    Acoustic emission monitoring of rockbursts during TBM-excavated headrace tunneling at Jinping II hydropower station

    2013-10-19 06:57:02WuweiChengWenyouWangShiqiangHuangPengMa

    Wuwei Cheng, Wenyou Wang, Shiqiang Huang, Peng Ma

    aHydroChina Huadong Engineering Corporation, Hangzhou 310014, China

    bZhejiang Huadong Engineering Safety Technology Co., Ltd., Hangzhou 310014, China

    cChemical Process Equipment, Beijing University of Chemical Technology, Beijing 100029, China

    1. Introduction

    Acoustic emission (AE) is quick release of energy at a local source in a material and in a form of transient elastic waves, which is also known as stress wave emission (Katsuyama, 1996). In a natural state, any point in rocks is basically in the state of force equilibrium. However, stress redistribution occurs after rock excavation,and new stress fields are regenerated in the surrounding rocks.Thus stress adjustment makes rocks more discontinuous and heterogeneous. This process is accompanied with rock energy release,during which AE signals are produced (Drouillard, 1979; Lockner,1993).

    For deep and long tunnels excavated by tunnel boring machine(TBM), rock excavation is a hot issue, where fault zone, rockburst, water inrush, karst cave-in, water-eroded cave, and swelling rocks may be involved. Through AE monitoring during TBM tunneling in the marble of Jinping II headrace tunnels, the location and frequency of micro-fractures are investigated, which are helpful for optimization design of support parameters. The AE monitoring is also helpful for analyzing in situ stresses of rocks, and for understanding mechanical properties of brittle marbles and support mechanism. According to the intensity and activity of AE signals, early-warning prediction of geological hazards during tunnel excavation can be carried out (Li et al., 2004; Wu and Wang,2011).

    In AE monitoring, the measuring points are arranged in various boreholes in the experimental sub-tunnel #2-1, and threedimensional (3D) positioning is conducted to locate the AE events.Therefore the variation characteristics and relaxation depth of surrounding rocks before and after TBM excavation can be well captured. This paper aims to locate the region of micro-fractures occurrence during stress adjustment on the cross-section of the headrace tunnels, and to determine the relaxation depth and relaxation time of the stress in the surrounding rocks of the headrace tunnel #3 excavated by TBM.

    With careful consideration, the AE monitoring is implemented under the site-specific geological conditions in combination of TBM and D&B tunnels. It should be convenient for us to design, assemble and retract the equipment, especially for installing and recovering the AE sensors in deep holes. Using this instrument, the AE events in rock masses were successfully captured and analyzed on the basis of complex geological conditions in deep brittle rocks (Zhao et al.,2012).

    2. Settings of AE monitoring

    Due to the high in situ stresses in the deep tunnels of Jinping II hydropower station, the mechanical responses of rocks in the deep tunnels are significantly different before and after excavation.To better understand the failure mechanism of deep brittle marbles such as rockburst, rib spalling and yield damage, deformation and stress of surrounding rocks are measured using comprehensive monitoring technique including AE, fiber grating, borehole TV,and borehole acoustic wave.

    2.1. Scopes and advantages of AE monitoring

    Generally, the scopes of AE monitoring include (1) positioning AE sources, (2) analyzing the activity of AE sources in order to perform rock failure analysis or to predict rock failure, (3) determining the time when AE events occur, and (4) evaluating the AE sources.

    AE technique has been widely used in many fields at present.Since 1980s, AE has been widely applied to monitoring rockbursts in Canada and USA. Ge (2005) summarized these monitoring experiences. AE was also utilized for tunneling monitoring. As presented in Talebi and Young (1992), a full-scale AE monitoring was implemented during whole TBM tunnel construction, characterized by large scale, long time, massive data and complex geological background.

    As is known, the geological condition in Jinping II hydropower station has challenging issues. To ensure that the AE monitoring can be well performed, the SHII-SRM 24 h AE monitoring system, developed by USA Physical Acoustics Corporation (PAC), with 16-channel and R.45IC-LP-AST-type sensors, is carefully chosen.Theoretically, the built-in magnifier can receive AE signals with frequency ranging from 1 kHz to 1 MHz. The sensors are located exactly in a borehole full of water and by means of specially developed installing and fixing devices. The boreholes are drilled 30 m in depth and 95 mm in diameter. This newly invented technique can successfully address the issues such as coupling between sensors and borehole wall. The free retract or release of sensors can be well conducted. Fig. 1 shows the field testing and instrumentation

    installation.

    2.2. Description of rocks readily for AE installation

    The stratum in the experimental section is mainly of thick gray white marble of Yantang formation (T52y) of Middle Triassic. The surrounding rocks exposed in this section are slightly weathered to fresh, and rock quality varies from poor to relatively good. Accordingly, the surrounding rocks are classified into grade III according to Standard for Engineering Classification of Rock Masses (GB 50218-94).The cracks in local structural surface are highly developed.

    Two tensional fracture zones, inclining N10°WN∠75°, are developed with a width of 10-40 cm, filled with clay and mixture of iron and manganese. Collapse in 10-20 cm depth due to tectonic stress frequently occurs on the shoulder and roof of the tunnel in this

    Fig. 1. Pictures of field testing and instrumentation installation.

    region. Pictures for the AE sensors hole at some sections in different depths are shown in Fig. 2.

    2.3. Layout of AE sensors monitoring

    The experimental sub-tunnel #2-1 is considered for AE monitoring. It is a crossing hole between the headrace tunnels #2 and #3.Thus, by adopting various monitoring instruments embedded, the AE sensors can be deployed to monitor rock performances of the headrace tunnel #3 excavated by TBM. After optimization design,the layout of AE sensors for field monitoring of the headrace tunnel#2 is shown in Fig. 3.

    The AE sensors are amounted on the cross-sections 11-11 and 12-12. The stake number of the cross-section 11-11 is Y(3)13+425,and monitoring boreholes are correspondingly numbered from top to bottom, A11-11, B11-11 and C11-11. The cross-section 12-12 is located at the stake of Y(3)13+428 with monitoring boreholes numbered A12-12, B12-12 and C12-12, from top to bottom. There are two sensors arranged in each monitoring borehole and the spacing between them is 3.05 m.

    Positive direction of the X-axis in the monitoring system is considered as the direction of TBM advancing. The coordinates of cross-sections 12-12 and 11-11 in the X-axis are 0 mm and 3000 mm, respectively. The Y-axis represents the vertical direction,and the Z-axis is the direction of hole-depth. Sensors 1, 3, 5, 7, 9 and 11 are located in the vicinity of the headrace tunnel #3. The 3D relations of the sensors in the operation system are shown in

    Fig. 2. Photographs for the AE sensors hole at some sections in different depths(unit: m).

    Fig. 3. Layout and installation of AE monitoring sensors.

    Fig. 4. Location of sensors in the operation system.

    Fig. 5. Spatial location of AE monitoring zone.

    Fig. 4. The relative positions of the sensors and the headrace tunnel#3 after geodetic coordinate transformation are illustrated in Fig. 5(Ge, 2012).

    2.4. Frequency of the AE monitoring system

    The SH-II-SRM AE monitoring system developed by PAC and the sensors of the R.45IC-LP-AST type employed in this study can receive AE burst signals with frequency ranging from 1 Hz to 1 MHz,and the frequency of valid signals range from 1 kHz to 50 kHz. In total, this monitoring system can mainly receive rockburst signals with higher frequency ranging from 1 kHz to 50 kHz theoretically.

    3. Characteristics of AE signals

    3.1. Determination of AE velocity

    The P-wave velocity of rock masses in the experimental subtunnel ranges from 3100 m/s to 6300 m/s, averaging 4800 m/s. The single-hole acoustic wave velocity in this area is 4600-6700 m/s,averaging 6100 m/s.

    Considering that the scope detected by the sound waves from a single hole is smaller than that the seismic waves do, it is wise to select the seismic wave as the AE wave. Moreover, the maximum distance of AE sensor detection can reach over 10 m. The AE wave velocity in rock masses in the monitoring region is higher than that on the surface of rocks. Thus, after calculating and testing, the velocity of seismic wave with 5% increment (i.e. velocity of approximately 5 km/s) is used for AE signals. This velocity is adopted in the experimental sub-tunnel #2-1. Although simulation results and analyses of observed AE data illustrate that a little error is induced and location error will be produced when using one value of velocity because of the rock heterogeneity in the studied area, the velocity employed is basically acceptable.

    3.2. Screening of effective AE signals

    The AE signal sources during TBM tunneling would be inevitably disturbed by rock mass rupture, rock broken by cutter head,mainframe vibration, bolt drilling, blasting vibration and electromechanical interference, etc. Except for the short-term blasting vibration and random electromechanical interference, other interferences make the sensors self-oscillated, and their vibration energies are basically great, thus filtering the frequency noise is not an easy task associated with present technology because the frequency ranges of noise are surprisingly wide. During TBM excavation, the AE signals coming from rocks in the vicinity of monitoring regions are very strong. For instance, rocks under forced continuous process can produce 2 × 106kB signals every 10-30 min, and each signal accounts for 2-3 kB. Therefore, twelve sets of sensors can receive approximately 1 × 105signals in one minute at the same time. It is an impossible mission to filter the huge number of signals artificially, although we have received over 1 × 108AE signals (about 300 GB) in total. At present, time- filtering is the most effective way to get rid of the pseudo-AE signals that come from the self-vibration of AE sensors. Thus, it will be used in the paper, and the signals from TBM or bolt disturbance can be analyzed after filtering. The limits of this method are that most of effective signals with enriched information will be lost, only the AE signals in relatively quiet state can be used, which can lead to an illusion at different times.

    3.3. Waveform characteristics of burst AE signals

    Waveforms of various types of AE signals received from burst sensors are captured. However, it is not easy to analyze each signal individually and to illustrate all characteristics of waveforms of AE signals associated with complex patterns. Thus, we present two typical AE signals, as shown in Fig. 6. In order to achieve a 3D location, one signal should be received by three or more sensors at the same time and those signals received by different sensors should be identical as possible.

    Table 1Schedule of TBM construction.

    4. AE monitoring process

    When the working face advanced 50 m before the monitoring area, AE monitoring began to work till the working face was 150 m away from the monitoring system. Basically, AE monitoring will last for approximately 20 days. For the headrace tunnels with a diameter of 12.4 m, the AE monitoring process can be divided into three stages, nine steps in total according to the relation between TBM excavation distance and tunnel diameter. The three stages are:

    (1) Before the working face arrived at the center of the monitoring area (from -3.5D to -0.5D, where D is the tunnel diameter).

    (2) The working face arrived at the center of the monitoring area(-0.5D to 0.5D).

    (3) After the working face left the center of the monitoring area(0.5D-3.5D).

    The construction schedule in nine steps is shown in Table 1.

    4.1. Signal characteristics before excavation

    Before the working face arrived at the center of the monitoring area, few shock signals were captured, which means that valid positioning events could not be captured. It indicates that the TBM has no effect on the rocks in the monitoring area before the first stage.In this process, the rocks were stable, and there were no evident fracture signals.

    4.2. Signal characteristics when excavation approached monitoring area

    Before the first and second stages (about 6.2 m away from the center of the monitoring area), rockbursts occurred in the monitoring area. The rockbursts were observed at the front of the working face and the top-right tunnel, basically within the distance of 7 m. In addition, more and more burst events were recorded when the working face advanced closer to the monitoring system.However, the regularity of the general distribution of rockbursts was not significantly reasonable, which showed that there were some micro-fractures in rocks without excavation unloading effect before the headrace tunnel #3 was excavated and, moreover, more random events were recorded. Distribution of the burst signals in this period of time is shown in Fig. 7.

    4.3. Signal characteristics when excavation was near the monitoring section

    When the TBM passed through the monitoring center, i.e. ±0.5D(about ±6.2 m), the monitoring lasted for about 20 h, of which 12 h signals are valid for analysis. In this process, the headrace tunnel#3 approached gradually and excavation unloading began to have a strong effect on the stability of surrounding rocks. The burst signals were observed to concentrate on the right spandrel, which means that spandrel part of the tunnel suffered the largest deformation during a short period of time after completion of the tunneling.During monitoring, rockbursts were observed in a concentrated area 1-3 m away from the tunnel wall at the right middle part of the tunnel. The results showed that the surrounding rocks in this region were unexpected fragile, where a structural plane was located. Distribution of the burst signal in this period of time is shown in Fig. 8.

    4.4. Signal characteristics after TBM left monitoring center

    In this process, the stresses of surrounding rocks of the tunnels were redistributed and adjusted, and thus the rockburst signals were distributed in the area centered around the tunnel axis. Distribution of the burst signals in this period is shown in Fig. 9.

    5. Analyses of AE monitoring results

    Fig. 6. Typical waveforms of burst signal from AE monitoring.

    5.1. Distribution characteristics analysis of rockburst AE signals

    After the tunnel was completed, the rockburst AE signals were represented by the stress adjustment itself. The long axis-direction of the signal distribution was approximately consistent with the direction of the maximum principal stress. The AE signals were mostly concentrated in the range of 1.5-5 m away from the borehole wall, and mainly concentrated in the range of 2-4 m away from the borehole wall. For this reason, we hereby divided the monitoring ranges into three regions: (1) fully relaxed region of rocks, 0-1.5 m away from the borehole wall; (2) disturbed region of rocks, 1.5-5 m away from the borehole wall; and (3) primary region of rocks, 5 m away from the borehole wall. The rocks might possibly become parts of relaxed region, or restore to primary rocks as a result of stress adjustment for a long period of time after being disturbed. This understanding accords with the average relaxation depth, 3-4 m, of surrounding rocks detected by the AE method. The comprehensive distribution characteristics of the AE signals, long after completion of excavation, are shown in

    Fig. 10.

    Fig. 8. Distribution characteristics of burst signals when excavation was near the monitoring section.

    Fig. 9. Distribution characteristics of burst signals when excavation was far away from the monitoring section.

    5.2. Analysis of rockburst AE signals

    5.2.1. Energy distribution of characteristics of rockburst AE signals

    The AE monitoring started on 1 December 2009 and ended on 31 December 2009. The number of valid signals captured for analysis is 19,605; the maximum energy value of all the signals is 65,535,the average energy value is 386, and the sum of average energy value is 8,941,389. Before arriving at the monitoring location (12 h before tunneling), the maximum energy value, the average energy value and the average energy value monitored are comparatively low. These data clearly illustrate that in situ stresses endured by rocks are limited, and the in situ stresses have a little effect on the stability of rocks. The AE signal intensity was weak before the TBM passed through the central monitoring location (in 20 h before and after tunneling). When the rocks were suddenly unloaded locally,the signal energy rapidly increased to a higher level and the signal intensity was very strong. After the working face passed through the monitoring section 0.5 times the tunnel diameter, the signal energy gradually reduced, and on the whole the AE signals intensity was weakened. The average energy value firstly decreased, then increased and finally decreased again, in the range 7.5 times the tunnel diameter in one week after tunneling. It illustrates that the rocks can endure great stress adjustment locally long after tunneling. The average energy distribution characteristics of the burst signal from AE monitoring in different phases are shown in Fig. 11.

    Fig. 10. Comprehensive distribution characteristic of AE signals long after completion of excavation.

    5.2.2. Penetration distance and amplitude of the burst signal from AE monitoring

    The average time difference, ΔT, of the positional signal away from some sensors was 0-1200 μs, averaging 483 μs. It means that the valid distance of the positional signal away from some sensors is 0-6 m and the valid average distance is 2.4 m. The amplitude of the burst signal monitored ranges from 20 dB to 99 dB, averaging 46 dB.

    Fig. 11. Average energy distribution characteristics of the burst signals from AE monitoring.

    5.2.3. Variation characteristics of AE events captured from rockburst in the monitoring area

    During the whole process of AE monitoring for rockburst, 4633 valid positioning events were recorded. In the whole process of AE monitoring, the frequency of the burst signals was relatively high when the tunnel advanced away from the monitoring center,i.e. -1.5D to -0.5D and -0.5D to 0.5D away from the monitoring center. In the range of -0.5D to 0.5D, the huge pushing force of the TBM had significant effects on the rock structure and stability. Local damage was observed and the rockburst was few. In the range of 0.5D-2.5D, the headrace tunnel #3 was formed and the amount of rockburst was relatively great. In the range of 3.5D or more, the stress in rocks was adjusted and the amount of rockburst was reduced with rock stress adjustment and elapsed time (Fig. 12).

    6. Discussion

    This paper has employed the AE to study the burst characteristics and distribution in the rock before and after excavation of TBM tunnel. But there are still some problems and deficiencies for the monitoring results:

    (1) TBM excavation is a continuous and dynamic process, so the rockburst signal and various noises should occur in a continuous process, too. These make it very difficult to locate, recognize and choose the AE signal. In other similar monitoring, the program should be optimized to make the monitoring fit for the excavating progress, and to ensure the monitoring progress is easy to be controlled, or the experiment should be conducted in the section constructed by D&B or other methods directly.

    (2) The strong and continuous interference makes most of the AE signals stack with the white noise. This increases the difficulty in analyzing the AE data, making us have to give up a lot of

    effective signals.

    (3) Due to the limitation in technology, AE signals are not analyzed in detail. Some aspects such as frequency analysis, power analysis, signal stack, etc. are not considered, and in-depth analysis should be conducted for the relationship between AE signal and rock stress change.

    (4) Limited by monitoring conditions, the range of this location test is a little small. This induces that a large number of concentrated or random AE signals of rockburst cannot be collected or are missed, making monitoring results significantly affected.For other similar tests, we should enlarge the monitoring zone,and increase the number of AE sensors, in order to detect the distribution regularities of rockburst AE signal more easily, and to reduce the errors caused by local factors (Barton, 2012).

    Fig. 12. Number of events captured from AE monitoring with elapsed time (in 2009).

    7. Conclusions

    Through the AE monitoring in Jinping II hydropower station,the rockburst AE signals in different stages were captured. The recorded data provide helpful information for optimization design of support parameters. Some conclusions can be drawn as follows:

    (1) According to the relationship among monitoring location, TBM advancing, and distribution of AE rupture, the process of AE signals can be divided into four stages. At first, before the TBM approached the position -1.5D away from the monitoring center, the great driving force of the TBM has significant effects on rock structure and stability, especially on locally damaged rocks. However, no or minor deformation happened in rocks in this stage. Secondly, when the distance between the TBM tunnel face and monitoring center is -1.5D to -0.5D or -0.5D to 0.5D, significant deformations of rocks were observed, and high and intensive frequency of AE signals occurred during the process of stress adjustment. Next, in the range of 0.5D-2.5D,the stress was adjusted and the rock deformed continuously.Sudden rupture signals still existed but the number and distribution range of signals were reduced. Finally, in the range of 3.5D or more, the ability of stress adjustment of rocks was reduced, and the number and frequency of burst signals were reduced significantly (Liu et al., 2006).

    (2) After the headrace tunnel #3 was constructed, AE signals monitored were mainly caused by the rupture of rock mass and stress adjustment, and the long-axis orientation of burst signals was generally in line with the maximum principal stress direction. The rockburst signals distributed radically around tunnels along the axis center of tunnel.

    (3) The rupture signals monitored were mainly distributed in the range of 1.5-5 m away from the borehole wall. The signals were concentrated at the depth of 2-4 m inside the tunnel wall.Therefore, complete relaxation of rock zones was located in the range of 0-1.5 m inside the tunnel wall. The EDZ of rocks was 1.5-5 m deep inside the tunnel wall. The region behind those areas can be considered as original status, where the property of disturbed rocks was close to the nature state of original rocks after stress adjustment (Liu et al., 2011).

    (4) Before the tunnel was completed, rockburst was induced by the in situ stresses, which have minor impact on the stability of rocks. At that time, the rupture signals were weak. In the process of TBM passing through the monitoring center(within 20 h before and after excavation), the tunnel was completed and local rocks were suddenly unloaded. At the same time, each energy index of AE signals rapidly reached a higher level and the energy of signals was great. When the working face passed through the monitoring section 0.5D, the AE signals were reduced generally. It showed that average energy of signals decreased firstly, then increased and finally decreased,when the excavation was completed. It also demonstrated that stress adjustment of local rocks might still exist in a long period of time after construction of tunnel (Fu, 2005).

    Since energy, signal strength and absolute energy are not directly convertible to physical unit in applications, it is better to treat them dimensionless.

    The characteristics of rock AE signals are related to the mechanical properties of marble in the studied area. However, the regularity and representativeness still of AE signals need further verification.

    Acknowledgements

    Helps from relevant experts in East China Investigation and Design Institute and USA Physical Acoustics Corporation (Beijing)are highly appreciated.

    Barton N. Reducing risk in long deep tunnels by using TBM and drill-and-blast methods in the same project—the hybrid solution. Journal of Rock Mechanics and Geotechnical Engineering 2012;4(2):115-26.

    Drouillard T. Acoustic Emission: A Bibliography with Abstracts. New York: IFI Plenum Data Company; 1979.

    Fu XM. Experimental study on uniaxial compression deformation and acoustic emission property of typical rocks. Journal of Chengdu University of Technology(Science and Technology Edition) 2005;32(1):17-21 (in Chinese).

    Ge M. Efficient mine microseismic monitoring. International Journal of Coal Geology 2005;64(1-2):44-56.

    Ge M. Source location error analysis and optimization methods. Journal of Rock Mechanics and Geotechnical Engineering 2012;4(1):1-10.

    Katsuyama T. Application of Acoustic Emission Technique. Beijing: China Metallurgical Industry Press; 1996 (in Chinese).

    Li SL, Yin XG, Wang YJ, Fang HY. Studies of acoustic emission characteristics of uniaxial compressive rock failure, vol. 23. Chinese Journal of Rock Mechanics and Engineering; 2004. p. 2499-503 (in Chinese).

    Liu DM, Cai MF, Zhou YB, Chen ZY. Dynamic monitoring on developing process of rock cracks. Chinese Journal of Rock Mechanics and Engineering 2006;25(3):467-72 (in Chinese).

    Liu LP, Wang XG, Zhang YH, Jia ZX, Duan QG. Tempo-spatial characteristics and influential factors of rockburst: a case study of transportation and drainage tunnels in Jinping II hydropower station. Journal of Rock Mechanics and Geotechnical Engineering 2011;3(2):179-85.

    Lockner D. The role of acoustic emission in the study of rock failure. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts 1993;30(7):883-99.

    Talebi S, Young RP. Microseismic monitoring in highly stressed granite: relation between shaft-wall cracking and in situ stress. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts

    1992;29(1):25-34.

    Wu SY, Wang G. Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping II hydropower station. Journal of Rock Mechanics and Geotechnical Engineering 2011;3(4):314-28.

    亚洲av男天堂| 欧美激情久久久久久爽电影 | 亚洲精品粉嫩美女一区| 捣出白浆h1v1| 别揉我奶头~嗯~啊~动态视频 | 亚洲中文字幕日韩| 老司机靠b影院| 精品少妇一区二区三区视频日本电影| 女性被躁到高潮视频| 亚洲成人免费电影在线观看| 国产一级毛片在线| 午夜视频精品福利| 午夜免费成人在线视频| 好男人电影高清在线观看| 欧美97在线视频| 人人妻人人爽人人添夜夜欢视频| 免费观看人在逋| 桃红色精品国产亚洲av| 国产成人av教育| 国产区一区二久久| 搡老乐熟女国产| 国产成人av激情在线播放| av电影中文网址| 蜜桃国产av成人99| 日韩精品免费视频一区二区三区| 日韩熟女老妇一区二区性免费视频| 日韩三级视频一区二区三区| 99热全是精品| 黑人巨大精品欧美一区二区蜜桃| 久久中文看片网| www.av在线官网国产| 狠狠狠狠99中文字幕| 丝袜人妻中文字幕| 肉色欧美久久久久久久蜜桃| 久久精品人人爽人人爽视色| 国产福利在线免费观看视频| 超色免费av| 亚洲精品国产一区二区精华液| 亚洲国产欧美网| 欧美亚洲日本最大视频资源| 考比视频在线观看| 99国产极品粉嫩在线观看| 女人高潮潮喷娇喘18禁视频| av在线老鸭窝| 无遮挡黄片免费观看| 久久久欧美国产精品| 日本91视频免费播放| 丝瓜视频免费看黄片| 国产精品免费视频内射| 久久人人97超碰香蕉20202| 中文字幕制服av| 日本五十路高清| 午夜影院在线不卡| 久热这里只有精品99| 国产精品.久久久| 欧美xxⅹ黑人| 黄片大片在线免费观看| 热99re8久久精品国产| 中文字幕色久视频| 正在播放国产对白刺激| 搡老熟女国产l中国老女人| 精品福利观看| 亚洲精品国产区一区二| 国产日韩欧美亚洲二区| 欧美变态另类bdsm刘玥| 国产有黄有色有爽视频| 国产一区二区三区av在线| 精品第一国产精品| 纯流量卡能插随身wifi吗| 亚洲国产日韩一区二区| 欧美亚洲 丝袜 人妻 在线| 精品一区在线观看国产| 美女视频免费永久观看网站| 91成年电影在线观看| 国产极品粉嫩免费观看在线| 久久 成人 亚洲| 狠狠精品人妻久久久久久综合| 日韩三级视频一区二区三区| 首页视频小说图片口味搜索| 男人爽女人下面视频在线观看| 日韩 欧美 亚洲 中文字幕| 久久99一区二区三区| 777米奇影视久久| 国产精品熟女久久久久浪| 日韩 欧美 亚洲 中文字幕| cao死你这个sao货| 淫妇啪啪啪对白视频 | kizo精华| 中文字幕人妻熟女乱码| 亚洲精品国产av成人精品| 国产野战对白在线观看| cao死你这个sao货| 精品一区二区三区av网在线观看 | 丁香六月天网| 狠狠狠狠99中文字幕| 熟女少妇亚洲综合色aaa.| 手机成人av网站| 国产主播在线观看一区二区| 国产一区二区三区av在线| 日日爽夜夜爽网站| 亚洲国产毛片av蜜桃av| 久久久久久久久久久久大奶| 中国国产av一级| 日韩一区二区三区影片| 午夜福利免费观看在线| 午夜激情久久久久久久| 热re99久久精品国产66热6| 一二三四社区在线视频社区8| 亚洲av日韩在线播放| 国产亚洲午夜精品一区二区久久| 啦啦啦啦在线视频资源| 最近中文字幕2019免费版| 老司机午夜福利在线观看视频 | 不卡一级毛片| 久久女婷五月综合色啪小说| 国产精品欧美亚洲77777| 少妇 在线观看| 他把我摸到了高潮在线观看 | 男女国产视频网站| 亚洲精品一卡2卡三卡4卡5卡 | 一区二区av电影网| 啦啦啦视频在线资源免费观看| 欧美+亚洲+日韩+国产| 18禁国产床啪视频网站| 国产成人av教育| 一区二区三区乱码不卡18| 在线观看一区二区三区激情| 色精品久久人妻99蜜桃| 精品国内亚洲2022精品成人 | 搡老熟女国产l中国老女人| 免费少妇av软件| 精品福利永久在线观看| 日本av手机在线免费观看| 亚洲 国产 在线| 国产伦人伦偷精品视频| 黑人猛操日本美女一级片| 一区二区三区激情视频| 90打野战视频偷拍视频| 国产精品免费大片| 亚洲精品国产区一区二| 久久99一区二区三区| 正在播放国产对白刺激| 午夜免费成人在线视频| 亚洲精品久久久久久婷婷小说| 脱女人内裤的视频| 国产真人三级小视频在线观看| 国产亚洲精品久久久久5区| 亚洲avbb在线观看| 悠悠久久av| 免费高清在线观看日韩| 久久ye,这里只有精品| 国产精品一二三区在线看| 亚洲中文av在线| 亚洲精品乱久久久久久| 性色av一级| 人人妻人人澡人人爽人人夜夜| 一本色道久久久久久精品综合| 黄色视频在线播放观看不卡| 亚洲av日韩精品久久久久久密| 一本色道久久久久久精品综合| 一级a爱视频在线免费观看| 免费在线观看完整版高清| 免费在线观看黄色视频的| 超碰成人久久| 99精品欧美一区二区三区四区| 国产国语露脸激情在线看| 又黄又粗又硬又大视频| 国产一卡二卡三卡精品| 99久久精品国产亚洲精品| 午夜激情av网站| 一二三四社区在线视频社区8| 99久久精品国产亚洲精品| 老司机在亚洲福利影院| 欧美日本中文国产一区发布| 日本av免费视频播放| 脱女人内裤的视频| 亚洲精品久久成人aⅴ小说| 一级,二级,三级黄色视频| 欧美国产精品一级二级三级| 免费日韩欧美在线观看| 国产欧美日韩精品亚洲av| 午夜福利在线观看吧| 亚洲avbb在线观看| 亚洲精品一区蜜桃| 久久性视频一级片| 在线观看舔阴道视频| 人妻 亚洲 视频| 免费高清在线观看视频在线观看| av不卡在线播放| 一区二区日韩欧美中文字幕| 国产精品秋霞免费鲁丝片| 两性午夜刺激爽爽歪歪视频在线观看 | 超碰97精品在线观看| 免费高清在线观看日韩| 黄色a级毛片大全视频| 国产日韩欧美亚洲二区| 久9热在线精品视频| 国产亚洲精品一区二区www | 少妇被粗大的猛进出69影院| 99热网站在线观看| 国产精品一二三区在线看| 99精国产麻豆久久婷婷| 欧美另类一区| 99久久人妻综合| 男女边摸边吃奶| 中文字幕av电影在线播放| 国产在线观看jvid| 国产极品粉嫩免费观看在线| 亚洲成人免费电影在线观看| 纵有疾风起免费观看全集完整版| 99国产精品99久久久久| 久久天堂一区二区三区四区| 自拍欧美九色日韩亚洲蝌蚪91| 久热爱精品视频在线9| 久久久国产精品麻豆| 国产亚洲午夜精品一区二区久久| 国产亚洲精品第一综合不卡| 成人黄色视频免费在线看| 我要看黄色一级片免费的| 18禁国产床啪视频网站| 高清av免费在线| 每晚都被弄得嗷嗷叫到高潮| 男女边摸边吃奶| 99久久综合免费| 国产又色又爽无遮挡免| 自拍欧美九色日韩亚洲蝌蚪91| 飞空精品影院首页| 天天操日日干夜夜撸| 91老司机精品| 少妇被粗大的猛进出69影院| 亚洲成国产人片在线观看| 国产精品久久久久久精品古装| 男女免费视频国产| 色播在线永久视频| 国产欧美日韩精品亚洲av| 老司机福利观看| 热re99久久精品国产66热6| 欧美xxⅹ黑人| 久久精品国产综合久久久| 欧美老熟妇乱子伦牲交| av网站在线播放免费| 亚洲精品国产av蜜桃| av超薄肉色丝袜交足视频| 丝袜美足系列| 亚洲精品美女久久av网站| 自拍欧美九色日韩亚洲蝌蚪91| 纯流量卡能插随身wifi吗| 大型av网站在线播放| 国产99久久九九免费精品| 国产淫语在线视频| 最新在线观看一区二区三区| 国产欧美日韩一区二区三区在线| 国产黄频视频在线观看| a 毛片基地| 久久女婷五月综合色啪小说| 脱女人内裤的视频| 免费在线观看完整版高清| 91麻豆av在线| 精品人妻一区二区三区麻豆| 18禁黄网站禁片午夜丰满| 亚洲欧美精品综合一区二区三区| 欧美xxⅹ黑人| 一本久久精品| 视频区欧美日本亚洲| 伦理电影免费视频| 妹子高潮喷水视频| 久久精品成人免费网站| 日韩免费高清中文字幕av| 日本精品一区二区三区蜜桃| 欧美国产精品一级二级三级| 久久狼人影院| 亚洲国产欧美在线一区| 日本91视频免费播放| 久久香蕉激情| 亚洲精品第二区| av有码第一页| av一本久久久久| 精品亚洲成a人片在线观看| 成人手机av| 岛国在线观看网站| 狠狠婷婷综合久久久久久88av| 精品一区二区三区av网在线观看 | 91精品三级在线观看| 亚洲国产欧美在线一区| 精品人妻一区二区三区麻豆| 国产欧美日韩一区二区精品| 精品少妇一区二区三区视频日本电影| 免费观看av网站的网址| 国产免费一区二区三区四区乱码| 国产一区二区三区综合在线观看| 久久人人爽av亚洲精品天堂| 国产免费av片在线观看野外av| 成人国语在线视频| 精品亚洲成国产av| av片东京热男人的天堂| 国产在线一区二区三区精| 如日韩欧美国产精品一区二区三区| 亚洲一区中文字幕在线| 国产亚洲精品久久久久5区| 免费一级毛片在线播放高清视频 | 在线观看免费日韩欧美大片| 国产精品免费视频内射| 电影成人av| 天天躁日日躁夜夜躁夜夜| 日韩,欧美,国产一区二区三区| √禁漫天堂资源中文www| 精品人妻一区二区三区麻豆| 国产一区二区在线观看av| 欧美亚洲日本最大视频资源| 这个男人来自地球电影免费观看| 国产精品免费视频内射| 午夜福利在线观看吧| 欧美激情久久久久久爽电影 | 国产成人欧美在线观看 | 动漫黄色视频在线观看| 欧美亚洲 丝袜 人妻 在线| a 毛片基地| 久久人妻熟女aⅴ| 精品国产国语对白av| 精品少妇黑人巨大在线播放| 精品国产乱子伦一区二区三区 | 啦啦啦视频在线资源免费观看| 久久亚洲国产成人精品v| 亚洲国产中文字幕在线视频| 国产精品香港三级国产av潘金莲| 久久久久国产一级毛片高清牌| 国产精品影院久久| 老司机午夜十八禁免费视频| 自线自在国产av| 99香蕉大伊视频| 亚洲精品中文字幕在线视频| 免费观看a级毛片全部| 亚洲精品一卡2卡三卡4卡5卡 | 亚洲av片天天在线观看| 国产精品久久久人人做人人爽| 别揉我奶头~嗯~啊~动态视频 | 成人国语在线视频| 免费黄频网站在线观看国产| 日本撒尿小便嘘嘘汇集6| 狠狠精品人妻久久久久久综合| 国产精品偷伦视频观看了| 欧美日韩精品网址| cao死你这个sao货| 中文字幕精品免费在线观看视频| 亚洲男人天堂网一区| 桃花免费在线播放| 日韩一区二区三区影片| 欧美激情高清一区二区三区| 人人妻人人添人人爽欧美一区卜| 十八禁高潮呻吟视频| 精品亚洲成国产av| 成人手机av| 国产老妇伦熟女老妇高清| 国产一区二区 视频在线| 日韩精品免费视频一区二区三区| 亚洲熟女精品中文字幕| a级毛片黄视频| 精品国产国语对白av| 涩涩av久久男人的天堂| 亚洲成人国产一区在线观看| av网站在线播放免费| 极品少妇高潮喷水抽搐| 久久国产精品大桥未久av| 黄片播放在线免费| 国产亚洲精品第一综合不卡| 制服诱惑二区| 久久国产精品影院| 成年人免费黄色播放视频| 在线天堂中文资源库| 亚洲第一欧美日韩一区二区三区 | 久久精品aⅴ一区二区三区四区| 99热网站在线观看| 亚洲国产欧美日韩在线播放| 纵有疾风起免费观看全集完整版| 国产免费一区二区三区四区乱码| 欧美黑人精品巨大| 两性夫妻黄色片| 一级黄色大片毛片| 国产伦人伦偷精品视频| 99国产精品99久久久久| 一本一本久久a久久精品综合妖精| 性少妇av在线| 日韩中文字幕欧美一区二区| 久久精品国产亚洲av高清一级| 日日爽夜夜爽网站| 一区二区日韩欧美中文字幕| 波多野结衣一区麻豆| 欧美国产精品va在线观看不卡| 亚洲精品国产精品久久久不卡| 亚洲avbb在线观看| 99国产极品粉嫩在线观看| 青草久久国产| 下体分泌物呈黄色| 美女脱内裤让男人舔精品视频| 人人妻人人添人人爽欧美一区卜| 日韩精品免费视频一区二区三区| 亚洲国产av新网站| 精品国产超薄肉色丝袜足j| 日本a在线网址| 黄色毛片三级朝国网站| 久久久欧美国产精品| 狂野欧美激情性xxxx| 国产高清视频在线播放一区 | 国产精品久久久久久精品电影小说| 欧美日韩中文字幕国产精品一区二区三区 | 在线观看免费视频网站a站| 国产极品粉嫩免费观看在线| 欧美成人午夜精品| 69av精品久久久久久 | 久热爱精品视频在线9| 香蕉丝袜av| 精品少妇久久久久久888优播| 纯流量卡能插随身wifi吗| 丝袜人妻中文字幕| 在线 av 中文字幕| 老司机在亚洲福利影院| 色94色欧美一区二区| 国产亚洲午夜精品一区二区久久| 精品人妻1区二区| 波多野结衣一区麻豆| 亚洲欧美日韩另类电影网站| 午夜福利在线免费观看网站| 一级毛片女人18水好多| 欧美变态另类bdsm刘玥| 精品久久蜜臀av无| 男人舔女人的私密视频| 欧美精品一区二区免费开放| 99热全是精品| 美女大奶头黄色视频| 亚洲欧美一区二区三区久久| 久久国产精品大桥未久av| 91精品伊人久久大香线蕉| 亚洲熟女精品中文字幕| 免费人妻精品一区二区三区视频| 多毛熟女@视频| 12—13女人毛片做爰片一| 亚洲欧美精品自产自拍| 777米奇影视久久| 欧美精品啪啪一区二区三区 | 高清在线国产一区| 天堂俺去俺来也www色官网| 精品久久久久久久毛片微露脸 | 在线 av 中文字幕| 日本黄色日本黄色录像| 一区二区av电影网| 老汉色∧v一级毛片| 欧美日韩亚洲综合一区二区三区_| 啦啦啦中文免费视频观看日本| 91麻豆精品激情在线观看国产 | 波多野结衣一区麻豆| 不卡av一区二区三区| 色94色欧美一区二区| 亚洲 欧美一区二区三区| 欧美黄色片欧美黄色片| av一本久久久久| 精品亚洲乱码少妇综合久久| 久久香蕉激情| 国产精品99久久99久久久不卡| 亚洲人成77777在线视频| 成人18禁高潮啪啪吃奶动态图| 精品一区二区三卡| av福利片在线| 精品少妇内射三级| 亚洲成av片中文字幕在线观看| 欧美另类一区| 欧美黑人精品巨大| 亚洲综合色网址| 国产日韩欧美在线精品| 国产97色在线日韩免费| 国产精品影院久久| 精品国产一区二区久久| 亚洲国产欧美日韩在线播放| 免费人妻精品一区二区三区视频| 国产日韩欧美视频二区| 男女免费视频国产| 欧美人与性动交α欧美软件| 五月天丁香电影| 亚洲成av片中文字幕在线观看| 日本av手机在线免费观看| 岛国毛片在线播放| av在线播放精品| 亚洲精品粉嫩美女一区| 亚洲精品av麻豆狂野| 国产欧美日韩精品亚洲av| 久久青草综合色| 人人妻人人爽人人添夜夜欢视频| 亚洲欧洲日产国产| 欧美午夜高清在线| 欧美大码av| h视频一区二区三区| 日本猛色少妇xxxxx猛交久久| 精品人妻在线不人妻| 91麻豆av在线| 国产成人系列免费观看| 电影成人av| 免费高清在线观看视频在线观看| 真人做人爱边吃奶动态| 久久久精品免费免费高清| 别揉我奶头~嗯~啊~动态视频 | 91麻豆精品激情在线观看国产 | 久久午夜综合久久蜜桃| 日本91视频免费播放| 国产成人av教育| 国产精品久久久久久精品古装| 桃红色精品国产亚洲av| 国产精品免费视频内射| 老鸭窝网址在线观看| 两性午夜刺激爽爽歪歪视频在线观看 | 色播在线永久视频| 99国产综合亚洲精品| 欧美日韩国产mv在线观看视频| 国产一区二区三区在线臀色熟女 | www.自偷自拍.com| 日韩制服骚丝袜av| 久久精品国产a三级三级三级| 极品人妻少妇av视频| 伊人久久大香线蕉亚洲五| 久久精品久久久久久噜噜老黄| 91字幕亚洲| 菩萨蛮人人尽说江南好唐韦庄| 99国产极品粉嫩在线观看| 女人精品久久久久毛片| 伦理电影免费视频| 国产欧美日韩精品亚洲av| 中文字幕精品免费在线观看视频| 黄片大片在线免费观看| 国产野战对白在线观看| 亚洲国产精品一区三区| 91成年电影在线观看| 国产老妇伦熟女老妇高清| 亚洲色图 男人天堂 中文字幕| 日本91视频免费播放| 成人18禁高潮啪啪吃奶动态图| 久久国产精品大桥未久av| 久热爱精品视频在线9| 视频区图区小说| 久久亚洲精品不卡| 精品高清国产在线一区| 午夜福利在线观看吧| 黄色 视频免费看| 老司机福利观看| 19禁男女啪啪无遮挡网站| 手机成人av网站| 久久香蕉激情| 欧美黑人精品巨大| 亚洲av片天天在线观看| 欧美亚洲 丝袜 人妻 在线| 午夜免费成人在线视频| 精品第一国产精品| 亚洲精品中文字幕一二三四区 | 大香蕉久久网| 一级a爱视频在线免费观看| 亚洲国产av影院在线观看| 蜜桃在线观看..| 国产免费一区二区三区四区乱码| 汤姆久久久久久久影院中文字幕| 在线观看人妻少妇| 国产精品一区二区免费欧美 | 午夜两性在线视频| e午夜精品久久久久久久| 宅男免费午夜| 中文字幕精品免费在线观看视频| 免费观看a级毛片全部| av欧美777| 精品卡一卡二卡四卡免费| 久久精品成人免费网站| 亚洲专区中文字幕在线| 国产精品 欧美亚洲| 日韩熟女老妇一区二区性免费视频| 久热爱精品视频在线9| 操出白浆在线播放| 久热这里只有精品99| 在线观看舔阴道视频| 久久精品亚洲av国产电影网| 欧美在线黄色| 亚洲成人手机| 亚洲精品久久久久久婷婷小说| 欧美av亚洲av综合av国产av| 日本av手机在线免费观看| 啪啪无遮挡十八禁网站| 久久精品国产a三级三级三级| 亚洲国产精品一区三区| 男女免费视频国产| www.自偷自拍.com| 9色porny在线观看| 69av精品久久久久久 | 美女脱内裤让男人舔精品视频| 国产无遮挡羞羞视频在线观看| 婷婷丁香在线五月| 国产精品九九99| 99热全是精品| 欧美一级毛片孕妇| 国产精品九九99| 国产视频一区二区在线看| 大码成人一级视频| 人人妻人人澡人人爽人人夜夜| 一边摸一边做爽爽视频免费| 久久久久国产一级毛片高清牌| 在线天堂中文资源库| 久久国产精品影院| 老司机午夜福利在线观看视频 | 天天操日日干夜夜撸| 精品人妻1区二区| 亚洲精品久久午夜乱码| 最近最新免费中文字幕在线| 无遮挡黄片免费观看| 啦啦啦在线免费观看视频4| 日韩大码丰满熟妇| 亚洲第一av免费看| 国产免费视频播放在线视频| 中亚洲国语对白在线视频| 久久久国产欧美日韩av| 91老司机精品| 母亲3免费完整高清在线观看| 十八禁高潮呻吟视频|