    Simulated Calculation of Bullheading Method When the Well is Empty

    2019-08-05 09:23:12GONGPeibinHELongWANGShujiangFANXilianCHENYangSUNBaojiang

    GONG Peibin; HE Long; WANG Shujiang; FAN Xilian; CHEN Yang; SUN Baojiang

    [a]Drilling Technology Research Institute, Shengli Petroleum Engineering Ltd., Sinopec, Dongying, China.

    [b]Southwest Oil & Gas Branch Company, Sinopec, Chengdu ,China.

    [c]Scholl of Petroleum engineering, China University of Petroleum(Huadong), Qingdao, China.

    Abstract In the case of drilling mud completely erupted out of wellbore in high pressure gas wells, a series of fluid flowing governing equations are established in the consideration of coupling relationship between gas in well bore and formation. The change in casing pressure and bottom hole pressure with time was numerically simulated during shut in and well killing process. The results show that casing pressure and bottom hole pressure can achieve stable value quickly after shut in. The casing pressure increases rapidly first and then decreases to zero in well killing process. The earlier a well killing is performed, the smaller the peak value of casing pressure will occur under the same kill rate. A high kill rate can generate a small peak value of casing pressure after the well killing starts.

    Key words: Gas well; Empty well; Well Control;Bullheading; Numerical simulation

    INTRODUCTION

    In drilling engineering, if a high pressure reservoir is encountered and unreasonable steps are taken to control the complication, the amount of formation gas with high pressure may invade the wellbore abruptly in a short time(Hao and Liu, 1988; Oudeman and Avest, 1994; Blount and Soeiinah, 1981). This can erupt the mud out of the well and make the well empty. A similar event can also occur in gas drilling. When a high-pressure formation is drilled with gas drilling, the formation gas will flood into the well without control because there is no mud in the wellbore to form a hydrostatic column pressure.Once the blowout occurs, the gas well production can reach millions, even tens of millions cubic meters per day(Blount and Soeiinah, 1981; Oudeman, 1999). To deal with this complication, weighted mud is usually pumped into the drill pipe to kill the blowout. But in some cases,mud pumped into the drill pipe cannot be circulated out of the well because the nozzle is plugged or there is only very short drill stem in the well. So the conventional well control method cannot be applied to kill the well (O’Brien and Goins, 1960; Grace, 2003; Ely and Holditch, 1987).Bullheading method is an unconventional kill method to solve this complicated situation, which is suitable to the blowout gas well with sound BOPs (Lei and Li, 2000;Li, et al. (2010; Lei and Lin, 1997; Hao, 1992). In this operation, firstly the BOPs are closed to seal the well and then a high pressure kill mud is pumped into the well to push the formation gas back into the formation.Bullheading is conducted until the whole gas is forced into the formation. Due to the complex fluid flow process in the well, there is not much research on this method and bullheading is ordinarily used by experience in field practice, which limits the application scale of the method to a large extent.

    In this paper, nodal analysis is adapted to calculate the gas flow rate with open BOPs by computer simulation which is used as the initial condition of shut in and well killing simulation. Dynamic change of casing pressure and bottom hole pressure is calculated during shut in and well killing process. Then key parameters of bullheading such as kill rate and shut-in moment are analyzed. The simulation results can supply a theory evidence for the field practice.

    1. PRINCIPLE OF BULLHEADING METHOD

    Bullheading is an unconventional well control method and the whole process of killing gas wells is divided into three stages.

    Stage one (shown in Figure 1-a): The well is shut in and weighted mud is pumped into the well from the kill line or drill stem or both of them simultaneously. Natural gas in the well is compressed. Formation pressure is still higher than the bottom hole pressure, that will result in a continuous gas inflow to the well until the sum of casing pressure, mud hydrostatic pressure and gas column pressure is equal to formation pressure. And then the formation gas stops to flow to the wellbore.

    Stage two (shown in Figure 1-b): Continue to pump the mud into wellbore. The bottom hole pressure is slightly higher than formation pressure and the gas in the well is pushed into the porous formation. As the mud column is gradually built, the casing pressure will show a lasting decrease.

    Stage three (shown in Figure 1-c): Continue to pump the mud into the well. As the mud hydrostatic column pressure is higher than the formation pressure, casing pressure becomes zero and the gas is forced to the porous formation by the mud only. When the gas in wellbore is wholly pushed into the formation, bullheading operation is achieved and the well killing is successful.

    Figure 1 Process of bullheading well control

    A constant pump rate is usually required to implement an effective application of bullheading. Other applied conditions include deep casing depth and high permeability of open hole formation. In addition, density and viscosity of kill mud, composition of natural gas,wellbore size, formation pressure and fracture pressure are all influencing factors of a bullheading operation (Otutu,et al., 2005).

    2. GOVERNING EQUATIONS OF FLUIDS IN WELLBORE

    When the well is empty, there is only gas phase in wellbore. Then well killing is implemented and the kill fluid is at the top of wellbore with the gas at the bottom.To simplify the calculation of the equations, the following assumption is made.

    ? The gas or kill mud in the well is one-dimensional flow because the wellbore size is much smaller than the well depth.

    ? When the well is empty (without mud), the loss of gas kinetic energy is ignored compared with the total energy loss (v·dv= 0).

    ? After the kill mud is pumped into the well, the mud pushes the gas to formation at a constant speed. The interface between gas and mud is thin and no mixture two-phase flow occurs.

    ? Permeability of porous formation at the bottom hole is isotropic and gas flow in the reservoir is calculated by plane radial flow formula.

    2.1 Continuity Equation

    Whereρgandρkare the gas density and kill mud density respectively in kg/m3,vgandvkare the gas velocity and kill mud velocity respectively in m/s,sis the depth of the well in m;qgis gas production in kg/(m·s).

    2.2 Momentum Equation

    When there is no mud in the well or the mud is absolutely erupted out of the well, the gas is the only fluid in the well. So the momentum equation is shown as Eq. (2).

    When bullheading begins, the momentum equation of kill mud is shown as Eq. (3).

    Where:Pis the pressure in the wellbore, Pa;gis the acceleration of gravity, m/s2;αis deviation angle,°;ρkis kill mud density, kg/m3;vkis the velocity of kill mud,m/s;f1andf2are friction resistance of gas and kill mud respectively, Pa/m.

    2.3 Gas Production Equation

    Considering the high production of formation gas, the gas flow in the porous rocks belongs to non-Darcy seepage behavior. And the gas production equation is as follows(Vallejo-Arrieta, 2002; Yang, 1992).

    During the stage two and three of bullheading, gas in wellbore is forced to the formation. The gas flow rate to the formation is equal to the kill rate which is Darcy seepage behavior and the gas flow rate can be calculated by Eq. (7).

    2.4 Auxiliary Equations

    Wellbore temperature field equation:

    Where:Tis wellbore temperature at the depth ofs,K;Tg0is gas temperature at wellhead in K;Tgradis gas temperature gradient in K/m.

    3. NUMERICAL SOLUTION METHOD

    3.1 Definite SoIution Condition

    The definite solution condition includes pressure boundary and temperature boundary at bottom hole and wellhead(Sun, et al., 2011; Wang, et al., 2009). The simulation of bullheading can be divided into three parts which are absolute open flow, shut-in and well killing. The initial and boundary conditions for the three period are as follows.

    Absolute open flow: pa= 105Pa,T(t,i) = FT(t,i)

    Shut-in: qg(t,i)= qsc(t,i)/rsc, T(t,i) = FT(t,i)

    Well killing: qg(t,i) = qsc(t,i)/rsc, T(t,i) = FT(t,i)(Stage one;qsi=Qk,T(t,i) = FT(t,i)(stage two to three)

    Where Pais casing pressure in Pa, Qkis kill mud pump rate in m3/s, rscis the natural gas density at standard condition in kg/m3, FTis wellbore temperature function.

    3.2 Solution Procedure

    Finite difference method is adopted to solve the differential equations. Space domain is the whole wellbore and the time domain is the bullheading time. Then the grid division of definite area is completed and all the grid points are used to simulated the whole time-space domain.During the calculation, the difference quotient is adopted instead of calculating the value of derivative in governing equations. Discrete all the governing equations and we can calculate the parameter value at each node. Repeat the above calculation in the entire time domain and all the parameters at any time and location of the well can be obtained (Gao, et al., 2008).

    Take the well killing operation as an example to demonstrate the calculation process shown in Figure 2.WherePmaxis the maximum allowed casing pressure,Vkis the kill mud volume andVwellis the volume of whole wellbore.

    Figure 2 Flow chart of bullheading calculation simulation

    4. SIMULATED EXAMPLE AND RESULT ANALYSIS

    In this subsection, the developed methodology has been applied to simulate the whole process of bullheading in a 1200 m well. The basic drilling parameters of the well are tabulated in Table 1. Besides, we assume that there is no drill stem in wellbore when the gas well blowout occurs and the BOPs are all in perfect working order. The well can be shut in to implement a bullheading well killing.The simulated results are described from Figure 3 to Figure 8.

    Table 1 Calculation Data of Bullheading

    4.1 Absolute Open Gas Flow

    Figure 3 Gas production in absolute open flow of gas well

    Figure 3 shows the calculation of gas production in absolute open hole by nodal analysis. The bottom hole is selected as the nodal and its pressure value can be obtained either through gas momentum equation Eq. (2)or gas production equation including Eq. (4), Eq. (5)and Eq. (6). The curve from the former method is called Outflow Performance Relationship Curve (OPR curve)which is calculated from wellhead to bottom hole. And the curve from the later method is called Inflow Performance Relationship Curve (IPR curve) which is calculated from the reservoir to bottom hole.

    As can be seen from Figure 3 the bottom hole pressure decreases with the increase of gas production in IPR curve, but it increases with the increase of gas production in OPR curve. The intersection of the two curves indicates the gas flow rate and the corresponding pressure at bottom hole. The gas flow rate is 6.525×106m3/d and the flow pressure at bottom hole is 3.77 MPa.

    4.2 Shut-in Process

    Once the well is shut-in, the formation gas will continue to flow to the wellbore initially. The gas in wellbore is then compressed and the bottom hole pressure keep rising,which in turn reduces the invasion of formation gas. At last, a state of equilibrium is reached and there is no gas flowing to the wellbore.

    The dynamic change of casing pressure and bottom hole pressure is shown in Figure 4. It can be seen from the diagram that both the casing pressure and bottom hole pressure increase after shut in. After about 125 seconds, the casing pressure and bottom hole pressure became constant until the 180 seconds. It reveals that the amount of gas invading the well in a short time can increases the casing pressure and bottom hole pressure after shut-in. At the same time, the growth of bottom hole pressure reduces the gas production from reservoir. As a result, the growth rate of gas production becomes lower and lower with time. And that can be seen from the slope of curve in Figure 4.

    Figure 4 Casing pressure and bottom hole pressure change after shut in

    4.3 Bullheading Well Killing

    4.3.1 Influence of Kill Moment

    Kill moment here is defined as any moment after the shut in of a well. Figure 5 and Figure 6 show the casing pressure and bottom hole pressure change respectively when the kill moment is 10s, 30s, 60s, 90s and 120s with the kill rate of 80L/s. From Figure 5 we can see that the casing pressure first increase and then starts to decrease after its peak value. The hydrostatic column value is slightly higher than the formation pressure at the moment of 615s and the casing pressure became 0 till the bullheading is over. Figure 6 shows the similar change law that the bottom hole pressure first increase till the casing pressure reaches the maximum value. Then the bottom hole pressure grows slightly higher than formation pressure and that value lasts until the bullheading is over.

    It can be seen from the comparison of Figure 5 and Figure 6 that the earlier the kill moment is, the lower the maximum casing pressure occurs. And a lower pressure level of wellhead equipment is needed when bullheading is applied.

    Figure 5 Effect of kill moments on casing pressure

    Figure 6 Effect of kill moments on bottom hole pressure

    4.3.2 Influence of kill rate

    Figure 7 and Figure 8 show the casing pressure and bottom hole pressure change respectively when the kill rate is 20 L/s, 40 L/s, 60 L/s, 80 L/s and 100 L/s with the kill moment of 0 s. That means well killing is implemented immediately after shut in. From Figure 7 the maximum casing pressure is 11.6MPa, 11.3MPa,10.9MPa, 10.7MPa, 10.4MPa and 10.1MPa when the kill rate is 20L/s, 40L/s, 60L/s, 80L/s and 100L/s. And the corresponding time needed to complete bullheading is 1553s, 1246s, 825s, 607s and 494s respectively. The conclusion can be obtained that a high kill rate will reduce the maximum casing pressure and the kill time under the same conditions. Because a higher kill rate can cause a rapid increase of hydrostatic column pressure which will decrease the casing pressure. At the same time a higher kill rate can compress the gas in wellbore in a shorter time, and the casing pressure occurs earlier.

    From Figure 8 we can see that the bottom hole pressure all increases to formation pressure in 120 second under different kill rate. But the time needed to apply a successful bullheading is 494 seconds to 1553 seconds.In a word, most of the bullheading time is spent on the process of forcing the gas to the formation. The whole time needed to implement a bullheading depends on the kill rate only.

    Figure 7 Effect of kill rate on casing pressure

    Figure 8 Effect of kill rate on bottom hole pressure

    The results demonstrate two simultaneous state during bullheading. One is the establishment of kill mud hydrostatic pressure that can decrease the casing pressure and the other is the compression of gas in wellbore that can increase the casing pressure. When the well killing begins, gas compression plays a leading role in the casing pressure change and the casing pressure increases at first. After the bottom hole pressure reaches formation pressure, the kill mud hydrostatic pressure starts to prevail and the casing pressure starts to decrease until the end of bullheading. So the casing pressure always increases first and then decreases (shown in Figure 7).

    CONCLUSIONS

    (1) Based on the characteristic of an empty well, a modelling of bullheading divided into three stages is established. Combined with the numerical solution method, the dynamic change of casing pressure and bottom hole pressure can be simulated during bullheading which can provide a well killing design.

    (2) After shut-in, the casing pressure can increase rapidly in a short time. If the pressure bearing capacity of BOPs is not enough, a bullheading should be applied immediately after shut in. Because the earlier the well killing moment is, the lower the peak casing pressure will be.

    (3) The well killing time is only related to kill rate. A big kill rate can reduce the kill time. If the casing pressure is bigger than the rated pressure of mud pump, fracturing truck is suggested to be applied to implement bullheading.

    ACKNOWLEDGEMENT

    The research is supported by the grant from Key Science and Technology Development of Sinopec Group Corporation (No. JP17065).

    欧美黑人欧美精品刺激| 亚洲七黄色美女视频| 成人手机av| 在线看三级毛片| 日韩欧美国产在线观看| 欧美绝顶高潮抽搐喷水| 欧美性长视频在线观看| 国产精品综合久久久久久久免费| 色综合亚洲欧美另类图片| 叶爱在线成人免费视频播放| 久久午夜亚洲精品久久| 最近最新中文字幕大全电影3 | 亚洲第一青青草原| 天天添夜夜摸| 男女床上黄色一级片免费看| 日本在线视频免费播放| e午夜精品久久久久久久| 后天国语完整版免费观看| 欧美乱妇无乱码| 1024手机看黄色片| 久久九九热精品免费| 久久中文字幕一级| 精华霜和精华液先用哪个| 超碰成人久久| 精品欧美一区二区三区在线| 国产成人精品无人区| 欧美激情 高清一区二区三区| 久久久久久九九精品二区国产 | 看黄色毛片网站| 亚洲精品av麻豆狂野| 成人一区二区视频在线观看| 成人18禁高潮啪啪吃奶动态图| 级片在线观看| 波多野结衣巨乳人妻| 日日爽夜夜爽网站| 成人永久免费在线观看视频| 婷婷精品国产亚洲av| 亚洲五月色婷婷综合| 国产99白浆流出| 免费av毛片视频| 亚洲无线在线观看| 在线观看免费午夜福利视频| 色综合婷婷激情| 99久久久亚洲精品蜜臀av| 欧美激情 高清一区二区三区| 精品久久久久久久末码| 欧美国产日韩亚洲一区| 在线观看免费视频日本深夜| 一区二区日韩欧美中文字幕| 亚洲黑人精品在线| 女人被狂操c到高潮| 欧美日本视频| 老熟妇仑乱视频hdxx| 中文字幕人妻丝袜一区二区| 日本一区二区免费在线视频| 成人一区二区视频在线观看| 久久久久亚洲av毛片大全| 国产三级黄色录像| 欧美色欧美亚洲另类二区| 亚洲av成人一区二区三| 91成人精品电影| a级毛片a级免费在线| 黄色片一级片一级黄色片| 中文字幕久久专区| 国内少妇人妻偷人精品xxx网站 | 宅男免费午夜| 最近在线观看免费完整版| 人人澡人人妻人| 亚洲熟女毛片儿| 欧美午夜高清在线| 久久午夜亚洲精品久久| 亚洲欧美日韩高清在线视频| 自线自在国产av| av有码第一页| 欧美黄色淫秽网站| 成年版毛片免费区| 在线免费观看的www视频| 99riav亚洲国产免费| 日本在线视频免费播放| 老汉色∧v一级毛片| 亚洲国产欧洲综合997久久, | 亚洲精品在线观看二区| 51午夜福利影视在线观看| 中出人妻视频一区二区| 国产精品1区2区在线观看.| 亚洲片人在线观看| 两性夫妻黄色片| 两个人看的免费小视频| 12—13女人毛片做爰片一| 亚洲久久久国产精品| 久久九九热精品免费| 人妻丰满熟妇av一区二区三区| 身体一侧抽搐| 日韩视频一区二区在线观看| 欧美丝袜亚洲另类 | 成人18禁高潮啪啪吃奶动态图| 黄网站色视频无遮挡免费观看| 在线永久观看黄色视频| 99在线视频只有这里精品首页| 久久青草综合色| 国产成人欧美| 亚洲九九香蕉| √禁漫天堂资源中文www| av免费在线观看网站| 亚洲激情在线av| 欧美黑人巨大hd| 亚洲一区高清亚洲精品| 中文字幕另类日韩欧美亚洲嫩草| 国产精品精品国产色婷婷| 国产精品 国内视频| 久久性视频一级片| 久久精品国产99精品国产亚洲性色| 日本撒尿小便嘘嘘汇集6| 国产麻豆成人av免费视频| 午夜福利成人在线免费观看| 人人澡人人妻人| 婷婷精品国产亚洲av| 搡老岳熟女国产| 国产欧美日韩精品亚洲av| 天堂√8在线中文| 免费女性裸体啪啪无遮挡网站| 叶爱在线成人免费视频播放| 18禁裸乳无遮挡免费网站照片 | 最近最新免费中文字幕在线| 这个男人来自地球电影免费观看| 久久午夜亚洲精品久久| aaaaa片日本免费| 国产精品久久电影中文字幕| 丁香六月欧美| 香蕉久久夜色| 在线观看www视频免费| 熟妇人妻久久中文字幕3abv| 后天国语完整版免费观看| 久久午夜亚洲精品久久| 国产麻豆成人av免费视频| 午夜久久久在线观看| 99热这里只有精品一区 | 怎么达到女性高潮| 久久精品亚洲精品国产色婷小说| 好男人电影高清在线观看| 99精品欧美一区二区三区四区| 欧美日韩乱码在线| 中国美女看黄片| 免费在线观看黄色视频的| 国内久久婷婷六月综合欲色啪| 国产激情偷乱视频一区二区| 国产精品一区二区精品视频观看| 人人妻,人人澡人人爽秒播| 国产精品免费一区二区三区在线| 久久精品国产亚洲av高清一级| 精品熟女少妇八av免费久了| 欧美国产日韩亚洲一区| 国产伦一二天堂av在线观看| 麻豆久久精品国产亚洲av| 国产一区在线观看成人免费| 成人亚洲精品一区在线观看| 18禁裸乳无遮挡免费网站照片 | 两性午夜刺激爽爽歪歪视频在线观看 | 成人亚洲精品av一区二区| 美女扒开内裤让男人捅视频| 看免费av毛片| 成年版毛片免费区| 欧美又色又爽又黄视频| 亚洲,欧美精品.| 听说在线观看完整版免费高清| 久久九九热精品免费| 亚洲免费av在线视频| 精品久久久久久久久久免费视频| 香蕉久久夜色| 亚洲全国av大片| 国产免费av片在线观看野外av| 叶爱在线成人免费视频播放| 老司机午夜福利在线观看视频| 国产黄片美女视频| 欧美性猛交黑人性爽| 国产单亲对白刺激| 欧美性长视频在线观看| 啦啦啦 在线观看视频| 午夜精品久久久久久毛片777| 亚洲午夜理论影院| avwww免费| 久久性视频一级片| 天天一区二区日本电影三级| 草草在线视频免费看| 国产亚洲av嫩草精品影院| 看黄色毛片网站| 国产又色又爽无遮挡免费看| 女警被强在线播放| 婷婷精品国产亚洲av| 亚洲av成人av| 性欧美人与动物交配| 午夜激情av网站| 中文字幕人妻丝袜一区二区| 老司机福利观看| 精品国产超薄肉色丝袜足j| 视频区欧美日本亚洲| www国产在线视频色| 久热爱精品视频在线9| 中文字幕人妻丝袜一区二区| 婷婷丁香在线五月| 12—13女人毛片做爰片一| 日韩欧美免费精品| www.熟女人妻精品国产| 久久久国产欧美日韩av| 18美女黄网站色大片免费观看| 久久青草综合色| 成人三级黄色视频| 给我免费播放毛片高清在线观看| 亚洲欧洲精品一区二区精品久久久| 国产亚洲av嫩草精品影院| 亚洲色图 男人天堂 中文字幕| 成年免费大片在线观看| 精品久久久久久久久久免费视频| 曰老女人黄片| 欧美又色又爽又黄视频| 19禁男女啪啪无遮挡网站| 成人手机av| 久久热在线av| 国产视频一区二区在线看| 色综合亚洲欧美另类图片| cao死你这个sao货| 欧美另类亚洲清纯唯美| 成人永久免费在线观看视频| av天堂在线播放| 亚洲av日韩精品久久久久久密| 在线观看日韩欧美| 欧美最黄视频在线播放免费| 在线观看www视频免费| 欧美激情 高清一区二区三区| a在线观看视频网站| 九色国产91popny在线| 此物有八面人人有两片| 夜夜爽天天搞| 香蕉久久夜色| 国产精品日韩av在线免费观看| 亚洲av电影不卡..在线观看| 久久精品人妻少妇| 亚洲第一电影网av| 国产精品久久久久久亚洲av鲁大| 欧美乱妇无乱码| 亚洲自偷自拍图片 自拍| 国产成年人精品一区二区| 很黄的视频免费| 久久精品亚洲精品国产色婷小说| 久久久久久国产a免费观看| 精品久久久久久成人av| 无遮挡黄片免费观看| 色精品久久人妻99蜜桃| 伦理电影免费视频| 精品久久久久久久人妻蜜臀av| 亚洲第一电影网av| 激情在线观看视频在线高清| 一a级毛片在线观看| 久久精品国产亚洲av高清一级| 亚洲第一欧美日韩一区二区三区| 不卡av一区二区三区| 一级a爱片免费观看的视频| 亚洲熟妇熟女久久| 欧美人与性动交α欧美精品济南到| 久久草成人影院| 女性被躁到高潮视频| 欧美av亚洲av综合av国产av| 免费看美女性在线毛片视频| aaaaa片日本免费| 国产伦一二天堂av在线观看| 97人妻精品一区二区三区麻豆 | 日韩高清综合在线| 国产人伦9x9x在线观看| 在线观看免费视频日本深夜| 免费电影在线观看免费观看| a在线观看视频网站| 亚洲人成网站高清观看| 麻豆久久精品国产亚洲av| 亚洲精品美女久久av网站| 免费在线观看亚洲国产| 丝袜在线中文字幕| 18禁裸乳无遮挡免费网站照片 | 成人免费观看视频高清| 精品第一国产精品| 免费av毛片视频| 国产单亲对白刺激| 久久精品人妻少妇| 91国产中文字幕| 欧美精品啪啪一区二区三区| 精品国产乱码久久久久久男人| 免费在线观看日本一区| 亚洲精品色激情综合| 成人亚洲精品av一区二区| 久久久久亚洲av毛片大全| 香蕉国产在线看| 国产精品99久久99久久久不卡| 听说在线观看完整版免费高清| 精品国产乱子伦一区二区三区| 久久精品夜夜夜夜夜久久蜜豆 | 国产精品永久免费网站| 亚洲国产毛片av蜜桃av| 亚洲一卡2卡3卡4卡5卡精品中文| 久久精品91蜜桃| 69av精品久久久久久| 国产成人精品久久二区二区免费| 国产精品九九99| 久久人妻av系列| 色在线成人网| 国产区一区二久久| 国产男靠女视频免费网站| 麻豆成人午夜福利视频| 亚洲精品国产区一区二| 男人的好看免费观看在线视频 | 国产高清激情床上av| 99久久精品国产亚洲精品| 亚洲中文字幕一区二区三区有码在线看 | 天天躁夜夜躁狠狠躁躁| 中文字幕人妻熟女乱码| 12—13女人毛片做爰片一| 十八禁人妻一区二区| www日本在线高清视频| 午夜福利免费观看在线| 看片在线看免费视频| 精品乱码久久久久久99久播| 国产aⅴ精品一区二区三区波| avwww免费| 国产单亲对白刺激| 天天躁狠狠躁夜夜躁狠狠躁| 日本撒尿小便嘘嘘汇集6| 国产精品综合久久久久久久免费| 一级作爱视频免费观看| 日韩欧美 国产精品| 麻豆av在线久日| 欧美国产精品va在线观看不卡| 听说在线观看完整版免费高清| 亚洲精品av麻豆狂野| 深夜精品福利| 精品第一国产精品| 亚洲男人天堂网一区| 久久伊人香网站| 久久国产精品男人的天堂亚洲| 两人在一起打扑克的视频| 日韩免费av在线播放| 国产av又大| 亚洲 欧美 日韩 在线 免费| 成人手机av| 亚洲熟女毛片儿| 精品久久久久久久末码| 又紧又爽又黄一区二区| 高清毛片免费观看视频网站| 久久香蕉精品热| 久久精品91无色码中文字幕| 黄色成人免费大全| www.www免费av| 黄色成人免费大全| 一边摸一边抽搐一进一小说| 又紧又爽又黄一区二区| 十八禁人妻一区二区| 精品少妇一区二区三区视频日本电影| a级毛片在线看网站| 欧美不卡视频在线免费观看 | 欧美一级毛片孕妇| 巨乳人妻的诱惑在线观看| 夜夜夜夜夜久久久久| 亚洲av成人不卡在线观看播放网| 非洲黑人性xxxx精品又粗又长| 成人av一区二区三区在线看| 最近在线观看免费完整版| 欧美日韩瑟瑟在线播放| 国产成年人精品一区二区| 一级a爱片免费观看的视频| 久久久精品欧美日韩精品| 99久久综合精品五月天人人| 亚洲人成网站在线播放欧美日韩| 国产黄a三级三级三级人| 国产区一区二久久| 夜夜看夜夜爽夜夜摸| 国产精品精品国产色婷婷| 欧美国产日韩亚洲一区| 精品一区二区三区视频在线观看免费| 国产精品精品国产色婷婷| 亚洲天堂国产精品一区在线| 天天躁夜夜躁狠狠躁躁| a级毛片在线看网站| 黄色a级毛片大全视频| 欧美av亚洲av综合av国产av| 两性夫妻黄色片| 在线十欧美十亚洲十日本专区| 亚洲第一青青草原| 夜夜夜夜夜久久久久| 日本黄色视频三级网站网址| 国产亚洲精品久久久久5区| 女人爽到高潮嗷嗷叫在线视频| 天堂√8在线中文| 久久青草综合色| 国产午夜精品久久久久久| 免费一级毛片在线播放高清视频| 女生性感内裤真人,穿戴方法视频| 精品国内亚洲2022精品成人| 国产成人一区二区三区免费视频网站| 天天躁夜夜躁狠狠躁躁| xxxwww97欧美| 国产成人系列免费观看| 中出人妻视频一区二区| 久热这里只有精品99| 久久久久精品国产欧美久久久| 黄色女人牲交| 黄色a级毛片大全视频| 亚洲精品美女久久久久99蜜臀| 久久国产精品人妻蜜桃| 波多野结衣高清作品| 国产激情欧美一区二区| 午夜福利免费观看在线| 亚洲自偷自拍图片 自拍| 日日干狠狠操夜夜爽| 激情在线观看视频在线高清| www.www免费av| 精品国产亚洲在线| 精品熟女少妇八av免费久了| 女人高潮潮喷娇喘18禁视频| 色av中文字幕| 亚洲成人国产一区在线观看| 怎么达到女性高潮| 十八禁网站免费在线| 怎么达到女性高潮| or卡值多少钱| 又黄又粗又硬又大视频| 老鸭窝网址在线观看| 黑人巨大精品欧美一区二区mp4| 久久精品成人免费网站| 国产成人欧美| 欧美色欧美亚洲另类二区| 亚洲国产毛片av蜜桃av| 国内久久婷婷六月综合欲色啪| 宅男免费午夜| 中文字幕av电影在线播放| av有码第一页| 免费在线观看视频国产中文字幕亚洲| 亚洲五月天丁香| 一二三四在线观看免费中文在| 一边摸一边抽搐一进一小说| 每晚都被弄得嗷嗷叫到高潮| xxxwww97欧美| 一区福利在线观看| 日韩欧美国产在线观看| 久热这里只有精品99| 性欧美人与动物交配| 国产野战对白在线观看| 99精品久久久久人妻精品| 神马国产精品三级电影在线观看 | 精品久久久久久久久久久久久 | 精品日产1卡2卡| 久久精品国产亚洲av香蕉五月| 日本三级黄在线观看| 亚洲精品久久成人aⅴ小说| 久久国产精品人妻蜜桃| 亚洲中文av在线| 搡老熟女国产l中国老女人| 狠狠狠狠99中文字幕| 久久国产精品影院| 麻豆国产av国片精品| 老熟妇仑乱视频hdxx| 国产视频内射| 久热这里只有精品99| 亚洲在线自拍视频| 亚洲狠狠婷婷综合久久图片| 曰老女人黄片| 国产av又大| av天堂在线播放| 午夜福利成人在线免费观看| 亚洲第一青青草原| 国产成人精品久久二区二区免费| 99国产精品一区二区蜜桃av| 国产午夜福利久久久久久| 无人区码免费观看不卡| 久久国产精品男人的天堂亚洲| 精品久久久久久久久久久久久 | 久久午夜综合久久蜜桃| 国产精品日韩av在线免费观看| 欧美乱色亚洲激情| 中亚洲国语对白在线视频| 亚洲精品在线美女| 国产视频内射| 他把我摸到了高潮在线观看| 国产激情偷乱视频一区二区| 欧美成人性av电影在线观看| 亚洲国产高清在线一区二区三 | 成人特级黄色片久久久久久久| 国产极品粉嫩免费观看在线| 99re在线观看精品视频| 91老司机精品| 日韩视频一区二区在线观看| 国产黄片美女视频| 中文字幕人妻熟女乱码| 无遮挡黄片免费观看| 高清在线国产一区| 久久久久久久午夜电影| 亚洲自偷自拍图片 自拍| 在线观看午夜福利视频| www.自偷自拍.com| 狂野欧美激情性xxxx| 黄色女人牲交| 99国产精品99久久久久| 日日干狠狠操夜夜爽| 亚洲 欧美 日韩 在线 免费| 两人在一起打扑克的视频| 久久精品国产亚洲av香蕉五月| 一级毛片女人18水好多| 51午夜福利影视在线观看| 亚洲成人免费电影在线观看| 日韩一卡2卡3卡4卡2021年| 欧美黑人精品巨大| 欧美国产日韩亚洲一区| 99热只有精品国产| 国产伦在线观看视频一区| 老鸭窝网址在线观看| 妹子高潮喷水视频| 成年免费大片在线观看| 国产一卡二卡三卡精品| 亚洲国产欧美网| av超薄肉色丝袜交足视频| 午夜视频精品福利| 熟女少妇亚洲综合色aaa.| 欧美激情 高清一区二区三区| 色播在线永久视频| 欧美成人一区二区免费高清观看 | 亚洲三区欧美一区| 亚洲成a人片在线一区二区| 他把我摸到了高潮在线观看| 99国产精品99久久久久| 老鸭窝网址在线观看| 午夜福利高清视频| 特大巨黑吊av在线直播 | 精品高清国产在线一区| 大型av网站在线播放| 欧美三级亚洲精品| 亚洲一区高清亚洲精品| 欧美黑人欧美精品刺激| 免费在线观看视频国产中文字幕亚洲| 亚洲成av人片免费观看| 亚洲av成人不卡在线观看播放网| 国内久久婷婷六月综合欲色啪| 视频区欧美日本亚洲| 777久久人妻少妇嫩草av网站| 国产精品美女特级片免费视频播放器 | 午夜日韩欧美国产| 亚洲精华国产精华精| 男人舔奶头视频| 午夜成年电影在线免费观看| 视频区欧美日本亚洲| 国产精品1区2区在线观看.| 无人区码免费观看不卡| 日韩欧美一区二区三区在线观看| 国产亚洲精品综合一区在线观看 | 亚洲第一电影网av| 亚洲狠狠婷婷综合久久图片| 熟女电影av网| 亚洲欧美激情综合另类| 亚洲成人国产一区在线观看| 国产精品亚洲美女久久久| 成人手机av| 97人妻精品一区二区三区麻豆 | 国产精品久久久人人做人人爽| 热re99久久国产66热| 国产精品久久视频播放| 一进一出抽搐gif免费好疼| 日本撒尿小便嘘嘘汇集6| 亚洲国产精品sss在线观看| 国产亚洲欧美98| 中文字幕人成人乱码亚洲影| 国产av一区在线观看免费| 久久久精品欧美日韩精品| 欧美日韩精品网址| 欧美成人一区二区免费高清观看 | 久久午夜综合久久蜜桃| 欧美激情高清一区二区三区| 亚洲一区二区三区色噜噜| 亚洲欧美精品综合久久99| 亚洲精品粉嫩美女一区| 国产乱人伦免费视频| x7x7x7水蜜桃| 午夜免费观看网址| 国产免费男女视频| 制服诱惑二区| 日韩精品免费视频一区二区三区| 色综合婷婷激情| 嫁个100分男人电影在线观看| 亚洲国产毛片av蜜桃av| 99精品在免费线老司机午夜| 最近最新中文字幕大全免费视频| av免费在线观看网站| 日本一区二区免费在线视频| 免费av毛片视频| 一本大道久久a久久精品| 香蕉国产在线看| 国产精品香港三级国产av潘金莲| 久久 成人 亚洲| 久久久久国内视频| 成人三级黄色视频| 久久 成人 亚洲| 国产成人影院久久av| 国产一区在线观看成人免费| 啦啦啦观看免费观看视频高清| 制服丝袜大香蕉在线| 欧美日韩瑟瑟在线播放| 久久久精品国产亚洲av高清涩受| 黄片小视频在线播放| 欧美激情久久久久久爽电影| 非洲黑人性xxxx精品又粗又长| 亚洲,欧美精品.| 欧美激情久久久久久爽电影| 非洲黑人性xxxx精品又粗又长| 亚洲男人天堂网一区| 激情在线观看视频在线高清| 老司机午夜十八禁免费视频| 久久中文看片网| 美女国产高潮福利片在线看| x7x7x7水蜜桃| 亚洲国产欧洲综合997久久, | 桃红色精品国产亚洲av|