【摘 要】隨著我國(guó)經(jīng)濟(jì)的迅速發(fā)展,對(duì)于建筑工程的需求量也在不斷上漲,機(jī)電設(shè)備作為施工過(guò)程中的重要工具,對(duì)于整個(gè)施工工作的安全性有著至關(guān)重要的作用。為確保該設(shè)備的順利進(jìn)行,相關(guān)安裝及預(yù)留預(yù)埋工作就顯得尤為重要,該工藝對(duì)于設(shè)備的壽命及運(yùn)行狀態(tài)會(huì)有一定的影響。基于此,論文針對(duì)當(dāng)前我國(guó)機(jī)電設(shè)備安裝中預(yù)留預(yù)埋工作要點(diǎn)進(jìn)行簡(jiǎn)要分析,并就推動(dòng)該工藝不斷優(yōu)化完善的措施提出幾點(diǎn)相關(guān)建議。
【Abstract】With the rapid development of China's economy, the demand for construction projects is also rising. Mechanical and electrical equipment, as an important tool in the construction process, plays a vital role in the safety of the whole construction work. In order to ensure the smooth operation of the equipment, the relevant installation and reserved and embedded work is particularly important, and this process will have a certain impact on the life and running state of the equipment. Based on this, this paper makes a brief analysis on the main points of the reserved and embedded work in the current installation of mechanical and electrical equipment in China, and puts forward some suggestions on the measures to promote the continuous optimization and improvement of the process.
【關(guān)鍵詞】機(jī)電安裝;電氣管線;預(yù)留預(yù)埋工作
【Keywords】mechanical and electrical installation; electrical pipelines; reserved and embedded work
【中圖分類號(hào)】TU85? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?【文獻(xiàn)標(biāo)志碼】A? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 【文章編號(hào)】1673-1069(2019)12-0138-02
1 引言
通過(guò)創(chuàng)新機(jī)電設(shè)備安裝工作方式,能夠很好地促進(jìn)該工程質(zhì)量的提升,同時(shí)還有利于企業(yè)減少作業(yè)的生產(chǎn)成本,提高整體效益。由于該設(shè)備較為復(fù)雜,所以說(shuō)在安裝過(guò)程當(dāng)中,一旦相關(guān)工作人員缺乏成熟技術(shù),就容易在施工時(shí)產(chǎn)生安全問(wèn)題,并對(duì)人們的自身安全產(chǎn)生威脅影響。因此,就要對(duì)該設(shè)備進(jìn)行合理的安裝控制。
2 當(dāng)前預(yù)留預(yù)埋工作過(guò)程中存在的不足之處
具體結(jié)合目前我國(guó)機(jī)電安裝工作過(guò)程中,相關(guān)電氣管線預(yù)留預(yù)埋工作的開展建設(shè)情況來(lái)看,設(shè)備技術(shù)安裝環(huán)節(jié)以及電氣設(shè)備預(yù)埋管路存在一定問(wèn)題。
2.1 設(shè)備基礎(chǔ)安裝環(huán)節(jié)中的問(wèn)題
機(jī)電安裝過(guò)程中這些設(shè)備預(yù)埋常見(jiàn)的問(wèn)題便是,前期的設(shè)備技術(shù)安裝環(huán)節(jié),此過(guò)程中出現(xiàn)問(wèn)題的頻率較高,由于設(shè)備技術(shù)安裝環(huán)節(jié)是整個(gè)機(jī)電安裝電氣設(shè)備預(yù)埋工作的前期準(zhǔn)備,也是整個(gè)工作的重要內(nèi)容,所以,做好前期設(shè)備安裝工作對(duì)整個(gè)工作質(zhì)量水平的提升都有重要的影響。而由于此方面的工作是基礎(chǔ),所需要的工作人員也必須具備專業(yè)技能,其綜合知識(shí)應(yīng)較為全面,才能夠在此基礎(chǔ)上確保設(shè)備技術(shù)安裝環(huán)節(jié)的質(zhì)量水平過(guò)關(guān)。設(shè)備基礎(chǔ)安裝工作需要對(duì)整個(gè)施工環(huán)境做好提前的考察工作,這樣才能防止在使用過(guò)程中出現(xiàn)其他情況,影響整個(gè)施工質(zhì)量及安全性。在具體的施工操作過(guò)程中應(yīng)嚴(yán)格認(rèn)真對(duì)待,做好前期準(zhǔn)備,才能確保整個(gè)施工工作的順利開展,然而結(jié)合當(dāng)前我國(guó)機(jī)電安裝電氣設(shè)備預(yù)埋預(yù)留工作的發(fā)展?fàn)顩r來(lái)看,大部分的施工人員會(huì)忽視前期的施工準(zhǔn)備,與此同時(shí),相關(guān)操作不夠規(guī)范。由于當(dāng)前機(jī)電安裝方面的工作人員,其專業(yè)知識(shí)及技能水平仍然處于較低的狀態(tài),所以在進(jìn)行具體的安裝工作時(shí),對(duì)設(shè)備預(yù)留預(yù)埋工作環(huán)節(jié)的重視度不足,而且前期安裝流程也沒(méi)有明確,這就導(dǎo)致當(dāng)前電器管線的預(yù)留預(yù)埋工作發(fā)展仍處于停滯不前的狀態(tài)[1]。
2.2 電氣設(shè)備預(yù)埋管路中存在的問(wèn)題
電氣設(shè)備預(yù)埋管路中存在的問(wèn)題也較為多元化,由于預(yù)埋管的管壁比較薄,在具體的澆筑過(guò)程中,容易出現(xiàn)管道壁斷裂的情況,這對(duì)整個(gè)施工工程的質(zhì)量都產(chǎn)生了嚴(yán)重的影響。而且在進(jìn)行預(yù)留預(yù)埋工作時(shí),也需要對(duì)預(yù)埋管表面的一些毛刺進(jìn)行仔細(xì)的處理,這才能夠保障整個(gè)施工的質(zhì)量水平,而且該工作也是當(dāng)前設(shè)備預(yù)埋工作中最為主要的問(wèn)題。由于這些細(xì)節(jié)性的工作不到位導(dǎo)致在后期的使用過(guò)程中,此類問(wèn)題頻頻出現(xiàn)。除此之外,也需要對(duì)預(yù)留預(yù)埋管的管路進(jìn)行及時(shí)的加固處理,如果不能夠及時(shí)進(jìn)行加固,后期的管道很容易出現(xiàn)變形的情況,對(duì)整個(gè)工程的安全性都會(huì)產(chǎn)生不利的影響。電氣管線的預(yù)留預(yù)埋工作對(duì)提升整個(gè)機(jī)電安裝設(shè)備的規(guī)范性、保障設(shè)備系統(tǒng)運(yùn)行的穩(wěn)定性以及促進(jìn)企業(yè)經(jīng)濟(jì)效益等各個(gè)方面都有推動(dòng)作用,所以針對(duì)預(yù)留預(yù)埋工作過(guò)程中存在的不良問(wèn)題需要引起企業(yè)等各方人士的高度重視,不斷采取措施將其解決來(lái)推進(jìn)預(yù)留預(yù)埋工作質(zhì)量水平的提升,進(jìn)而保障機(jī)電設(shè)備的正常運(yùn)行。
3 針對(duì)上述問(wèn)題所提出的解決措施
通過(guò)文章上面的分析可以看到,目前電氣管線的預(yù)留預(yù)埋工作開展過(guò)程中存在較多問(wèn)題且較為復(fù)雜多元化,對(duì)機(jī)電安裝工作的質(zhì)量水平提升來(lái)說(shuō)產(chǎn)生了不利影響,以下主要從明確設(shè)備的安裝流程以及加強(qiáng)對(duì)該施工過(guò)程的計(jì)劃制定工作兩方面全面闡述當(dāng)前時(shí)期做好機(jī)電安裝電氣管線預(yù)留預(yù)埋工作的方法措施[2]。
3.1 明確設(shè)備安裝流程
要想推動(dòng)該工作不斷優(yōu)化發(fā)展,首先就要明確機(jī)電設(shè)備的安裝工作流程,該方面的工作對(duì)整個(gè)施工工作來(lái)說(shuō)都起著至關(guān)重要的作用。所以說(shuō),相關(guān)工作人員在開始工作之前就必須對(duì)該設(shè)備安裝的具體流程制定一個(gè)明確的計(jì)劃。就當(dāng)前我國(guó)該方面工作的發(fā)展建設(shè)情況而言,每個(gè)設(shè)備的差異性都比較大,其安裝流程也各有各的不同,比較多樣化,因此,在對(duì)這些設(shè)備進(jìn)行安裝的過(guò)程當(dāng)中,相關(guān)工作人員就要注重對(duì)閱讀說(shuō)明書的審閱。只有明確設(shè)備的安裝流程,才能更好地針對(duì)流程制定相應(yīng)的安裝計(jì)劃。在安裝過(guò)程當(dāng)中,如果出現(xiàn)安裝的指示圖與實(shí)際的安裝過(guò)程之間存在較大的差別,此時(shí),工作人員不能夠盲目地進(jìn)行下一步的安裝,要盡快與設(shè)備供應(yīng)商之間取得聯(lián)系,與供應(yīng)商進(jìn)行探討,尋找解決辦法,只有這樣,才能夠保障安裝的科學(xué)性,確保設(shè)備的安全性能及質(zhì)量。如果在安裝過(guò)程當(dāng)中出現(xiàn)問(wèn)題,而工作人員自主地進(jìn)行安裝,就有可能對(duì)設(shè)備造成損害,對(duì)于設(shè)備的使用壽命來(lái)說(shuō)也有危害作用。除此之外,必須進(jìn)行相關(guān)的設(shè)備調(diào)試,只有這樣才能夠看出設(shè)備在安裝過(guò)程當(dāng)中所存在的不合理之處,進(jìn)而積極地尋找解決措施,從而確定設(shè)備的運(yùn)轉(zhuǎn)科學(xué)性以及合理性。
3.2 加強(qiáng)對(duì)該過(guò)程的計(jì)劃制定工作
結(jié)合當(dāng)前我國(guó)對(duì)機(jī)電設(shè)備的安裝拆除過(guò)程來(lái)看,在日后的工作當(dāng)中,我們要注重對(duì)該工作的計(jì)劃制定。在制定安裝計(jì)劃過(guò)程當(dāng)中,要確保該計(jì)劃是根據(jù)自己的實(shí)際發(fā)展情況進(jìn)行開展的。
首先,電源的安裝是十分重要的,完成對(duì)該方面的安裝之后,要促進(jìn)對(duì)設(shè)備及電力元結(jié)構(gòu)的提升,這樣才能夠確保其安裝環(huán)境的安全穩(wěn)定性,對(duì)于工程的質(zhì)量監(jiān)督管理工作來(lái)說(shuō)也有幫助作用。確保電源的安全性,也在一定程度上保障了工作人員自身的安全性。
其次,在進(jìn)行該設(shè)備安裝拆除過(guò)程時(shí),我們必須全面地認(rèn)識(shí)該技術(shù)的發(fā)展情況以及改造。當(dāng)前大多數(shù)的企業(yè)在進(jìn)行技術(shù)改造過(guò)程當(dāng)中,都會(huì)進(jìn)行再次生產(chǎn),還要順應(yīng)時(shí)代發(fā)展潮流,對(duì)技術(shù)進(jìn)行不斷優(yōu)化,這樣才能夠更好地提高自身的競(jìng)爭(zhēng)力,滿足發(fā)展需求。并且,我們?cè)诋?dāng)前信息化技術(shù)的發(fā)展背景下,要加強(qiáng)對(duì)該方面的信息管理,通過(guò)對(duì)信息技術(shù)的應(yīng)用,可以有效地對(duì)整個(gè)安全管理流程進(jìn)行整合,主動(dòng)地建立一個(gè)針對(duì)性的檔案,可以分析設(shè)備的各種參數(shù),進(jìn)而可以有效地制定相應(yīng)的維修機(jī)制及維護(hù)計(jì)劃。
最后,在安裝體系當(dāng)中,我們必須注重對(duì)圖紙的設(shè)計(jì)工作進(jìn)行有效的整合,加強(qiáng)對(duì)系統(tǒng)化監(jiān)督管理控制系統(tǒng)的建設(shè)。通過(guò)加大對(duì)圖紙?jiān)O(shè)計(jì)工作的檢查與監(jiān)督,才能夠防止由于圖紙?jiān)O(shè)計(jì)所存在的缺陷而引起整個(gè)施工質(zhì)量的問(wèn)題,防止對(duì)工作人員的安全產(chǎn)生威脅。
4 結(jié)語(yǔ)
綜上所述,在進(jìn)行機(jī)電設(shè)備安裝過(guò)程時(shí),要注重科學(xué)的安裝管控策略,這對(duì)于設(shè)備的安全發(fā)展來(lái)說(shuō)至關(guān)重要。并且相關(guān)工作人員也要加大管理流程的熟悉力度,要全面掌握該設(shè)備在安裝拆除過(guò)程當(dāng)中的各種要點(diǎn)及質(zhì)量控制的重點(diǎn)。只有加大對(duì)該方面的監(jiān)督管理力度,才能夠促進(jìn)設(shè)備的安全性能,進(jìn)一步推動(dòng)工作的順利開展,提高工作效率,從而提高我國(guó)的經(jīng)濟(jì)效益。
【參考文獻(xiàn)】
【1】楊春.研究機(jī)電安裝電氣設(shè)備預(yù)埋常見(jiàn)的問(wèn)題及措施[J].智庫(kù)時(shí)代,2018(48):178+181.
【2】李東辰.機(jī)電電氣設(shè)備預(yù)埋常見(jiàn)的問(wèn)題及對(duì)策[J].科技經(jīng)濟(jì)導(dǎo)刊,2018,26(14):234.
【作者簡(jiǎn)介】余順軍(1987-),男,四川簡(jiǎn)陽(yáng)人,工程師,從事電氣工程研究。