after drilling along the crushed interlayer surfaces, and cement-chemical composite reinforcing grouting in the vicinity of the dam and anti-seepage curtains.

    4.2.5.Treatmentdesignofconsolidationgroutingforweakrock massesoftheresistanceblocksinleftdamfoundation

    The resistance blocks in the left dam foundation basically consist of intensively unloaded rock masses grades III2and IV. Thus, effective treatment with consolidation grouting needs to be considered for the purpose of stability.

    The elevations of grouting range from 1635 m to 1885 m. The lower boundary of grouting extends from weak rock to relatively high-quality rocks below the fault f2, including its interlayer crushed zones. The horizontal boundary is 5–10 m inside the influential zones governed by lamprophyre dyke X. The distance of grouting along the river bank is determined through sensitivity analysis of deformation by FEM.

    Fig. 9. Schematic diagram of the slot-cutting replacement for the fault f2 and the crushed interlayer zones.

    The sensitivity analysis is conducted by 2D FEM at two typical elevations, i.e. 1750 m and 1830 m. In the calculation model, the concrete cushion, the faults f5, f8, and the lamprophyre dyke X are considered, including the distribution of rocks of various grades. The results indicate that the displacement rate of the arch abutment decreases sharply at the elevation of 1750 m when the grouting distance along the downstream river bank is two times the thickness of the arch abutment (larger than 110 m). The displacements in the upstream and downstream sections are 27 mm and 46 mm, respectively. At the elevation of 1830 m, the displacements in the upstream and downstream sections are 17 mm and 21 mm, respectively, when grouting distance is 2.5 times the thickness of the arch abutment (larger than 95 m).

    The results suggest that the distance of grouting along the downstream river bank could be determined in three elevations by considering the thickness of the arch abutment. Above the elevation of 1820 m, the rocks are mainly composed of sandy slate grades III2and IV, with considerably low rock quality. Therefore, the grouting range should be considered to somewhat large extent, and the ratio of the distance to the thickness of the arch abutment is determined as 3. In the elevations of 1820–1670 m, the rocks are predominately of grades III1and III2, thus the ratio of 2.5–2.7 can be adopted (Fig. 10). In the elevations of 1670–1635 m, most rocks are of grades II and III1, and the ratio is determined as 1.5.

    According to the grouting principle of sliding-resistance, the quality of rocks after grouting should be grades III2–III1or higher. The detailed controlling standards of grouting are listed in Table 4.

    Table 4 Requirements of rock quality after grouting.

    Fig. 10. Layout of the grouting area in resistance blocks at the elevation 1730 m.

    In order to control the grouting quality and reduce the adverse influence of the grouting on the stability of the abutment slopes, the grouting area in the resistance blocks is divided into two zones, i.e. controlling grouting zone and main grouting zone. The controlling grouting zone is located in the margin of the grouting area with a width of 7.5–10 m. In this region, grouting will be implemented with relatively low-pressure and thick grouting, aiming at forming a protective closure against the main grouting zone. In the main grouting zone, grouting is conducted with high-pressure serum with various water-cement ratios. In particular, controllable grouting with cement mortar is adopted in deep fracture zones which contain large-scale and long fractures and may consume a considerably great amount of grout.

    5. Preliminary evaluations of dam foundation treatments

    The design schemes of treatments of the dam foundation were proposed in 2009. At present, the arch dam is constructed up to the elevation of about 1830 m. Concrete cushion and other measures for geological defects in the left abutment are almost completed except for grouting at the upper elevations. The impoundment of diversion tunnels has been realized. Results of geo-mechanical model tests, deformation monitoring, acoustic wave examinations of structures after impoundment indicate that treatments of the dam foundation are basically successful, and effectiveness of the design schemes has been preliminarily veri fied (Varga, 1979; Ronzhin et al., 1986; Xue and Huang, 2005; Mou et al., 2009; Hu et al., 2010; Song et al., 2011).

    5.1.Geo-mechanicalmodeltests

    Three geo-mechanical model tests for the stability of arch dam and its foundation were conducted in different stages (feasibility study, bidding, and design) before construction (Liu et al., 2003a,b; Zhang et al., 2005; Jiang et al., 2009). In the tests, the displacement, deformation and cracks of the dam foundation before and after treatment were measured, and the global factor of safety was calculated. Test results show that after treatment, the displacement of the crown was decreased from 105.3 mm to 85 mm under the normal load case. The factor of safety of crack initiation,K1, of the dam is increased from 1.5–2.0 to 2.5; the ultimate overload coef ficient,K3, is increased from 5–6 to 7.5. They are larger than those in most similar projects, which show that the asymmetrically deformable dam has been signi ficantly improved.

    5.2.Qualityassurancetests

    Quality inspections of grouting in resistance blocks below the elevation of 1730 m were conducted by acoustic P-wave tests, deformation modulus tests in drilling holes, and packer permeability tests. Test results indicate that, after conventional and intensive grouting, the average P-wave velocity in marble of grade III2is 5208 m/s, increased by 3.1%; the average deformation modulus is 12.3 GPa, increased by 28.2%. For marble of grade IV2, the average P-wave velocity is increased to 5184 m/s by 9.1%, and the average modulus to 10.5 GPa by 42.8%. Permeability rates in various rocks are kept in allowable values. It is indicated that all the indexes can meet the design requirements.

    5.3.Monitoringresultsofdeformation,stressesandfractures

    At present, the reservoir water level remains at about 1702 m. Monitoring results of deformation, stresses and fractures in foundation rocks indicate that the deformations in the dam foundation of both banks and galleries are considerably small with reasonable fluctuation. Distribution of compressive deformation in the riverbed is basically uniform, with a maximum value of 10.3 mm. The apertures of joints between the dam and the foundation are smaller than 1.0 mm. Stresses in the concrete cushion and the dams are mainly of compressive stresses. Monitoring results show that the deformation and stresses in the dam foundation are basically controlled.

    6. Conclusions

    Jinping I arch dam concerns many engineering issues and has attracted worldwide attentions due to its huge scale and unique settings. The geological conditions in the project region are extremely complex, characterized by serious geological defects, which pose great technical challenges on the project stability.

    At present, the treatments have almost been completed, and the arch dam is still in the process of construction, and the final impoundment of the reservoir is not experienced yet. The performances of the dam and its foundation are pretty good at present. Numerical analysis, model tests, field excavation, quality inspection, and deformation monitoring indicate that the treatment schemes for geological defects in the dam foundation are effective. The concepts of treatment methods are helpful for similar dam foundations. It is strongly suggested that monitoring of the performances of the dam foundation be continuously conducted. Real-time analysis and dynamic design are needed in order to ensure the safety of the dam.

    Fan Q, Zhou S, Li B. Key technologies of rock engineering for construction of Xiluodu super high arch dam. Chinese Journal of Rock Mechanics and Engineering 2012;31(10):1998–2015 [in Chinese].

    Hu Z, Zhang J, Zhou Z, Rao H. Analysis of stress and deformation of Jinping I high arch dam after foundation reinforcement. Rock and Soil Mechanics 2010;31(9):2861–8 [in Chinese].

    Jiang X, Chen J, Sun S. Research on physical model test for high arch dam of Jinping I hydropower station. Yangtze River 2009;40(19):76–105 [in Chinese].

    Liu J, Feng X, Ding X, Zhang J, Yue D. Stability assessment of the Three-Gorges dam foundation, China, using physical and numerical modeling-Part I: physical model tests. International Journal of Rock Mechanics and Mining Sciences 2003a;40(5):609–31.

    Liu J, Feng X, Ding X. Stability assessment of the Three-Gorges dam foundation, China, using physical and numerical modeling-Part II: numerical modeling. International Journal of Rock Mechanics and Mining Sciences 2003b;40(5):633–52.

    Liu R, Liu F, Yu X. Design of consolidation grouting and treatment of geological defects for the foundation of the Three Gorges dam. Water Power 2004;30(3):18–21 [in Chinese].

    Liu M, Huang R, Yan M, Lin F, Huo J. Preliminary evaluation of geological defects for rock foundation below left bank pedestal of arc dam for Jinping I power-station. Journal of Engineering Geology 2010;18(6):933–9 [in Chinese].

    Mou G, Chen G, Liu R. Study on Jinping I arch dam left abutment foundation treatment. Design of Hydroelectric Power Station 2009;25(2):7–22 [in Chinese].

    Qi S, Wu F, Yan F, Lan H. Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station. Engineering Geology 2004;73(1–2):129–44.

    Ronzhin IS, Kanygin LE, Chernenko VN, Listrovio PP, Kim FG. Grout curtain in the foundation of the Nurek dam and evaluation of its effectiveness [Gidrotekhnicheskoe Stroitel’stvo, Trans.]. Hydrotechnical Construction 1986;9:18–21 [UDC 624.138.232.1:627.826.3].

    Song S, Xiang B, Yang J, Feng X. Stability analysis and reinforcement design of high and steep slopes with complex geology in abutment of Jinping I hydropower station. Chinese Journal of Rock Mechanics and Engineering 2010;29(3):442–58 [in Chinese].

    Song S, Cai D, Feng X, Chen X, Wang D. Safety monitoring and stability analysis of left abutment slope of Jinping I hydropower station. Journal of Rock Mechanics and Geotechnical Engineering 2011;3(2):117–30.

    Varga AA. The main problems of evaluation of geological structure in dam construction. Bulletin of the International Association of Engineering Geology 1979;20:21–3.

    Wang J, Duan S, Hu S. Treatment of high and steep slopes with complicated geological conditions at left abutment of Jinping I hydropower station. Chinese Journal of Rock Mechanics and Engineering 2012;31(8):1598–605 [in Chinese].

    Xiang B, Rao H. Jinping I hydropower station dam site left abutment high slope complicated rock mechanics problems and engineering treatment measures. Design of Hydroelectric Power Station 2008;24(2):14–9 [in Chinese].

    Xue L, Huang Z. Finite element method analysis of Jinping I arch dam foundation treatments effects. Design of Hydroelectric Power Station 2005;21(4):11–5 [in Chinese].

    Zhang L, Fei W, Li G, Chen J, Hu C. Experimental study on global geomechanical model for stability analysis of high arch dam foundation and abutment. Chinese Journal of Rock Mechanics and Engineering 2005;24(19):3465–9 [in Chinese].

    Shengwu Song,born in 1957, graduated from Wuhan Geology College in 1982, majoring in hydrogeology engineering geology. At present, he is the vice president of China Society for Rock Mechanics and Engineering (CSRME) and vice president of Chengdu Hydroelectric Investigation and Design Institute. He has been working on field investigation, design and research of hydroelectric projects for more than 30 years, and successfully designs over 20 large-scale projects in Southwest China, including Pubugou, Yele and Jinping I hydropower stations with complex geological conditions and challenging construction difficulties. He proposes two technological methodologies in dam constructions. One is the construction technology of dam with thick overburden, such as Pubugou and Yele hydropower stations on the Dadu River. This technology system includes bearing capacity, compressive deformation, liquefaction of sandy layer, and seepage stability issues on soft dam foundation. The other is the technology of rock masses stability controlling in high concrete dam construction, such as Xiluodu hydropower station on the Jinsha River and Jinping I hydropower station on the Yalong River. This technology system consists of analytical methods, reinforcement techniques and safety criteria, especially in high rock slopes and huge underground power houses. He is the principal investigator of a team that observed the deep-unloading phenomenon in sharply incised valleys in Southwest China and interpretation of its mechanism. The deep-unloading concept has been included in Chinese geological code as a new unloading type of rock masses.

    ?Corresponding author. Tel.: +86 13908092641.

    E-mail address: sshengwu@chidi.com.cn (S. Song).

    Peer review under responsibility of Institute of Rock and Soil Mechanics, Chinese Academy of Sciences.

    1674-7755 ? 2013 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. All rights reserved.

    http://dx.doi.org/10.1016/j.jrmge.2013.06.002

    国产精品国产三级国产av玫瑰| 免费日韩欧美在线观看| 天天躁夜夜躁狠狠久久av| 久久久久久久久久久丰满| 国产综合精华液| 国产黄色免费在线视频| 亚洲av成人精品一区久久| 男男h啪啪无遮挡| 久久99蜜桃精品久久| 日本欧美视频一区| 少妇猛男粗大的猛烈进出视频| 国产一区二区三区av在线| 人妻一区二区av| a级毛色黄片| 视频中文字幕在线观看| 亚洲精品日韩av片在线观看| 欧美激情极品国产一区二区三区 | 国产精品国产三级国产av玫瑰| 久久人妻熟女aⅴ| 久久国产精品男人的天堂亚洲 | 国精品久久久久久国模美| 成人黄色视频免费在线看| 免费大片黄手机在线观看| 高清毛片免费看| 国模一区二区三区四区视频| 我的女老师完整版在线观看| 欧美三级亚洲精品| 精品视频人人做人人爽| 狂野欧美激情性bbbbbb| 搡老乐熟女国产| 亚洲熟女精品中文字幕| av有码第一页| 新久久久久国产一级毛片| 久久国内精品自在自线图片| 色吧在线观看| 国产女主播在线喷水免费视频网站| 中文字幕久久专区| 97精品久久久久久久久久精品| 久久精品夜色国产| 精品久久久精品久久久| 青春草视频在线免费观看| 日本vs欧美在线观看视频| 大片电影免费在线观看免费| 亚洲国产成人一精品久久久| 久久久久久久久久久久大奶| 51国产日韩欧美| 欧美日韩在线观看h| 少妇的逼水好多| 亚洲欧美清纯卡通| 中文天堂在线官网| 97精品久久久久久久久久精品| 亚洲av.av天堂| 成年人免费黄色播放视频| 亚洲国产欧美日韩在线播放| 国产精品一区二区在线不卡| 欧美精品人与动牲交sv欧美| 91成人精品电影| 久久97久久精品| 狠狠婷婷综合久久久久久88av| 九色亚洲精品在线播放| 日韩av免费高清视频| 国产免费福利视频在线观看| 精品一品国产午夜福利视频| 国产 精品1| 黄片播放在线免费| 亚洲精品自拍成人| kizo精华| 国产一级毛片在线| 国产精品女同一区二区软件| 国产一区二区在线观看av| 性高湖久久久久久久久免费观看| xxxhd国产人妻xxx| 80岁老熟妇乱子伦牲交| av女优亚洲男人天堂| 精品久久久久久电影网| 在线天堂最新版资源| 国产在线一区二区三区精| 啦啦啦在线观看免费高清www| 丝袜脚勾引网站| 少妇丰满av| 国产午夜精品一二区理论片| 少妇人妻精品综合一区二区| 免费久久久久久久精品成人欧美视频 | 日韩欧美一区视频在线观看| 爱豆传媒免费全集在线观看| 亚洲色图综合在线观看| 欧美精品高潮呻吟av久久| 校园人妻丝袜中文字幕| av网站免费在线观看视频| 国产精品蜜桃在线观看| 日韩强制内射视频| 国产av码专区亚洲av| 日日摸夜夜添夜夜爱| 久久久久久久久久久久大奶| 国产精品久久久久久精品电影小说| 国产亚洲欧美精品永久| 亚洲激情五月婷婷啪啪| 两个人免费观看高清视频| 性色av一级| 国精品久久久久久国模美| av又黄又爽大尺度在线免费看| 国产精品国产三级专区第一集| 久久久久久久大尺度免费视频| 亚洲内射少妇av| 视频在线观看一区二区三区| 国产亚洲精品第一综合不卡 | 国产爽快片一区二区三区| 日韩成人av中文字幕在线观看| 只有这里有精品99| 午夜福利,免费看| 亚洲精品一区蜜桃| 一级毛片 在线播放| 大话2 男鬼变身卡| av专区在线播放| 韩国高清视频一区二区三区| av一本久久久久| 最黄视频免费看| 日本-黄色视频高清免费观看| 久久女婷五月综合色啪小说| 国产成人精品一,二区| 999精品在线视频| 人妻系列 视频| 一本一本综合久久| 日本欧美国产在线视频| 国产av国产精品国产| 国产男女内射视频| 国产精品欧美亚洲77777| 99国产综合亚洲精品| 99精国产麻豆久久婷婷| 精品酒店卫生间| 老司机影院毛片| 精品人妻熟女毛片av久久网站| 亚洲精品久久成人aⅴ小说 | 久久免费观看电影| 国产av码专区亚洲av| 欧美人与善性xxx| 80岁老熟妇乱子伦牲交| 精品一区二区三卡| 美女cb高潮喷水在线观看| 有码 亚洲区| 国产精品国产三级国产av玫瑰| 制服诱惑二区| 久久精品久久久久久噜噜老黄| 日本vs欧美在线观看视频| 97超视频在线观看视频| 777米奇影视久久| 一区二区三区精品91| 99热国产这里只有精品6| 亚洲欧美一区二区三区黑人 | 欧美日韩成人在线一区二区| 久久婷婷青草| 亚洲综合色网址| 欧美激情 高清一区二区三区| 18禁在线无遮挡免费观看视频| 欧美日韩在线观看h| 久久久欧美国产精品| 久久久久久久国产电影| 99久久精品国产国产毛片| 久久韩国三级中文字幕| 久久ye,这里只有精品| 精品久久国产蜜桃| 久久久久久久久大av| 日产精品乱码卡一卡2卡三| 国产有黄有色有爽视频| 国产色爽女视频免费观看| 春色校园在线视频观看| 久久人人爽av亚洲精品天堂| 国产日韩一区二区三区精品不卡 | 久久精品国产a三级三级三级| 亚洲精品视频女| 大香蕉久久网| 赤兔流量卡办理| 一级黄片播放器| 久久影院123| 国产精品国产三级专区第一集| 国产精品99久久久久久久久| 国产老妇伦熟女老妇高清| 日韩欧美精品免费久久| 毛片一级片免费看久久久久| 国产精品女同一区二区软件| 中文字幕最新亚洲高清| 国产成人91sexporn| 国产在线视频一区二区| 亚洲经典国产精华液单| 秋霞伦理黄片| 免费少妇av软件| 丝袜喷水一区| 精品亚洲乱码少妇综合久久| 亚洲国产精品国产精品| 中文字幕精品免费在线观看视频 | 黄色欧美视频在线观看| 国产精品久久久久久久久免| 97精品久久久久久久久久精品| 高清欧美精品videossex| 午夜老司机福利剧场| 国产成人免费无遮挡视频| 国产成人av激情在线播放 | freevideosex欧美| 成年人免费黄色播放视频| 天天影视国产精品| 亚洲精品乱码久久久v下载方式| 欧美 亚洲 国产 日韩一| 久久人人爽人人爽人人片va| 伦理电影免费视频| 日韩伦理黄色片| 亚洲av成人精品一二三区| 在线观看三级黄色| 国产精品免费大片| 制服人妻中文乱码| av专区在线播放| 女人久久www免费人成看片| 亚洲第一av免费看| 麻豆成人av视频| 看免费成人av毛片| 在线精品无人区一区二区三| 久久久久久久久久久免费av| 国产男女超爽视频在线观看| 人人妻人人澡人人爽人人夜夜| 人妻制服诱惑在线中文字幕| 久久精品国产自在天天线| 久久99蜜桃精品久久| 美女大奶头黄色视频| 欧美激情 高清一区二区三区| 简卡轻食公司| 精品少妇内射三级| 少妇猛男粗大的猛烈进出视频| 一级毛片我不卡| 亚洲精品第二区| 亚洲精品成人av观看孕妇| 欧美日韩av久久| 能在线免费看毛片的网站| 国产在视频线精品| 最近中文字幕高清免费大全6| 日日爽夜夜爽网站| 高清不卡的av网站| 亚洲国产精品一区三区| 久久午夜综合久久蜜桃| 国产黄片视频在线免费观看| 国产精品一区二区在线不卡| 亚洲情色 制服丝袜| 日本av手机在线免费观看| xxxhd国产人妻xxx| 18禁在线播放成人免费| 久久青草综合色| 国产综合精华液| 一区二区三区四区激情视频| 亚洲婷婷狠狠爱综合网| 一本久久精品| 亚洲欧美一区二区三区国产| 水蜜桃什么品种好| 国产视频内射| 欧美3d第一页| 国产精品99久久99久久久不卡 | 91久久精品国产一区二区三区| 激情五月婷婷亚洲| 天美传媒精品一区二区| av卡一久久| 国产高清国产精品国产三级| 久久午夜综合久久蜜桃| 日韩三级伦理在线观看| 激情五月婷婷亚洲| 久久久久人妻精品一区果冻| 国产国拍精品亚洲av在线观看| 黄片无遮挡物在线观看| 又大又黄又爽视频免费| 大香蕉久久成人网| 日本wwww免费看| 成人国语在线视频| 久久人人爽人人爽人人片va| 精品一区在线观看国产| 亚洲欧洲国产日韩| 九九久久精品国产亚洲av麻豆| 国产日韩欧美在线精品| 欧美一级a爱片免费观看看| 久久久久久久国产电影| av在线app专区| 精品人妻一区二区三区麻豆| 免费人成在线观看视频色| 精品人妻一区二区三区麻豆| 天堂俺去俺来也www色官网| 最近2019中文字幕mv第一页| 好男人视频免费观看在线| 亚洲国产最新在线播放| 美女cb高潮喷水在线观看| 下体分泌物呈黄色| 久久午夜福利片| 亚洲国产精品成人久久小说| 久久精品国产亚洲网站| 超碰97精品在线观看| videos熟女内射| 熟女av电影| videosex国产| freevideosex欧美| 桃花免费在线播放| 亚洲综合色网址| 精品少妇久久久久久888优播| videossex国产| 亚洲内射少妇av| 99久久中文字幕三级久久日本| 免费人妻精品一区二区三区视频| 国产 一区精品| 制服诱惑二区| 九九久久精品国产亚洲av麻豆| 大片免费播放器 马上看| 欧美3d第一页| 三级国产精品片| 秋霞在线观看毛片| 久久99热6这里只有精品| 免费观看无遮挡的男女| 精品少妇内射三级| 国产av国产精品国产| 最近最新中文字幕免费大全7| 一本—道久久a久久精品蜜桃钙片| 精品久久久久久电影网| 日韩精品有码人妻一区| 如日韩欧美国产精品一区二区三区 | 母亲3免费完整高清在线观看 | 免费观看性生交大片5| 日韩成人av中文字幕在线观看| 久久韩国三级中文字幕| 国产精品久久久久久精品电影小说| 国产无遮挡羞羞视频在线观看| 新久久久久国产一级毛片| 99久久精品一区二区三区| 国产精品不卡视频一区二区| 男女无遮挡免费网站观看| 18+在线观看网站| 国产在线免费精品| 精品熟女少妇av免费看| 精品国产露脸久久av麻豆| 久久人妻熟女aⅴ| 亚洲一区二区三区欧美精品| 精品国产乱码久久久久久小说| 最近最新中文字幕免费大全7| 久久久国产一区二区| 2018国产大陆天天弄谢| 美女xxoo啪啪120秒动态图| 久久韩国三级中文字幕| 久久久久网色| a级毛色黄片| 中文字幕精品免费在线观看视频 | 新久久久久国产一级毛片| 免费黄频网站在线观看国产| 熟女av电影| 一区二区三区精品91| 久久影院123| 三级国产精品片| 国产精品人妻久久久久久| 婷婷色麻豆天堂久久| 一级毛片电影观看| av女优亚洲男人天堂| 亚洲三级黄色毛片| 国产免费福利视频在线观看| 日韩中文字幕视频在线看片| 丰满少妇做爰视频| av在线老鸭窝| 亚洲精品自拍成人| 天堂8中文在线网| 日韩亚洲欧美综合| 亚洲国产毛片av蜜桃av| 国产av一区二区精品久久| 亚洲精品美女久久av网站| 成人免费观看视频高清| 寂寞人妻少妇视频99o| 午夜日本视频在线| 国产熟女午夜一区二区三区 | 99国产综合亚洲精品| 在线精品无人区一区二区三| 日本免费在线观看一区| 91久久精品电影网| 大香蕉久久成人网| 国产一区二区三区av在线| 极品人妻少妇av视频| 丰满乱子伦码专区| 免费观看无遮挡的男女| 插阴视频在线观看视频| 99热全是精品| 三上悠亚av全集在线观看| 极品少妇高潮喷水抽搐| 伦精品一区二区三区| 国产男女超爽视频在线观看| 一级,二级,三级黄色视频| 日韩一本色道免费dvd| 亚洲av二区三区四区| 欧美日韩综合久久久久久| 天天躁夜夜躁狠狠久久av| 少妇丰满av| 九色成人免费人妻av| 日日爽夜夜爽网站| 亚洲欧美一区二区三区国产| 久久精品国产亚洲av天美| 国产色婷婷99| 看免费成人av毛片| 日韩av在线免费看完整版不卡| 色婷婷av一区二区三区视频| 久久ye,这里只有精品| 制服人妻中文乱码| 高清欧美精品videossex| 韩国av在线不卡| 久久久久国产精品人妻一区二区| 蜜桃国产av成人99| 国产精品麻豆人妻色哟哟久久| 一本一本久久a久久精品综合妖精 国产伦在线观看视频一区 | 久久精品久久久久久噜噜老黄| 天美传媒精品一区二区| 久久久久久人妻| av.在线天堂| 国产高清不卡午夜福利| av有码第一页| 日韩av在线免费看完整版不卡| 亚洲国产av新网站| 多毛熟女@视频| 久久韩国三级中文字幕| 国产日韩欧美视频二区| 51国产日韩欧美| 久久国产精品男人的天堂亚洲 | 久久久精品94久久精品| 97在线视频观看| 91精品国产国语对白视频| 亚洲欧美一区二区三区国产| 国产色爽女视频免费观看| 九草在线视频观看| 日本黄色日本黄色录像| 日本黄大片高清| 久久久久精品久久久久真实原创| 男女高潮啪啪啪动态图| 国产免费一区二区三区四区乱码| 日本91视频免费播放| 少妇高潮的动态图| 只有这里有精品99| 欧美少妇被猛烈插入视频| 国语对白做爰xxxⅹ性视频网站| 国产精品久久久久久久久免| 国产日韩欧美亚洲二区| 国产精品.久久久| 精品人妻偷拍中文字幕| 亚洲精品日韩av片在线观看| 亚洲一级一片aⅴ在线观看| 日日爽夜夜爽网站| 最近2019中文字幕mv第一页| 精品亚洲乱码少妇综合久久| 九草在线视频观看| 日产精品乱码卡一卡2卡三| 欧美国产精品一级二级三级| 国产精品熟女久久久久浪| 高清在线视频一区二区三区| 一本一本久久a久久精品综合妖精 国产伦在线观看视频一区 | 国产精品久久久久久精品古装| 夜夜爽夜夜爽视频| 插逼视频在线观看| 高清午夜精品一区二区三区| 十八禁网站网址无遮挡| 久久99蜜桃精品久久| 亚洲欧洲日产国产| av黄色大香蕉| 日韩,欧美,国产一区二区三区| 全区人妻精品视频| 久久韩国三级中文字幕| 欧美人与善性xxx| 免费大片18禁| 亚洲在久久综合| 9色porny在线观看| 晚上一个人看的免费电影| 欧美日韩视频精品一区| 国产精品一区二区在线观看99| 亚洲情色 制服丝袜| 国产成人午夜福利电影在线观看| 国产视频首页在线观看| 久久鲁丝午夜福利片| 卡戴珊不雅视频在线播放| 欧美最新免费一区二区三区| 免费观看无遮挡的男女| 国产白丝娇喘喷水9色精品| 亚洲精品久久午夜乱码| 在线精品无人区一区二区三| av有码第一页| 国产成人a∨麻豆精品| 夫妻性生交免费视频一级片| 99久国产av精品国产电影| 91久久精品电影网| 99热这里只有是精品在线观看| 欧美日韩在线观看h| 丝袜在线中文字幕| 亚洲av成人精品一二三区| 99久久人妻综合| 国产69精品久久久久777片| 成人手机av| 18禁动态无遮挡网站| 色婷婷av一区二区三区视频| 亚洲第一av免费看| 一级毛片电影观看| 久久精品国产亚洲av涩爱| 91精品伊人久久大香线蕉| 精品国产露脸久久av麻豆| 亚洲欧美中文字幕日韩二区| 亚洲av国产av综合av卡| 国产精品久久久久久久久免| 精品国产一区二区久久| 新久久久久国产一级毛片| 777米奇影视久久| 日韩欧美一区视频在线观看| 美女xxoo啪啪120秒动态图| 看免费成人av毛片| 国产在视频线精品| 成人毛片60女人毛片免费| 亚洲精品成人av观看孕妇| 亚洲熟女精品中文字幕| 国产深夜福利视频在线观看| 精品午夜福利在线看| 少妇的逼水好多| 久久久久久久精品精品| 人体艺术视频欧美日本| 老司机亚洲免费影院| 日韩av不卡免费在线播放| 欧美3d第一页| 日本vs欧美在线观看视频| 成人综合一区亚洲| 成人漫画全彩无遮挡| 欧美人与善性xxx| videossex国产| 纵有疾风起免费观看全集完整版| 久久久精品区二区三区| 亚洲国产av新网站| 国产av一区二区精品久久| 国产精品女同一区二区软件| 日日摸夜夜添夜夜添av毛片| 国产精品久久久久久av不卡| 三级国产精品欧美在线观看| 国产视频内射| 亚洲国产av影院在线观看| 日韩视频在线欧美| 99九九线精品视频在线观看视频| 午夜福利,免费看| av国产久精品久网站免费入址| 日本-黄色视频高清免费观看| 少妇人妻精品综合一区二区| 看非洲黑人一级黄片| 午夜影院在线不卡| 国产日韩一区二区三区精品不卡 | 2018国产大陆天天弄谢| 国产不卡av网站在线观看| 9色porny在线观看| 精品国产露脸久久av麻豆| 一级黄片播放器| 中文天堂在线官网| 日本黄色片子视频| 久久久久久久久大av| 午夜免费观看性视频| 最近中文字幕高清免费大全6| 国产av码专区亚洲av| 水蜜桃什么品种好| 看非洲黑人一级黄片| 男女无遮挡免费网站观看| 黄片播放在线免费| 国产熟女欧美一区二区| 秋霞在线观看毛片| 美女国产视频在线观看| 热99久久久久精品小说推荐| 18禁在线无遮挡免费观看视频| 纵有疾风起免费观看全集完整版| 晚上一个人看的免费电影| 午夜激情久久久久久久| 亚洲久久久国产精品| 亚洲综合精品二区| 汤姆久久久久久久影院中文字幕| 久久久久久久久久久丰满| 男女高潮啪啪啪动态图| 久久精品人人爽人人爽视色| 丝袜脚勾引网站| 3wmmmm亚洲av在线观看| 男人添女人高潮全过程视频| 日日爽夜夜爽网站| 成人毛片60女人毛片免费| 中文字幕制服av| 国产亚洲欧美精品永久| 日韩,欧美,国产一区二区三区| a级毛片黄视频| 最黄视频免费看| 青春草视频在线免费观看| 一区二区三区四区激情视频| 交换朋友夫妻互换小说| 特大巨黑吊av在线直播| 久久人人爽人人爽人人片va| 少妇高潮的动态图| 国产精品一区www在线观看| 亚洲欧美成人综合另类久久久| 日韩一区二区视频免费看| 美女内射精品一级片tv| 亚洲精品亚洲一区二区| 亚洲av在线观看美女高潮| 国产视频首页在线观看| 一级毛片黄色毛片免费观看视频| 一级黄片播放器| 中国三级夫妇交换| 亚洲,欧美,日韩| 国内精品宾馆在线| av免费观看日本| 久久狼人影院| 黄色毛片三级朝国网站| 亚洲一区二区三区欧美精品| 国产在线一区二区三区精| 中文字幕最新亚洲高清| 最近中文字幕2019免费版| 国产无遮挡羞羞视频在线观看| 亚洲一级一片aⅴ在线观看| 国产不卡av网站在线观看| 免费观看的影片在线观看| 欧美日韩视频精品一区| 精品一品国产午夜福利视频| 国产成人免费无遮挡视频| 久久免费观看电影| 亚洲少妇的诱惑av| 9色porny在线观看| 纵有疾风起免费观看全集完整版| 久久精品国产亚洲av天美|