    Construction Technologies for Tunnels in Special and Complicated Geology of Lanzhou-Chongqing Railway

    2018-04-19 06:49:48LINingLIGuoliang
    隧道建設(shè)(中英文) 2018年3期

    LI Ning, LI Guoliang

    (China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043, Shaanxi, China)

    0 Introduction

    Lanzhou-Chongqing Railway is a major railway that represents the centenary dream of Chinese and connects the Southwest China and Northwest China. It is located in the northeast margin of the Tibetan Plateau, where the geological environment is very complicated under the impact of plate activities and compression. Transformed by the very-low-grade metamorphism and strong deformation of multiple periods and affected by faults, tectonic structures, and geostress fields, etc., large deformed soft rock and quick sand were formed. The geology was evaluated as "a global challenge that is infrequent both in China and abroad". As a result, both the design and construction of this railway were special. The current codes and standards were inapplicable and there was no precedent. A special design became the critical factor that determined the success of Lanzhou-Chongqing Railway[1]. In addition, the full-face hard-rock tunnel boring machines (TBMs) used for West Qinling Tunnel of Lanzhou-Chongqing Railway were the railway TMB with the largest diameter in China. Compared with other TBMs, they had much larger diameter and longer tunneling distance. Their adaptability requirement was more stringent, and the related supporting technology determined the TBM tunneling speed.

    In the process of continuous development of construction of transport facilities in China, we have to face more and more long, large, deep, and difficult tunnel projects and more and more geological hazards and complicated geological conditions. The construction difficulty is ever growing. By taking tunnels on Lanzhou-Chongqing Railway in complicated geology as examples, the technological problems and construction technologies related to the Tertiary aquiferous quick sand, large deformation of soft rock, as well as safe, fast and long-distance tunneling by large-diameter TBMs are elaborated so as to provide reference and guide for the design and construction of tunnels in the future.

    1 Project overview

    1.1 Tunnel overview

    With a design speed of 200 km/h, Lanzhou-Chongqing Railway, a class-I electrified double-track railway, is an important part of Chongqing-Xinjiang-Europe-Interna tional Railway under Belt and Road Initiative and the most convenient passage that connects the Southwest China and Northwest China. The 492 km-long Lanzhou-Guangyuan Section has 66 tunnels with a total length of 343 km, including 9 over-10 km-long tunnels. Among the tunnels, West Qinling Tunnel with a length of 28.236 km is the longest tunnel and the critical works of Lanzhou-Chongqing Railway Project. It is also the second longest railway tunnel completed in China and the railway tunnel constructed by TBMs with the largest diameter (10.23 m) in China.

    The construction of Lanzhou-Guangyuan Section of the railway was commenced in 2008, and the section of the railway was put into operation in September 2017. It shortens the Lanzhou-Chongqing transport distance from 1 466 km to 855 km and the passenger train traveling time from 22 hours to 6.5 hours.

    1.2 Geological background

    Lanzhou-Chongqing Railway is located in the junction zone of the Qinghai-Tibet Plate, Yangtze Plate, North China Plate, etc. (see Fig. 1) with very special and complicated geological background. Especially, the collision between Eurasian Plate and Indian Plate, in addition to the uplift and northeastward compression and extension of Qinghai-Tibet Plate, leads to the high and variable initial geostress and developed folds and fractures in the railway site.

    Fig. 1 Regional geological background of Lanzhou-Chongqing Railway

    1.2.1 Special geological structures

    Lanzhou-Guangyuan Section is located in the margin of Tibetan Plateau, where the geological activities are frequent. Under the impact of the geological activities in multiple periods, the geological environment becomes complicated and the regional structures develop very well. Along the line, there are 10 regional major fractures, 87 relatively major faults, 43 folds and developed secondary faults, minor structures and folds.

    1.2.2 Complicated and variable geostress fields

    Affected by the uplift of Tibetan Plateau and compression between plates, the geostress fields of Lanzhou-Guangyuan Section are very complicated and variable. The maximum measured geostress of Lanzhou-Minxian Section in north-east direction is 27.16 MPa and that of Minxian-Guangyuan Section in north-west direction is 33.82 MPa (see Fig. 2). The surrounding rocks of the tunnels in several places are under very high geostress.

    Fig. 2 Distribution of geostress direction along Lanzhou-Chongqing Railway

    2 Key points and difficulties

    Tertiary aquiferous silty fine sandstone and high geostress soft rock encountered during the construction of Lanzhou-Chongqing Railway are infrequent both in China and abroad, and they are special and complicated environment. The current codes and standards are inapplicable and a special design is required. Meanwhile, how to make the large-diameter TBMs operate safely, fast and efficiently through a long distance is another task.

    2.1 Tertiary aquiferous silty fine sandstone

    The Tertiary clayey aquiferous silty fine sandstone with weak cementation is evaluated as "unfavorable rock" by experts. The rock has poor diagenesis. It is the transitional stratum between rock and sand, with properties of rock and sand. It is in the state of rock when undisturbed and in the state of sand when disturbed. It will quickly be softened and become pasty in contact with water. Often accompanied with water and sand gushing, cavity may be formed in the rock behind the support, which makes the support system crack or collapse and thus leads to high construction difficulty and risk (see Fig. 3). The total length of such strata is about 8 km long, located in 3 tunnels, including Humaling Tunnel and Taoshuping Tunnel.

    2.2 Soft rock under high geostress

    Along Lanzhou-Chongqing Railway, the total length of the soft rock under high geostress is about 83 km, located in 12 tunnels. The soft rock under high geostress is mainly composed of the Silurian phyllite and carboniferous phyllite, the Permian and Triassic slate and carboniferous slate, etc. with a low strength and soft texture. The high geostress often caused large squeezing deformation. Long cracking and intrusion of primary support and torsion and damage of steel supports happened (see Fig. 4), and in some areas, the secondary lining cracked and was damaged. It was very difficult to control the deformation, which seriously endangered the construction and operation safety. The typical tunnels include the Muzhailing Tunnel, Liangshui Tunnel, Xinchengzi Tunnel, Maoyushan Tunnel, Majiashan Tunnel, Tongzhai Tunnel, and Zhifang Tunnel, etc.

    2.3 Fast long-distance tunneling by large-diameter TBMs

    West Qinling Tunnel on Lanzhou-Chongqing Railway has a length of about 28.236 km and maximum overburden of about 1 400 m. Restricted by the topography, it is impossible to build access adit and so the tunnel is a deep-covered long tunnel passing through various stratum and lithology with different rock integrity and geological units. In the design, two large-diameter TBMs (see Fig. 5) were adopted for construction. There were such technological challenges as TBM adaptability, mucking mode, parallel lining, and construction ventilation of the long tunnel.

    (a) Unstability of tunnel face

    (b) Deformation and crack of primary suppnt

    Fig. 3 Deteriorated and instable tertiary sandstone & deformed and damaged support

    (a) Squeezing deformation of H175 shaped steel

    (b) Cracking and intrusion of support

    Fig. 5 TBM for West Qinling Tunnel

    3 Innovation achievements

    3.1 Construction technology for tunnel in Tertiary clayey aquiferous silty fine sandstone with weak cementation

    3.1.1 Study of physical properties and mechanical parameters

    3.1.1.1 Mechanical parameters

    The physical and mechanical properties of the Tertiary aquiferous silty fine sandstone with weak cementation (Fig. 6 and 7) are ascertained to lay a theoretical foundation for the design and construction of the tunnels. The test showed that the permeability coefficient of the Tertiary aquiferous silty fine sandstone sample is similar to that of silty soil, and is much less than that of the common fine sand and even the silty sand strata. Its strength declines with the growth of its moisture content. Where the moisture content exceeds the plastic-limit moisture content, the surrounding rock becomes plastic and loses its strength[2].

    Fig. 6 Grading curves of soil samples of different inclined shafts

    3.1.1.2 Micro-structure variation laws

    Water significantly affects its stability. Before deformation and flow, the matrix particles are granular (see Fig. 8), the pores are dominated by off-contact pores, particles contact each other at points and the structure is relatively stable; with rheological behavior, the point contact between particles disappears, small-and medium-sized particles increase sharply, various flocculent sediments settle on the pore margin, and the sand layer becomes plastic and is deformed.

    Fig. 7 Permeability factors of soil samples of different inclined shafts

    (a) Before flowing deformation

    (b) After flowing deformation

    3.1.2 Study of water-related stability and critical deformation rule

    The water-related stability mechanism of the Tertiary aquiferous silty fine sandstone with weak cementation is ascertained (see Fig. 9): in the case of low moisture content, sandstone particles are under equilibrium load and stable state; in the case of high moisture content, the structure is damaged, and the particles may be easily plastically deformed or rheological behavior occurs. The field tests at 11 working faces showed that the moisture content of 12%-16% 3-5 h after excavation is the critical point of plastic deformation of surrounding rock and the moisture content of 18%-19% 7-10 h after excavation is the critical point of rheological behavior of surrounding rock.

    Fig. 9 Variation of moisture content of sandstone before dewatering

    3.1.3 Study of comprehensive dewatering technology

    The strength of the sandstone obviously declines with the moisture content, which eventually leads to flowing sand. Therefore, it′s necessary to develop a reasonable dewatering technology to keep the moisture content of the sandstone below the critical moisture content so as to ensure the stability of the surrounding rock. Tests on advance dewatering and post dewatering were carried out on the site: in the case of excavation before dewatering, it took consecutive 24 h for dewatering to make the moisture content below the plastic limit (see Fig. 10), while in the case of advance dewatering, the moisture content remained around 5%, which is much lower than the critical moisture content, and the sandstone exhibited a good stability (see Fig. 11)[3].

    Fig. 10 Excavation before Dewatering

    Fig. 11 Advance vacuum dewatering

    A comprehensive dewatering technological system integrating deep surface wells and vacuum light well points in tunnel is built (see Fig. 12); for areas with high cohesive particle content, high moisture content and thick aquifer where it was difficult to obtain the desired effect only by dewatering in tunnel, the technology of advance dewatering by surface wells with large depth (more than 200 m) and the well forming technology were applied to the silty fine sand stratum. In this way, the effective dewatering funnel was made (see Fig. 13) to lower the water head of the Tertiary aquiferous silty fine sandstone and the moisture content of the surrounding rock. The practice proved that the surface dewatering was effective. Before surface dewatering, the monthly tunneling rate was about 6-7 m; after surface dewatering, the monthly tunneling rate was increased to 15-20 m.

    Fig. 12 Layout of light well point dewatering pipes in tunnel

    Fig. 13 Surface dewatering well

    3.1.4 Construction technology of advance reinforcement by full-face horizontal jet grouting piles

    The construction technique of advance reinforcement by horizontal jet grouting for tunnels in aquiferous silty fine sand is developed. For the exit section of Taoshuping Tunnel, high-pressure horizontal jet grouting was applied for the excavation contour scope, and the reinforcement by fiberglass anchor bolts+horizontal jet grouting piles was applied to the working face (Fig. 14). After the reinforcement, bench excavation method can be used, which is characterized by high mechanization and fast construction.

    (b) Working site

    3.1.5 Study of tunnel construction technology in Tertiary aquiferous silty fine sandstone with weak cementation

    3.1.5.1 Characteristics of loads of surrounding rock

    The tunnel in aquiferous sandstone with weak cementation may be quickly deformed after excavation and its deformation is difficult to control. To provide theoretical support for the design and construction of the tunnel, field tests on the surrounding rock pressure, contact pressure, and concrete stress, etc. are made. The tests showed that the surrounding rock pressure of the Tertiary sandstone is saddle-shaped (Fig. 15) and characterized by high surrounding rock pressure at the spring lines on both sides and low surrounding rock pressure at the crown.

    3.1.5.2 Construction method

    In line with the characteristics of the pressure of the Tertiary surrounding sandstone, the supporting rigidity was enhanced in the design. The Ⅰ25 shaped steel arches were used. For areas suffering serious flowing sand and large deformation, two-layer supporting was employed; according to such parameters as the cohesive particle content, permeability factor, cohesion and frictional angle at each working area, the cross diaphragm (CRD) method and double-side heading construction method were used. Orderly construction can be obtained by using each of the construction methods. However, the double-side heading construction method is recommended for areas with high moisture content and serious liquefaction (Fig. 16). Based on the surrounding rock characteristics of working area of inclined shaft #3, the construction method combining advance dewatering in the double-side heads and CRD on the upper bench (Fig. 17) is designed.

    Fig. 15 Distribution of surrounding rock pressure (unit: MPa)

    Fig. 16 Nine-step double-side heading method

    Fig. 17 Double-side heading construction method

    3.2 Deformation control technology for tunnels with large deformation in soft rock under high geostress

    3.2.1 Classification of large deformation

    At present, there are many deformation classification methods for tunnels with large deformation in soft rock under high geostress. However, many factors control the large deformation[4], and it is very difficult to use one method or indicator to evaluate the deformation scale or class in advance. Common large deformations are classified according to the total deformation class of the primary support during the construction, and this is a kind of passive classification that cannot reflect the real conditions of the surrounding rock because it is significantly affected by construction. As a result, based on the previous deformation classification method for squeezing surrounding rock in combination with matching between the supporting and deformation during construction in squeezing surrounding rock, the method integrating advance evaluation and classification for deformation potentiality of squeezing surrounding rock in design and classification for dynamic adjustment in construction is developed[5].

    3.2.1.1 Advance evaluation of deformation potentiality in design

    In the design, according to geological conditions and previous cases of tunnel with large deformation, the advance large-deformation evaluation is carried out and the deformation potentiality classification method with the strength-stress ratio as the major indicator for soft rock tunnels with large deformation is established (see Table 1).

    Table 1 Deformation potentiality classification method for soft rock tunnels with large deformation on Lanzhou-Chongqing Railway

    ClassoflargedeformationStrength?stressratioRelativedeformation/%Ⅰ0.25-0.151.5-3Ⅱ0.15-0.13-5Ⅲ <0.1>5

    3.2.1.2 Dynamic adjustment in construction

    In the construction, according to surrounding rock characteristics revealed by the working face and adjacent sections, the large deformation potentiality is evaluated (see Table 2); through the real-time monitoring, the deformation process of the squeezing surrounding rock is monitored and traced and the portentous information prior to the occurrence of large deformation and the deformation rule is obtained. Then, a further evaluation on the deformation is made by using two indicators, i.e., the deformation amount and deformation rate (see Table 3). Meanwhile, the matching between the supporting and surrounding rock is evaluated according to the supporting damage conditions (see Table 3) and the supporting parameters are adjusted and optimized accordingly to realize dynamic design and adjustment[6].

    Table 3 validation criteria for large deformation classification of soft rock tunnels of Lanzhou-Chongqing Railway

    Remarks: Crown settlement can be considered as per 50% of the horizontal convergence.

    3.2.2 Technical countermeasures

    3.2.2.1 Testing in advance

    According to the principle of "testing in advance for special and complicated works", the tests are made to validate the supporting parameters and section types corresponding to the deformation potentiality classification established in the design, the deformation and supporting loads are monitored, and the parameters and deformation control measures are duly adjusted according to the test results. The displacement in front of the working face in railway tunnels is measured for the first time (see Fig. 18) and the advance deformation rule ahead of the working face of tunnels in soft rock is mastered.

    3.2.2.2 Deformation control technology

    The study shows that the large deformation of Lanzhou-Chongqing Railway belongs to large structural squeezing deformation caused by energy accumulation, transfer and release under the control of structures as well as shearing and shifting of structures. Therefore, according to the genesis mechanism of large squeezing deformation, a comprehensive deformation control technology combining the active stress release and passive control is developed. It includes: (1) active energy release and consumption; (2) surrounding rock improvement and reinforcement to increase its bearing capacity and energy storage capacity; (3) improvement of resistance and adaptability to deformation of supporting system.

    (a) Pipe burying

    (b) Test operation

    Fig. 18 Measurement of longitudinal displacement in surrounding rock of working face

    (1) Active release

    Based on the deformation classes, we increased the deformation allowance according to the conditions revealed by working face excavation and the actual deformation conditions. For sections with high predicated deformation class, we made large advance boring and advance pilot when necessary to facilitate active stress release (Figs. 19 and 20). For the ridge core section of Muzhailing Tunnel, to solve the problem of large deformation and repeated primary support removal/replacement, we made the advance pilot for stress release and succeeded in the construction of ridge section with large deformation, reducing the primary support removal/replacement.

    Fig. 19 Stress release by large advance boring

    (2) Improvement and reinforcement of surrounding rock

    The short, medium and/or long anchorage/grouting system are used to improve the surrounding rock in phases and steps and enhance the bearing capacity (Fig. 21). This method was successfully used for Xinchengzi Tunnel, the first station tunnel with super-large cross-section (with an excavation cross-section area of 340 m2) in soft rock with high geostress.

    Fig. 20 Stress release by advance pilot

    Fig. 21 Anchorage system

    (3) Improvement of resistance and deformation adaptability of supporting system

    For sections with high predicated deformation class, the multi-layer supporting system was built in layers to make the supporting system yielding; the cross-section type to put the structural cross-section under reasonable loads is adjusted so as to adapt to the surrounding rock deformation. For the first time, an energy-absorption buffer structure is used in the design of tunnels in soft rock with high geostress (see Fig. 22). The buffer structure can enhance the energy-absorption capacity of the supporting system in sections where the deformation cannot be stabilized, and can prevent stress centralization so as to put the structure under even loads.

    Regarding Muzhailing Tunnel on Lanzhou-Chongqing Railway, due to the huge loads undertaken by the supporting system, the secondary lining was partially broken. We duly adjusted the cross-section type (Fig. 23) and used the multi-layer supporting to protect the secondary lining from cracking. In addition, we set energy-absorption buffer between the primary support and the secondary lining. The test showed that the loads borne by the supporting structure of sections provided with an energy-absorption buffer are even and are 40% lower than those of sections without the energy-absorption buffer. The energy-absorption buffer mitigates the risk of secondary lining cracking in the later stages.

    Fig. 22 Buffer structure

    Fig. 23 Circular cross-section of multi-layer supporting

    3.2.2.3 Operation monitoring

    Tunnels in soft rock with high geostress can only be finally stabilized by 2-3 years or even 5-6 years after the completion of the construction. Moreover, lining cracking and damage often occur during operation, which endangers train operation safety. To ensure the safety of the tunnels in soft rock with high geostress on Lanzhou-Chongqing Railway during operation, a long-term monitoring system, including real-time monitoring and automatic data transmission, is employed for tunnels in soft rock with high geostress for the first time in China. In addition, in order to ensure the safety, the monitoring management criteria for the operation of tunnels in high geostress soft rock is put forward, with considerations of operation, repair and maintenance.

    3.3 Long-distance safe and fast tunneling technology of large-diameter TBM

    3.3.1 Study of TBM adaptability

    By using advanced technologies such as the remote sensing technology, controlled-source audio-frequency magnetotellurics (CSAMT) V8 geophysical prospecting survey line and deep drilling, comprehensive geological investigation is carried out and the geological structure, strata lithology, surrounding rock characteristics, geostress, and groundwater, etc. of the tunnel area are ascertained and the tunnel scheme with the best geological conditions is selected. The tunnel is mainly located in the lower Proterozoic phyllite and metamorphic sandstone, as well as limestone at local positions. The structure zones include 5 fracture zones and 5 fold cores. According to the geotechnical indicators and the fracture zone distribution, the construction scheme of using two large-diameter TBMs at the exist section is doveloped[7].

    The result shows that the design and type selection of the TBMs for West Qinling Tunnel are successful. World records including the daily boring rate of 42 m, weekly boring rate of 235 m, and monthly boring rate of 843 m of large-diameter TBMs, as well as the new record of the longest boring length of 15.6 km by large-diameter TBMs, were created.

    3.3.2 Study of parameters of long-distance-boring TBM

    3.3.2.1 Reasonable design of cutterhead and cutting tool spacing

    To enable the TBMs of West Qinling Tunnel to continuously operate through a distance of 15.6 km, according to such geological parameters as the rock uniaxial compressive strength and integrity factor, the energy transfer rule in the process of rock breaking by disc cutter is analyzed from the view of rock breaking capacity, the boring performance indicators based on the analysis of the cutterhead input energy and the rock mass output energy is determined, and the TBM cutterhead and reasonable cutting tool spacing for West Qinling Tunnel is designed[8].

    3.3.2.2 Design of driving system and main bearing fatigue damage

    Based on the study of the dynamic characteristics of the driving system, the problems including the driving system and the main bearing fatigue damage are analyzed, and the design principle for the driving system resistance against fatigue damage under the precondition of meeting the power requirement is put forward, and the principle for key parameter selection that can guide the design of main bearing resistance against fatigue damage is established.

    3.3.3 Technology of boring and parallel lining

    Previously, the construction of tunnels by TBMs follows the procedure of "Tunneling through by TBM-TBM removal-Lining". The required long construction duration and the lining seriously lagged, which lead to the risk of supporting deformation and instability. To mitigate the risk and shorten the construction duration, the jumbo and platform that allow passage of the locomotives, cables, air pipe, and belt conveyor is designed (see Fig. 24) to achieve uninterrupted mucking by continuous belt conveyors during the secondary lining construction. The concrete ever-standing pipe working system is developed to prevent the concrete pipeline from interfering with the passage of the locomotives during concrete placing. The telescopic platform between the jumbo and platform is set to replace the belt conveyor support, realizing the parallel operation of TBM boring, locomotive passage and lining under the condition of mucking by continuous belt conveyors for the first time[9]and thus shortening the construction duration by 20 months.

    Fig. 24 Technology of TBM boring accompanied by lining construction (unit: cm)

    3.3.4 Mucking by continuous belt conveyor system

    To meet the demand of large cross-section fast tunneling by large-diameter TBMs and solve the problems of complicated topography of West Qinling Tunnel, large mucking amount, large transport amount of materials, and timely transfer of spoil materials, on the basis of advanced construction technologies and ideas, the multi-stage belt conveyor mucking system[10]is developed and one-stop transport from the TBM working face to spoil yard outside the tunnel is achieved (Fig. 25). Such a transport mode exhibited advantages of safety, high efficiency, environmental friendliness, and energy saving, and made significant contribution to safe and fast construction of the tunnel.

    (a) Inside tunnel

    (b) Outside tunnel

    The quick non-damage belt contracting and extending equipment is developed to allow the long-distance belt to perform two functions, i.e., automatic contracting and extending and transport in the tunnel and make the continuous belt be conveniently extended; to prevent breakdown of the whole system caused by the fault of the single-stage belt, a belt serial redundant system is developed to improve the fault-tolerant capability of the belt system and ensure continuous and fast tunneling of TBMs. In addition, the hydraulic shifting plate for spoil distributor is developed to achieve continuous spoiling loading of multiple trucks and seamless linkage between the belt conveyor mucking system and the spoil trucks.

    3.4 Super-long-distance ventilation

    The longest TBM construction ventilation distance of West Qinling Tunnel is 20 km, while that of previous similar tunnel works is about 13 km. How to solve problems of out-of-limit hazardous gas, dust and temperature in the tunnel was a great challenge for tunnel construction ventilation. Based on the access adit, a two-stage ventilation mode is invented: the dead-end blowing ventilation is used in phase Ⅰ while the combined gallery ventilation on the basis of the fresh air supply from phase Ⅰ and dirty air venting by inclined shafts was used in phase Ⅱ (see Fig. 26). Moreover, comprehensive energy saving measures such as using the high-power energy-saving variable-frequency fans, large-diameter high-pressure flexible ventilation ducts and anti-leakage high-strength joints are taken for the first time in super-long-distance construction of TBMs to meet the tunnel ventilation standard, and thus a new economical and environmental friendly mode for construction ventilation of similar works in the future is created.

    Fig. 26 Combined gallery ventilation in phase Ⅱ

    Test data showed that the test result was closely related to the operation status of fans. Except the high dust concentration and noise at the startup of the fans, other indicators were lower than the standard values. In other time, all the indicators were lower than the control standard values. Both the ventilation effect and dirty air venting time can meet construction requirements.

    4 Conclusions and experience

    Based on the scientific tests, practices and adjustments made by all the parties participating in the construction, innovation and exploration in various fields of the technologies of construction in special and complicated geology were carried out and the global challenge of the Tertiary quick sand was overcome, the large deformation of high geostress soft rock was controlled, the technical problem of safe, fast and long-distance construction by large-diameter TBMs was solved, and finally a complete set of feasible and effective design and construction technologies was developed. The conclusions and suggestions are as follows:

    (1) With a critical moisture content for plastic deformation of 12%-16% and that for rheological behavior of 18%-19%, the Tertiary sandstone has very poor water-related stability. The comprehensive dewatering technology integrating deep surface wells and light well points in tunnel can make the moisture content below the critical value and thus can ensure the stability of the sandstone. In addition, the construction technique featured with advance reinforcement by horizontal jet grouting for the full face of tunnels in aquiferous silty fine sand strata was developed, and the construction technique is environmental friendly and effective. It is suggested to use specialized teams to carry out construction of key operations such as dewatering and advance horizontal jet grouting.

    (2) The principle of dynamic design and making test first should be applied to tunnels with large deformation in soft rock with high geostress. It is advisable to do pre-design of classification according to the strength-stress ratio of surrounding rock, carry out dynamic adjustment during construction according to the surrounding rock characteristics, deformation amount, deformation rate, and supporting damage types, etc., and use the comprehensive deformation control technology combining active stress release and passive control. However, in view of the complexity and specificity of tunnels in soft rock with high geostress, it is necessary to carry out further studies on the deformation mechanism and classify the deformation potentiality in various ways so as to improve the accuracy of pre-evaluation.

    (3) In the design and construction of the tunnel bored by TBMs, attention should be paid to the adaptability to the surrounding rock. The advanced and effective technologies such as the parallel lining during operation of belt conveyors and the belt conveyor mucking system were developed and a complete set of technical system for safe, fast and effective tunneling by TBMs was established. According to the characteristics of long-distance tunneling by large-diameter TBMs, further studies should be carried out on parameter design and fatigue resistance of TBM cutterheads and cutters, the correlation between the geology and tunneling parameters should be analyzed in detail, and TBM tunneling record should be established to improve the TBM tunneling efficiency.

    5 Honors achieved by the project

    (1) Scientific and technological achievements: 1 special prize, 1 first prize, 2 second prizes of science & technology progress award at the level of province and ministry; 1 normalized construction technique at the state level and 3 normalized construction techniques at the level of province and ministry;

    (2) Patents: about 50 invention patents and utility model patents have been granted.

    6 Organizations participating in the project

    Designer: China Railway First Survey and Design Institute Group Co., Ltd.

    Construction contractors: China Railway Tunnel Group Co., Ltd., China Railway 11 Bureau Group Co., Ltd., China Railway 18 Bureau Group Co., Ltd., China Railway 19 Bureau Group Co., Ltd. and China Railway 21 Bureau Group Co., Ltd.

    Scientific research organizations: Beijing Jiaotong University, Shijiazhuang Tiedao University, Southwest Jiaotong University, Lanzhou Jiaotong University and China Railway Southwest Research Institute Co., Ltd.

    Acknowledgement

    The study was supported by the Study of Comprehensive Safe Construction Technologies for Super-long Tunnels in Complex Geology (2009G009-B).

    :

    [1]LI Guoliang.Construction difficulties and countermeasures for the Lanzhou-Chongqing railway tunnels in complicated geological conditions[J]. Modern Tunnelling Technology, 2015, 52(5): 10.

    [2] China Railway First Survey and Design Institute Group Co., Ltd., and Beijing Jiaotong University. Experimental study of physico-mechanical parameters of water-containing poorly-cemented sandstone formation[R]. Xi′an: China Railway First Survey and Design Institute Group Co., Ltd., 2010.

    [3]LI Guoliang,WANG Fei. Major technical measures of the third series argillaceous weak cementation rich water silty sand rock tunnels[J]. Journal of Chongqing Jiaotong University (Natural Science), 2015, 34(4): 39.

    [4] LI Guoliang, LI Ning. Discussion of tunnelling in squeezed surrounding rock[J]. Modern Tunnelling Technology, 2018, 55(1): 1.

    [5]LI Guoliang, LIU Zhichun, ZHU Yongquan. On the large squeezing deformation law and classification criteria for the Lanzhou-Chongqing railway tunnels in soft and high geostress rocks[J]. Modern Tunnelling Technology, 2015, 52(1): 62.

    [6] WANG Jianjun. The deformation mechanism of a tunnel in triassic slate and forecasting surrounding rock classifications [J]. Modern Tunnelling Technology, 2013, 50(2): 79.

    [7] LI Guoliang, SI Jianjun, LI Ning. Construction scheme of the West Qinling Extra-Long Tunnel on the Lanzhou-Chongqing Railway[J]. Modern Tunnelling Technology, 2014, 51(3): 7.

    [8]GUO Wei, SONG Liwei, ZHU Dianhua,et al.Matching characteristics analysis of TBM cutterhead boring parameters and disc cutter spacing based on energy principle [J]. Journal of Tianjin University(Science and Technology), 2017, 50(2): 128.

    [9]XU Shuangyong, SU Rui. Synchronized lining with TBM driving in West Qinling Tunnel[J]. Modern Tunnelling Technology, 2011, 48(2): 1.

    [10] XU Jinlin, XU Zan, WANG Yanbo. Key technology of mucking by continuous conveyor belt: Case study of West Qinling Extra-long Tunnel[J]. Tunnel Construction, 2011, 31(6): 678.

    一级毛片女人18水好多| 日日夜夜操网爽| 日韩欧美精品v在线| 丁香六月欧美| 国产精品久久久久久精品电影| 国产精品久久电影中文字幕| 俄罗斯特黄特色一大片| 国产主播在线观看一区二区| ponron亚洲| 精品国产亚洲在线| 一级毛片高清免费大全| 午夜精品久久久久久毛片777| 亚洲国产欧洲综合997久久,| 少妇被粗大的猛进出69影院| 国产精品久久久人人做人人爽| 国产精品久久久久久久电影 | 在线国产一区二区在线| 欧美日韩亚洲国产一区二区在线观看| 别揉我奶头~嗯~啊~动态视频| 亚洲精品久久国产高清桃花| 久久精品91无色码中文字幕| 久久中文字幕一级| 18禁国产床啪视频网站| 嫩草影视91久久| 成人国产综合亚洲| 91老司机精品| 欧美人与性动交α欧美精品济南到| 叶爱在线成人免费视频播放| 99久久精品热视频| 色哟哟哟哟哟哟| 亚洲中文日韩欧美视频| 久久精品国产99精品国产亚洲性色| 久久中文字幕人妻熟女| 精华霜和精华液先用哪个| 亚洲中文日韩欧美视频| 日韩欧美在线二视频| 午夜老司机福利片| 老鸭窝网址在线观看| 国产亚洲欧美在线一区二区| 男女下面进入的视频免费午夜| 18禁观看日本| 亚洲熟女毛片儿| 国产精品国产高清国产av| 真人做人爱边吃奶动态| 精品久久蜜臀av无| 麻豆成人午夜福利视频| 一级片免费观看大全| 天天添夜夜摸| 长腿黑丝高跟| 91麻豆精品激情在线观看国产| 亚洲自拍偷在线| 12—13女人毛片做爰片一| 欧美精品亚洲一区二区| 中文字幕av在线有码专区| 国产又黄又爽又无遮挡在线| 中文字幕精品亚洲无线码一区| 这个男人来自地球电影免费观看| 免费看美女性在线毛片视频| 国产黄a三级三级三级人| 两个人免费观看高清视频| 欧美又色又爽又黄视频| 精品一区二区三区视频在线观看免费| 国产精品一区二区三区四区免费观看 | 国产一区二区在线观看日韩 | 19禁男女啪啪无遮挡网站| 国产精品av视频在线免费观看| 2021天堂中文幕一二区在线观| 国产99白浆流出| 久热爱精品视频在线9| 成人永久免费在线观看视频| 黑人欧美特级aaaaaa片| 老司机福利观看| 美女 人体艺术 gogo| 青草久久国产| 在线观看免费日韩欧美大片| 狂野欧美白嫩少妇大欣赏| 禁无遮挡网站| 国产一区二区三区在线臀色熟女| 男女床上黄色一级片免费看| 日韩精品免费视频一区二区三区| av国产免费在线观看| 久久久久亚洲av毛片大全| 欧美高清成人免费视频www| 女人被狂操c到高潮| 成人手机av| 精品欧美一区二区三区在线| 亚洲性夜色夜夜综合| 日韩欧美三级三区| 在线免费观看的www视频| 午夜免费成人在线视频| 日韩精品中文字幕看吧| 黄色毛片三级朝国网站| 最近最新中文字幕大全电影3| 欧美中文日本在线观看视频| 亚洲人成电影免费在线| 可以在线观看的亚洲视频| 俺也久久电影网| 99久久无色码亚洲精品果冻| 亚洲欧美一区二区三区黑人| 香蕉丝袜av| 欧美性猛交╳xxx乱大交人| 欧美一区二区国产精品久久精品 | a级毛片a级免费在线| 99精品欧美一区二区三区四区| 美女免费视频网站| 久久欧美精品欧美久久欧美| 精品少妇一区二区三区视频日本电影| 亚洲国产日韩欧美精品在线观看 | 日韩国内少妇激情av| 99久久精品国产亚洲精品| av欧美777| 免费无遮挡裸体视频| 亚洲专区字幕在线| 精品一区二区三区视频在线观看免费| 成人国产一区最新在线观看| 波多野结衣高清无吗| 国产精品影院久久| 97人妻精品一区二区三区麻豆| 国产不卡一卡二| 久久精品夜夜夜夜夜久久蜜豆 | 五月玫瑰六月丁香| 宅男免费午夜| 国内揄拍国产精品人妻在线| 男女午夜视频在线观看| 一区二区三区激情视频| 成人国产综合亚洲| 丁香六月欧美| 国产99久久九九免费精品| 91大片在线观看| 高清在线国产一区| 欧美中文综合在线视频| 国产成人啪精品午夜网站| 中出人妻视频一区二区| 最新在线观看一区二区三区| 老司机午夜十八禁免费视频| 精品无人区乱码1区二区| 国产成人av教育| 日韩有码中文字幕| 亚洲五月婷婷丁香| 99riav亚洲国产免费| 久久久久九九精品影院| 欧美在线一区亚洲| 91av网站免费观看| 免费看美女性在线毛片视频| 最近视频中文字幕2019在线8| 久久久久久大精品| 国产精品日韩av在线免费观看| 九色成人免费人妻av| 天堂√8在线中文| 丰满人妻一区二区三区视频av | 香蕉丝袜av| av在线天堂中文字幕| 欧美日韩中文字幕国产精品一区二区三区| 久久精品影院6| 国产欧美日韩精品亚洲av| 五月玫瑰六月丁香| 少妇被粗大的猛进出69影院| 男女做爰动态图高潮gif福利片| 巨乳人妻的诱惑在线观看| 日韩欧美精品v在线| 巨乳人妻的诱惑在线观看| 一级a爱片免费观看的视频| 国产成人系列免费观看| 99re在线观看精品视频| 国产一区在线观看成人免费| 18禁黄网站禁片午夜丰满| 一边摸一边抽搐一进一小说| 午夜免费激情av| 久久性视频一级片| 午夜精品在线福利| 欧美成狂野欧美在线观看| 久久性视频一级片| 欧美成狂野欧美在线观看| 国产精品久久视频播放| 日本 欧美在线| 18禁裸乳无遮挡免费网站照片| 最近在线观看免费完整版| 国产成人啪精品午夜网站| 国产高清videossex| 国产人伦9x9x在线观看| 99精品在免费线老司机午夜| 国产精品野战在线观看| 在线观看舔阴道视频| 婷婷亚洲欧美| 精品国产亚洲在线| 国内少妇人妻偷人精品xxx网站 | 麻豆久久精品国产亚洲av| 波多野结衣高清无吗| 成人三级黄色视频| 在线永久观看黄色视频| 久久中文看片网| 亚洲狠狠婷婷综合久久图片| 亚洲av熟女| 国产亚洲av嫩草精品影院| 麻豆成人午夜福利视频| www国产在线视频色| 天堂影院成人在线观看| 人妻丰满熟妇av一区二区三区| 亚洲av成人一区二区三| 午夜激情av网站| 欧美成人午夜精品| 久久久久久人人人人人| www.自偷自拍.com| 国产精品久久久人人做人人爽| 国产高清视频在线观看网站| av有码第一页| 在线观看美女被高潮喷水网站 | 午夜免费成人在线视频| 国产又色又爽无遮挡免费看| 亚洲,欧美精品.| 国产一区二区激情短视频| 精品免费久久久久久久清纯| 日韩av在线大香蕉| 午夜精品在线福利| 国产精品亚洲av一区麻豆| 精品久久久久久久久久久久久| 国产99久久九九免费精品| 成人国产综合亚洲| 无遮挡黄片免费观看| 天堂√8在线中文| 亚洲av熟女| 久久九九热精品免费| 亚洲人成伊人成综合网2020| 两个人看的免费小视频| 国产亚洲精品av在线| 亚洲av五月六月丁香网| 老汉色∧v一级毛片| 97人妻精品一区二区三区麻豆| 亚洲熟妇熟女久久| 两个人视频免费观看高清| 男女视频在线观看网站免费 | 国产亚洲精品av在线| 婷婷精品国产亚洲av| www.自偷自拍.com| 久久精品国产亚洲av香蕉五月| 一二三四社区在线视频社区8| 亚洲五月天丁香| 国产熟女午夜一区二区三区| 欧美中文日本在线观看视频| 欧美一级a爱片免费观看看 | 色噜噜av男人的天堂激情| 欧美一区二区国产精品久久精品 | 中出人妻视频一区二区| 成人18禁高潮啪啪吃奶动态图| 欧美精品啪啪一区二区三区| 一区二区三区高清视频在线| 黄色女人牲交| 一个人免费在线观看的高清视频| 亚洲一码二码三码区别大吗| 国产熟女午夜一区二区三区| 99久久精品国产亚洲精品| 欧美极品一区二区三区四区| 精品国产乱子伦一区二区三区| 亚洲国产欧美网| 国产精品国产高清国产av| 亚洲 欧美 日韩 在线 免费| 91字幕亚洲| 国产真人三级小视频在线观看| www.999成人在线观看| 男女之事视频高清在线观看| 高清毛片免费观看视频网站| 久久久久性生活片| 蜜桃久久精品国产亚洲av| 一级毛片高清免费大全| 日韩精品中文字幕看吧| 亚洲专区中文字幕在线| 精品不卡国产一区二区三区| 亚洲欧美日韩东京热| 欧美日韩黄片免| 国产精品98久久久久久宅男小说| 三级国产精品欧美在线观看 | 国产成+人综合+亚洲专区| 在线观看免费视频日本深夜| 国产爱豆传媒在线观看 | aaaaa片日本免费| 两个人看的免费小视频| 精品少妇一区二区三区视频日本电影| 午夜福利高清视频| 日韩欧美一区二区三区在线观看| 久久久久久久精品吃奶| 精品欧美一区二区三区在线| 一级毛片精品| 在线观看免费视频日本深夜| 少妇人妻一区二区三区视频| 国产私拍福利视频在线观看| 亚洲国产欧美一区二区综合| 国产精品久久电影中文字幕| 岛国在线观看网站| 五月伊人婷婷丁香| 精品国产乱码久久久久久男人| 在线观看日韩欧美| 91老司机精品| 国产视频一区二区在线看| 一区福利在线观看| 我要搜黄色片| 精品一区二区三区四区五区乱码| 国内精品久久久久精免费| 亚洲熟女毛片儿| 丰满的人妻完整版| 午夜免费激情av| 国产成人啪精品午夜网站| 日韩国内少妇激情av| 日本五十路高清| 久久香蕉国产精品| 香蕉国产在线看| 正在播放国产对白刺激| 激情在线观看视频在线高清| 日韩欧美国产一区二区入口| 成在线人永久免费视频| 99热6这里只有精品| 黑人操中国人逼视频| 999精品在线视频| 国产91精品成人一区二区三区| 亚洲色图 男人天堂 中文字幕| 制服人妻中文乱码| 午夜两性在线视频| 日韩 欧美 亚洲 中文字幕| 中文字幕熟女人妻在线| 久久午夜亚洲精品久久| 亚洲欧洲精品一区二区精品久久久| av免费在线观看网站| 在线视频色国产色| 午夜免费观看网址| 亚洲精品美女久久av网站| 欧美性猛交黑人性爽| 琪琪午夜伦伦电影理论片6080| 欧美在线一区亚洲| 99久久精品国产亚洲精品| 啦啦啦韩国在线观看视频| 亚洲中文字幕日韩| 可以在线观看的亚洲视频| 久久九九热精品免费| 国产精品 欧美亚洲| 亚洲欧美日韩高清在线视频| 黄色a级毛片大全视频| 国产亚洲精品一区二区www| 在线十欧美十亚洲十日本专区| ponron亚洲| 亚洲成人中文字幕在线播放| av在线播放免费不卡| 久久精品国产亚洲av香蕉五月| 亚洲美女视频黄频| 美女黄网站色视频| 久久精品综合一区二区三区| 国产真实乱freesex| 亚洲在线自拍视频| 欧美成人午夜精品| 婷婷六月久久综合丁香| 老鸭窝网址在线观看| 一卡2卡三卡四卡精品乱码亚洲| 一本大道久久a久久精品| 亚洲av成人不卡在线观看播放网| 亚洲国产欧洲综合997久久,| 国产精华一区二区三区| 久久热在线av| 成人特级黄色片久久久久久久| 国产精品一及| 俺也久久电影网| 中文字幕最新亚洲高清| 麻豆成人av在线观看| 久久婷婷人人爽人人干人人爱| 99久久无色码亚洲精品果冻| 精品久久久久久成人av| 色老头精品视频在线观看| 国产三级在线视频| 久久久精品欧美日韩精品| 日本一区二区免费在线视频| 国产1区2区3区精品| 久久久久久人人人人人| 国产精品日韩av在线免费观看| 1024手机看黄色片| 精品一区二区三区av网在线观看| 亚洲精品在线美女| 岛国视频午夜一区免费看| 久久精品成人免费网站| 国产片内射在线| 国语自产精品视频在线第100页| 久久亚洲精品不卡| 亚洲五月天丁香| 男女做爰动态图高潮gif福利片| 亚洲国产欧美一区二区综合| 久久伊人香网站| 午夜激情av网站| 欧美午夜高清在线| 桃红色精品国产亚洲av| 夜夜躁狠狠躁天天躁| 成人国产一区最新在线观看| 国产精品久久久久久人妻精品电影| 国内久久婷婷六月综合欲色啪| 婷婷精品国产亚洲av| 久久天堂一区二区三区四区| 欧美成狂野欧美在线观看| 看黄色毛片网站| 久久久国产欧美日韩av| 搡老妇女老女人老熟妇| 欧美成人免费av一区二区三区| 女同久久另类99精品国产91| 变态另类丝袜制服| 欧美黄色淫秽网站| 日韩精品中文字幕看吧| 亚洲18禁久久av| 中文字幕精品亚洲无线码一区| 搞女人的毛片| 草草在线视频免费看| 最近在线观看免费完整版| 搡老熟女国产l中国老女人| 男人舔奶头视频| 国产精品日韩av在线免费观看| 又爽又黄无遮挡网站| 国产视频一区二区在线看| 午夜福利免费观看在线| 欧美丝袜亚洲另类 | 国产精品香港三级国产av潘金莲| 99久久无色码亚洲精品果冻| 国产aⅴ精品一区二区三区波| 欧美+亚洲+日韩+国产| 少妇裸体淫交视频免费看高清 | 法律面前人人平等表现在哪些方面| 久久热在线av| 最新美女视频免费是黄的| 欧美乱码精品一区二区三区| 全区人妻精品视频| 日韩成人在线观看一区二区三区| 九色成人免费人妻av| 亚洲五月天丁香| 欧美丝袜亚洲另类 | 久久久久性生活片| 亚洲人成网站高清观看| 岛国在线观看网站| 又粗又爽又猛毛片免费看| 中文字幕人妻丝袜一区二区| 久久精品国产亚洲av高清一级| 午夜福利高清视频| 少妇被粗大的猛进出69影院| 国产av又大| 亚洲中文日韩欧美视频| 在线观看一区二区三区| 好男人在线观看高清免费视频| 人人妻人人看人人澡| 一级a爱片免费观看的视频| 精品久久久久久久末码| 日韩大尺度精品在线看网址| 无遮挡黄片免费观看| 一本久久中文字幕| 中文字幕高清在线视频| av欧美777| 18禁黄网站禁片午夜丰满| 老司机在亚洲福利影院| 九九热线精品视视频播放| 老司机福利观看| 亚洲精品中文字幕在线视频| 99国产综合亚洲精品| 制服人妻中文乱码| 午夜福利18| 国产欧美日韩一区二区精品| 在线观看舔阴道视频| 亚洲精品久久成人aⅴ小说| 久久久国产成人免费| 欧美 亚洲 国产 日韩一| 亚洲,欧美精品.| 国产视频内射| 国产亚洲av高清不卡| 亚洲无线在线观看| 美女扒开内裤让男人捅视频| 成人av一区二区三区在线看| 日本a在线网址| 黄色a级毛片大全视频| 久久国产乱子伦精品免费另类| 免费看十八禁软件| 中文字幕高清在线视频| 国产av一区二区精品久久| 午夜激情福利司机影院| 国产精品98久久久久久宅男小说| 久久久久久国产a免费观看| 蜜桃久久精品国产亚洲av| 久久久久久九九精品二区国产 | 久久久久精品国产欧美久久久| 亚洲 国产 在线| 一个人观看的视频www高清免费观看 | 少妇粗大呻吟视频| 大型av网站在线播放| 啦啦啦韩国在线观看视频| av国产免费在线观看| 麻豆成人午夜福利视频| 亚洲午夜精品一区,二区,三区| 麻豆国产97在线/欧美 | 婷婷精品国产亚洲av| 亚洲精品美女久久av网站| 精品久久久久久成人av| 日韩免费av在线播放| 亚洲国产欧美一区二区综合| 在线国产一区二区在线| 国产精品,欧美在线| 欧美3d第一页| 黄色 视频免费看| 99国产精品一区二区蜜桃av| 麻豆一二三区av精品| 精品国产美女av久久久久小说| 日本撒尿小便嘘嘘汇集6| 动漫黄色视频在线观看| 狠狠狠狠99中文字幕| 亚洲欧美日韩高清在线视频| 男女下面进入的视频免费午夜| 女警被强在线播放| 亚洲人成网站在线播放欧美日韩| 国内毛片毛片毛片毛片毛片| 日本一本二区三区精品| av在线播放免费不卡| 色av中文字幕| 国产在线观看jvid| 操出白浆在线播放| av免费在线观看网站| 免费看美女性在线毛片视频| 啦啦啦韩国在线观看视频| 美女高潮喷水抽搐中文字幕| 在线播放国产精品三级| 国产精品久久久av美女十八| 精品一区二区三区四区五区乱码| 在线观看www视频免费| av视频在线观看入口| 9191精品国产免费久久| 免费高清视频大片| 久久伊人香网站| 国产一区在线观看成人免费| 国产麻豆成人av免费视频| 国产精品久久久久久久电影 | 亚洲中文日韩欧美视频| 亚洲熟妇熟女久久| 日韩大尺度精品在线看网址| 欧美午夜高清在线| 婷婷丁香在线五月| 亚洲精品一区av在线观看| 久9热在线精品视频| 亚洲欧美精品综合一区二区三区| 午夜亚洲福利在线播放| 国产精品野战在线观看| 丰满人妻一区二区三区视频av | 欧美乱色亚洲激情| 精品久久久久久久毛片微露脸| 黑人欧美特级aaaaaa片| 亚洲精品久久成人aⅴ小说| 首页视频小说图片口味搜索| 黄色 视频免费看| 我要搜黄色片| 可以在线观看毛片的网站| 在线永久观看黄色视频| 国产精品久久电影中文字幕| 少妇人妻一区二区三区视频| www.www免费av| 日韩大尺度精品在线看网址| 免费电影在线观看免费观看| 久久久久性生活片| 变态另类成人亚洲欧美熟女| 国产精品av久久久久免费| 一级毛片精品| 美女高潮喷水抽搐中文字幕| 日韩欧美在线二视频| 少妇人妻一区二区三区视频| 国产视频内射| 日韩精品青青久久久久久| 女警被强在线播放| 日韩精品青青久久久久久| 欧美人与性动交α欧美精品济南到| 日本成人三级电影网站| av超薄肉色丝袜交足视频| 亚洲欧美精品综合一区二区三区| 99riav亚洲国产免费| 色哟哟哟哟哟哟| 在线观看日韩欧美| 亚洲全国av大片| 亚洲人成电影免费在线| 午夜视频精品福利| 久久久国产成人免费| 每晚都被弄得嗷嗷叫到高潮| 欧美成狂野欧美在线观看| 成人av一区二区三区在线看| 国产精品美女特级片免费视频播放器 | 1024手机看黄色片| 亚洲熟女毛片儿| 十八禁人妻一区二区| 在线观看免费视频日本深夜| 18禁裸乳无遮挡免费网站照片| 久久精品91蜜桃| 成人av在线播放网站| 久久欧美精品欧美久久欧美| 99热6这里只有精品| 人人妻,人人澡人人爽秒播| 久久这里只有精品19| 久久欧美精品欧美久久欧美| 三级毛片av免费| 波多野结衣高清无吗| 亚洲人成伊人成综合网2020| 午夜福利在线在线| 中文字幕精品亚洲无线码一区| 久久精品人妻少妇| 99久久国产精品久久久| 好男人电影高清在线观看| 狂野欧美白嫩少妇大欣赏| 成人国产一区最新在线观看| 国产成人av教育| 99国产极品粉嫩在线观看| e午夜精品久久久久久久| 国产亚洲精品第一综合不卡| 亚洲欧美激情综合另类| 女人高潮潮喷娇喘18禁视频| 国产亚洲欧美98| 亚洲自拍偷在线| 精品午夜福利视频在线观看一区| 午夜福利欧美成人| 日韩欧美在线二视频| 午夜免费观看网址| 日本一本二区三区精品| 亚洲熟妇中文字幕五十中出| 窝窝影院91人妻| a级毛片a级免费在线|