• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    Review and Evaluation of Stray Current Mitigation for Urban Rail Transit

    2021-12-22 06:18:44SahilBhagatXiaofengYangMiaoWangAndreaMariscotti
    電工技術(shù)學(xué)報(bào) 2021年23期
    關(guān)鍵詞:熱那亞阿布扎比雜散

    Sahil Bhagat Xiaofeng Yang Miao Wang Andrea Mariscotti

    Review and Evaluation of Stray Current Mitigation for Urban Rail Transit

    1223

    (1. Hitachi Rail STS Abu Dhabi 41096 UAE 2. School of Electrical Engineering Beijing Jiaotong University Beijing 100044 China 3. Department of Naval, Electrical, Electronics and Telecommunications Engineering (DITEN) University of Genova Genova 16145 Italy)

    Stray current causes inevitable corrosion to structures near electric transportation systems, especially in DC urban rail transit. The paper considers the issue of stray current mitigation discussing what can be done for design and existing systems, sticking to applicable standards and consolidated protection practice. Mitigation measures may be devised for a new constructed system, such as the optimization of traction substation positions, reducing the longitudinal resistance of the running rails and return circuit, and using an additional stray current collection system (to be included in the track bed during construction). As for an existing system, besides increasing the total cross section of the aforementioned return circuit and stray current collection system by adding parallel conductors or cross-bonds, it is recommended to employ static converter units (e.g. negative resistance converters) to control the stray current in the return circuit. These units can be deployed in specific points where analysis or measurement indicates the large rail potential or incipient corrosion is spotted out.

    Urban rail transit, stray current, corrosion, stray current collection, stray current mitigation, negative resistance converter

    0 Introduction

    Stray current corrosion poses challenges for the installations and structures exposed to free geo- magnetic currents and more remarkably to industrial electric processes and sources with significant leakage through soil[1-3]. As known, DC systems have a much higher impact than AC systems for the same amount of leakage[4]. High-voltage DC systems can affect buried structures near their earthing electrodes. Industrial processes such as welding, electrical discharge machining and galvanic plating also employ a large amount of current with significant dispersion through the installation and respective protection earthing circuits. However, the most relevant source of stray current both in terms of intensity and physical extension are electric transportation systems (ETSs), such as railways, metros, and tram lines. The peculiar element promoting a significant exchange of current with soil are the running rails, used as part of the traction supply return circuit and subject to significant degradation of the electrical interface throughout service life[5]. This, in combination with the integration of such transportation systems in the urban and suburban context, has made necessary a thorough analysis of the problem and of existing and preferable design solutions. The stray current problem is complex for the large extension of the system, the non-ideal electrical conditions at interfaces, the long- time interval for effects to become evident, and in general the interaction of multiple phenomena and disciplines (civil engineering, electrical engineering, chemistry), for which the word “holistic” was also used in an attempt to comprehend the various approaches[6].

    Modeling and simulation always imply some degree of approximation, especially considering use of simplified circuits, the variability of parameters, and the combination of electrical and electrochemical phenomena[7]. In addition, results are not always fully and/or directly applicable, and a tradeoff with a wide range of constraints is always necessary. For example, the position of traction substations is subject to many constraints, and cannot follow the indications of a full optimization. Or the track-bed insulation is subject to structural constraints for the static and most of all dynamic response at train passage, especially at curves. In addition, construction pursues the goal of cost minimization, often offsetting costs to a later project stage and to maintenance (in charge of a different entity, the operator, in lieu of the original client). In general, the importance must be underlined of solutions that can be applied to already built systems, as part for instance of a major overhaul or upon evidence of critical damage and need of urgent intervention.

    This paper thus offers an overview of solutions at construction and operation phase in an engineering perspective. The objective is the integration of stray current mitigation measures with construction exigencies and constraints and electrical safety constraints, carrying out a comparison with simple, yet representative, models.

    1 Principles of Stray Current and Corrosion

    1.1 Corrosion cell

    For corrosion to occur, the formation of a corrosion cell is a necessity. It is composed of typically four components: anode, cathode, electrolyte and metallic path. Anode is where oxidation (removal of electrons) takes place. Cathode is where reduction (gain of electrons) takes place. Electrolyte is an electrically conductive solution, through which positively charged ions (cations) can flow. Conversely, a metallic path is necessary for the flow of electrons. Conventional current flows from anode to cathode in form of positively charged ions through the electrolyte; metallic path is necessary for the flow of electrons flow[8]. The best way to stop corrosion is opening this circuit by removing one (or more than one) of the aforementioned components of the corrosion cell.

    1.2 DC traction stray current

    The traction current, which in conjunction with the voltage applied to the collectors, supplies power to the railway traction vehicle through positive conductor (third rail or overhead contact system) must have a return path. As the current path must be considered to constitute a closed loop, the total return current must be equal to the current flowing through the positive conductor.

    The train current collection devices receive the DC supply required to operate the train and the current then returns to traction substations via the wheels of the train and the unearthed rail track system.

    Fig.1 illustrates that the third rail is positive with respect to the rails. Ideally, all the current should return through the rails. But due to the resistances of running rails and insulation deterioration between running rails & track plinth/slab, there will be a portion of the return traction current that deviates from the intended path (i.e. running rails) called stray current. This current leaks from the rails to the structure (track plinth, deck and surrounding ground), and flows back into the rectifier negative bus through the running rails. Since the rectifier is insulated from the earth, so there is no other path for stray current to enter the negative bus of the rectifier.

    Fig.1 DC traction system

    The return traction current causes a longitudinal voltage drop along the rails. Although the rails are isolated from the main mass of earth, there is inevitably distributed leakage resistance causing a varying potential difference with respect to earth[9]. Thus, the region where current leaving the metallic object (running rails, structure reinforcement, etc.) is the anodic region. The below reaction indicates the oxidation of iron which leads to corrosion[10].

    Cathodic reaction:

    At the point where the stray current leaves the metal surfaces, an anodic reaction takes place at the metal/electrolyte, resulting in oxidation (dissolution) of the metal. The anodic reaction results in positive polarisation (positive potential shift) of the metal surface, and thus stray current can be identified by potential measurements.

    At the point where the stray current enters the metal surface the cathodic part of the reaction takes place at the metal/electrolyte interface. The cathodic reaction at the surface, where the current enters, generally lowers the corrosion rate.

    Regarding the anode consumption, the produced ions which tend to migrate away from the anode, may readily react with ions existing in the electrolyte to form an adherent film on the surface of the metal. Such a film can prevent further corrosion of the metal by restricting the access of the electrolyte to metallic ions. This is called passivation, which is observed on stainless steel or steel in concrete (under specific conditions) for instance.

    2 Design Criteria to Reduce Stray Current

    As per EN 50122-2[11], there are two important criteria in order to reduce corrosion and assess protection against it.

    2.1 Criterion 1: rail-to-earth conductance

    Fig.2 Basic stray current model

    For a double rail line the overall conductance limit must be multiplied by two. Furthermore, this value will change based on the average rail potential, such as calculated by electromechanical simulation, as a consequence of Equ.(2). The conductance limit remains effective during the entire system’s life cycle and must be met even after many years of operation, considering ageing of material, dust and other influences. Therefore, the initial limit value must be selected with sufficient margin and this is a point exposed to some discretion of the infrastructure owner: usual contractual values are in the range of 50 to 200W·km, corresponding to 0.005S/km to 0.04S/km[12-13].

    2.2 Criterion 2: potential shift of structure

    Besides conductance, the other relevant quantity subject to limit is the average potential shift between the structure and earth in the hour of highest traffic, not to exceed +200mV for steel in concrete stru- ctures[14]. This is illustrated in Fig.3.

    Fig.3 Average potential shift of structure

    2.3 Criterion 3: longitudinal voltage drop

    A similar criterion may be applied to the longitudinal voltage drop between any two points of the through-connected metal reinforced structure, such as viaducts or tunnels. Although a slightly different case from the potential shift previously considered, it is generally agreed the limit to be 200mV[11]in Fig.4.

    Fig.4 Longitudinal voltage drop of structure along line section

    3 Mitigations and Control Measures

    The mitigation measures can be arranged in four broad categories described in the following.

    3.1 Reducing the rail-return circuit resistance

    Three specific measures are used to decrease the resistance of the rail-return circuit.

    3.1.1 Increase rail size or cross-sectional area

    Stray current leakage is a result of the resistance relationship between the rail-to-earth return path and the running rail return path. A high resistance of the running rail negative return increases the voltage drop along the rails and, therefore, makes the rail-to-earth return circuit a more favorable path for the return current, thus causing stray current leakage.

    The size of the rail is internationally standardized and increasing the cross-sectional area for reducing stray currents is not an available option. Similarly, structural and dynamical exigencies dictate the sele- ction of rail hardness and other mechanical properties, within the same cross section, affecting significantly the DC resistance values[15]. The rail resistance is to be measured in accordance to annex A.1 of EN 50122-2.

    3.1.2 Improve track and rail cross bonding

    The second important measure to decrease the running rail resistance is to maintain a continuous electrical path for the negative current return. This is accomplished by using continuously welded rails, or by using welded cable bonds between discontinuous sections of the track. The objective must be to ensure that the longitudinal rail resistance is not increased by more than 5% by the rail joints[11].

    To achieve as low voltage drop as possible, running rails are welded, and rail-to-rail (RR) and track-to-track (TT) low-resistance bonds are provided at regular intervals. Typical interval for RR bonds is at every 150m (approx.) and for TT bonds is at every 300m (approx.). However, these distances are based on main factors such as headway, distance between traction substations, traction load, and others. Bonding must be compatible with the track circuit technology, if in use: metros are shifting consistently to CBTC (communication-based train control system) and other modern signaling systems based on balises and axle counters, tram lines have specific signaling technology, but railways still employ track circuits as an old reliable method including broken rail detection feature.

    In some cases, it is not possible to reduce rail potential using cross bonds due to high headway and large distance between traction substations. In this scenario, it is suggested to install a return cable bonded to track at regular intervals. The size of the return cable is governed by the limit of rail potential prescribed by section 9.2 of EN 50122-1[16], dis- cussed in a wider perspective in Ref.[12].

    3.1.3 Reduce distance between traction substations

    Short distance between two substations decreases the length of positive feeder and the negative return circuit, and thereby reducing the voltage drop and making stray current paths less favorable. Traction substations typically will coincide with a passenger station, which provides added benefit in reducing stray current, since the current requirements of the trains are highest during acceleration, but the running rails return circuit voltage drops are the smallest due to the short length of track.

    3.2 Increasing resistance of leakage path to earth

    Specific measures used to increase the leakage path resistance are discussed below.

    3.2.1 Maintaining an ungrounded negative return circuit

    First and foremost, to increase the resistance of leakage paths to earth an ungrounded traction power system must be used.

    Let us consider the case of insulated track, having a small uniform electrical conductance with the earth. In the case of a traction substation at one end and a train at the other, the major portion of traction current will flow through the running rails, and part will leak into the earth where rail potential is positive and will return to the rails where rail potential is negative. At equilibrium, the current entering will be equal to the current leaving and somewhere near the mid-point between train and traction substation the potential will be zero (“Pseudo earth”, see Fig.5a)[17].

    In case, the negative busbar is earthed at the traction sub-station end, while maintaining the remaining track floating. It is observed the running rail potential will increase to double the value as the curve will shift to the origin, where the traction substation is connected to earth, as shown in Fig.5b. This will lead to more current leakage; thus, it is advisable to keep the system ungrounded[18-20].

    However, to avoid impermissible touch voltage, voltage limiting devices shall be installed. Typically, they are installed at passenger stations where the probability of passenger entering the tracks is higher, including the contact with Platform Screen Doors[12].

    Fig.5 Diagram of rail potential profile

    3.2.2 Increasing the rail-to-earth resistance

    This is the most influencing variable for stray current leaving the tracks. Rail fastener insulation is important, so that, high rail-to-earth resistance is maintained. In theory, stray currents from an ungrounded system should be low, as long as rail is not earthed along the line. By increasing this resistance, the stray current path is less favorable than the running rail return path, resulting in less stray current. Track design shall utilize insulated track fasteners on concrete track plinths or track slabs.

    3.2.3 Isolating the yard track

    Tracks in depots and workshops are concentrated in a small area and no major voltage drop arises. However, one needs to deal with the most restrictive touch voltage limits (50/60V[11]) and the general attitude of pursuing such limits by extensive earthing of tracks.

    Sectioning and isolation of depot tracks results in smaller track sections for which selective earthing may be implemented (e.g. at workshops only), while increasing rail-to-earth resistance in other areas (that is beneficial for impact on infrastructure, such as building foundations, buried cables and reservoirs). Electrical isolation of depot track from the mainline track prevents the higher running rail voltages from being imposed on the depot track which are normally at lower voltages. The rectifier negative bus should be solidly bonded to the earth, to eliminate the hazard of high voltage developed between rails and earth. Fig.6 explains the typical arrangement of depot earthing.

    Fig.6 Depot earthing arrangement

    3.3 Stray current collection system

    Stray current collection system (SCCS) is aimed at catching as much stray current as possible to limit their propagation to the surrounding environment[21-22]. All reinforced track sections shall meet the corrosion criteria of 200mV maximum as per EN 50122-2 and EN 50162. This criterion is intended for the voltage taken between any two points of the track or structure reinforcement.

    There are two types of SCCS schemes, which have been adopted in various metro projects.

    3.3.1 Floating stray current collection system

    In this case, the track slab reinforcement is separated from the one of the substructures. Insulation layers shall thus be added to shear connectors bonding both structures as per Fig.7 and Fig.8[23]. This system ensures that the most stray current remains within the track slab. However, drawback of this arrangement is that in case one out of thousand shear connectors fails, that area will become hot spot and lead to corrosion over a longer period. Furthermore, it can affect the utilities running along the alignment.

    Fig.7 Floating SCCS

    Fig.8 Floating SCCS electric model

    In addition to the above insulation requirement, the reinforcement steel shall be longitudinally interconnected, so to form a mat that complies to the aforementioned corrosion criteria. Adequate measures must be deployed to ensure that bonds between adjacent plinths avoid being corroded by the atmospheric environment. This can be achieved by insulated cables, stainless or coated bare metal.

    If the reinforcement is discontinuous due to structural or construction reasons (expansion joints, turnouts if the slab reinforcement cannot be used), this discontinuity shall be bridged by at least two cable bonds (minimum 50mm2Cu each as a conductor in direct contact with rails) per track.

    SCCS of each running rail shall be laid within the trackwork and completely segregated from the running rails. They shall be also cross bonded every approximated 100m. The following Fig.9 illustrates on how to achieve such cross-bonds.

    At each above-mentioned interconnection between track slabs, the SCCS is made discontinuous, but bonded to a stray current collector cable (usually an insulated 70 mm2or larger) through disconnectable links. Such facilities allow possible isolation of local SCCS for stray current monitoring purposes. Fig.10illustrates the electrical arrangement.

    Fig.9 SCCS cross-bonding principles

    Fig.10 Floating SCCS interconnection

    A stray current cubicle is located in traction substation (TSS) to connect the reinforcement to the traction system negative bus through a diode and switch system. The so-called drainage function is aimed to collect stray current that flows along the SCCS when the latter is under corrosion risk. To achieve this drainage function, a dedicated manual switch must be closed: this operation should be taken as the last resort only, since it brings the potential of the traction return circuit to earth (in turn increasing the overall amount of stray current). The drainage function is illustrated in Fig.11.

    Fig.11 Drainage diode connection

    Stray current is not easy to measure accurately[13]. Indeed, it can temporarily leave the rail and came back to it without any control on its path and values. However, it remains possible to measure the part flowing along the SCCS up to the TSS by closing the switch of the stray current cubicle, transforming the system from isolated to diode drained.

    It is important to highlight that in case of floating SCCS, the structure earth cable (SEC), or parallel earth conductor (PEC), is separated from the stray current collector cable (SCCC). Fig.12 explains the typical cross-section of the viaduct with floating SCCS.

    Fig.12 Floating SCCS typical cross-section

    3.3.2 Earthed stray current collection system

    In this case, the track slab reinforcement is bonded to the substructure one, as shown in Fig.13 and Fig.14. The shear connectors are either wire lashed or welded (preferable). Although this provides a lower resistance path for a potentially larger stray current to flow, the design is such that the maximum longitudinal voltage drop between any two points is kept well below 200mV.

    Fig.13 Earthed SCCS

    While performing design calculations, it is preferable as a margin to take into consideration only the track slab rebars and SEC, or PEC. The SCCS is bonded then to both PECs and hence the earthing systems of passenger stations and depot buildings.

    Fig.14 Earthed SCCS electric model

    Where the reinforcement is made discontinuous for structural or construction reasons, this dis- continuity shall be bridged by at least two cable bonds (usually using 50mm2for homogeneity of requirement when connecting to rails[16]and in general satisfying at once also lightning protection constraints). Mats of different tracks are cross bonded every approx. 100m. They shall be laid within the trackwork and com- pletely segregated from the running rails. To further reduce the longitudinal resistance of the reinfor- cement, the interconnected track slab reinforcement shall be bonded to the SECs/PECs every 100m as shown in Fig.15.

    Fig.15 Earthed SCCS interconnection

    It is important to note that in case of earthed SCCS, there is no separate SCCC. Fig.16shows the typical cross-section of a viaduct with earthed SCCS.

    Fig.16 Earthed SCCS typical cross-section

    3.3.3 Sizing of stray current collection system

    In order to estimate the worst-case scenario, it’s assume that the stray current flow through track rebars and PEC/SCCS only. This approach is adopted to design both floating SCCS (see Fig.8) and earthed SCCS (see Fig.14). In this case considering the advantage of less resistance offered by deck reinforcements, cable trays, handrails and other metallic object running in parallel to the track reinforcement. A lower resistance path would in fact decrease the longitudinal voltage drop and help achieving the limit set by EN 50122-2[11].

    Typically, the worst case for highest average value of traction current will be in the section where the two traction substations are located farthest. To estimate the amount of stray current leakage, let us take a reference system with section length of 1km, train current 500A and rail-to-earth conductance for single track equal to 0.05S/km.

    To evaluate the longitudinal voltage drop for the section length to be within 200mV, let us assume the same value of current (1 000A), section length (1km) and rail-to-earth conductance (0.05S/km) as above. There are two possibilities for selecting rebars arrangement. In the first case (1), taking all the rebars that form the part of structure design of track slab as depicted in Fig.17. In this case at least one stirrup must be welded or wire lashed (ideally required for a length 20 times the rebar diameter) to connect to the external PEC.

    Fig.17 Case (1) cross-section

    In the other case (2), considering the dedicated stray current collection rebars for calculations, as reported in Fig.18, assuming the other reinforcement rebars sufficiently insulated.

    Fig.18 Case (2) cross-section

    Using the formula defined in annex C.2 of EN 50122-2.

    The results for different scenarios are shown below in Tab.1 and Tab.2.

    Tab.1 Us potential for cases (1) and (2), described in Fig.17 and Fig.18

    Tab.2. Us potential for improvements to case (1)

    While using the structure reinforcement of track as stray current collection rebars meets the requirement, whereas, in case providing dedicated stray current collection rebars, four rebars of 12mm diameter are needed along with structure reinfor- cement. As it is not possible to isolate dedicated stray current collection rebars structure reinforcement, thus, they can be avoided in case satisfing the criteria of 200mV.

    The other scenarios with high traction current and no dedicated stray current rebars are provided. In this case either adding rebars to meet the requirement or changing their cross-sectional area or both. The other possibility is to increase the PEC size, as shown in the Tab.2.

    3.4 Specific current-returning rail/cable

    Considering that running rails are not totally isolated from earth, stray current will leak into the earth when the running rails are the return path of traction current to the TSS negative bus. Therefore, by replacing the running rails return path with a specific current-returning rail/cable may solve stray current issue fundamentally[24]. Here, the current-returning rail/cable usually requires low longitudinal resistance for reducing rail potential, and a high rail-to-earth resistance to prevent stray current leakage.

    The current-returning rail/cable scheme includes typical implementation methods: fourth rail and power electronic solutions. The former requires modification of the train to introduce the traction current directly into the added rail instead of running rails. While the latter may transfer the traction current to added cable with power electronic equipment without modifying the train.

    Three typical current-returning rail/cable measures are introduced below.

    3.4.1 Fourth rail system

    Fig.19 shows the illustration of fourth rail system. Compared with the third rail configuration, a fourth rail is added to transfer traction current to sub- station[25]. The fourth rail can be mounted on high-insulation concrete sleepers to minimize the stray current leakage, but this is not possible for running rails which have to be seated on sleepers to carry the weight of trains. Therefore, without traction current on running rails and high insulation of fourth rail, the stray current issue of DC traction system may be solved fundamentally. But the fourth rail system requires the train modification and high cost; it’s only applied in a few lines, such as London Underground, Milan Metro Line 1, etc.

    Fig.19 Fourth rail system

    3.4.2 DC booster circuit traction power system

    The configuration of DC booster circuit traction power system is shown as Fig. 20. Compared with the third rail configuration, DC booster system adds multiple DC boosters and specific return cable[26-27]. Here, DC boosters transfer the traction current to the return cable, and then reduce the stray current and rail potential. However, each DC booster circuit in Ref.[26] consists of two DC inductor and eleven switches, which leads to high cost, large volume and complex control. Thus, the added DC boosters may be not applicable in narrow space, such as tunnel. Meanwhile, unlike the booster transformer in AC railways, DC booster has a certain window period due to the dead time of switches, and the traction current flows back to substation through running rails during the window period. Therefore, such limitations make DC booster traction system to be difficult implement and limited effect.

    Fig.20 DC booster circuit traction power system

    3.4.3 Negative resistance converter traction power system

    Fig.21 shows the typical configuration of negative resistance converter (NRC) traction power system[28-30]. Similarly, NRC traction power system adds NRCs and multiple switch units (SUs) compared with the third rail configuration. Here, NRC has fewer components (i.e. one DC inductor and four switches) compared with DC booster. Thus, NRC is recom- mended to be installed in traction substation, and SUs with small volume may be installed directly in tunnels. SUs operate according to the position of train, and NRC provides negative voltage to make up for voltage drop caused by current-returning feeder cable. Then the rail current only exists on the train-running section, and the rail currents of no-train sections are zero. Therefore, NRC system achieves the stray current and rail potential mitigation effectively. However, NRC system requires accurate position detection to ensure the correct operation of SUs, and it lacks of direct test on the running railway lines because of immature technology, then NRC system still needs the further research to ensure the safe operation.

    Fig.21 NRC traction power system

    3.5 Comparison of typical mitigation and control measures

    Based on the above stray current mitigation solutions, the performance comparison is shown as Tab.3. Here, the more stars (from 1 to 5), the higher effectiveness, cost, applicability and maturity, and the easier aging. Clearly, the traditional mitigation solutions generally have the high maturity, while the effectiveness is low and the aging is serious. And these solutions are mainly adopted during the construction of urban rail transit.

    Correspondingly, the maturity of the special current-return rail/cable is not high enough, but it has high and permanent effectiveness compared with the traditional solutions. And the special current-return rail/cable can be adopted both for the existing system and new lines during the construction, which leads to the high applicability in urban rail transit. Further- more, NRC traction power system also shows better application prospect in urban rail transit stray current mitigation for the higher effectiveness and low cost.

    Tab.3 Performance comprison of stray current mitigation solutions

    4 Conclusions

    Aiming at the stray current in urban rail transit, this paper studies the principle of stray current and its corrosion based on a simplified stray current model, and discusses the design criteria for stray current mitigation. Moreover, the stray current mitigation solutions are analyzed and discussed in detail. The results show that:

    1) The traditional stray current mitigation solutions should be implemented in strict accordance with the standards during the construction phase.

    2) If the traditional solutions are no longer suitable for the existing system, the stray current in the system can be further suppressed by adopting specific current-returning rail/cable.

    3) In such current-returning rail/cable scheme the traction current is transferred from the rail to the added rail/cable, which may solve the stray current issue fundamentally.

    4) NRC traction power system shows a good application prospect in existing system stray current mitigation with the advantages of high effectiveness and low cost.

    [1] Saud A M, Paul F. Stray current corrosion and mitigation: a synopsis of the technical methods used in DC transit systems[J]. IEEE Electrification Magazine, 2014, 2(3): 22-31.

    [2] Yang Xiaofeng, Xue Hao, Trillion Q Z. Stray current and rail potential dynamic simulation system based on bidirectional variable resistance module[J]. Transa- ctions of China Electrotechnical Society, 2019, 34(13): 2793-2805.

    [3] Alberto D, Federica F, Sonia L. Stray current effects mitigation in subway tunnels[J]. IEEE Transactions on Power Delivery, 2012, 27(4): 2304-2311.

    [4] Chen Zhipei, Dessi K, Klaas V B. A review on stray current-induced steel corrosion in infrastructure[J]. Corrosion Reviews, 2017, 35(6): 397-423.

    [5] Katarina V, Stjepan L, Marijana S. Corrosion and stray currents at urban track infrastructure[J]. Gradevinar (Journal of the Croatian Association of Civil Engineers). 2020, 72(7): 593-606.

    [6] Charalambos A C, Ian C, Pete A, et al. A holistic stray current assessment of bored tunnel sections of DC transit systems[J]. IEEE Transactions on Power Delivery, 2013, 28(2): 1048-1056.

    [7] Liu Sheng, Zhou Qi, Lin Xiaohong, et al. Infinitesimal method based calculation of metro stray current in multiple power supply sections[J]. IEEE Access, 2020, 8: 96581-96591.

    [8] Zakir A. Principles of corrosion engineering and corrosion control[M]. Oxford: Butterworth-Heinemann, 2006.

    [9] Du Guifu, Zhang Dongliang, Wang Chonglin, et al. Effect of traction current transmission among power sections on rail potential in DC mass transit system[J]. Transactions of China Electrotechnical Society, 2016, 31(11): 129-139.

    [10] Ian C, Charalambos A C, Pete A, et al. Stray current control in DC mass transit systems[J]. IEEE Transactions on Vehicular Technology, 2005, 54(2): 722-730.

    [11] EN 50122-2. Railway applications-fixed installations- electrical safety, earthing and the return circuit-part 2: provisions against the effects of stray currents caused by d.c. traction systems[S]. Brussels, 2010.

    [12] Andrea M. Electrical safety and stray current protection with platform screen doors in DC rapid transit[J]. IEEE Transactions on Transportation Electrification, 2021, 7(3): 1724-1732.

    [13] Andrea M. Stray current protection and monitoring systems: characteristic quantities, assessment of performance and verification[J]. Sensors, 2020, 20(22): 6610.

    [14] EN 50162. Protection against corrosion by stray current from direct current systems[S]. Brussels, 2004.

    [15] Andrea M. Impact of rail impedance intrinsic variability on railway system operation, EMC and safety[J]. International Journal of Electrical and Computer Engineering (IJECE), 2021, 11(1): 17-26.

    [16] EN 50122-1. Railway applications-fixed installations- electrical safety, earthing and the return circuit-part 1: protective provisions against electric shock[S]. Brussels, 2011.

    [17] Lowes F J. DC railways and the magnetic fields they produce-the geomagnetic context[J]. Earth, Planets and Space, 2009, 61: 1-15.

    [18] Dev P. DC stray current in rail transit systems and cathodic protection[J]. IEEE Industry Applications Magazine, 2016, 22(1): 818-824.

    [19] Chien H L, Chien J L. Assessment of grounding schemes on rail potential and stray currents in a DC transit system[J]. IEEE Transactions on Power Delivery, 2006, 21(4): 1941-1947.

    [20] Alamuti M M, Nouri H, Jamali S. Effects of earthing systems on stray current for corrosion and safety behaviour in practical metro systems[J]. IET Elec- trical Systems in Transportation, 2011, 1(2): 69-79.

    [21] Liu Wei, Li Tian, Jie Zheng, et al. Evaluation of the effect of stray current collection system in DC- electrified railway system[J]. IEEE Transactions on Vehicular Technology, 2021, 70(7): 6542-6553.

    [22] Du Guifu, Wang Jun, Jiang Xingxing, et al. Evaluation of rail potential and stray current with dynamic traction networks in multitrain subway systems[J]. IEEE Transactions on Transportation Electrification, 2020, 6(2): 784-796.

    [23] Jordi C, Jose S A, Joan R D. Modelled, simulation and design of collecting grid of stray currents in slab track in DC electrified railway systems[C]//IEEE International Conference on Electrical Systems for Aircraft, Railway, Ship Propulsion and Road Vehicles & International Transportation Electrification, Nottingham, UK, 2018: 1-7.

    [24] Wang Miao, Yang Xiaofeng, Trillion Q Z, et al. DC autotransformer-based traction power supply for urban transit rail potential and stray current mitiga- tion[J]. IEEE Transactions on Transportation Elec- trification, 2020, 6(2): 762-773.

    [25] Farah A A R, Mohd Z A A K, Miszaina O, et al. Review of the AC overhead wires, the DC third rail and the DC fourth rail transit lines: issues and challenges[J]. IEEE Access, 2020, 8: 213277-213295.

    [26] Reza F, Siamak F, Seyed S F. A new novel DC booster circuit to reduce stray current and rail potential in DC railways[C]//Compatibility and Power Electronics, Badajoz, Spain, 2009: 457-462.

    [27] Reza F, Siamak F. A new novel power electronic circuit to reduce stray current and rail potential in DC railway[C]//International Power Electronics and Motion Control Conference, Poznań, Poland, 2008: 1575-1580.

    [28] Jingda G, Xiaofeng Y, Trillion Q Z, et al. Negative resistance converter traction power system for reducing rail potential and stray current in the urban rail transit[J]. IEEE Transactions on Transportation Electrification, 2021, 7(1): 225-239.

    [29] Gu Zhan, Yang Xiaofeng, Jingda G, et al. Modeling of negative resistance converter traction power system[C]//IEEE Energy Conversion Congress and Exposition, Detroit, USA, 2020: 6367-6371.

    [30] Gu Jingda, Yang Xiaofeng, Trillion Q Z, et al. Rail potential and stray current on negative resistance converter traction power system under different grounding schemes and train conditions[J]. Transactions of China Electrotechnical Society, 2021, 36(8): 1703-1717.

    城市軌道交通雜散電流治理的綜述與評估

    Sahil Bhagat1楊曉峰2王 淼2Andrea Mariscotti3

    (1. 日立軌道信號與運(yùn)輸方案股份有限公司-阿布扎比 阿布扎比 41096 2. 北京交通大學(xué)電氣工程學(xué)院 北京 100044 3. 熱那亞大學(xué)海軍、電氣、電子和電信工程系 熱那亞 16145)

    雜散電流會造成電氣化交通系統(tǒng)附近金屬結(jié)構(gòu)腐蝕,該現(xiàn)象在普遍采用直流牽引供電的城市軌道交通中尤為突出。該文分別對城市軌道交通新建線路和運(yùn)營階段的現(xiàn)有線路的雜散電流治理和防護(hù)措施進(jìn)行討論。對設(shè)計(jì)階段的新建線路而言,可采用包括優(yōu)化牽引變電所位置、減小軌道縱向電阻、在道床中安裝雜散電流收集系統(tǒng)等措施。對處于運(yùn)營階段的現(xiàn)有線路而言,除了采取在走行軌上并聯(lián)線纜或走行軌間焊接均流線等以增大回流路徑截面積措施外,通過電力電子的靜止變換器(如負(fù)阻變換器等)控制回流路徑雜散電流的方法也是極具潛力的治理措施;上述單元可以部署在特定點(diǎn),以實(shí)現(xiàn)對軌道電位過高或出現(xiàn)初期腐蝕位置處的定點(diǎn)治理。

    城市軌道交通 雜散電流 腐蝕 雜散電流收集 雜散電流緩解 負(fù)阻變換器

    TM922

    10.19595/j.cnki.1000-6753.tces.210923

    This work is supported by the Key Program of National Natural Science Foundation of China (51737001).

    June 30, 2021;

    August 02, 2021.

    Sahil Bhagat male, born in 1991, Senior EMC Engineer at Hitachi Rail, Major research interests include grounding system design, DC stray currents, electromagnetic compatibility, and power system protection.E-mail: Sahil.Bhagat@hitachirail.com

    Xiaofeng Yang male, born in 1980, IEEE Senior Member, PhD, Major research interests include safety power supply in rail transit, high power energy conversion, wide band gap devices application.E-mail: xfyang@bjtu.edu.cn (Corresponding author)

    Andrea Mariscotti male born in 1968, IEEE Senior Member, PhD, Major research interests include electrical safety, stray current, electromagnetic compatibility and human exposure in electrified transports, measurement science and design of instrumentation.E-mail: andrea.mariscotti@unige.it (Corresponding author)

    (編輯 陳 誠)

    猜你喜歡
    熱那亞阿布扎比雜散
    輻射雜散騷擾測量不確定度的評定
    阿布扎比火烈鳥游客中心
    無線電發(fā)射設(shè)備雜散發(fā)射的測試方法探討
    基于FreeRTOS操作系統(tǒng)的地鐵雜散電流監(jiān)測系統(tǒng)
    天下
    圖記
    第12屆阿布扎比國際防務(wù)展掠影
    太空探索(2015年4期)2015-07-12 14:16:10
    城市軌道交通線路雜散電流監(jiān)測系統(tǒng)研究
    意大利熱那亞“哥倫布”故居
    航海(2013年1期)2013-03-27 06:01:56
    從西雅圖到熱那亞
    世界知識(2001年18期)2001-09-28 19:43:04
    日韩欧美一区视频在线观看 | 久久人人爽人人爽人人片va| 午夜福利网站1000一区二区三区| 国产伦精品一区二区三区四那| 国产成人a区在线观看| 亚洲国产精品成人久久小说| 卡戴珊不雅视频在线播放| 激情 狠狠 欧美| 一边亲一边摸免费视频| 精品一区二区免费观看| 亚洲国产精品sss在线观看| 边亲边吃奶的免费视频| 亚洲第一区二区三区不卡| 黄色一级大片看看| 国产日韩欧美在线精品| 精品一区二区三卡| 在现免费观看毛片| 国产黄片视频在线免费观看| 国产av不卡久久| 七月丁香在线播放| eeuss影院久久| 国产黄色免费在线视频| 中文天堂在线官网| 国产午夜福利久久久久久| 免费av不卡在线播放| 中文字幕av在线有码专区| 小蜜桃在线观看免费完整版高清| 日韩欧美一区视频在线观看 | 80岁老熟妇乱子伦牲交| 亚洲在线自拍视频| 精品一区二区三卡| 最近最新中文字幕大全电影3| 一级av片app| 色视频www国产| 国内精品宾馆在线| 插阴视频在线观看视频| 欧美激情在线99| 亚洲av福利一区| 九色成人免费人妻av| 日韩欧美三级三区| 久久久久精品久久久久真实原创| 免费高清在线观看视频在线观看| 三级国产精品欧美在线观看| 国产精品一区二区性色av| 麻豆久久精品国产亚洲av| 亚洲第一区二区三区不卡| 身体一侧抽搐| 亚洲国产高清在线一区二区三| 在线a可以看的网站| 夫妻性生交免费视频一级片| 国产精品一区二区三区四区免费观看| 伊人久久精品亚洲午夜| 少妇熟女aⅴ在线视频| 99久久九九国产精品国产免费| 久久久久免费精品人妻一区二区| 亚洲精品一二三| 午夜免费男女啪啪视频观看| 又黄又爽又刺激的免费视频.| 成人美女网站在线观看视频| 最近最新中文字幕大全电影3| av黄色大香蕉| 中文字幕免费在线视频6| 免费黄网站久久成人精品| 亚洲久久久久久中文字幕| 亚洲精品乱码久久久v下载方式| 色尼玛亚洲综合影院| 天堂影院成人在线观看| 美女被艹到高潮喷水动态| 80岁老熟妇乱子伦牲交| 秋霞伦理黄片| 欧美高清成人免费视频www| 国产成人一区二区在线| 99re6热这里在线精品视频| 特级一级黄色大片| 国产精品.久久久| av福利片在线观看| 大陆偷拍与自拍| 亚洲av日韩在线播放| 神马国产精品三级电影在线观看| 久久久午夜欧美精品| 久久国产乱子免费精品| av国产免费在线观看| 亚洲成人中文字幕在线播放| 日韩不卡一区二区三区视频在线| 99久久中文字幕三级久久日本| 国产欧美另类精品又又久久亚洲欧美| av又黄又爽大尺度在线免费看| 亚洲av福利一区| 嫩草影院精品99| 亚洲最大成人av| 综合色丁香网| 一二三四中文在线观看免费高清| 日韩欧美精品v在线| 永久免费av网站大全| 91久久精品电影网| 男人舔奶头视频| 久久国产乱子免费精品| 久久久久精品久久久久真实原创| 久久久成人免费电影| 欧美精品国产亚洲| 久久久精品94久久精品| 日本爱情动作片www.在线观看| av卡一久久| 国产亚洲精品久久久com| 国产人妻一区二区三区在| 秋霞在线观看毛片| 三级毛片av免费| 天堂俺去俺来也www色官网 | 久久久精品免费免费高清| 午夜视频国产福利| 久久精品国产亚洲av涩爱| 人体艺术视频欧美日本| 国产极品天堂在线| 草草在线视频免费看| 2018国产大陆天天弄谢| 色哟哟·www| 日本爱情动作片www.在线观看| 一区二区三区乱码不卡18| 成年人午夜在线观看视频 | 天堂影院成人在线观看| 青春草视频在线免费观看| 久久鲁丝午夜福利片| 永久网站在线| 街头女战士在线观看网站| 亚洲av.av天堂| 亚洲内射少妇av| 校园人妻丝袜中文字幕| 卡戴珊不雅视频在线播放| 成人性生交大片免费视频hd| 99热这里只有是精品在线观看| 久久久久久久国产电影| 小蜜桃在线观看免费完整版高清| 久久鲁丝午夜福利片| 亚洲av日韩在线播放| 精品人妻视频免费看| 精品久久久久久电影网| 成人特级av手机在线观看| 日本免费a在线| 午夜免费激情av| 国产一级毛片在线| 亚洲在线自拍视频| 少妇熟女aⅴ在线视频| 精品国产露脸久久av麻豆 | 国产国拍精品亚洲av在线观看| 中国国产av一级| 午夜免费激情av| 国产视频内射| 欧美成人精品欧美一级黄| 国产在视频线在精品| 成人欧美大片| 日韩,欧美,国产一区二区三区| 亚洲av日韩在线播放| 国产真实伦视频高清在线观看| 精品久久久久久电影网| 免费大片18禁| 一本久久精品| 日本黄色片子视频| 午夜久久久久精精品| 中国美白少妇内射xxxbb| 一个人看的www免费观看视频| 国产乱人视频| 久久精品夜夜夜夜夜久久蜜豆| 97超视频在线观看视频| 国产高清国产精品国产三级 | 国产伦在线观看视频一区| 一级毛片黄色毛片免费观看视频| 亚洲激情五月婷婷啪啪| 亚洲国产av新网站| 精品久久久久久久久av| 久久久精品94久久精品| 午夜福利在线观看吧| 国产成人aa在线观看| 亚洲人成网站在线播| 日本一本二区三区精品| 亚洲,欧美,日韩| av在线蜜桃| av免费观看日本| 有码 亚洲区| 国产综合精华液| 乱人视频在线观看| 深爱激情五月婷婷| 青春草亚洲视频在线观看| videossex国产| 麻豆精品久久久久久蜜桃| 伊人久久国产一区二区| 看黄色毛片网站| 99视频精品全部免费 在线| 亚洲国产精品sss在线观看| 黑人高潮一二区| 91在线精品国自产拍蜜月| 一区二区三区乱码不卡18| 午夜福利成人在线免费观看| 国产一区有黄有色的免费视频 | 熟女电影av网| 汤姆久久久久久久影院中文字幕 | 69人妻影院| 视频中文字幕在线观看| 少妇猛男粗大的猛烈进出视频 | 美女cb高潮喷水在线观看| 亚洲精品成人av观看孕妇| 狠狠精品人妻久久久久久综合| 久久这里有精品视频免费| 国产老妇女一区| 91aial.com中文字幕在线观看| 七月丁香在线播放| 日日干狠狠操夜夜爽| 日韩 亚洲 欧美在线| 观看免费一级毛片| 特级一级黄色大片| 亚洲精品自拍成人| 亚洲精品乱久久久久久| 免费观看无遮挡的男女| a级毛色黄片| 国产免费又黄又爽又色| 亚洲成色77777| 3wmmmm亚洲av在线观看| 麻豆国产97在线/欧美| 天天躁日日操中文字幕| 午夜精品国产一区二区电影 | 色播亚洲综合网| 亚洲国产精品成人久久小说| 成年av动漫网址| 久久亚洲国产成人精品v| 午夜福利在线观看免费完整高清在| 草草在线视频免费看| 两个人视频免费观看高清| 少妇人妻精品综合一区二区| 久久这里有精品视频免费| 亚洲成人av在线免费| 欧美日韩精品成人综合77777| 精品一区在线观看国产| 国产精品一区www在线观看| 日日啪夜夜爽| 少妇高潮的动态图| 美女大奶头视频| 日韩强制内射视频| 亚洲四区av| av线在线观看网站| 黄色一级大片看看| 91av网一区二区| 久久国产乱子免费精品| 天天躁夜夜躁狠狠久久av| 极品少妇高潮喷水抽搐| 男女下面进入的视频免费午夜| 色视频www国产| 亚洲av成人精品一二三区| 久久久成人免费电影| 听说在线观看完整版免费高清| 久久精品国产亚洲网站| 少妇的逼水好多| 亚洲精品亚洲一区二区| 精品久久久久久久久av| 18禁裸乳无遮挡免费网站照片| 蜜桃久久精品国产亚洲av| 久久久久国产网址| av播播在线观看一区| 嫩草影院精品99| 麻豆精品久久久久久蜜桃| 97超碰精品成人国产| 天天躁夜夜躁狠狠久久av| 97在线视频观看| 成人av在线播放网站| 一级毛片aaaaaa免费看小| 美女脱内裤让男人舔精品视频| 亚洲欧洲国产日韩| 嫩草影院新地址| 国产69精品久久久久777片| 97超碰精品成人国产| 亚洲精品乱码久久久久久按摩| 亚洲欧洲日产国产| 禁无遮挡网站| 欧美成人午夜免费资源| h日本视频在线播放| 亚洲欧美成人综合另类久久久| 午夜福利视频精品| 久久精品久久久久久久性| 午夜免费男女啪啪视频观看| 一区二区三区高清视频在线| 亚洲av.av天堂| 午夜老司机福利剧场| 99久久人妻综合| 国产精品.久久久| 婷婷色综合大香蕉| 久久综合国产亚洲精品| 少妇人妻精品综合一区二区| 亚洲人成网站在线观看播放| 亚洲av国产av综合av卡| 搡老乐熟女国产| 婷婷色av中文字幕| 女人久久www免费人成看片| 免费观看a级毛片全部| 男女视频在线观看网站免费| 乱码一卡2卡4卡精品| 精品国产露脸久久av麻豆 | 亚洲婷婷狠狠爱综合网| 18禁动态无遮挡网站| 久久精品国产亚洲av涩爱| 美女主播在线视频| 校园人妻丝袜中文字幕| 美女高潮的动态| 黄色配什么色好看| 亚洲av成人精品一二三区| 欧美成人a在线观看| 国产在线一区二区三区精| 国产av码专区亚洲av| 日韩制服骚丝袜av| 天美传媒精品一区二区| 亚洲美女搞黄在线观看| 久久久久久久久久久免费av| 精品一区二区免费观看| 春色校园在线视频观看| 国产免费又黄又爽又色| 国产乱人视频| 一个人免费在线观看电影| 中文字幕制服av| 免费av不卡在线播放| 热99在线观看视频| 久久精品久久精品一区二区三区| 秋霞在线观看毛片| 久久精品国产亚洲av涩爱| 搡女人真爽免费视频火全软件| 婷婷色综合www| 精品国内亚洲2022精品成人| 男女啪啪激烈高潮av片| a级毛片免费高清观看在线播放| 少妇人妻精品综合一区二区| 91狼人影院| 婷婷色综合大香蕉| 欧美成人a在线观看| 亚洲人成网站高清观看| 一区二区三区高清视频在线| 偷拍熟女少妇极品色| 午夜福利成人在线免费观看| 波野结衣二区三区在线| 黑人高潮一二区| 国产淫片久久久久久久久| 欧美日本视频| 五月伊人婷婷丁香| 性插视频无遮挡在线免费观看| 黄色欧美视频在线观看| freevideosex欧美| 啦啦啦中文免费视频观看日本| 日日啪夜夜爽| 久久热精品热| 青春草亚洲视频在线观看| 99热这里只有是精品在线观看| 九草在线视频观看| 色吧在线观看| 51国产日韩欧美| www.av在线官网国产| 我的女老师完整版在线观看| 久久精品夜色国产| 天天一区二区日本电影三级| 亚洲国产av新网站| 久久国内精品自在自线图片| 精品久久久久久久人妻蜜臀av| 欧美日韩精品成人综合77777| 高清欧美精品videossex| 天堂av国产一区二区熟女人妻| 中文欧美无线码| 日韩成人av中文字幕在线观看| 亚洲av在线观看美女高潮| 麻豆久久精品国产亚洲av| 成人漫画全彩无遮挡| 中文字幕免费在线视频6| 成年女人看的毛片在线观看| 激情五月婷婷亚洲| 欧美成人精品欧美一级黄| 老司机影院毛片| 麻豆国产97在线/欧美| 免费在线观看成人毛片| 不卡视频在线观看欧美| 婷婷六月久久综合丁香| 五月天丁香电影| 国产成人一区二区在线| 日韩不卡一区二区三区视频在线| 丝袜美腿在线中文| 免费黄频网站在线观看国产| 神马国产精品三级电影在线观看| 丝袜美腿在线中文| av黄色大香蕉| 日韩一本色道免费dvd| 视频中文字幕在线观看| 18禁动态无遮挡网站| 日本免费在线观看一区| a级毛片免费高清观看在线播放| 男人狂女人下面高潮的视频| 全区人妻精品视频| 少妇的逼好多水| 久久久久久久大尺度免费视频| 亚洲成色77777| 亚洲国产欧美人成| 亚洲av电影不卡..在线观看| 高清午夜精品一区二区三区| 97在线视频观看| 国产精品伦人一区二区| 成年女人看的毛片在线观看| 狂野欧美激情性xxxx在线观看| 亚洲av不卡在线观看| 一区二区三区高清视频在线| 国产黄色小视频在线观看| 亚洲在线观看片| 日本午夜av视频| 国产老妇伦熟女老妇高清| 中国美白少妇内射xxxbb| 婷婷六月久久综合丁香| 亚洲欧美中文字幕日韩二区| 久久精品国产亚洲av涩爱| 丰满人妻一区二区三区视频av| 久99久视频精品免费| 精品酒店卫生间| 色哟哟·www| 蜜桃久久精品国产亚洲av| 成人毛片a级毛片在线播放| 69人妻影院| 精品国内亚洲2022精品成人| 国产真实伦视频高清在线观看| 国产亚洲精品久久久com| 国内精品一区二区在线观看| 亚洲18禁久久av| 中文字幕亚洲精品专区| 天天躁夜夜躁狠狠久久av| 18禁在线无遮挡免费观看视频| 国产精品人妻久久久久久| 亚洲综合色惰| 天堂俺去俺来也www色官网 | 国产不卡一卡二| 亚洲欧美一区二区三区国产| 黄色配什么色好看| 国产亚洲午夜精品一区二区久久 | 内地一区二区视频在线| 麻豆久久精品国产亚洲av| 成人午夜高清在线视频| 欧美97在线视频| 少妇丰满av| 一级黄片播放器| 高清午夜精品一区二区三区| 国产精品女同一区二区软件| 免费少妇av软件| 婷婷色综合大香蕉| 男人爽女人下面视频在线观看| 黄色配什么色好看| 2018国产大陆天天弄谢| 欧美日韩亚洲高清精品| ponron亚洲| 91久久精品国产一区二区成人| 99久久精品一区二区三区| 久久久久精品久久久久真实原创| 三级毛片av免费| 国产熟女欧美一区二区| 嫩草影院新地址| 美女被艹到高潮喷水动态| 国产成人91sexporn| 99热6这里只有精品| av天堂中文字幕网| 综合色丁香网| 美女被艹到高潮喷水动态| 99久久中文字幕三级久久日本| 国产69精品久久久久777片| 日韩欧美 国产精品| 亚洲高清免费不卡视频| 久久久久免费精品人妻一区二区| av免费在线看不卡| 欧美 日韩 精品 国产| 精品一区二区免费观看| 99久久精品国产国产毛片| 啦啦啦韩国在线观看视频| 亚洲国产av新网站| 成人性生交大片免费视频hd| 亚洲国产精品专区欧美| 欧美日韩视频高清一区二区三区二| 国产成人a区在线观看| 精华霜和精华液先用哪个| 狂野欧美白嫩少妇大欣赏| 三级男女做爰猛烈吃奶摸视频| 久久综合国产亚洲精品| 国产淫语在线视频| 亚洲av男天堂| 如何舔出高潮| 在线观看av片永久免费下载| 亚洲四区av| 国产探花极品一区二区| 一级片'在线观看视频| 内地一区二区视频在线| 亚洲欧美日韩无卡精品| 精品人妻熟女av久视频| 色网站视频免费| 欧美zozozo另类| 中文资源天堂在线| 麻豆国产97在线/欧美| 精品久久久久久久久久久久久| 自拍偷自拍亚洲精品老妇| 久久精品夜色国产| 亚洲av日韩在线播放| 国产精品久久久久久av不卡| 亚洲无线观看免费| 成人特级av手机在线观看| 青春草视频在线免费观看| 久久久久久伊人网av| 欧美 日韩 精品 国产| 亚洲乱码一区二区免费版| 成年人午夜在线观看视频 | 九九久久精品国产亚洲av麻豆| 91精品国产九色| 久久99蜜桃精品久久| 国产美女午夜福利| 永久网站在线| 婷婷色综合www| 亚洲成色77777| 国产av国产精品国产| 精品少妇黑人巨大在线播放| av一本久久久久| 美女被艹到高潮喷水动态| 亚洲精品乱久久久久久| 中文在线观看免费www的网站| 26uuu在线亚洲综合色| 18禁动态无遮挡网站| 国产午夜精品久久久久久一区二区三区| 在线免费观看不下载黄p国产| 91久久精品电影网| 日本一二三区视频观看| 成人亚洲欧美一区二区av| 一二三四中文在线观看免费高清| 熟妇人妻久久中文字幕3abv| av在线天堂中文字幕| 看黄色毛片网站| 国产亚洲午夜精品一区二区久久 | 久久精品熟女亚洲av麻豆精品 | 亚洲av免费高清在线观看| 99视频精品全部免费 在线| 午夜福利视频精品| 白带黄色成豆腐渣| 日韩av在线大香蕉| 99re6热这里在线精品视频| 欧美一区二区亚洲| 人人妻人人看人人澡| 国产成人福利小说| 成人一区二区视频在线观看| 日韩欧美三级三区| 国产亚洲av片在线观看秒播厂 | 99久久精品国产国产毛片| 人体艺术视频欧美日本| av卡一久久| 三级经典国产精品| 在线观看免费高清a一片| 久久久久久久久久久免费av| 性插视频无遮挡在线免费观看| 色综合色国产| 一个人观看的视频www高清免费观看| 日韩,欧美,国产一区二区三区| 嫩草影院新地址| 国产一区二区三区综合在线观看 | 午夜爱爱视频在线播放| 国内精品美女久久久久久| 2021少妇久久久久久久久久久| 在线天堂最新版资源| 免费观看的影片在线观看| 欧美三级亚洲精品| 亚洲精品国产av成人精品| av天堂中文字幕网| 18禁裸乳无遮挡免费网站照片| 国产熟女欧美一区二区| 毛片女人毛片| 我的老师免费观看完整版| av女优亚洲男人天堂| 成人毛片a级毛片在线播放| 国产人妻一区二区三区在| 久久精品人妻少妇| 国产黄色视频一区二区在线观看| 久久热精品热| 亚洲精品第二区| 久久99蜜桃精品久久| 嘟嘟电影网在线观看| 免费播放大片免费观看视频在线观看| 欧美极品一区二区三区四区| 最新中文字幕久久久久| 日本三级黄在线观看| av免费在线看不卡| 免费少妇av软件| 色哟哟·www| 免费av观看视频| 美女xxoo啪啪120秒动态图| 伦精品一区二区三区| 国产黄片视频在线免费观看| 九草在线视频观看| 亚洲婷婷狠狠爱综合网| 欧美日韩一区二区视频在线观看视频在线 | 欧美 日韩 精品 国产| 免费播放大片免费观看视频在线观看| 别揉我奶头 嗯啊视频| 国产成年人精品一区二区| 啦啦啦韩国在线观看视频| 成人特级av手机在线观看| 国产伦理片在线播放av一区| av在线播放精品| 三级男女做爰猛烈吃奶摸视频| 大香蕉97超碰在线| 男的添女的下面高潮视频| 秋霞在线观看毛片| 深夜a级毛片| 亚洲精品第二区| 成人毛片60女人毛片免费| 国产中年淑女户外野战色| 国产真实伦视频高清在线观看| 欧美高清性xxxxhd video| 久久久久久久久久黄片| 国产伦精品一区二区三区四那| 最近视频中文字幕2019在线8| 国内精品一区二区在线观看| 午夜老司机福利剧场| 亚洲精品aⅴ在线观看| 久久99热6这里只有精品| 又大又黄又爽视频免费| 精品亚洲乱码少妇综合久久| 有码 亚洲区|