    Configuration synthesis of planar folded and common overconstrained spatial rectangular pyramid deployable truss units

    2019-08-13 02:22:28HuiYANGHongweiGUOYnWANGRongqingLIUZongqunDENG
    CHINESE JOURNAL OF AERONAUTICS 2019年7期

    Hui YANG ,Hongwei GUO ,Yn WANG ,Rongqing LIU ,Zongqun DENG

    a College of Electrical Engineering and Automation,Anhui University,Hefei 230601,China

    b State Key Laboratory Robotics and System,Harbin Institute of Technology,Harbin 150001,China

    c China Electronics Technology Group Corporation No.38 Research,Hefei 230088,China

    KEYWORDS Assembly SAR antenna;Common overconstraint;Deployable truss structure;Screw theory;Structural synthesis

    Abstract Compared with non-overconstrained deployable units,overconstrained deployable units are widely used in space missions for their higher stiffness characteristics.Besides the performance of a three-step topological structural analysis and design of the rectangular pyramid deployable truss unit(PDTU),conducting a structural synthesis of an overconstrained deployable unit requires the determination of the relative position and direction of each kinematic axis.The structural synthesis of an overconstrained deployable unit is investigated based on screw theory and its topological structure.The possible overconstrained cases of the rectangular PDTUs are analyzed,and corresponding screw expressions are obtained.Thus,the rectangular PDTUs,which can be folded into a plane,are synthesized systemically,and a series of overconstrained rectangular PDTUs is obtained.Furthermore,the feasibility of the folded and deployed motions under one degree of freedom for those deployable units is verified in dynamical simulation by using ADAMS 2010.

    1.Introduction

    Deployable mechanisms are widely used in satellite synthetic aperture radar(SAR),solar arrays,space borne antennas and space exploratory missions.Applying modern mechanistic theory to describe and analyze the topological structure of the deployable mechanisms for modeling their structural synthesis and discovering new deployable mechanisms is of significant value in engineering and academic applications as well.You and Chen1-4improved the Bennett, Myard, and Bricard linkages by presenting a design and networking method of configuring the deployable mechanism by using single-loop overconstrained spatial linkages as the base unit and thus have,and a variety of spatial closed-loop overconstrained deployable mechanisms have been created.Gan and Pellegrino5proposed a numerical kinematic method for single closed-loop deployable mechanism.Medzmariashvili et al.6obtained a new variant of the deployable ring-shaped space antenna reflector by synthesizing ring-and umbrella-shaped deployable mechanisms.Korkmaz et al.7designed a 2-DOF 8R linkage for transformable hyper-structure.Moterolle et al.8proposed a numerical form finding of geotensoid tension truss for a network reflector,which can guarantee the key point position and tensioning force simultaneously.

    Structural synthesis is an effective method of planar and spatial mechanism innovative design,and structural synthesis has been divided into three main groups in past decades9.The first group is the displacement subgroup based on structural synthesis.Specifically,Herve′10proposed twelve types of displacement subgroups.By using this method,the geometric condition for the mechanisms was elucidated.However,the mathematical method is complex,and hence the mathematical method is only for structural synthesis with displacement subgroup structures.Later,Angeles11,Rico12,Huang and Li13also synthesized the parallel manipulators based on displacement subgroups.The second group is based on the constraint screw principle,proposed by Huang and Li14.This synthesis method is a simple numerical linear operation and is suitable for general overconstrained and non-overconstrained mechanisms.However,the geometric conditions for the mechanisms are non-generic,and the instantaneous mechanisms need to be investigated.Fang15,16,Kong and Gosselin17made important improvements to this method.The third group is the kinematic synthesis.In this kinematic synthesis,Yang et al.18presented a position and orientation characteristics matrix.The problem with this group is that the mechanisms obtained by this method are not instantaneous.The physical meaning of its synthesis process is explicit and it is widely applied in engineering.However,compared with the former methods,its mathematical theory is incomplete.The kinematic synthesis also includes the GF synthesis method proposed by Gao et al.19and the linear transformations presented by Gogu20.

    In this study,the application of the synthesis theory of the parallel manipulators to the deployable mechanisms with the aim of obtaining a new deployable mechanism is investigated.Based on screw theory,the conditions of the continuous folded and deployed movement are derived for the overconstrained deployable mechanisms according to the overconstrained power and the addition of overconstrained power that is equal to zero.The structural synthesis flowchart of the overconstrained deployable mechanism is proposed,a rectangular deployable mechanism under common constraint as a first-,second-and third-order wrench as well as a redundant constraint,are synthesized and a series of overconstrained rectangular deployable mechanisms is obtained.

    2.Rectangular pyramid deployable truss structure

    Design of a pyramid deployable truss structure (PDTS)includes three main assumptions:its spatial deployed state is a pyramidal structure,and its folded state is a planar structure;both folded and deployed states are stable;and PDTS is a lower mobility mechanism during the deployable and retraction phases.Weighted graph and kinematic chains were used to describe the intersection relationships of nodes and components in a conceptual configuration,respectively.Rectangular pyramid deployable truss unit(PDTU)includes five nodes and nine links,and its weight graph is a regular pentagon with all vertices located in the outer loop.This number is optimum because that all planes are consisted of triangles in deploying statue and are high stability.

    A two-step topology structure synthesis and analysis approach for PDTU was proposed and applied to design PDTU in Ref.21-25.The conceptual configuration of PDTU was synthesized first.Weighted graph and weighted adjacency matrices were established to realize a topological description for PDTU.Graph properties were summarized to distinguish differences between PDTU and other types of structures.A procedure for synthesis conceptual configuration of PDTU was presented according to graph properties.The joint relationship of components in a PDTU was analyzed.Kinematic chain and a corresponding incidence/adjacency matrix were employed to analyze the joint relationship of PDTU.Properties and simplified rules of kinematic chain were extracted to construct a kinematic chain.Then, a procedure for construction of a kinematic chain of PDTU was established.Based on the two-step approach,all eleven rectangular PDTUs were constructed.All eleven conceptual configurations of rectangular PDTSs and their kinematic chains were structurally synthesized based on the screw principle,shown in Tables 1-4.

    The number on the line in the weight graph denotes weight,and different weights indicate different types of intersections between the vertices.The truss structure links can be divided into spatial links and planar links.Spatial links pertain to the lateral edges,and planar links pertain to the bottom edges.Spatial links are expressed as weight 3 and planar links as weight 2.For the stability criterion of the articulated truss wrench,Maxwell proposes a necessary condition:e ≥αv-β,where e is the total number of links,v is the number of nodes,α is a dimensional parameter and β is the freedom parameter.For spatial structures:α=3,β=6;planar structures:α=2,β=3;linear structures:α=1,β=1.

    The capital letters A,B,C,D and E stand for the polygon vertices.Letter L stands for length of the link.The lines with and without black dots indicate folded and fixed links respectively in weighted graphs and conceptual configurations.Vertices and edges correspond to components and join conditions of components,respectively,in kinematic chains.The kinematic chain of PDTU is exactly the opposite of the definition for vertices and edges in the weighted graph.The component with three vertices is a triangular frame linked by two vertices.A triangular frame is expressed by a solid dot,and a link is expressed by a hollow dot.Take the kinematic chains of No.8 in Table 3 as an example.The conceptual configuration of No.8 includes six components:two triangular frames ΔADE and ΔACE,two folded links CD and AB,and two fixed links BC and BD.The kinematic chain of No.8 is composed of three loops:ΔADE-ΔACE-CD,ΔADE-ΔACEBC-BD,and ΔADE-AB-BD.

    The eleven PTDUs listed in Tables 1-4 are nonoverconstrained which has the disadvantage of low stiffness.Overconstrained deployable structure has higher stiffness.Thus,the works in the preceding sections are to allocate motion pairs and the relative position of each kinematic axes for the eleven rectangular PDTSs based on the synthesis theory of the parallel manipulators to construct overconstrained PTDU.The deployable and foldable feasibility is verified by ADAMS.

    Table 1 The first group of rectangular PDTU.

    Table 2 The second group of rectangular PDTU.

    3.Screw representation of overconstrained deployable unit

    3.1.Kinematic screw theory

    The screw pitch of the revolute joint equals zero,which applies the three constrained forces and two constrained moments.

    Table 3 The third group of rectangular PDTU.

    Table 4 The fourth group of rectangular PDTU.

    The axis vector of the revolute joint directs radially from point A to point P as shown in Fig.1.Hence,the kinematic screw of the relative movement of the revolute joint passing point A is expressed as26:

    where letter A indicates a joint simplified point,and letter O indicates the coordinate origin,R is the initial letter of the revolute joint,rOAis a radius vector of point A with respect to point O,rOPis a radius vector of point P with respect to point O,$Ris the kinematic screw of the revolute joint,sAPis the direction vector of the revolute axis from point A to point P,and rOAis the radius vector of the kinematic joint simplified point A that is relative to coordinate origin O as shown in Fig.1.

    In a universal joint,the two axes of the universal joint are perpendicular to each other.The universal joint applies three forces and one moment to a connected component.If one axis of the universal joint points radially from point A to point P,and the other axis is perpendicular to AP,then the possible motion kinematic screw of the universal joint through point A is expressed as follows:

    Fig.1 Kinematic screw in Cartesian coordinates.

    The spherical joint applies three constraint forces to connecting components,hence,it can be simplified as three revolute joints at intersecting constraint point P.The kinematic screw of the two adjacent components connected by the spherical joint can be described as:

    3.2.Analysis of overconstrained mechanisms

    The number of constraints in spatial mechanisms is generally the sum of the common constraints and the redundant constraints, which are usually calculated independently.Overconstrained screw is a constraint force screw of relative overconstrained force or moment in the rectangular pyramid deployable truss units.If an overconstrained screw is reciprocal to all motion wrenches in the mechanism,the overconstrained screw is a common constraint. The constraint number of the remaining screw is still larger than the order number of the wrench excluding the common constraint,and the spatial mechanism exists with redundant constraints.The hypothesizes of kinematic pairs are as following:(1)There are only revolute joints,universal joints and spherical joints;(2)The joints in middle position of folded link prefer to easy locked revolute joint;(3)Connections between frames only use revolute joints;(4)two ends of fixed link of folded link on the same loop cannot adopt spherical joints simultaneously;(5)DOF of each loop in non-overconstrained deployable unit is no more than one.

    Considering the overconstrained condition based on the loop theory,the DOF of the PTDUs Fdis

    where S is the number of spherical joints,U is the number of universal joints,R is the number of revolute joints,d is the number of common constraints,l is the number of the independent loops,and u is the number of redundant constraints without the common constraint.Only the common constraint is discussed in this study,hence we have u=0.

    The number of edges and folded links in a topological graph should be equal to the sum of revolute joints,universal joints and spherical joints,shown as follows,

    where e is the number of links,and nt is the number of folded links in a topological graph,respectively.

    The number of revolute joints should be no smaller than the sum of connections between frames and folded links

    where Q is the number of connections between frames.

    By solving Eqs.(4)-(6),the possibility of 1-DOF deployable structure with common constraint is obtained and listed in Table 5.N5-7-S1U1R6indicates the fifth,sixth and seventh deployable unit s containing one spherical joint,one universal joint,and six revolute joints,respectively.The PTDUs from numbers one to four in Table 1 consists of two independent loops,and each loop must have an independent DOF to fold and deploy.Thus,the PTDU can only realize 2-DOF movement.If the number of common constraints is four,there exists no feasible motion configuration of a deployable unit with continuous folding and deploying based on Eq.(4).

    Table 5 Possible 1-DOF deployable unit configurations with common constraints.

    The structural synthesis of the rectangular PDTU is divided into three types according to the three common constraint number.Possible 1-DOF deployable structure configurations with common constraints are listed in Table 5.Then,the first type of the rectangular PDTUs with one common constraint are called the F and C deployable unit,respectively.Letter F denotes the force line vector,and C denotes the force couple.Similarly,the second type with two common constraints is called the FF,CC and FC deployable unit.The third type with three common constraints is the FFF,FFC,FCC and CCC deployable unit.Let letter N denote the number of the rectangular PDTSs from Tables 1 to 3;Ni-jdenotes the rectangular PDTS with numbering from ith to jth;letters S and R denote a spherical joint and a revolute joint,respectively.

    For all deployable units,nt=2 since two links are set with foldable links.For schemes 5-7 in Table 2,l=2,e=6,which is obvious from their topological graph,and Q=2,because three rigid triangles are connected one by one in a series.Thus,the number of revolute joints is at least four,and the sum of universal joints and spherical joints is at most four.According to Eq.(6),the DOF of the PTDU is

    If d=1, F=(S+U)+S-2=1, then, S+U=3,S=0,or S+U=2,S=1,equivalently,S=0,U=3,R=5, or, S=1, U=1, R=6. Then N5-7-U3R5and N5-7-S1U1R6are obtained.

    3.3.Overconstrained continuous folding and deploying conditions

    Virtual work principle indicates that realizing a given motion by a constrained rigid body generally depends on whether instantaneous constraint power is zero.The instantaneous constraint power is the product of the constraint force and the given velocity.If the instantaneous constraint power is zero,then the motion is possible27,28.This principle is also applicable to the overconstrained deployable units.If the overconstrained powers of the constraint force screw are zero for the folded and deployed wrench of all joint screws in an overconstrained deployable unit,then this overconstrained is called a common constraint of the PTDU,and the motion refers to the possible folded and deployed motions of the common constraint.

    The derivative of the overconstrained power should be considered in determining whether a motion is an instantaneous mechanism29.For a deployable unit with continuous folded and deployed motion under overconstrained circumstances,both the overconstrained power and its derivative should be zero,as shown in the following two cases:

    (1)The overconstrained screw is a force line vector.If the directions of the constraint forceand the revolute joints(˙s=0)are constants,then the existing overconstrained mechanism pivot force is

    Thus,when the PTDU includes the common constraint force,the revolute joints should satisfy the following configurations:(a)When s is parallel to sr,the above conditions are satisfied.(b)When s and srare intersected,rPA,s and srare coplanar andrPA·(sr×s)=0.To satisfy Eq.(8),s×rPA=0 should be satisfied.Thus,rPAands must be collinear,and s goes through the overconstrained point P.(c)If rPA,s and srare not coplanar,thenrPA·and it does not satisfy the condition.

    (2)The overconstrained screw is a force couple.If the directions of the constraint forceand the revolute joints,˙s=0,are constants,then the existing overconstrained mechanism pivot force couple is

    Thus,when the given common constraint force couple exists in the PTDU,all revolute joints should satisfy the configured condition s⊥sr.In addition,the axis-configured principles of the above revolute joints are based on the hypothesis of the direction of one revolute joint ˙s=0 to ensure that the direction of that one invariable revolute joint is consecutively parallel or that the number of intersected revolute joints is not less than two.The overconstrained deployable units should satisfy the conditions of Eqs.(8)and(9),and satisfy the basic principles listed in Table 6 for continuous folded and deployed motions.

    Table 6 Basic principles of overconstrained deployable structure.

    4.Deployable unit structural synthesis with common constraints

    According to the number of common constraints,overconstrained deployable unit can be divided into nine kinds,i.e.,F,C,FF,CC,FC,FFF,CCC,FCC and FFC.In addition,these common constraints can be divided further into different configurations due to different space positions.FFF constraint includes three force line vectors that are coplanar but not intersected,non-coplanar,spatial parallel and concurrent configurations.The FF parallel overconstraint is equivalent to FC perpendicular overconstraint,and their constrained motions are a 1-DOF translation along the direction of F and 1-DOF rotation around the direction of C.Twelve kinematic features for the first-,second-and third-order of constrained wrenches are summarized in Table 7.

    4.1.First-order wrench common constraint

    When a deployable unit contains one common overconstrained mechanism,the MLI number of kinematic screw in each loop is five.

    4.1.1.Single F

    When the PTDU contains one common overconstrained force

    where ∧is and operator,∨is or operator,∩and ∪are intersection and union of collections respectively.

    A synthesis procedure E of the rectangular PDTU with a common overconstrained force is shown in Fig.2.The steps of synthesizing the rectangular pyramid deployable unit with only one common force line vector are listed as follows.

    Table 7 Twelve kinds of constrained wrenches.

    Fig.2 Synthesis procedure E of the rectangular PDTU with one common overconstrained force.

    Step 1. Synthesis configuration and its topological graph are shown in Fig.3.The fifth rectangular PDTU is shown in Fig.3(e),in which the same color or gray scale indicates one component.The PTDU is composed of two loops.Loop 1 is ΔCDE-AC-ΔADE and loop 2 is ΔCDE-ΔCBD-AB-ΔADE as shown in Fig.3(f).

    Step 2. The kinematic joints configuration are chosen as 1-DOF F deployable unit N5-S1U1R6from Table 5.The MLI number of loop 1 and loop 2 is five.

    Fig.3 Synthesis steps of 1-DOF F deployable unit N5-S1U1R6.

    Table 8 Wrenches of the deployable structure shown in Fig.3.

    Step 3. There are two connected positions between two triangular frames.The first revolute joint RDEis located at point E and it is parallel to link DE.The second revolute joint RCDis located at point O and it is parallel to link OD as shown in Fig.3(a).Loop 1 has 3R and 1S,whereas loop 2 has 4R and 1U.Six motion screws can denote both loop 1 and loop 2,and the results are listed in Table 8.

    Step 4. The selected revolute joints RDEand RCDin Step 3 intersect at point D.According to the existing condition of revolute joints in Eq.(9),three configurations for the position of overconstrained point P and the direction of common constrained force F are derived:{P ∈DE}∧{F//CD}, {P ∈CD}∧{F//DE}, and{P=D}. The third configuration chosen in this example is shown in Fig.3(b).

    Step 5. Spherical joint can be equivalent to three spatial revolute joints orthogonal to a constraint point D in loop 1 based on Eq.(4).Revolute joints and spherical joints are set to intersect at the constraint point D in step 1.According to Table 6,the MLI number of the revolute joints intersected to one point is three.To ensure that the MLI number of 3R1S with six kinematic screws in loop 1 is five,the remaining distributed revolute joints cannot intersect at the constraint point D.Other revolute joints should be parallel to the common constraint force line vector F according to Eq.(12),as shown in Fig.3(c).

    The universal joint in loop 2 is equivalent to two orthogonal revolute joints based on Eq.(2).One of the two perpendicular revolute joints is parallel to F,and the other passes through point D according to Eq.(9).The universal joint is set at the connecting point B of ΔCBD-AB.The two revolute joints at point A of ΔADE-AB and point J of link AB are not allocated.If the MLI number of the wrench in loop 2 is five,the remaining 2R cannot intersect at the constraint point D,because the MLI number of spatial points concurrent to one point should be no larger than three.Thus,the revolute joint at point J intersects at point D,whereas the revolute joint at point A is parallel to the constraint force line vector F as shown in Fig.3(d).Finally,the structural synthesis result is shown in Fig.3(e)-(f).

    Step 6. The coordinates are set as follows:A(0,0,L),B(L,0,0),C(0,-L,0),D(0,L,0),E(-L,0,0),I(0,-L/2,L/2)and J(L/2,0,L/2).The kinematic screws of each loop based on Eqs.(1)-(3)and motion wrenches are listed in Table 8.Based on the theory of reciprocal screws,loop 1 and loop 2 have the same common overconstrained force line vector$r=[1,1,0,0,0,-L]T,which is parallel to the direction of line DE and passes through point D.

    Step 7. By solving Eq.(4),the DOF of this deployable unit is Fd=(3×1+2×1+6)-(6-1)×2=1.

    Step 8. The simulation results of the PTDU N5-S1U1R6using ADAMS are shown in Fig.4.The simulation in this study includes two deployed-to-folded and foldedto-deployed processes.The simulated results indicate that the PTDU can realize a continuous folded and deployed motion with one common overconstrained F.

    Step 9. The configuration is accepted and saved.

    Second example:(1)The synthesis mechanism and its topological graph are shown in Fig.5.The eighth rectangular PDTU is shown in Fig.5(a),where one color or gray scale indicates one component.The PTDU is comprised of three loops as shown in Fig.5(b).Loop 1 is ΔACE-CD-ΔADE,loop 2 is ΔACE-ΔADE-BD-BC,and loop 3 is ΔACE-AB-BC.There are two$RAEone is between ΔACE and ΔADE in loop 2 and the other is between ΔACE and point A in loop 3.

    (2)The configuration is chosen as a single F deployable unit N8-U6R4from Table 5.

    (3)There exists one connection position between triangular frames in this example.The connected revolute joint RAEof ΔACE-ΔADE is located at point E directing from point A to point E.Loop 1 contains 2R and 2U,loop 2 contains 1R and 3U,and loop 3 contains 2R and 2U.

    Fig.4 Simulation results of the PTDU N5-S1U1R6.

    Fig.5 1-DOF F deployable unit N8-U6R4.

    (4)Three configurations for the position of point P and the direction of point F exist according to the revolute joints existing condition in Eq.(12):{P=E},{P=A}and{F//AE}.Point E coincides with point P in this example.The universal joints are allocated preliminary in three loops.The universal joint can be placed at point B,point C and point D,respectively.According to Eq.(9),one revolute axis of the universal joint is directing from point B,C and D to point E.The other rotating axis is parallel to the constraint force F and orthogonal to the first rotating axis.The z-axis is orthogonal to the axes of BE,CE and DE.Therefore,the overconstrained force is parallel to the z-axis.

    (5)The revolute joint of ΔACE-ΔADE is located at point E and its direction is along AE.The universal joint of ΔACE-CD is located at point C,and its two rotating axes are parallel to the z-axis and CE,respectively.The universal joint of ΔADECD is located at point D,and its two rotating axes are parallel to the z-axis and DE in loop 1.The last revolute joint is located at point J,and its direction is from point J to point E based on the linear correlation condition listed in Table 6.The three universal joints are located at points B,C and D,and the directions of their axes are BE,CE and DE,respectively.The other axis is parallel to the z-axis in loop 2.According to the linear correlated principle,the MLI number of wrenches is five.Similarly,the allocation of the kinematic joint in loop 3 is as shown in Fig.6.

    (6)The coordinates are set as follows:A(0,0,L),B(L,0,0),C(0,-L,0),D(0,L,0),E(-L,0,0),I(L/2,0,L/2),and J(0,0,0).The MLI number of all wrenches in loop 1,2 and 3 is five;the motion wrenches are the same.The kinematic screws of each loop based on Eqs.(1)-(3)and motion wrench are listed in Table 9,as shown in Fig.6.Loop 1 and 2 have the same common overconstrained force line vector=[0,0,1,0,L,0]Tthat is parallel to the z-axis and passes through point E as expected.

    (7)By solving Eq.(4),the DOF of this deployable unit is one.

    (8)The simulation results of the PTDU N8-U6R4are shown in Fig.6.The simulated results indicate that the deployable mechanism can realize continuous folded and deployed motions with one common overconstrained F.

    (9)The configuration is accepted and saved.

    4.1.2.Single force couple C

    When the PTDU contains one common overconstrained force couplethe following conclusions are reached,

    (1)A spherical joint is nonexistent.

    (2)The universal joint should satisfy the following condition:(3) The revolute jointshould satisfy the following condition:

    The structural synthesis process of a deployable unit with only one common overconstrained force couple C is similar to the synthesis process of a deployable unit with only one common overconstrained force line vector F.Thus,the steps are as follows:

    Fig.6 Simulation results of the PTDU N8-U6R4.

    Table 9 Wrenches of the deployable structure shown in Fig.5.

    Fig.7 1-DOF C deployable unit N11-U6R4.

    Step 1. The selected synthesis object is the eleventh configuration,as shown in Fig.7.Loop 1 is ΔADE-CE-BCΔABD,loop 2 is ΔADE-AC-CE,and loop 3 is ΔADECD-CE.

    Step 2. The kinematic joint component is 1-DOF C deployable unit N11-U6R4,as listed in Table 5.

    Step 3. There exists one connected position of triangular frames in this example.There is the revolute joint RADof ΔADE-ΔABD located at point D with a direction from A to D.Loop 1 contains 2R and 2U,loop 2 contains 2R and 2U,and loop 3 contains 2R and 2U.

    Step 4. There exists two configurations of the common overconstrained force couple C based on Eq.(14){C//AC}and{C//x-axis}.In this example,the first configuration is selected.

    Step 5. By solving Eq.(13),the two rotating axes of the universal joint in loop 1 are parallel to the x-axis and AD,respectively.Based on the linear correlated condition from Table 6,the MLI number of the wrench is allocated as five.The last revolute joint is located at point E and its direction is from A to D.Similarly,kinematic joint configurations in loops 2 and 3 can be determined,as shown in Fig.7.

    Step 6. Coordinates are set as follows:A(0,0,L),B(L,0,0),C(0,-L,0),D(0,L,0),E(-L,0,0),I(0,-L/2,L/2),and J(0,0,0).The MLI number of wrenches in loops 1,2 and 3 is five;the wrenches are same.The wrenches of each loop based on Eqs. (1)-(3) are listed in Table 10.Based on the theory of reciprocal screws,loops 1 and 2 have the same common overconstrained force couple$r=[0,0,0,0,1,1]Tand the force couple is parallel to AC.

    Step 7. By solving Eq. (4), DOF is Fd=(2×6+4)-(6-1)×3=1.

    Step 8. The simulation results of the PTDU N11-U6R4with single C common overconstrained unit are shown in Fig. 8. The simulation results indicates that the deployable mechanism can realize continuous folded and deployed motions with only one common overconstrained C.

    Step 9. Finally,the configuration is accepted and saved.

    4.2.Second-order wrench common constraint

    If the PTDU contains two common overconstraints,the MLI number of each loop is four.

    4.2.1.Coplanar and intersected FF

    If the PTDU contains two linearly independent common overconstrained forcesand,and the two common overconstrained forces intersect at point P, i.e.,, for different types of kinematic joints the following conditions should be satisfied.

    Table 10 Wrenches of the deployable structure shown in Fig.7.

    Fig.8 Simulation results of the PTDU N11-U6R4.

    The synthesis flow-chart in the Section 4.1.1 is suitable for coplanar and intersected FF deployable units.For example,the coplanar and intersected FF deployable unit N6-U1R7is synthesized by solving Eqs.(15)-(17)as shown in Fig.9.In this example,the coordinates are set as follows:A(0,0,L),B(L,0,0),C(0,-L,0),D(0,L,0),E(-L,0,0),I(0,-L/2,L/2),and J(L/2,-L/2,0).The MLI number of the wrenches in loops 1,2,and 3 in Fig.9 is four.The wrenches of each loop are listed in Table 11.

    Based on the theory of reciprocal screws,loop 1 and loop 2 have same common overconstrained force line vectorsrespectively.Moreover,the force line vectorpasses through point D and it parallels the x-axis.The other force line vectorpasses through point D and it parallels to the y-axis.

    By solving Eq. (4), the DOF of the configuration is Fd=(2×6+4)-(6-1)×3=1.

    Fig.9 1-DOF FF deployable unit N6-U1R7.

    The simulation results of the PTDU N6-U1R7with coplanar and intersected FF are depicted in Fig.10.The simulated results indicate that the deployable mechanism can realize continuous folded and deployed motions with two intersected common overconstrained force line vectors.

    4.2.2.Perpendicular FC

    When the PTDU contains one common overconstrained forceand one common overconstrained force couple,andthe following conditions should be satisfied for different types of the kinematic joints.

    (1)No spherical joints exist;

    The perpendicular FC deployable unit N10-U3R7 is synthesized by solving Eqs.(18)and(19),as shown in Fig.11.The coordinates are set as follows:A(0,0,L),B(L,0,0),C(0,-L,0),D(0,L,0),E(-L,0,0),I(0,-L/2,L/2)and J(0,L/2,L/2).The MLI number of the wrenches in loops 1,2 and 3 is four.The wrenches of each loop are listed in Table 12.Based on the theory of reciprocal screws,loops 1 and 2 have the same common overconstrained force line vectors,and force couplewhich are perpendicular to each other.The force line vectorpasses through point O and is parallel to the y-axis,and the force coupleis parallel to the x-axis.

    From solving Eq. (4), DOF is Fd=(2×3+7)-(6-2)×3=1.

    The simulation results of the perpendicular FC deployable unit N10-U3R7are shown in Fig.12.The simulated results indicate that the PTDU can realize continuous folded and deployed motions with one couple of perpendicular force line vectors and a couple.

    Table 11 Wrenches of the deployable structure shown in Fig.9.

    Fig.10 Simulation results of the PTDU N6-U1R7.

    Fig.11 1-DOF FC deployable unit N10-U3R7.

    4.2.3.Parallel FC

    When the PTDU contains one common overconstrained forceand one common overconstrained force couple,andthe following conditions should be satisfied for different types of kinematic joints.

    (1)No spherical joint exists;

    All connections between the revolute joint and the constraint point are located at a plane based on Eq.(21).However, the spatial geometrical condition of the rectangular PDTUs does not satisfy this condition.Thus,the rectangular pyramid deployable unit with parallel FC exists.

    4.2.4.Coplanar and intersected CC

    If the PTDU contains two common overconstrained couplesandand the two couples intersect at a point P,i.e.,the spherical and revolute joints do not exist.The revolute jointshould satisfy the following condition:

    Based on the condition of Table 5,the rectangular pyramidal deployable unit with two common overconstrained mechanisms must contain one universal joint or one spherical joint.Thus,the rectangular pyramidal of a deployable unit with coplanar and intersected CC do not exist.

    4.3.Third-order wrench common constraint

    4.3.1.Spatial parallel FFF

    The common overconstrained force,andare parallel,and the spherical and universal joints do not exist.All revolute jointsshould satisfy the following condition.

    A spatial parallel FFF deployable unit N5-R7G1is shown in Fig.13.The coordinates are set as follows:A(0 0 L),B(L,0,0),C(0,-L,0),D(0,L,0),E(-L,0,0),I(0,-L/2,L/2),and J(L/2,0,L/2).The MLI numbers of the wrenches in loops 1 and 2 are two. The wrenches of each loop are listed in Table 13.Loops 1 and 2 have three common overconstrained force line vectors:andThe three overconstrained mechanisms are spatially parallel to DE.

    Fig.13 1-DOF FFF deployable unit N5-R7G1.

    Table 12 Wrenches of the deployable structure shown in Fig.11.

    Fig.12 Simulation results of the PTDU N10-U3R7.

    Table 13 Wrenches of the deployable structure shown in Fig.13.

    Fig.14 Simulation results of the spatial parallel FFF deployable unit N5-R7G7.

    By solving Eq. (4), the DOF of the configuration is Fd=7-(6-3)×2=1.The simulation results of the PTDU N5-R7G7with spatial parallel FFF are shown in Fig.14.Simulation results indicate that the PTDU can realize continuous folded and deployed motions with three spatial parallel common overconstrained force line vectors.

    4.3.2.Spatial concurrent FFF

    When three common overconstrained force,andare spatially concurrent,no universal joint exists.Spherical and revolute jointshould satisfy the following condition:

    Fig.15 1-DOF FFF deployable unit N8-R10.

    The PTDU N8-R10is shown in Fig.15.Coordinates are set as follows: A(0,0,L), B(L,0,0), C(0,-L,0), D(0,L,0), E(-L,0,0), I(L/2,0,L/2),J(0,0,0),and H (-L/2,0,L/2).The MLI numbers of the wrench in loops 1,2 and 3 are three.The wrenches of each loop are listed in Table 14.Loops 1,2,and 3 have three same common overconstrained force line vectors:= [1 ,0 ,0,0,L/2,0]T,= [0 ,1 ,0,-L/2,0,-L/2]T,and= [0 ,0 ,1,0,L/2,0]T.The three overconstrained mechanisms are perpendicular at point H and parallel to the x-,yand z-axes,respectively.

    By solving Eq. (4), the DOF of the configuration is Fd=(3S+2U+R)-(6-d)l+u=10-(6-3)×3=1.

    The simulation results of the concurrent FFF deployable unit N8-R10is shown in Fig.16.Simulation results indicate that the PTDU can realize continuous folded and deployed motions when the three common overconstrained force line vectors are perpendicular to one point.

    4.3.3.Others

    When the common overconstraints are three coplanar but not intersected force line vectors,or three force line vectors distributed at three different parallel planes,or three generally distributed force line vectors,or three spatially intersected couples,revolute joints,there exists no universal joint or spherical joint.

    Table 14 Wrenches of the deployable structure shown in Fig.15.

    Fig.16 Simulation results of the concurrent FFF deployable unit N8-R10.

    5.Synthesis results with only one common constraint

    Based on the former method,eleven planar folded rectangular PDTUs are synthesized.However,the conceptual design of rectangular PDTS with only one common overconstrained mechanism is difficult to determine by synthesizing;because of the characteristic differences between it and the eleven deployable units shown previously.Synthesis results of the rectangular PDTS with only one common overconstrained mechanism are listed in Table 15.

    ADAMS is employed to verify the continuous folded and deployed motions of these overconstrained deployable units as shown from Figs.17 to 22.The simulation results indicate that the synthesis method proposed in this paper canobtain some deployable units with only one common constraint.

    Fig.17 Single F Configuration.

    Fig.18 Single C configuration.

    Fig.19 Concurrent FF configuration.

    Fig.20 Perpendicular FC configuration.

    Fig.21 Spatial parallel FFF configuration.

    Fig.22 Spatial concurrent FFF configuration.

    6.Conclusions

    (1)Rectangular pyramidal overconstrained deployable units are synthesized based on the screw principle.The necessary and sufficient conditions of continuous folded and deployed motions of the overconstrained deployable units are derived based on the virtual work principle.

    (2)The configured principle of the kinematic joints of the PTDU is analyzed with twelve different common overconstrained mechanisms.

    (3)The rectangular PDTUs with common and redundant constraints are systematically synthesized,and twentyeight kinds of overconstrained deployable units are obtained based on this configured principle of the kinematic joint.The simulation results of the new deployable units denote that all synthesized overconstrained deployable units can realize continuous folded and deployed motions under predetermined DOFs that are verified by ADAMS 2010.

    Acknowledgements

    This study was co-supported by the National Natural Science Foundation of China(No.51605001),in part by the Joint Funds of the National Natural Science Foundation of China(No.U1637207),Key Funds of the National Natural Science Foundation of China (No. 51835002), in part by Anhui University Research Foundation for Doctor of China(No.J01003222)and the Key Research and Development Plan of Anhui Province,China(201904A05020034).

    一个人免费在线观看的高清视频| 国产精品美女特级片免费视频播放器 | 欧美老熟妇乱子伦牲交| 国产乱人伦免费视频| 欧美绝顶高潮抽搐喷水| 久久热在线av| 国产人伦9x9x在线观看| 热99re8久久精品国产| 嫩草影院精品99| 国产午夜精品久久久久久| 男人舔女人下体高潮全视频| 97碰自拍视频| 日韩免费av在线播放| 精品福利观看| 久久青草综合色| 国产精品电影一区二区三区| 丰满人妻熟妇乱又伦精品不卡| 国产人伦9x9x在线观看| 精品第一国产精品| 法律面前人人平等表现在哪些方面| 成熟少妇高潮喷水视频| 熟女少妇亚洲综合色aaa.| 三级毛片av免费| 高清毛片免费观看视频网站| www.自偷自拍.com| www日本在线高清视频| 黄色毛片三级朝国网站| 精品第一国产精品| 9色porny在线观看| 亚洲精品国产色婷婷电影| 伦理电影免费视频| 国内久久婷婷六月综合欲色啪| 欧美另类亚洲清纯唯美| 少妇的丰满在线观看| 欧美中文日本在线观看视频| 后天国语完整版免费观看| 国内精品久久久久久久电影| 欧美一级毛片孕妇| 亚洲国产中文字幕在线视频| 两人在一起打扑克的视频| 极品人妻少妇av视频| 国产成人一区二区三区免费视频网站| 一本久久中文字幕| 欧美成狂野欧美在线观看| 久久精品成人免费网站| 99精品久久久久人妻精品| 这个男人来自地球电影免费观看| 久久久久九九精品影院| 禁无遮挡网站| 18禁裸乳无遮挡免费网站照片 | 午夜免费成人在线视频| 欧美日本亚洲视频在线播放| 色在线成人网| 免费看a级黄色片| 黑人巨大精品欧美一区二区蜜桃| 搡老岳熟女国产| 一级a爱片免费观看的视频| 午夜精品国产一区二区电影| 午夜福利高清视频| 天天躁夜夜躁狠狠躁躁| 日本五十路高清| 在线观看一区二区三区| 日韩欧美一区视频在线观看| 免费av毛片视频| 免费高清视频大片| 欧美日韩中文字幕国产精品一区二区三区 | 亚洲成人久久性| 一边摸一边抽搐一进一出视频| 身体一侧抽搐| 成人特级黄色片久久久久久久| 亚洲 国产 在线| 亚洲自拍偷在线| 人人妻,人人澡人人爽秒播| 亚洲少妇的诱惑av| 亚洲av成人不卡在线观看播放网| 久久人人97超碰香蕉20202| 国产精品1区2区在线观看.| 久久影院123| 日本三级黄在线观看| 日韩欧美在线二视频| 精品无人区乱码1区二区| 久久九九热精品免费| 俄罗斯特黄特色一大片| 日本精品一区二区三区蜜桃| 91精品三级在线观看| 国产三级黄色录像| videosex国产| 亚洲狠狠婷婷综合久久图片| 纯流量卡能插随身wifi吗| 精品高清国产在线一区| 亚洲av五月六月丁香网| 国产1区2区3区精品| 真人做人爱边吃奶动态| 麻豆一二三区av精品| 热re99久久国产66热| av电影中文网址| 美国免费a级毛片| 精品福利观看| 一级黄色大片毛片| 精品国产超薄肉色丝袜足j| 国产精品亚洲美女久久久| 国产精品98久久久久久宅男小说| 亚洲专区国产一区二区| 午夜两性在线视频| 一区二区三区高清视频在线| av中文乱码字幕在线| 亚洲国产精品999在线| 久久婷婷人人爽人人干人人爱 | 亚洲免费av在线视频| 狂野欧美激情性xxxx| 免费看十八禁软件| a在线观看视频网站| 国产极品粉嫩免费观看在线| 精品久久蜜臀av无| 日韩欧美国产在线观看| 人妻丰满熟妇av一区二区三区| 久久 成人 亚洲| 窝窝影院91人妻| 夜夜躁狠狠躁天天躁| 热re99久久国产66热| 国产99久久九九免费精品| 两人在一起打扑克的视频| 国产成人精品久久二区二区91| 日本欧美视频一区| 悠悠久久av| 好看av亚洲va欧美ⅴa在| 国产99久久九九免费精品| 亚洲精品国产一区二区精华液| 久久久久久亚洲精品国产蜜桃av| 很黄的视频免费| 好男人在线观看高清免费视频 | 99热只有精品国产| 欧美老熟妇乱子伦牲交| 他把我摸到了高潮在线观看| 神马国产精品三级电影在线观看 | 国产成+人综合+亚洲专区| 亚洲第一电影网av| 久9热在线精品视频| 制服丝袜大香蕉在线| 亚洲视频免费观看视频| 91成人精品电影| 婷婷六月久久综合丁香| 国产精品爽爽va在线观看网站 | 一进一出好大好爽视频| 亚洲精品粉嫩美女一区| av视频在线观看入口| tocl精华| 国产成人啪精品午夜网站| 50天的宝宝边吃奶边哭怎么回事| 午夜激情av网站| av天堂在线播放| 欧美黄色片欧美黄色片| 男女下面插进去视频免费观看| 麻豆国产av国片精品| 欧美一级毛片孕妇| 在线国产一区二区在线| 夜夜看夜夜爽夜夜摸| 精品一品国产午夜福利视频| 性色av乱码一区二区三区2| 禁无遮挡网站| 桃色一区二区三区在线观看| 久久热在线av| 国产免费男女视频| 身体一侧抽搐| 国产真人三级小视频在线观看| 午夜福利免费观看在线| tocl精华| 日本在线视频免费播放| 国产免费男女视频| 国产高清视频在线播放一区| 亚洲国产看品久久| 国产精品爽爽va在线观看网站 | 在线观看一区二区三区| 99在线人妻在线中文字幕| 日韩欧美免费精品| 男人的好看免费观看在线视频 | 久久人人97超碰香蕉20202| 黄色女人牲交| 成在线人永久免费视频| 1024视频免费在线观看| 中文字幕人妻熟女乱码| 午夜成年电影在线免费观看| 欧美最黄视频在线播放免费| www日本在线高清视频| 一区二区三区高清视频在线| av视频免费观看在线观看| 国产高清有码在线观看视频 | 亚洲一区二区三区不卡视频| 亚洲熟女毛片儿| 亚洲精品在线观看二区| 一进一出好大好爽视频| 亚洲性夜色夜夜综合| 欧美xxxx黑人xx丫x性爽| 久久99热6这里只有精品| 男女那种视频在线观看| 国产精品乱码一区二三区的特点| 99久久久亚洲精品蜜臀av| 久久精品夜夜夜夜夜久久蜜豆| 国产精品自产拍在线观看55亚洲| www.www免费av| 欧美色欧美亚洲另类二区| 天堂网av新在线| 成年版毛片免费区| 97碰自拍视频| 亚洲精品色激情综合| 黄色视频,在线免费观看| 午夜免费激情av| 成年人黄色毛片网站| 国内精品宾馆在线| 国产91精品成人一区二区三区| 他把我摸到了高潮在线观看| 男人舔女人下体高潮全视频| 一区福利在线观看| 国产一区二区在线观看日韩| av女优亚洲男人天堂| 最近在线观看免费完整版| 色尼玛亚洲综合影院| .国产精品久久| www.色视频.com| a级毛片免费高清观看在线播放| 午夜精品在线福利| 国内久久婷婷六月综合欲色啪| 国产精品乱码一区二三区的特点| 三级国产精品欧美在线观看| 午夜a级毛片| 深爱激情五月婷婷| 亚洲欧美激情综合另类| 中文字幕高清在线视频| 两个人的视频大全免费| 亚洲自偷自拍三级| 性插视频无遮挡在线免费观看| 亚洲一区高清亚洲精品| 午夜日韩欧美国产| 国产乱人视频| 他把我摸到了高潮在线观看| av视频在线观看入口| 欧美中文日本在线观看视频| 欧美高清成人免费视频www| 亚洲成人久久性| 亚洲内射少妇av| 国产精品久久视频播放| 干丝袜人妻中文字幕| 美女被艹到高潮喷水动态| 亚洲经典国产精华液单| eeuss影院久久| 极品教师在线免费播放| 国产真实乱freesex| 中文在线观看免费www的网站| 国产精品98久久久久久宅男小说| 少妇人妻一区二区三区视频| 日本免费a在线| 又爽又黄无遮挡网站| 久久久久久久久久成人| 国产精品一区二区性色av| 精品一区二区免费观看| 69av精品久久久久久| 桃色一区二区三区在线观看| 亚洲午夜理论影院| 国内少妇人妻偷人精品xxx网站| 亚洲自偷自拍三级| 午夜老司机福利剧场| 九九爱精品视频在线观看| 在线观看66精品国产| 搡女人真爽免费视频火全软件 | 搡老岳熟女国产| 免费搜索国产男女视频| 国产精品永久免费网站| 亚洲av五月六月丁香网| 97人妻精品一区二区三区麻豆| 亚洲精品国产成人久久av| 久9热在线精品视频| av在线老鸭窝| 欧美三级亚洲精品| 国产精品免费一区二区三区在线| 色精品久久人妻99蜜桃| 在线播放国产精品三级| 亚洲国产精品合色在线| 少妇丰满av| 狠狠狠狠99中文字幕| 亚洲av电影不卡..在线观看| 久久久久久久久久成人| 国产 一区精品| 久久6这里有精品| 如何舔出高潮| 欧美+日韩+精品| 国内揄拍国产精品人妻在线| 欧美激情在线99| 极品教师在线视频| 欧美不卡视频在线免费观看| 嫩草影视91久久| 中文字幕熟女人妻在线| 中出人妻视频一区二区| 欧美激情国产日韩精品一区| 欧美bdsm另类| 欧美激情在线99| 日本一本二区三区精品| 不卡一级毛片| 国产欧美日韩精品亚洲av| av女优亚洲男人天堂| 日日摸夜夜添夜夜添小说| 午夜免费成人在线视频| 亚洲欧美日韩卡通动漫| 国产久久久一区二区三区| 动漫黄色视频在线观看| 欧美精品国产亚洲| 51国产日韩欧美| a级一级毛片免费在线观看| 男人舔奶头视频| 校园人妻丝袜中文字幕| 国产av一区在线观看免费| 免费av不卡在线播放| 又粗又爽又猛毛片免费看| 亚洲无线在线观看| 国产人妻一区二区三区在| 尾随美女入室| 国产主播在线观看一区二区| 久久久久九九精品影院| 日韩大尺度精品在线看网址| av在线观看视频网站免费| 成人午夜高清在线视频| 久久久久久久久久久丰满 | 一区福利在线观看| 黄色欧美视频在线观看| 久久热精品热| 欧美性猛交╳xxx乱大交人| 欧美极品一区二区三区四区| 小说图片视频综合网站| 国产一区二区亚洲精品在线观看| 美女 人体艺术 gogo| 中文字幕高清在线视频| 亚洲乱码一区二区免费版| 一区二区三区四区激情视频 | 亚洲性夜色夜夜综合| 成人鲁丝片一二三区免费| 精品福利观看| 九色成人免费人妻av| 禁无遮挡网站| 国产伦精品一区二区三区四那| 人人妻人人澡欧美一区二区| 亚洲精品影视一区二区三区av| 国产高潮美女av| 久久久成人免费电影| 成年人黄色毛片网站| 国产精品不卡视频一区二区| 国产一区二区三区av在线 | 国产熟女欧美一区二区| 成人特级av手机在线观看| 精品久久久久久成人av| 国产精品一区二区性色av| 乱人视频在线观看| 中文字幕免费在线视频6| 女同久久另类99精品国产91| 国产欧美日韩精品亚洲av| 成年免费大片在线观看| 欧美精品啪啪一区二区三区| 色综合亚洲欧美另类图片| 99精品久久久久人妻精品| 国产毛片a区久久久久| 久久久久久国产a免费观看| 直男gayav资源| 欧美+亚洲+日韩+国产| 国模一区二区三区四区视频| 不卡视频在线观看欧美| 麻豆国产97在线/欧美| 中出人妻视频一区二区| 我的老师免费观看完整版| 久久久久久久精品吃奶| 国产成人a区在线观看| 在线观看av片永久免费下载| 在线观看午夜福利视频| 国产精品不卡视频一区二区| 丰满人妻一区二区三区视频av| 51国产日韩欧美| 一个人看的www免费观看视频| 嫩草影院精品99| 亚洲avbb在线观看| 成人av一区二区三区在线看| 欧美成人性av电影在线观看| 国产精品电影一区二区三区| 日韩中字成人| 毛片女人毛片| 特级一级黄色大片| 国产精品久久久久久精品电影| 日韩 亚洲 欧美在线| 欧美最新免费一区二区三区| 麻豆国产97在线/欧美| 欧美高清性xxxxhd video| 久久久久久九九精品二区国产| 国产精品自产拍在线观看55亚洲| 中文字幕人妻熟人妻熟丝袜美| 日本五十路高清| 男人的好看免费观看在线视频| 国产色爽女视频免费观看| 亚洲精品在线观看二区| 欧美xxxx黑人xx丫x性爽| 黄色欧美视频在线观看| 日韩中字成人| 国产美女午夜福利| 老熟妇乱子伦视频在线观看| a级毛片免费高清观看在线播放| 欧美极品一区二区三区四区| 欧美一区二区精品小视频在线| videossex国产| 色5月婷婷丁香| 国产精品一及| 中文字幕精品亚洲无线码一区| 波野结衣二区三区在线| 国产精品日韩av在线免费观看| 中文在线观看免费www的网站| 国产精品福利在线免费观看| 国产亚洲精品久久久com| 国产精品一区二区三区四区免费观看 | 可以在线观看毛片的网站| 国产精品久久久久久精品电影| 97超级碰碰碰精品色视频在线观看| 成人特级黄色片久久久久久久| 免费大片18禁| 美女被艹到高潮喷水动态| 国产精品免费一区二区三区在线| 性欧美人与动物交配| 日韩中文字幕欧美一区二区| 国产精品女同一区二区软件 | 高清日韩中文字幕在线| 国内精品久久久久久久电影| 国产老妇女一区| 一夜夜www| 日日摸夜夜添夜夜添小说| 久久久成人免费电影| 91麻豆av在线| 日韩欧美国产一区二区入口| 男人的好看免费观看在线视频| 黄色配什么色好看| 国产精品日韩av在线免费观看| 国产大屁股一区二区在线视频| 一级a爱片免费观看的视频| 好男人在线观看高清免费视频| 小说图片视频综合网站| 99国产极品粉嫩在线观看| 日本 欧美在线| 国产午夜精品论理片| 88av欧美| 亚洲国产精品久久男人天堂| 免费看a级黄色片| 国产精品嫩草影院av在线观看 | 久久婷婷人人爽人人干人人爱| 国产亚洲欧美98| 亚洲专区中文字幕在线| av视频在线观看入口| 午夜免费男女啪啪视频观看 | 99在线人妻在线中文字幕| 亚洲美女搞黄在线观看 | 亚洲美女黄片视频| 国产美女午夜福利| 九九在线视频观看精品| av天堂在线播放| 国产精品女同一区二区软件 | 久久久久久久久久成人| 亚洲第一区二区三区不卡| 日本色播在线视频| 国产亚洲91精品色在线| 免费观看人在逋| 麻豆国产av国片精品| 国产视频内射| 欧美最新免费一区二区三区| 欧美成人性av电影在线观看| 国产亚洲精品综合一区在线观看| 99在线人妻在线中文字幕| av在线老鸭窝| 久久99热这里只有精品18| 91麻豆av在线| 精品人妻1区二区| 国产美女午夜福利| 成人av一区二区三区在线看| 午夜免费激情av| 国产高清不卡午夜福利| 性插视频无遮挡在线免费观看| 91狼人影院| 国产精品免费一区二区三区在线| 在线播放国产精品三级| 欧美激情久久久久久爽电影| 最近视频中文字幕2019在线8| 九色国产91popny在线| 九九久久精品国产亚洲av麻豆| 国产精品久久久久久久久免| 日韩欧美国产一区二区入口| 久久午夜亚洲精品久久| .国产精品久久| 国产精品久久久久久av不卡| 国产精品乱码一区二三区的特点| 乱人视频在线观看| 国产精品人妻久久久久久| 女生性感内裤真人,穿戴方法视频| av在线老鸭窝| 国产精品免费一区二区三区在线| 亚洲第一电影网av| 婷婷六月久久综合丁香| 99久国产av精品| 国产三级中文精品| 免费观看的影片在线观看| 精品福利观看| av视频在线观看入口| 国产免费男女视频| 免费大片18禁| 国产精品99久久久久久久久| 亚洲精品国产成人久久av| 看片在线看免费视频| 久久久久久久久久黄片| 女的被弄到高潮叫床怎么办 | 成人无遮挡网站| 免费av不卡在线播放| 欧美黑人巨大hd| 欧美精品啪啪一区二区三区| 一级毛片久久久久久久久女| 亚洲av中文字字幕乱码综合| 色吧在线观看| 久久人妻av系列| 久久中文看片网| 成人综合一区亚洲| 国产欧美日韩精品亚洲av| 日本一本二区三区精品| 亚洲av.av天堂| 欧美成人免费av一区二区三区| 亚洲美女视频黄频| 久久国产精品人妻蜜桃| 亚洲国产欧洲综合997久久,| 成人美女网站在线观看视频| 有码 亚洲区| 亚洲午夜理论影院| 91久久精品国产一区二区三区| 国产激情偷乱视频一区二区| 国产av不卡久久| 日日夜夜操网爽| 亚洲熟妇熟女久久| 成人美女网站在线观看视频| 丰满人妻一区二区三区视频av| 一本精品99久久精品77| 日日撸夜夜添| 又黄又爽又刺激的免费视频.| 99热只有精品国产| 国产又黄又爽又无遮挡在线| 91麻豆精品激情在线观看国产| 又爽又黄a免费视频| 九九久久精品国产亚洲av麻豆| 又爽又黄a免费视频| 91麻豆精品激情在线观看国产| 中文在线观看免费www的网站| 高清日韩中文字幕在线| 中文在线观看免费www的网站| 免费不卡的大黄色大毛片视频在线观看 | 精品一区二区三区人妻视频| 亚洲欧美日韩高清专用| 成人av一区二区三区在线看| 简卡轻食公司| 亚洲 国产 在线| 非洲黑人性xxxx精品又粗又长| 精品人妻1区二区| 免费看av在线观看网站| 亚洲美女黄片视频| 91精品国产九色| 国产主播在线观看一区二区| av黄色大香蕉| 欧美黑人欧美精品刺激| 窝窝影院91人妻| 久久久久久大精品| 中国美白少妇内射xxxbb| 成人特级av手机在线观看| 国产激情偷乱视频一区二区| 成人特级av手机在线观看| 国产亚洲精品综合一区在线观看| 国产黄色小视频在线观看| 国产黄片美女视频| 少妇猛男粗大的猛烈进出视频 | 亚州av有码| 看黄色毛片网站| 日本爱情动作片www.在线观看 | 日本在线视频免费播放| 国内揄拍国产精品人妻在线| 久久人妻av系列| 有码 亚洲区| av在线亚洲专区| 69av精品久久久久久| 在线天堂最新版资源| 国产麻豆成人av免费视频| 3wmmmm亚洲av在线观看| 国产高清三级在线| 精品乱码久久久久久99久播| 在线免费观看不下载黄p国产 | 中文字幕精品亚洲无线码一区| 村上凉子中文字幕在线| 人人妻人人澡欧美一区二区| 成人鲁丝片一二三区免费| 日韩人妻高清精品专区| 非洲黑人性xxxx精品又粗又长| 午夜影院日韩av| 色av中文字幕| 亚洲综合色惰| 亚洲美女搞黄在线观看 | 男女啪啪激烈高潮av片| 成年免费大片在线观看| www日本黄色视频网| 亚洲国产精品久久男人天堂| 国产精品国产三级国产av玫瑰| 啦啦啦观看免费观看视频高清| 欧美性猛交黑人性爽| 内射极品少妇av片p| 中亚洲国语对白在线视频| 免费av不卡在线播放| 1024手机看黄色片| 99国产极品粉嫩在线观看| 女的被弄到高潮叫床怎么办 | 中文字幕免费在线视频6| 91麻豆精品激情在线观看国产| 亚洲欧美精品综合久久99| 一进一出好大好爽视频| 黄色欧美视频在线观看|