    Overcoming the Logistical Constraints of Ultra-LongUndersea Tunnels

    2011-12-28 06:05:32GarethMainwaring
    關(guān)鍵詞:沉箱成孔重力

    Gareth Mainwaring

    (Metros& Civil Engineering,Mott MacDondld,England)

    1 Background

    Rail is now being seen as a more sustainable solution to long-distance travel compared with air flights.More high-speed lines are being designed and built all around the world:throughout Europe,in China,Korea,Japan,Taiwan,and now in India.Further schemes are in the planning stages in North America,Brazil,South Africa,Australia and the Middle East.Although a world-wide network of high speed rail lines would currently appear to be impractical,there is still a desire to link each of the continental networks.The Channel Tunnel between UK and France has initiated that target for Europe,and the AlpTransit project which is currently under construction will further extend the network.It will be possible to travel throughout Europe by high-speed trains within the next few years.

    The possibility of forming a similar system in North-East Asia,by connecting the rail lines in China,Taiwan,Korea and Japan is impeded by the geography of the region.The rail links would require the construction of a number of deep sea tunnels,all of which would be considerably longer than have ever been built to date.It is recognised that the construction of fixed links between Japan and Korea,China and Taiwan,and more recently between South Korea and China–thus avoiding North Korea,have long been the pipedreams of both engineers and politicians.Similarly the construction of a trans-Atlantic tunnel and a connection between North America and Russia are regularly featured on television programmes.A practical means of building ultra-along undersea tunnels remains a major challenge.

    However,the solution for undertaking such major transportation projects may already exist:using the proven technology that has been used for the past 30 years in the oil and gas industry–the use of the gravity structures that have been constructed in areas such as the North Sea between UK and Scandinavia in Northern Europe.

    2 Construction Logistics

    Although the overall length of the Channel Tunnel is 50 km from portal to portal,the undersea portion is 38km in length.The tunnelling sites were located closer to the coastlines,and the longest of the tunnel drives was 22 km–which is that of the undersea portion extending from the UK coastline.The Seikan Tunnel is 53.8 km in total length,but only 23.3 km is undersea.Again the undersea portion was excavated from both shorelines,so the longest of the tunnel drives was of the order of 12 km.

    The most recent ultra-long tunnel is not an undersea project,but the Gotthard Base Tunnel of the Alp-Transit Project which passes underneath a mountain range.The total length of this tunnel is 57 km,but with the use of intermediate shafts and access adits,the longest of the tunnel drives is 14km.Although it could have been possible to construct this project by minimising the number of tunnel drives,and the longest drives would have been comparable with those used for both the Channel Tunnel and Seikan Tunnels,it was considered that the most cost-effective way to construct the AlpTransit Project was to use multiple drives,via a number of shafts and adits the deepest of which was 800 m deep.

    One of the major considerations with the construction logistics of tunnels is accessibility and the delivery of materials-and personnel-to the working face and the efficient removal of spoil.Above all is the provision of a safe working environment for the workforce.

    The locomotives that are used to deliver tunnel segments and the workforce to the TBM are not highspeed trains,but generally operate at speeds of between 15-20 km/h.Indeed in the confines of a tunnel under construction it would be unsafe to operate locomotives at a speed which would be hazardous to the workers within the tunnel.Additionally,the faster the locomotive speed,then the greater the power they require,and if diesel powered,the greater the heat generated and the exhaust emissions created.Thus the ventilation ducts to the tunnel face increases in size.Overhead line power could be provided,but there are associated safety considerations with such a choice.

    The temporary track installed for a construction locomotive is also not compatible with high speeds.For the Channel Tunnel,a high performance temporary track was installed which allowed the locomotives to travel at a maximum permissible speed of 30 km/h.However,towards the end of the tunnel drives,when the length of the tunnel exceeded 20 km,then it took the workforce almost an hour to reach the TBM,and a similar duration at the end of the shift to exit the tunnel.Labour costs quickly become a major factor when 20%of each working day is spent travelling to the tunnel face.Ultra-long tunnels would encounter even greater travel times,and it is considered that these considerations would have been a major factor in the construction of the intermediate shafts and adits for the Gotthard Base Tunnel.

    The examples described above,together with another major undersea tunnel,Storebaelt Railway Project in Denmark,all are based on the premise that the TBM drives are converging.Thus in the event that a major breakdown is experienced with one of the tunnelling machines then the other TBM can continue for a further distance than originally planned.A major TBM breakdown in an ultra-long undersea tunnel,when it is impossible to form an intervention shaft,and the opposite TBM has a an excessive distance to tunnel would compound all the logistical issues mentioned above,plus would probably exceed the capabilities of the TBM itself,necessitating a number of major overhauls which would impact on the construction programme.

    Again,the use of multiple tunnel drives for the Gotthard Base Tunnel would seem to be a logical decision.The issue for consideration would be how to provide the intermediate staging point for an ultra-long tunnel that is located in the deep sea?

    3 Operational Requirements

    3.1 Temperature

    Electrical power used by locomotives in overcoming aerodynamics and rolling resistances degrades into heat.Within a tunnel environment,this is supplemented by heat from power losses,train air conditioning systems and tunnel services.The average level of heat generated in the Channel Tunnel has been calculated at 80MW,with only 10MW conducted away through rock strata and tunnel ventilation.

    A cooling system is therefore needed to maintain air temperatures below 25°C.Without cooling,air temperatures could reach 50°C after 2 to 3 months – and this is in the temperate climate of Northern Europe.The cooling of the tunnel is provided by water chilled to 3℃which is circulated through 400 mm pipes mounted on the walls of the running tunnels.Longer tunnels would require larger pipes,as the water temperature could not be lowered any further.

    3.2 Air Quality

    Maintaining air quality during the operations of the tunnel is a fundamental design issue for the safety of the users of the system.Generally fresh air is pushed through the running tunnels by the movement of trains.However,if a central services tunnel is required,then other means of ventilation is needed.For the Channel Tunnel there are two ventilation systems within the tunnels:the normal ventilation system(NVS),and the supplementary ventilation system(SVS),which is used during emergency conditions.

    The NVS provides fresh air to the service tunnel from fans located at each of the shorelines.The capacity of these fans and the provision of air-control devices in the cross-passages ensure that the air in the service tunnel is separated from the running tunnels and is kept pressurised at all times.

    The emergency SVS provides smoke control and purging of the running tunnels in the event of a fire.Again,the fans are located on each of the shorelines.The SVS fans for the Channel Tunnel supply 300 m3/s of air directly into the running tunnels,sufficient to induce longitudinal airflows around stationary trains.

    Obviously larger or additional fans could be provided to supply the necessary ventilation systems for longer tunnels.However,the relationship between tunnel length and fan capacity is not linear,and the complexity of the ventilation design increases with the length of the tunnel as there are likely to be more trains within the tunnel.The provision of intermediate ventilation installations would greatly benefit the efficiency of the air quality systems.However,this is not practical with undersea tunnels unless an intermediate connection to surface can be provided.

    3.3 Drainage

    To reduce hydrostatic loads on the tunnel linings,small groundwater flows are permitted through the joints of the segmental concrete linings used for the Channel Tunnel.The seepage water is collected in a carrier drain located in the invert of each of the tunnels,and is collected in two pump stations located 5 km and 15 km from the shorelines.

    The collected seepage water is then pumped back to the mainland via four pipes,each 400 mm in diameter which are located in the service tunnel.The space provisions for these pipes has a significant impact on the diameter of the service tunnel.

    3.4 Fire & Life Safety

    One of the major considerations in the design of a transportation tunnel is the provision of a place of safety in the event of a major incident such as a fire occurring in the tunnel.This is usually accommodated by the provision of cross passages or escape routes to allow passengers to vacate the incident tunnel.Any new tunnel would be designed in full accordance with international safety requirements irrespective of length of tunnel.However,for an ultra-long tunnel,a major issue comes with access for emergency services and evacuation of injured people if incident occurred a long way from the shoreline.The international standards do not give precise guidelines on the time required for the emergency services to reach the scene of the incident,or to attend to casualties.For facilities such as the Channel Tunnel,a dedicated response crew is employed so that any incident can be responded to immediately.However,the incident could still occur 25 km away from where the response crew is based,and the time for them to reach the scene would be longer than for an accident occurring in an urban environment.For an ultra-long tunnel,the time could be considerably longer and potentially unacceptable in terms of safety.

    3.5 Conclusion

    It is considered that any ultra-long transportation tunnel which will accommodate people would benefit by the inclusion of intermediate access point along the route.This has been provided for the AlpTransit project,but would seem to be impractical for undersea tunnels unless islands are formed along the align-ment.However,for most undersea tunnels the sea depth would generally be in excess of 100 metres,which would make the formation of man-made islands impossible.Other options should therefore be investigated.

    4 Off-Shore Gravity Structures

    One method of providing intermediate“islands”along the length of a major undersea tunnel,which would not only be of benefit for the construction logistics but would also provide a means of compartmentalising the overall tunnel into manageable section,would be to use the proven technology gained from the oil industry(Fig.1).

    It is possible to locate a number of major concrete gravity structures along the alignment.These gravity structures have been successfully used for over 30 years for oil and gas production mainly in the Norwegian sector of the North Sea.Installation depths of over 300 m greatly exceed those to be encountered on any tunnel route between say Japan and Korea,or between China and Taiwan.

    The Draugen platform in the Norwegian sector of the North Sea is the model for the structures intended for use in the ultra-long undersea tunnel.It has a central shaft of 20 m diameter and accommodation modules for the workforce are secured on the topsides superstructure.The design of the operational support systems on the“topsides”is greatly simplified and rendered safer by the absence of the pressurised hydrocarbons and associated process plant that is required for the oil and gas industry.The structures would instead be used as construction sites for the proposed tunnel,with tunnelling being carried out in two directions from each structure.

    The space available on the“topside”is more than adequate for accommodating the personnel required for manning the multiple TBMs that would undertake the tunnelling works and for the generators and workshops required to support the tunnelling operations.Tunnel segments would be delivered by barges which could be moored alongside the platform.

    For the permanent works,the structures would provide the means of ventilating the ultra-long tunnel,the discharging of drainage water,and would also provide emergency access/egress points along the route.It is the novel use of this proven technology which can provide the means of overcoming the logistical constraints of both constructing and operating an ultra long undersea tunnel.

    Fig.1 Gravity structures used in the off-shore oil& gas industry圖1 海岸石油和天然氣重力結(jié)構(gòu)

    5 Construction Methodology

    If it were to be assumed that the configuration of a major undersea tunnel would be similar to that of the Channel Tunnel,i.e.2 × running tunnels plus a central service tunnel,then each of the intermediate construction shafts would need to service the construction of six tunnel faces concurrently-again assuming that tunnelling would need to progress in two directions from each shaft.The most practical way this could be undertaken would be via a large cavern formed below the sea bed at each of the shaft locations.

    One of the main considerations in the feasibility of the proposed construction method is the means of securing the gravity structure into the seabed,and the logistics for different ground conditions are assessed in greater detail as follows.At each location selected as a site for a concrete structure,the seabed would need to be surveyed in order to establish which method would be used for the installation of the base.

    The use of caissons to penetrate the upper soils and provide a solid connection into the underlying rock is again proven technology(Fig.2).The caisson would have internal dimensions which would permit subsequent passage of drilling and tunnelling equipment,and a wall thickness which would resist all loads encountered during installation and operation.Pipework through which jetting mud and fixing/sealing grouts can pass would be incorporated into the walls of the caisson,with the fluids being pumped from surface vessels typically through flexible piping attached to the top of the caisson.

    Fig.2 Use of caissons for penetrating overlying soft ground圖2 穿過軟土層沉箱示意

    At the bottom of the caisson would be a cutting profile,preferably of steel,as typically employed in the civil engineering sector.The caisson can penetrate the soil by a combination of self-weight,jetting,and by excavation of soil inside the caisson as required to reduce wall friction.In the event that these measures are insufficient to set the caisson at required depth,piledriving equipment attached to the caisson through an appropriate interface-the tieback liner to be subsequently installed is such an interface-would ensure final attainment of setting depth.

    Upon reaching the bedrock,under-reaming drilling would be used to remove rock immediately below the caisson to allow penetration to a required depth.The drilling equipment would be mounted onto an integral circumferential rail sited on the bore of the caisson and would be powered by drilling mud:cuttings would be removed by a suction system as part of the drilling equipment.The weight of the caisson can be suspended and controlled during drilling operations.After attaining the requisite depth,the caisson is cemented into place with sufficient volume of concrete to ensure that the bore of the caisson is sealed.In order to direct the slurry towards the outside of the caisson,a weighted cover would be landed on the caisson just prior to pumping of concrete.On completion of cementing and after waiting on concrete to harden,its integrity can be tested by pressuring the inside of the caisson through the weight cap.

    The gravity structure would then be towed over the caisson and landed on the surrounding soil.After landing the structure,successive caisson elements would be landed through the shaft of the structure and cemented to each other until the stacked elements comprise a liner reaching the surface of the structure.The water within the caisson shaft can now be pumped out and shaft sinking operations inside and below the liner may commence.This configuration is necessary to ensure that no loading is transferred to the sealing caisson from the structure set on the soil.It should also be noted that,in the absence of a seal between the structure and liner,there is a hydrostatic pressure in the annulus between the structure and the liner.The completed system is shown in Fig.3.

    Fig.3 Completed shaft and cavern圖3 成孔情況示意

    Where the seabed is of rock or with light removable topsoil cover,a different method must be employed as preparation for the landing of the gravity structure.On the area of seabed where the base would be landed,a pattern of fixing posts would need to be drilled and cemented.If necessary,the surface on the target seabed could be modified by excavation.The base would be landed in the target and the posts would pass through columnar elements in the base.Concrete would then be pumped through the base via integrated pipes to expel all seawater underneath the base and also to cement the base to the posts.After the concrete has set,the gravity structure can be landed on the base.The interface area between the extended column of the base and the structure shall then be cemented via piping integral to the structure.The water column inside the shaft of the structure can be pumped out after this concrete sets:all paths for ingress of seawater into the central shaft have been sealed by concrete.

    After completion of pumping operations for either of the methods of landing preparation,a shaft would be formed through the ground rock and would be of a diameter of sufficient size to allow passage of elements of tunnel-boring machines(TBMs)which would be assembled in a cavern.The cavern would provide an assembly workshop for the TBMs,and the muck from each face would be conveyed up the shaft to the topsides unit for loading onto ships which would transport the muck to disposal sites.The cavern can serve as a crossover when the tunnel is completed,which is of benefit to subsequent rail operations.

    The methods and procedures stated would be repeated at each location of concrete structure.

    6 Major Benefits

    The benefits of intermediate staging points for tunnel construction are numerous.Not only can work be carried out more quickly,by undertaking a number of faces simultaneously,but the overall flexibility of the construction programme is enhanced.Should one TBM suffer a major breakdown then the opposite TBM would still be working and the meeting point would be adjusted accordingly.The overall construction schedule is also shortened considerably with multiple drives.

    It would be expected that during the construction of a long tunnel that a variety of ground conditions would be encountered.If such a tunnel were to be constructed from a single face,then the TBM would need to be designed to cope with all the different types of ground conditions.The efficiency of the TBM and production rates would be likely to suffer as the“one size fits all”machine is not specifically tailored to the conditions at a particular location.By dividing the overall tunnel into a number of smaller sections,it may be possible to build the tunnel with TBMs that are specifically designed to the ground conditions along that section.

    The operation of the completed facility would also see benefits as the shafts would be utilised as permanent ventilation points along the length of the tunnel,and would also serve as emergency escape routes in the event of an incident.The location of wind turbines and solar panels on each of the gravity structures could also provide an energy efficient means of providing power for the ventilation fans and the other services required to operate the facility.This could also reduce the number of sub-stations that would normally be required to be installed within the tunnel itself.

    7 Potential Applications

    A number of routes have been identified where fixed links are desired.A link between Japan and Korea has been the subject of a number of studies extending many years.The shortest route for this link would require an undersea tunnel of 128 km in length,but with a maximum water depth of 220 m for this particular route.Shallower water depths can be identified,but the associated tunnel lengths are greater.

    More recently a tunnel linking South Korea and China has been discussed,the route of which across the Yellow Sea from near Incheon in Korea to Shandong region in China would require a tunnel in excess of 300 km to be formed under the sea.It is noted that there are no islands in the Yellow Sea to simplify the construction logistics.However,the use of gravity structures would be an obvious solution.

    A tunnel across the Taiwan Straits to link mainland China with Taiwan would be approximately 150 km in length.The depth of the sea is approximately 70 m,which is well within the range of the gravity structures described in this paper.The use of 4 gravity structures to form intermediate staging points along the route would allow the tunnel to be divided into 5 sections,each 30 km in length.The longest tunnel drive would then be 15 km,which is similar to the longest drive on the Gotthard Base Tunnel.It is acknowledged that any platform located in the Taiwan Straits would need to be designed to resist major seismic loadings and the adverse weather conditions encountered during typhoons.However,the fact that these types of structures have been built in the harsh environment of the North Sea,and are still operational after 30 years demonstrates that these challenges can be met.

    8 Conclusions

    It is recognised that more transportation links are being constructed all around the world,and that high speed rail lines are being considered as a more sustainable option than air travel.The next stage of the evolution of the fixed links would be the construction of major undersea tunnels that would eclipse the Channel Tunnel in terms of length and complexity.

    It can be demonstrated that a viable method for constructing these ultra-long undersea tunnels already exists,and the method proposed has major benefits for both the construction logistics and the long-term operations of the rail link.

    The use of technology developed by the Oil&Gas industry would seem to have major benefits in providing sustainable solutions to some of the world’s transport requirements.

    [1]Sharp A,Mainwaring G D.Method for the Accelerated Construction of Ultra-Long Subsea Tunnels(Japan-Korea/China-Taiwan)[C].Seoul,Korea:3rd CECAR Conference,2004.

    [2]Southwood A J.The Channel Tunnel,A Designer’s Perspective[M].Croydon:Mott MacDondld International Ltd.,1994.

    [3]Hee Soon Shin.Use of Underground Space in Korea[M].Korea:Tunnels & Tunnelling International,2011.

    猜你喜歡
    沉箱成孔重力
    阿爾及利亞BETHIOUA礦業(yè)碼頭工程沉箱安裝施工技術(shù)
    瘋狂過山車——重力是什么
    不良地質(zhì)情況下機(jī)械成孔灌注樁的施工
    沖擊成孔混凝土灌注樁施工技術(shù)
    沉箱出運(yùn)安裝施工技術(shù)分析
    小型傾倒沉箱打撈扶正施工技術(shù)
    城市地下綜合管廊成孔技術(shù)探討
    江西建材(2018年4期)2018-04-10 12:37:12
    雜填土區(qū)灌注樁成孔方案比選分析
    仰斜式重力擋土墻穩(wěn)定計(jì)算復(fù)核
    一張紙的承重力有多大?
    亚洲在久久综合| 一本久久精品| 黑人高潮一二区| 亚洲av福利一区| or卡值多少钱| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 亚洲av.av天堂| 色综合亚洲欧美另类图片| 久久久久精品久久久久真实原创| 亚洲欧美成人综合另类久久久 | 中文字幕亚洲精品专区| 国产精品乱码一区二三区的特点| 在线观看一区二区三区| 欧美成人a在线观看| 久热久热在线精品观看| 伦理电影大哥的女人| 亚洲精品自拍成人| 我要看日韩黄色一级片| 国产麻豆成人av免费视频| 青春草视频在线免费观看| 在线天堂最新版资源| 少妇被粗大猛烈的视频| 日本爱情动作片www.在线观看| 韩国av在线不卡| 亚洲av中文字字幕乱码综合| 国产高潮美女av| 亚洲av免费在线观看| 成人无遮挡网站| 蜜桃久久精品国产亚洲av| 亚洲在久久综合| 村上凉子中文字幕在线| 日日干狠狠操夜夜爽| 亚洲一区高清亚洲精品| 欧美+日韩+精品| 2021天堂中文幕一二区在线观| 九九热线精品视视频播放| 国产真实乱freesex| 日韩视频在线欧美| 国产爱豆传媒在线观看| 我要看日韩黄色一级片| 特大巨黑吊av在线直播| 人人妻人人澡人人爽人人夜夜 | 五月玫瑰六月丁香| 日韩 亚洲 欧美在线| 美女被艹到高潮喷水动态| 成人毛片60女人毛片免费| 爱豆传媒免费全集在线观看| 国产精品嫩草影院av在线观看| 最近最新中文字幕大全电影3| 国产高清不卡午夜福利| 婷婷六月久久综合丁香| 亚洲欧美清纯卡通| 99热精品在线国产| 精品人妻偷拍中文字幕| 我要搜黄色片| 一级av片app| 国产成人一区二区在线| 男人舔女人下体高潮全视频| 国产免费视频播放在线视频 | 国语自产精品视频在线第100页| 黄片wwwwww| 亚洲国产成人一精品久久久| 国产成人一区二区在线| 草草在线视频免费看| 卡戴珊不雅视频在线播放| 18禁动态无遮挡网站| 少妇熟女aⅴ在线视频| 五月伊人婷婷丁香| 一区二区三区乱码不卡18| 中文字幕亚洲精品专区| 久久精品91蜜桃| 国产成年人精品一区二区| 一本一本综合久久| 在线播放无遮挡| 只有这里有精品99| 丝袜美腿在线中文| 亚洲在线自拍视频| 身体一侧抽搐| 国产成人福利小说| 国产精品一二三区在线看| 国产成人午夜福利电影在线观看| av在线观看视频网站免费| 超碰av人人做人人爽久久| 啦啦啦啦在线视频资源| 亚洲av二区三区四区| 亚洲欧美成人综合另类久久久 | 日韩人妻高清精品专区| 淫秽高清视频在线观看| 内地一区二区视频在线| 最近中文字幕2019免费版| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 欧美精品国产亚洲| a级毛色黄片| 亚洲无线观看免费| 美女大奶头视频| 成人午夜高清在线视频| 亚洲久久久久久中文字幕| 伦理电影大哥的女人| 菩萨蛮人人尽说江南好唐韦庄 | 99久久九九国产精品国产免费| 久久亚洲精品不卡| 亚洲国产色片| 伊人久久精品亚洲午夜| 久久亚洲精品不卡| 国产美女午夜福利| 少妇熟女aⅴ在线视频| 搡女人真爽免费视频火全软件| 亚洲国产最新在线播放| 精品久久久久久久人妻蜜臀av| 汤姆久久久久久久影院中文字幕 | 性色avwww在线观看| 黄色欧美视频在线观看| 国产精品无大码| 亚洲欧美日韩卡通动漫| 中文字幕久久专区| 亚洲欧美精品专区久久| 午夜老司机福利剧场| 国产一区有黄有色的免费视频 | 精品久久久久久久久亚洲| 欧美成人a在线观看| 国产大屁股一区二区在线视频| 寂寞人妻少妇视频99o| 精品久久国产蜜桃| 干丝袜人妻中文字幕| 伦理电影大哥的女人| 国产精品,欧美在线| 中文乱码字字幕精品一区二区三区 | 久久人妻av系列| 1000部很黄的大片| 日日摸夜夜添夜夜爱| 精品久久久久久久久久久久久| 午夜福利在线观看免费完整高清在| 亚洲内射少妇av| 麻豆乱淫一区二区| 精品国产一区二区三区久久久樱花 | 久久国内精品自在自线图片| 国产欧美日韩精品一区二区| 亚洲成人精品中文字幕电影| 春色校园在线视频观看| 赤兔流量卡办理| 哪个播放器可以免费观看大片| 亚洲婷婷狠狠爱综合网| 黄色欧美视频在线观看| www日本黄色视频网| 一边摸一边抽搐一进一小说| 亚洲人成网站在线观看播放| 亚洲欧洲国产日韩| 99久国产av精品国产电影| 欧美变态另类bdsm刘玥| 99久久精品热视频| 51国产日韩欧美| 国产免费男女视频| 国产精品人妻久久久影院| 中文字幕精品亚洲无线码一区| 国产免费男女视频| 国产高清视频在线观看网站| 99久国产av精品| 全区人妻精品视频| 校园人妻丝袜中文字幕| 联通29元200g的流量卡| 国产精品无大码| videossex国产| 日韩一区二区视频免费看| 少妇人妻一区二区三区视频| 一区二区三区乱码不卡18| 亚洲av中文字字幕乱码综合| www.色视频.com| 亚洲欧美中文字幕日韩二区| 精品酒店卫生间| 亚洲国产欧美在线一区| 老司机福利观看| 亚洲国产高清在线一区二区三| 国产精品日韩av在线免费观看| 国产精品伦人一区二区| 日本黄色视频三级网站网址| 九九热线精品视视频播放| 午夜福利成人在线免费观看| 日韩人妻高清精品专区| 丰满少妇做爰视频| av在线亚洲专区| 亚洲综合色惰| 国产乱来视频区| 欧美最新免费一区二区三区| av在线天堂中文字幕| av线在线观看网站| 久久久午夜欧美精品| 国产成人a∨麻豆精品| 国产精品电影一区二区三区| 久久久成人免费电影| 久99久视频精品免费| 伦精品一区二区三区| 国产成人免费观看mmmm| 超碰97精品在线观看| 精品不卡国产一区二区三区| 观看美女的网站| 中文字幕人妻熟人妻熟丝袜美| 亚洲精品乱码久久久久久按摩| 久久精品久久精品一区二区三区| 欧美变态另类bdsm刘玥| 99久久中文字幕三级久久日本| 免费黄色在线免费观看| 黄色一级大片看看| 九九热线精品视视频播放| 日本三级黄在线观看| 国产爱豆传媒在线观看| 久久久久九九精品影院| 两性午夜刺激爽爽歪歪视频在线观看| 亚洲精品乱久久久久久| 成人亚洲精品av一区二区| 国产免费一级a男人的天堂| 一个人免费在线观看电影| 十八禁国产超污无遮挡网站| 男人舔女人下体高潮全视频| 在线免费十八禁| 成人高潮视频无遮挡免费网站| 国产精品人妻久久久影院| 国产单亲对白刺激| 天天躁夜夜躁狠狠久久av| 99国产精品一区二区蜜桃av| 国产精品不卡视频一区二区| 久久人人爽人人爽人人片va| 亚洲精品一区蜜桃| 美女大奶头视频| 久久久久网色| 色网站视频免费| 国产黄a三级三级三级人| 91精品国产九色| 国产高潮美女av| 99久久无色码亚洲精品果冻| 少妇的逼水好多| www.色视频.com| 韩国高清视频一区二区三区| 国产精品一区二区性色av| 日本爱情动作片www.在线观看| 99热精品在线国产| 亚洲综合色惰| 国产91av在线免费观看| av播播在线观看一区| 日本欧美国产在线视频| av福利片在线观看| 欧美激情在线99| 少妇的逼水好多| 99久久中文字幕三级久久日本| 超碰97精品在线观看| 麻豆久久精品国产亚洲av| 69av精品久久久久久| 午夜视频国产福利| 国产av不卡久久| 国产精品久久电影中文字幕| 亚洲国产精品sss在线观看| 国产老妇伦熟女老妇高清| 人妻制服诱惑在线中文字幕| 最近视频中文字幕2019在线8| 老师上课跳d突然被开到最大视频| 黄片无遮挡物在线观看| 在线免费观看不下载黄p国产| 欧美日韩综合久久久久久| 欧美性猛交╳xxx乱大交人| 久久久久久久亚洲中文字幕| 国产精品av视频在线免费观看| 精品无人区乱码1区二区| 亚洲国产高清在线一区二区三| 日日干狠狠操夜夜爽| 波多野结衣巨乳人妻| 高清日韩中文字幕在线| 91精品国产九色| 天天躁夜夜躁狠狠久久av| 午夜老司机福利剧场| 国产精品乱码一区二三区的特点| 欧美性感艳星| 97超碰精品成人国产| 亚洲精品乱久久久久久| 日韩欧美国产在线观看| 99久久精品热视频| 午夜精品国产一区二区电影 | 日日摸夜夜添夜夜添av毛片| 亚洲精品乱久久久久久| 中文在线观看免费www的网站| 日本色播在线视频| 99热这里只有是精品在线观看| 1000部很黄的大片| 亚洲va在线va天堂va国产| 两性午夜刺激爽爽歪歪视频在线观看| 偷拍熟女少妇极品色| 亚洲在线自拍视频| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 免费搜索国产男女视频| 日本熟妇午夜| 视频中文字幕在线观看| 国产精品野战在线观看| 国产成人福利小说| 国产淫语在线视频| 长腿黑丝高跟| 黄色欧美视频在线观看| 国产私拍福利视频在线观看| 99久久人妻综合| 国产精品无大码| 三级毛片av免费| 国产免费福利视频在线观看| 午夜免费激情av| 色综合色国产| 久久6这里有精品| 亚洲无线观看免费| 99九九线精品视频在线观看视频| 看黄色毛片网站| 国产精品一区二区三区四区久久| 一级爰片在线观看| 最近最新中文字幕免费大全7| 中文字幕制服av| 2021天堂中文幕一二区在线观| 国产美女午夜福利| 国产乱人视频| 精品人妻熟女av久视频| 纵有疾风起免费观看全集完整版 | 韩国av在线不卡| 成人毛片a级毛片在线播放| 插阴视频在线观看视频| 成人亚洲欧美一区二区av| 99国产精品一区二区蜜桃av| 大香蕉久久网| 色播亚洲综合网| 特级一级黄色大片| 综合色丁香网| 久久久久久久久久成人| 一夜夜www| 亚洲精华国产精华液的使用体验| 91久久精品国产一区二区三区| 午夜精品一区二区三区免费看| 国产成人免费观看mmmm| 老女人水多毛片| 亚洲欧洲国产日韩| 久久久久久久久久久丰满| 婷婷色综合大香蕉| 欧美成人免费av一区二区三区| 日产精品乱码卡一卡2卡三| 国产成人aa在线观看| 1000部很黄的大片| 国产精品一区www在线观看| av.在线天堂| 国语对白做爰xxxⅹ性视频网站| 免费无遮挡裸体视频| 日本av手机在线免费观看| 亚洲无线观看免费| 视频中文字幕在线观看| 日本熟妇午夜| 色播亚洲综合网| 亚洲国产精品合色在线| 亚洲av熟女| 一个人看视频在线观看www免费| 99九九线精品视频在线观看视频| 欧美人与善性xxx| 国产精品女同一区二区软件| 两性午夜刺激爽爽歪歪视频在线观看| av在线播放精品| 免费看光身美女| 午夜亚洲福利在线播放| 亚洲最大成人中文| 91精品伊人久久大香线蕉| 少妇高潮的动态图| 天天躁日日操中文字幕| 国产老妇女一区| 97热精品久久久久久| 亚洲成色77777| 六月丁香七月| 全区人妻精品视频| 久久国内精品自在自线图片| 亚洲精品aⅴ在线观看| 亚洲欧美日韩高清专用| 一区二区三区高清视频在线| 免费黄色在线免费观看| av播播在线观看一区| 啦啦啦啦在线视频资源| av国产免费在线观看| 久久精品国产99精品国产亚洲性色| 亚洲av中文av极速乱| 非洲黑人性xxxx精品又粗又长| 波多野结衣高清无吗| 51国产日韩欧美| 男人舔奶头视频| 精华霜和精华液先用哪个| 精品欧美国产一区二区三| 天天一区二区日本电影三级| 国产男人的电影天堂91| 欧美高清性xxxxhd video| 精品一区二区三区人妻视频| 一夜夜www| 国产精品野战在线观看| 我的女老师完整版在线观看| 桃色一区二区三区在线观看| 国产成人精品久久久久久| 国产精品精品国产色婷婷| 国产成人精品一,二区| 3wmmmm亚洲av在线观看| 成人av在线播放网站| 亚洲av二区三区四区| 国产精品女同一区二区软件| 免费观看精品视频网站| 日本wwww免费看| 欧美3d第一页| 1000部很黄的大片| 美女内射精品一级片tv| 91精品一卡2卡3卡4卡| 亚洲18禁久久av| 国产91av在线免费观看| 亚洲精品亚洲一区二区| 一本久久精品| 国产成人freesex在线| 精品久久久久久久久av| av线在线观看网站| 亚洲怡红院男人天堂| 日韩欧美国产在线观看| 国产av不卡久久| 午夜视频国产福利| 观看美女的网站| 岛国毛片在线播放| 一本久久精品| 国产爱豆传媒在线观看| 美女高潮的动态| 成人三级黄色视频| 免费黄网站久久成人精品| 九九久久精品国产亚洲av麻豆| 乱码一卡2卡4卡精品| 久久久久久久久大av| 99热这里只有是精品50| 久久人人爽人人爽人人片va| 日韩在线高清观看一区二区三区| 午夜亚洲福利在线播放| 夫妻性生交免费视频一级片| 老司机影院成人| 久久热精品热| 国产精品伦人一区二区| 菩萨蛮人人尽说江南好唐韦庄 | 最新中文字幕久久久久| 亚洲天堂国产精品一区在线| 精品久久国产蜜桃| 内射极品少妇av片p| 色播亚洲综合网| 插逼视频在线观看| 人妻少妇偷人精品九色| 国产三级在线视频| 国产久久久一区二区三区| 亚洲一级一片aⅴ在线观看| 啦啦啦观看免费观看视频高清| a级毛片免费高清观看在线播放| 亚洲精华国产精华液的使用体验| 日日摸夜夜添夜夜爱| 精品国产露脸久久av麻豆 | 91精品国产九色| 日韩制服骚丝袜av| 成人一区二区视频在线观看| 精品人妻视频免费看| 国产一级毛片在线| 99热网站在线观看| 啦啦啦韩国在线观看视频| 乱人视频在线观看| 国产毛片a区久久久久| 午夜福利在线观看吧| 亚洲av日韩在线播放| 99热6这里只有精品| 日本午夜av视频| 国产精品永久免费网站| 99在线人妻在线中文字幕| 97超碰精品成人国产| 久久6这里有精品| 中文亚洲av片在线观看爽| 久久久国产成人免费| 神马国产精品三级电影在线观看| 极品教师在线视频| 亚洲精品乱久久久久久| 亚洲欧美成人精品一区二区| 性插视频无遮挡在线免费观看| 日本-黄色视频高清免费观看| 亚洲成人久久爱视频| 国产精品福利在线免费观看| 国产精品永久免费网站| 日本猛色少妇xxxxx猛交久久| 伦精品一区二区三区| 国产精品久久视频播放| 在线观看av片永久免费下载| 亚洲欧美精品综合久久99| 七月丁香在线播放| 国产成人午夜福利电影在线观看| 免费搜索国产男女视频| 日韩欧美 国产精品| 日本黄色片子视频| 亚洲av男天堂| kizo精华| 一区二区三区免费毛片| 久久久亚洲精品成人影院| 干丝袜人妻中文字幕| 亚洲伊人久久精品综合 | 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 久99久视频精品免费| 久久国产乱子免费精品| 日本一本二区三区精品| 国产精品女同一区二区软件| 亚洲性久久影院| 天美传媒精品一区二区| 麻豆成人av视频| 熟妇人妻久久中文字幕3abv| 变态另类丝袜制服| 国产综合懂色| 丰满人妻一区二区三区视频av| 欧美另类亚洲清纯唯美| 亚洲精品日韩av片在线观看| 久久久国产成人精品二区| 亚洲真实伦在线观看| 麻豆精品久久久久久蜜桃| 国产三级中文精品| 热99re8久久精品国产| 又粗又爽又猛毛片免费看| 日韩 亚洲 欧美在线| 国内少妇人妻偷人精品xxx网站| 成人性生交大片免费视频hd| 人妻夜夜爽99麻豆av| 亚洲国产精品成人久久小说| 成人毛片a级毛片在线播放| 成人性生交大片免费视频hd| 欧美一区二区精品小视频在线| 乱系列少妇在线播放| 中文天堂在线官网| 狂野欧美白嫩少妇大欣赏| 婷婷色麻豆天堂久久 | 久久精品91蜜桃| 美女高潮的动态| 在线免费观看的www视频| 天堂av国产一区二区熟女人妻| 九九热线精品视视频播放| 尾随美女入室| 美女国产视频在线观看| 一级毛片我不卡| 国内精品美女久久久久久| 大香蕉97超碰在线| 国产精品.久久久| 亚洲精品影视一区二区三区av| 波野结衣二区三区在线| 一区二区三区乱码不卡18| 亚洲精品aⅴ在线观看| 在线免费十八禁| 你懂的网址亚洲精品在线观看 | av专区在线播放| 变态另类丝袜制服| 精品久久久久久久人妻蜜臀av| 久久久久久久午夜电影| 亚洲人成网站在线观看播放| 最近视频中文字幕2019在线8| 高清视频免费观看一区二区 | 久久午夜福利片| 亚洲国产高清在线一区二区三| 亚洲欧美日韩高清专用| 日本免费一区二区三区高清不卡| 久久精品夜色国产| 亚洲乱码一区二区免费版| 晚上一个人看的免费电影| 国产精品av视频在线免费观看| 国产 一区 欧美 日韩| 国产av不卡久久| 国产又色又爽无遮挡免| 一个人免费在线观看电影| 精品酒店卫生间| 日韩欧美精品免费久久| 精品一区二区三区人妻视频| 日韩 亚洲 欧美在线| 亚洲成人精品中文字幕电影| 欧美另类亚洲清纯唯美| 男女下面进入的视频免费午夜| 天堂网av新在线| 丝袜美腿在线中文| 亚洲av中文av极速乱| 亚洲成人中文字幕在线播放| 又爽又黄a免费视频| 偷拍熟女少妇极品色| 大话2 男鬼变身卡| 国产91av在线免费观看| 日韩强制内射视频| 亚洲国产高清在线一区二区三| 一级av片app| 国产一区二区在线av高清观看| 国产精品1区2区在线观看.| 少妇熟女欧美另类| 97超视频在线观看视频| 国产成人freesex在线| 乱系列少妇在线播放| 精品一区二区免费观看| 中文字幕av在线有码专区| 最近手机中文字幕大全| 精华霜和精华液先用哪个| 看片在线看免费视频| 性色avwww在线观看| 日本色播在线视频| 亚洲av中文字字幕乱码综合| 一区二区三区乱码不卡18| 成人三级黄色视频| 亚洲av中文字字幕乱码综合| 18禁裸乳无遮挡免费网站照片| 国产精品国产三级专区第一集| 国产成人精品一,二区| 亚洲国产精品成人综合色| 国产极品天堂在线| 国产精品麻豆人妻色哟哟久久 | 别揉我奶头 嗯啊视频| av在线天堂中文字幕| 永久免费av网站大全| 亚洲国产精品国产精品| 99九九线精品视频在线观看视频| 国产免费一级a男人的天堂| 直男gayav资源| 国产黄色小视频在线观看| 在线观看av片永久免费下载| 国产综合懂色| 欧美zozozo另类| 人人妻人人澡欧美一区二区| 联通29元200g的流量卡| 一边摸一边抽搐一进一小说| av国产免费在线观看|