    Key Construction Technology of Ultra-deep Diaphragm Wall Under Complicated Geological Conditions*

    2022-06-21 02:18:00SHIJiangchuanLIUWeiweiCHENGPeichunNIEYanxiaZHUHaoboXIEZhicheng
    施工技術(shù)(中英文) 2022年9期

    SHI Jiangchuan, LIU Weiwei, CHENG Peichun, NIE Yanxia, ZHU Haobo, XIE Zhicheng

    (1.China Construction First Group Construction & Development Co., Ltd.,Beijing 100102,China;2.Installation Engineering Co., Ltd. of First Bureau Group of CSCEC,Beijing 102600, China)

    Abstract: The LNG Receiving Station project in Shenzhen is located in a land reclamation area with complicated geological conditions. The thickness of diaphragm wall is 1.5m, the depth is up to 62m, and is extremely difficult to construct. During the construction process, slot wall reinforcement technology is used to ensure the stability of slot formation, and milling-drilling-milling technology is used to address the problem of ultra-deep rock of diaphragm wall. The super-large reinforcement cage of underground continuous wall is built and lifted in one time to ensure the construction quality and safety, and the green construction is achieved by adopting the green and environment-friendly mud circulation treatment technology. The construction technology of ultra-deep diaphragm wall applied in the project yielded positive results and has the potential be become more widely used.

    Keywords:underground engineering;diaphragm wall; reinforcement cage;mud circulation; construction

    0 Introduction

    The LNG Receiving Station project in Shenzhen is an important component of the second line of the west-east natural gas transportation project. Its functions including emergency response, peak regulation and natural gas supply to Guangdong and Hong Kong, China. The first phase of the project will involve the construction of two LNG storage tanks of 200,000m3. The project will play an important role in guaranteeing the natural gas supply in the Pearl River Delta and Hong Kong, China, which is strategically significant. The project is located in a sea reclamation area, with the ocean on the other deep and newly filled soil is under the surface, and the underlying bedrock is strong and thick. On the whole, it is soft at the top and hard at the bottom.

    1 Overview of the project

    1.1 Overview of diaphragm wall

    In the project, circular foundation excavations T-1201 and T-1202 with an inner diameter of 100m and a design depth of 50m are set up. The foundation excavation bottom is located in medium and breezed rock strata, and the underground continuous wall and inner wall are adopted to form overlapping external walls. The thickness of underground diaphragm wall is 1.5m, and the grooves can be classified by two types. Using a width of 2.8m, the type Ⅱ groove is slotted with a knife. The sleeve milling joint is used between the type Ⅰ and type Ⅱ grooves, as shown in Fig.1. Each foundation excavation is surrounded by 72 underground continuous walls, the depth of which is 54~62m, and the perpendicularity of which must be 1/600.

    Fig. 1 Trench type of diaphragm wall

    1.2 Geological conditions

    The project site was originally a sea area, which was subsequently reclaimed. From top to bottom, the strata are mainly composed of Quaternary Holocene artificial filling layer, continental inter-sedimentary layer, alluvial diluvial layer, Quaternary weathering residual layer, and the underlying bedrock is Cretaceous granite, conglomerate, quartz porphyry and quartz sandstone.

    The thickness of artificial soil filling in the upper section of the site is about 6.2~13.77m, and the self-weight consolidation has not been completed yet, resulting in inadequate stability. The underlying bedrock varies obviously from east to west, which contain granite, quartz porphyry and conglomerate in turn, as shown in Fig.2. According to the geological survey report, the bedrock strength of this project is extremely high. The compressive strength of granite is 60.54MPa on average and 89.90MPa at the maximum. The average compressive strength of quartz porphyry is 52.36MPa, with a maximum of 61.10MPa. The average compressive strength of conglomerate is 46.46MPa, with a maximum of 63.30MPa. The average compressive strength of quartz sandstone is 84.35MPa, with the maximum of 90.30MPa.

    Fig. 2 Rock stratum distribution plan

    Ground water mainly consists of upper stagnant water, pore confined water and bedrock fissure water. The upper stagnant water is mostly supplied by atmospheric precipitation and seawater infiltration, and the buried depth of the stable water level is 1.80~2.80m. The pore confined water is mainly supplied by atmospheric precipitation and seawater infiltration, and the buried depth of stable water level is -1.43~6.40m. Bedrock fissure water is mainly supplied by lateral drainage, and the buried depth of stable water level is 12.10~24.00m.

    2 The challenges of the project

    1) The project site is produced via land reclamation and is located in a coastal area, with abundant groundwater, and the site is formed by. The backfilling time of the upper soil is limited, and the gravity consolidation has not yet been completed. The stability of the soil is very weak. In this project, the underground diaphragm wall is a permanent structure, which requires high quality of wall construction. Therefore, it is critical to make reasonable plans and take effective methods to manage the forming quality of the underground diaphragm wall.

    2) The bedrock strength of the site is quite strong, making conventional construction methods impossible to groove smoothly. The rock undulation is severe, and the depth of an underground continuous wall into the rock can be as high as 20~30m, with a perpendicularity of 1/600. Therefore, the key to the success or failure of construction is to select the suitable slot-forming method and controlling verticality.

    3) The steel cage in this project is too lengthy and the reinforcement is dense, making it difficult to construct and lift. Appropriate construction methods should be adopted to reduce the deformation of the steel cage and control the safety of the lifting of the steel cage.

    4) The construction volume of ground wall is enormous, and the volume of single slot section is large. The mud consumption is high, and it is located near a beach and tourism region. Then the environmental protection requirements must be in a high level. The orderly operation of mud treatment system should be considered to ensure the mud supply capacity and meet the requirements of green construction.

    3 Project analysis of key construction technology

    3.1 Groove wall stability reinforcement technology

    According to the stratum distribution, the thickness of the artificial filled soil is more than 10m, and there are adverse geological conditions such as silt below the filled soil. The site is surrounded by the sea, with a high groundwater level and a replenishment quantity. The deepest trough formation depth of the underground continuous wall reaches 62m, and the possibility of trough instability is substantial. To ensure the stability of the diaphragm wall during the construction process, the wall is reinforced with a three-axis cement soil mixing pile before it is formed.

    In the slotting range, six rows ofφ850mm triaxial mixing piles are arranged, as shown in Fig.3. The depth of mixing piles is about 18~30m, ranging from the ground to the top of the whole weathering layer. The cement percentage of soil-cement mixing piles is no less than 20%. The middle four rows of mixing piles are mainly located in the groove, and neighboring rows and piles are overlapped 250mm. The outer two rows of mixing piles adopt the method of drilling a hole, and the lap connection between piles is relatively full. In addition to reinforcement, the piles offer good water stopping performance, and serve as a water stopping curtain.

    Fig. 3 Schematic diagram of three-axis mixing pile reinforcement

    After the cement-soil mixing pile construction is completed, the strength of cement-soil test block is evaluated by drilling core method. According to the test results, the 28d unconfined compressive strength of soil-cement is more than 0.8MPa, which meets the design requirements and the requirements of underground diaphragm wall slotting.

    3.2 Trough formation technology of ultra-deep rock underground continuous wall

    3.2.1Underground continuous wall into the rock construction

    The groove depth of underground diaphragm wall is 54~62m, and the average depth of medium and breezy rock is 20~30m. In the construction stage, it was found that the rock strength was higher than planned, necessitating additional construction investigation. According to the results of rock compressive tests, the average strength of slightly weathered granite reached 94MPa, with the maximum of 136MPa, indicating an excellent rock integrity, as shown in Fig.4. In addition, a large number of minerals, such as quartz and gravel, are found in the rock, which greatly increases the overall hardness of the rock, and further enhances the difficulty of building a continuous wall construction into the rock.

    Fig. 4 Rock core sample

    According to past experience, for ultra-deep rock construction of ground wall, the commonly used construction methods mainly include percussive drilling rig construction or rotary drilling rig with percussive drilling rig construction. In recent years, dual-wheel groove milling machines are also commonly used for rock construction. Generally, this approach is mainly applicable to the underground diaphragm wall construction where the depth of rock entrance is not high, the rock strength is not high, or the time constraint is relatively sufficient. Considering the actual geological conditions and construction schedule requirements, the previous construction method was analyzed and optimized, and the rotary excavator was selected to cooperate with the double wheel groove milling machine, and the construction technology of milling-drilling-milling was adopted to solve the problem of connecting the wall into grooves. Due to the ineffective cut of domestic slotting equipment in hard rock, Germany Bauer BC-40 double wheel grooving machine and BG-38 rotary drilling rig are used for construction.

    When grooving, BC-40 groove milling machine is firstly used to construct the soil layer and the shallow rock layer. When entering medium and breeze rock layer, the footage speed decreases significantly. At this time, continuing construction will aggravate the loss of drilling gear and equipment, and the efficiency is too low. Therefore, the slot milling machine is temporarily moved to other slots for construction, and the rotary drilling rig equipped with roller cone drill is used to perform pre-crack drilling of rock strata, that is, two drilling holes with a diameter of 1.2m are constructed in the first and second cutting ranges of the slot milling machine, and the drilling depth is to the bottom of the underground continuous wall groove. Following the completion of the lead hole, the groove milling machine will re-create the groove milling construction. At this time, the original hard and entire rock formation has been fully pre-cracked, and the face has been expanded, as shown in Fig.5. The rock breaking footage speed of the groove milling machine can be increased by more than 2~3 times, and the drilling loss is significantly reduced. This method fully utilizes the benefits of a rotary drilling rig and double-wheel groove milling machine, significantly improving the construction efficiency of diaphragm wall and reducing the construction cost.

    Fig. 5 Slotting method of diaphragm wall

    3.2.2Vertical control of underground diaphragm wall

    The design requires an allowable deviation of the perpendicularity of the diaphragm wall of 1/600, which is far higher than the specification requirements. Moreover, the fluctuation of the rock surface in the site is more severe, and the inclined rock strata are widely distributed, increasing the difficulty of controlling the perpendicularity of the trench. Based on this, the guide frame is set up at the slot hole mouth according to the laying out mark before slotting, and the milling head is fixed in the opening process of the grooving machine to serve as a guide. Throughout the slotting process, the deviation of each slotting direction can be monitored in real time by using its own verticality display system,as shown in Fig.6. Based on the construction situation and geological prospecting data, the operator can adjust the running state of the double-wheel slotting machine to drill into the junction of plagioclase and soft and hard stratum, and control the drilling speed and pressure in time to avoid the deviation of the milling head. When the groove deviation is large, the hydraulic rectifying plate of the groove milling machine is used to correct it, and the verticality is tested using ultrasonic inclinometer. By adopting the aforementioned measures, the quality of underground diaphragm wall is improved, and the design requirements are fully satisfied.

    Fig. 6 Verticality monitoring system

    3.3 Overall production and hoisting technology of super large steel cages

    The longest length and width of the underground continuous wall reinforcement cage of the project are 59.5m and 5.6m, respectively, and the maximum dead weight of the reinforcement cage is 95t. By adding the additional load such as the sling, the total weight of is more than 110t, belonging to the super large and super heavy reinforcement cage.

    3.3.1Steel cage production and reinforcement

    The wall steel cage reinforcement is dense, three main bars are bonded together and the joint form is mechanical connection, as shown in Fig.7. If the steel cage is constructed by section hoisting, the main reinforcement and reinforcement form can lead to extremely difficult butt, and the hole to connect the steel cage takes a long time, which can easily cause the groove wall to collapse. Considering comprehensively, the floor wall steel cage is built and hoisted as a whole.

    Fig. 7 Section of reinforcement cage

    To strengthen the overall stiffness of the reinforcement cage and reduce the deformation during the hoisting process, the reinforcement cage as a whole and the lifting point must be reinforced. The longitudinal truss bars and horizontal truss bars of the reinforcement cage are produced by 32mm steel bars, with five trusses of the longitudinal truss bars spaced roughly 1m apart in the width direction of the reinforcement cage. The horizontal truss bars are arranged every 3m along the length of the cage. The layout of the truss bars can significantly enhance the overall stiffness of the cage. The lifting point of the steel cage is welded by a 25mm thickness steel plate skeleton for reinforcement, and the concentrated force of the lifting point is reasonably dispersed to the steel cage body.

    To guarantee the machining quality of the steel reinforcement cage and forming speed, combined with the structure parameters of the reinforcing cage, through the analysis and practice, the optimal machining sequence for the wall reinforcing cage is the horizontal reinforcement of bottom layer→the longitudinal reinforcement of bottom layer→the longitudinal truss reinforcement→the horizontal truss reinforcement→the steel plate skeleton at lifting point→the acoustic pipe and grouting casing→the embedded reinforcement and shear reinforcement→the longitudinal reinforcement of upper layer→the horizontal reinforcement of upper layer→the horizontal sealing reinforcement.

    3.3.2Hoisting equipment selection

    Reinforcing cage hoisting adopts the construction method of double machine coordination and one-time overall hoisting, which is extremely difficult. The lifting equipment should meet the requirements of lifting capacity and lifting height.

    1) Hoisting height requirements

    The maximum length of the steel cage upright is 59.5m. With the 0.5m from the ground, the distance between the hook and the end of the boom is about 6m. The total height of the sling and wire rope below the hook is about 10m, then the vertical height of the lifting must be at least 76m.

    2) Hoisting capacity requirements

    When the reinforcement cage is in the upright state, the main crane has the maximum stress. The total lifting load is 110t, and the safety factor when the main crane is walking is set as 0.7, then the lifting capacity of the main crane must be at least 157t.

    According to relevant research and construction experience, the maximum force of the auxiliary crane in the process of rotating vertically in the air from flat lifting is set to be 70% lifting load, so the load to be borne by the auxiliary crane is 77t. When the safety factor of the auxiliary crane is 0.8, the lifting capacity of the auxiliary crane should reach 96.25t.

    3) Crane selection

    Based on the hoisting capacity, hoisting height requirements and site conditions, Zoomlion ZCC5200S type 400t crawler crane is selected for the main crane, with arm length of 84m a turning radius of 16m, and 80t over-lifting counterweight. Under this situation, the lifting weight is 176t>157t, and the lifting height can reach 85m>76m, meeting the specification requirements.

    XCMG XGC260 type 260t crawler crane is selected as the auxiliary crane. The arm length is 51m and the working radius is 12m, the lifting weight is 109t>96.25t, which meets the requirements.

    3.3.3Layout of steel cage lifting point and selection of sling

    If the position of the hoisting point of the steel cage is not calculated accurately, large deflection deformation will be produced, causing the weld to crack, the overall structure to break, and the lifting to be impossible. According to the law of bending moment balance, when the positive and negative bending moments are equal, the bending moment deformation is the smallest, as shown in Fig.8.

    Fig. 8 Schematic diagram of reinforcement cage bending moment

    Based on the calculation, fine-tuning is carried out in combination with the actual structural parameters of the reinforcement cage. The positions of lifting points and sling settings are shown in Fig.9.

    Fig. 9 Schematic diagram of reinforcement cage hoisting

    3.3.4Reinforcement cage hoisting construction

    1) Hoist in place

    Firstly the flatness and ground endurance of the foundation must be checked, and the working range and angle of the crawler crane can be adjusted. Then the center of the hook overlaps with the center of the steel cage must be ensured to install the sling.

    2) Flat lifting test lifting

    To ensure the safety of the steel cage hoisting scheme, the test hoisting was performed before the formal hoisting. Two crawler cranes are used to lift the steel cage for 50cm and hold it for 10min. The deformation and welding of the steel cage, as well as the working state of the crane, are observed. If there is an abnormality, the steel cage should be lowered again to determine the cause and take corresponding measures. If there is no abnormal situation, the lifting procedure can continue.

    3) Turn upright in the air

    After the completion of trial lifting, the main crane is gradually lifted, and the steel cage is inclined in the air. The secondary crane is gradually moving close to the main crane, and the steel cage is gradually adjusted to the vertical state.

    4) Main crane movement

    When the reinforcement cage is vertical, the secondary crane is detached from the hook, and the 400t main crane is directed to walk the reinforcement cage to the slot section. The crane should be kept stable during the walking process, and the distance from the ground cannot exceed 0.5m. The traction rope is attached on the reinforcement cage to prevent the shaking.

    5) Rebar cage is lowered and the lifting point is adjusted

    When the main lifting point is lifted, the lifting point transformation is gradually completed, as shown in Fig.10~Fig.12.

    Fig. 10 Transformation process Ⅰ of steel cage lifting point

    Fig. 11 Transformation process II of steel cage lifting point

    Fig. 12 Transformation process III of steel cage lifting point

    3.4 Green mud circulation technology

    Mud performance is one of the critical factors affecting the construction of an underground diaphragm wall. The main function of mud is to protect the wall by forming grooves, carrying drilling slags, cooling and lubricating, and so on. The engineering geological conditions are complex and the stratum stability is low. In addition, the thickness and depth of the ground wall are significant. The number of grooves and the amount of mud used in the construction process are large. All of these conditions might pollute the surrounding environment. Therefore, during the construction process, it is critical to choose green mud recycling treatment technology to ensure the quality and supply of mud.

    The ground wall in this project has a circular layout, and the double-wheel groove milling machine is arranged within the circular road construction inside the ground wall. The convenience of construction is considered by reducing the mud transport distance and the loss. The mud circulation processing system is arranged in the inside wall. The system mainly consists of the pulp pool, the final settling basin, the clear water reservoirs, the slag and sand removal system, and so on. These conditions can ensure that the construction under the premise of reducing the slurry in amount of consumption cannot be affected and also the goal of green construction is achieved.

    The operation principle of the whole mud circulation treatment system is described as follows.

    1) First, the slurry is created by a mud mixing equipment in the pulping pool. After 24h, the proportion of mud, viscosity, sand content and other indicators are measured. Following the completion of the usage requirements, a mud pump is used to supply mud to the new slotted section.

    2) The double-wheel slot milling machine starts to work. Two hydraulic motors drive the milling wheel, which rotates and cuts rock and soil bodies by breaking them into pieces, rolling them up, and mixing them with the mud in the slot. A centrifugal pump located between the two milling wheels pumps the mud containing debris through the mud pipe to the background desanding system.

    3) The background desanding screen system is composed of a gravel separator and a desanding device. The mud pumped by the centrifugal pump of a milling trough machine is filtered and desanded on two levels. The clean mud enters the slurry storage box at the bottom of the desanding system.

    4) As the tank’s depth increases and the mud is lost in the process, the mud needs to be replenished during the construction, and the mud is manufactured and transported to the tank through the pulping pool.

    5) During underwater concrete pouring, the mud in the tank will be recycled to the sedimentation tank through the mud pump. If the indicators are qualified, the mud can be used to reduce the overall amount of mud.

    When the performance index of circulating mud or recycled mud is not qualified, it becomes waste slurry. The waste slurry that is immediately removed will cause huge pollution to the environment, and it needs to be transported to the authorized off-site facility for treatment, which will be extremely expensive. The waste slurry produced during the construction process was treated harmlessly and the procedure is described as following. The waste mud is separated into water and mud cake through the mud filter press, as shown in Fig.13. The water is directed into the clear pool for reuse, and the mud cake produced by the filter press was dehydrated and can be directly transported to the filling area of the site. Then, the cost of mud treatment is effectively reduced, and the waste mud is fully utilized to avoid pollution and achieve green construction.

    Fig. 13 Water separation diagram of mud filter press

    4 The construction effect

    By adopting essential construction techniques listed above, the underground diaphragm wall construction has achieved good results. After the underground diaphragm wall has been grooved, ultrasonic grooved meter is used to test the slot hole, and all of the indexes can meet the design requirements. According to the results, the trench verticality of the ground wall has completely reached 1/600 which met the design requirements, and the filling coefficient of concrete is less than 1.10, with an average of about 1.05, and the trench effect is good. The integrity of the wall body was tested by acoustic transmission method, and the quality of the wall was satisfactory. Basically, it was a class I wall, with no class Ⅲ and IV walls.

    5 Conclusion

    With the continuous development of underground space, the application scope of underground diaphragm wall is becoming more and more wide, and the increasingly difficult engineering geological conditions have become a serious problem. To construct an ultra-deep underground continuous wall under difficult geological conditions, the project adopts a number of advanced and applicable essential technologies that can effectively solve the construction problems.

    1) In the newly filled area, cement-soil mixing piles are used to pre-reinforce the groove wall of underground continuous wall, which effectively improves the stability of the groove wall. The piles can also ensures the quality of the wall, and reduces the filling coefficient of concrete perfusion.

    2) Using the milling-drilling-milling grooving method can increase the double wheel grooving machine into the rock construction of the air surface. It can also significantly improve the construction efficiency, and ensure the quality of construction.

    3) In view of the super long and overweight underground continuous wall reinforcement cage, the safety of the overall production and hoisting construction process is ensured through the reinforcement and hoisting calculation and the selection of the reinforcement cage.

    4) The efficient and green mud circulation treatment technology is adopted to achieve the goal of recycling and green construction.

    天天影视国产精品| 曰老女人黄片| 悠悠久久av| 精品国产一区二区三区四区第35| 一个人免费在线观看的高清视频| 国产熟女午夜一区二区三区| 国产在线精品亚洲第一网站| 老司机在亚洲福利影院| 巨乳人妻的诱惑在线观看| 嫩草影院精品99| 久久久国产成人免费| 中文字幕最新亚洲高清| 亚洲av五月六月丁香网| 国产不卡一卡二| 久久人妻福利社区极品人妻图片| 国产成人av教育| 91大片在线观看| 99国产精品一区二区三区| 成人av一区二区三区在线看| 国产三级黄色录像| bbb黄色大片| 国产日韩一区二区三区精品不卡| 夜夜看夜夜爽夜夜摸 | 国产精品自产拍在线观看55亚洲| 午夜老司机福利片| 亚洲午夜理论影院| 亚洲成人免费av在线播放| av有码第一页| 日本wwww免费看| 精品国产乱子伦一区二区三区| 一级a爱视频在线免费观看| 日本欧美视频一区| 日本免费a在线| 国产麻豆69| 黄片播放在线免费| 韩国av一区二区三区四区| 看免费av毛片| 久久精品人人爽人人爽视色| 成年人免费黄色播放视频| 99精品欧美一区二区三区四区| 欧美日本中文国产一区发布| 露出奶头的视频| 久久人妻福利社区极品人妻图片| 老鸭窝网址在线观看| 久久久久九九精品影院| 又大又爽又粗| tocl精华| 国产国语露脸激情在线看| 欧美中文日本在线观看视频| 欧美另类亚洲清纯唯美| 亚洲欧美日韩高清在线视频| 精品久久久精品久久久| 亚洲精品成人av观看孕妇| 搡老岳熟女国产| 国产亚洲精品久久久久5区| 欧美黄色淫秽网站| 亚洲一区中文字幕在线| 欧美午夜高清在线| 国产成人影院久久av| svipshipincom国产片| 亚洲午夜精品一区,二区,三区| 国产又爽黄色视频| 亚洲一区二区三区欧美精品| 午夜免费鲁丝| 国产深夜福利视频在线观看| 性色av乱码一区二区三区2| 可以免费在线观看a视频的电影网站| 午夜91福利影院| 午夜视频精品福利| 免费看a级黄色片| 日韩精品免费视频一区二区三区| 高清黄色对白视频在线免费看| 少妇的丰满在线观看| 搡老熟女国产l中国老女人| 日韩欧美国产一区二区入口| 免费高清在线观看日韩| 婷婷丁香在线五月| 欧美成人午夜精品| 国产成年人精品一区二区 | 欧美日韩精品网址| 亚洲第一青青草原| 高清毛片免费观看视频网站 | 亚洲自拍偷在线| 欧美激情高清一区二区三区| 欧美中文综合在线视频| 妹子高潮喷水视频| 亚洲av电影在线进入| 极品人妻少妇av视频| 亚洲中文日韩欧美视频| 日韩欧美国产一区二区入口| 日韩av在线大香蕉| 久久伊人香网站| 国产精品98久久久久久宅男小说| 黄色女人牲交| 麻豆国产av国片精品| 中文字幕色久视频| 啦啦啦在线免费观看视频4| 一进一出抽搐gif免费好疼 | 不卡av一区二区三区| 欧美av亚洲av综合av国产av| av超薄肉色丝袜交足视频| 欧洲精品卡2卡3卡4卡5卡区| 亚洲 欧美 日韩 在线 免费| 精品国产美女av久久久久小说| 欧美黄色片欧美黄色片| 宅男免费午夜| 久久久久久大精品| 日日干狠狠操夜夜爽| 国产欧美日韩一区二区精品| 久久久国产一区二区| 中文字幕av电影在线播放| 欧美精品亚洲一区二区| 男人舔女人的私密视频| 免费av毛片视频| 久久中文字幕一级| 亚洲五月婷婷丁香| 亚洲av成人av| 欧美成人性av电影在线观看| 波多野结衣一区麻豆| www国产在线视频色| 久久国产亚洲av麻豆专区| 欧美性长视频在线观看| 三上悠亚av全集在线观看| 国产精品国产av在线观看| 欧美日韩亚洲综合一区二区三区_| 中文欧美无线码| 亚洲男人的天堂狠狠| 欧美日韩国产mv在线观看视频| 热re99久久精品国产66热6| 国产不卡一卡二| 国内毛片毛片毛片毛片毛片| 日韩一卡2卡3卡4卡2021年| 黄色丝袜av网址大全| 美国免费a级毛片| 一级黄色大片毛片| 国产精品影院久久| 亚洲男人天堂网一区| 满18在线观看网站| av福利片在线| 成人18禁在线播放| 一本大道久久a久久精品| 身体一侧抽搐| 美女午夜性视频免费| 视频区欧美日本亚洲| 久久久久九九精品影院| av网站在线播放免费| 91在线观看av| 伊人久久大香线蕉亚洲五| 国产精品二区激情视频| 亚洲五月婷婷丁香| 最近最新中文字幕大全电影3 | 少妇的丰满在线观看| 大码成人一级视频| 老司机福利观看| 两性夫妻黄色片| 男女下面插进去视频免费观看| tocl精华| 国产精品秋霞免费鲁丝片| 少妇的丰满在线观看| 人妻丰满熟妇av一区二区三区| 一级毛片高清免费大全| 两性午夜刺激爽爽歪歪视频在线观看 | 正在播放国产对白刺激| 高潮久久久久久久久久久不卡| 亚洲色图综合在线观看| 一本大道久久a久久精品| 中文字幕最新亚洲高清| www日本在线高清视频| 日韩中文字幕欧美一区二区| 999久久久国产精品视频| 在线观看一区二区三区激情| 亚洲精品一二三| 交换朋友夫妻互换小说| 国产精品 国内视频| 国产精品美女特级片免费视频播放器 | 视频区欧美日本亚洲| www.www免费av| 人妻久久中文字幕网| 黑人欧美特级aaaaaa片| 免费一级毛片在线播放高清视频 | 高清av免费在线| 69av精品久久久久久| 日韩高清综合在线| 欧美丝袜亚洲另类 | 色老头精品视频在线观看| 亚洲专区字幕在线| 国产成人欧美| 国产高清激情床上av| 国产91精品成人一区二区三区| 亚洲av日韩精品久久久久久密| 一级,二级,三级黄色视频| 性欧美人与动物交配| 亚洲中文日韩欧美视频| 国产精品亚洲一级av第二区| 身体一侧抽搐| 国产精品国产av在线观看| 视频区欧美日本亚洲| 91成年电影在线观看| 在线观看免费午夜福利视频| 性少妇av在线| 首页视频小说图片口味搜索| 中文字幕色久视频| 久久人人爽av亚洲精品天堂| 亚洲一区二区三区不卡视频| 伊人久久大香线蕉亚洲五| av在线天堂中文字幕 | 老司机靠b影院| 十八禁网站免费在线| 夜夜夜夜夜久久久久| 不卡av一区二区三区| 另类亚洲欧美激情| 日本精品一区二区三区蜜桃| 中文字幕人妻熟女乱码| 老司机亚洲免费影院| 精品一品国产午夜福利视频| 亚洲免费av在线视频| 超碰成人久久| 国产主播在线观看一区二区| 麻豆国产av国片精品| 成人精品一区二区免费| 日韩欧美一区二区三区在线观看| 国产极品粉嫩免费观看在线| 精品国产国语对白av| 国产91精品成人一区二区三区| 久久香蕉激情| 色婷婷久久久亚洲欧美| 女生性感内裤真人,穿戴方法视频| 精品久久久久久电影网| 精品福利观看| 亚洲av第一区精品v没综合| 日本三级黄在线观看| 一区二区三区激情视频| 丝袜美腿诱惑在线| 一级片'在线观看视频| 99久久久亚洲精品蜜臀av| 90打野战视频偷拍视频| av网站在线播放免费| 一边摸一边做爽爽视频免费| 99国产综合亚洲精品| 欧美中文日本在线观看视频| 精品一区二区三区视频在线观看免费 | 亚洲男人天堂网一区| 国产成人一区二区三区免费视频网站| 一边摸一边抽搐一进一出视频| 欧美激情 高清一区二区三区| 国产熟女午夜一区二区三区| 在线观看舔阴道视频| 国产一区在线观看成人免费| 午夜免费激情av| 中文字幕高清在线视频| 他把我摸到了高潮在线观看| 午夜福利在线观看吧| 成人永久免费在线观看视频| 宅男免费午夜| 欧美黄色淫秽网站| 老汉色∧v一级毛片| 午夜福利在线免费观看网站| 9色porny在线观看| 99久久久亚洲精品蜜臀av| 亚洲,欧美精品.| 黑人巨大精品欧美一区二区蜜桃| 精品卡一卡二卡四卡免费| 亚洲精品在线美女| 久久天堂一区二区三区四区| 亚洲一码二码三码区别大吗| 中文字幕色久视频| 精品久久久精品久久久| 精品国产超薄肉色丝袜足j| 免费高清视频大片| 99精国产麻豆久久婷婷| 精品国产一区二区久久| 国产99久久九九免费精品| 夜夜看夜夜爽夜夜摸 | 纯流量卡能插随身wifi吗| 日韩欧美三级三区| 免费人成视频x8x8入口观看| x7x7x7水蜜桃| 韩国av一区二区三区四区| 一进一出抽搐gif免费好疼 | 亚洲人成电影免费在线| 成人影院久久| 在线观看午夜福利视频| 午夜精品在线福利| 国产亚洲欧美精品永久| 自拍欧美九色日韩亚洲蝌蚪91| 久久人人爽av亚洲精品天堂| 精品国内亚洲2022精品成人| 一边摸一边做爽爽视频免费| 两个人免费观看高清视频| 久久中文字幕人妻熟女| 国产精品美女特级片免费视频播放器 | 日韩有码中文字幕| 精品第一国产精品| 又紧又爽又黄一区二区| 天天躁夜夜躁狠狠躁躁| 一二三四社区在线视频社区8| www.www免费av| 国产精品永久免费网站| 又黄又粗又硬又大视频| 亚洲少妇的诱惑av| 日本黄色日本黄色录像| 黄片播放在线免费| 99国产极品粉嫩在线观看| 中亚洲国语对白在线视频| 50天的宝宝边吃奶边哭怎么回事| 日韩欧美三级三区| 亚洲欧美精品综合久久99| 午夜两性在线视频| 极品教师在线免费播放| 中文字幕最新亚洲高清| 午夜影院日韩av| 亚洲一区二区三区欧美精品| 欧美乱色亚洲激情| 男女床上黄色一级片免费看| 91老司机精品| 女人高潮潮喷娇喘18禁视频| 一区二区三区精品91| 精品久久久精品久久久| 日韩精品青青久久久久久| 麻豆av在线久日| 热re99久久国产66热| 天天躁狠狠躁夜夜躁狠狠躁| 国产精品亚洲av一区麻豆| 中文亚洲av片在线观看爽| 国产精品av久久久久免费| 欧美日韩亚洲国产一区二区在线观看| 伊人久久大香线蕉亚洲五| 久久久久久久精品吃奶| 国产1区2区3区精品| 久久精品aⅴ一区二区三区四区| 在线观看免费日韩欧美大片| 美女国产高潮福利片在线看| 三上悠亚av全集在线观看| 国产精品日韩av在线免费观看 | 免费女性裸体啪啪无遮挡网站| 亚洲精品中文字幕一二三四区| 伦理电影免费视频| 国产91精品成人一区二区三区| 欧美黄色淫秽网站| 纯流量卡能插随身wifi吗| av超薄肉色丝袜交足视频| 91麻豆av在线| 好男人电影高清在线观看| 麻豆国产av国片精品| 亚洲色图av天堂| 免费高清在线观看日韩| 一级毛片女人18水好多| 国产精品国产av在线观看| 日本三级黄在线观看| 男人舔女人的私密视频| 一边摸一边抽搐一进一小说| 欧美 亚洲 国产 日韩一| 一个人免费在线观看的高清视频| 久久国产精品人妻蜜桃| 国产精品影院久久| 国产午夜精品久久久久久| 久久香蕉激情| 女人爽到高潮嗷嗷叫在线视频| 一边摸一边做爽爽视频免费| 亚洲性夜色夜夜综合| 黄色a级毛片大全视频| 国产不卡一卡二| av网站在线播放免费| 嫩草影视91久久| 黄片大片在线免费观看| 两性午夜刺激爽爽歪歪视频在线观看 | 亚洲精品美女久久久久99蜜臀| 久久草成人影院| 成人av一区二区三区在线看| 十八禁人妻一区二区| 中文字幕精品免费在线观看视频| 叶爱在线成人免费视频播放| 免费在线观看日本一区| 免费av毛片视频| 亚洲第一欧美日韩一区二区三区| 国产99白浆流出| 成人黄色视频免费在线看| 成年版毛片免费区| 久久久精品欧美日韩精品| 黄色a级毛片大全视频| 久热这里只有精品99| 国产极品粉嫩免费观看在线| 国产一区二区三区视频了| 亚洲精华国产精华精| 亚洲一区二区三区不卡视频| 久久久久久大精品| 亚洲情色 制服丝袜| 亚洲欧美日韩另类电影网站| 精品第一国产精品| 最新在线观看一区二区三区| 国产精品野战在线观看 | 亚洲精品在线观看二区| 大陆偷拍与自拍| 久99久视频精品免费| 在线观看免费高清a一片| 欧美日本亚洲视频在线播放| 午夜亚洲福利在线播放| 高清av免费在线| 激情视频va一区二区三区| 天堂√8在线中文| 97超级碰碰碰精品色视频在线观看| 国产熟女xx| 一级a爱片免费观看的视频| 一个人观看的视频www高清免费观看 | 性色av乱码一区二区三区2| 成年女人毛片免费观看观看9| 欧美精品啪啪一区二区三区| 在线观看免费视频网站a站| 又大又爽又粗| 99精品在免费线老司机午夜| 亚洲少妇的诱惑av| 满18在线观看网站| e午夜精品久久久久久久| 夜夜躁狠狠躁天天躁| 欧美日韩亚洲高清精品| 亚洲中文av在线| 可以免费在线观看a视频的电影网站| 少妇 在线观看| 久久精品国产亚洲av高清一级| 9191精品国产免费久久| 国产黄a三级三级三级人| 制服人妻中文乱码| 欧美在线黄色| 国产欧美日韩综合在线一区二区| 最好的美女福利视频网| 99久久国产精品久久久| 久久人人97超碰香蕉20202| 波多野结衣一区麻豆| 亚洲三区欧美一区| 99香蕉大伊视频| 亚洲欧美日韩另类电影网站| 久久精品人人爽人人爽视色| 超碰成人久久| 免费女性裸体啪啪无遮挡网站| 亚洲av片天天在线观看| 亚洲熟妇熟女久久| 黄色怎么调成土黄色| videosex国产| 中文字幕高清在线视频| videosex国产| 精品国内亚洲2022精品成人| 日韩三级视频一区二区三区| 高潮久久久久久久久久久不卡| 91成年电影在线观看| 亚洲情色 制服丝袜| 国产av一区二区精品久久| 亚洲avbb在线观看| 一边摸一边抽搐一进一出视频| 99精品欧美一区二区三区四区| 啪啪无遮挡十八禁网站| 国产精品一区二区在线不卡| 身体一侧抽搐| 少妇裸体淫交视频免费看高清 | 午夜精品在线福利| netflix在线观看网站| 两个人免费观看高清视频| 后天国语完整版免费观看| 美国免费a级毛片| 久久精品国产清高在天天线| 在线看a的网站| 最新美女视频免费是黄的| 精品人妻1区二区| 久久天躁狠狠躁夜夜2o2o| 色播在线永久视频| 国产免费现黄频在线看| 精品卡一卡二卡四卡免费| 成人免费观看视频高清| 国产1区2区3区精品| 长腿黑丝高跟| 日韩免费高清中文字幕av| 久久中文字幕一级| 又黄又粗又硬又大视频| 狠狠狠狠99中文字幕| 无限看片的www在线观看| 国产精品 国内视频| 一二三四在线观看免费中文在| 99国产精品一区二区蜜桃av| 色婷婷久久久亚洲欧美| 欧美在线一区亚洲| 黄色 视频免费看| 午夜精品在线福利| 999精品在线视频| 69精品国产乱码久久久| 国产成人欧美| 波多野结衣一区麻豆| 老汉色∧v一级毛片| 欧美乱妇无乱码| 手机成人av网站| 露出奶头的视频| 国产高清videossex| 99久久人妻综合| 丝袜人妻中文字幕| 咕卡用的链子| 国产精品国产av在线观看| 女人精品久久久久毛片| 亚洲欧美精品综合一区二区三区| 99在线人妻在线中文字幕| 成人黄色视频免费在线看| 不卡av一区二区三区| 久久久水蜜桃国产精品网| 久久久国产一区二区| 欧美一区二区精品小视频在线| 免费人成视频x8x8入口观看| 国产精品野战在线观看 | 夜夜爽天天搞| 国产亚洲精品综合一区在线观看 | a级毛片黄视频| 成人亚洲精品一区在线观看| xxx96com| 在线观看免费视频日本深夜| 亚洲第一青青草原| 老司机午夜福利在线观看视频| 午夜精品国产一区二区电影| 国产av精品麻豆| 在线天堂中文资源库| 国产区一区二久久| 欧美国产精品va在线观看不卡| 亚洲精品久久成人aⅴ小说| 热99re8久久精品国产| 黄网站色视频无遮挡免费观看| 高清黄色对白视频在线免费看| 啦啦啦在线免费观看视频4| 精品国产一区二区三区四区第35| 国产国语露脸激情在线看| 亚洲熟女毛片儿| 亚洲欧美一区二区三区黑人| 精品卡一卡二卡四卡免费| 亚洲va日本ⅴa欧美va伊人久久| 99久久人妻综合| 免费看十八禁软件| 大码成人一级视频| 成人av一区二区三区在线看| 国产精品久久视频播放| 女人爽到高潮嗷嗷叫在线视频| 久久久水蜜桃国产精品网| www.熟女人妻精品国产| 亚洲成人精品中文字幕电影 | 99香蕉大伊视频| 自线自在国产av| 免费不卡黄色视频| 午夜福利一区二区在线看| 久久国产精品人妻蜜桃| 欧美激情极品国产一区二区三区| 精品国产国语对白av| 天堂中文最新版在线下载| 欧美乱色亚洲激情| 大陆偷拍与自拍| 9191精品国产免费久久| 日韩高清综合在线| 黄色 视频免费看| 美女 人体艺术 gogo| 男人舔女人的私密视频| 欧美丝袜亚洲另类 | 天堂√8在线中文| 啦啦啦在线免费观看视频4| 国产亚洲欧美在线一区二区| 中文字幕精品免费在线观看视频| 母亲3免费完整高清在线观看| 亚洲熟女毛片儿| 国产精品美女特级片免费视频播放器 | 99在线视频只有这里精品首页| 热re99久久国产66热| 成年人免费黄色播放视频| 国产精品乱码一区二三区的特点 | 12—13女人毛片做爰片一| 亚洲欧美精品综合久久99| 久热这里只有精品99| 久久人人爽av亚洲精品天堂| 亚洲中文av在线| 日韩免费高清中文字幕av| 久久久精品欧美日韩精品| 一区二区三区激情视频| 午夜老司机福利片| 巨乳人妻的诱惑在线观看| 国产精品一区二区在线不卡| 人人妻人人爽人人添夜夜欢视频| 中文字幕高清在线视频| 日日干狠狠操夜夜爽| 精品少妇一区二区三区视频日本电影| 嫁个100分男人电影在线观看| 国产高清视频在线播放一区| 99久久综合精品五月天人人| 久久天堂一区二区三区四区| 免费在线观看视频国产中文字幕亚洲| tocl精华| 精品人妻在线不人妻| 精品久久久精品久久久| 欧美色视频一区免费| 一区福利在线观看| 热re99久久国产66热| 久久精品亚洲av国产电影网| 日本欧美视频一区| 丝袜美足系列| 午夜精品在线福利| 久久精品aⅴ一区二区三区四区| 韩国av一区二区三区四区| 男人操女人黄网站| 日本 av在线| 香蕉久久夜色| 日韩高清综合在线| 国产真人三级小视频在线观看| 久久影院123| 午夜福利免费观看在线| 日韩精品中文字幕看吧| 亚洲欧美一区二区三区黑人| 亚洲 国产 在线| 精品欧美一区二区三区在线| 亚洲,欧美精品.| 国产人伦9x9x在线观看| 亚洲精品中文字幕一二三四区| 日本黄色视频三级网站网址| x7x7x7水蜜桃| 精品一品国产午夜福利视频| 美国免费a级毛片| 18禁裸乳无遮挡免费网站照片 |