    The influence of the underpassing frozen connecting passage on the deformation of the existing tunnel

    2023-01-02 08:08:04JunHaoChenJianZhangBiJianChenGenLu
    Sciences in Cold and Arid Regions 2022年4期

    JunHao Chen,Jian Zhang,BiJian Chen,Gen Lu

    1.School of Civil Engineering,Fujian University of Technology,Fuzhou,Fujian 350118,China

    2.Key Laboratory of Underground Engineering,Fujian Province University,Fuzhou,Fujian 350118,China

    ABSTRACT Based on the engineering background of the contact channel between Shangyang and Gushan of Fuzhou Metro Line 2 undercrossing the existing tunnel line,the freezing temperature field of the contact channel,the displacement field of the existing tunnel line and the contact channel with different net distances and horizontal angles are analyzed by ANSYS finite element software and field measurement method.The obtained results indicate that during the freezing period,the temperature drops at different measuring holes are almost the same.The temperature near the bottom freezing tube drops faster than that far from the tube.It is found that the bilateral freezing technique improves the formation of the freezing wall in the intersection area.In this case,the intersection time of the cross-section is 7 days faster than that of the adjacent ordinary section.The change curve of the displacement of the surface uplift in different freezing periods with the distance from the center of the channel is"M"shaped.The maximum uplift displacement at 12 m from channel center is 25 mm.The vertical displacement of the measuring point located above the central axis of the connecting channel is large.The farther the point from the central axis,the smaller the corresponding vertical displacement.When the horizontal angle between the existing tunnel and the connecting channel is less than 60°,the existing vertical displacement of the tunnel changes rapidly with the horizontal angle,reaching 0.17 mm/°.Meanwhile,when the net distance is less than 6.1 m,the change rate of the vertical displacement of the tunnel is up to 2.4 mm/m.

    Keywords:existing tunnel;displacement field;connecting passage;freezing method;down crossing

    1 Introduction

    With the development of subway transportation networks,the mutual influence between subway tunnels has attracted scholars worldwide.As an important part of the subway tunnels,connecting passages affect the nearby tunnels during the construction process(Liet al.,2009;Sunet al.,2015;Penget al.,2017;Wuet al.,2018;Yinet al.,2018).Currently,numerous investigations have been carried out on the construction of contact channels.In this regard,experts obtained the normal distribution of the surface deformation by monitoring and analyzing the displacement field of the contact channel(Lang,2017;Yanget al.,2017;Tanget al.,2019;Zhao,2019).Liet al.2015)studied the orthogonal crossing of an existing tunnel through a contact channel and obtained the frost heave and thaw settlement change law of the existing tunnel in the upper part of the passage in the freezing construction.Scholars analyzed the mechanical properties of the freezing wall of the contact channel to provide a design and construction reference(Shiet al.,2011;Zhai and Cui,2012;Wang and Zhou,2013;Sunet al.,2018;Honget al.,2019;Li and Cai,2019).Others analyzed the freezing temperature field,surface displacement,internal force and deformation of tunnels on both sides of the tunnel during the construction of the subway connection channel,and provided a basis for the freezing construction of the connection channel(Wanget al.,2011;Mao and Liu,2013;Liet al.,2019).

    Reviewing the literature indicates that the majority of investigations on the surrounding environment of the frozen connecting passage have focused on the displacement and deformation of the shield tunnel and the ground surface area connected to the left and right sides of the connecting passage.More specifically,investigating the influence of the freezing construction of the connecting passage on the upper existing tunnel is mainly confined to the study of the temperature and displacement fields under a single orthogonal or fixed vertical clearance between the existing tunnel and the connecting passage.However,for increasingly complex underground transportation networks,designing and planning of the spatial position between the two lines are often not an ideal orthogonal,or there is not a constant distance between adjacent lines.Therefore,it is necessary to study the action law of the upper existing tunnel with different net distances or horizontal angles in the process of channel freezing.

    In the present study,the connecting passage between Shangyang and Gushan on Fuzhou Metro Line 2 is considered as the research object.It is intended to carry out field measurements and apply the finite element method to perform numerical simulations and investigate the connecting passage and the existing subway tunnel at different net distances and horizontal angles during the freezing process.The obtained displacements and deformation laws under the lower part are expected to provide a reference in the designing and construction of similar projects.

    2 Engineering background

    2.1 Project descri ption

    In the present study,the subway line between Shangyang and Gushan in Fuzhou Metro Line 2,which passes through Wenfu Railway from north to south sides of Yanglizhong Bridge and there are more infrastructure and public facilities around,Moreover,a contact channel(hereafter called 1#)exists in this interval line.

    The center mileage of the studied interval contact channel with a length of 42.68 m is YDK35+898.179(ZDK35+939.022).The channel is at a depth of 20 m with a 300 mm thick C25 shotcrete as initial support and a 400 mm thick mold C35 concrete as the secondary lining.The net width and net height of the tunnel are 2.5 m and 2.48 m,respectively.Meanwhile,the net distance between the contact channel and the upper existing tunnel is 7.1 m.

    The soil layers at the top of the existing tunnel consist of silt(9.26-12 m thick),clay(4.7-9.5 m thick)and silt soil with a thin sand layer(8.7 m-10.8 m thick).The silt layer is dark gray,fluid plastic,saturated and highly compressible,which mainly consists of clay,silt with a thin sand layer.Moreover,the clay layer is shiny and impervious and has medium compressibility.Silty soil is highly compressible and weakly permeable and consists of a thin sand layer.

    Above the left line of the channel is the block of Fuzhou Shuntai Motor Vehicle Detection Co.,Ltd.,and the right line is the edge of Fuzhou West Third Ring Auxiliary Road,where vehicles are always passing.A DN800 rainwater pipeline is installed on the lane of the third ring auxiliary road on the right side of the contact channel with a buried depth of about 2.5 m.Other pipelines are not distributed and have a negligible impact on the construction.The water level of the site is about 4.65 m.

    2.2 Freezing design

    In order to ensure soil stability during the construction,the ground mixing pile is used to reinforce the soil before excavating the contact channel.Considering the length of the contact channel,many factors affect the excavation process.To reduce the engineering risks during the construction,the scheme of'horizontal freezing in the tunnel to reinforce the soil and underground excavation in the tunnel'is used.In this regard,freezing pipes are arranged at both ends to perform the horizontal freezing,facilitate the drilling construction and achieve a better freezing effect.Accordingly,a total of 178 freezing holes were prepared on the left and right sides,and?108×8 mm seamless steel pipes were used as the freezing pipe.The active freezing period was considered 66 days in this project.

    Based on the safety design requirements,the unconfined compressive strength of the frozen wall should be higher than 3.6 MPa.To this end,the interface temperature between the frozen wall and the segment and the average temperature of frozen soil should be maintained lower than-5 °C,and-10 °C,respectively.Moreover,the thickness of the horn mouth is 1.8 m,the normal section of the channel and pump house is 2.1 m,and the end of the channel is 2.4 m.Figure 1 illustrates the position of the contact channel relative to the freezing pipe.Section A-A is intercepted at the bell mouth 3.272 m from the center of the left tunnel,section B-B is intercepted at the normal section 12.254 m from section A-A,and the cross center of the freezing pipe is C-C.Figure 2 shows the layout of the left freezing hole.

    Figure 1 The position relation graph of connecting channel and freezing pip

    Figure 2 Layout of left line freezing hole

    3 Calculation of the Contact Channel

    3.1 Modelling

    In the present study,ANSYS software,which is a widely adopted commercial finite element solver,is used to establish the model for the freezing contact channel.Considering the symmetry of the contact channel,only half of the domain is modeled.The established model is 89.2 m long,15 m wide,39 m high,and the net distance between the bottom of the existing tunnel and the top of the channel is 7.1 m.It is assumed that each soil layer is horizontal and isotropic.Moreover,the elastic constitutive model is adopted in calculations.Figures 3 and 4 show the position and grid division of the established model for the freezing pipe and tunnel structure,respectively.The calculation model is mainly composed of 4-hedron units,a total of 303,968 units and 528,676 nodes.

    Figure 3 Half of the frozen mod

    Figure 4 The distribution of model cell grid

    3.2 Parameter selection

    Tables 1 and 2 present the parameters of soil layers and tunnel structure,respectively.It is worth noting that these data are obtained from the geological survey of the project.The compression modulus and Poisson's ratio of soil layer at the temperature of-30 °C and-1 °C are 160 MPa and 0.26(Liet al.,2019).

    Table 1 Parameter table of soil physical mechanics

    Table 2 Thermodynamic parameters of soil layer

    3.3 Simulating the freezing process

    In the calculations,the transient thermal analysis module of ANSYS software is used to investigate the temperature field of the contact channel.Since the stratum is located in the hot spring concentrated area,the soil temperature reaches 40 °C so that the initial soil temperature is to 40 °C.The temperature load on the freezing pipe wall is applied according to the temperature curve of the left and right saltwater loops,shown in Figure 5.It should be indicated that the start time of the right line is 8 days earlier than that of the left line.After performing the simulation,calculated temperatures are imported into the model as the temperature load of displacement analysis for deformation analysis.

    Figure 5 Temperature change chart of salt water in freezing pipes on both sides

    4 Analysis of the freezing temperature field

    4.1 Verifying the Numerical Calculation

    In order to determine the rationality of the model temperature calculation results,three positions are considered to compare calculated temperatures with the measured values.In this regard,the outer temperature measuring hole C1-5 m and the inner temperature measuring hole C3-18 and C7-12 m are considered.It should be indicated that in the CN-Y format,N is the number of the temperature measuring hole,and Y denotes the hole depth.The distance between each measuring point and the freezing pipe is shown in Figure 2.Since the right line starts 8 days earlier than the left line,the field measurement results of each temperature measurement hole in the 9-58 d interval of the left line are compared with the temperature change of the corresponding region in the model.Figure 6 shows the obtained results accordingly.

    It is observed that the simulated and measured temperature variations of points C1,C3 and C7 are the same trend.Before freezing for 40 days,the deviation between the two is 2-3 °C,and then the deviation is within 1 °C.Meanwhile,it is found that the temperature of the point C3 reaches-5 °C at the end of the freezing period and meets the design requirements.In addition to the deviation between simulation and measurement caused by the phase change heat release of the soil at 0 °C,the temperature difference at other freezing moments is consistent.Since point C7 is close to the bottom freezing tube,the temperature reaches-17°C at the end of the active freezing process.Temperature distribution at point C7 indicates that variation of the freezing temperature can be divided into three stages.The first stage,called the"rapid cooling zone",is the region where the temperature is higher than 0°C,and the temperature reduction rate is high,up to 2-2.5 °C/d.In the second stage,called the"stationary region",the temperature ranges between-5 and 0 °C and the temperature changes slowly,during 0.25-0.35 °C/d.Finally,in the third stage,known as the"slow cooling zone",the temperature is less than-5°C,and the variation rate is between the first two stages.Obtained results show that the difference between the simulation and the measured values at all points is less than 2 °C.However,the maximum difference during the phase transition is 5 °C.Accordingly,the simulation is verified.

    Figure 6 Comparison between simulation and measurement of temperature measurement points

    4.2 Analysis of temperature field results

    The temperature change of the contact channel was simulated and the temperature contours at different times during the freezing process were obtained.Figure 7 illustrates temperature contours for 58 days process.According to the survey report,the soil freezing point temperature is-1°C.

    It is observed that after 58 days of active freezing,the frozen wall is distributed along the full length of the channel.Moreover,it is found that the frozen wall in the horn mouth area is the thickest,reaching 4.3 m.The closer to the cross area of the middle freezing pipe,the thicker the freezing wall.At the depth of 8 m,the thickness of the freezing wall at the top of the channel gradually reduces from 3.6 m to 2.1 m.This may be attributed to the arrangement of the freezing pipes,indicating that an appropriate spacing between the freezing pipes significantly affects the freezing.Moreover,it is observed that the frozen wall in the cross area of the freezing pipe significantly thickens to 3 m,indicating that the bilateral freezing promotes the formation of the frozen wall in the cross area.

    Affected by the divergent layout of the freezing pipe,the freezing pipe at the horn mouth section is the densest so that the thickest freezing wall forms at this position.The intersection time of the cross-section(14 d)is 7 d faster than that of the adjacent normal section(21 d).After active freezing,the thickness of the channel sidewall is 2.8 m>2.2 m>2.0 m.It is concluded that reasonable spacing between freezing pipes improves the freezing effect,thereby saving resources and reducing costs.

    Figure 7 Temperature nephogram of contact passage for 58 days freezing

    5 Analyzing the freezing displacement field of the contact channel

    5.1 Displacement variation of the surrounding soil layer

    The displacement calculation model above the existing tunnel,which is affected by the freezing of the lower contact channel,is carried out in ANSYS software.Figure 8 illustrates the Cloud atlas of the surrounding displacement field at the end of the active freezing process of the contact channel.

    It is observed that the upward frost heaving displacement occurs along the horizontal centerline,and the maximum frost heaving displacement occurs at the upper part of the contact channel.After 58 days of freezing,the maximum displacement reaches 75 mm.The frost heaving displacement direction at the lower part of the contact channel is downward.After 58 days of freezing,the maximum displacement value reaches-47 mm.According to the cloud image,it is found that the closer the soil to the freezing pipe,the more obvious the frost heaving effect.In the contrast,the farther the distance,the smaller the frost heaving effect.

    Figure 9 compares the displacement of the measuring points on the cross-section of the central surface is compared with the measured data.

    Figure 8 Displacement of stratum after 58 d freezing(m)

    Figure 9 Comparison of ground displacement measured and simulated

    It is observed that the measured displacements of XDC491-1,XDC491-2 and XDC491-3 are similar to the simulated values.Except for individual points,the measured displacement of XDC491-2 on the 20th day is-3.5 mm,while the calculated displacement is 8.5 mm.This deviation may be attributed to the measuring error,approximations in the calculations and uncertainties in material characteristics,boundary conditions and other aspects.However,the measured data simulations have similar variations.It is inferred that the performed simulation has an excellent consistency with the experiment.

    In order to obtain the correlation between the surface uplift displacement and the distance,the surface displacement changes of four sections shown in Figure 8 are selected.Meanwhile,variations of the surface uplift displacement at the symmetric surface of 0 m at active freezing periods of 30 d,40 d,50 d and 58 d are obtained,as shown in Figure 11.

    Figure 10 shows the variation trend of surface uplift displacement at four sections(0 m,10 m,20 m and 30 m).It is observed that the maximum vertical displacement is 25.0 mm,which occurs at the symmetric surface.Considering the influence of the existing tunnel in the upper part,as the distance from the symmetry center increases,the 0 m vertical displacement of the symmetry plane increases rapidly at first and then decreases gradually,while the 10 m vertical displacement of the symmetry plane only changes slightly.This may be attributed to the close arrangement of the freezing pipe above the contact channel so that the stress does not release.Figure 11 shows that the vertical displacement curve of the surface in different freezing periods is almost"M"shaped.It is observed that as the axial distance from the contact channel increases,the vertical displacement of the surface gradually increases.Moreover,12 m far from the center of the channel,the vertical displacement of the surface reaches the maximum value,which is 25.0 mm after 58 d of freezing.Subsequently,the vertical displacement of the surface gradually decreases.

    Figure 10 Relationship between surface uplift and distance

    Figure 11 Relationship between surface uplift changes during different freezing periods

    6 Displacement field analysis of existing upper tunnel

    6.1 Relationship between displacement of the existing tunnel and the buried depth

    To obtain the displacement variation law of the upper existing tunnel under different burial depths,the vault net distances of the existing tunnel and the contact channel of 7.6 m,6.1 m and 4.6 m are analyzed.Through the finite element simulation,the displacement change cloud chart of the upper existing tunnel with different net distances at 58 days of freezing is obtained,which is shown in Figure 12.

    Figure 12 Displacement nephogram of existing tunnel and soil layer under different net distances

    It is observed that for the net distances of 4.6 m,6.1 m and 7.6 m,the maximum vertical displacements of the soil layers are 69.8 mm,71.3 mm and 75.1 mm,respectively.At these points,the maximum vertical displacements of the existing tunnel are 12.6 mm,9.0 mm and 8.0 mm,respectively.It is found that as the net distance increases,the vertical displacement of the soil layer increases,while the vertical displacement of the existing tunnel decreases.This is because the smaller the net distance,the greater the soil layer impact on the existing tunnel.

    Then the displacements at the arch bottom and arch top,and vertical displacements corresponding to the surface positions at different net distances of the existing tunnel in the upper part after 58 d of freezing are extracted.Obtained results are shown in Figure 13.

    Figure 13 The relationship between the displacement of 58 days frozen and the net distance

    It is observed that as the net distance increase,the displacement of the vault and arch bottom gradually decreases.For the net distances of 4.6 m and 6.1 m,the maximum corresponding displacements of the vault and arch bottom of the existing tunnel are 11.1 mm,12.6 mm and 8.6 mm,9.1 mm,respectively.It is found that when the net distance increases by 1 m,the displacement of the vault and the arch bottom reduce by 1.67 mm and 2.33 mm,respectively.A similar trend exists for the net distances within the range of 6.1-7.6 m and as the net distance increases by 1 m,the corresponding displacement of vault and vault bottom reduces by 0.73 mm and 0.87 mm,respectively.

    In order to obtain the correlation between the surface uplift corresponding to the symmetrical section(0 m)at different net distances,deformations of the surface uplift against the path are extracted.

    Figure 14 shows the variation of the vertical displacement of the surface for three net distances.It is observed that the vertical displacement of the uplift is almost"M"shaped,and variations of the surface uplift displacement for different net distances are similar.At a net distance of 7.6 m,as the distance increases,the surface uplift displacement rapidly increases first and then decreases slowly.Moreover,for the net distance of 18 m,the uplift displacement reaches the maximum of 25.0 mm.When the net distance is 0 m,the maximum vertical displacements for the net distances of 7.6 m,6.1 m and 5.6 m are 15.0 mm,16.5 mm and 21.5 mm,respectively.It is concluded that the closer the freezing pipe to the bottom,the stronger the freezing effect and the larger the vertical displacement.Distributions of the surface vertical displacement in Figure 14 reveal that the soil within 60 m from the axis of the contact channel is affected by the freezing process.

    Figure 14 The relationship between surface uplift and distance with different net distances

    6.2 Correlation between displacements of the upper existing tunnel and the horizontal angle

    In order to obtain the correlation between the displacement of the upper existing tunnel and the horizontal angle of the lower contact channel,four cases are considered in this section.Horizontal angle refers to the angle(sharp angle)between the contact channel and the existing tunnel projection on the horizontal plane.In the selected cases,the vertical net distance between the upper existing tunnel and the lower contact channel is 5.6 m,and the horizontal angles are 45°,60°,75°and 90°,respectively.Figure 15 presents the displacement contours for selected cases.

    It is observed that the maximum vertical displacements of the existing tunnel for the horizontal angles of 45°,60° and 75° are 19.0 mm,16.4 mm and 15.0 mm,respectively.Moreover,it is found that when the angle is less than 60°,the vertical displacement of the existing tunnel decreases by 0.17 mm/°of the horizontal angle.On the other hand,when the angle exceeds 60°,the vertical displacement of the tunnel decreases by 0.09 mm/° of the horizontal angle.The difference may be attributed to the higher energy loss for larger angles,originating from higher heat exchange rate with the surrounding soil of the existing tunnel in the freezing process.

    Figure 15 Relationship nephogram of existing tunnel displacement with angle change

    Vertical displacements of the vault and the arch bottom of the upper existing tunnel at different horizontal angles are extracted,and the obtained results are presented in Figure 16.

    It is observed that the vertical displacement of the vault and arch bottom gradually decreases as the horizontal angle increases.When the angle is between 45°and 90°,the displacement difference between the two cases is less than 1 mm.It is found that the displacement variations of vault and arch bottom with the angle are basically the same.

    7 Conclusions

    In the present study,the connection channel between Shangyang and Gushan in Fuzhou Metro Line 2,which passes through the existing tunnel line is investigated.Then displacements of the existing tunnel for different net distances and horizontal angles are analyzed.Based on the obtained results,the main conclusions can be summarized as follows:

    (1)In the positive freezing period,the temperature drops at different holes are almost the same.The temperature near the bottom freezing pipe decreases faster than that far from the pipe.The bilateral freezing improves the formation of the freezing wall and the intersection time of the cross-section is 7 days faster than that of the adjacent normal section.

    (2)During the freezing period,the displacement variations of different points are almost the same.The surface uplift displacement is the largest at the symmetry plane,and the vertical displacement curve of the surface in different freezing periods is"M"shaped.The longer the freezing time,the greater the surface uplift displacement.The maximum uplift displacement at 12 m from the channel center reaches 25 mm.

    (3)The vertical displacement of the measuring point above the central axis of the contact channel is large,and the farther from the central axis,the smaller the vertical displacement.Moreover,the larger the net distance between the existing tunnel and the contact channel vault,the larger the vertical displacement of the existing tunnel.For the net distance of 7.6 m,the maximum vertical displacement at 12 m from the channel center is 25 mm.

    (4)When the horizontal angle between the upper existing tunnel displacement and the lower contact channel is less than 60°,the change rate of the vertical displacement of the tunnel is fast,reaching 0.17 mm/°,indicating that the vertical displacement is greatly affected by the horizontal angle.

    Acknowledgments:

    This research was supported by the project of Natural Science Foundation of Fujian Province(No.2022J019 25),and supported by the project of the Fuzhou Science and Technology Plan Project(2021-P-047),and supported by the Open Project Program Foundation of Engineering Research Center of underground mine construction,Ministry of Education(Anhui University of Science and Technology)(No.JYBGCZX2021104).

    亚洲国产精品国产精品| 欧美变态另类bdsm刘玥| 国产一区二区激情短视频 | 五月伊人婷婷丁香| av国产精品久久久久影院| 亚洲精品国产av成人精品| 最近的中文字幕免费完整| 在线免费观看不下载黄p国产| 日本黄大片高清| 精品一区二区三卡| 久久精品国产a三级三级三级| av黄色大香蕉| 18+在线观看网站| 99国产精品免费福利视频| 久久国产精品大桥未久av| 日韩av不卡免费在线播放| av片东京热男人的天堂| 一级a做视频免费观看| 午夜av观看不卡| 自拍欧美九色日韩亚洲蝌蚪91| 日韩中字成人| 日产精品乱码卡一卡2卡三| 亚洲精品久久久久久婷婷小说| 国产女主播在线喷水免费视频网站| 日韩人妻精品一区2区三区| 成人手机av| 亚洲一级一片aⅴ在线观看| 91精品伊人久久大香线蕉| 美女视频免费永久观看网站| 久久综合国产亚洲精品| 国产免费一区二区三区四区乱码| 男女午夜视频在线观看 | 少妇的丰满在线观看| 日产精品乱码卡一卡2卡三| 中国国产av一级| av天堂久久9| 我要看黄色一级片免费的| 天堂俺去俺来也www色官网| 侵犯人妻中文字幕一二三四区| 中文字幕精品免费在线观看视频 | 晚上一个人看的免费电影| 国产精品久久久久久精品古装| 亚洲国产成人一精品久久久| 欧美成人午夜免费资源| 精品卡一卡二卡四卡免费| 国产黄频视频在线观看| 黑丝袜美女国产一区| 女性生殖器流出的白浆| 亚洲成色77777| 亚洲成人av在线免费| 大话2 男鬼变身卡| 欧美精品一区二区大全| 国产 一区精品| 亚洲国产av影院在线观看| 少妇猛男粗大的猛烈进出视频| 如何舔出高潮| 人体艺术视频欧美日本| 少妇人妻久久综合中文| 国产在视频线精品| 日韩一区二区视频免费看| 22中文网久久字幕| 久久综合国产亚洲精品| av线在线观看网站| 国产精品一区二区在线观看99| 免费播放大片免费观看视频在线观看| 人妻人人澡人人爽人人| 夜夜爽夜夜爽视频| 超色免费av| 国产综合精华液| 国产69精品久久久久777片| 国产毛片在线视频| 国产国语露脸激情在线看| 久久韩国三级中文字幕| 亚洲精品国产av蜜桃| 人妻系列 视频| 天堂中文最新版在线下载| 大话2 男鬼变身卡| 少妇被粗大猛烈的视频| 男女高潮啪啪啪动态图| 久久国产亚洲av麻豆专区| 久久97久久精品| 亚洲成国产人片在线观看| 看非洲黑人一级黄片| 日本wwww免费看| 最近最新中文字幕免费大全7| 国产麻豆69| 午夜激情久久久久久久| 免费日韩欧美在线观看| 日韩成人伦理影院| 久久久久精品久久久久真实原创| 精品久久久精品久久久| 精品一区二区三卡| 亚洲精品自拍成人| 亚洲精品av麻豆狂野| 精品99又大又爽又粗少妇毛片| 国产免费现黄频在线看| 国产男人的电影天堂91| 国产精品一二三区在线看| a级片在线免费高清观看视频| 国产精品偷伦视频观看了| 免费观看性生交大片5| 精品99又大又爽又粗少妇毛片| 国产高清不卡午夜福利| av一本久久久久| 99热这里只有是精品在线观看| 伦精品一区二区三区| 亚洲天堂av无毛| 久久国产亚洲av麻豆专区| 伊人久久国产一区二区| 中文字幕人妻丝袜制服| 91久久精品国产一区二区三区| 国产精品国产三级国产专区5o| 一本一本久久a久久精品综合妖精 国产伦在线观看视频一区 | 久久久欧美国产精品| 蜜臀久久99精品久久宅男| 男女高潮啪啪啪动态图| 内地一区二区视频在线| 男女免费视频国产| 国产综合精华液| 内地一区二区视频在线| 日本-黄色视频高清免费观看| 日韩中字成人| 我的女老师完整版在线观看| 秋霞伦理黄片| 丁香六月天网| 十八禁高潮呻吟视频| 18+在线观看网站| 亚洲精品,欧美精品| 午夜久久久在线观看| 日韩免费高清中文字幕av| 精品99又大又爽又粗少妇毛片| 精品酒店卫生间| 免费观看在线日韩| 草草在线视频免费看| 国精品久久久久久国模美| 日韩人妻精品一区2区三区| 欧美激情极品国产一区二区三区 | 日本爱情动作片www.在线观看| 中文乱码字字幕精品一区二区三区| 国产亚洲av片在线观看秒播厂| 精品人妻熟女毛片av久久网站| 全区人妻精品视频| 日本色播在线视频| 日韩大片免费观看网站| 久久综合国产亚洲精品| 一本大道久久a久久精品| 三级国产精品片| 日韩电影二区| 欧美精品一区二区免费开放| 亚洲精品av麻豆狂野| 国产色爽女视频免费观看| 国产永久视频网站| 精品卡一卡二卡四卡免费| 美女中出高潮动态图| 18在线观看网站| 啦啦啦中文免费视频观看日本| 精品亚洲成国产av| 日本色播在线视频| 久久久久网色| 欧美激情极品国产一区二区三区 | 午夜视频国产福利| 日日撸夜夜添| 久久精品夜色国产| 精品国产一区二区三区久久久樱花| 大片电影免费在线观看免费| 亚洲成人一二三区av| 色94色欧美一区二区| 大片电影免费在线观看免费| 激情视频va一区二区三区| 成人免费观看视频高清| av一本久久久久| 在线亚洲精品国产二区图片欧美| 人成视频在线观看免费观看| 18禁在线无遮挡免费观看视频| 日本欧美视频一区| av在线观看视频网站免费| 国产精品久久久久久av不卡| 亚洲丝袜综合中文字幕| 亚洲av成人精品一二三区| 五月天丁香电影| 99re6热这里在线精品视频| 99热网站在线观看| 欧美3d第一页| 午夜福利在线观看免费完整高清在| 精品一区在线观看国产| 免费黄频网站在线观看国产| 久久99蜜桃精品久久| 性色avwww在线观看| 秋霞伦理黄片| 亚洲综合色惰| 亚洲国产欧美日韩在线播放| 日韩一本色道免费dvd| 国产av国产精品国产| 国产高清三级在线| 看非洲黑人一级黄片| 精品一区二区三区视频在线| 成人免费观看视频高清| 亚洲国产精品一区三区| 日韩电影二区| 女人精品久久久久毛片| 亚洲精品456在线播放app| 国产精品久久久久久久电影| 视频中文字幕在线观看| 美女中出高潮动态图| 日本午夜av视频| 亚洲欧美清纯卡通| 黄色配什么色好看| 狂野欧美激情性xxxx在线观看| 熟妇人妻不卡中文字幕| 蜜臀久久99精品久久宅男| 久久精品国产综合久久久 | 日日摸夜夜添夜夜爱| 亚洲国产看品久久| 免费观看a级毛片全部| 色婷婷久久久亚洲欧美| 免费av不卡在线播放| 免费av中文字幕在线| 老熟女久久久| 午夜av观看不卡| 日本欧美国产在线视频| 看十八女毛片水多多多| 久久热在线av| 少妇精品久久久久久久| 少妇人妻 视频| 最近的中文字幕免费完整| 免费av不卡在线播放| 国产高清国产精品国产三级| 亚洲三级黄色毛片| 精品一区二区三区四区五区乱码 | 国产免费福利视频在线观看| 亚洲欧美日韩卡通动漫| 青春草视频在线免费观看| 日本午夜av视频| 国产精品久久久久久精品电影小说| 九草在线视频观看| 久久综合国产亚洲精品| 久久毛片免费看一区二区三区| 国产成人91sexporn| 欧美成人午夜精品| 精品福利永久在线观看| 午夜福利影视在线免费观看| 成人亚洲精品一区在线观看| 啦啦啦中文免费视频观看日本| 久久狼人影院| 少妇的丰满在线观看| 在线亚洲精品国产二区图片欧美| 欧美亚洲 丝袜 人妻 在线| 国产亚洲精品久久久com| 在线天堂中文资源库| 丰满乱子伦码专区| 亚洲精品一区蜜桃| 久久97久久精品| 国产 精品1| 免费久久久久久久精品成人欧美视频 | 中文字幕亚洲精品专区| 日韩在线高清观看一区二区三区| av播播在线观看一区| 精品第一国产精品| 青春草国产在线视频| 精品少妇黑人巨大在线播放| 一区在线观看完整版| 欧美精品亚洲一区二区| 久久人妻熟女aⅴ| 国精品久久久久久国模美| 欧美变态另类bdsm刘玥| 亚洲内射少妇av| 欧美成人午夜免费资源| 欧美bdsm另类| 香蕉精品网在线| 一级,二级,三级黄色视频| 婷婷色综合www| 亚洲精品美女久久久久99蜜臀 | 国产探花极品一区二区| 91久久精品国产一区二区三区| 一个人免费看片子| 日日撸夜夜添| 伊人久久国产一区二区| 人妻少妇偷人精品九色| 国产有黄有色有爽视频| 91精品伊人久久大香线蕉| 欧美激情 高清一区二区三区| 18禁裸乳无遮挡动漫免费视频| 性色av一级| 一级片免费观看大全| 性色avwww在线观看| 黄色配什么色好看| 国产日韩一区二区三区精品不卡| 亚洲丝袜综合中文字幕| 国产精品国产三级国产av玫瑰| 欧美成人精品欧美一级黄| 亚洲一区二区三区欧美精品| 欧美精品亚洲一区二区| 伊人亚洲综合成人网| 又黄又粗又硬又大视频| 九九在线视频观看精品| 午夜91福利影院| 在线天堂中文资源库| 亚洲av电影在线观看一区二区三区| 久久精品国产鲁丝片午夜精品| 亚洲美女黄色视频免费看| 一二三四在线观看免费中文在 | 卡戴珊不雅视频在线播放| 欧美激情 高清一区二区三区| 国产精品免费大片| 久久婷婷青草| 有码 亚洲区| 精品亚洲成a人片在线观看| 国产一区二区在线观看日韩| 欧美成人午夜精品| 欧美亚洲 丝袜 人妻 在线| 午夜激情av网站| 日本黄大片高清| 精品久久久精品久久久| 亚洲av电影在线进入| 综合色丁香网| 亚洲精品美女久久久久99蜜臀 | 国产高清不卡午夜福利| 国产免费一区二区三区四区乱码| 波野结衣二区三区在线| 精品少妇内射三级| 免费高清在线观看日韩| 午夜老司机福利剧场| www.av在线官网国产| 综合色丁香网| 国产一区二区三区综合在线观看 | 久久久国产精品麻豆| 久久99热这里只频精品6学生| 国产精品人妻久久久久久| 有码 亚洲区| 国产日韩欧美在线精品| 中文精品一卡2卡3卡4更新| 午夜福利视频在线观看免费| 亚洲精品色激情综合| 涩涩av久久男人的天堂| 一本—道久久a久久精品蜜桃钙片| 天天躁夜夜躁狠狠躁躁| 搡女人真爽免费视频火全软件| 如何舔出高潮| 国产极品粉嫩免费观看在线| 超碰97精品在线观看| 亚洲av中文av极速乱| 丝袜脚勾引网站| 国产免费福利视频在线观看| 男人爽女人下面视频在线观看| 插逼视频在线观看| 精品国产国语对白av| 国产精品.久久久| xxxhd国产人妻xxx| 在线天堂中文资源库| 久久精品久久精品一区二区三区| 精品人妻熟女毛片av久久网站| 黄片播放在线免费| 久久鲁丝午夜福利片| 91在线精品国自产拍蜜月| 精品少妇黑人巨大在线播放| 中文字幕av电影在线播放| 国产在线视频一区二区| 卡戴珊不雅视频在线播放| 五月开心婷婷网| 日日摸夜夜添夜夜爱| 欧美激情极品国产一区二区三区 | 亚洲国产精品一区二区三区在线| 老司机影院成人| 久久人妻熟女aⅴ| 一区二区三区四区激情视频| 亚洲国产精品国产精品| 性色avwww在线观看| 婷婷成人精品国产| 国产一区二区激情短视频 | 免费黄频网站在线观看国产| 亚洲国产精品一区二区三区在线| 精品一区在线观看国产| 日韩制服丝袜自拍偷拍| 成人亚洲精品一区在线观看| 2018国产大陆天天弄谢| 国产精品久久久久久精品古装| 18禁国产床啪视频网站| 最新中文字幕久久久久| 在现免费观看毛片| 蜜桃在线观看..| 久久久久精品久久久久真实原创| 最近2019中文字幕mv第一页| 国产精品.久久久| 亚洲欧洲精品一区二区精品久久久 | 在线观看人妻少妇| 免费看光身美女| 国产精品不卡视频一区二区| 亚洲精品日韩在线中文字幕| 我要看黄色一级片免费的| 亚洲性久久影院| 欧美精品国产亚洲| 国产精品久久久久久久久免| 欧美人与善性xxx| 在线观看三级黄色| 自线自在国产av| 满18在线观看网站| 国产免费视频播放在线视频| 中文字幕亚洲精品专区| 中文欧美无线码| 侵犯人妻中文字幕一二三四区| 国产免费福利视频在线观看| 久久国产亚洲av麻豆专区| 国产精品不卡视频一区二区| 亚洲精品色激情综合| 久久久久久久大尺度免费视频| 国产免费一级a男人的天堂| 青春草亚洲视频在线观看| 久久99热6这里只有精品| 波野结衣二区三区在线| 久久97久久精品| 日韩,欧美,国产一区二区三区| 丰满迷人的少妇在线观看| 男人添女人高潮全过程视频| 草草在线视频免费看| 美女视频免费永久观看网站| 一区二区三区精品91| 下体分泌物呈黄色| 欧美xxⅹ黑人| 王馨瑶露胸无遮挡在线观看| 国产午夜精品一二区理论片| 色哟哟·www| 一级爰片在线观看| 一本色道久久久久久精品综合| 如何舔出高潮| 如日韩欧美国产精品一区二区三区| 狂野欧美激情性bbbbbb| 永久免费av网站大全| 日本欧美国产在线视频| 亚洲成人av在线免费| 啦啦啦视频在线资源免费观看| 少妇被粗大的猛进出69影院 | 亚洲国产精品一区三区| 两个人免费观看高清视频| 精品久久久久久电影网| 国产精品久久久久久久久免| 国产精品国产三级专区第一集| 国产黄色视频一区二区在线观看| 最近中文字幕2019免费版| 日日爽夜夜爽网站| 国产国拍精品亚洲av在线观看| 日本vs欧美在线观看视频| 好男人视频免费观看在线| 国产精品不卡视频一区二区| 中国三级夫妇交换| 成人二区视频| 亚洲精品视频女| 国产在线视频一区二区| 男女国产视频网站| 在线观看免费视频网站a站| 亚洲精品乱久久久久久| 欧美日韩亚洲高清精品| 1024视频免费在线观看| 人妻人人澡人人爽人人| 日韩,欧美,国产一区二区三区| 国产男人的电影天堂91| 久久久精品区二区三区| 伦理电影大哥的女人| 国产国拍精品亚洲av在线观看| 香蕉精品网在线| 成人毛片60女人毛片免费| 国产1区2区3区精品| kizo精华| 一边亲一边摸免费视频| 999精品在线视频| 大话2 男鬼变身卡| 两个人看的免费小视频| 韩国av在线不卡| 亚洲成色77777| 综合色丁香网| 亚洲av在线观看美女高潮| 大话2 男鬼变身卡| 在现免费观看毛片| 精品国产露脸久久av麻豆| 一二三四中文在线观看免费高清| 国产成人午夜福利电影在线观看| 黄片无遮挡物在线观看| 日本欧美国产在线视频| 伦精品一区二区三区| 国产成人91sexporn| 丝袜在线中文字幕| 制服丝袜香蕉在线| 国产1区2区3区精品| 欧美激情 高清一区二区三区| 少妇被粗大猛烈的视频| 午夜老司机福利剧场| 老司机影院毛片| 国产成人91sexporn| 丝袜在线中文字幕| av网站免费在线观看视频| 欧美日韩国产mv在线观看视频| 久久精品人人爽人人爽视色| 卡戴珊不雅视频在线播放| 午夜福利,免费看| 两个人看的免费小视频| 国产伦理片在线播放av一区| √禁漫天堂资源中文www| 国产成人午夜福利电影在线观看| 日日摸夜夜添夜夜爱| 日本黄大片高清| 韩国高清视频一区二区三区| 亚洲综合色惰| 亚洲精华国产精华液的使用体验| 久久精品久久精品一区二区三区| 久久人妻熟女aⅴ| 免费日韩欧美在线观看| 黄片无遮挡物在线观看| 精品人妻一区二区三区麻豆| 欧美少妇被猛烈插入视频| 十八禁网站网址无遮挡| 国产精品熟女久久久久浪| 中文欧美无线码| 在线观看人妻少妇| 激情五月婷婷亚洲| 人人妻人人澡人人爽人人夜夜| 国产老妇伦熟女老妇高清| 亚洲熟女精品中文字幕| 亚洲欧美色中文字幕在线| 制服人妻中文乱码| 亚洲人成77777在线视频| 国产精品99久久99久久久不卡 | 国产成人精品在线电影| 熟女人妻精品中文字幕| 日韩不卡一区二区三区视频在线| 久热这里只有精品99| 精品少妇久久久久久888优播| 在线天堂最新版资源| 建设人人有责人人尽责人人享有的| 日韩中字成人| 成年女人在线观看亚洲视频| 亚洲色图综合在线观看| 午夜福利网站1000一区二区三区| 国产精品久久久久久精品古装| 日韩三级伦理在线观看| 欧美激情国产日韩精品一区| 热99国产精品久久久久久7| 国产精品成人在线| 老女人水多毛片| 青青草视频在线视频观看| 国产熟女欧美一区二区| 超碰97精品在线观看| 精品久久蜜臀av无| 国产探花极品一区二区| 精品一区二区三区视频在线| 26uuu在线亚洲综合色| 国产色婷婷99| 亚洲色图综合在线观看| 伊人亚洲综合成人网| 18禁观看日本| 欧美国产精品一级二级三级| 亚洲人成77777在线视频| 51国产日韩欧美| 99热国产这里只有精品6| 欧美97在线视频| 一二三四中文在线观看免费高清| 国产成人精品久久久久久| 亚洲av综合色区一区| 亚洲av福利一区| 久久鲁丝午夜福利片| 欧美 亚洲 国产 日韩一| 精品福利永久在线观看| 黄网站色视频无遮挡免费观看| 69精品国产乱码久久久| 国产亚洲一区二区精品| 亚洲欧美精品自产自拍| 国精品久久久久久国模美| 国产av一区二区精品久久| 草草在线视频免费看| 999精品在线视频| 欧美精品一区二区大全| 日韩免费高清中文字幕av| 五月开心婷婷网| 久久综合国产亚洲精品| 老女人水多毛片| av在线观看视频网站免费| 中文字幕精品免费在线观看视频 | 欧美日韩精品成人综合77777| 男人爽女人下面视频在线观看| 女性生殖器流出的白浆| 男女国产视频网站| 乱人伦中国视频| 久久99蜜桃精品久久| 亚洲国产精品成人久久小说| 亚洲国产日韩一区二区| 国产精品免费大片| 男女午夜视频在线观看 | 亚洲高清免费不卡视频| 宅男免费午夜| 777米奇影视久久| 99久久人妻综合| 日本av免费视频播放| 一级黄片播放器| 边亲边吃奶的免费视频| 我要看黄色一级片免费的| 看十八女毛片水多多多| 人人妻人人添人人爽欧美一区卜| 在线观看免费视频网站a站| 成人漫画全彩无遮挡| 亚洲经典国产精华液单| 国产精品熟女久久久久浪| 这个男人来自地球电影免费观看 | 亚洲av电影在线观看一区二区三区| 久久久久久久久久人人人人人人| 人妻系列 视频| 欧美精品国产亚洲| 国产白丝娇喘喷水9色精品| a 毛片基地| 色吧在线观看| 在线天堂中文资源库| 久久精品夜色国产| 日韩三级伦理在线观看| 国产精品.久久久| a级毛色黄片| 久久久国产一区二区| 看十八女毛片水多多多| 性色av一级|