    Accident Analysis and Emergency Response Effect Research of the Deep Foundation Pit in Taiyuan Metro

    2020-09-23 02:39:24ZHANGXiaoshuang張曉雙FENGChaoHANYunshan韓云山ZHANGJun
    關鍵詞:云山

    ZHANG Xiaoshuang(張曉雙),FENG Chao(封 超), HAN Yunshan(韓云山),ZHANG Jun(張 軍)

    1 School of Science,North University of China,Taiyuan 030051,China2 Key Laboratory of Highway Construction and Maintenance Technology in Loess Region,Shanxi Trasnsportaion Research Institue,Taiyuan 030006,China

    Abstract: Taking the deep foundation pit accident occurring at a station of metro Line 2 in Taiyuan as an example,the influence of the seepage and inrush of the foundation pit on the retaining structure and surrounding environment were studied under the geological conditions of the confined aquifer on the east coast of Fenhe River. The causes of deep foundation pit accident were also analyzed systematically based on the monitoring data,and various emergency measures were proposed to control the occurrence of secondary accident for deep foundation pit. The results showed that the occurrence of inrush for foundation pit was mainly caused by the insufficient dewatering. The development of the accident was effectively controlled by the adding of the dewatering wells,local grouting of retaining structure to stop seepage,surface grouting to reinforcement and uplift soil. The successful experience can provide some guidance to the construction of similar projects in the proposal.

    Key words: metro station; deep foundation pit; inrush; seepage; grouting reinforcement

    Introduction

    With the rapid development of national urban construction,deep foundation pits of urban metro keeps emerging. At present,most underground engineering problems are closely related to groundwater characteristics. The water head difference between the inside and outside of a foundation pit would induce seepage in the high ground water table,which had significant influence on excavation engineering. In order to prevent engineering accidents caused by underground water,such as water inrush,quicksand,piping,land subsidence,collapse,building cracks,broken pipes,and failure of the retaining structure,it is necessary to pay attention to the problem of underground water and formulate the solution measures in time.

    Aiming at the groundwater problem in foundation pit engineering,the researchers used a variety of methods to conduct the study,such as model test[1],numerical modeling[2-3]and case analysis[4]. The lowering of the groundwater level outside the pit can lead to ground subsidence,affecting the stability of surrounding buildings[5-6]. The effect of the pre-excavation dewatering on the retaining walls and soil in the foundation pit was deeply studied,indicating that time effect and size effect were two features of dewatering-induced deformation[7-8]. In order to minimize dewatering-induced ground settlements in deep excavation,the artificial recharge method is adopted,which can compensate the drawdown by injecting the water into the aquifer[9-10]. Zengetal.[11-13]proposed a method referred to as the combined recharge concluding the artificial recharge wells and traditional recharge wells,and response of deep soils during combined recharge and the influence of opening timing of recharge wells on settlement were also studied. However,the insufficient of dewatering groundwater level can also lead to the happen of accident. Hence,the drawdown of the groundwater outside the foundation pit must be strictly controlled. A 32.55 m deep circular foundation pit was selected as an example to study the dewatering scheme under potential leakage conditions[14]. Field experiments and numerical simulations were performed to determine potential leakage risks,and water inrush and piping were successfully controlled by pre-installed pumping wells. Considering the different hydrogeological conditions of each area of the foundation pit near the Yangtze River,a 3D numerical simulation was adopted to evaluate the effect of the dewatering schemes,and the optimal dewatering scheme was proposed according to the simulation results[15]. In addition,the stability calculation method of foundation pit inrush was also studied[16-17].

    A certain thickness of silt sand and middle sand with good permeability exist in the soil of Taiyuan. Under the strong permeation of groundwater,soil particles are easy to move and lose in the formed pore channel,and the permeation volume also increases sharply,which increases the difficulty of excavation and precipitation. The inrush induced by permeation occurs easily,resulting in the gushing of water and sand,the damage of foundation pit and the collapse of ground surface.

    This study focuses on the influence of the inrush and seepage on retaining structure and surrounding environment based on a foundation pit accident of Taiyuan metro Line 2 station. The reasons of the accident are also analyzed and a variety of emergency measures are proposed to prevent the occurrence of secondary disasters. This case provides certain guidance for other similar metro foundation pits.

    1 Background Introduction of the Case

    The station is located in the outskirts of Taiyuan,which is close to the farmland in the northwest side and the old shooting range in the northeast side,as shown in Fig. 1. The total length,width and excavation depth of the station are 307.550,21.600 and 19.042 m,respectively,among which the width of the north end side is 25.7 m specially. The station of “island-style,double-storey,double-pillar and three-span” box frame structure is constructed by means of open-cut excavation method. The soil mechanical parameters of north end side can be seen in Table 1.

    Fig. 1 Station layout plan

    Table 1 Soil mechanical parameters

    The groundwater at the station site is located in phreatic aquifers or micro-confined aquifers. The micro-confined aquifer mainly exists in ③5silty fine sands (shown in Fig. 2). The groundwater level of phreatic aquifer is 1.6-4.3 m below the ground surface,and the fluctuation of level is general ±(1-2) m. The phreatic aquifer is susceptible to atmospheric precipitation and human activities due to its shallow location and small flow.

    Fig. 2 Geological section of north end side of foundation pit

    (a) Foundation pit supporting plan

    (b) Supporting layout of seepage point of foundation pit

    2 Overview and Impact of the Foundation Pit Accident

    2.1 Overview of the foundation pit accident

    At 9∶00 a.m. on March 31,2017,as shown in Fig. 3,the third support at the north end side had been installed,and the excavation depth was about 17.89 m,which was only 0.57 m away from the fourth support. Suddenly,large amount of water mixing with soil seeped from the waterproof wall,which was slightly above the position of the third support [S1,shown in Fig. 3 and Fig. 4(a)]. At the same time,two inrush points located at the excavation surface of north end side begun to pour water with small flow rate [T1 and T2,shown in Fig. 4(b)]. At 12∶00 a.m. on April 1,the diameter of the seepage point expanded significantly,resulting in the increasing of the soil loss. For the inrush points,the water flow of the T1 and T2 increased gradually and the third inrush point appeared,indicating the engineering risks rose step by step. By 3∶00 p.m. on April 1,the water accumulation induced by the inrush in the foundation pit had become very serious,as shown in Fig. 5.

    (a) Seepage point

    Fig. 5 Water accumulation in foundation pit

    2.2 Impact of the foundation pit accident

    2.2.1Settlementofthegroundsurface

    Field monitoring data analysis is an important measure to ensure the safety of deep foundation pit and surrounding environment. The layout of monitoring points on the north end side of foundation pit is shown in Fig. 6,which mainly contains the displacement of ground surface,horizontal displacement on the top of wall and observation well.

    Fig. 6 Plane view of the instrumentation layout on the north end side of foundation pit

    The displacement of ground surface around the foundation pit is shown in Fig. 7.

    (a) Monitoring points adjacent to the foundation pit

    (b) Monitoring points away from the foundation pit

    The displacement of the monitoring points of DBC38-1,DBC39-1 and DBC40-1 adjacent to the foundation pit occurred a certain degree of uplift,and the differences between the values were small when the monitoring time was the same. For the same monitoring point,the variation rate increased significantly from about 2 mm/d on April 1 to about 6 mm/d on April 2,which exceeded the warning value of 3 mm/d. By contrast,the displacement of the monitoring points of DBC38-2,DBC39-2 and DBC40-2 away from the foundation pit showed a certain degree of settlement. On March 31,the settlement of the monitoring points of DBC38-2,DBC39-2 and DBC40-2 was small,but the settlement rose significantly on April 1 and the increment of settlement was significant larger when the monitoring point was closer to the seepage location. Specifically,the value and variation rate of settlement for DBC39-2 reached up to 102.7 mm and 92.4 mm/d,respectively,which both vastly exceeded the warning values. The gushing of water and soil at seepage point was continuously intensified and the excavation speed was accelerated by contractor to install the fourth steel support as soon as possible,resulting in the faster unload of foundation pit,increasing the disturbance of the envelope and raising the deformation. Until April 2,the settlement was still increasing,but at a slower rate than that on April 1. The excessive settlement around the seepage and inrush points leaded to an obvious crack with about 5 m long and 3 mm wide on the ground surface,which was 1 m away from the edge of foundation pit on the north end side,as shown in Fig. 8.

    Fig. 8 Crack on the ground surface

    2.2.2Deformationoftheretainingstructure

    The deformation of retaining structure is shown in Fig.9. The deformation of retaining structure for the monitoring point of ZQT38 far away from the seepage and inrush points was small at the early stage of the case,which showed a spoon shape. The maximum deformation was only 11.7 mm and located near the third support (seepage point). With the increase of seepage and water inflow,the retaining structure on the top moved to the outside of foundation pit and the deformation increased gradually,resulting in the uplift of the ground surface adjacent to the foundation pit (shown in Fig.7). The deformation of retaining structure on the top was up to -15.6 mm by April 2. This was because the seepage leaded to the decrease of water and soil pressure,and then the retaining structure was inclined to some extent,resulting in the upheaval for the monitoring point [shown in Fig. 7(a)]. On April 1,significant displacement occurred in the middle of the retaining structure into the foundation pit,with a change rate as high as 28.8 mm/d. Then on April 2,the displacement continued to increase,reaching a maximum value of 43.5 mm,and the position remained unchanged,but the change rate significantly decreased. The deformation of retaining structure on the bottom remained unchanged except occurring movement of about 10.2 mm toward the inside of foundation pit on April 1,which was mainly due to the inrush at the bottom of foundation pit,resulting in the destruction of soil and reduction of soil strength.

    The deformation of retaining structure for the monitoring point of ZQT39 near the seepage and inrush points was similar to that of the monitoring point of ZQT38. Distinctively,the change rate of deformation in the middle of the retaining structure was very large on April 2,with the maximum value as high as 19.7 mm/d,and the location of the maximum value gradually shifted downward. This was due to the influence of the soil loss and soil structure damage caused by seepage and inrush on the monitoring point of ZQT39. It’s worth noting that the deformation for the monitoring points of both ZQT38 and ZQT39 exceeded the warning and control values.

    (a) Monitoring point of ZQT38

    (b) Monitoring point of ZQT39

    3 Analysis on the Reasons of Accident

    The layout of dewatering well on the north end side of foundation pit in the construction scheme is shown in Fig. 10,containing two observation wells (G1 and G2),three depressurized dewatering wells (J1,J2 and J3) and three drainage dewatering wells (S1,S2 and S3). However,the actual configuration of wells were completely inconsistent with the requirements,only containing two observation wells (G1 and G2),one depressurized dewatering well (J2) and two drainage dewatering wells (S1 and S2),and the J2 was damaged only two days after it was put into use. The result was that the actual observed water level only decreased 2.00 m,which were far smaller than the requirement of 11.70 m for ③5fine sand layer in the dewatering safety special construction scheme of foundation pit. The water level was complete inconformity with the conditions of foundation pit excavation,and the high water pressure made the retaining structure easy to seepage.

    Fig. 10 Layout of dewatering well on the north end side of foundation pit

    According to the current standard[18],the inrush stability analysis of foundation pit mainly considered the weight of soil above the confined aquifer and below excavation position to resist the water pressure in the confined aquifer. The calculation formula is

    (1)

    whereγandγware the unit weights of soil and water,respectively,kN/m3;Dis the soil width above the confined aquifer and below excavation position,m (shown in Fig. 11);hwis the height of confined water head,m;Fis safety coefficient;Fsis critical safety coefficient,1.1-1.3.

    The safety coefficients of inrush stability of foundation pit with different excavation depths are calculated and shown in Table 2. The safety coefficients of inrush stability decreased significantly with the increase of the excavation depth. The safety coefficients of inrush stability already reached the critical value of 1.1 when the excavation depth was 12.44 m,which meant that the confined water head needed to be lowered in time to prevent the accident of inrush of foundation pit. It was a pity that the safety coefficient of inrush stability was only 0.65 when the accident occurred based on the survey report and construction log.

    Fig. 11 Schematic diagram of inrush stability analysis

    Table 2 Safety coefficients of inrush stability

    In addition,the design scheme required that the additional loading and soil storage were not allowed within 10 m of the foundation pit during the excavation and construction of structure,and the construction additional loading beyond 10 m of the foundation pit should be controlled to be no more than 10 kN/m2. However,before the accident,a large amount of steel supports and heavy construction equipment were piled up at the 5 m edge of foundation pit on the north side for a long time,which increased the accumulated surface settlement.

    Finally,the contractor stacked the inrush point used sand and stone at the initial stage of the accident,and accelerated the excavation speed to install the fourth steel support at the same time,leading to the emergence of the third inrush point,further increasing the unloading effect and causing further deterioration of the accident.

    4 Disposal Measures and Effects of Accident

    4.1 Disposal measures of accident

    After the accident,the contractor took the following emergency measures to control the further development of the accident (shown in Fig. 12).

    On April 2,in view of the problem of the high water level induced by insufficient number of dewatering wells,one drainage dewatering well (S3) was added in foundation pit on the north end side,two depressurized dewatering wells (J1 and J3) were added outside the foundation pit,and at the same time,the damaged depressurized dewatering well (J2) was repaired according to the dewatering scheme. In addition,the filter pipe of the depressurized dewatering wells outside the foundation pit was buried of 34 m depth and located in the confined aquifer,so as to reduce the underground water level and improve the inrush stability of the foundation pit.

    On April 6,aiming at the problem of seepage,the grouting near the seepage point after the pile was adopted by constructor in order to form a closed waterproof wall from outside to seal the seepage point and reduce the flow rate of water and sand. At the same time,grouting also reinforced the soil near the seepage point and improved the strength of the soil.

    On April 10,in order to solve the problem of excessive surface settlement,the constructors adopted the double-fluid grouting method to reinforce the soil around the seepage point. The reinforcement depth was from the surface of the foundation pit to the excavation surface,and the reinforcement plane dimension was 7 m from east to west of the north end side,and 20 m from south to north. On April 15,no abnormality was found within 3 h after the completion of grouting,and the uplift of ground surface caused by grouting was about 15 mm,indicating the good grouting effect.

    Fig. 12 Construction schedule of the excavation

    4.2 Disposal effects of accident

    After nearly half a month of treatment and repair,the construction was resumed on April 17,and successfully excavated to the bottom at the north end side of the foundation pit on April 20. Subsequently,the floor cushion and waterproof construction were completed on April 30.

    The displacement of ground surface around the foundation pit after the disposal of the accident is shown in Fig. 13. As shown in Fig. 13,after taking the measures on April 2,the displacement of the monitoring points DBC38-1 and DBC39-1 adjacent to the foundation pit changed little,while the displacement of the monitoring point DBC40-1 first decreased significantly and then gradually increased,which was mainly affected by the grouting effect. The displacement of the monitoring points DBC38-2 and DBC40-2 far from the foundation pit also changed little and gradually tended to be stable. However,as the monitoring point DBC39-2 was the closest to the seepage point,it was difficult to control the settlement in a short period of time. On April 12,the settlement was still increasing,and then gradually recovered with the implementation of grouting and precipitation measures,indicating that the treatment measures of the accident had a significant effect.

    (a) Monitoring points adjacent to the foundation pit

    (b) Monitoring points adjacent to the foundation pit

    The deformation of retaining structure after the disposal of the accident is shown in Fig. 14. As can be seen from Fig. 14,after the treatment measures were taken on April 2,the horizontal deformation of the retaining structure gradually stabilized and slightly decreased due to the dewatering outside the retaining structure,proving that grouting could effectively reduce the horizontal displacement. This phenomenon was consistent with the experimental results reported by Zhengetal.[19]On May 1,the water level of the observation dewatering well had dropped to -14 m,which significantly reduced the water pressure acting on the retaining structure,resulting that the displacement of the retaining structure to the inside of the foundation pit was recovered.

    (b) Monitoring point of ZQT39

    To sum up,the accident disposal measures have a good effect and the project can be successfully completed.

    5 Conclusions

    This paper focuses on the influence of the inrush and seepage on retaining structure and surrounding environment based on a foundation pit accident of Taiyuan metro. The reasons of the accident are also analyzed and a variety of emergency measures are also proposed. The following conclusions can be drawn based on this research.

    (1) The occurrence of inrush for foundation pit was the mainly caused by the insufficient dewatering. Hence,corresponding dewatering measures must be taken in areas with high water level.

    (2) The displacement of ground surface adjacent to the foundation pit showed a certain degree of uplift,which was contrary to that of ground surface away from the foundation pit,and the settlement of ground surface closed to the seepage location was significant large caused by the loss of water and soil.

    (3) The deformation of retaining structure showed a spoon shape,and the retaining structure on the top moved to the outside of foundation pit compared to the inside deformation of other positions. The maximum deformation of retaining structure located near the seepage point,and remained unchanged for the monitoring point far away from the seepage and inrush points,but gradually shifted downward for the monitoring point near the seepage and inrush points.

    (4) The development of the accident was effectively controlled by the adding of the dewatering wells,local grouting of retaining structure to stop seepage,surface grouting to reinforcement and uplift soil,and so on,which could provide some guidance for related engineering accidents.

    猜你喜歡
    云山
    云山圖
    金秋(2020年16期)2020-12-09 01:41:48
    云山梅詠
    云山萬重歸故鄉(xiāng),疾風千里嘆離愁
    學生天地(2020年18期)2020-08-25 09:29:22
    Yunshan Mountain
    云山廣西辦公室
    張大千 《潑墨云山》:巔峰巨制
    藝術品鑒(2019年10期)2019-11-25 07:09:56
    云山燕幾 寸石須彌
    寶藏(2018年1期)2018-04-18 07:39:38
    云山的樹
    中學語文(2017年25期)2017-01-29 01:12:10
    愛別離
    小小說月刊(2016年8期)2016-08-11 16:16:03
    愛別離
    小說月刊(2016年5期)2016-05-06 16:53:30
    亚洲精品国产av成人精品| 插逼视频在线观看| 久久国产乱子免费精品| 综合色丁香网| 欧美3d第一页| 蜜桃在线观看..| 午夜福利网站1000一区二区三区| 亚洲av.av天堂| 啦啦啦视频在线资源免费观看| 韩国高清视频一区二区三区| 国产伦在线观看视频一区| 永久免费av网站大全| 日韩精品有码人妻一区| 国产欧美另类精品又又久久亚洲欧美| 日韩精品有码人妻一区| 蜜臀久久99精品久久宅男| 91精品一卡2卡3卡4卡| 久热久热在线精品观看| 美女cb高潮喷水在线观看| 水蜜桃什么品种好| 久久人人爽人人片av| 亚洲欧美中文字幕日韩二区| 水蜜桃什么品种好| 亚洲高清免费不卡视频| 国国产精品蜜臀av免费| 99热网站在线观看| 亚洲伊人久久精品综合| 国产精品偷伦视频观看了| 亚洲精品久久久久久婷婷小说| 美女大奶头黄色视频| 天天躁夜夜躁狠狠久久av| 亚洲精品,欧美精品| 五月伊人婷婷丁香| 99久久精品热视频| 啦啦啦在线观看免费高清www| 亚洲精品国产成人久久av| 久久久久久久精品精品| 一级毛片我不卡| 国产黄色视频一区二区在线观看| 一级av片app| 欧美成人精品欧美一级黄| 亚洲欧美一区二区三区国产| 女性被躁到高潮视频| 18禁在线无遮挡免费观看视频| 久久韩国三级中文字幕| 久久韩国三级中文字幕| 人妻人人澡人人爽人人| 欧美日韩av久久| 狂野欧美白嫩少妇大欣赏| 日韩一区二区三区影片| 国产精品久久久久久久久免| 国产亚洲av片在线观看秒播厂| 不卡视频在线观看欧美| 视频区图区小说| 国精品久久久久久国模美| 亚洲成人一二三区av| a级片在线免费高清观看视频| a级毛片在线看网站| 高清av免费在线| 99久国产av精品国产电影| 在线观看人妻少妇| 亚洲国产精品一区二区三区在线| 丰满乱子伦码专区| 建设人人有责人人尽责人人享有的| 久久久精品免费免费高清| 人妻夜夜爽99麻豆av| 大码成人一级视频| 国产老妇伦熟女老妇高清| 国产精品三级大全| 久久精品夜色国产| 久久久久久久久久成人| 国产一区二区在线观看av| 亚洲高清免费不卡视频| av在线老鸭窝| 男女边摸边吃奶| 丰满乱子伦码专区| 99热全是精品| 看十八女毛片水多多多| 久久久久精品久久久久真实原创| 精品少妇内射三级| 乱码一卡2卡4卡精品| 高清午夜精品一区二区三区| 自拍欧美九色日韩亚洲蝌蚪91 | 亚洲久久久国产精品| 国产一区二区三区av在线| 日韩成人av中文字幕在线观看| 国产亚洲一区二区精品| 久久久久久久久久久免费av| 亚洲一级一片aⅴ在线观看| 一本大道久久a久久精品| 黄色欧美视频在线观看| 亚洲精品亚洲一区二区| 国精品久久久久久国模美| 亚洲不卡免费看| 最近中文字幕2019免费版| 女人精品久久久久毛片| 国产黄色视频一区二区在线观看| 人妻制服诱惑在线中文字幕| 桃花免费在线播放| 亚洲精品日本国产第一区| av专区在线播放| 男人舔奶头视频| 成人特级av手机在线观看| 久久99热6这里只有精品| 欧美人与善性xxx| 99热国产这里只有精品6| 大片免费播放器 马上看| 十八禁高潮呻吟视频 | 亚洲欧美一区二区三区国产| 免费大片黄手机在线观看| 精品国产一区二区久久| 久久久久网色| 亚洲在久久综合| 欧美bdsm另类| 精品久久久精品久久久| av视频免费观看在线观看| 中文欧美无线码| 日韩成人av中文字幕在线观看| 国产爽快片一区二区三区| 在线天堂最新版资源| 午夜激情久久久久久久| 亚洲国产欧美日韩在线播放 | 麻豆成人午夜福利视频| 99国产精品免费福利视频| 成人国产麻豆网| 能在线免费看毛片的网站| 日本欧美视频一区| 久久久亚洲精品成人影院| 一级毛片久久久久久久久女| 免费黄频网站在线观看国产| 日韩av不卡免费在线播放| 久久人人爽av亚洲精品天堂| 丁香六月天网| 美女大奶头黄色视频| 偷拍熟女少妇极品色| 熟妇人妻不卡中文字幕| 中文天堂在线官网| 国产高清有码在线观看视频| 久久狼人影院| 国产一区二区在线观看日韩| 欧美日韩av久久| 欧美激情国产日韩精品一区| 国产精品人妻久久久影院| 国产美女午夜福利| 女人久久www免费人成看片| 少妇人妻久久综合中文| 免费黄色在线免费观看| 成人亚洲精品一区在线观看| 五月玫瑰六月丁香| 女的被弄到高潮叫床怎么办| 人妻夜夜爽99麻豆av| 成人漫画全彩无遮挡| 国产欧美日韩一区二区三区在线 | 免费不卡的大黄色大毛片视频在线观看| 曰老女人黄片| 国产黄片美女视频| 久久午夜综合久久蜜桃| 国产色爽女视频免费观看| 亚洲精品乱码久久久久久按摩| 在线观看美女被高潮喷水网站| 特大巨黑吊av在线直播| 欧美精品人与动牲交sv欧美| 美女福利国产在线| 97超碰精品成人国产| 国内揄拍国产精品人妻在线| 狂野欧美白嫩少妇大欣赏| 九草在线视频观看| 欧美另类一区| 精品人妻一区二区三区麻豆| freevideosex欧美| 一本久久精品| 亚洲欧美日韩东京热| 桃花免费在线播放| 嘟嘟电影网在线观看| 插逼视频在线观看| 最近中文字幕高清免费大全6| 精品人妻一区二区三区麻豆| 深夜a级毛片| 一区二区三区免费毛片| 午夜福利,免费看| 亚洲美女视频黄频| 三级国产精品片| 黄色日韩在线| 国产亚洲午夜精品一区二区久久| 亚洲精品一区蜜桃| 日韩av在线免费看完整版不卡| 高清不卡的av网站| 久久久欧美国产精品| 久久久久精品久久久久真实原创| 少妇熟女欧美另类| 熟女电影av网| 国产黄片视频在线免费观看| 日韩欧美一区视频在线观看 | 成人美女网站在线观看视频| 国产精品无大码| 免费观看的影片在线观看| 国产伦理片在线播放av一区| 国产成人精品婷婷| 亚洲精品乱码久久久v下载方式| 午夜福利网站1000一区二区三区| 久久午夜福利片| 久久这里有精品视频免费| 日韩中字成人| 人妻系列 视频| 美女脱内裤让男人舔精品视频| 成人特级av手机在线观看| 亚洲不卡免费看| 91午夜精品亚洲一区二区三区| 美女福利国产在线| av视频免费观看在线观看| 亚洲av成人精品一二三区| 亚洲欧美一区二区三区国产| 亚洲第一区二区三区不卡| 一级毛片久久久久久久久女| 人妻 亚洲 视频| 99热国产这里只有精品6| 黄色视频在线播放观看不卡| 哪个播放器可以免费观看大片| 大片免费播放器 马上看| 午夜视频国产福利| www.色视频.com| 久久99热6这里只有精品| 你懂的网址亚洲精品在线观看| 精品一区在线观看国产| 成年av动漫网址| 男女边摸边吃奶| 99九九在线精品视频 | 美女内射精品一级片tv| 国产伦在线观看视频一区| av又黄又爽大尺度在线免费看| 国产无遮挡羞羞视频在线观看| 欧美xxⅹ黑人| av国产久精品久网站免费入址| 国产精品人妻久久久久久| 七月丁香在线播放| 成年av动漫网址| 中文天堂在线官网| 免费观看的影片在线观看| 国产在线视频一区二区| 久久久久人妻精品一区果冻| 久久精品熟女亚洲av麻豆精品| 日韩中字成人| 国产无遮挡羞羞视频在线观看| 久久99一区二区三区| 久久国产亚洲av麻豆专区| 人妻 亚洲 视频| 99热网站在线观看| 九九爱精品视频在线观看| 国产极品天堂在线| 老司机影院成人| 国产在线免费精品| 9色porny在线观看| 人妻 亚洲 视频| 日日撸夜夜添| 成年av动漫网址| 汤姆久久久久久久影院中文字幕| 人妻少妇偷人精品九色| 天堂中文最新版在线下载| 国产高清有码在线观看视频| 国产伦在线观看视频一区| 国产国拍精品亚洲av在线观看| 久久久久久人妻| 婷婷色麻豆天堂久久| 国产亚洲精品久久久com| 亚洲在久久综合| 国产精品三级大全| 男人添女人高潮全过程视频| 爱豆传媒免费全集在线观看| 99久久人妻综合| 91aial.com中文字幕在线观看| 国产片特级美女逼逼视频| 久久久久久久久久久免费av| 亚洲,一卡二卡三卡| 亚洲人成网站在线观看播放| 少妇的逼好多水| 老熟女久久久| 国产极品粉嫩免费观看在线 | 亚洲精品乱码久久久v下载方式| 只有这里有精品99| 国产精品99久久99久久久不卡 | 国产精品国产三级国产av玫瑰| 嘟嘟电影网在线观看| 亚洲激情五月婷婷啪啪| 2021少妇久久久久久久久久久| 女性生殖器流出的白浆| av国产精品久久久久影院| 国产在线男女| 一级a做视频免费观看| 中文在线观看免费www的网站| 美女主播在线视频| 久热久热在线精品观看| 亚洲精品亚洲一区二区| 欧美xxxx性猛交bbbb| 欧美三级亚洲精品| 久久午夜福利片| 男人添女人高潮全过程视频| 国产黄频视频在线观看| 一级毛片黄色毛片免费观看视频| .国产精品久久| 2018国产大陆天天弄谢| 另类精品久久| 国产高清不卡午夜福利| 日韩av免费高清视频| 三级国产精品片| 最近中文字幕2019免费版| 有码 亚洲区| 久久久久久久大尺度免费视频| 天天操日日干夜夜撸| 91久久精品国产一区二区成人| 亚洲三级黄色毛片| 日本色播在线视频| 精品久久久精品久久久| 免费看不卡的av| 成人国产麻豆网| 午夜激情福利司机影院| 夫妻性生交免费视频一级片| 午夜久久久在线观看| 亚洲av不卡在线观看| 在线精品无人区一区二区三| 欧美bdsm另类| 麻豆成人午夜福利视频| 精品人妻熟女毛片av久久网站| 成人国产av品久久久| 国产精品伦人一区二区| 九九在线视频观看精品| 欧美另类一区| 国产69精品久久久久777片| 久久久欧美国产精品| 日韩人妻高清精品专区| a级片在线免费高清观看视频| 国产精品成人在线| 在线观看免费高清a一片| 久久久a久久爽久久v久久| 三级国产精品欧美在线观看| xxx大片免费视频| 最近2019中文字幕mv第一页| 国产午夜精品一二区理论片| 少妇人妻 视频| 亚洲国产最新在线播放| 久久精品国产鲁丝片午夜精品| 肉色欧美久久久久久久蜜桃| 我的女老师完整版在线观看| 精品国产国语对白av| videos熟女内射| 在线看a的网站| 青青草视频在线视频观看| 免费黄网站久久成人精品| 夫妻性生交免费视频一级片| 国产精品免费大片| 国产精品蜜桃在线观看| 永久网站在线| 中国国产av一级| 亚洲av在线观看美女高潮| 男女免费视频国产| 97在线视频观看| 亚洲精品中文字幕在线视频 | 男女边摸边吃奶| 一区二区三区免费毛片| 国产午夜精品一二区理论片| 夫妻午夜视频| 18+在线观看网站| 国产亚洲最大av| 国产av一区二区精品久久| 亚洲欧洲日产国产| 亚洲欧美成人精品一区二区| 一级二级三级毛片免费看| 在线观看美女被高潮喷水网站| h视频一区二区三区| 亚洲欧洲日产国产| 亚洲欧美成人精品一区二区| 亚洲欧洲精品一区二区精品久久久 | 国产精品久久久久成人av| 亚洲电影在线观看av| 丰满少妇做爰视频| 久久人妻熟女aⅴ| 中文字幕精品免费在线观看视频 | 久久久国产精品麻豆| 少妇猛男粗大的猛烈进出视频| 国产精品.久久久| 国产精品久久久久久av不卡| 国产熟女欧美一区二区| av不卡在线播放| 高清黄色对白视频在线免费看 | 一区在线观看完整版| 如何舔出高潮| 99久久精品热视频| 久久久久久久亚洲中文字幕| 国产亚洲午夜精品一区二区久久| 国产精品不卡视频一区二区| 亚洲精品久久午夜乱码| 久久久国产精品麻豆| 好男人视频免费观看在线| 欧美日韩综合久久久久久| 最后的刺客免费高清国语| 国产有黄有色有爽视频| 国产片特级美女逼逼视频| 中文天堂在线官网| 99热这里只有是精品在线观看| 国产午夜精品久久久久久一区二区三区| 亚洲av综合色区一区| 亚洲天堂av无毛| 精品99又大又爽又粗少妇毛片| 日本wwww免费看| 高清在线视频一区二区三区| 国产成人精品婷婷| 在线播放无遮挡| 观看美女的网站| 国产在线免费精品| 性色avwww在线观看| 亚洲第一区二区三区不卡| 亚洲国产色片| 国产亚洲5aaaaa淫片| 日本黄色片子视频| 国产极品粉嫩免费观看在线 | 日韩精品免费视频一区二区三区 | 国产亚洲5aaaaa淫片| 男人狂女人下面高潮的视频| 亚洲国产av新网站| 亚洲av成人精品一区久久| 有码 亚洲区| 日韩在线高清观看一区二区三区| 久久精品久久精品一区二区三区| 国产高清不卡午夜福利| 成年人午夜在线观看视频| 日韩人妻高清精品专区| 成人二区视频| 日本vs欧美在线观看视频 | 在线观看国产h片| 国产毛片在线视频| 大片免费播放器 马上看| 高清午夜精品一区二区三区| 国产成人aa在线观看| 在线观看免费日韩欧美大片 | 三级经典国产精品| 日本欧美国产在线视频| 这个男人来自地球电影免费观看 | 国产黄片美女视频| 老司机亚洲免费影院| 国内少妇人妻偷人精品xxx网站| 一级黄片播放器| av免费观看日本| 亚洲国产精品国产精品| 亚洲内射少妇av| a级片在线免费高清观看视频| av国产精品久久久久影院| av福利片在线观看| 免费av不卡在线播放| 在线观看免费高清a一片| 精品国产露脸久久av麻豆| 亚洲国产精品成人久久小说| 国产精品偷伦视频观看了| 久久久久久久国产电影| 国产精品人妻久久久影院| 午夜视频国产福利| 亚洲,一卡二卡三卡| 美女脱内裤让男人舔精品视频| 男人爽女人下面视频在线观看| 亚洲av国产av综合av卡| 国产91av在线免费观看| xxx大片免费视频| 国产精品人妻久久久久久| av国产精品久久久久影院| 99精国产麻豆久久婷婷| 精品人妻熟女av久视频| 婷婷色综合大香蕉| 少妇精品久久久久久久| 久久影院123| 女人久久www免费人成看片| 亚洲国产最新在线播放| 欧美精品一区二区大全| 免费看日本二区| 日本vs欧美在线观看视频 | 免费观看性生交大片5| 亚洲真实伦在线观看| 亚洲av男天堂| 在线观看美女被高潮喷水网站| 国产成人精品一,二区| 亚洲av男天堂| 日日啪夜夜爽| 自拍偷自拍亚洲精品老妇| 国产精品99久久99久久久不卡 | 高清午夜精品一区二区三区| 久久综合国产亚洲精品| 人妻一区二区av| 青青草视频在线视频观看| 久久久久国产网址| 亚洲,一卡二卡三卡| 在线播放无遮挡| 人人澡人人妻人| 国产精品99久久久久久久久| 国产av国产精品国产| 成人免费观看视频高清| 欧美日韩国产mv在线观看视频| 99视频精品全部免费 在线| 性色avwww在线观看| 欧美最新免费一区二区三区| 亚洲国产欧美在线一区| 精品99又大又爽又粗少妇毛片| freevideosex欧美| 亚洲精品第二区| 国产精品一区二区性色av| 一级毛片我不卡| 寂寞人妻少妇视频99o| 最近2019中文字幕mv第一页| 国产精品国产三级专区第一集| 最近2019中文字幕mv第一页| 精品熟女少妇av免费看| 2021少妇久久久久久久久久久| 肉色欧美久久久久久久蜜桃| 亚洲精品国产av成人精品| 欧美日韩一区二区视频在线观看视频在线| 大片免费播放器 马上看| 久久久久久久久久久免费av| 男男h啪啪无遮挡| 午夜福利,免费看| 免费观看性生交大片5| 欧美+日韩+精品| 啦啦啦中文免费视频观看日本| 国产毛片在线视频| 观看美女的网站| 成人亚洲精品一区在线观看| 大香蕉97超碰在线| av网站免费在线观看视频| 久久精品国产亚洲网站| 欧美精品一区二区免费开放| 国产乱来视频区| 国产 一区精品| 精品亚洲乱码少妇综合久久| 啦啦啦在线观看免费高清www| 久久久精品免费免费高清| 视频中文字幕在线观看| 波野结衣二区三区在线| 夜夜骑夜夜射夜夜干| 在线观看av片永久免费下载| 国产淫片久久久久久久久| 国产永久视频网站| 久久精品夜色国产| 欧美日韩在线观看h| 高清毛片免费看| 一本色道久久久久久精品综合| 国产日韩欧美在线精品| av免费在线看不卡| 精品久久久噜噜| av天堂久久9| 性高湖久久久久久久久免费观看| 国产成人a∨麻豆精品| 波野结衣二区三区在线| 精品久久久精品久久久| 国产免费一级a男人的天堂| 少妇人妻精品综合一区二区| 午夜福利网站1000一区二区三区| 麻豆乱淫一区二区| 久久99精品国语久久久| 狠狠精品人妻久久久久久综合| 最近最新中文字幕免费大全7| 欧美97在线视频| 亚洲精品国产成人久久av| 麻豆成人av视频| 99久久综合免费| 欧美精品一区二区大全| 麻豆精品久久久久久蜜桃| 日韩伦理黄色片| 久久久国产欧美日韩av| 国产精品三级大全| 高清视频免费观看一区二区| 亚洲色图综合在线观看| 波野结衣二区三区在线| 丝袜脚勾引网站| 如日韩欧美国产精品一区二区三区 | 少妇被粗大猛烈的视频| 亚洲第一av免费看| 大码成人一级视频| 亚洲欧美成人精品一区二区| 国产成人a∨麻豆精品| 两个人的视频大全免费| 麻豆精品久久久久久蜜桃| 亚洲天堂av无毛| 亚洲av在线观看美女高潮| 少妇的逼好多水| 欧美日本中文国产一区发布| 午夜老司机福利剧场| 国产精品久久久久久久电影| 97精品久久久久久久久久精品| 成人黄色视频免费在线看| 国产欧美日韩一区二区三区在线 | av福利片在线| 内地一区二区视频在线| 一本—道久久a久久精品蜜桃钙片| 另类亚洲欧美激情| 校园人妻丝袜中文字幕| 欧美最新免费一区二区三区| 五月天丁香电影| 久久国产乱子免费精品| 又爽又黄a免费视频| 啦啦啦在线观看免费高清www| 亚洲欧美成人精品一区二区| 毛片一级片免费看久久久久| 国内少妇人妻偷人精品xxx网站| 久热久热在线精品观看| 亚洲精品色激情综合| 日韩欧美一区视频在线观看 | 午夜福利,免费看| 国产免费一区二区三区四区乱码| 亚洲av欧美aⅴ国产| 如何舔出高潮| 97超视频在线观看视频| 亚洲国产精品999| 日韩欧美精品免费久久| 天天躁夜夜躁狠狠久久av| 亚洲国产成人一精品久久久| av又黄又爽大尺度在线免费看| 亚洲欧美成人精品一区二区| 精品国产国语对白av| 一级,二级,三级黄色视频| 成年av动漫网址|