    Study of Design and Construction Technology of Ultra-large-span Tunnel at Badaling Great Wall Station

    2018-04-19 06:49:06ZHANGMinqingLYUGangHEZhijunLIUJianyouJIAOYunzhouLUODuhao
    隧道建設(中英文) 2018年3期
    關鍵詞:交心商量交友

    ZHANG Minqing, LYU Gang, HE Zhijun, LIU Jianyou, JIAO Yunzhou, LUO Duhao

    (1. Engineering Management Center of China Railway Corporation, Beijing 100844, China;2. China Railway Engineering Consulting Group Co., Ltd., Beijing 100055, China;3. China Railway No.5 Engineering Group Co., Ltd., Changsha 410117, Hunan, China)

    0 Introduction

    With the development and utilization of underground spaces, people are building increasing numbers of large-span and large-section underground works, especially urban underground stations, to support the application functions. In general, tunnels are classified as small-span (excavation span of 5 m to 8.5 m), middle-span (excavation span of 8.5 m to 12 m), large-span (excavation span of 12 m to 14 m), extra-large-span (excavation span of 14 m to 16 m), and ultra-large-span (excavation span of more than 16 m)[1-3].

    Larger tunnel excavation span and section area lead to more difficult excavation and higher construction safety risk[4-6]. For tunnels with a large span and section, there are three critical factors ensuring safe construction, i.e., the support system design, excavation method determination, and surrounding rock deformation control. To study the process of progressive destruction of the surrounding rock of ultra-large-span tunnels growing with the increase of their buried depth, Li et al.[7]used the test system of a large 3D geological mechanical model with uniform gradient loading and developed materials similar to weak, broken surrounding rock and its support system to conduct a large-scale model test. This provided a true representation of the full process of the progressive destruction of the surrounding rock of sections built by the full-face excavation method and bench cut method as well as the weak, broken surrounding rock of the working face retaining section. To master the deformation features of the large-section tunnel in the stratum of the Xigeda Formation and ensure stability of the surrounding rock during construction of the large-section tunnel, Wang et al.[8]studied the time-space effect of the deformation of the large-section tunnel in the stratum of the Xigeda Formation during construction using the temporary 3-bench inverted arch method; this was based on the reconstruction of the Tongzilin Tunnel of the Panzhihua-Miyi Section of Chengdu-Kunming Railway and used the method combining numerical simulation and multi-section site monitoring. Jiang et al.[9]studied the 8-lane ultra-section tunnel of an expressway and developed an optimized design scheme and construction procedure based on structural calculation and engineering analogy. Based on the loess tunnel works of the Zhengzhou-Xi′an Passenger-dedicated Railway, Gao[10]provided reasonable directions for the design and construction of large-section shallow-buried loess tunnels and set forth a construction method that can reduce surface cracks. Teng[11]proposed several technical solutions for the construction of large-section shallow-buried tunnels in soft plastic clay in northeastern cold areas and determined the best solution upon comparison. Using the methods of theoretical analysis, site testing and numerical research, Zhang[12]conducted an optimization study of both the surrounding rock deformation features and the construction parameters of large-section shallow-buried tunnels and determined the major factors leading to surrounding rock deformation.

    As described above, in the past, for large-section tunnel construction, steel frames, shotcrete and system rockbolts were typically used as the primary support system and the temporary 3-bench inverted arch method (large-section tunnels) or dual-side heading method (ultra-section tunnels) was adopted. The study of deformation control during construction based on two control criteria (total deformation and deformation in steps) was absent. In the present paper, by taking the large-span transition section tunnel at Badaling Great Wall Station of the new Beijing-Zhangjiakou Railway as an example, a new support design idea, new excavation method, and dual principles and criteria for surrounding rock deformation control of undercut tunnels with an ultra-large span and ultra-large section are studied.

    1 Project overview

    The new Badaling Tunnel is 12.01 km in length and is the longest tunnel of the new Beijing-Zhangjiakou Railway. Badaling Great Wall Station is an underground station within the new Badaling Tunnel. The tunnel is below the Guntiangou Parking Lot of the Badaling Scenic Spot and is adjacent to the Badaling Great Wall. With a buried depth of 102 m. The station is the high-speed railway station with the largest buried depth in the world.

    With a total length of 470 m and underground floor area of approximately 36 000 m2, the station has a 3-level underground structure,i.e., the platform level, entrance level and exit level from the bottom to the top. At the platform level, there are a total of 5 parallel tunnels, including the excavation passages on both sides of the station. In total, the station has 78 chambers with 88 section types. The intersections of the chambers are dense. The minimum horizontal interval and vertical interval between the chambers are 2.27 m and 4.45 m, respectively. The building structure is very complicated, making the station the underground station with the most complicated building structure in the world.

    As shown in Figs. 1, 2 and 3, a 163-m large-span transition section is set at each end of the Badaling Great Wall Station; it is connected to the main-track tunnel via the transition sections. The transition section is the traffic tunnel with the largest excavation span (32.7 m) and excavation section area (494.4 m2) in the world, resulting

    in great construction difficulty and high safety risk. Table 1 shows the statistics of traffic tunnels with ultra-large span and ultra-large section both in China and abroad.

    Fig. 1 Badaling Great Wall Station

    Fig. 2 Alignment of Badaling Great Wall Station

    Fig. 3 Large-span section of Badaling Great Wall Station

    TunnelGeologicalconditionsSurroundingrockgradeMaximumexcavationspan/mMaximumexcavationarea/m2ExcavationmethodXinkaotangTunnelofGanzhou?LongyanRailway(stationtunnel)CompletelyweatheredgraniteⅤ30.9411.0 Largewallfootingandtwo?sideheadingmethodVeniceStationofMilanUrbanRailwayConnectingLineHolocenecohesionlesssoilⅤ30.0440.0CellulararchmethodWumengshanNo.2TunnelofLi?upanshui?ZhanyiDouble?trackRailway(stationtunnel) Mudstone,andshale?interbeddedwithsandstoneⅣandⅤ28.4354.3 Compositetwo?sideexcavation,supportcableconversionsupportandpartialliningconstructionmethodDapingStationofChongqingLightRailSystem MudstoneinterbeddedwithsandstoneⅢ26.3430.3 Uppersideheading,pullingtroughinlowerpartandpartialliningwitharchliningmadebeforesidewallliningHongtudiStationofChongqingMetroLine6 Moderatelyweatheredsandymudstoneinterbeddedwiththin?layersandstoneⅣ25.9375.8 Two?sideheading,TBMpassingthroughthemiddlepartandpartialliningwitharchliningmadebeforesidewallliningLinjiangmenStationofChongqingRailTransitLine2SandstoneandmudstoneⅢ21.8421.0Two?sideheadingmethodXinchengziTunnelofLanzhou?ChongqingRailway(stationtun?nel) Triassiccarboniferousslatewithhighterrestrialstressandmaximumhorizontalprincipalstressof21.2MPaⅤ21.5350.0Two?sideheadingmethodGongbeiTunnelofHongKong?Zhuhai?MacaoBridgeSiltyclayⅤ18.8344.85?benchmethod

    2 Engineering geology and hydrogeology

    The site of Badaling Station is in the Jundushan Low-and Medium-Mountain Areas, which are characterized by large land undulation and developed gullies; overall landform is high in the northeast and low in the southwest. The ground elevation generally ranges from 600 m to 1 030 m, with an elevation difference between 200 m and 400 m. The lush vegetation is dominated by shrubs. The granite complex of Badaling medium-size stock developing in the scope of the station is distributed in the Chadao Village-Qinglong Bridge area with outcrop of approximately 25 km2. The rock mass contacts the volcanic rock of Tiaojishan Formation and Donglingtai Formation on its north side, contacts the Yingwoliang rhyolite porphyry and Shanghuayuan quartz diorite on its east side and contacts the Donglaoyu granite, Xiqiaozi granite, and Mesozoic volcanic rock on its south side and west side, respectively. The granite is generally hard, with a saturated uniaxial compressive strength of 40 MPa to 60 MPa. The intrusive rock dikes of Badaling develop very well and exist in 10 forms: quartz porphyry dike, rhyolite porphyry dike, granite porphyry dike, diorite porphyrite dike, diabase dike, gabbro dike, orthophyre dike, Ivernite dike, alnoite dike, and eurite dike. With a width ranging from 2 m to 5 m, most of the dikes have an NNW strike, dipping eastwards with an angle of 60°- 70°. Table 2 shows the classification of the surrounding rock of the large-span transition section at the station.

    Table 2 Classification of surrounding rock of large-span transition section at station

    In the station site area, the major geological structures are of the Yanshan Period, and fractures develop easily in these structures. The backbone is the NE fracture that is parallel to the Badaling box anticline axis accompanied by a NW fracture under horizontal tension nearly perpendicular to it. In addition, normal faults composed of nearly EW and nearly SN shear fracture faces and NNW shear fracture zones develop as well. In this area, fault F2 intersects the tunnel at DK68+260~+300, and the angle between it and the track is 35°. The fracture is a compresso-shear fracture with an attitude of 263°∠86°. Its hanging wall is of porphyritic monzonite granite, and its foot wall is of granite. There is crushed stone in the fault zone. There are 3 major sets of joints developing in the area. Groundwater in the area is bedrock fissure water with a normal yield of approximately 2 400 m3/d and a maximum yield of approximately 7 000 m3/d.

    3 Design of the support system

    With an excavation span of 19.3 m to 32.7 m, the large-span transition section at Badaling Station shows the features of ultra-large span and variable span. Therefore, based on the conventional method of "advance reinforcement, advance support, primary support, and secondary lining", a new definition was provided to each support function and a structural design and safety checking calculation for loads borne by the structure was conducted.

    (1) Advance reinforcement and advance support. For class Ⅴ surrounding rock, the advance grouting reinforcement was employed to improve the surrounding rock and promote its cohesion and inner frictional angle. Support via pre-grouting with small ducts was used for classes Ⅲ and Ⅳ surrounding rock, and support by pipe umbrella was used for class Ⅴ surrounding rock to avoid separation and collapse, prevent formation of cavities and loose zones, and stabilize the self-supporting capacity of the surrounding rock during construction. The advance reinforcement and support were only used for safety and protection during the excavation and were not subject to checking calculation of loads borne by the structure.

    (2) Steel frame support. In consideration of the large excavation span and large section of the tunnel, to avoid separation upon excavation, classes Ⅲ, Ⅳ and Ⅴ surrounding rocks were supported with grid steel frames for protection, which were not subject to checking calculation of loads borne by the structure.

    (3) Anchor bolts, anchor cables and shotcrete. According to the theory of surrounding rock bearing arch, all the surrounding rock loads during the construction were borne by the bearing arch composed of anchor bolts, anchor cables, shotcrete and surrounding rock. Based on this theory, the safety checking calculation of loads borne by the structure was performed.

    (4) Secondary lining. A service life of 300 years was designated for the operation period. In this case, the prestress of anchor bolts and cables as well as loads borne by reinforcing bars in the secondary lining were not taken into consideration. The loads borne by the secondary lining was calculated as a plain concrete structure. To enable the tunnel to achieve a 300-year service life, a 7-cm protective layer made of reinforcing bars was designed using raw materials such as moderate-heat cement, grade Ⅰ fly ash, shaped aggregate, and shrinkage-compensating material, and innovative technical measures including secondary concrete mixing, automatic intelligent vibration, and moisture protection with self-stick film were implemented.

    3.1 Design of the support structure

    See Table 3 for the design parameters of the support structure of the large-span transition section at Badaling Great Wall Station.

    Table 3 Design parameters of support structure of large-span transition section at Badaling Great Wall Station

    Remarks: (1) The spacing between anchor bolts and cables includes both the circumferential and longitudinal spacing. (2) According to the tunnel excavation span and classification of surrounding rock, 6-8 anchor cables were set for each excavation section in case of class Ⅲ surrounding rock, 13-15 were set in case of class Ⅳ surrounding rock, and 21-23 were set in case of class Ⅴ surrounding rock. (3) Depending on the engineering geology, a total of 92 anchor bolts were designed for the large-span section at the small chainage end and 603 were designed for the large-span section at the large chainage end. (4) A tension of 100 kN was set for prestressed anchor bolts and 1 000 kN was set for prestressed anchor cables. (5) Reinforced concrete was used for the secondary lining.

    3.2 Checking calculation of loads borne by structures

    3.2.1 Anchor bolt supporting force

    It is calculated using the following formula.

    (1)

    wherepbis the anchor bolt supporting force (kPa),Fbis the designed tension of anchor bolts (kN),Sb1is the circumferential spacing between anchor bolts (m), andSb2is the longitudinal spacing between anchor bolts (m).

    It is calculated using the following formula.

    (2)

    wherepais the anchor cable supporting force (kPa),Fais the designed tension of anchor cables (kN),Sa1is the circumferential spacing between anchor cables (m), andSa2is the longitudinal spacing between anchor cables (m).

    3.2.3 Shotcrete supporting force

    It is calculated using the following formula.

    (3)

    wherepsis the shotcrete supporting force (kPa),σsis the shotcrete shear strength (kPa), anddsis the shotcrete thickness (m).

    3.2.4 Bearing arch thickness

    It is calculated using the following formula.

    (4)

    wheredbis the bearing arch thickness (m),Lb1is the free end length of anchor bolts (m), andγis the curvature radius of the tunnel sides (m).

    3.2.5 Safety factor

    據(jù)相關調查結果顯示:在回答“我碰到問題首先找誰商量”時,選擇同伴選項的占70%,選擇父母的占10%,選擇老師的占8%,選擇其他的占12%。這表明,當學生碰到麻煩時,他們首先想到的是自己的同伴。社會心理學的研究證明,與在各方面接近自己的人交往,人們普遍更能打開話題,交友交心,因為人際吸引具有一致性原則,相似的人更容易相互肯定,更容易進行平等交往,也更能增強交往的效果。

    It is calculated using the following formulas.

    (5)

    (6)

    whereKarchcrownis the safety factor of arch crown,Ksidewallis the safety factor of side wall,Cgis the cohesion of medium-hard rock or soft rock upon improvement by grouting (kPa),φgis the inner frictional angle of medium-hard rock or soft rock upon improvement by grouting (°),His the excavation height of the tunnel (m),Lis the excavation width (span) of the tunnel (m),qis the vertical load (kPa), andkis the lateral pressure factor.

    Checking calculation of the structural design safety factor of the large-span section (32.7 m) was conducted using the formulas above; the results are given in Table 4.

    Table 4 Checking calculation of structural design safety factor of large-span transition section at Badaling Great Wall Station

    According to the checking calculation, if the designed supporting parameters are adopted, then the tunnel structural design will be safe and reliable during construction and operation.

    4 Tunnel excavation methods

    In general, excavation methods applied to large-span and large-section tunnels are determined according to the engineering geology and the designed supporting measures. At present, the CRD method or two-side heading method is widely used. Such excavation methods have many disadvantages and complicated load conversion, introducing difficulties for construction using mechanical equipment. The large-span transition section at Badaling Great Wall Station is the tunnel with the maximum excavation span and section in the world. According to our calculation based on modeling, the innovative method of "triangle" type excavation was developed, as shown in Fig. 4.

    The design of the "triangle" type excavation method involves the following: tunnel top excavation first, excavation in layers, reserving the core, and locking the critical points. The method exhibits the following four features.

    (1) Simple and clear excavation methods

    Where the "triangle" type excavation method is used, based on the principle of "being even horizontally and vertically", the large-span tunnel will be divided into three layers, and its excavation will be performed in 11 steps, forming a cross section in the shape of a "triangle". The method is simple and clear.

    Fig. 4 "Triangle" type excavation method applied to large-span transition section at Badaling Great Wall Station

    (2) Safe and reliable structure

    In construction, tunnel top (① in the Fig.4) excavation should be performed first to verify the geological conditions in advance and take necessary reinforcement measures accordingly. Next, excavation in layers and steps (②, ③, ④, ⑤, ⑥, and ⑦ in the Fig.4) should be performed according to the principle of "reserving the core, excavating from top to bottom and from two sides to the middle". Finally, the core and inverted arch should be excavated step by step to form a closed support system (⑧, ⑨, ⑩ andin the Fig.4). If this method is used, then the support system should be composed of the pre-grouting small ducts or pipe umbrellas, grid steel frames, shotcrete, prestressed anchor bolts, or cables. During construction, support should be completed promptly for excavation of each part to ensure the construction safety.

    (3) High level of mechanization

    For each step, the tunnel excavation width is 8-12 m and the height is 5-6 m, allowing for the use of large mechanical equipment.

    (4) High construction efficiency

    The key to the work involves the excavation and construction of anchor bolts/cables. Multiple sets of equipment can operate at the same time during excavation on a large section, thereby significantly increasing the construction efficiency.

    The essence of the "triangle" type excavation method for an ultra-large section is summarized as follows: (1) anchor bolts/cables must be set in place according to the design requirement; (2) prestressed anchor bolts/cables must be able to reach the quick tension. In general, tensioning will be performed within 1-3 days after grouting, and they should reach the design tension at that time.

    5 Deformation control

    Deformation control is the key for safe construction. In view of the large excavation span and section of the tunnel, the total deformation and the deformation arising in each step were controlled at the same time to perform dynamic management of safe construction.

    5.1 Criteria for total deformation control

    The currentTechnicalCodeforMonitoringMeasurementofRailwayTunnel(Q/CR 9218-2015) is applicable to single-track tunnels with a span of less than 7 m, double-track tunnels with a span of 7 m to 12 m, and loess tunnels with a span of 12 m to 16 m. The tunnel has an excavation span of 32.7 m, much larger than the scope specified by the current technical code. Therefore, it is necessary to conduct a special study and establish thecriteria for its total deformation control.

    5.1.1 Ultimate strain of rock mass

    According to the rockmass mechanics and the Hoek-Brown strength empirical formula, the ultimate train of rockmass should be calculated using the following formulas[13]:

    (7)

    (8)

    Em=(0.023 1RQD-1.32)·Er

    (9)

    whereεmcis the ultimate strain of rockmass,σmcis the compressive strength of rockmass (MPa),Emis the elastic modulus of rockmass (MPa),σrcis the compressive strength of rock block (MPa),σ3is the minimum principal stress (MPa), i.e., the confining pressure borne by the rockmass,mb, s and a are empirical factors reflecting the rockmass characteristics, RQD is the indictor of rockmass integrity, andEris the elastic modulus of the rock (MPa).

    5.1.2 Critical deformation of rockmass

    The critical deformation of rockmass based on the ultimate strain of rockmass and was obtained it was used as the value for the total deformation control.

    Fig. 5 Calculation model of rockmass critical deformation of tunnel arch crown

    (10)

    According to the rock mechanical parameters measured on site, the ultimate strain and criticaldeformation of the rockmass were calculated using the formula above. To simplify the site management, the criteria was established for total deformation control of the large-span transition section of the Badaling Tunnel based on two classes: 19.3 m to 25.0 m and 25.0 m to 32.7 m. See Table 5.

    5.2 Criteria for Deformation Control in Steps

    In view of the large excavation span and section of the tunnel, it is necessary to conduct deformation control in each of the construction steps to ensure safety; otherwise, the structure may become unstable after the deformation exceeds the limit with increase of the span and section. The deformation in each step of excavation was calculated based on numerical simulation; the results are shown in Fig. 6.

    Table 5 Criteria for total deformation control of large-span transition section at Badaling Great Wall Station

    (a) 1st step of excavation

    (b) 2nd step of excavation

    (c) 3rd step of excavation

    (d) 4th step of excavation

    (e) 5th step of excavation

    (f) 6th step of excavation

    (g) 7th step of excavation

    (h) 8th step of excavation

    (i) 9th step of excavation

    (j) 10th step of excavation

    (k) 11th step of excavation

    According to the numerical simulation results, the percentage of the deformation in each step was calculated (see Fig. 7); the calculated percentage of each step was used as the criterion for deformation control in the step.

    Fig. 7 Percentages of deformation in each step of "Triangle" type excavation

    Fig. 7 shows that the deformation mainly arises in the tunnel-arch making stage (1st-5th steps), accounting for approximately 95% of the total, followed by that arising in the side-making stage (6th and 7th steps), accounting for 4% of the total, followed by the smallest deformation only accounting for 1% in the inverted arch-making stage (10th and 11th steps).

    5.3 Management of Deformation Control in Levels

    According to theTechnicalCodeforMonitoringMeasurementofRailwayTunnel(Q/CR 9218-2015), management in levels was performed based on the deformation in steps, the total deformation and the deformation rate, as shown in Table 6.

    6 Conclusions and Experience

    (1) According to the checking calculation, our support system for the large-span transition section at Badaling Great Wall Station has a safety factor of 1.16-2.46 during the construction period and 1.59-3.54 during the operation period, i.e., its engineering structure is safe and reliable.

    Table 6 Management of deformation control in levels

    Remark:U0is the ultimate deformation, i.e., the control value of deformation in each step or the total deformation.

    (2)The innovative triangle-type excavation applied to the tunnel with an ultra-large span of 32.7 m and section of 494.4 m2has advantages such as simple and clear methodology, safe and reliable structure, high applicability of machinery and high construction efficiency; thus, it can be popularized.

    (3)Based on the ultimate strain, criteria for total deformation control of the large-span transition section at Badaling Great Wall Station were calculated. Depending on different surrounding rock classes and spans, in the case of class Ⅱ surrounding rock, the total settlement is 20-30 mm and total horizontal convergence is 15-20 mm; in the case of class Ⅲ surrounding rock, the total settlement is 30-40 mm and the total horizontal convergence is 20-25 mm; in the case of class Ⅳ surrounding rock, the total settlement is 60-90 mm and the total horizontal convergence is 40-55 mm; in the case of class Ⅴ surrounding rock, the total settlement is 130-190 mm and the total horizontal convergence is 90-105 mm. These values were used as the basis for the deformation control management on site.

    (4)According to the numerical simulation, the innovative method of triangle-type excavation results in deformation that is mainly centralized in the tunnel arch-making stage, accounting for approximately 95% of the total, followed by that in the side-making stage, accounting for 4% of the total, with the smallest deformation only accounting for 1% in the inverted arch-making stage. These values were used as the basis for the deformation control management on site.

    (5)The deformation measured during the on-site monitoring of the works is much less than the result of the theoretical calculation; this difference demands a further study upon completion of the works.

    Acknowledgement

    The study was supported by Technological Research and Development Project of China Railway Corporation (2017G007-A).

    :

    [1] Ministry of Railways of the People′s Republic of China.Technical guide of construction of high-speed railway tunnel engineering[S]. Beijing: China Railway Publishing House, 2011.

    [2] Technical code for railway tunnel in loess: Q/CR 9511-2014[S].Beijing: China Railway Publishing House, 2014.

    [3] Technical specification for monitoring measurement of railway tunnel: Q/CR 9218-2015[S].Beijing: China Railway Publishing House, 2015.

    [4] GUAN Baoshu, ZHAO Yong. Construction technology of soft rock tunnel[M]. Beijing: China Communications Press, 2011.

    [5] ZENG Wei,ZHANG Minqing. Analyses of causes for the de-formation intrusion structure ambit of tunnel on Yichang-Wanzhou Railway and its treatment[J]. Journal of Railway Engineering Society, 2008(3): 42.

    [6] SONG Ye, WANG Xindong, WANG Gang, et al.Technology for monitoring construction of large section loess tunnel of passenger dedicated line[J]. Journal of Railway Engineering Society, 2010(1): 52.

    [7] LI Liping, LI Shucai, ZHAO Yong, et al. 3D geomechanical model for progressive failure progress of weak broken surrounding rock in super large section tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(3): 550.

    [8] WANG Zhijie, XU Ruining, HE Nengfang. Study of deformation characteristics of large coss-section tunnel in Xigeda Fm Strata[J]. Tunnel Construction, 2016, 36(12): 1412.

    [9] JIANG Shuping, HUANG Lunhai, HU Xuebing. Design and study of highway tunnel with super-large cross section[J]. Chinese Journal of Underground Space and Engineering, 2005, 1(1): 54.

    [10] GAO Jianguo.Design and construction of large section shallow loess tunnel[J]. Communication Standardization, 2011(11): 141.

    [11] TENG Fei. Large cross section of soft and plastic clay ground in cold region shallow-buried tunnel construction scheme[J]. Northern Communications, 2011(6): 143.

    [12] ZHANG Quanquan. Study of the deformation characteristics and construction parameter optimization of shallow buried tunnel surrounding rock [D]. Kunming: Kunming University of Science and Technology, 2015.

    [13] LIU Yourong, TANG Huiming. Rock mass mechanics[M]. Beijing: Chemical Industry Press, 2009.

    猜你喜歡
    交心商量交友
    荷韻
    金沙江文藝(2024年6期)2024-06-27 02:55:19
    商量
    交友啟事
    山西水利(2021年4期)2021-01-17 15:18:39
    閑談“交友”
    你會和別人商量嗎?
    商量出共識
    人大建設(2019年12期)2019-11-18 12:11:06
    交人交心,澆花澆根
    交友如擇居
    文苑(2018年23期)2018-12-14 01:06:10
    交友之道
    文苑(2018年23期)2018-12-14 01:06:08
    亚洲国产av影院在线观看| 韩国av在线不卡| 一级黄片播放器| 亚洲第一av免费看| 国产熟女欧美一区二区| 精品国产乱码久久久久久小说| 色吧在线观看| av国产精品久久久久影院| 男人爽女人下面视频在线观看| 国产乱人偷精品视频| 国产成人精品福利久久| 如日韩欧美国产精品一区二区三区| 97在线视频观看| 久久国内精品自在自线图片| 久久精品国产亚洲av天美| 老汉色av国产亚洲站长工具| 亚洲人成电影观看| 天堂8中文在线网| 最近2019中文字幕mv第一页| 日本欧美视频一区| 伊人亚洲综合成人网| 久久久久视频综合| 国产片特级美女逼逼视频| 男女午夜视频在线观看| 国产有黄有色有爽视频| av又黄又爽大尺度在线免费看| 色播在线永久视频| 97在线人人人人妻| 日本免费在线观看一区| 高清av免费在线| 久久国内精品自在自线图片| 亚洲一级一片aⅴ在线观看| videossex国产| 日韩制服丝袜自拍偷拍| videosex国产| 少妇人妻 视频| 91久久精品国产一区二区三区| 久久久久网色| 午夜免费男女啪啪视频观看| 久久99蜜桃精品久久| 中国国产av一级| 国产成人aa在线观看| 亚洲三级黄色毛片| 婷婷色麻豆天堂久久| 多毛熟女@视频| av女优亚洲男人天堂| 国产色婷婷99| 亚洲精品自拍成人| 国产亚洲欧美精品永久| 丰满迷人的少妇在线观看| av一本久久久久| 国产av精品麻豆| 欧美亚洲 丝袜 人妻 在线| 国产一区亚洲一区在线观看| 嫩草影院入口| 精品99又大又爽又粗少妇毛片| 免费在线观看完整版高清| 80岁老熟妇乱子伦牲交| 久久精品aⅴ一区二区三区四区 | 极品少妇高潮喷水抽搐| 欧美变态另类bdsm刘玥| 免费大片黄手机在线观看| 欧美激情高清一区二区三区 | 成人黄色视频免费在线看| 黄片播放在线免费| 中文字幕制服av| 国产一区二区三区综合在线观看| 亚洲av男天堂| 丝袜脚勾引网站| 亚洲精品久久成人aⅴ小说| 国产女主播在线喷水免费视频网站| 午夜激情久久久久久久| 亚洲欧美一区二区三区国产| 亚洲久久久国产精品| 亚洲熟女精品中文字幕| 亚洲国产欧美网| 亚洲少妇的诱惑av| 最近最新中文字幕大全免费视频 | 宅男免费午夜| 91国产中文字幕| 久久久久久久精品精品| 老司机影院成人| 免费黄色在线免费观看| 极品人妻少妇av视频| 免费播放大片免费观看视频在线观看| 91aial.com中文字幕在线观看| 亚洲欧洲国产日韩| 爱豆传媒免费全集在线观看| 国产精品 欧美亚洲| 国产日韩一区二区三区精品不卡| 国产免费一区二区三区四区乱码| 妹子高潮喷水视频| 波多野结衣av一区二区av| 欧美老熟妇乱子伦牲交| 国产精品成人在线| 午夜日韩欧美国产| 日韩视频在线欧美| 日产精品乱码卡一卡2卡三| 黑人欧美特级aaaaaa片| 亚洲图色成人| 最近中文字幕2019免费版| 日韩精品有码人妻一区| 国产精品秋霞免费鲁丝片| 日韩电影二区| 老熟女久久久| 久久鲁丝午夜福利片| 久久99精品国语久久久| 免费久久久久久久精品成人欧美视频| 91精品国产国语对白视频| 日韩 亚洲 欧美在线| 日韩电影二区| 成人毛片60女人毛片免费| 一本色道久久久久久精品综合| av国产精品久久久久影院| 成人二区视频| 熟女av电影| 这个男人来自地球电影免费观看 | 精品人妻偷拍中文字幕| 欧美bdsm另类| 国产片内射在线| 亚洲欧美精品综合一区二区三区 | 日本免费在线观看一区| 亚洲色图 男人天堂 中文字幕| 国产男人的电影天堂91| 卡戴珊不雅视频在线播放| 热re99久久精品国产66热6| 热99久久久久精品小说推荐| 久久99一区二区三区| av又黄又爽大尺度在线免费看| 王馨瑶露胸无遮挡在线观看| 18禁观看日本| 亚洲国产精品999| 亚洲激情五月婷婷啪啪| 一边亲一边摸免费视频| 免费在线观看视频国产中文字幕亚洲 | 欧美xxⅹ黑人| 日韩av在线免费看完整版不卡| av免费在线看不卡| 嫩草影院入口| 午夜福利,免费看| 欧美+日韩+精品| 最近最新中文字幕大全免费视频 | 亚洲综合精品二区| 下体分泌物呈黄色| 丝瓜视频免费看黄片| 亚洲国产精品999| a级毛片在线看网站| 黄片无遮挡物在线观看| 精品一区二区三区四区五区乱码 | 日韩中文字幕欧美一区二区 | 国产精品 欧美亚洲| 国精品久久久久久国模美| 亚洲av综合色区一区| 99久久人妻综合| 国产免费现黄频在线看| 在线天堂最新版资源| 国产老妇伦熟女老妇高清| 免费观看性生交大片5| 最近2019中文字幕mv第一页| 国产 精品1| 青春草视频在线免费观看| 99国产综合亚洲精品| 精品一区二区免费观看| 国产av国产精品国产| 在线观看www视频免费| 一区二区日韩欧美中文字幕| 久久99一区二区三区| 五月伊人婷婷丁香| 18禁国产床啪视频网站| 香蕉丝袜av| 日韩制服骚丝袜av| 久久久久久久精品精品| 亚洲av免费高清在线观看| 高清在线视频一区二区三区| 老鸭窝网址在线观看| 一本色道久久久久久精品综合| 男的添女的下面高潮视频| 夫妻午夜视频| 热re99久久国产66热| 日韩一区二区三区影片| 久久精品熟女亚洲av麻豆精品| 999久久久国产精品视频| 亚洲精品在线美女| 国产精品久久久久久久久免| 亚洲图色成人| 久久久精品免费免费高清| 亚洲成av片中文字幕在线观看 | 国产乱人偷精品视频| 久久精品国产亚洲av涩爱| 男女边摸边吃奶| 亚洲国产av新网站| 少妇人妻久久综合中文| 亚洲av电影在线观看一区二区三区| 亚洲欧美精品综合一区二区三区 | 叶爱在线成人免费视频播放| 男女啪啪激烈高潮av片| 国产一区二区在线观看av| 中文字幕最新亚洲高清| 丝袜脚勾引网站| 亚洲国产毛片av蜜桃av| 美女脱内裤让男人舔精品视频| 色网站视频免费| 黄色一级大片看看| 黑丝袜美女国产一区| 午夜福利网站1000一区二区三区| 成人黄色视频免费在线看| 夫妻午夜视频| 97人妻天天添夜夜摸| 国产精品蜜桃在线观看| 一本一本久久a久久精品综合妖精 国产伦在线观看视频一区 | 9热在线视频观看99| 免费看av在线观看网站| 视频在线观看一区二区三区| 伊人亚洲综合成人网| 亚洲欧美精品自产自拍| 美女大奶头黄色视频| 中文天堂在线官网| 久久婷婷青草| 国产毛片在线视频| 美女高潮到喷水免费观看| 国产成人精品久久二区二区91 | 男女边吃奶边做爰视频| 久久热在线av| 日日爽夜夜爽网站| 青春草国产在线视频| 精品一区二区三卡| 99国产综合亚洲精品| 免费在线观看黄色视频的| 亚洲欧洲精品一区二区精品久久久 | a级毛片黄视频| 久久久久久人人人人人| 尾随美女入室| 这个男人来自地球电影免费观看 | 免费av中文字幕在线| 啦啦啦视频在线资源免费观看| 欧美 亚洲 国产 日韩一| 久久久久久久国产电影| 国产精品国产av在线观看| 成人亚洲精品一区在线观看| 欧美bdsm另类| 久久久久国产一级毛片高清牌| 一二三四中文在线观看免费高清| 在线免费观看不下载黄p国产| 男女午夜视频在线观看| www.精华液| 欧美日韩av久久| 久久久精品免费免费高清| 午夜福利网站1000一区二区三区| 成年女人毛片免费观看观看9 | 777久久人妻少妇嫩草av网站| 亚洲美女搞黄在线观看| 亚洲久久久国产精品| 视频在线观看一区二区三区| 久久影院123| 超碰97精品在线观看| 国产在线视频一区二区| 街头女战士在线观看网站| 亚洲天堂av无毛| 日韩中文字幕视频在线看片| 一二三四中文在线观看免费高清| 国产乱来视频区| 久久久久久久大尺度免费视频| 日韩一区二区视频免费看| 纵有疾风起免费观看全集完整版| 国产一区二区在线观看av| 亚洲精品国产色婷婷电影| 精品国产国语对白av| 国产精品99久久99久久久不卡 | 日日摸夜夜添夜夜爱| 午夜免费鲁丝| 久久久精品区二区三区| 精品一区二区三卡| 日本免费在线观看一区| 国产国语露脸激情在线看| 9色porny在线观看| 国产精品嫩草影院av在线观看| 在线免费观看不下载黄p国产| 另类精品久久| 乱人伦中国视频| 精品人妻在线不人妻| 成人毛片a级毛片在线播放| 国产欧美日韩综合在线一区二区| 久久久久久久精品精品| 男人爽女人下面视频在线观看| 精品99又大又爽又粗少妇毛片| 波多野结衣av一区二区av| 不卡视频在线观看欧美| freevideosex欧美| 自拍欧美九色日韩亚洲蝌蚪91| 亚洲成人手机| 超碰97精品在线观看| 久久亚洲国产成人精品v| 亚洲精品视频女| 丰满乱子伦码专区| 亚洲国产色片| 男人添女人高潮全过程视频| 亚洲国产精品一区二区三区在线| 亚洲成国产人片在线观看| 啦啦啦在线免费观看视频4| 在线观看免费视频网站a站| 一级毛片 在线播放| 飞空精品影院首页| 国产黄色免费在线视频| 多毛熟女@视频| 亚洲综合精品二区| av又黄又爽大尺度在线免费看| 日本猛色少妇xxxxx猛交久久| 不卡av一区二区三区| 成年动漫av网址| 黄片无遮挡物在线观看| 欧美精品国产亚洲| 91在线精品国自产拍蜜月| 老司机影院成人| 三级国产精品片| 国产一区二区三区综合在线观看| 天天躁夜夜躁狠狠久久av| 久久久久国产一级毛片高清牌| 天天躁日日躁夜夜躁夜夜| 天天躁夜夜躁狠狠躁躁| 岛国毛片在线播放| 99香蕉大伊视频| 一区二区三区四区激情视频| 欧美成人精品欧美一级黄| 国产成人精品福利久久| 一区二区av电影网| 午夜日韩欧美国产| 十八禁高潮呻吟视频| 成年美女黄网站色视频大全免费| 777米奇影视久久| 亚洲欧美一区二区三区久久| 深夜精品福利| 综合色丁香网| 午夜福利一区二区在线看| 少妇的丰满在线观看| 亚洲av在线观看美女高潮| 欧美日韩视频精品一区| 激情视频va一区二区三区| 麻豆av在线久日| 亚洲国产色片| 母亲3免费完整高清在线观看 | 91成人精品电影| 26uuu在线亚洲综合色| 韩国高清视频一区二区三区| 街头女战士在线观看网站| 秋霞在线观看毛片| 午夜日本视频在线| 人妻系列 视频| 人成视频在线观看免费观看| 美女国产高潮福利片在线看| 制服丝袜香蕉在线| 热99国产精品久久久久久7| 亚洲成人av在线免费| 99久久综合免费| 午夜福利,免费看| 国产精品一区二区在线不卡| 亚洲第一青青草原| 久久久久久久久免费视频了| 国产成人一区二区在线| 人人妻人人添人人爽欧美一区卜| 国产一区二区三区综合在线观看| 国产成人免费无遮挡视频| 亚洲,欧美精品.| av天堂久久9| 午夜福利乱码中文字幕| 国产亚洲午夜精品一区二区久久| 两个人免费观看高清视频| 欧美精品国产亚洲| 日韩欧美一区视频在线观看| 久久ye,这里只有精品| 午夜免费男女啪啪视频观看| 看十八女毛片水多多多| 免费观看性生交大片5| 深夜精品福利| av在线播放精品| 捣出白浆h1v1| 国精品久久久久久国模美| 亚洲精品美女久久久久99蜜臀 | 激情五月婷婷亚洲| 亚洲欧美一区二区三区久久| 国产成人午夜福利电影在线观看| 精品第一国产精品| 中文字幕人妻丝袜一区二区 | 亚洲精品中文字幕在线视频| 久久精品国产自在天天线| 青春草国产在线视频| 只有这里有精品99| 精品国产超薄肉色丝袜足j| 黄片无遮挡物在线观看| 三上悠亚av全集在线观看| 国产欧美日韩综合在线一区二区| 精品亚洲乱码少妇综合久久| 女人精品久久久久毛片| 国产精品久久久av美女十八| 亚洲欧洲日产国产| 亚洲精华国产精华液的使用体验| 观看美女的网站| 国产探花极品一区二区| 日日摸夜夜添夜夜爱| 看十八女毛片水多多多| 婷婷色综合www| 黄频高清免费视频| a级毛片黄视频| 欧美激情高清一区二区三区 | 久久久久久久久久久久大奶| 色94色欧美一区二区| 日韩伦理黄色片| 午夜免费鲁丝| 精品99又大又爽又粗少妇毛片| 狠狠婷婷综合久久久久久88av| 国产亚洲午夜精品一区二区久久| 啦啦啦啦在线视频资源| 久久女婷五月综合色啪小说| 一边亲一边摸免费视频| 99热全是精品| 最近中文字幕2019免费版| 2018国产大陆天天弄谢| 青春草国产在线视频| 国产熟女欧美一区二区| 色视频在线一区二区三区| 80岁老熟妇乱子伦牲交| 在线观看三级黄色| 亚洲国产精品国产精品| 黄片无遮挡物在线观看| 97精品久久久久久久久久精品| 成年美女黄网站色视频大全免费| 久久国产亚洲av麻豆专区| 尾随美女入室| 美女福利国产在线| 中文字幕另类日韩欧美亚洲嫩草| 黄色视频在线播放观看不卡| 国产精品一国产av| 亚洲少妇的诱惑av| 色哟哟·www| 18禁国产床啪视频网站| 日日爽夜夜爽网站| 亚洲成色77777| 2021少妇久久久久久久久久久| 亚洲一码二码三码区别大吗| 韩国高清视频一区二区三区| 人人妻人人澡人人看| 极品少妇高潮喷水抽搐| 国产亚洲午夜精品一区二区久久| 午夜福利,免费看| 91精品国产国语对白视频| 色网站视频免费| 国产精品熟女久久久久浪| 亚洲精品视频女| 如何舔出高潮| 亚洲一级一片aⅴ在线观看| 亚洲精品久久成人aⅴ小说| 妹子高潮喷水视频| 制服诱惑二区| 国产在线一区二区三区精| 777米奇影视久久| 国产精品国产av在线观看| 久久精品久久精品一区二区三区| 熟女电影av网| 午夜激情av网站| 国产一区二区三区av在线| 久久人人97超碰香蕉20202| 18禁裸乳无遮挡动漫免费视频| 久久久精品免费免费高清| 色视频在线一区二区三区| 亚洲人成77777在线视频| 色婷婷久久久亚洲欧美| 中文欧美无线码| 熟妇人妻不卡中文字幕| 大码成人一级视频| 久久亚洲国产成人精品v| 国产免费视频播放在线视频| 国产成人精品久久二区二区91 | 亚洲五月色婷婷综合| 波多野结衣一区麻豆| 国产野战对白在线观看| 亚洲欧洲精品一区二区精品久久久 | 女人高潮潮喷娇喘18禁视频| 免费av中文字幕在线| 日本黄色日本黄色录像| 日韩免费高清中文字幕av| 日韩av在线免费看完整版不卡| 999精品在线视频| 美女国产视频在线观看| 亚洲精品久久成人aⅴ小说| 日本av手机在线免费观看| 大陆偷拍与自拍| 狂野欧美激情性bbbbbb| 欧美精品人与动牲交sv欧美| 2021少妇久久久久久久久久久| 欧美97在线视频| 久久99一区二区三区| 亚洲精品国产av成人精品| 国产有黄有色有爽视频| 啦啦啦视频在线资源免费观看| 精品少妇黑人巨大在线播放| freevideosex欧美| 我要看黄色一级片免费的| 国产成人精品久久二区二区91 | 成人漫画全彩无遮挡| 精品视频人人做人人爽| 大码成人一级视频| 久久久久久久亚洲中文字幕| 日韩制服骚丝袜av| 国产深夜福利视频在线观看| 成人国产麻豆网| 黑人巨大精品欧美一区二区蜜桃| 又大又黄又爽视频免费| 亚洲国产成人一精品久久久| 欧美日韩成人在线一区二区| 一边摸一边做爽爽视频免费| 免费高清在线观看视频在线观看| 三级国产精品片| 成人手机av| 精品国产超薄肉色丝袜足j| 青草久久国产| 国产精品一二三区在线看| 久久精品亚洲av国产电影网| 久久久精品区二区三区| 街头女战士在线观看网站| 国产精品久久久久久精品古装| 欧美精品一区二区免费开放| 久热久热在线精品观看| 日本午夜av视频| av线在线观看网站| 七月丁香在线播放| 亚洲国产毛片av蜜桃av| 男女高潮啪啪啪动态图| 90打野战视频偷拍视频| 亚洲欧美精品综合一区二区三区 | 青春草国产在线视频| 日日撸夜夜添| 亚洲男人天堂网一区| 一本久久精品| 亚洲三级黄色毛片| 天堂8中文在线网| 国产av码专区亚洲av| 久久人人爽人人片av| av片东京热男人的天堂| 亚洲视频免费观看视频| 亚洲国产最新在线播放| 在线观看免费日韩欧美大片| 免费黄频网站在线观看国产| 国产一区二区 视频在线| 精品国产一区二区三区久久久樱花| 欧美成人午夜精品| av片东京热男人的天堂| 深夜精品福利| 女性被躁到高潮视频| 成人黄色视频免费在线看| 国产成人精品一,二区| 黄色怎么调成土黄色| 成年美女黄网站色视频大全免费| 国产一级毛片在线| 国产男女内射视频| 美女高潮到喷水免费观看| 最近2019中文字幕mv第一页| 亚洲av成人精品一二三区| 赤兔流量卡办理| 久久精品久久精品一区二区三区| 国产成人精品久久二区二区91 | 青春草视频在线免费观看| 啦啦啦视频在线资源免费观看| 国产精品 国内视频| 亚洲精品一区蜜桃| 国产一区二区 视频在线| 亚洲欧美一区二区三区黑人 | 中文精品一卡2卡3卡4更新| 国产欧美亚洲国产| a 毛片基地| 菩萨蛮人人尽说江南好唐韦庄| 国产精品国产av在线观看| 美国免费a级毛片| 亚洲熟女精品中文字幕| 精品一品国产午夜福利视频| 王馨瑶露胸无遮挡在线观看| 欧美日韩成人在线一区二区| 国产又爽黄色视频| 卡戴珊不雅视频在线播放| 男女啪啪激烈高潮av片| 国产在线一区二区三区精| 美女xxoo啪啪120秒动态图| 久久人妻熟女aⅴ| 三上悠亚av全集在线观看| 91久久精品国产一区二区三区| 亚洲伊人色综图| 美女中出高潮动态图| 中文字幕av电影在线播放| 久久久亚洲精品成人影院| 国产日韩欧美亚洲二区| xxxhd国产人妻xxx| 国产日韩欧美在线精品| 看免费av毛片| 男女边摸边吃奶| 国产亚洲精品第一综合不卡| av国产精品久久久久影院| 一级,二级,三级黄色视频| 丁香六月天网| 久久青草综合色| 亚洲精品视频女| 欧美精品高潮呻吟av久久| 久久国产亚洲av麻豆专区| av在线观看视频网站免费| 精品国产一区二区三区四区第35| 毛片一级片免费看久久久久| 一区二区三区精品91| 男女无遮挡免费网站观看| 久久精品国产综合久久久| 制服诱惑二区| 赤兔流量卡办理| 亚洲四区av| 日本wwww免费看| 午夜福利,免费看| 丝袜脚勾引网站| 桃花免费在线播放| 欧美日本中文国产一区发布| 国产成人aa在线观看|