• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    多年凍土區(qū)空間通風(fēng)殼型基礎(chǔ)設(shè)備技術(shù)

    2014-03-19 03:43:36GoncharovPetrova
    關(guān)鍵詞:多年凍土西伯利亞聯(lián)邦

    Goncharov Y.M.,Petrova Y.M.

    (西伯利亞聯(lián)邦大學(xué) 土木工程學(xué)院,克拉斯諾亞爾斯克 660041,俄羅斯)

    0 Introduction

    In the view of essential novelty of the structure of the surface ventilated shell-type foundation and unusual conditions of its work,with presence of permafrost soils,and a lack of information about the technology of its device and temperature condition of soil base formation,the aim was set to develop and investigate:

    1)The device technology of intermediate layer from different nonfrost-susceptible soils;

    2)The filling technology of internal spaces of shell-type foundation by a low-strength material;

    3)The manufacture of prefabricated shell-type foundation elements outside the factory conditions;

    4)The manufacturing technology of cast in situ thin-walled structures shell-type foundation at the construction site in the North conditions,in particular in reinforcement,and concreting structures;

    5)To investigate the formation of temperature conditions base soils of operated experimental buildings which built at high-temperature and strongly-icy soils.

    1 Materials and Methods

    The design of the spatial ventilated shell-type foundation implements the concept of load transmission and deformation from foundation,combining the functions of bearing structures and freezing soil of device base,through an intermediate layer,realized from nonfrost-susceptible material,which leads to a significant reduction of intensity of cryogenic processes in thermal and mechanical interaction of buildings with frozen soil.

    Possible design schemes of the ground part of building in shell-type foundations are shown in Fig.1.

    Fig.1 Structural scheme of the building cap(a)for a building with technical floor;(b)the same with ventilated underground1-fold;2-insert;3-intermediate layer;4-bearing wall;5– floor slabs;6-foundation ventilated space;7-column;8-;9-brick fencing;10-air hole;11-spandrel beam under the socle panel;12-glass holder under the column.

    Taking into consideration,qualitative device of intermediate layer fill pad is an essential condition for reliable stability of a building;this issue is to be paid great attention.For this purpose,it is necessary to make layering fill and compact to increase its bearing capacity by mechanical methods using rollers.When you select a method of soil compression and soil compression-type machines,you should consider the soil properties(granulometric composition,moisture,degree of homogeneity,required density)and also amount of work and season.

    Work on non-cohesive soils compression(sand,gravel and sand,etc.)necessary to produce at their moisture level closing to the optimum,so that the greatest compression effect is achieved.

    The above mentioned,the device of intermediate layer is based on the experience of building in Igarka and Norilsk.

    Before,experimental works on developing the technology of intermediate layer device from coarse sand were conducted before experimental housing construction in Igarka.Fill was made layer by layer by 20~25 cm.

    To obtain the required density of fill with void ratio of e=0.5~0.55,each layer was sprinkled with water(the watering machine)to a moisture content of W=7%~9%.Pneumatic roller brought about rolling layers.

    The rolling density using a Dorn densitometer was pre-determined after 5~6 trips in one track.The rolling density was considered to be achieved for each layer,if the dive striker occurred at 8~10 dropping weights with mass of 3 kg densitometer.

    Before the fill of the next layer with the help of rings,samples were selected and un laboratory conditions humidity and average density were determined to calculate the void ratio.Sampling was carried out in the entire area of 92.5 m2in the corners of the grid with a side of 150 cm×150 cm.

    Punching tests with A=5 000 cm2were conducted to determine the total deformation modulus E0of a sand bed.Punching test has shown that in compacting using the above method deformation modulus corresponds to 28.5 MPa.

    Later,filled and compacted bed were served for testing the prototype shell-type foundation.

    During the construction of the first three residential buildings and laboratory building in Igarka city on the shell-type foundations,an intermediate layer (bed)was made from sandy gravel.

    Construction of experimental buildings in Igarka was performed at watered taliks in the permafrost zone with deformation modulus of E0=3,4 MPa.This area built was within the old riverbed with silt.Keeping in mind the geological conditions of the building site and the territory relief,works on large-block hard rock fill for the purpose of“reinforcement”of base liquid mass under the bed shell-type foundations and creation of a single mark of territory of development planning were made originally.

    Works to fill a bed of gravel-sand mixture with a moisture between 10%and 12%were carried out for the planned,construction site for development.

    Moistening of soil mixture was made by a watering machine.

    The fill was realized layer by layer by 15~20 cm with compacting by a loaded dump-body truck.The rolling density was determined visually and was considered to be achieved after complete lack of track tread of a wheel dump-truck.After its completion to the designed level,works on the arrangement of sand-cement inserts under internal spaces of shell-type foundation were made for laying-out axis of buildings.Schemes are shown in Fig.2.

    A layer of 10 cm sand was prepared and poured on the prepared base,after that formwork was set on two constraint axes of the building of its transverse direction in the first half of a shift,then the sand-cement solution(M25)was filled and compacted by an internal vibrator.(Fig.2(a)).

    Formwork allowed creating an insert on the internal form of shell-type foundation folds.In 3 hours,the formwork was removed and rearranged to the following foundation folds,and the process was further repeated.

    Leveling course of the same sand-cement mixture was deposited on the inserts surface and after that precast reinforced concrete foundation elementswere mounted,then armatures welding,and joints concreting between them were made.

    Fig.2 Scheme for filling internal spaces shell-type foundation:a-filling using the panel formwork;b-the same after installation of prefabricated elements,c-filling through holes in the horizontal beams mounted prefabricated shell-type foundation1-formwork;2,5-solution;3-board in the places of prefabricated elements are jointed;4-box;5-bucket;6-horizontal beam with holes for grouting.

    The sequence of production for filling the internal foundation spaces changed at laying of the second building,as well as the laboratory building.At the beginning,elements of foundation were installed along the transverse laying-out axis of building.Thereafter,wooden boards and gutters were fastened at the ends of foundation folds(Fig.2(b)).Then through the gutters and gaps between the fold elements,solution was poured and its compacting was produced(Fig.3).

    Fig.3 Filling the internal foundation space

    The degree of filling of the folds internal spaces by the mixture was monitored to displace their surplus from boxes and gaps between elements[1].

    The third scheme was also developed with the aim of filling the internal shell-type foundation spaces by solution.

    The prefabricated elements of foundation along transverse laying-out axes of building are necessary to be erected at the prepared base where in horizontal folds beams,it is necessary to provide two δ=100 mm holes between internal reinforcing stiffening ribs (Fig.2(c)).The injection of complex solution (sand,cement,lime)by M25 hose through the holes above is made after prefabricated elements have been installed in the design position.

    Filling the internal spaces with solution can be controlled by its displacement in a neighbouring hole while compaction by vibrators,which is passed inside after the space complete filling.

    The metal formwork was fabricated for the manufacture of prefabricated elements of the shell-type foundation,in which a reinforcing cage was installed (Fig.4).

    Its sides were closed after installation of the reinforcing cage into the formwork,and the concrete pouring occurred with W/C=0.7 m B20.

    Concrete compaction was made by vibrators,which were fastened to the inclined sides of the formwork,two on each side.

    A steaming cap was used for concrete durability (Fig.5),in which the steam from the concrete section was supplied by a hose.Product Steaming was produced up to 80%of concrete strength,then the cap was raised,the formwork sides were opened and products produced were removed(Fig.6 and Fig.7).The prefabricated elements were delivered and packed at a construction site(Fig.8).During the construction of a 4-storey frame-panel administrative and amenity building(AAB)in the Norilsk industrial district(Oganer) on the surface shell-type foundation,the latter was made in a monolithic form(Fig.9).

    Fig.5 Lifting steaming cap:1-cap;2-formwork with reinforced concrete element

    Fig.6 Opening formwork sides after steaming

    Fig.7 Lifting and entrucking the element

    Fig.8 Prefabricated elements at a construction site

    Fig.9 The monolithic structure of shell-type foundation1-foundation fold;2-horizontal slab;3-vertical stiffening ribs;4-broadening under column base;5-horizontal fold beam;6-insert in the inner foundation spaces;MJ-movement joint.

    Before starting work on filling the intermediate layer under the building,"reinforcement"of upper peat layer has been done.Previously,boraxes heaving was cut,trees were uprooted,a small lake was filled up with the larger particles of rock,which has been under the spot building.

    The arrangement of the intermediate layer was made from rock in two stages.

    At the first stage,keeping in mind the complex relief of the territory in the micro-district Oganer,preliminary works were performed for soil mixture filling (rock fraction size from 10~15 to 50~60 cm with an admixture of loam).The presence in rock the loam allowed creating an impervious layer in the form of" sand-gravel-clay building mixture"as a result of soil mixture compaction.

    The capacity of"sand-gravel-clay building mixture"depending on the construction site relief was 50~80 cm,and in lower areas,including the lake-to 2m.

    The wave motion of backfilled surface was observed while filling and compaction of the first two layers in the first stage,especially in the place where site included the lake area.Therefore,the backfilled soil in this area of the lake was removed to its natural base and rocky ground was poured at the bottom of the formed depression(the size of individual particles was to 30~50 cm),and then with the help of a vibrating roller,the rock was pressed into the pit bottom.Further,several layers of rock were laid(average fraction size to 20~30 cm),and compacted layer by layer.Fill and compaction were made to a surface mark of the surrounding territory site.This work was carried out at a temperature of-10℃.After replacement of the soil and its compaction(for 3 shifts),undulating motion of the surface stopped and the whole site of the first fill phase was additionally compacted by a 12-ton vibrating roller.

    The density analysis of the fill pad was performed by determining the density in pouring and compacting state.Grain composition,humidity,the content of clay particles were also performed.For example,a quarry density in a natural condition was-1.72 g/cm3and in a compacting one-2.34 g/cm3,humidity-5.7% and the content of clay particles-8.7%.

    Later layerwise fill of second stage from pure crushed rocky with fraction sizes of 20~30 cm was carried out at temperature of-20℃,with its compaction by vibrating rollers to the design elevation.Before filling each next layer,the site was cleared from snow in case it had snowed.

    Final vertical planning of site was made by fill of the sandy gravel compacted by BelAz with 400 kN load.

    Before concreting shell-type foundation,the works for arrangement of sand-cement inserts M25 originally were performed under the internal spaces of shell-type foundation,as shown in Fig.2(a),in its turn,the inserts served as the base for reinforcement and concreting of the foundation body.

    Reinforcement of shell-type foundation was performed by separate and bent reinforcing bars which had been delivered to the construction site from the reinforcement section of reinforcement concrete products factory(Fig.10).

    Fig.10 Common view of shell-type foundation reinforcement.

    To provide a continuous concreting of a spatial 25 cm thin-walled shell-type foundation,the latter was divided into three areas each of which corresponding to the temperature size unit(Fig.11).

    Fig.11 Technological schemes of concreting shell-type foundation:

    The laying concrete scheme in the foundation design with two technological breaks was developed for reasons of necessity to constantly alternate works on mounting armature(horizontal beams,wall beam and anvils)with the formwork and concrete works.The necessity of phased concreting was dictated by the condition for achievement the required quality of laying concrete mixture in thin-walled structure of foundation fold of inclined elements which was saturated by armature,with the possibility of further compaction of concrete mixture by vibrators.The first technological place was (Fig.9(a))at the temperature foundation block,including the horizontal slobs,1/3 of the inclined slobs,and the second site 2/3 of the inclined slobs consisted of,the horizontal foundation beams and vertical reinforcing stiffening ribs.After shell-type foundation concreting at the first temperature block,works on the formwork device,installation armature,anvils,wall beam(provided in the initial draft of AAB)and their subsequent concreting,were produced.At the second and third temperature block,all works for reinforcement and concreting of the foundation had the same flow sheet.

    Concreting foundation at the first concreting technological place is shown on Fig.12.

    Fig.12 Concreting foundation at the first concreting technological place

    All works on the site were occurred on the basis of the work production plan developed by the"Promstroi" and"Norilskstroi".

    The compaction of concrete mixture was immediately performed after its laying by hand internal vibrators before appearing the signs of laitance in the surface,lack of bubbling air and ending of settling of concrete mixture.The beginning of setting concrete was in the range of 3~6 hours from the moment of its installation in structure.

    Favorable temperature and humidity weather conditions during concreting(16~17℃)have contributed to a rapid increase in concrete strength and its cube strength,for example,foundation slab was from 30 to 41.4 MPa in 28 daily age.

    The mobility of concrete mixture ranged from 6 to 12 of cone slump.

    The installation of columns and slabs was accomplished after complete ending of works and getting the desired concrete strength.

    Fig.13 shows a photograph of a building erection and Fig.14 shows the general view of AAB.

    Fig.13 Building erection

    Fig.14 The general view of administrative and amenity building

    The experimental building construction and observation of formation temperature soil condition at their bases were carried out according to the above-mentioned technology of arrangement of spatial ventilated shell-type foundations in Norilsk and Igarka.

    A small lake turned out to be under AAB spot while building connection(Fig.15),water being removed from it,and depression filling with rock compaction.

    The presence of positive formation of soil temperature(from 2 to 4℃)below the lake bottom in the future influenced the temperature soil condition of base intermediate layer in the former lake area.Fig.15 shows graphs of temperature soil dynamics under the foundation to a 10 m depth.

    Fig.15 Ground temperature profiles beneath the office/service center,Norilskx—x IX.1989;Δ—Δ—IX.1990,o—o—IX.1991;?—?—IX.1992;----average depth of pad

    Analysis of temperature data showed,first,complete freezing of the fill below the base of the foundation;second,lowering of the ground temperatures in comparison to 1989(before fill placement).At a distance of 7.5 m from the building edge,for example,the ground temperature at 10 m depth decreased from-0.7℃ in September 1989 to-1.0℃in September 1991 and-1.4℃ in September 1992(borehole 7).In borehole10,cooling was respectively from -0.1 to-0.3℃,from 0.1 to-0.7℃ and to-1.15℃(Fig.15).Other boreholes showed similar changes.The talik around BH 10 affected ground temperatures outside the thaw zone:temperatures lowered with increasing distance from the talik.Ground temperatures at 10 m depth in BH 4 located 12.0 m away were- 0.6 and-0.7℃,respectively.Ground temperature profiles also illustrate that in 1989 the depths of seasonal thaw beneath the building were 4 and 3 m in BH 10 and 4,respectively.In 1991 thaw depths were significantly reduced,to 2.3 and 1.8 m.In other boreholes,thaw depths were within 2.0.In 1992,all boreholes measured the same depths of thaw not exceeding 1.8 m.,and then was 1.3 m.

    Along with temperature,settlement observations were conducted which showed that settlements were relatively uniform.The maximum settlement did not exceed 2 cm in 1992.

    In Igarka,a heated parking garage was constructed on a ventilated shell-type foundation.The foundation was built of prefabricated and cast-in-situ sections.It was based on a gravel/sand pad of thickness ranging from 0.5 to 1.5 m in lengthwise direction.The garage was a brick structure 6 m in height and 10.4 by 18.0 m in plan area.

    The subsoil profile at the construction site was as follows:-ice-rich silty clay with ice lenses 3 to 30 cm in thickness;ice content of up to 40%.Permafrost temperature is-0.8 to-0.9℃.

    Details of the foundation are shown in Fig.16.Rectangular ventilating ducts were provided between the folded foundation elements leaning against 160-mm-thick horizontal slabs.

    Fig.16 Cross-section of the heated parking garage on a shell-type foundation,Igarka.1-folded element;2-ventilating duct;3-granular fill pad;4-cast-in-situ slab;5-granular infill;6-insulation;7-concrete floor

    Fig.17 shows changes in the ground temperatures during four years of operation.The figure illustrates that temperature decreased with depth,and the maximum depth of thaw was 1.3 m.The ground temperature at 7 m depth lowered from -0.9 in 1989 to-1.4℃ in 1992.At a distance of 1.5 m from the side wall axis(south),the depth of seasonal thaw was 1 m below the base of the fill.

    Cooling or warming of the subgrade occurs through the inner spaces of folded elements and the ventilating ducts where air temperature is colder than inside and outside the building.This is confirmed by the data presented in Fig.17 for the summer-winter months.

    The thermal regime of the concrete floor has little effect on the subgrade thermal regime[2].Heat exchange with the ground mainly occurs due to air movement through the ventilating spaces in the foundation during the winter(Fig.17(b)).As is seen in the graph,seasonal thaw progression in the subgrade is mainly influenced by a relatively short season whose length and climatic parameters vary from year to year. In 1992,for example,the period of positive temperatures was about 3 months in length.Maximum positive temperatures(13.8 and 14.7℃)were both observed in August.Mean monthly temperatures for July and September were 4.3 and 2.3℃,respectively.The maximum average monthly temperature in the ducts was close to the outside air temperature only during August,while during the other months it was much lower (Fig.17(a)).

    The lower temperatures along the vertical section of the foundation(ducts,beneath the fill pad,and at the top and base of the horizontal slab)compared to the outside air temperature are due to the absence of solar radiation beneath the foundation.An additional effect is from the cold accumulated in the ground during the previous winter,as indicated by±0℃ temperatures in June in the contact zone between the foundation and the fill(Fig.17(a),2,3 and 4).As a result,the depth of seasonal thaw below the foundation was less than 1.3 m.This explains the observed dynamics of subgrade temperatures and rising of the per-mafrost table under the foundation.

    Fig.17 Graphs of mean monthly temperature(a)and air velocity(b)a-temperatures along the foundation's vertical section:1-outside air,2-duct air,3-below the infill,4-beneath the foundation base,5-on the garage floor;b-air velocity:1-outside the building,2-in the duct;c-vertical section of the foundation:2~5-temperature measurement points

    The mean monthly air temperature begins to decrease in September and falls below 0℃ in October (Fig.17(a),1).This results in lowering of temperatures across the foundation(points 2,3 and 4)and in the subgrade.Starting from October,the temperatures across the foundation are warmer than ambient air due to heat exchange between the building and the subgrade(a heating season starts in September).Ground cooling adjacent to the garage is stronger,as illustrated by the temperature profile for October 1995.In the depth interval from 1 to 3 m(the pad and subgrade),temperatures beneath the building are colder than in the surrounding ground due to the absence of solar radiation.Below these depths,the foundation soils are warmer than the surrounding ground.

    The results of field observations presented above suggest that the combination of open spaces in the spatial foundation(at a 6 m spacing of the folds),ventilating ducts and granular fill not only maintain the foundation in a frozen state,but also cool its temperatures provided that no thawing is allowed during building’s service life.

    2 Conclusion

    Building construction can be carried out in areas of permafrost soil distribution on the surface of ventilated shell-type foundations on structurally weak stronglyicy and high-temperature ground.

    The internal spaces of shell-type foundations are necessary to be filled with low strength material with strength quality not above M25.

    The local broadening with outcomes of armature for the design of monolithic glass-holders for the column is need to provide in horizontal beams of shelltype foundation elements for frame buildings with concentrated loads.

    Reinforcement of shell-type foundation elements is reasonable to carry out by enlarged spatial reinforced prefabricated frames.

    The outcomes of work armature for subsequent embedment of joints in prefabricated monolithic variant of production it is necessary to provide in manufacture of prefabricated shell-type foundation elements along the perimeter.

    The gap setting between adjoining foundation elements is assigned according to the axes pitch of the foundation.The minimum size of the gap,welding of armature outcomes is not provided,should be not less than 30 diameters.In a smaller gap,it is necessary to weld the outcomes of armature.

    Shell-type foundations in a prefabricated or cast in situ design are made of heavy-weight concrete classes with compressive strength B20~B30.For the class of buildings on the extent of responsibility:I-B30,and II-IV-B20,and monolithing the joint-from concrete B40 and B30,as appropriate.The reinforcement bar of A-2 and A-3 classes,wire reinforcement is BP used-1 class,for working and structural reinforcement.The grade of concrete in freeze-thaw resistance depends on the class of buildings on the extent of responsibility: for buildings of I class-F300 and F200 for others.The grade of concrete on water permeability must be not less than W6.

    Reinforcement of monolithic foundations by reinforcement bars,as well as using the factory reinforcement frames can be performed in winter conditions in slight precipitation areas,and in areas where there are often large snow drifts during a snowstorm-in the warm season.

    To provide a continuous concreting cast in situ of shell-type foundation the latter must be divided into separated areas within temperature length and movement joint.

    Keeping in mind the necessity of constant alternation of mounting armature,from horizontal beams,wall beams,if they occur,according to the project,and anvils for the columns with erection of formwork is necessary to develop a scheme of foundation concreting with two technological breaks within area.

    Phased concreting is necessary to achieve quality of laying concrete mixture in to thin-walled structure of inclined foundation elements,saturated with reinforcement,and the possibility of subsequent compaction by vibrators.All works should be implemented at a site according to work production plan.

    Laying concrete mixture in the construction of the shell-type foundation needs to be carried out at the entire elements thickness without gaps,consequently with the laying direction from outer edges of area to the center.Laying concrete mixture in the vertical direction needs to be implemented on 1/3 foundation folds height at the beginning,and further to 2/3 of their height.

    Compaction concrete mixture should be carried out immediately after its laying by the deep vibrators before compaction signs(the appearance of laitance at the surface,the lack of air bubbles and finish of settling of concrete mixture).The mobility of the concrete mixture must be between 6-12 cm slump concrete.

    Quality control of concreting monolithic foundation should be in accordance with the instructions for bearing reinforcement concrete structures.

    [1] Goncharov Y M,Construction experience of the buildings in the watered taliks[J].Science and Technology in Yakutia,2006,1 (10):12-16.

    [2] Goncharov Y M,Popovich A P,Surface spatial ventilated foundations at the permafrost[M].Yakutsk:Permafrost institute after P.I.Melinokov Siberian branch of the Russian Academy of Science,2013.

    猜你喜歡
    多年凍土西伯利亞聯(lián)邦
    中國東北多年凍土退化對植被季節(jié)NDVI 的影響研究
    一“炮”而紅 音聯(lián)邦SVSound 2000 Pro品鑒會完滿舉行
    西伯利亞的熊媽媽
    小讀者(2019年20期)2020-01-04 02:13:32
    303A深圳市音聯(lián)邦電氣有限公司
    西伯利亞博亞雷巖畫與歐亞大草原的青銅時代
    太陽能制冷在多年凍土熱穩(wěn)定維護(hù)中的傳熱效果研究
    多年凍土地基隔熱保溫技術(shù)研究綜述
    多年凍土區(qū)鐵路路堤臨界高度研究
    來啦!西伯利亞!
    探索地理(2013年3期)2014-01-09 06:37:28
    20年后捷克與斯洛伐克各界對聯(lián)邦解體的反思
    老司机影院毛片| 亚洲伊人久久精品综合| 在线观看免费视频网站a站| 麻豆乱淫一区二区| 妹子高潮喷水视频| 在线观看www视频免费| 欧美日韩国产mv在线观看视频| 我的亚洲天堂| 久久精品国产99精品国产亚洲性色 | 一进一出好大好爽视频| 欧美中文综合在线视频| 久久亚洲真实| 色视频在线一区二区三区| 法律面前人人平等表现在哪些方面| 精品国产一区二区久久| 香蕉国产在线看| 国产成人精品久久二区二区91| av有码第一页| 他把我摸到了高潮在线观看 | 电影成人av| 久久精品亚洲av国产电影网| 大香蕉久久成人网| 黄频高清免费视频| 99在线人妻在线中文字幕 | av一本久久久久| 美女高潮到喷水免费观看| 欧美黑人精品巨大| 国产野战对白在线观看| 久久久久久免费高清国产稀缺| 国产成人免费无遮挡视频| 大片电影免费在线观看免费| 啪啪无遮挡十八禁网站| 欧美精品人与动牲交sv欧美| 中文字幕人妻丝袜一区二区| 在线观看一区二区三区激情| 日韩欧美国产一区二区入口| 久久久久久久国产电影| 黄色视频在线播放观看不卡| 国产成人精品久久二区二区免费| 国产成+人综合+亚洲专区| 色播在线永久视频| 真人做人爱边吃奶动态| 一区二区三区国产精品乱码| 精品少妇内射三级| 99九九在线精品视频| 最新美女视频免费是黄的| 91麻豆av在线| 极品人妻少妇av视频| 五月开心婷婷网| 91成年电影在线观看| 精品国产乱码久久久久久男人| 亚洲伊人色综图| 久久 成人 亚洲| av网站在线播放免费| 国产成人av教育| 国产极品粉嫩免费观看在线| 国产欧美日韩一区二区精品| 亚洲av电影在线进入| 亚洲精品美女久久av网站| 91成年电影在线观看| 久久中文字幕一级| 高清黄色对白视频在线免费看| 满18在线观看网站| 国产精品成人在线| 亚洲伊人久久精品综合| 正在播放国产对白刺激| 我的亚洲天堂| 国精品久久久久久国模美| 中文字幕最新亚洲高清| 777米奇影视久久| 亚洲精品国产色婷婷电影| 国产99久久九九免费精品| xxxhd国产人妻xxx| 亚洲成人手机| netflix在线观看网站| 精品少妇内射三级| 又紧又爽又黄一区二区| 丝瓜视频免费看黄片| 精品视频人人做人人爽| 国产免费av片在线观看野外av| 色94色欧美一区二区| 免费人妻精品一区二区三区视频| 亚洲人成伊人成综合网2020| 一级片'在线观看视频| 久久99热这里只频精品6学生| 国产精品熟女久久久久浪| 欧美日韩亚洲高清精品| 午夜福利视频在线观看免费| 一区福利在线观看| 19禁男女啪啪无遮挡网站| 黄频高清免费视频| 制服诱惑二区| 在线av久久热| 午夜免费鲁丝| 757午夜福利合集在线观看| 999久久久精品免费观看国产| 国产成人系列免费观看| 亚洲精品美女久久av网站| av超薄肉色丝袜交足视频| 三级毛片av免费| 制服人妻中文乱码| 国产免费视频播放在线视频| www日本在线高清视频| 91字幕亚洲| 国产精品二区激情视频| 男女下面插进去视频免费观看| 极品人妻少妇av视频| 最新美女视频免费是黄的| 两性午夜刺激爽爽歪歪视频在线观看 | 亚洲中文av在线| 国产精品美女特级片免费视频播放器 | 飞空精品影院首页| 亚洲av电影在线进入| 欧美黄色淫秽网站| 美女国产高潮福利片在线看| 高清视频免费观看一区二区| 操出白浆在线播放| 天天躁日日躁夜夜躁夜夜| 色在线成人网| 黄片大片在线免费观看| 午夜91福利影院| 欧美av亚洲av综合av国产av| 久久精品成人免费网站| 国产免费视频播放在线视频| 99国产极品粉嫩在线观看| 免费高清在线观看日韩| 熟女少妇亚洲综合色aaa.| 一级a爱视频在线免费观看| 18禁国产床啪视频网站| 69精品国产乱码久久久| 757午夜福利合集在线观看| 另类亚洲欧美激情| 人人妻人人澡人人看| 丰满少妇做爰视频| 国产精品免费一区二区三区在线 | 别揉我奶头~嗯~啊~动态视频| 午夜福利视频精品| 一区二区日韩欧美中文字幕| 免费在线观看黄色视频的| 咕卡用的链子| 亚洲成人国产一区在线观看| 极品人妻少妇av视频| av不卡在线播放| av在线播放免费不卡| 一区二区三区精品91| 高清在线国产一区| 亚洲全国av大片| 免费女性裸体啪啪无遮挡网站| 成人18禁在线播放| 大型黄色视频在线免费观看| 69av精品久久久久久 | 午夜福利乱码中文字幕| 久久久精品免费免费高清| 一区二区日韩欧美中文字幕| 99在线人妻在线中文字幕 | 久久中文看片网| 成在线人永久免费视频| tocl精华| 91大片在线观看| 欧美精品啪啪一区二区三区| 男人舔女人的私密视频| 91精品三级在线观看| av超薄肉色丝袜交足视频| 亚洲综合色网址| 久久精品国产综合久久久| 国产深夜福利视频在线观看| 黄色视频不卡| 国产av又大| 国产日韩一区二区三区精品不卡| 黄色成人免费大全| 热99久久久久精品小说推荐| 欧美精品人与动牲交sv欧美| 高清av免费在线| 又黄又粗又硬又大视频| 深夜精品福利| 亚洲国产欧美在线一区| 悠悠久久av| 香蕉丝袜av| 亚洲欧洲精品一区二区精品久久久| 亚洲精品国产区一区二| 日韩三级视频一区二区三区| 久久香蕉激情| 国产成人av激情在线播放| 欧美乱码精品一区二区三区| 国产精品免费视频内射| 99re在线观看精品视频| 99国产精品免费福利视频| 日韩大码丰满熟妇| 亚洲欧洲精品一区二区精品久久久| 欧美激情久久久久久爽电影 | 午夜福利视频在线观看免费| 国产精品av久久久久免费| 亚洲国产av新网站| 91九色精品人成在线观看| 丝瓜视频免费看黄片| 亚洲精品久久成人aⅴ小说| 美女高潮到喷水免费观看| 19禁男女啪啪无遮挡网站| 免费一级毛片在线播放高清视频 | 国产精品免费视频内射| 成人特级黄色片久久久久久久 | 51午夜福利影视在线观看| 中亚洲国语对白在线视频| 精品福利永久在线观看| 国产精品美女特级片免费视频播放器 | 国产精品一区二区精品视频观看| 精品人妻在线不人妻| 色94色欧美一区二区| 在线观看免费午夜福利视频| svipshipincom国产片| 岛国在线观看网站| 欧美精品高潮呻吟av久久| 亚洲九九香蕉| 69精品国产乱码久久久| 精品久久蜜臀av无| 91九色精品人成在线观看| 色老头精品视频在线观看| 免费在线观看影片大全网站| 欧美在线黄色| 色94色欧美一区二区| 亚洲五月婷婷丁香| 亚洲国产中文字幕在线视频| 高清欧美精品videossex| 精品一区二区三卡| 久久久国产精品麻豆| 久久香蕉激情| 日日爽夜夜爽网站| 97在线人人人人妻| 狠狠婷婷综合久久久久久88av| 成人国产av品久久久| 激情在线观看视频在线高清 | 91成人精品电影| 宅男免费午夜| 精品福利永久在线观看| av一本久久久久| 大片免费播放器 马上看| 一区二区三区激情视频| 国产精品香港三级国产av潘金莲| 精品国产一区二区三区久久久樱花| av网站免费在线观看视频| 亚洲天堂av无毛| 久久午夜亚洲精品久久| 国产精品免费一区二区三区在线 | 一区二区av电影网| 亚洲免费av在线视频| 人人妻人人添人人爽欧美一区卜| 亚洲精品av麻豆狂野| www日本在线高清视频| 伊人久久大香线蕉亚洲五| 天天影视国产精品| 精品亚洲乱码少妇综合久久| 韩国精品一区二区三区| 久久精品aⅴ一区二区三区四区| 国产一区二区三区在线臀色熟女 | 国产高清videossex| 国产99久久九九免费精品| 老司机亚洲免费影院| 水蜜桃什么品种好| 日韩欧美国产一区二区入口| 亚洲伊人色综图| 一区福利在线观看| www.999成人在线观看| 亚洲av电影在线进入| 日韩人妻精品一区2区三区| 操美女的视频在线观看| 国产在线精品亚洲第一网站| 一本综合久久免费| 搡老熟女国产l中国老女人| 岛国在线观看网站| 国产成人欧美| 亚洲成人免费av在线播放| 久久狼人影院| 十八禁网站网址无遮挡| 成人黄色视频免费在线看| 精品少妇内射三级| 国产日韩欧美亚洲二区| 露出奶头的视频| 一本—道久久a久久精品蜜桃钙片| 亚洲专区字幕在线| 少妇精品久久久久久久| 丝袜美腿诱惑在线| 中文字幕色久视频| 国产精品国产高清国产av | 国产精品1区2区在线观看. | 色综合欧美亚洲国产小说| 久久精品亚洲精品国产色婷小说| 国产又爽黄色视频| 一夜夜www| 国产麻豆69| 伦理电影免费视频| 在线观看舔阴道视频| 午夜激情av网站| 国产无遮挡羞羞视频在线观看| 久久久久久人人人人人| 日韩精品免费视频一区二区三区| 国产在线视频一区二区| 满18在线观看网站| 国产单亲对白刺激| 国产aⅴ精品一区二区三区波| 国产成人精品久久二区二区免费| 亚洲专区国产一区二区| 精品人妻1区二区| 考比视频在线观看| 黄色视频,在线免费观看| 欧美日韩亚洲综合一区二区三区_| 丝袜人妻中文字幕| 国产黄色免费在线视频| 首页视频小说图片口味搜索| 丰满迷人的少妇在线观看| 两性午夜刺激爽爽歪歪视频在线观看 | 女人久久www免费人成看片| 香蕉丝袜av| 亚洲欧美一区二区三区黑人| 高清毛片免费观看视频网站 | 中文字幕人妻熟女乱码| 久久久久国产一级毛片高清牌| xxxhd国产人妻xxx| 免费人妻精品一区二区三区视频| 亚洲伊人久久精品综合| 色综合婷婷激情| 亚洲精品在线美女| 欧美午夜高清在线| 一夜夜www| 久久久久国产一级毛片高清牌| 国产1区2区3区精品| 亚洲av成人不卡在线观看播放网| 露出奶头的视频| 欧美日韩一级在线毛片| 少妇的丰满在线观看| 久久国产亚洲av麻豆专区| 欧美精品亚洲一区二区| 亚洲成人免费av在线播放| 亚洲精品粉嫩美女一区| 制服诱惑二区| 国产激情久久老熟女| 国产老妇伦熟女老妇高清| 日韩欧美一区二区三区在线观看 | 亚洲国产看品久久| 日韩人妻精品一区2区三区| 精品少妇久久久久久888优播| 国产真人三级小视频在线观看| 视频在线观看一区二区三区| 看免费av毛片| 久久精品aⅴ一区二区三区四区| 精品熟女少妇八av免费久了| 中文字幕高清在线视频| 另类亚洲欧美激情| 夜夜夜夜夜久久久久| 亚洲精品成人av观看孕妇| 90打野战视频偷拍视频| 国产精品免费大片| 天天躁夜夜躁狠狠躁躁| 久久亚洲真实| 国产精品电影一区二区三区 | 精品视频人人做人人爽| a在线观看视频网站| 黄色毛片三级朝国网站| 国产精品免费一区二区三区在线 | 欧美在线一区亚洲| 2018国产大陆天天弄谢| 18禁观看日本| 91国产中文字幕| 岛国在线观看网站| 精品乱码久久久久久99久播| 免费不卡黄色视频| 一边摸一边做爽爽视频免费| 天天影视国产精品| 一进一出抽搐动态| 曰老女人黄片| 免费在线观看完整版高清| 老司机午夜十八禁免费视频| 777久久人妻少妇嫩草av网站| 人妻 亚洲 视频| 亚洲熟女精品中文字幕| 久久精品亚洲熟妇少妇任你| 一进一出好大好爽视频| 亚洲伊人久久精品综合| 中文亚洲av片在线观看爽 | 最近最新中文字幕大全免费视频| 一级毛片女人18水好多| 国产淫语在线视频| 超色免费av| 9191精品国产免费久久| 搡老岳熟女国产| 91国产中文字幕| 一区二区三区乱码不卡18| 黄色视频不卡| av网站在线播放免费| 精品国产超薄肉色丝袜足j| 大陆偷拍与自拍| 丰满人妻熟妇乱又伦精品不卡| 日韩制服丝袜自拍偷拍| 老鸭窝网址在线观看| 王馨瑶露胸无遮挡在线观看| 日韩视频在线欧美| 香蕉国产在线看| 欧美国产精品va在线观看不卡| 日韩欧美一区视频在线观看| 欧美精品人与动牲交sv欧美| 黄片播放在线免费| 国产野战对白在线观看| 久久性视频一级片| 99久久99久久久精品蜜桃| 国产不卡av网站在线观看| 日本vs欧美在线观看视频| 欧美性长视频在线观看| 国产欧美日韩精品亚洲av| 女人精品久久久久毛片| 午夜激情av网站| 亚洲熟妇熟女久久| 高清av免费在线| 久久人人97超碰香蕉20202| 国产免费福利视频在线观看| 制服人妻中文乱码| 国产深夜福利视频在线观看| 亚洲av第一区精品v没综合| 亚洲精品久久午夜乱码| 亚洲第一av免费看| 菩萨蛮人人尽说江南好唐韦庄| 国产无遮挡羞羞视频在线观看| 亚洲精品粉嫩美女一区| 精品久久蜜臀av无| 黑人巨大精品欧美一区二区mp4| 99国产综合亚洲精品| 2018国产大陆天天弄谢| 亚洲熟女毛片儿| 日本a在线网址| 脱女人内裤的视频| 久久国产精品男人的天堂亚洲| 免费在线观看黄色视频的| 在线观看66精品国产| 亚洲九九香蕉| 人人澡人人妻人| 天天躁狠狠躁夜夜躁狠狠躁| 免费在线观看黄色视频的| 成人永久免费在线观看视频 | 亚洲精华国产精华精| 真人做人爱边吃奶动态| 十八禁高潮呻吟视频| 成人黄色视频免费在线看| 久久久久网色| 日韩视频一区二区在线观看| 搡老乐熟女国产| 亚洲成人免费电影在线观看| 精品久久久久久久毛片微露脸| 黄色丝袜av网址大全| 亚洲天堂av无毛| 国产成+人综合+亚洲专区| 宅男免费午夜| 亚洲人成伊人成综合网2020| 亚洲欧美日韩另类电影网站| 丝袜美腿诱惑在线| 一区二区三区国产精品乱码| 国产欧美日韩一区二区三| 久久久久视频综合| 飞空精品影院首页| 18在线观看网站| 老司机深夜福利视频在线观看| 国产精品二区激情视频| 免费av中文字幕在线| 无遮挡黄片免费观看| 亚洲一卡2卡3卡4卡5卡精品中文| 久久久久久免费高清国产稀缺| 国产精品 国内视频| av不卡在线播放| 亚洲欧美一区二区三区黑人| 亚洲中文日韩欧美视频| 亚洲男人天堂网一区| 亚洲国产中文字幕在线视频| 97在线人人人人妻| 国产成人av教育| av天堂在线播放| 亚洲免费av在线视频| 亚洲三区欧美一区| 麻豆av在线久日| 一边摸一边抽搐一进一出视频| 91麻豆精品激情在线观看国产 | 国产精品免费视频内射| 精品久久久久久久毛片微露脸| 久久影院123| 久久久欧美国产精品| 欧美中文综合在线视频| 久久狼人影院| 婷婷丁香在线五月| 精品亚洲成a人片在线观看| 色婷婷av一区二区三区视频| 男女午夜视频在线观看| 国产极品粉嫩免费观看在线| 久久精品亚洲精品国产色婷小说| 99国产综合亚洲精品| 亚洲va日本ⅴa欧美va伊人久久| 久久中文字幕人妻熟女| 亚洲国产欧美网| 日韩欧美三级三区| 亚洲欧洲日产国产| 午夜福利乱码中文字幕| 首页视频小说图片口味搜索| 久久久国产欧美日韩av| 国产精品亚洲av一区麻豆| 一个人免费看片子| 日韩大片免费观看网站| 男女午夜视频在线观看| 国产97色在线日韩免费| 十八禁高潮呻吟视频| 精品一区二区三区四区五区乱码| 少妇粗大呻吟视频| 两性夫妻黄色片| 国产日韩欧美视频二区| 最近最新免费中文字幕在线| 五月天丁香电影| 在线看a的网站| 一本大道久久a久久精品| 成人免费观看视频高清| xxxhd国产人妻xxx| 中文字幕人妻丝袜一区二区| 最新美女视频免费是黄的| 久久久精品免费免费高清| 人妻久久中文字幕网| 国产日韩欧美亚洲二区| 成人黄色视频免费在线看| 国产精品98久久久久久宅男小说| 日韩欧美免费精品| 少妇猛男粗大的猛烈进出视频| 亚洲精品国产精品久久久不卡| 亚洲色图综合在线观看| 一个人免费在线观看的高清视频| 91精品国产国语对白视频| 极品教师在线免费播放| 丰满少妇做爰视频| 久久人妻熟女aⅴ| www日本在线高清视频| 精品福利永久在线观看| 国产精品1区2区在线观看. | 岛国毛片在线播放| 中文字幕av电影在线播放| 国产精品九九99| 中文字幕高清在线视频| 亚洲性夜色夜夜综合| 丝袜美足系列| 性高湖久久久久久久久免费观看| 久久ye,这里只有精品| 1024香蕉在线观看| 国产日韩一区二区三区精品不卡| 精品人妻在线不人妻| 十分钟在线观看高清视频www| 丝瓜视频免费看黄片| 麻豆国产av国片精品| 婷婷成人精品国产| 99精品久久久久人妻精品| 亚洲伊人色综图| 亚洲国产欧美在线一区| 一区福利在线观看| 搡老乐熟女国产| 精品人妻熟女毛片av久久网站| 黄色怎么调成土黄色| videosex国产| 成人永久免费在线观看视频 | 久久国产亚洲av麻豆专区| 亚洲精品粉嫩美女一区| 成人精品一区二区免费| 十八禁网站网址无遮挡| 色视频在线一区二区三区| 99精品欧美一区二区三区四区| 久久久久精品国产欧美久久久| 男女无遮挡免费网站观看| 中文字幕色久视频| 色在线成人网| 最新在线观看一区二区三区| 男人舔女人的私密视频| 老司机午夜十八禁免费视频| 日韩成人在线观看一区二区三区| 成年女人毛片免费观看观看9 | 激情在线观看视频在线高清 | 免费观看av网站的网址| 午夜福利视频精品| www.999成人在线观看| 啦啦啦中文免费视频观看日本| 高清视频免费观看一区二区| 成人18禁高潮啪啪吃奶动态图| 久久久精品免费免费高清| 午夜久久久在线观看| 精品视频人人做人人爽| 法律面前人人平等表现在哪些方面| 精品一品国产午夜福利视频| 国产精品久久电影中文字幕 | av不卡在线播放| 51午夜福利影视在线观看| 淫妇啪啪啪对白视频| 精品乱码久久久久久99久播| 丰满迷人的少妇在线观看| 国产91精品成人一区二区三区 | 91麻豆精品激情在线观看国产 | 丝瓜视频免费看黄片| 桃花免费在线播放| 少妇精品久久久久久久| 少妇的丰满在线观看| 精品一区二区三卡| 国产成人啪精品午夜网站| 亚洲,欧美精品.| 久久久久精品国产欧美久久久| 成年动漫av网址| 亚洲精品国产色婷婷电影| av视频免费观看在线观看| 高清av免费在线| 国产精品久久久久久精品电影小说| 日韩欧美免费精品| 王馨瑶露胸无遮挡在线观看| 日韩视频一区二区在线观看| 99久久99久久久精品蜜桃| 狠狠狠狠99中文字幕| 成人特级黄色片久久久久久久 | 亚洲欧美日韩高清在线视频 | 欧美大码av| 国产欧美亚洲国产| 亚洲中文日韩欧美视频|