    The traps behind the failure of Malpasset arch dam, France, in 1959

    2013-07-10 12:23:42PierreDuffaut

    Pierre Duffaut

    ExpertinGeologicalEngineering,France

    The traps behind the failure of Malpasset arch dam, France, in 1959

    Pierre Duffaut?

    ExpertinGeologicalEngineering,France

    A R T I C L E I N F O

    Articlehistory:

    Received 22 November 2012

    Received in revised form 3 May 2013

    Accepted 8 May 2013

    Dams

    Geology

    Rock mechanics

    State control

    Human error

    The case of the Malpasset arch dam failure in 1959 has been widely exposed in scientific and technical forums and papers. The focus here is on the many traps which have confused the whole chain of bodies and persons involved, owner, designer, geologist, contractor, up to the state management officers. When the first traps were hidden inside geology, many more appeared, as well geotechnical, technical, fortuitous, and administrative. In addition to such factual factors, human and organizational factors may be today easily identified, when none of them was yet suspected. Both dam safety and rock mechanics benefited from the studies done since the Malpasset case, most of them within one decade.

    ? 2013 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. All rights reserved.

    1. Introduction

    On 2 December 1959, the failure of Malpasset dam (Fig. 1) was a prominent industrial catastrophe in France within the 20th century, only second by number of victims to a coal dust explosion in Courrières mine 53 years before. It was also a clap of thunder in the world dam community as never before any arch dam had failed, as André Coyne had pointed when opening a symposium on arch dams in 1957 as president of International Commission on Large Dams (ICOLD). It is well known that many more have been built since worldwide, and far higher, without any failure either. Many papers have described the Malpasset case, from the early studies to construction, operation and failure, the expert reports, the trial minutes and many lab and site investigations launched in order to understand what went wrong, ending with five papers published in 2010 inRevueFranc?aisedeGéotechnique(Carrère, 2010; Duffaut, 2010; Goguel, 2010a, b; Habib, 2010).

    No surprise the first traps have been geological ones: for long, igneous and metamorphic rocks had been experienced as impervious enough for reservoirs and strong enough for dam foundations. Here they proved impervious, but failed as foundation. As the author began working in 1948 with EDF, the French authority for Electricity, in the Geology Department, he took part in the studies of many dam sites in France. He is now one of very few living geological engineers (if even anyone worldwide) to have worked in the field of dams at this time, when a great number of sites were investigated, in France and abroad. Neither EDF nor the author had been involved in Malpasset dam before the failure, while they immediately manifested their highest interest in the case. EDF was yet operating many arch dams, and many more were at construction or design stage. To the author, the case may look as a family affair, as his father Joseph Duffaut, had spent his whole career in dams. When Malpasset failed, the author was resident engineer on an arch dam construction site, just completed; his father was the first civil servant sent to the site by the government, the day after, as head of the Dam and Electricity department in the Ministry of Public Works; he then followed all the studies and trial sessions and the author could benefit his early pictures on site as well as his philosophy, “from father to son”. After that his career was turned from Geological Engineering into Rock Mechanics.

    One knows that most rare accidents derive from many wrong events together instead of only one; many more traps were to be soon discovered in addition to geological ones: geotechnical tests on site and in lab showed unsuspected and very poor properties; technical rules about uplift were not applied to thin dams! Two fortuitous events at the same time confused the local authorities, a worksite downstream and a flash flood. Last, and the more, no independent state control had ever been done on this public project, neither before nor during construction and operation. Since the mid-20th century, partly under pressure from the most hazardous industries, oil, aerospace, and nuclear activities, non-technical factors of accidents safety have been studied more and more and many scientists pointed that complexity is a hazard in itself: they showedhow the weight of human and organizational factors could be heavier than factual and technical ones. The Malpasset case can bring them one more example.

    Fig. 1. Malpasset dam, left, at end of construction, summer 1954 (photo COB); right, soon after failure, end 1959 (photo Mary).

    The purpose of the paper is to explain how people in charge have been abused by so many traps, while what had been done there up to completion of the dam was correct within the practices of 1950s. So the responsibility of the catastrophe must be shared by many bodies and persons, the last one being a prefect, the local representative of the government, who did not know that a dangerous structure inside his territory was not managed by a competent enough staff. Many dams worldwide have been deeply modified along the years and a few have been put out of service when their responsible manager happened to discover they did not behave as safely as expected. So the memory must be saved of André Coyne and his dam engineering Bureau, (appearing below under acronym COB, Coyne and Bellier), always active today as Tractebel Engineering France, a member of GDF-SUEZ.

    2. What happened

    About 15 km from Fréjus, an old Roman city on the C?te d’Azur, along Mediterranean Sea, at a place called Malpasset (a bad pass for passing people), a dam had been designed and built in 1950s to provide irrigation and drink water from Reyran, a very small river. Prof. G. Corroy of Marseilles University delivered the geological report, André Coyne and his Bureau COB designed the arch dam (Figs. 2 and 3) and supervised the whole construction works, made by contractor Ballot. None of them kept any mission from the owner after completion, in spite of the dam having never been formally checked; along the first years its filling up was prevented by lack of expropriation of a fluorite mine upstream of the dam, and later this reservoir was left unused as the water distribution network had not been completed. A geodesy company made four yearly measurements on about 30 targets (Fig. 4), but nobody interpreted the results of the year 1959, which had been transferred lately to the owner.

    Fig. 2. Site map, contours in meters over sea level (1: bottom gate; 2: surface weir; 3: water intake; 4: stilling basin); at right a gravity thrust block protected from water thrust by a wing wall counteracts the crest arch thrust.

    Fig. 3. Highest dam cross section (mosl means meter over sea level). The support of the hollow valve and its control gate explains the widened foundation at this place only. Crest elevation: 102.55 m over sea level; spillway elevation: 100.4 m; normal operation level: 98.5 m; bedrock level: 38 m.

    This year it rained a lot in autumn, resulting in the reservoir level increasing over any levels attained before. Contrary to previous years, the bottom gate was not opened to control the levelbecause a motorway bridge was under construction 1 km downstream of the dam and nobody took account of any flow in the river. From November 30 to December 2, the rain intensity was such that the level rose 4.5 m in spite of the reservoir area increasing for each meter more (box in Fig. 4); the “normal” autumn rain had peaked as a sudden flash flood which was close to overflow the weir. In spite of a late opening of the bottom gate, the dam gave off at 23:11 and a huge wave wiped all structures along the valley, up to a small military airport on the seashore, making more than 400 casualties and a lot of destruction including all rail and roadways across the valley.

    Fig. 4. Graph of the reservoir level along years 1954–1959. The box magnifies the four latest days, and triangles mark the dates of geodesy measurements A–D (after Mary, 1968).

    3. The traps

    3.1.Geologicaltraps

    The gross site of the reservoir was a narrow section through a small gneiss horst across a wide valley carved in coal measures, a rocky tract for easily damming a big reservoir. At first sight, the rock mass of this old metamorphic horst did not appear different from so many dam sites in other parts of France. After the failure, a flow of 50 million cubic meters of water have cleaned the slopes perfectly from any loose or even weathered material, the rock mass structure appeared very heterogeneous and crisscrossed by joints at any scale and in any direction as noticed by prominent geologist Jean Goguel (Goguel, 2010b) who surveyed the whole site soon after the failure. The geological history of the Estérel massif, now better known, may explain this peculiar structure which nobody had expected.

    Only the failure daylighted two features of the rock mass which proved instrumental. A huge block of foundation rock was missing where was the left half of the dam arch, leaving an excavation in a dihedral form limited by two subplane faces, always visible now (top of Fig. 5). Its downstream face is a true fault plane with a thin cover of crushed rock (fresh scratches on the surface proved the whole block had moved upwards). Its upstream face looks as a set of tears along two or more foliation surfaces, without any crushed rock. Neither the fault nor the foliation had been recognized before; the contours on Fig. 2 could have helped to infer the position of the fault, but its strike perpendicular to the valley axis and its dip about 45°upstream would have considered it as perfectly neutral with respect to the thrusts received from the dam; the continuity of rock foliation had not appeared either, within the so heterogeneous structure of the gneiss. So a geometrical trap was in place, waiting for a force susceptible to move the block, which will appear later.

    Fig. 5. The most conspicuous features of the site exposed after failure. Top, the“dihedral” excavation with half of the thrust block fallen after the flow (the exploratory adit at right was bored early after the failure to make jack tests in situ); below, a wide crevice is open just upstream of the concrete arch, wider at the base and closing more higher (photos Duffaut, 1960).

    One may question why boreholes had not previously located the fault. First, most boreholes investigated the depth to the sound rock, under alluvium in the river bed and under any loose grounds along the valley slopes. Second, it is today difficult to recall that the technology of core recovery was not able to investigate such features. On many dam sites where contour lines accidents suggested a weak zone, their investigation used trenches instead of boreholes. The cleaning action of the flow made the fault path visible on the right bank and daylighted its cross section at either bank toe (Fig. 6).

    Fig. 6. Close view of a cross section of the main fault on right bank. The finely crushed borders of the fault zone are well visible, thickness about metric (photo Duffaut, 1960).

    Fig. 7. Deformation modulus measured on 17 dam sites (V: arch; P: concrete gravity; E: rockfill). Modulus scale in MPa, logarithmic; sites classified by decreasing modulus along three curves, maximal, average and minimal values (graph designed by B. Goguel, from EDF data).

    At rock matrix scale, some samples (Goguel, 2010b) revealed the rock close to the dihedral contained moresericitethan elsewhere, a mica like mineral susceptible to increase the deformability and decrease the strength. He wrote: “I think . . . the failure is due to the poor mechanical strength of a gneiss which happens to contain dispersed sericite” (this observation was not followed with any tests of strength and deformability, and no rock block from the dihedral has been sampled to check this in fluence). Weathering of the gneiss has been pointed by some experts, but instead of any observation con firming its in fluence; the absence of any slope slide upstream of the dam during the fast drawdown and the perfect state of the roman aqueduct at mid-height proved the global strength of the slopes.

    3.2.Geotechnicaltraps

    There had been no geotechnical investigations before the construction of the dam. Immediately after the failure, several studies were launched, at first on site, by seismic methods and jack tests, and in laboratories on samples taken from the site.

    Refractiontraverses showed a compact rock (velocity over 4000 m/s) below a shallow zone with velocity closer to 2500 m/s.

    Petitesismique(Schneider, 1967): A new short range seismic technology, easy to use on site, con firmed the high deformability of the rock in situ, together with the high compactness of the rock mass. The dynamic modulus derived from both deep refraction traverses and shallowPetitesismiquewas around 1500 MPa, a rather low figure for a dam foundation.

    Jacktests(Talobre, 1957): EDF sent immediately a team to perform jack tests in a few small pits and galleries purposely bored. As very few such tests on dam sites were available for comparison, EDF ordered same tests be made on seven sites the same year and Malpasset provided by far the weaker results.

    Later the practice became usual on most new sites, as shown in Fig. 7 which gathers the results for 17 sites and con firms the very high deformability of the rock mass, ten times less than that on most sites, hundred times less than that on best sites.

    Such low deformability was unsuspected and even the Saint Cassien dam site, close to Malpasset on the same rock type had provided results two times more.

    Labtests: Rock samples were sent to various labs, mainly école Polytechnique, Palaiseau (LMS, Laboratoire de Mécanique des solides), école des Mines, Paris-Fontainebleau, and école de Géologie,Nancy.The main set of tests results was described and discussed in a thesis work at LMS under supervision of Pierre Habib (Bernaix, 1967).

    Fig. 8. Distribution of unconfined compressive strength Rcin bar (=0.1 MPa) on dry samples (échantillons) collected on the left bank; three sets of cylinders, diameters 10, 36, and 60 mm (Bernaix, 1967). Comparison between three cases shows the scale effect: maximum strength occurs on smaller cylinders, where scatter also is the highest (vertical axis: number of samples; M: average value; σ: standard deviation).

    Standard uniaxial compressive and tensile tests were performed on cylinders with diameters 10–60 mm and the same height to diameter ratio, 2.0. Strength values did not appear too low in average (58 MPa at dry state, and 42.5 MPa at saturated), but theirscatterappeared by far wider than usual (coefficient of variation about 0.36), so providing many spots with high deformability. Taking various dimensions, a high scale effect was detected, as seen in Fig. 8. Systematic studies on various rock types showed that scatter and scale effect went together and provided a reliable fracturation criteria.

    Actually, all types of classical lab tests were performed, and one more: the permeability being very low, Habib (2010) proposed a new type of test to make measurements without any risk of error due to leaks along the envelope of the sample; thanks to a coaxial hole in the rock cylinder, a radial flow is generated from or to the hole depending if the fluid pressure is applied around or inside. When the flow is centrifuge, the rock is set in a tensile state which makes the permeability increase with the pressure, whatever the rock type; conversely a flow toward the hole creates a compressive state which does not alter the permeability of most rock types; but all samples from Malpasset showed a high sensitivity of the permeability, the more on the left bank: though rather low, the permeability decreased a lot under compression, due to closure of minute cracks. Not any other rock displayed such a behavior.

    This unsuspected property, high sensitivity to stress, was then supposed to be the main cause of failure, as the load applied by the dam on the foundation rock induced a deep “underground dam” against which the uplift pressure could build more and more. Here was the force to move the dihedral. Actually, the highdeformability was susceptible to play the same role: when the dam moves downstream under the water thrust, the rock upstream does not follow and a crack opens between the concrete and the rock as seen in Fig. 5 (below). The more deformable the rock mass is, the wider the crack opens, the deeper it extends, so increasing the height of the dam with a hydrostatic thrust increasing as the square of the height. Whichever mechanism prevails, the force on the dihedral is the same.

    The anisotropy of the rock mass may provide another more mechanism: Maury (1970) investigated the stress bulb under a foundation which becomes thinner and deeper when the thrust is perpendicular to the strati fication or schistosity; this in fluence was not well known at the time.

    3.3.Technicaltraps

    After the failure of Bouzey small gravity dam (eastern France), Lévy (1895) showed that pressure from water seeping below and inside a structure plays as Archimede’s thrust on buoying vessels and named itsous-pression(uplift). Most gravity dams were since preserved from it by relief holes; a so-called “drainage curtain”became a corollary of classical tightness curtains, but thin dams were thought immune thanks to the smaller area of their base. Malpasset opened the eyes of dam designers on uplift acting not only below and inside the structure, but also inside the rock mass downstream.

    It became clear that any dam is a gravity dam, contrary to the usual classi fication of dams (Duffaut, 1992) provided enough ground mass be included in the gross resistant weight against the water thrust.

    3.4.Incidentaltraps

    Moneyin flation: In 1950s, the money in France (and in many more Europe states) was in flating at a high rate. The sum allowed for the project was fixed, the owner was pressed to see the job finished in order to avoid the cost rise and he did not follow a recommendation of the geologist to make some more investigations. This monetary trap has been focused by Jean Goguel at the trial (Goguel, 2010a).

    Bridgeworksite: In 1959, a motorway was to be built from Aixen-Provence to Nice which had to cross the Reyran river about 1 km downstream of the dam: earthworks had begun during summer months and the bridge worksite was glad to bene fit a zero discharge in the river thanks to the dam; so the gate was kept close and the level rose higher than ever before, without any extra test or survey.

    Flashflood: At the end of November, a flash flood occurred and the level rose dramatically (box in Fig. 4). One may notice such floods had been neglected from the design stage.

    Geodesycontract: One could add the late delivery of the August 1959 measurements: the director of the company in charge of them was called to the trial for having delayed their delivery: he argued the length of calculations plus the summer vacations of his staff. Formally his contract did not ask for any interpretation or comparison with previous results. When the owner received the results (Fig. 9), nobody had paid attention and they were forwarded to the prefect to be included in the dam files.

    Cracksinthestillingbasin: No report was produced which confirmed the date, the location and the importance of appeared cracks a few days before the catastrophe in the reinforced concrete of the stilling basin without any schemes and photographs. One wonders that the guard was not specially auditioned on a material element susceptible to alert the staff in charge, at any level, on a disorder susceptible to be a sign of imminent danger. This element re flects the importance that each member of an organization is aware of its role in the safety of operation. If it is not an unfounded rumor, it is a grave failure of the organization, maybe a grave fault of the guard. At least, the concern of the staff in charge had led them to summon Coyne (and Ballot) at a close date, which has proved too late.

    Fig. 9. Displacements of the targets along arches at elevation 78 and 90 m (after Mary, 1968); bold letters refer to measurement dates (Fig. 4); other letters name the construction joints between monoliths; the scale applies to target displacements: segments CD, between measurements 1958–1959, show a general move toward the left bank, a fact any professional could have noticed as a change of behavior, long before the latest 5 m rise.

    3.5.Statemanagementtraps

    The Vardépartement, an administrative level of the State, was the owner, deprived of any dam specialist. It relied on the Engineer for design and for construction supervision but did not asked for any more mission after the end of construction; the formalréception(commissioning) did not wait for any test at full level, as was usual but not mandatory, by lack of water and because the property rights of the whole reservoir area had not been bought; the prefect signed it in order to permit full payment of contractors without asking the owner to perform any more surveys.

    4. Human and organizational factors

    Lack of dialog with more than two persons (the Geologist sent reports but did not meet the Engineer on site). In France, Coyne used to work with EDF, a national company with many experimented engineers, and under permanent supervision of a corps of well trained state engineers. Neither EDF nor this corps were involved in Malpasset.

    One may wonder administrative borders be tight against technical information exchange: along the same years a bigger arch dam, Bimont, was being built within 100 km of Malpasset for drink water of Marseilles under the nextdépartementBouches-du-Rh?neas owner, but not any link appeared between the teams in charge of those dams in spite of both the geologist and the engineer being the same.

    And the more one must notice the lack of any control by a third party (which was soon created and made mandatory for all dams over 15 m height).

    5. Other catastrophes

    Many comparisons may be made with a series of catastrophes within the 20th century and up to now:

    (1) coal-dust explosion in the Courrières mine in France in 1906, when nobody could think a coal-dust explosion could reach so far;

    (2) drowning of the British liner Titanic in 1912 after collision with an iceberg: from the of ficers and all passengers on board, to the general public worldwide, the liner was thought of as nonsubmersible and the staff denied the cables received about the drift of icebergs;

    (3) explosion of the English dirigible R101 (1930, near Beauvais, France) during its inaugural flight, operated before completion of the convincing steps of the experimental stage, to ful fill political ambitions: a fault shared with Malpasset and Vajont (see below);

    (4) deadly Aberfan debris flow in South Wales in 1966: in spite of many small shallow slides on sterile coal mine heaps, the height has been increased higher than experienced before (Duffaut, 1982);

    (5) explosion of the American Space Shuttle Challenger (1986) after many warnings about failed joints in the solid rocket booster and the decision to maintain the launch to meet political requirements of NASA (aimed to obtaining next budgets);

    (6) crash of flight AF447 (offshore Brasil, 2009), the staff of which was caught in a tropical tempest and deprived from data from frozen Pitot tubes;

    (7) Fukushima tsunami induced nuclear accident (2011, Japan), where the local staff was left without any means of action when both water cooling of the reactors and electric power were put out of service by a wave higher than supposed.

    Soon after Malpasset, another dam catastrophe occurred in the Dolomites, Northeastern Italy: the fall of Monte Toc slope into the Vajont reservoir on 9 October 1963. It displaced the water from the reservoir, which swept 2000 people in the valley downstream: as the slope was moving slowly along two years, the engineers thank they could control the slide through management of the reservoir level, ignoring the lesson of the celebrated Goldau slide, Switzerland, 200 years before, which had suddenly accelerated and destructed the city (Heim, 1932; Erismann and Ebele, 2001). Leopold Müller who was in charge of the geotechnical studies focused on the reinforcement of the rock mass through many rock anchors on both banks (which actually proved ef ficient: Leonards (1987) stated that the Vajont dam withstood a load eight times greater than it was designed to bear). The actual trap was the confidence in the management of the slide in front of a transfer of property from a local company to a State one.

    6. Human and organizational factors of catastrophes:“normal accident” theories

    In addition to the lack of civil Rock Mechanics, which was to be derived from the studies following the catastrophe, one must notice that social research on major accidents was also in infancy in the fifties: after works on accidents by Patrick Lagadec in France, Charles Perrow in the US, James Reason in UK and many other since, under pressure from high hazardous activities, it is now well understood that nature and industry build together so complex systems than nobody can any longer master all hazardous interactions inside them.

    In France, Lagadec (1979) introduced the concept of Major Technological Hazard and performed reviews of many major accidents. In his famous book, “Normal accidents”, Perrow (1984) wrote after the Three Mile Island nuclear accident: “we might stop blaming the wrong people and the wrong factors”; he stated that in complex systems, “multiple and unexpected interactions of failures are inevitable”: the accident becomes “normal”! The aerospace industry, NASA at the first place, ordered many studies which benefited to all most hazardous industries, nuclear energy to begin with. These studies have quickly highlighted the importance not only of human functioning but also the influence of organizations as outlined by James Reason “we cannot change the human conditions, but we can change the conditions under which people work”(Reason, 1990).

    7. Conclusions

    The geology set the first traps; the mechanical behavior of the rock aggravated the dangerous forces; the practice of drainage only was of rule under thick dams; two fortuitous circumstances, the construction of a bridge and a flash flood, conjugated; all of those traps were in a way preparatory causes. Money in flation, lack of any state control, blindness in front of alarms, and absence of any quali fied staff completed the scenery. One should stress as well the technical isolation of André Coyne, instead of the high level of implication of engineers of both EDF and the state in hydro-dams inside France.

    It was highly uneasy, either at the trial, some years after, or, some decades later at Purdue University (Leonards, 1987), and it is yet today uneasy too, half a century later, to discuss how engineers performed in the early fifties; it may look easy to charge them with outrageous transgressions of elementary rules of art, when no such rules did exist at the time: most of the rules enforced today have been derived from the results of the Malpasset case history; within a few years, many had yet become evident. Geological materials are opaque, we cannot see through, so it may be compared with a lock, the mechanism of which is purposely hidden behind a steel plate; in most geotechnical problems the thrust to turn the key is provided by groundwater. While geology may be investigated as much as needed, future events are not predictable, from rain and flood to earthquakes and tsunamis, to worksites, and even societal movements.

    For sure the catastrophe has brought many useful teachings: the way dam sites were investigated before construction and the way dams were managed during operation has been since deeply changed worldwide, but my purpose here is to recall what has been done before construction was “normal” at the time, while what has been done after was not.

    Acknowledgements

    Colleagues of both French committees for Dams and Reservoirs and for Rock Mechanics, Jean-Louis Bordes, Bernard Goguel, Pierre Habib, and younger doctorant Justin Larouzée. Some more valuable information may be found in Bellier (1967), Londe (1987), and Duffaut (2011).

    Bellier J. Le barrage de Malpasset. Paris: Travaux; 1967. p. 3–23.

    Bernaix J. étude géotechnique de la roche de Malpasset. Paris: Dunod; 1967.

    Carrère A. Les lec? ons de Malpasset, leur application aux projets de barrages d’aujourd’hui. Revue franc? aise de Géotechnique 2010;131/132:37–51.

    Duffaut P. In: La rupture du terril d‘Aberfan (Pays de Galles); 1982. p. 413–8.

    Duffaut P. In: Any geotechnical engineer has to face rockmass water; 1992.

    Duffaut P. Malpasset, la seule rupture totale d’un barrage-vo?te. Revue franc? aise de Géotechnique 2010(131/132):5–18.

    Duffaut P. What modern rock mechanics owe to the Malpasset Arch dam failure. In: Proceedings of International ISRM Congress. Leiden: CRC Press; 2011. p. 701.

    Erismann T, Ebele G. Dynamics of rockslides and rockfalls. Berlin: Springer; 2001.

    Goguel B. Avant-propos au rapport géologique Malpasset de Jean Goguel. Revue franc?aise de Géotechnique 2010a;131/132:23–4.

    Goguel J. Rapport géologique Malpasset. Revue franc? aise de Géotechnique 2010b;131/132:25–36.

    Habib P. La fissuration des gneiss de Malpasset. Revue franc? aise de Géotechnique 2010;131/132:19–22.

    Heim A. Bergsturz und Menschenleben. Zurich: Fretz and Wasmuth; 1932.

    Lagadec P. Le défidu risque technologique majeur. Futuribles 1979;28:11–34.

    Leonards GA. In: Proceedings of the International colloquium on Dam failures. Lafayette, Indiana: Purdue University; 1987.

    Lévy M. Quelques considérations sur la construction des grands barrages. Comptes rendus de l’Académie des Sciences, Paris 1895;121:288–300.

    Londe P. The Malpasset dam failure. Engineering Geology 1987;24:295–329.

    Mary M. Barrages-vo?tes, historique, accidents et incidents. Paris: Dunod; 1968.

    Maury V. Mécanique des milieux stratifiés. Paris: Dunod; 1970.

    Perrow C. Normal accidents: living with high risk technologies. New York, NJ: Princeton University Press; 1984.

    Reason J. Human error. Cambridge: Cambridge University Press; 1990.

    Schneider B. Moyens nouveaux de reconnaissance des massifs rocheux. Annales Institut technique du Batiment et des Travaux Publics 1967;235/236:1055–93.

    Talobre J. La Mécanique des roches appliquée aux Travaux publics. Paris: Dunod; 1957.

    Pierre Duffautis a retired geological engineer. Graduated from Saint étienne School of Mines, France, in 1948, he served EDF, the French Authority for Electricity, first as geological engineer and later as civil engineering expert. He spent some years as Head of the Geotechnical Department at the French Geological Survey; then Head of Civil Engineering at the Continuing Education ofécoledesPonts etChaussées.From 1983 he worked worldwide as a free lance consultant. From the Malpasset failure he followed the growth of civil Rock Mechanics, as a founder member in 1967 and later Chairman of the French Committees on Rock Mechanics. He performed research mainly on Concrete, Rock Mechanics, and Underground City Planning, being active in Dams, Tunneling, and all Geotechnical Societies, through conferences, working groups, papers, and lectures. Among his latest work was the coordination of a Manual of Rock Mechanics, in 4 volumes from 2000 to 2013. He is a founding member of ISRM Commission on Underground Nuclear Power Plants.

    ?Tel.: +33 6 7110 2972.

    E-mail address: pierre.duffaut@gmail.com

    Peer review under responsibility of Institute of Rock and Soil Mechanics, Chinese Academy of Sciences.

    1674-7755 ? 2013 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. All rights reserved.

    http://dx.doi.org/10.1016/j.jrmge.2013.07.004

    午夜福利在线观看免费完整高清在 | 蜜桃久久精品国产亚洲av| 草草在线视频免费看| 午夜久久久久精精品| 国产精华一区二区三区| 中国美女看黄片| 亚洲综合色惰| 欧美潮喷喷水| 久久九九热精品免费| 美女黄网站色视频| 精品99又大又爽又粗少妇毛片| 日韩高清综合在线| 免费在线观看影片大全网站| 欧美zozozo另类| 91狼人影院| 一区二区三区四区激情视频 | 久久久精品94久久精品| 日韩在线高清观看一区二区三区| 秋霞在线观看毛片| 日韩欧美免费精品| 国产极品精品免费视频能看的| 国产亚洲欧美98| 亚州av有码| av黄色大香蕉| 亚洲最大成人av| 伊人久久精品亚洲午夜| 精品久久久久久成人av| 国产精品免费一区二区三区在线| 联通29元200g的流量卡| 夜夜爽天天搞| 在线观看一区二区三区| 日本色播在线视频| 在线国产一区二区在线| 午夜爱爱视频在线播放| 国产精品爽爽va在线观看网站| 午夜日韩欧美国产| 91在线精品国自产拍蜜月| 男人舔奶头视频| 亚洲国产精品国产精品| 欧美在线一区亚洲| 国产伦精品一区二区三区视频9| 国产精品亚洲一级av第二区| 精品久久久久久久久久久久久| 一区二区三区免费毛片| 久久欧美精品欧美久久欧美| 熟女电影av网| 又黄又爽又刺激的免费视频.| 俄罗斯特黄特色一大片| 久久久久久九九精品二区国产| 国产高清不卡午夜福利| 国语自产精品视频在线第100页| 国产白丝娇喘喷水9色精品| av天堂中文字幕网| 伦精品一区二区三区| 久久久久久久亚洲中文字幕| 欧美高清性xxxxhd video| 国产真实乱freesex| 精品久久久久久久久av| 丰满的人妻完整版| 人人妻人人澡欧美一区二区| 亚洲性久久影院| а√天堂www在线а√下载| 日本与韩国留学比较| 欧美+日韩+精品| 午夜精品国产一区二区电影 | 亚洲av成人精品一区久久| 综合色丁香网| 国产精品,欧美在线| 神马国产精品三级电影在线观看| 亚洲在线观看片| 最近2019中文字幕mv第一页| 国产一区二区三区在线臀色熟女| 中文资源天堂在线| 性插视频无遮挡在线免费观看| 国产伦精品一区二区三区视频9| 亚洲av二区三区四区| 午夜久久久久精精品| 亚洲av第一区精品v没综合| 五月伊人婷婷丁香| 熟女电影av网| 久久久a久久爽久久v久久| 乱人视频在线观看| 久久精品夜夜夜夜夜久久蜜豆| 可以在线观看毛片的网站| 国产成人aa在线观看| 91在线精品国自产拍蜜月| 国产 一区精品| 亚洲av电影不卡..在线观看| 床上黄色一级片| 国产探花在线观看一区二区| 在现免费观看毛片| 我要搜黄色片| 国产精品久久久久久久电影| 99热精品在线国产| 国产成人aa在线观看| 亚洲av.av天堂| 精品熟女少妇av免费看| 日本一本二区三区精品| 在线国产一区二区在线| 99热6这里只有精品| 热99在线观看视频| 三级毛片av免费| 亚洲专区国产一区二区| 在线播放无遮挡| 啦啦啦观看免费观看视频高清| 欧美极品一区二区三区四区| 亚洲图色成人| 一区二区三区免费毛片| 一级毛片我不卡| 免费大片18禁| 两个人视频免费观看高清| 欧美性猛交╳xxx乱大交人| 国产精品久久久久久精品电影| 国产高潮美女av| 中文字幕久久专区| 在线免费观看不下载黄p国产| 91久久精品国产一区二区三区| 91午夜精品亚洲一区二区三区| 亚洲成人av在线免费| 黄色欧美视频在线观看| 别揉我奶头~嗯~啊~动态视频| 免费人成视频x8x8入口观看| 九色成人免费人妻av| 自拍偷自拍亚洲精品老妇| 国产精华一区二区三区| 村上凉子中文字幕在线| 男人的好看免费观看在线视频| 赤兔流量卡办理| АⅤ资源中文在线天堂| 尾随美女入室| 日本a在线网址| 丝袜喷水一区| 免费搜索国产男女视频| 可以在线观看毛片的网站| 男女下面进入的视频免费午夜| 国产黄片美女视频| 国产欧美日韩精品一区二区| 亚洲av电影不卡..在线观看| 久久人人爽人人爽人人片va| 一本精品99久久精品77| 1024手机看黄色片| 少妇被粗大猛烈的视频| 亚洲成av人片在线播放无| 久久综合国产亚洲精品| 国产毛片a区久久久久| 日韩大尺度精品在线看网址| 中文字幕久久专区| 成人二区视频| 国产女主播在线喷水免费视频网站 | 国产欧美日韩精品亚洲av| 偷拍熟女少妇极品色| 久久韩国三级中文字幕| 春色校园在线视频观看| 熟女人妻精品中文字幕| 一级av片app| 人妻久久中文字幕网| 久久久久性生活片| 亚洲图色成人| 免费看光身美女| 波野结衣二区三区在线| 亚洲欧美日韩高清在线视频| 亚洲av不卡在线观看| 老司机福利观看| 美女 人体艺术 gogo| 欧美丝袜亚洲另类| 午夜久久久久精精品| 一个人看视频在线观看www免费| 国产精品一二三区在线看| 免费看日本二区| 一本精品99久久精品77| 日日摸夜夜添夜夜添小说| 久久久久国产网址| 悠悠久久av| 在线国产一区二区在线| a级一级毛片免费在线观看| 啦啦啦韩国在线观看视频| 亚洲丝袜综合中文字幕| 国产久久久一区二区三区| 亚洲成a人片在线一区二区| a级毛色黄片| 亚洲久久久久久中文字幕| 国产av一区在线观看免费| 国产精品野战在线观看| 搞女人的毛片| 色哟哟哟哟哟哟| 日韩欧美三级三区| 黄色视频,在线免费观看| 我要搜黄色片| 男插女下体视频免费在线播放| 久久久色成人| 国产亚洲欧美98| 亚洲av成人精品一区久久| 免费看光身美女| 三级男女做爰猛烈吃奶摸视频| 免费看光身美女| 欧美日本视频| 成人精品一区二区免费| 欧美高清成人免费视频www| 免费看美女性在线毛片视频| 久久精品国产清高在天天线| 国产精品一区二区三区四区久久| 国产一区二区在线av高清观看| 18禁在线播放成人免费| 偷拍熟女少妇极品色| 我要搜黄色片| 日本a在线网址| 日本免费a在线| 欧美日韩乱码在线| 国产黄色小视频在线观看| 午夜亚洲福利在线播放| 搡老妇女老女人老熟妇| 成人午夜高清在线视频| 免费大片18禁| 99久久无色码亚洲精品果冻| 18禁在线无遮挡免费观看视频 | 久久精品国产99精品国产亚洲性色| 国产v大片淫在线免费观看| 国产精品永久免费网站| 国产综合懂色| 别揉我奶头 嗯啊视频| 日韩欧美国产在线观看| 青春草视频在线免费观看| 国产激情偷乱视频一区二区| 尾随美女入室| 精品不卡国产一区二区三区| 国产精品久久久久久亚洲av鲁大| 婷婷色综合大香蕉| 丰满人妻一区二区三区视频av| 国产国拍精品亚洲av在线观看| 国产精品女同一区二区软件| 日本免费a在线| 亚洲精品影视一区二区三区av| 久久久久国内视频| 成人鲁丝片一二三区免费| 久久久精品大字幕| 日韩一区二区视频免费看| 内地一区二区视频在线| 最近最新中文字幕大全电影3| 日韩国内少妇激情av| 国产精品一区二区性色av| 国产午夜精品久久久久久一区二区三区 | 午夜福利在线观看免费完整高清在 | 精品一区二区三区av网在线观看| 赤兔流量卡办理| 欧美+日韩+精品| 免费av不卡在线播放| 国产亚洲精品久久久久久毛片| 精品一区二区三区视频在线观看免费| 欧美又色又爽又黄视频| 黄片wwwwww| 村上凉子中文字幕在线| 国产一区二区在线av高清观看| 亚洲五月天丁香| 亚洲欧美中文字幕日韩二区| 成人综合一区亚洲| 亚洲成人av在线免费| 国产一区二区三区av在线 | 免费av毛片视频| 两个人视频免费观看高清| 欧美极品一区二区三区四区| 成年版毛片免费区| 日韩欧美精品v在线| 国产成人福利小说| 一本久久中文字幕| 如何舔出高潮| 国产精品亚洲美女久久久| 白带黄色成豆腐渣| 国产精品综合久久久久久久免费| 久久这里只有精品中国| 美女cb高潮喷水在线观看| 日韩 亚洲 欧美在线| 精品99又大又爽又粗少妇毛片| 国语自产精品视频在线第100页| 久久亚洲精品不卡| 日本一二三区视频观看| 国内久久婷婷六月综合欲色啪| 国产女主播在线喷水免费视频网站 | 中文字幕av成人在线电影| 成人漫画全彩无遮挡| 亚洲图色成人| 三级国产精品欧美在线观看| 俄罗斯特黄特色一大片| 久久久久精品国产欧美久久久| 午夜福利在线观看免费完整高清在 | 不卡视频在线观看欧美| 国产精品无大码| 欧美zozozo另类| 亚洲天堂国产精品一区在线| 欧美三级亚洲精品| 亚洲av免费在线观看| 在线看三级毛片| 国产午夜精品论理片| 日韩人妻高清精品专区| 国产高清有码在线观看视频| 别揉我奶头 嗯啊视频| 亚洲中文字幕一区二区三区有码在线看| 国产成年人精品一区二区| 精品人妻熟女av久视频| 特级一级黄色大片| 亚洲av中文av极速乱| 丰满乱子伦码专区| 最新在线观看一区二区三区| 国内精品一区二区在线观看| 99久久精品热视频| 久久久久九九精品影院| 免费人成在线观看视频色| 欧美又色又爽又黄视频| 久久久午夜欧美精品| 草草在线视频免费看| 亚洲四区av| 国产午夜精品论理片| 久久婷婷人人爽人人干人人爱| 亚洲人与动物交配视频| 欧美不卡视频在线免费观看| 一区福利在线观看| 在线免费十八禁| 婷婷亚洲欧美| 亚洲综合色惰| 亚洲欧美中文字幕日韩二区| 天天一区二区日本电影三级| 国产精品,欧美在线| 欧美丝袜亚洲另类| 色综合色国产| 国产黄a三级三级三级人| 亚洲欧美精品综合久久99| 亚洲无线观看免费| 久久亚洲精品不卡| 嫩草影院入口| 日韩大尺度精品在线看网址| 国产男靠女视频免费网站| 91久久精品国产一区二区三区| 99久久精品国产国产毛片| 久久久久久久亚洲中文字幕| 欧美三级亚洲精品| 综合色av麻豆| 国产久久久一区二区三区| 欧美最新免费一区二区三区| 色综合站精品国产| 久久99热6这里只有精品| 日韩在线高清观看一区二区三区| 精品人妻偷拍中文字幕| 在线免费观看的www视频| 日本免费a在线| 韩国av在线不卡| 国产久久久一区二区三区| 看黄色毛片网站| 少妇熟女aⅴ在线视频| 国产成人一区二区在线| 成年女人看的毛片在线观看| 美女大奶头视频| 国产高清有码在线观看视频| 在线看三级毛片| 国产激情偷乱视频一区二区| 1000部很黄的大片| 国产精品国产三级国产av玫瑰| 久久久久九九精品影院| 国产av麻豆久久久久久久| av.在线天堂| 深夜精品福利| 91在线精品国自产拍蜜月| 69av精品久久久久久| 午夜激情欧美在线| 精品日产1卡2卡| 亚洲在线自拍视频| 久久久久国产网址| 此物有八面人人有两片| 自拍偷自拍亚洲精品老妇| 亚洲国产欧洲综合997久久,| 18禁在线无遮挡免费观看视频 | av在线老鸭窝| 91狼人影院| 久久精品91蜜桃| 亚洲一级一片aⅴ在线观看| 亚洲五月天丁香| 亚洲不卡免费看| 久久鲁丝午夜福利片| 亚洲精品成人久久久久久| 国产一区二区在线av高清观看| 久久久久国内视频| 欧美成人精品欧美一级黄| 国产伦一二天堂av在线观看| 国产午夜福利久久久久久| 日韩制服骚丝袜av| 国产精品久久久久久av不卡| 在线播放国产精品三级| 欧美又色又爽又黄视频| 俺也久久电影网| 日韩国内少妇激情av| 色综合站精品国产| 国产精品久久久久久久久免| 免费观看精品视频网站| 国产成人精品久久久久久| 国产高清激情床上av| 亚洲国产精品成人综合色| 男人的好看免费观看在线视频| 99热这里只有是精品在线观看| 日韩大尺度精品在线看网址| 国产老妇女一区| 我的女老师完整版在线观看| 亚洲欧美日韩卡通动漫| 晚上一个人看的免费电影| 日韩,欧美,国产一区二区三区 | 国产 一区精品| 在线观看美女被高潮喷水网站| 性欧美人与动物交配| 亚洲成av人片在线播放无| 一区二区三区高清视频在线| av国产免费在线观看| 成人特级av手机在线观看| 好男人在线观看高清免费视频| 天堂影院成人在线观看| 国产伦在线观看视频一区| 国产午夜福利久久久久久| 国产蜜桃级精品一区二区三区| 免费观看人在逋| 日本一二三区视频观看| 成人二区视频| 日韩欧美在线乱码| av中文乱码字幕在线| 天堂√8在线中文| 久久久国产成人免费| 久久久国产成人精品二区| 国产探花极品一区二区| 久久久久久九九精品二区国产| 高清午夜精品一区二区三区 | 人人妻人人澡人人爽人人夜夜 | 在线播放国产精品三级| 一个人看的www免费观看视频| 日韩亚洲欧美综合| 国产在视频线在精品| 女同久久另类99精品国产91| 国产精品,欧美在线| 日韩欧美精品免费久久| 丝袜喷水一区| 精品不卡国产一区二区三区| 精品乱码久久久久久99久播| 久久九九热精品免费| 免费人成在线观看视频色| 成年女人看的毛片在线观看| 亚洲熟妇熟女久久| 中文字幕精品亚洲无线码一区| 亚洲欧美成人精品一区二区| 22中文网久久字幕| 欧美性感艳星| 秋霞在线观看毛片| 两性午夜刺激爽爽歪歪视频在线观看| 国产精品久久久久久亚洲av鲁大| 91久久精品国产一区二区三区| 51国产日韩欧美| 成人精品一区二区免费| 国产老妇女一区| 精品久久国产蜜桃| 久久精品综合一区二区三区| 高清毛片免费看| 看非洲黑人一级黄片| 99热这里只有是精品在线观看| 在线a可以看的网站| 女生性感内裤真人,穿戴方法视频| 欧美极品一区二区三区四区| 欧美一区二区精品小视频在线| 日韩av在线大香蕉| 国产探花在线观看一区二区| 美女免费视频网站| 亚洲五月天丁香| 亚洲国产日韩欧美精品在线观看| 色噜噜av男人的天堂激情| 国产欧美日韩一区二区精品| 伦精品一区二区三区| 亚洲18禁久久av| 午夜精品国产一区二区电影 | 久久久久国产网址| 久久99热这里只有精品18| 精品一区二区三区视频在线| 久久久久久久久久成人| 天堂动漫精品| 亚洲人成网站在线播| 久久精品91蜜桃| 久久久久久大精品| 免费黄网站久久成人精品| 我的老师免费观看完整版| 99国产精品一区二区蜜桃av| 久久久欧美国产精品| 国产成人91sexporn| 国产成人aa在线观看| 亚洲色图av天堂| 亚洲精品粉嫩美女一区| 欧美国产日韩亚洲一区| 一级a爱片免费观看的视频| 少妇熟女欧美另类| 麻豆久久精品国产亚洲av| 男插女下体视频免费在线播放| 日韩精品中文字幕看吧| 久久综合国产亚洲精品| 国产精品野战在线观看| 国产成年人精品一区二区| 国产在视频线在精品| 在线观看一区二区三区| 如何舔出高潮| 美女大奶头视频| 亚洲欧美中文字幕日韩二区| 一级黄色大片毛片| 免费人成视频x8x8入口观看| 国产成人一区二区在线| 久久久精品94久久精品| 天堂网av新在线| 国产男靠女视频免费网站| 好男人在线观看高清免费视频| 黄色一级大片看看| АⅤ资源中文在线天堂| 一级av片app| 不卡一级毛片| 国内精品宾馆在线| h日本视频在线播放| 中国国产av一级| a级一级毛片免费在线观看| 国产黄a三级三级三级人| 美女被艹到高潮喷水动态| 久久人人爽人人爽人人片va| 国内久久婷婷六月综合欲色啪| 日本 av在线| 亚洲av电影不卡..在线观看| 国产 一区精品| 男人狂女人下面高潮的视频| 国产av在哪里看| 国产成人aa在线观看| 国内精品美女久久久久久| 日本一二三区视频观看| 小说图片视频综合网站| 欧美zozozo另类| 欧美+日韩+精品| 久久久久久大精品| 青春草视频在线免费观看| 久久久久久伊人网av| av黄色大香蕉| 在线观看一区二区三区| 性欧美人与动物交配| 亚洲精品一区av在线观看| 一级黄片播放器| 亚洲欧美日韩无卡精品| 国产黄色视频一区二区在线观看 | 成人av在线播放网站| 欧美一区二区精品小视频在线| 中文字幕熟女人妻在线| 色尼玛亚洲综合影院| 国产精品福利在线免费观看| 狂野欧美白嫩少妇大欣赏| 亚洲av中文av极速乱| 国产视频内射| 国产男靠女视频免费网站| 蜜桃亚洲精品一区二区三区| 天天躁夜夜躁狠狠久久av| 久久久国产成人免费| 国产精品一区二区性色av| 亚洲精品国产av成人精品 | 听说在线观看完整版免费高清| 久久久久久久亚洲中文字幕| 日韩三级伦理在线观看| 乱码一卡2卡4卡精品| 国产欧美日韩精品亚洲av| 人人妻人人澡欧美一区二区| 中文字幕精品亚洲无线码一区| 悠悠久久av| 亚洲欧美日韩高清专用| 成人特级黄色片久久久久久久| 毛片一级片免费看久久久久| 在线播放无遮挡| 综合色av麻豆| 天堂av国产一区二区熟女人妻| 五月玫瑰六月丁香| 又黄又爽又刺激的免费视频.| 丰满的人妻完整版| 色尼玛亚洲综合影院| 亚洲美女视频黄频| 老司机午夜福利在线观看视频| 最好的美女福利视频网| 色视频www国产| 亚洲成人精品中文字幕电影| 在线免费观看不下载黄p国产| 在线观看av片永久免费下载| 久久久色成人| 国产精品一区二区性色av| 久久国内精品自在自线图片| 全区人妻精品视频| 俺也久久电影网| 夜夜看夜夜爽夜夜摸| 男人的好看免费观看在线视频| 在线a可以看的网站| 性色avwww在线观看| 欧美区成人在线视频| 99riav亚洲国产免费| 国产老妇女一区| 亚洲欧美清纯卡通| 久久精品91蜜桃| 久久久色成人| 1000部很黄的大片| 乱系列少妇在线播放| 日韩av不卡免费在线播放| 日韩 亚洲 欧美在线| 亚洲精品一区av在线观看| 国产精品久久久久久久久免| 国产精品久久久久久精品电影| 午夜精品一区二区三区免费看| 97在线视频观看| 内射极品少妇av片p| 日韩av在线大香蕉| 亚洲成人av在线免费| 亚洲精品久久国产高清桃花| 日本黄大片高清| 欧美色欧美亚洲另类二区| 美女免费视频网站| 日韩欧美国产在线观看| 精品久久国产蜜桃| 亚洲无线观看免费| 女人十人毛片免费观看3o分钟| 亚洲中文字幕日韩|