    Frozen curtain characteristics during excavation of submerged shallow tunnel using Freeze-Sealing Pipe-Roof method

    2023-01-02 08:08:12YeNiuZeQunHongJunZhangLeiHan
    Sciences in Cold and Arid Regions 2022年4期

    Ye Niu,ZeQun Hong,Jun Zhang,Lei Han

    1.China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan,Hubei 430056,China

    2.School of Mechanics and Civil Engineering,China University of Mining and Technology,Xuzhou,Jiangsu 221116,China

    3.CCCC Second Highway Consultants Co.,Ltd.,Wuhan,Hubei 430056,China

    4.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China

    ABSTRACT The Freeze-Sealing Pipe-Roof(FSPR)method,which has been applied for the first time in the Gongbei Tunnel of the Hong Kong-Zhuhai-Macao Bridge,is a new approach of tunnel pre-support that allows flexible adjustment of freeze tube arrangement and can be adapted to different environmental conditions.When the FSPR method is used to construct shallow burial submerged tunnels,the frozen wall to hold back groundwater during excavation will be weakened by air and water flows inside and outside the tunnel,and its waterproof performance needs to be further investigated.In this paper,a two-dimensional numerical model of the temperature field considering excavation and moving water boundary is established based on the preliminary design scheme and in-situ conditions and is used to analyze the variation in frozen curtain properties with various active freezing times during excavation.The results show that excavation has a weakening effect on both sides of the frozen wall,with a greater effect on the inner side,and a positive temperature appears in the local area inside the jacked pipe.The concrete fill in the jacked pipe obviously improves the freezing efficiency,and the tunnel excavation after 60 days of active freezing in the interval filling mode can ensure that the frozen soil thickness at the thinnest segment exceeds 2 m,i.e.,the design requirement.In practice,the active freezing time can be extended appropriately to reduce the influence of river water flow above the tunnel.The study serves as a technical reference for the design and implementation of similar projects.

    Keywords:Freeze-Sealing Pipe-Roof method;submerged tunnel;soil excavation;temperature field;frozen wall thickness

    1 Introduction

    The shallow burial concealed method was proposed for application in a complex urban tunnel and underground engineering environment(Wang,2004).After more than 20 years of development,a complete set of supporting technologies has been designed and widely used in tunnel and underground engineering(Zheng and Zhang,2014).As the construction environment of urban tunnels and underground engineering becomes more and more complex,it is increasingly difficult to apply existing construction technologies.The development trend of the traditional shallow mining method is mainly manifested in strengthening the auxiliary measures and simplifying the original main procedures(Guo,2012).For shallow tunnels with water-rich strata,the choice of auxiliary methods is particularly important.When ordinary methods such as horizontal rotary spray,pipe curtain,ground freezing or precipitation method alone cannot meet the requirements,a combination of multiple auxiliary methods is proposed to complement each other(Shenet al.,2006;Huet al.,2013).

    The construction of the concealed section of the Gongbei tunnel of the Hong Kong-Zhuhai-Macao Bridge adopted a combination of the pipe curtain method and artificial ground freezing(AGF)method,namely the Freeze-Sealing Pipe-Roof method(Cheng and Liu,2012).This was the first-ever engineering application of such a method,although the"steel pipe+freezing"method was previously studied in Japan(Moriuchiet al.,2008).Examples of similar applications only appeared in the subsurface excavation of U55 subway station in Berlin,Germany.However,there is still a fundamental difference between these studies and the new FSPR method.Foreign studies consider frozen soil as a load-bearing structural,and steel pipe is used to improve the overall load-bearing performance.In contrast,the pipe roof is designed as a load-bearing structure in the FSPR method,and the frozen soil curtain is only a substitute for the locking catch to play a role in sealing water.

    A research team from Tongji University in China has conducted many studies on the concept of the FSPR method and its reliability of water sealing through numerical simulations(Hu and She,2012),indoor tests(Wang,2013)and large physical model tests in conjunction with the Gongbei tunnel(Chen,2013).Applications of the FSPR method in constructing shallow tunnels under rivers have not been reported before.This paper describes a detailed investigation into the frozen curtain development during excavation of a submerged tunnel based on the numerical simulation of ground freezing of the Qinhuai River Tunnel using the FSPR method.The variation of the thickness and critical location temperature of the frozen curtain is revealed to provide a reference for field design and construction.

    2 Engineering Background

    2.1 Environment around tunnel site

    The Ning-Wu Railway connects Nanjing and Wuhu City in East China.The rapid development in this region urgently necessitates improving the transportation capacity of the existing railroad.At the same time,it is very important to reduce the impact on the lives of the neighboring residents.Under this background,the expansion and reconstruction project of the Ning-Wu Railway was put on the agenda in recent years.

    The newly modified line crosses the new Qinhuai River from mileage DK24+400 to DK24+600,which is called the Qinhuai Tunnel.This tunnel is 385 meters long,with a 200-meter underwater section intersecting obliquely with the Qinhuai New River at an angle of about 41°.It is only 32 m from the proposed Beijing-Shanghai high-speed railroad upstream,as shown in Figure 1.

    Figure 1 Schematic diagram of the Qinhuai Tunnel route and nearby infrastructure

    2.2 Engineering geology conditions

    A preliminary engineering geological survey was carried out prior to the construction of the Qinhuai tunnel.The survey results show that there are various soil and rock layers distributed from the river bottom to the tunnel bottom,as illustrated by the general geotechnical profile near the north working shaft in Figure 2.The soil index properties of each layer are summarized in Table 1.

    Figure 2 Geotechnical profile of the Qinhuai Tunnel

    Table 1 Index properties of main geologic units

    2.3 Design of the FSPR method

    The original plan to build by open excavation had to be changed to concealed excavation due to the need for flood control in the summer of the Qinhuai River.This left an extremely shallow overburden at the tunnel top and a minimum distance of less than 2 m between the structure and the river.Traditional tunnel construction methods such as the shield method are not applicable in this hydrogeological environment.After construction plan selection,it is proposed to use the FSPR method for concealed excavation.The preliminary scheme of the pipe curtain group consists of 26 steel pipes with a diameter of 1.62 meters,which are jacked in sequence along the quasi-rectangular tunnel profile to form the bearing structure.The spacing between adjacent jacked pipes is about 25 cm,and the load-bearing capacity is increased by filling every other pipe with concrete.The freeze tubes of 0.108 m in diameter are arranged inside the steel pipes,and the designed thickness of the frozen wall is 2 m.For description convenience,a total of 26 jacked pipes are numbered in clockwise order,with No.1 pipe at the top of the tunnel,as shown in Figure 3.

    Figure 3 Tunnel cross-section and arrangement of jacked pipes and freeze tubes

    3 Numerical model and parameter selection

    The computational model also necessitates simplification due to the small difference in the freezing state along the longitudinal direction of the tunnel in the actual construction,and the evaluation of the freezing effect only requires qualitative analysis of the temperature field.Therefore,the study is simplified to a planar thermal conductivity problem,i.e.,a two-dimensional temperature field,without considering the longitudinal variation in the temperature field.

    According to the preliminary freezing scheme described previously,a two-dimensional finite element(FE)model with a width of 67.6 m and a height of 52.6 m was selected,considering the temperature field influence range and geometric symmetry.The FE mesh close to the jacked pipes was refined to better simulate the freezing effect,and the excavation was simulated using the birth and death unit technique.PLANE55 element was selected to simulate the soil,and the enthalpy change in the frozen soil was considered by phase change.The computational model and enlarged mesh division diagram for the excavation period are shown in Figure 4.

    The boundary conditions of this model mainly include several parts such as geometric boundary,freeze tube boundary,water-soil interface and air-soil interface.For the geometric boundary,the left and right sides can be set as adiabatic by the symmetry of the model.For the freeze tube boundary,which is the source of the cooling capacity,studies have shown that directly setting the outer wall of the freeze tubes at a constant temperate same as the brine inlet does not cause large errors(Yang and Che,2004).The brine temperature in the active freezing stage is varied gradually,with the temperature maintained at-18 °C for 7 days,-24 °C for 11 days and-28 °C for 17 days.Afterward,the brine is cycled at-28 °C during the excavation process.For the water-soil interface,the convective heat exchange boundary is set,and the heat exchange coefficient is taken as 50 J/(s·m2·°C).For the internal air-soil interface after excavation,with reference to previous engineering experience,the heat transfer coefficient of 15 J/(s·m2·°C)is applied on the heat dissipation surface.

    In addition,the initial temperature of ground and river water is set at 20 °C,air temperature at the excavation surface is taken as 30 °C,and the freezing point of in-situ soil is-2.1 °C.Referring to the report on physical and mechanical properties of artificially frozen soil in Yangtze River(Hu and She,2012),the thermophysical parameters of other materials such as mild steel,earth,air and concrete are shown in Table 2.

    Figure 4 Numerical model and enlarged mesh near the jacked pipes

    Table 2 Thermophysical parameters of materials in the finite element model

    4 Results and discussions

    4.1 Temperature cloud maps under differentfreezing times

    After preliminary trial calculations,the thermal field of three most likely active freezing plans was simulated,namely:32 days,45 days,and 60 days.Each case includes active freezing before excavation and maintenance freezing for 60 days during excavation.Figure 5 through Figure 7 show the initial pre-excavation and after-excavation temperature clouds for each case.

    One can see from the cross-section temperature clouds in Figure 5 through Figure 7 that the temperature field inside the tunnel will be drastically affected by the high-temperature airflow after excavation,regardless of which active freezing case.The presence of positive temperature zones near the excavation surface inside the pipe roof indicates a partial thaw of the frozen soil.Although the frozen curtain thickness outside of the tunnel also decreases after excavation,it has a much greater impact on the inner frozen wall than on the outer one.Comparison between the three cases shows that the thickness of the frozen soil on the tunnel profile also increases significantly with the increase in the active freezing time,especially in the area above the tunnel near the river.This result proves that the extension of active freezing time is an effective measure to counteract the weakening effect of the moving water.

    Furthermore,one can also notice that the concretefilled jacked pipes have a larger blue area around them,indicating that the concrete fill not only enhances the load-bearing capacity of the pipe roof but also increases the rate of heat transfer and improves the freezing efficiency to a large extent.

    Figure 5 Temperature cloud maps before and after excavation for 32 days of active freezing

    Figure 6 Temperature cloud maps before and after excavation for 45 days of active freezing

    Figure 7 Temperature cloud maps before and after excavation for 60 days of active freezing

    4.2 Variation of temperature at key locations during excavation

    Temperature data at selected key locations were retrieved to evaluate the effect of tunnel excavation on the freezing performance of the FSPR method quantitatively.Points A and B within jacked pipe #1 at the top and C and D within jacked pipe #4 at the right corner of the tunnel were selected as shown in Figure 8.Specifically,Points A and C are at the center,and C and D are by the pipe wall.

    Figure 9 through Figure 11 illustrate the temperature change with time for each observation point during excavation after 32,45 and 60 days of active freezing,respectively.One can see from these figures that excavation after 32,45 and 60 days of active freezing produced a significant warming at each key point in the first 5 days of of the excavation.Then,the thermal erosion from inside the tunnel and the cooling supply of the cryogenic brine in freeze tubes during the maintenance freezing stage reached an equilibrium state,and the temperature began to stabilize and remain constant until the end of excavation.It should be noted that the temperature profile was calculated assuming that the full section is excavated in one step and should be recalculated according to the actual excavation sequence,which could involve the multi-block or multi-step method due to site constraints.

    Points C and D are located at the center and by the wall of the concrete-filled pipe,respectively.As can be seen from Figure 9 through Figure 11,the temperature at point D is higher than that at point C throughout the excavation process,indicating that the temperature on the pipe wall is higher than that at the pipe center with a temperature difference of about 5 °C after 60 days of active freezing.In contrast,such a difference is doubled to about 10 °C for the pipe without concrete fill.It can also be seen that for the case of 60 days of active freezing,the temperature at point B at thermal equilibrium,which is the highest among all key points,can be maintained near 0 °C.This condition is favorable to ensure the water sealing performance of the whole frozen curtain.Therefore,it is recommended to extend the active freezing time to more than 60 days to ensure the water sealing capability of the frozen curtain by the FSPR method during tunnel excavation,if allowed by the construction schedule.

    Figure 8 Location of selected key observation points within the frozen soil curtain

    Figure 9 Variation of temperature at key points with time after 32 days of active freezing

    Figure 10 Variation of temperature at key points with time after 45 days of active freezing

    Figure 11 Variation of temperature at key points with time after 60 days of active freezing

    4.3 Variation of the frozen curtain thickness with time

    In AGF,the thickness of the frozen wall is one of the most important parameters.It determines the bearing capacity and strength of the frozen soil,and it is no exception for the FSPR method.Considering the effects of concrete fill on the temperature field development,a pipe filled with concrete and an unfilled one are selected in this section to discuss the frozen wall thickness during the excavation.Figure 12 and Figure 13 show the thickness development of the frozen curtain outside the unfilled and concrete-filled jacked pipes during excavation after various periods of active freezing.It can be seen from the figures that the initial frozen thickness outside the concrete-filled pipe before excavation is significantly greater than that of the unfilled case,and the difference between these two thicknesses is the largest when active freezing lasts for 45 days,reaching about 0.6 m.At thermal equilibrium after excavation,the frozen soil thickness outside the unfilled pipe for 60 days of active freezing is roughly 0.2 m thicker than that for 45 days of active freezing,which increases to 0.28 m for the concrete-filled pipe.Around the unfilled pipe is the weakest freezing zone in the FSPR method.Figure 12 shows that the initial frozen wall thickness after 60 days of active freezing is approximately 2.05 m,which exceeds the design requirement of 2 m.Meanwhile,extending the active freezing time before excavation can significantly increase the thickness of the frozen curtain,which is more conducive to ensuring the reliability of water sealing performance.

    Figure 12 Thickness of the frozen curtain on the outside of the unfilled pipe(#1)

    Figure 13 Thickness of the frozen curtain on the outside of the concrete-filled pipe(#2)

    5 Conclusions

    This paper investigates the effects of active freezing on the thermal state of the submerged Qinhuai Tunnel during excavation via the FSPR method by conducting a two-dimensional finite element analysis.The following conclusions can be drawn:

    (1)The inside of the frozen curtain experiences greater aerothermal disturbance than the outside,and localized thaw occurs at the wall edge of the jacked pipe during tunnel excavation.

    (2)Extending the active freezing time can effectively increase the frozen wall thickness,especially for resisting the thermal erosion of the river flow above the tunnel.

    (3)Filling concrete in the jacked pipe not only improves the load-bearing capacity of the frozen curtain but also significantly enhances the thermal conductivity and strengthens the efficiency of the FSPR method.

    (4)After 60 days of active freezing,the thickness of the frozen curtain outside the unfilled pipe can reach more than 2 m,meeting the design requirements.This key design parameter reduces to about 0.8 m after tunnel excavation,which still can form a sufficient and stable waterproof curtain.

    Acknowledgments:

    This research was supported by the National Natural Science Foundation of China(No.52108386).The authors are deeply indebted to the financial support.

    亚洲国产精品一区三区| tube8黄色片| 性色avwww在线观看| 精品第一国产精品| 十分钟在线观看高清视频www| 欧美精品一区二区大全| 国产在线视频一区二区| 国产色婷婷99| 国产乱来视频区| 精品少妇内射三级| 免费大片18禁| 久久久久人妻精品一区果冻| 人妻人人澡人人爽人人| 国产亚洲一区二区精品| 国产黄色视频一区二区在线观看| 在现免费观看毛片| 国产欧美日韩一区二区三区在线| 精品人妻在线不人妻| 大话2 男鬼变身卡| www.色视频.com| 午夜福利视频精品| av线在线观看网站| 亚洲经典国产精华液单| av片东京热男人的天堂| 王馨瑶露胸无遮挡在线观看| 九九爱精品视频在线观看| 久久久久精品人妻al黑| 美女主播在线视频| 亚洲色图综合在线观看| 高清毛片免费看| 黄色配什么色好看| 99热国产这里只有精品6| 黄色怎么调成土黄色| 91精品国产国语对白视频| 国产精品一区www在线观看| 美国免费a级毛片| 侵犯人妻中文字幕一二三四区| 国产成人aa在线观看| 亚洲图色成人| 久久亚洲国产成人精品v| 夫妻性生交免费视频一级片| 国产黄频视频在线观看| 啦啦啦在线观看免费高清www| 日韩成人av中文字幕在线观看| 18禁在线无遮挡免费观看视频| 欧美日韩av久久| 欧美成人午夜精品| 夜夜爽夜夜爽视频| a 毛片基地| 韩国精品一区二区三区 | av在线app专区| 亚洲丝袜综合中文字幕| 欧美激情极品国产一区二区三区 | 肉色欧美久久久久久久蜜桃| 亚洲四区av| 97人妻天天添夜夜摸| 亚洲第一av免费看| 久久免费观看电影| 日韩av免费高清视频| 这个男人来自地球电影免费观看 | 男女高潮啪啪啪动态图| 亚洲国产精品一区三区| 老司机影院成人| 国产精品久久久久久久久免| 亚洲三级黄色毛片| 国产av精品麻豆| 黄片无遮挡物在线观看| 男女高潮啪啪啪动态图| 亚洲精品日本国产第一区| 中文字幕制服av| 夜夜爽夜夜爽视频| 欧美变态另类bdsm刘玥| 国产男女超爽视频在线观看| 26uuu在线亚洲综合色| 国国产精品蜜臀av免费| 精品国产国语对白av| 韩国av在线不卡| 新久久久久国产一级毛片| 日韩电影二区| 国产乱来视频区| 欧美日韩一区二区视频在线观看视频在线| 99久久人妻综合| 少妇 在线观看| av不卡在线播放| 亚洲精品国产av成人精品| 美女xxoo啪啪120秒动态图| 丝袜美足系列| 高清欧美精品videossex| 欧美国产精品va在线观看不卡| 久久ye,这里只有精品| 亚洲色图 男人天堂 中文字幕 | 国产成人av激情在线播放| 久久精品久久久久久噜噜老黄| 婷婷色综合大香蕉| 黄片无遮挡物在线观看| 日韩电影二区| 国产精品一二三区在线看| 精品一区二区三卡| 亚洲四区av| 人人澡人人妻人| 日本爱情动作片www.在线观看| 在线观看免费高清a一片| 国产亚洲午夜精品一区二区久久| 青春草亚洲视频在线观看| 国产综合精华液| 男女国产视频网站| 亚洲一码二码三码区别大吗| 免费在线观看完整版高清| 美女脱内裤让男人舔精品视频| 日产精品乱码卡一卡2卡三| 视频区图区小说| 亚洲内射少妇av| 啦啦啦中文免费视频观看日本| 午夜福利影视在线免费观看| 精品一区二区三卡| 午夜av观看不卡| 久久97久久精品| av线在线观看网站| 视频在线观看一区二区三区| 日本av手机在线免费观看| 久久久久久人人人人人| 日本黄大片高清| 伦理电影免费视频| 自线自在国产av| 插逼视频在线观看| 搡老乐熟女国产| 久热久热在线精品观看| 中文字幕人妻丝袜制服| 国产精品女同一区二区软件| 亚洲精品一区蜜桃| 国产永久视频网站| 少妇猛男粗大的猛烈进出视频| 高清在线视频一区二区三区| 1024视频免费在线观看| 9191精品国产免费久久| 国产精品国产av在线观看| 街头女战士在线观看网站| 精品第一国产精品| 嫩草影院入口| 国产极品天堂在线| 欧美日韩成人在线一区二区| 国产av码专区亚洲av| 天天操日日干夜夜撸| 国产一区二区三区av在线| 日韩大片免费观看网站| 一边亲一边摸免费视频| 国产1区2区3区精品| 亚洲av免费高清在线观看| 亚洲精品国产av成人精品| 97人妻天天添夜夜摸| 狠狠精品人妻久久久久久综合| 美女中出高潮动态图| 午夜福利,免费看| 狠狠婷婷综合久久久久久88av| 日韩一本色道免费dvd| 精品一区二区免费观看| 搡老乐熟女国产| 日韩免费高清中文字幕av| 国产精品99久久99久久久不卡 | 日本欧美国产在线视频| 亚洲精品久久成人aⅴ小说| 这个男人来自地球电影免费观看 | 精品国产乱码久久久久久小说| 日韩免费高清中文字幕av| 久久精品aⅴ一区二区三区四区 | 国产精品免费大片| 成年av动漫网址| 免费观看av网站的网址| 日本av手机在线免费观看| videos熟女内射| 亚洲一区二区三区欧美精品| xxxhd国产人妻xxx| videos熟女内射| 国产有黄有色有爽视频| 在线观看国产h片| 女的被弄到高潮叫床怎么办| 美女大奶头黄色视频| 青青草视频在线视频观看| 黑人巨大精品欧美一区二区蜜桃 | 国产无遮挡羞羞视频在线观看| 日韩熟女老妇一区二区性免费视频| 自拍欧美九色日韩亚洲蝌蚪91| 三级国产精品片| 女人久久www免费人成看片| 777米奇影视久久| 欧美3d第一页| 欧美xxⅹ黑人| 久久久久久久精品精品| 乱码一卡2卡4卡精品| 在线观看免费高清a一片| 飞空精品影院首页| 欧美精品人与动牲交sv欧美| 黄色毛片三级朝国网站| 国产又色又爽无遮挡免| av免费在线看不卡| 国产精品久久久久久精品古装| 国产有黄有色有爽视频| 制服人妻中文乱码| 久久精品国产鲁丝片午夜精品| 纵有疾风起免费观看全集完整版| 毛片一级片免费看久久久久| 日韩欧美一区视频在线观看| 久久久久久伊人网av| 99热6这里只有精品| 90打野战视频偷拍视频| 国产精品三级大全| 精品人妻一区二区三区麻豆| 男女边摸边吃奶| av卡一久久| 巨乳人妻的诱惑在线观看| 国产极品天堂在线| 中文乱码字字幕精品一区二区三区| 一级爰片在线观看| 亚洲国产精品一区二区三区在线| 免费在线观看黄色视频的| 日韩av免费高清视频| 免费观看av网站的网址| 久久免费观看电影| 各种免费的搞黄视频| 9191精品国产免费久久| 熟妇人妻不卡中文字幕| 深夜精品福利| freevideosex欧美| 97在线视频观看| 国内精品宾馆在线| 日日啪夜夜爽| 伦理电影大哥的女人| 美女主播在线视频| 久久97久久精品| 国产精品蜜桃在线观看| 亚洲国产日韩一区二区| av免费观看日本| 国精品久久久久久国模美| 欧美精品高潮呻吟av久久| 欧美人与性动交α欧美精品济南到 | 91国产中文字幕| 亚洲四区av| 黄色配什么色好看| 青青草视频在线视频观看| 丝袜喷水一区| 亚洲av成人精品一二三区| 韩国av在线不卡| 精品熟女少妇av免费看| 亚洲 欧美一区二区三区| 精品人妻在线不人妻| 99热网站在线观看| 18禁动态无遮挡网站| 欧美精品一区二区大全| 亚洲av免费高清在线观看| 捣出白浆h1v1| 久久久久人妻精品一区果冻| 丝袜喷水一区| 精品国产一区二区久久| 国产亚洲一区二区精品| 精品福利永久在线观看| 最近手机中文字幕大全| 久久精品人人爽人人爽视色| 黑人欧美特级aaaaaa片| 97超碰精品成人国产| 免费不卡的大黄色大毛片视频在线观看| 久热久热在线精品观看| av播播在线观看一区| 久久国内精品自在自线图片| 国产男女超爽视频在线观看| 国产1区2区3区精品| 精品一品国产午夜福利视频| 免费高清在线观看视频在线观看| 在线观看免费高清a一片| 一区二区日韩欧美中文字幕 | 欧美日韩国产mv在线观看视频| 一级爰片在线观看| a级毛片在线看网站| 国产精品免费大片| 一二三四在线观看免费中文在 | 18在线观看网站| 久久午夜综合久久蜜桃| a级毛色黄片| 捣出白浆h1v1| 国产麻豆69| 一本久久精品| 久久国产精品男人的天堂亚洲 | 曰老女人黄片| 国产午夜精品一二区理论片| 国产一区二区三区av在线| 久久韩国三级中文字幕| 日本欧美视频一区| av播播在线观看一区| 精品卡一卡二卡四卡免费| 午夜福利,免费看| 国产精品三级大全| 久久婷婷青草| 国产男人的电影天堂91| 国产日韩欧美在线精品| 18禁裸乳无遮挡动漫免费视频| 欧美日韩亚洲高清精品| 日本色播在线视频| 久热久热在线精品观看| 超色免费av| 人妻少妇偷人精品九色| 久久99一区二区三区| 高清欧美精品videossex| 亚洲欧美成人精品一区二区| 丰满乱子伦码专区| 赤兔流量卡办理| 一本—道久久a久久精品蜜桃钙片| 纯流量卡能插随身wifi吗| 亚洲精品日韩在线中文字幕| 亚洲精品第二区| 国产成人精品无人区| 一级毛片我不卡| 国产精品.久久久| 美女xxoo啪啪120秒动态图| 久久久精品免费免费高清| 国产精品人妻久久久影院| 天天躁夜夜躁狠狠躁躁| 日韩伦理黄色片| 韩国高清视频一区二区三区| 成人手机av| 在线免费观看不下载黄p国产| 高清黄色对白视频在线免费看| 9191精品国产免费久久| 成人亚洲欧美一区二区av| 亚洲色图综合在线观看| 18禁国产床啪视频网站| 中国国产av一级| av视频免费观看在线观看| 2018国产大陆天天弄谢| 午夜免费观看性视频| 在线观看三级黄色| 美女中出高潮动态图| 亚洲av福利一区| 国产精品麻豆人妻色哟哟久久| 久久这里只有精品19| 国产欧美日韩一区二区三区在线| 人人妻人人澡人人看| 中文字幕亚洲精品专区| 少妇被粗大猛烈的视频| 免费黄网站久久成人精品| 一区在线观看完整版| 丰满饥渴人妻一区二区三| 国产极品天堂在线| 啦啦啦啦在线视频资源| 国产一区二区三区av在线| 韩国高清视频一区二区三区| 制服诱惑二区| 18禁动态无遮挡网站| 国产熟女午夜一区二区三区| 中文字幕亚洲精品专区| 搡女人真爽免费视频火全软件| 纯流量卡能插随身wifi吗| 欧美人与性动交α欧美精品济南到 | 亚洲精品,欧美精品| 一区二区三区精品91| 亚洲 欧美一区二区三区| 国产av一区二区精品久久| 久久久久久久久久久久大奶| 大码成人一级视频| 99热全是精品| 国产成人精品在线电影| 中国国产av一级| 丁香六月天网| 久久99蜜桃精品久久| a 毛片基地| 国产男女超爽视频在线观看| 啦啦啦在线观看免费高清www| 91久久精品国产一区二区三区| 中文字幕免费在线视频6| 男的添女的下面高潮视频| 欧美日韩视频高清一区二区三区二| 一级毛片我不卡| 精品一品国产午夜福利视频| 国产麻豆69| 丝袜在线中文字幕| 2022亚洲国产成人精品| √禁漫天堂资源中文www| 一级黄片播放器| 久久久欧美国产精品| 亚洲欧美一区二区三区黑人 | 久久精品久久久久久噜噜老黄| 婷婷色综合www| 久久久精品免费免费高清| 亚洲国产av新网站| 大香蕉97超碰在线| 免费看光身美女| 久久人人爽人人爽人人片va| 狠狠精品人妻久久久久久综合| 色网站视频免费| 美女xxoo啪啪120秒动态图| 又黄又爽又刺激的免费视频.| 免费人妻精品一区二区三区视频| 一二三四中文在线观看免费高清| 精品视频人人做人人爽| 免费在线观看黄色视频的| 水蜜桃什么品种好| 捣出白浆h1v1| 日本猛色少妇xxxxx猛交久久| 精品99又大又爽又粗少妇毛片| 国产黄色免费在线视频| 99久久综合免费| 久久久久国产网址| 久久热在线av| 亚洲精品美女久久av网站| 一二三四中文在线观看免费高清| 99国产综合亚洲精品| 欧美人与性动交α欧美软件 | 天堂俺去俺来也www色官网| 久久99蜜桃精品久久| 婷婷成人精品国产| 日韩不卡一区二区三区视频在线| 丝袜喷水一区| 欧美少妇被猛烈插入视频| 少妇被粗大的猛进出69影院 | 午夜免费观看性视频| 激情五月婷婷亚洲| 捣出白浆h1v1| 咕卡用的链子| 亚洲一码二码三码区别大吗| 欧美成人午夜精品| 欧美bdsm另类| 午夜福利视频在线观看免费| 一级片'在线观看视频| 欧美变态另类bdsm刘玥| 日本av手机在线免费观看| 女性生殖器流出的白浆| 大香蕉97超碰在线| 国产黄色免费在线视频| 久久久久久人人人人人| 日韩大片免费观看网站| 两个人免费观看高清视频| 两个人看的免费小视频| videosex国产| 老司机影院成人| 日韩av在线免费看完整版不卡| 国产亚洲一区二区精品| 搡女人真爽免费视频火全软件| 日本91视频免费播放| 一边亲一边摸免费视频| 国产成人一区二区在线| 国产成人a∨麻豆精品| 你懂的网址亚洲精品在线观看| 热99国产精品久久久久久7| 欧美精品一区二区大全| 亚洲成人一二三区av| 亚洲美女视频黄频| 男人添女人高潮全过程视频| 成人影院久久| 五月开心婷婷网| av电影中文网址| 欧美精品一区二区大全| 免费看av在线观看网站| 一区二区av电影网| 青春草视频在线免费观看| 久久久久人妻精品一区果冻| 性高湖久久久久久久久免费观看| 婷婷色综合www| 男女啪啪激烈高潮av片| 久久久久久人人人人人| 国产欧美另类精品又又久久亚洲欧美| 国产又色又爽无遮挡免| 91精品国产国语对白视频| 日本免费在线观看一区| 亚洲五月色婷婷综合| 美女主播在线视频| 一级爰片在线观看| 美女xxoo啪啪120秒动态图| 成人免费观看视频高清| 亚洲四区av| freevideosex欧美| 丝瓜视频免费看黄片| av又黄又爽大尺度在线免费看| 国产成人午夜福利电影在线观看| 91精品国产国语对白视频| 午夜福利在线观看免费完整高清在| 久久久久国产精品人妻一区二区| 精品国产乱码久久久久久小说| 在线观看人妻少妇| 成人影院久久| 久久女婷五月综合色啪小说| 免费日韩欧美在线观看| 成年av动漫网址| 91aial.com中文字幕在线观看| 中文字幕免费在线视频6| 久久久久视频综合| 熟女av电影| 丝袜美足系列| 国产女主播在线喷水免费视频网站| 亚洲五月色婷婷综合| 精品国产乱码久久久久久小说| 国产精品麻豆人妻色哟哟久久| 亚洲欧洲精品一区二区精品久久久 | 亚洲精品av麻豆狂野| 久久鲁丝午夜福利片| 夜夜骑夜夜射夜夜干| 亚洲av中文av极速乱| 中文字幕制服av| 亚洲国产欧美在线一区| 深夜精品福利| 中文字幕精品免费在线观看视频 | 天天躁夜夜躁狠狠躁躁| 国产亚洲欧美精品永久| 人人妻人人爽人人添夜夜欢视频| av电影中文网址| 丝袜人妻中文字幕| 精品亚洲乱码少妇综合久久| 丰满乱子伦码专区| 日韩熟女老妇一区二区性免费视频| 色婷婷久久久亚洲欧美| 午夜av观看不卡| tube8黄色片| 亚洲国产精品一区三区| 人体艺术视频欧美日本| 日韩一区二区三区影片| av片东京热男人的天堂| 宅男免费午夜| 午夜91福利影院| 久久免费观看电影| 黑人巨大精品欧美一区二区蜜桃 | 国产在线视频一区二区| 老司机亚洲免费影院| 国产一区二区三区av在线| 在线观看人妻少妇| 免费大片18禁| 永久网站在线| 丝袜在线中文字幕| 大片电影免费在线观看免费| 久久久久国产网址| 下体分泌物呈黄色| 亚洲欧洲国产日韩| 精品一品国产午夜福利视频| 免费观看无遮挡的男女| 中文天堂在线官网| 免费黄网站久久成人精品| 国产精品三级大全| 人人妻人人澡人人爽人人夜夜| 国产 精品1| 国产国语露脸激情在线看| 久久国产精品男人的天堂亚洲 | 肉色欧美久久久久久久蜜桃| 妹子高潮喷水视频| 国产精品国产三级国产av玫瑰| kizo精华| 国产在视频线精品| 国产精品无大码| 国产日韩欧美在线精品| 亚洲色图综合在线观看| 亚洲一码二码三码区别大吗| 女的被弄到高潮叫床怎么办| 一级a做视频免费观看| 高清视频免费观看一区二区| 丰满少妇做爰视频| 中文欧美无线码| 免费少妇av软件| 久久99热这里只频精品6学生| av.在线天堂| 国产成人欧美| 一级a做视频免费观看| 成人免费观看视频高清| 97人妻天天添夜夜摸| 国产麻豆69| 欧美老熟妇乱子伦牲交| 久久国内精品自在自线图片| 69精品国产乱码久久久| 成年女人在线观看亚洲视频| 热re99久久国产66热| 亚洲精品自拍成人| 新久久久久国产一级毛片| 狂野欧美激情性xxxx在线观看| 国产av码专区亚洲av| 三级国产精品片| 久久精品久久久久久噜噜老黄| 91成人精品电影| 久久久久人妻精品一区果冻| 免费女性裸体啪啪无遮挡网站| 飞空精品影院首页| 免费av中文字幕在线| 99国产综合亚洲精品| 亚洲成人一二三区av| 九色成人免费人妻av| 国产精品.久久久| 99热全是精品| av又黄又爽大尺度在线免费看| 岛国毛片在线播放| 一二三四在线观看免费中文在 | 中文字幕制服av| 精品一区在线观看国产| 日本免费在线观看一区| 国产精品蜜桃在线观看| 男女国产视频网站| 中文字幕另类日韩欧美亚洲嫩草| 婷婷成人精品国产| 国国产精品蜜臀av免费| 国产av码专区亚洲av| 欧美 日韩 精品 国产| www.熟女人妻精品国产 | 亚洲欧美日韩另类电影网站| 99久久中文字幕三级久久日本| 国产在线视频一区二区| 狂野欧美激情性bbbbbb| 美女国产视频在线观看| 十八禁网站网址无遮挡| 久久精品夜色国产| 中国三级夫妇交换| 精品酒店卫生间| 麻豆乱淫一区二区| 亚洲国产欧美在线一区| 国产精品一区二区在线观看99| 久久精品久久久久久久性| 国产激情久久老熟女| 国产av码专区亚洲av| 欧美日韩亚洲高清精品| 搡老乐熟女国产| 国产女主播在线喷水免费视频网站| 亚洲伊人色综图| 最近中文字幕高清免费大全6| 亚洲一区二区三区欧美精品|