    Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm

    2012-08-16 09:04:01WeiXIEChangmingJIZijunYANGXiaoxingZHANG
    Water Science and Engineering 2012年1期

    Wei XIE*, Chang-ming JI, Zi-jun YANG, Xiao-xing ZHANG

    1. Beijing Key Laboratory of New and Renewable Energy, North China Electric Power University, Beijing 102206, P. R. China

    2. Hydrochina Kunming Engineering Corporation, Kunming 650051, P. R. China

    3. Jinsha River Hydropower Development Co., Ltd., Kunming 650228, P. R. China

    Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm

    Wei XIE*1, Chang-ming JI1, Zi-jun YANG2, Xiao-xing ZHANG3

    1. Beijing Key Laboratory of New and Renewable Energy, North China Electric Power University, Beijing 102206, P. R. China

    2. Hydrochina Kunming Engineering Corporation, Kunming 650051, P. R. China

    3. Jinsha River Hydropower Development Co., Ltd., Kunming 650228, P. R. China

    Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.

    scheduling rule; short-time power generation dispatching; hybrid algorithm; cascade hydropower station

    1 Introduction

    Two conventional approaches can be used to obtain the optimal scheduling of power generation in cascade hydropower stations. One is the reservoir operation chart (Yang et al. 2010; Yu et al. 2010; Chen et al. 2007). However, the latest results of runoff prediction cannot be used with this method, and the scheduling results are too conservative to represent the advantages and economic benefits of scheduling of cascade hydropower stations. Alternatively, a basic scheduling process can be obtained using a variety of traditional algorithms or intelligent algorithms based on the long-term data series of runoff. Yoo (2009) applied a linear programming method to maximize hydropower energy generation. Pérez-Díaz et al. (2010) proposed nonlinear programming based on a scheduling model for solving short-termoperation scheduling of a hydropower plant. Li et al. (2009) used the immune algorithm-based particle swarm optimization (PSO) for optimized load distribution among cascade hydropower stations. Similar studies have been reported by Mandal and Chakraborty (2011) for solving combined economic emission scheduling of hydrothermal systems with cascade reservoirs using the PSO algorithm, and by Hota et al. (2009) for solving short-term optimal hydrothermal scheduling using an improved PSO technique. Lakshminarasimman and Subramanian (2008) developed a modified hybrid differential evolution algorithm for short-term scheduling of hydrothermal power systems with cascade reservoirs. Yuan and Yuan (2006) proposed a new cultural algorithm to solve the optimal daily generation scheduling of hydrothermal power systems. Liang (1999) applied grey relation analysis to hydroelectric generation scheduling. Huang (1998) applied the genetic-embedded fuzzy system approach to hydroelectric generation scheduling. Liang and Hsu (1995) developed a hybrid artificial neural network-differential dynamic programming approach for short-term hydroelectric scheduling.

    It is observed from the above literature review that although many studies have provided the basic rules of reservoir operation, only some general conclusions have been obtained, there have been very few studies on the clearly different scheduling rules for the different varieties of runoff, and the feasibility of the methods is relatively poor. In order to improve the short-term power generation scheduling rules of cascade hydropower stations on the Jinsha River, studies on the practical and effective scheduling rules were carried out using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA).

    2 Mathematical model

    In this study, the maximum power output during the scheduling period was regarded as the objective. Thus the objective function can be expressed as follows:

    whereEis the total generated energy,Gis the number of cascade hydropower stations,Tis the number of time intervals (Δt),Pi,tis the average output of theith hydropower station in thetth time interval,Kiis the output coefficient of theith hydropower station,Qi,tis the power flow of theith hydropower station in thetth time interval, andHi,tis the water head of theith hydropower station in thetth time in terval.

    The objective function is subjected to the following constraints:

    (1) Water balance equations:

    whereVi,tandVi,t+1are, respectively, the storage capacity of theith hydropower station in thetth and (t+1)th time intervals;Ii,tandare the reservoir inflow and outflow of theith hydropower station in thetth time interval,respectively;Si,tandare the surplus flow andregion inflow of theith hydropower station in thetth time interval, respectively; andτiis the water flow’s travel time between the (i-1)th andith hydropower stations.

    (2) Storage capacity constraint:

    whereViminis the dead storage of theith hydropower station, andVimaxis the storage corresponding to the normal water level of theith hydropower station. During the flood season,Vimaxis the storage corresponding to the limiting water level.

    (3) Power constraint:

    whereNi,tis the actual output of theith hydropower station in thetth time interval, andNiminandNimaxare the highest and lowest outputs of theith hydropower station, respectively.

    (4) Discharge constraint:

    whereQiminis the minimum ecological flow of theith hydropower station determined by the water resources department, andQimaxis the permitted maximum discharge flow of theith hydropower station to guaranteethe flood control security of downstream region.

    3 Hybrid algorithm and computational process

    The hybrid algorithm adopts GA in the inner loop and POA in the outer loop, integrating the advantages of traditional algorithms and intelligent algorithms. GAs were proposed by Holland (1975) as an abstraction of biological evolution, drawing on ideas from natural evolution and genetics for the design and implementation of robust adaptive systems. GAs have been used to optimize the reservoir operation because of their potential as optimization techniques for complex functions (Goldberg 1989; Romero and Carter 2001). Studies of POA for reservoir operation were reported by Nanda et al. (1986) and Xuan et al. (2009). The calculation steps of the hybrid algorithm are as follows:

    Step 1: The initial water level trajectory of each hydropower station is determined. It can be the dead water level or the normal water level.zi,0,zi,1,zi,2,…,zi,Tis defined as the initial water level trajectory of theith hydropower station, wherezi,j(i=1, 2,…,G;j=1, 2,…,T)is the water level of theith hydropower station at time pointj.

    Step 2: The optimal output process of each hydropower station is sought from upstream to downstream. Considering theith (1≤i≤G) hydropower station as an instance, the water levelzi,0at time point zero andzi,2at time point 2 must be fixed, and then the water levelzi,1at time point 1 can be adjusted using GA to get the maximum generated energy during the zero time interval and 1st time interval. Thus, after optimizing, the water level trajectory of theith hydropower station is changed tozi,0,zi′,1,zi,2,…,zi,T(1≤i≤G).

    Step 3: Similarly, the water level in next time point is adjusted. The water levelzi′,1at time point 1 andzi,3at time point 3 must be fixed, and then the water levelzi,2at time point 2can be adjusted using GA to get the maximum generated energy during the 1st time interval and the 2nd time interval. Thus, after optimizing, the water level trajectory of theith hydropower station is changed to(1≤i≤G).

    Step 4: Step 3 is repeated until the iteration times reach the number of time intervals (T). Based on initial conditions and the constraint conditions of the cascade hydropower station, the stage hydrograph, output process, outflow process, and the total output of this cascade hydropower station can be obtained.

    Step 5: The water level trajectory is initialized again using the latest stage hydrograph, and then the process returns to step 2.

    Step 6: If the convergence condition that the difference in total output of the cascade hydropower station between adjacent iterations reaches the specified precision is met, the process is over. Otherwise, it returns to step 5. The flow chart of the hybrid algorithm is presented in Fig. 1.

    Fig. 1 Flow chart of hybrid algorithm

    4 Scheduling rules for cascade hydropower stations in Jinsha River

    Taking six hydropower stations on the Jinsha River as examples, the steps forestablishing the scheduling rules are as follows: First, based on the mathematical model, the daily runoff process in three typical years and large numbers of simulated daily runoff processes are analyzed using the hybrid algorithm to obtain the corresponding optimal scheduling processes. Second, these optimal results are summarized using the principles of statistics, and then the specific scheduling rules under different conditions of cascade hydropower stations are given. Finally, according to expert experience, those scheduling rules are formulated in the form of experience formulas which are very convenient for guiding the short-term power generation scheduling of cascade hydropower stations.

    The Jinsha River is the upper reaches of the Yangtze River. The cascade hydropower station studied in this study is located on the middle reaches of the Jinsha River. It includes six hydropower stations: Liyuan, Ahai, Jinanqiao, Longkaikou, Ludila, and Guanyinyan hydropower stations from upstream to downstream. Characteristic parameters of six hydropower stations on the Jinsha River are listed in Table 1. The scheduling period of this cascade hydropower station is one year, and the length of time intervals is one day, so the number of time intervals is 364, and the space is relatively far between hydropower stations. Thus,did not need to be considered in this study.

    Table 1 Characteristic parameters of six hydropower stations

    4.1 Basic principle and normal operation for short-term power generation scheduling

    4.1.1 Basic principle

    Based on the power system load requirements, the water level of the reservoir which has weekly or daily regulation capacity should be maintained at the high water level as far as possible. In other words, the water level should be maintained at the normal water level during the non-flood season and at the limited water level during the flood season as far as possible. If the flood process is more than that needed for generating the expected output according to the short-term runoff forecast, part of the regulation storage capacity of the reservoir should be vacated early to store this flood. Nevertheless, the water level must be return to the high water level at the end of the flood process as soon as possible.

    4.1.2 Normal operation

    If the storage capacity of cascade reservoirs needs to be vacated early before the flood season, it should start from the upstream reservoirs and move to the downstream reservoirs. However, at the end of flood season, the water levels of these reservoirs must be return to the high water level in time, following a sequence from downstream to upstream.

    4.2 Power generation scheduling rules of cascade hydropower stations

    After analyzing the optimal results obtained by the hybrid algorithm, the power generation scheduling rules can be determined. To better guide the operation of hydropower stations, the scheduling period can be divided into a dry-flood transition period and general period. The length of the former is a variable, meaning that the values at different hydropower stations are different, and it will be further explained later. Naturally, the scheduling period, in addition to the dry-flood transition period, is defined as general period.

    4.2.1 Rules during general period

    The forecast period means the period of validity of runoff prediction. If the natural runoffs of these six stations are all less than those needed for generating the expected output during the forecast period according to the runoff prediction, the cascade hydropower stations should be in normal operation. However, if the natural runoff of any station is more than that needed for generating the expected output during the forecast period according to the runoff prediction, the six hydropower stations need joint pre-discharge scheduling.

    When adopting joint pre-discharge scheduling, the termination time needs to be accurately determined. First, the final time for each station in which the natural runoff is more than that needed for generating the expected output during the forecast period is determined according to the runoff prediction. Then, the termination time is equal to the final time which is closest to the future time. Here,Nis defined as the time interval between current time and the termination time. To sum up, the cascade hydropower stations should carry out the pre-discharge scheduling during the time intervalN, and the normal operation after termination time. Moreover, the water level of each reservoir needs to return to the high water level in the termination time. Steps of pre-discharge scheduling are as follows:

    Step 1: The average dischargethat can guarantee that the water level of Liyuan Hydropower Station reaches the high water level at the termination time is determined. Then, it is assumed that Liyuan Hydropower Station generates electricity using, while the other five hydropower stations downstream generate electricity only by use of actual flow, and these five reservoirs’ storage remains unchanged. Based on this assumption, the operation rules of the cascade hydropower stations are given:

    (1) If there is surplus water released from the Liyuan Reservoir, the Liyuan Reservoir should generate the expected output power during the forecast period. In other words, the inflow of the Liyuan Reservoir is relatively abundant.

    (2) If the Liyuan Reservoir has no surplus water while the other five reservoirs downstream have, the Liyuan Reservoir should generate electricity within every time interval during the forecast period, and the operation of the downstream stations will be further formulated.

    (3) If all the reservoirs have no surplus water, the minimum dischargeQminthat can guarantee that the water level of the Liyuan Reservoir reaches the high water level at the termination time is determined under the condition that the other five reservoirs downstream have no surplus water when generating electricity with the actual inflow.Qminis regarded as the discharge of the Liyuan Reservoir in every time interval during the forecast period. For the Liyuan Reservoir, if the output generated byQminis less than the basic required output, Liyuan Hydropower Station must run in accordance with the basic output requirements.

    Step 2: The sum of the discharge of the Liyuan Reservoir and the corresponding predicted local inflow is regarded as the inflow of the hydropower stations downstream.

    Step 3: The hydropower stations downstream are treated as a new cascade. The discharge of Ahai Hydropower Station in each time interval during the forecast period is obtained using the method used for Liyuan Hydropower Station. Similarly, the discharges of the other four hydropower stations, Jinanqiao, Longkaikou, Ludila, Guanyinyan, during the forecast period, are calculated.

    The specific calculation process and formulas are shown in Fig. 2. In Fig. 2,is the average discharge that can guarantee that the water level of theith hydropower station reaches the high water level at the termination time;is the runoff of theith hydropower station needed for generating expected output;is the natural inflow of theith hydropower station in thejth time interval obtained by the runoff prediction;Wiis the change value of storage capacity of theith hydropower station during the time intervalN, and usually zero or negative;is the allowed discharge of theith hydropower station in thejth time interval;is the local inflow of thesth hydropower station in thejth time interval;qi,tis the discharge of theith hydropower station in thetth time interval;is the discharge of theith hydropower station in thejth time interval for the initial scheduling decision;is the discharge of theith hydropower station that meets the basic output requirements;is the final discharge flow of theith hydropower station in thejth time interval;mis the number of cascade hydropower stations (2≤m≤G);Zi,jis the water level of theith hydropower station in thejth time interval; andandare the minimum and the maximum allowed water levels of theith hydropower station in thejth time interval, respectively.

    When using the formulas in Fig. 2, we need to pay attention to the following:

    (1) When calculating, the upstream water level of the reservoir is the average value of the water level at the current time and the expected water level at the end of the scheduling time. Generally, the expected water level is the normal water level and the limited water level in the flood season.

    Fig. 2 Calculation process and formulas during general period

    (2) In terms of the generation scheduling of the downstream station, the predicted inflow is actually the sum of the discharge of the farthest upstream station and the corresponding predicted local inflow.

    (3) The calculation order ofqi,tshould be from the farthest upstream station to farthest downstream station according to chronological order. In other words, it is not until all discharges of theith station during forecast period have been obtained that the calculation for (i+1)th station is carried out.

    4.2.2 Rules during dry-flood transition period

    Based on Table 1, it is clear that almost all hydropower stations have the limited water level in July. Guanyinyan Hydropower Station has the limited water level in August as well. Through analysis of the optimized operation results, it is known that before the flood season in July, even in a wet year, the water levels of these six hydropower stations can regress from the normal water level to the limited water level through increasing output in around a total of 17 days. To better explain the length of the dry-flood transition period which is a variable mentioned above, an example is given: Suppose that the water levels of cascade hydropower stations can regress from the normal water level to the limited water level in five days before the flood season in July, then the period from June 25 to June 30 is identified as the dry-flood transition period. Thus, it is easy to learn that the dry-flood transition period of the cascade in this study is June 13-30. This dynamic partitioning is simple and universal.

    The scheduling rules during the dry-flood transition period are as follows:

    Step 1: As the limitation of short-term runoff forecast, the forecast period is shorter. Taking into account the feasibility and applicability, the average discharge in the forecast period is regarded as the average discharge in the time intervalM. Here,Mis the time interval between the current time and the starting time of the flood season.

    Step 2: The required time that the water level of these six stations regresses from the current level to the limited level is calculated when Guanyinyan Hydropower Station runs with the flow discharge needed for generating the expected output power.

    Step 3: If the required time is shorter thanM, the scheduling rules are the same as those during the general period. Otherwise, the rules during the dry-flood transition period are as follows: the farthest downstream station of the cascade (Guanyinyan Station) generates the expected output power, and the other five stations upstream generate electricity all by using the maximum discharge that can ensure that the next station has no surplus water. It must be noted that the order of scheduling should be from upstream to downstream.

    The specific calculation process and formulas are shown in Fig. 3. In Fig. 3,is the average discharge needed when the water level of the farthest downstream station (Guanyinyan Station) declines to the limited water level,Qmeis the discharge of the farthest downstream station that can generate the expected output,T1is the runoff forecast period,Kis the total time interval between current time and the starting time of flood season,T′ is the time needed for the water levels of all reservoirs to regress from the current water level to the limited water level when the farthest downstream station generates the expected output, andTuis the length of the unit time interval.

    5 Results verification

    Fig. 3 Calculation process and formulas during dry-flood transition period

    The data used is the daily runoff process within three typical years and a large number of simulated daily runoff processes. The computational processes have been given in Section 3. In this study, the results of the normal year are shown in figures for analyzing the operation processes. Comparison of the simulated operation processes of all hydropower stations based on the scheduling rules and the optimized operation processes obtained by the hybrid algorithm are shown in Fig. 4. However, these figures mostly refer to the processes between June and September because the scheduling processes of other months are almost unchanged. In other words, the water levels basically remain at the high water level. The comparison of power generation in three typical years is listed in Table 2 as well.

    Table 2 Comparison of power generation in three typical years

    Fig. 4 Comparison of optimized operation processes with simulated operation processes

    The following observations are made from the comparative study of the simulated operation and the optimized operation:

    (1) It is concluded from Fig. 4 that the output processes and the water level processes of all hydropower stations according to scheduling rules are basically the same as those optimized results.

    (2) Regarding to Liyuan Hydropower Station (Fig. 4(a)) and Longkaikou Hydropower Station (Fig. 4(d)), the starting time of pre-discharge scheduling of simulated operation is June 22 or so, while the starting time is around June 25 for optimized operation. Owing to the water levels of the two hydropower stations prematurely regressing from the normal water level to the limited water level, power generation from the two stations decreases. As shown in Table 2, the power generation decrease 0.16 × 108kW·h at Liyuan Hydropower Station, 0.456 × 108kW·h at Longkaikou Hydropower Station, and 1.081 × 108kW·h at Guanyinyan Hydropower Station in a normal year. Another reason for the power generation reduction of Longkaikou Hydropower Station may be that the pre-discharge scheduling is not adopted between August 30 and September 15. With regard to Guanyinyan Hydropower Station (Fig. 4(f)), the main reason for the power generation reduction may be that the pre-discharge scheduling is not adoptedbetween August 25 and September 10.

    (3) Increase in the power generation of simulated operation at Ahai Hydropower Station (Fig. 4(b)) and Jinanqiao Hydropower Station (Fig. 4(c)) may be attributed to the better control of the water level during the flood season. For example, the water level of Jinanqiao Hydropower Station decreased from 1 418 m to 1 405 m when the optimized operation was adopted between June 20 and July 1, while it decreased only from 1 418 m to 1 409.9 m when the simulated operation was adopted between June 16 and June 24. As shown in Table 2, the power generation increases 0.326 × 108kW·h at Ahai Hydropower Station, and 0.209 × 108kW·h at JinAnqiao Hydropower Station in a normal year.

    (4) All hydropower stations have adopted the joint pre-discharge scheduling before the cascade hydropower stations enter into the flood season according to the runoff prediction.

    (5) It can be shown from Table 2 that the results of annual power generation obtained by the scheduling rules are quite close to the optimized operation results. For a single hydropower station, the minimum relative difference of annual power generation is only 0.09% (Jinanqiao Hydropower Station in a dry year), and the maximum is also no more than 1% (Longkaikou Hydropower Station in a dry year). For cascade hydropower stations, the maximum relative difference of the total annual power generation is just 0.36% (in a dry year), and the relative differences in a wet year and normal year are smaller.

    6 Conclusions

    Through analysis of large numbers of optimized scheduling processes, this study highlights the short-time power generation scheduling rules for cascade hydropower stations. After further refining and summarizing these rules, a set of simple and practical formulas are eventually provided. Compared with many previous studies, the principle of the rules is so clear that it is easy to understand and the feasibility is relatively high. Moreover, compared with the optimized operation, these rules have high accuracy with a relative difference of less than 1% in annual power generation. Being different from the conventional optimal generation rules for hydropower stations, the rules can take full advantage of the rolling runoff forecast and carry out the rolling scheduling. In this way, the prediction error of a runoff forecast can be revised, and the negative impact on power generation dispatching is effectively reduced. The accuracy of the results is verified by a case study. Furthermore, the application of these formulas can be easily extended because of the simple form and specific meaning. Therefore, this study provides a new perspective in formulating the rules of power generation dispatching.

    Chen, L., McPhee, J., and Yeh, W. W. G. 2007. A diversified multiobjective GA for optimizing reservoir rule curves.Advances in Water Resources, 30(5), 1082-1093. [doi:10.1016/j.advwatres.2006.10.001]

    Goldberg, D. E. 1989.Genetic Algorithms in Search, Optimization and Machine Learning. New York: Addison-Wesley Publishing Company.

    Holland, J. H. 1975.Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applicationsto Biology, Control, and Artificial Intelligence. Cambridge: MIT Press.

    Hota, P. K., Barisal, A. K., and Chakrabarti, R. 2009. An improved PSO technique for short-term optimal hydrothermal scheduling.Electric Power Systems Research, 79(7), 1047-1053. [doi:10.1016/j.epsr. 2009.01.001]

    Huang, S. J. 1998. Hydroelectric generation scheduling: An application of genetic-embedded fuzzy system approach.Electric Power Systems Research48(1), 65-72. [doi:10.1016/S0378-7796(98)00091-1]

    Lakshminarasimman, L., and Subramanian, S. 2008. A modified hybrid differential evolution for short-term scheduling of hydrothermal power systems with cascaded reservoirs.Energy Conversion and Management, 49(10), 2513-2521. [doi:10.1016/j.enconman.2008.05.021]

    Li, A. Q., Wang, L. P., Li, J. Q., and Ji, C. M. 2009. Application of immune algorithm-based particle swarm optimization for optimized load distribution among cascade hydropower stations.Computers and Mathematics with Applications, 57(11-12), 1785-1791. [doi:10.1016/j.camwa.2008.10.016]

    Liang, R. H., and Hsu, Y. Y. 1995. A hybrid artificial neural network-differential dynamic programming approach for short-term hydro scheduling.Electric Power Systems Research, 33(2), 77-86. [doi:10.1016/ 0378-7796(95)00929-C]

    Liang, R. H. 1999. Application of grey relation analysis to hydroelectric generation scheduling.International Journal ofElectrical Power and Energy Systems, 21(5), 357-364. [doi:10.1016/S0142-0615(98)00055-6]

    Mahmoud, M., Dutton, K., and Denman, M. 2004. Dynamical modelling and simulation of a cascaded reservoirs hydropower plant.Electric Power Systems Research, 70(2), 129-139. [doi:10.1016/j.epsr. 2003.12.001]

    Mandal, K. K., and Chakraborty, N. 2011. Short-term combined economic emission scheduling of hydrothermal systems with cascaded reservoirs using particle swarm optimization technique.Applied Soft Computing, 11(1), 1295-1302. [doi:10.1016/j.asoc.2010.03.006]

    Nanda, J., Bijwe, P. R., and Kothari, D. P. 1986. Application of progressive optimality algorithm to optimal hydrothermal scheduling considering deterministic and stochastic data.International Journal of Electrical Power and Energy Systems,8(1), 61-64. [doi:10.1016/0142-0615(86)90026-8]

    Pérez-Díaz, J. I., Wilhelmi, J. R., and Sánchez-Fernández, J. A. 2010. Short-term operation scheduling of a hydropower plant in the day-ahead electricity market.Electric Power Systems Research, 80(12), 1535-1542. [doi:10.1016/j.epsr.2010.06.017]

    Romero, C. E., and Carter, J. N. 2001. Using genetic algorithms for reservoir characterisation.Journal of Petroleum Science and Engineering, 31(2), 113-123. [doi:10.1016/S0920-4105(01)00124-3]

    Xuan, Y. J., Mei, Y. D., and Xu, J. S. 2009. Research of hydropower stations optimal operation based on the discrete differential dynamic programming: Progressive optimization algorithm combination method.Proceedings of the 7th ACIS International Conference on Software Engineering Research, Management and Applications,25-29. Haikou. [doi:10.1109/SERA.2009.26]

    Yang, Z. J., Wang, L. P., Shao, L., and Wu, Y. Q. 2010. Drawing of the reservoir operation chart based on the particle swarm optimization algorithm.Power System Protection and Control, 38(14), 59-62.

    Yoo, J. H. 2009. Maximization of hydropower generation through the application of a linear programming model.Journal of Hydrology, 376(1-2), 182-187. [doi:10.1016/j.jhydrol.2009.07.026]

    Yu, S., Ji, C. M., Xie, W., and Liu, F. 2011. Instructional mutation ant colony algorithm in application of reservoir operation chart optimization.2011 Fourth International Symposium on Knowledge Acquisition and Modeling, 462-465. Sanya: IEEE.

    Yuan, X. H., and Yuan, Y. B. 2006. Application of cultural algorithm to generation scheduling of hydrothermal systems.Energy Conversion and Management, 47(15-16), 2192-2201. [doi:10.1016/ j.enconman.2005.12.006]

    This work was supported by the National Key Basic Research Development Program of China (Grant No. 2002CCA00700).

    *Corresponding author (e-mail:yxa@cup.edu.cn)

    Received Jan. 7, 2011; accepted Oct. 11, 2011

    只有这里有精品99| 久久综合国产亚洲精品| 久久亚洲精品不卡| 精品国产一区二区三区久久久樱花 | 亚洲av不卡在线观看| 男插女下体视频免费在线播放| 听说在线观看完整版免费高清| 亚洲18禁久久av| 亚洲伊人久久精品综合 | 国国产精品蜜臀av免费| 美女黄网站色视频| 久久99蜜桃精品久久| 神马国产精品三级电影在线观看| 汤姆久久久久久久影院中文字幕 | 亚洲在线观看片| 女的被弄到高潮叫床怎么办| 99久国产av精品国产电影| 日韩成人av中文字幕在线观看| 国产精品精品国产色婷婷| 九色成人免费人妻av| 欧美日韩精品成人综合77777| 亚洲精品亚洲一区二区| 人妻夜夜爽99麻豆av| 在线天堂最新版资源| 国产极品精品免费视频能看的| 欧美人与善性xxx| 可以在线观看毛片的网站| 老女人水多毛片| 亚洲国产成人一精品久久久| 91精品国产九色| 婷婷色av中文字幕| 禁无遮挡网站| 最近手机中文字幕大全| 日韩av在线大香蕉| 一夜夜www| 久久精品综合一区二区三区| 国产成人91sexporn| 亚洲欧美成人综合另类久久久 | 男人和女人高潮做爰伦理| 亚洲精品国产av成人精品| 午夜老司机福利剧场| 亚洲婷婷狠狠爱综合网| 女人十人毛片免费观看3o分钟| 青春草亚洲视频在线观看| 午夜亚洲福利在线播放| 我要看日韩黄色一级片| 久久久久久久午夜电影| 亚洲18禁久久av| 一边亲一边摸免费视频| 久久人人爽人人爽人人片va| 亚洲精品乱久久久久久| 日本wwww免费看| www日本黄色视频网| 成人三级黄色视频| 成人三级黄色视频| 亚洲精品成人久久久久久| 日本与韩国留学比较| 国产三级中文精品| 精品人妻偷拍中文字幕| 99视频精品全部免费 在线| 中文亚洲av片在线观看爽| 国产午夜福利久久久久久| 亚洲中文字幕一区二区三区有码在线看| 三级经典国产精品| 亚洲经典国产精华液单| 熟妇人妻久久中文字幕3abv| 国产精品人妻久久久久久| 免费一级毛片在线播放高清视频| 成人午夜精彩视频在线观看| 国产日韩欧美在线精品| 久久精品夜夜夜夜夜久久蜜豆| 精品国产三级普通话版| 国产精品久久久久久精品电影| 精品久久久久久电影网 | 亚洲欧美一区二区三区国产| 99久国产av精品国产电影| 日韩亚洲欧美综合| 亚洲va在线va天堂va国产| 美女内射精品一级片tv| 嫩草影院入口| 亚洲欧美清纯卡通| 大香蕉97超碰在线| 成人性生交大片免费视频hd| 熟女人妻精品中文字幕| 在线免费观看不下载黄p国产| 日本一二三区视频观看| av国产久精品久网站免费入址| 最后的刺客免费高清国语| 午夜老司机福利剧场| 国产精华一区二区三区| 老司机影院成人| 亚洲四区av| 成人性生交大片免费视频hd| 日韩 亚洲 欧美在线| 人妻系列 视频| 国产69精品久久久久777片| 国产单亲对白刺激| 青春草国产在线视频| 男人狂女人下面高潮的视频| 级片在线观看| 久久久精品大字幕| 亚洲人成网站在线观看播放| 亚洲性久久影院| 少妇高潮的动态图| 在线天堂最新版资源| 精品一区二区三区人妻视频| 三级男女做爰猛烈吃奶摸视频| 欧美区成人在线视频| 全区人妻精品视频| 纵有疾风起免费观看全集完整版 | 可以在线观看毛片的网站| 国产成人一区二区在线| 久久久久久久久久久免费av| 国产成人精品久久久久久| 国产爱豆传媒在线观看| av国产免费在线观看| 又粗又爽又猛毛片免费看| 国产精品电影一区二区三区| 波野结衣二区三区在线| 91av网一区二区| 成年女人看的毛片在线观看| 久久久国产成人精品二区| 日本午夜av视频| 成年版毛片免费区| av.在线天堂| 成人毛片60女人毛片免费| 中文字幕av成人在线电影| 日本午夜av视频| 久久这里只有精品中国| 97超视频在线观看视频| 国产国拍精品亚洲av在线观看| 国产亚洲91精品色在线| 精品久久久久久久久av| 久久精品影院6| 激情 狠狠 欧美| 久久综合国产亚洲精品| 国产精品久久视频播放| 亚洲高清免费不卡视频| 18禁裸乳无遮挡免费网站照片| 亚洲欧美一区二区三区国产| 国产精品久久久久久久久免| 99久久人妻综合| 久久精品国产鲁丝片午夜精品| 夜夜爽夜夜爽视频| 少妇的逼水好多| 精品久久久久久久人妻蜜臀av| 少妇的逼水好多| 不卡视频在线观看欧美| 一级黄色大片毛片| 欧美三级亚洲精品| 国内少妇人妻偷人精品xxx网站| 欧美性感艳星| av在线天堂中文字幕| 亚洲av一区综合| 国产精华一区二区三区| 久久久国产成人精品二区| 夜夜爽夜夜爽视频| 伦精品一区二区三区| 三级男女做爰猛烈吃奶摸视频| 亚洲中文字幕日韩| 亚洲精品亚洲一区二区| 日本午夜av视频| 黑人高潮一二区| 久久综合国产亚洲精品| 18禁在线无遮挡免费观看视频| 国产精品美女特级片免费视频播放器| 又爽又黄无遮挡网站| 亚洲精品影视一区二区三区av| 男女视频在线观看网站免费| 精品无人区乱码1区二区| 欧美高清性xxxxhd video| 免费人成在线观看视频色| 精品酒店卫生间| 久久久久久九九精品二区国产| www日本黄色视频网| 亚洲一级一片aⅴ在线观看| 一级毛片久久久久久久久女| 亚洲婷婷狠狠爱综合网| 亚洲欧美中文字幕日韩二区| 成人鲁丝片一二三区免费| 男女那种视频在线观看| 亚洲性久久影院| 纵有疾风起免费观看全集完整版 | 成人综合一区亚洲| 欧美人与善性xxx| 中文亚洲av片在线观看爽| 亚洲精品日韩av片在线观看| 免费电影在线观看免费观看| 国产精品精品国产色婷婷| 一区二区三区乱码不卡18| 精品人妻熟女av久视频| 久热久热在线精品观看| 国产日韩欧美在线精品| 中文资源天堂在线| 亚洲av日韩在线播放| 3wmmmm亚洲av在线观看| 国产一区亚洲一区在线观看| 最近中文字幕高清免费大全6| 久久国内精品自在自线图片| 成人二区视频| 国产伦精品一区二区三区四那| 亚洲色图av天堂| 三级国产精品欧美在线观看| 亚洲欧洲国产日韩| 国产精品三级大全| 国模一区二区三区四区视频| 国产亚洲一区二区精品| 欧美潮喷喷水| 人人妻人人澡人人爽人人夜夜 | 99热这里只有是精品50| 赤兔流量卡办理| 白带黄色成豆腐渣| 日本免费一区二区三区高清不卡| 婷婷六月久久综合丁香| 欧美一区二区国产精品久久精品| 午夜老司机福利剧场| 免费看日本二区| 欧美潮喷喷水| 欧美区成人在线视频| 精华霜和精华液先用哪个| 国产精品三级大全| 性色avwww在线观看| 91精品国产九色| 天堂av国产一区二区熟女人妻| 人体艺术视频欧美日本| 菩萨蛮人人尽说江南好唐韦庄 | 99国产精品一区二区蜜桃av| 乱系列少妇在线播放| 蜜桃久久精品国产亚洲av| 赤兔流量卡办理| 熟女电影av网| 看非洲黑人一级黄片| 亚洲国产欧美人成| 午夜免费激情av| 亚洲av不卡在线观看| 小蜜桃在线观看免费完整版高清| 精品国产露脸久久av麻豆 | 三级经典国产精品| 国产三级中文精品| 亚洲精品色激情综合| 日本爱情动作片www.在线观看| 国产精品嫩草影院av在线观看| 精品人妻一区二区三区麻豆| 日韩国内少妇激情av| 亚洲精品乱码久久久久久按摩| 最近最新中文字幕免费大全7| 亚洲欧美日韩卡通动漫| 久久人人爽人人片av| 成人一区二区视频在线观看| 麻豆久久精品国产亚洲av| 国产伦精品一区二区三区视频9| 深爱激情五月婷婷| 麻豆乱淫一区二区| 青春草视频在线免费观看| 熟女电影av网| 七月丁香在线播放| 亚洲精品影视一区二区三区av| 女人被狂操c到高潮| 亚洲人成网站在线观看播放| 永久网站在线| 色吧在线观看| 久久韩国三级中文字幕| 亚洲一区高清亚洲精品| 少妇的逼水好多| 欧美精品一区二区大全| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 国产人妻一区二区三区在| 日韩视频在线欧美| 国产精品一区二区性色av| 菩萨蛮人人尽说江南好唐韦庄 | 精品99又大又爽又粗少妇毛片| 黄色一级大片看看| 少妇人妻一区二区三区视频| 91久久精品国产一区二区三区| 51国产日韩欧美| 久久精品熟女亚洲av麻豆精品 | 日本一二三区视频观看| 亚洲av不卡在线观看| 亚洲在久久综合| 五月伊人婷婷丁香| 欧美激情在线99| 国产91av在线免费观看| 日韩,欧美,国产一区二区三区 | 麻豆av噜噜一区二区三区| 搞女人的毛片| 免费看a级黄色片| 免费看美女性在线毛片视频| 日韩一区二区三区影片| 亚洲成av人片在线播放无| av播播在线观看一区| 一级毛片久久久久久久久女| 嘟嘟电影网在线观看| 精品少妇黑人巨大在线播放 | 午夜激情欧美在线| 小蜜桃在线观看免费完整版高清| 亚洲激情五月婷婷啪啪| 久久久久久大精品| 国产乱来视频区| 久久久久久久久中文| 国产极品天堂在线| 国产视频首页在线观看| 国产精品一二三区在线看| 欧美人与善性xxx| 精华霜和精华液先用哪个| 我要搜黄色片| 国产v大片淫在线免费观看| 国产午夜精品论理片| 久久99蜜桃精品久久| 国产精品女同一区二区软件| 成年免费大片在线观看| 中文资源天堂在线| 91aial.com中文字幕在线观看| 在线观看美女被高潮喷水网站| 日韩一区二区三区影片| 国产成人一区二区在线| 国产一区二区三区av在线| 搡老妇女老女人老熟妇| 免费看日本二区| 成年版毛片免费区| www.色视频.com| 丰满少妇做爰视频| 国产成人a区在线观看| 成人毛片a级毛片在线播放| 欧美性猛交黑人性爽| 国产亚洲一区二区精品| 不卡视频在线观看欧美| 国产真实伦视频高清在线观看| 校园人妻丝袜中文字幕| 亚洲欧美精品综合久久99| 欧美人与善性xxx| 久久久久精品久久久久真实原创| 国产精品人妻久久久影院| 一本久久精品| 国产色婷婷99| 亚洲av中文av极速乱| 我要搜黄色片| 国产精品久久电影中文字幕| 中文亚洲av片在线观看爽| 九色成人免费人妻av| 三级国产精品片| 国产伦理片在线播放av一区| 亚洲精品成人久久久久久| av国产久精品久网站免费入址| 国产精品麻豆人妻色哟哟久久 | 免费观看在线日韩| 亚洲av成人精品一二三区| 丰满少妇做爰视频| 中文字幕久久专区| 亚洲精品,欧美精品| 99在线人妻在线中文字幕| 国产乱来视频区| 少妇熟女aⅴ在线视频| 男女下面进入的视频免费午夜| 久久韩国三级中文字幕| 久久久a久久爽久久v久久| 两个人的视频大全免费| 爱豆传媒免费全集在线观看| 性色avwww在线观看| 中文字幕人妻熟人妻熟丝袜美| 日本-黄色视频高清免费观看| 亚洲欧美日韩无卡精品| 国产亚洲午夜精品一区二区久久 | 少妇熟女aⅴ在线视频| 国产成人91sexporn| 一区二区三区乱码不卡18| 十八禁国产超污无遮挡网站| 91久久精品电影网| 一级毛片久久久久久久久女| 久久精品国产鲁丝片午夜精品| 一级毛片aaaaaa免费看小| 91精品国产九色| 三级经典国产精品| 国产午夜精品久久久久久一区二区三区| 国产精品精品国产色婷婷| 久久精品国产亚洲av天美| 国内精品一区二区在线观看| 精品久久久久久久久亚洲| 亚洲av成人av| 精品人妻熟女av久视频| 久久这里有精品视频免费| 免费看a级黄色片| 一夜夜www| 久久精品国产亚洲av天美| 国产精品一区二区三区四区免费观看| 中文字幕人妻熟人妻熟丝袜美| 成人性生交大片免费视频hd| 看黄色毛片网站| 哪个播放器可以免费观看大片| 亚洲五月天丁香| 看片在线看免费视频| 2021天堂中文幕一二区在线观| 一区二区三区乱码不卡18| 天堂av国产一区二区熟女人妻| 亚洲自拍偷在线| 亚洲精品国产av成人精品| 久久久欧美国产精品| 黄片wwwwww| 2021少妇久久久久久久久久久| 久久久欧美国产精品| 色综合亚洲欧美另类图片| 成人性生交大片免费视频hd| 国产免费男女视频| 97超视频在线观看视频| 免费黄色在线免费观看| 国内精品一区二区在线观看| 亚洲18禁久久av| 建设人人有责人人尽责人人享有的 | 尾随美女入室| 国产精品久久久久久精品电影| 免费在线观看成人毛片| 一个人看的www免费观看视频| 黑人高潮一二区| 久久精品国产亚洲网站| 一级黄色大片毛片| 91久久精品国产一区二区三区| av线在线观看网站| 亚洲精品亚洲一区二区| 日韩高清综合在线| 国产又色又爽无遮挡免| 久久久久久伊人网av| 久久久久性生活片| 亚洲成人av在线免费| 国产一区二区在线av高清观看| 亚洲图色成人| 男女啪啪激烈高潮av片| 久久韩国三级中文字幕| 亚洲av中文字字幕乱码综合| 亚洲av成人精品一二三区| 国产精品美女特级片免费视频播放器| 国语自产精品视频在线第100页| 国产欧美另类精品又又久久亚洲欧美| 久久久国产成人免费| .国产精品久久| 九九热线精品视视频播放| 夫妻性生交免费视频一级片| 精品一区二区免费观看| 非洲黑人性xxxx精品又粗又长| 国产爱豆传媒在线观看| 3wmmmm亚洲av在线观看| 国产真实乱freesex| 天天一区二区日本电影三级| 国产成人精品婷婷| 亚洲人成网站在线播| 欧美精品一区二区大全| 成人午夜高清在线视频| 国产成人a区在线观看| 成人国产麻豆网| 最近的中文字幕免费完整| 欧美最新免费一区二区三区| 久久久精品94久久精品| 天堂影院成人在线观看| 欧美日本亚洲视频在线播放| 国产精华一区二区三区| 两性午夜刺激爽爽歪歪视频在线观看| 久久人人爽人人爽人人片va| 亚洲国产成人一精品久久久| 成人毛片a级毛片在线播放| 91在线精品国自产拍蜜月| av专区在线播放| 日本wwww免费看| 建设人人有责人人尽责人人享有的 | 99九九线精品视频在线观看视频| 午夜爱爱视频在线播放| 国产欧美日韩精品一区二区| 成年女人看的毛片在线观看| 菩萨蛮人人尽说江南好唐韦庄 | a级毛色黄片| 免费一级毛片在线播放高清视频| 大香蕉久久网| 精品不卡国产一区二区三区| 91久久精品电影网| 亚洲国产精品成人综合色| 国产亚洲精品av在线| АⅤ资源中文在线天堂| 久久精品国产鲁丝片午夜精品| 汤姆久久久久久久影院中文字幕 | 男女国产视频网站| 天堂网av新在线| 99热网站在线观看| 男人狂女人下面高潮的视频| 欧美一区二区精品小视频在线| 一边摸一边抽搐一进一小说| 亚洲在久久综合| 国国产精品蜜臀av免费| 一级爰片在线观看| 搡女人真爽免费视频火全软件| 国产乱来视频区| 边亲边吃奶的免费视频| 久久久久九九精品影院| 亚洲经典国产精华液单| 免费大片18禁| 直男gayav资源| 亚洲成人中文字幕在线播放| 亚洲欧美一区二区三区国产| 亚洲电影在线观看av| 亚洲aⅴ乱码一区二区在线播放| 日韩成人伦理影院| 麻豆国产97在线/欧美| 午夜久久久久精精品| 免费播放大片免费观看视频在线观看 | 中文乱码字字幕精品一区二区三区 | 嘟嘟电影网在线观看| 久久久午夜欧美精品| 国产片特级美女逼逼视频| 国产熟女欧美一区二区| 国产免费视频播放在线视频 | 亚洲最大成人中文| 久久久久久久午夜电影| 啦啦啦观看免费观看视频高清| 爱豆传媒免费全集在线观看| 欧美高清性xxxxhd video| av播播在线观看一区| 午夜激情欧美在线| 国内精品美女久久久久久| 一边摸一边抽搐一进一小说| 国产精品.久久久| 久久99热这里只频精品6学生 | 男人舔奶头视频| 国产精品久久久久久精品电影小说 | 99久久精品一区二区三区| 色吧在线观看| 中文字幕人妻熟人妻熟丝袜美| 少妇被粗大猛烈的视频| 超碰97精品在线观看| 蜜臀久久99精品久久宅男| 非洲黑人性xxxx精品又粗又长| 国产精品综合久久久久久久免费| 国内精品宾馆在线| 欧美不卡视频在线免费观看| 岛国在线免费视频观看| 内射极品少妇av片p| 超碰av人人做人人爽久久| 日韩在线高清观看一区二区三区| 国产精品日韩av在线免费观看| 大又大粗又爽又黄少妇毛片口| 国产精品人妻久久久影院| 观看免费一级毛片| 色吧在线观看| 中文在线观看免费www的网站| 久久99热这里只有精品18| 一卡2卡三卡四卡精品乱码亚洲| 精品久久久久久久久亚洲| 18禁动态无遮挡网站| 97人妻精品一区二区三区麻豆| 国产亚洲一区二区精品| 国产精品福利在线免费观看| 国产中年淑女户外野战色| 亚洲精品日韩在线中文字幕| 国产精品美女特级片免费视频播放器| 精品一区二区三区人妻视频| 午夜精品在线福利| 国产免费福利视频在线观看| 99久国产av精品国产电影| 欧美日韩一区二区视频在线观看视频在线 | 18禁在线无遮挡免费观看视频| 精品酒店卫生间| 性插视频无遮挡在线免费观看| 波野结衣二区三区在线| 成人无遮挡网站| 日本免费在线观看一区| 日本欧美国产在线视频| 两个人的视频大全免费| 亚洲欧美中文字幕日韩二区| 国产女主播在线喷水免费视频网站 | 免费不卡的大黄色大毛片视频在线观看 | 日韩高清综合在线| 夜夜看夜夜爽夜夜摸| 日本一二三区视频观看| 身体一侧抽搐| 精品人妻熟女av久视频| 国产亚洲5aaaaa淫片| 亚洲一区高清亚洲精品| 亚洲精品成人久久久久久| 国产精品蜜桃在线观看| 哪个播放器可以免费观看大片| 国产精品伦人一区二区| 久久国产乱子免费精品| 国产精品伦人一区二区| 久久这里只有精品中国| 乱码一卡2卡4卡精品| 美女黄网站色视频| 精品久久久噜噜| 一级毛片电影观看 | 久久99精品国语久久久| 国产视频内射| 成人三级黄色视频| 中文字幕免费在线视频6| 久久精品夜夜夜夜夜久久蜜豆| 国产在线一区二区三区精 | 久久国内精品自在自线图片| 日韩欧美 国产精品| 乱系列少妇在线播放| 日韩一本色道免费dvd| 国产亚洲一区二区精品| 五月伊人婷婷丁香| 国产在线一区二区三区精 | 精品一区二区三区视频在线| 精品人妻偷拍中文字幕| 久久久久性生活片| 精品久久久久久久久亚洲| 九九爱精品视频在线观看| 国产私拍福利视频在线观看| 99热精品在线国产| 欧美性猛交黑人性爽| 国产精品乱码一区二三区的特点| 少妇猛男粗大的猛烈进出视频 | 最近的中文字幕免费完整| 2021天堂中文幕一二区在线观| 国产精品久久久久久久久免| 久久这里只有精品中国| 国产亚洲av片在线观看秒播厂 | 一区二区三区高清视频在线| 99热6这里只有精品| 黄片wwwwww| 十八禁国产超污无遮挡网站|