    北京鐵路地下直徑線泥水盾構刀盤、刀具適應性分析

    2011-10-10 09:03:36
    隧道建設(中英文) 2011年4期
    關鍵詞:泥水中鐵刀盤

    何 峰

    (中鐵隧道集團有限公司北京地下直徑線項目部,北京 100045)

    0 Introduction

    For the shield tunneling method,a construction method for underground works,the equipment is critical for its successful implementation and the configuration of the cutter head and cutters is very important.Adaptability of the configuration to geological conditions of a project will directly affect the cutting result,tunneling rate and construction efficiency of the shield machine,so the configuration scheme of the cutter head and cutters should be specifically designed according to different geological conditions[1].

    It is universally acknowledged in the industry that design of the cutter head and cutters under the sand-pebble condition is a technical challenge[2],and in recent years,we have made many useful researches and studies in this field.Paper[3] analyzed advantages and disadvantages of the shield machines used in Chengdu Metro Project,and set forth many methods that can effectively solve the problem of safety of cutter replacement for shield machines such as increasing opening rate of cutter head ,using belt-type screw conveyors instead of shaft-type screw conveyors,handling pebbles mainly by discharge instead of by crushing,allowing extension of cutter head,and using muck baffle when replacing cutters and so on;Paper[4]put forward suggestions and opinions for logical configuration of cutters of existing cutter head in such aspectsas cutter head opening rate,opening location selection as well as logical configuration of disc cutters,scrapers and tooth cutters based on comparison between configurations of cutter head and cutters of two shield machines of Lot 4 of Chengdu Metro Line 1;Dduring shield tunneling for Chengdu Metro Project,serious wearing of cutters was a major problem that restricted smooth implementation of the project[5].On the basis of analysis of cutting principle of cutters and site investigation of wearing of cutters during shield tunneling,the main causes of wearing were pointed out and finally reasonable suggestions and opinions were put forward after analyzing and studying features and causes of wearing of disc cutters and scrapers.

    Although the above papers have achieved certain results,the strata features and engineering conditions of Beijing Railway Underground Connecting Line are different and moreover,in China,there is no successful largediameter slurry shield project under the sand-pebble condition for reference.Therefore,it is necessary to carry out study on application of the cutter head and cutters used under the sand-pebble condition in this project,which is of great significance for popularizing the overall structure reinforcement of cutter head as well as selection and configuration of cutters for similar strata.

    1 Engineering Geological Characteristics

    For the Project of Beijing Railway Station-Beijing West Railway Station Underground Connecting Line,the 12.04 m-diameter slurry shield machine was planned for construction of the 5 175 m long shield tunnel.

    The real geological conditions of Beijing Underground Connecting Line Project are greatly different from those in the geological investigation of the preliminary design.The main differences are as follows:firstly,the compactness of the stratum which the shield tunnel crosses is very large(i.e.N120 > 14);secondly,it was found during the construction that there was a 1~2 m thick pebble cementation layer in the groundwater level variation area,and its maximum strength was 23 MPa according to the sampling test;thirdly,according to screening test of mucks separated from the slurry,the variation of the components of the strata that the tunnel crosses is larger than that in the geological investigation report,especially the local clay layer content and the fine grain content are largely different from those in the geological investigation report;fourthly,the grain size of revealed pebbles is larger than that described in the geological investigation report.The details about the grain screening as well as the revealed pebbles and cementation layer are shown in Fig.1 and Table 1.

    Fig.1 Revealed cementation layer and large pebbles of Connecting Line

    2 Original Configuration of Cutter Head and Cutters and Its Application

    2.1 Configuration of cutter head and cutters

    The cutter head and cutters were originally designed based on the original geological investigation data and in accordance with the theoretical basis of cutting of the ordinary sand-pebble stratum.Two-layer cutting was adopted in cutting tool configuration:using the heavy-duty splitter as the advance cutter to carry out the main cutting while using the cutting bit to carry out the follow-up soil scraping and cutting.The height difference between the heavy-duty splitter and the cutting bit was 20 mm.

    The composite cutter head was used with the opening rate of 30%and the opening design of wedged step struc-ture to allow the opening behind the cutter head to gradually become larger and larger so as to facilitate flowing of the muck and prevent clay from clogging the opening.At the same time,the central opening rate of the cutter head was designed at 45%so as to effectively avoid clay cake formed in the clay stratum.The mixing arm was installed on the back of the cutter head to prevent muck from settling,optimize the control of the slurry pressure and improve the slurry homogeneity[6].

    The original configuration of cutter head and cutters mainly included the tooth cutters:heavy-duty splitters(which are interchangeable with 17″(1″=2.54cm)disc cutters),cutting bits,peripheral scrappers,central fishtail cutting bits and reaming cutters.See Fig.2 below.

    Table 1 Comparison between grain contents obtained in muck screening test and those described in geological investigation document

    2.2 Application of cutting head and cutters in original configuration

    After the shield machine tunneled for 69 m and reached DK6+718.2,the main drive safety shaft was broken due to the huge cutter head torque.In the inspection by entering the chamber with pressure,it was found that the cutter head and the cutters were seriously worn out.

    2.3 Analysis on causes of problems in cutter head and cutters in original configuration

    Firstly,there are some defects in the present geological investigation by drilling,because the undisturbed soil sample is destroyed during drilling,and as a result,the fine grain content in the strata cannot be revealed in details and it is difficult to find out the existing calcitic cementation layer;secondly,in rock and soil codes,the compactness of sand-pebble stratum should be determined mainly through the standard penetration test,but in the rock crushing mechanism of shield cutters,the stress applied by cutters in axial direction and radial direction to the stratum should be considered at the same time,so the present compactness presentation can hardly meet the demand of shield cutter design.As the above problems make configuration of shield cutters cannot match the actual strata characteristics so that the content of large pebbles is far more than that in the geological investigation report.Moreover,where there is local cementation layer,the heavy-duty splitters cannot loosen the soil layer and will be seriously damaged so that the cutting bits have to participate in cutting during which many cutting bit teeth will fall after collision with pebbles and in such a case,the cutter head and cutters will be worn out;the peripheral scrappers have the maximum linear speed,so their wearing is the most serious.After serious damage of cutter teeth,the cutter seat will be directly worn out by the stratum,and for cutters,the teeth point contact will be changed into plane contact,which will finally lead to serious wearing of cutter head and cutters.Details are shown in Fig.3 below.

    3 Improvement of Cutter Head and Cutters

    For the problems existing in the original configuration of cutter head and cutters,according to our understanding about the strata,we decided to improve the configuration of cutter head and cutters.(According to adaptability of different cutters to the strata(see Table 2),the cutter head of the original design was improved as shown in Fig.4).

    3.1 Main improvement items of cutters

    1)Replacing the heavy-duty splitters,cutting bits and peripheral scrappers of the original design with the disc cutters,new wearing-resistant cutting bits and new wearing-resistant scrappers.

    Fig.2 Original configuration of cutting heads and cutters

    Fig.3 Wearing of scrappers,cutting bits and heavy-duty splitters

    2)Cutting off the seats of the 12 central cone-shaped fishtail cutting bits on the cutter head of the original design,and providing 5 central duplex disc cutters,and at the same time improving the rotary connector of the cutter head to make it adapted to the change from central fishtail cutting bits to disc cutters,focusing on improving copying cutters,inspecting cutter hydraulic pipes,and providing protection.

    3)Setting an additional 17″disc cutter on the 90°spoke and 270°spoke respectively on the cutter head.

    4)Providing additional 26 replaceable splitters on spokes of the cutter head and 26 additional welded splitters on spoke plates.

    5)Making holes in spoke plates on the periphery of the cutter head,fabricating short cutter beam,installing the side disc cutter,and providing 1 additional scrapper and 3 cutting bits on two sides of the cutter beam.At the same time,providing 1 additional welded splitter at the cutter head chamfers near two sides of the short cutter beam respectively.There were 8 disc cutters,16 scrappers and 48 cutting bits in total.

    6)Providing 1 additional cutting bit on outer diameters of the spokes of the cutter head respectively.16 cutting bits were used in total.

    7)Providing 96 additional peripheral protective cutters in the outer periphery and outer diameter transition zone of the cutter head.

    Table 2 Comparison of adaptability of cutters

    3.2 Reinforcement of overall steel structure of cutter head

    The maximum stress produced by the improved cutter head was 525MPa,which was far more than 355MPa,the designed yield stress of the cutter head before improvement,so reinforcement plates were used to reinforce the cutter head to ensure that the structure of the reinforced cutter head can meet the overall strength requirement of the cutter head.

    Reinforcement steel plates were set between the cutter head spoke plates and bars,steel plates of box structure were set between the cutter head spokes and flanges,and reinforcement steel plates were set between spoke plates and flanges.The reinforcement of these steel plates guaranteed the overall structure of the cutting head.

    3.3 Overall wearing resistance treatment of cutter head

    1)Additional wearing-resistant steel plates were set in the peripheral area of the front face of the cutter head spoke plates.The wearing-resistant steel plates were made of hardox500 and were 20 mm thick;10 mm wearing-resistant steel plates were set in the area near the center of the cutter head spoke plates by fillet welding,and additional splitters were welded on the front face of the spoke plates to improve wearing resistance of the cutter head.

    2)Due to long tunneling distance of the shied machine,complex geological conditions,and the maximum linear speed of the outer circle of the cutter head,the wearing of shield machine was the most serious.Therefore,40 peripheral scrappers were set with a mean spacing of 0.9m,and at the same time,the wearing resistance of the cutter head was enhanced by means of welding wearing-resistant triangle blocks and doing additional wearing-resistant surfacing welding in gaps of the original wearing-resistant surfacing welding.

    3)The wearing of the outer circle and the front face chamfer of the cutter head was the most serious because these locations were worn out after the peripheral scrappers being worn out.Therefore,wearing-resistant splitters were welded on both sides of the short cutter beam,and at the same time two additional alloy cutters were provided on both sides of each splitter to protect the cutter head chamfers together with the disc cutters on the short cutter beam,the peripheral scrappers and welded splitters so as to promote the wearing resistance of the cutter head.

    4)Wearing-resistant steel plates were provided by fillet welding and wearing-resistant layers were provided by surfacing welding at all muck chute outlets of the spoke plates and bars to enhance the wearing resistance capability.

    5)The additional disc cutter heads and cutters were protected by means of wearing-resistant surfacing welding.

    3.4 Improvement of flushing system

    As the clay content is high in the east section of the shield tunnel,a flushing system is provided to prevent the clay layer from sticking to the cutter head and cutters and avoid clay cake formed in the center of the cutter head.

    4 Analysis on Adaptability of Improved Cutter Head and Cutters and Countermeasures

    4.1 Analysis on adaptability of cutter head

    1)After improvement,the cutter head is provided with disc cutters,splitters and alloy cutters,and at the same time,wearing-resistant welding and wearing-resistant steel plates are provided at different locations on the face plate.In this way,the passive wearing of the cutter head is substituted by active cutting of cutters,which can effectively protect the cutter head.

    2)The environment requirements and geological conditions have significant influence on the cutter head opening rate.Taking all factors into consideration,such as stability of heading face during construction,muck flow,and boulders of less than 650 mm size,and so on,the design of cutter head of spokes+face plate was applied to the Connecting Line,which basically met the demand of tunneling and cutting.At the same time,for the total opening rate of the cutter head,the original design was used,i.e.the total opening rate was kept around 32%,but the local opening rate was properly optimized:disc cutters,instead of central fishtail cutters,were used and disc cutters were set at peripheral openings,which objectively changed the flowing track of the soil on the face plate of the cutter head and improved the fluidity of mucks.

    4.2 Introduction of three-dimensional cutting concept

    Disc cutters were used as advance cutters,and an additional layer of splitters were provided between disc cutters and cutting bits.The height difference between disc cutters,splitters,cutting bits was all 20mm.During cutting,splitters effectively protected the cutting bits,and two-layer cutting was changed into three-layer cutting.In this way,the demand of three-dimensional cutting was satisfied.

    4.3 Analysis on adaptability of cutting bits

    As shown in Fig.5,abnormal damage was very serious during the 1.8km shield tunneling completed so far,because the angle of the contact location between the cutting bit and seat was too small,and during the rotation of the cutter head,the back and side of the cutting bit were under high-speed impact of pebbles and boulders,which brought the bolts of the cutters under frequent and uneven fatigue stress.After the bolts were broken,cutting bits fell and accumulated at the bottom of the excavation chamber.During rotation of the cutter head,the fallen cutters drastically collided with those on the cutter head,which led to falling of cutting bits and scrappers in a larger scope,and as a result,pressurized diving must be done to fish up the fallen cutters and meanwhile cutters on the cutter head must be recovered.

    4.4 Analysis on adaptability of disc cutters

    The front-face disc cutters used for the Connecting Line were the double-blade disc cutters,side disc cutter,and single-blade disc cutter.The spacing between them was 80 mm.During the tunneling,it was found that the wearing of all the disc cutters was normal,and bias wearing and cutter ring breaking were rare.However,it was found that wearing rate of double-blade disc cutters was faster than that of single-blade disc cutters,and the wearing degree was more serious.At the same time,axial movement of some double-blade disc cutter rings was found.Analysis and study show that it happened because during driving of shield machine and rotation of cutter head,double-blade disc cutters were under high-speed impact of pebbles and boulders,which caused axial movement of cutter rings and deformation of cutter bodies.In order to mitigate wearing of disc cutters,promote their service life and cut down cost,single-blade disc cutters,instead of double-blade disc cutters,were used.This method has achieved satisfactory result,i.e.the service life was promoted by 1/3.However,after the doubleblade disc cutters were substituted by single-blade disc cutters,spacing between cutters was increased.Relatively speaking,the quantity of disc cutters on the face plate was insufficient,which led to more wearing of cutter head by sand-gravel.

    Fig.4 Configuration of cutter head and cutters

    4.5 Countermeasures

    1)The wearing resistance and service life of disc cutter bodies and collars were improved by properly increasing the width of cutter blades and meanwhile their anti-impact capability was improved.The starting torque of disc cutters,which should not be more than 25N·m,should be strictly controlled,because for single-blade disc cutters,high starting torque will disable the excavation face from providing enough reaction force to overcome the starting torque and resistance torque.

    2)The mixture ratio of the slurry system was properly adjusted and bentonite of proper amount was filled into the excavation chamber to improve the fluidity of mucks and reduce agglomeration of mucks in the cutter box so as to mitigate wearing of cutters and cutting head.

    3)Key technical parameters,such as the cutter head speed,torque,penetration,shield machine driving force and driving speed,etc.are rationally selected on basis of the geological conditions and properties of the cutter head and cutters so as to reduce abnormal wearing of the cutter head and cutters.

    4)Close attention was paid to the geological changes of strata,the configuration of the cutter head and cutters as well as the shield tunneling parameters were timely adjusted,and new processes,new technologies and new cutters were adopted.

    Fig.5 Pictures of fallen cutters and damaged cutter seats

    5)Inspection by entering the chamber with pressure was made,cutters were replaced in time,and repeated fastening of bolts of the cutters was made.The cutters falling into the excavation chamber must be timely fished up.Feed back and evaluate The damage of cutter head and cutters were fed back and evaluated and the damaged cutter head and cutters were recovered in time.

    4.6 Comparative analysis of cutter head and cutters before and after improvement

    1)Comparison of tunneling parameters(see table 3).

    2)After heavy-duty splitters were substituted by disc cutters,additional 52 splitters were used(including 26 replaceable ones).The improved disc cutters were used as the advance cutters,and the height difference between disc cutters,splitters,and cutting bits is 20 mm,which achieved the three-dimensional cutting.The threedimensional cutting played an outstanding role in protection of the cutter head and cutters:firstly,it allowed relatively clear work division of the cutting action of cutters,and the disc cutters,splitters,and cutting bits carried out soil cutting in sequence according to change of the penetration of cutting tool wearing;secondly,the three-dimensional cutting can facilitate flowing of mucks after cutting on the cutter head face plate and thus mitigate the secondary wearing of the cutter head and cutters.

    Table 3 Comparison of tunneling parameters

    3)After substituting disc cutters for heavy-duty splitters,the spacing between cutters was increased to deferent degrees at different locations,and two remedying measures were taken for the Connecting Line:one was to use double-blade disc cutter at the location where the spacing between cutters was large,and the other was to set more splitters on the spokes of the cutter head.

    5 TheSecondaryImprovementofCutterHead and Cutters

    The improved shield machine succeeded in the 1.8km tunneling,but due to features of the sand-pebble of Beijing Connecting Line,cutting bits of the shield cutter head fell in a large scope,and other intact cutting tolls on the cutter head were indirectly damaged.At the same time,the wearing-resistant welding of the shield cutter head was worn out.Therefore,the aforementioned problems couldn’t be solved only by entering the chamber with pressure,and it was difficult to fulfill the task of the following 3.4 km tunneling.The type of cutting bits and seats on the cutter head must be improved and pressurized wearing-resistant welding must be done at the locations where the cutter head was damaged or worn out so as to avoid similar phenomenon arising again.According to the complex geological conditions of the shield tunnel of the Connecting Line,the location relationship between the major risk points along the line and the structures around,and such requirements as settlement index,etc.,it was determined to enter the chamber with pressure at DK5+028 on west side of Xuanwumen to carry out hot operation of welding so as to make the secondary maintenance and improvement of the cutter head and cutters.The main contents are as follows:

    1)Cutting bits were changed from the original boltconnection type to pin-connection type,and new cutting bit seat was set on the original seat by fixed-position welding.

    2)As for the treatment measure for scrapper seat,a new seat was welded on the original scrapper seat to mount the new scrapper.

    3)The treatment measure for disc cutter box was to cut off the disc cutter shaft,which can not be dismantled,and then carry out repair welding of the cutter box after removing the disc cutter to mount the new cutter.

    4)Peripheral protective cutters were welded on the periphery of the cutter head to ensure the wearing resistance of the cutter head periphery and the excavation diameter.Wearing-resistant splitters were welded on the face plate of the cutter head to mitigate wearing of the cutter head and reduce the stress on the cutting bit during rotary cutting of the cutter head.

    5)Wearing-resistant repair welding was made according to wearing of the cutter head at such main locations as the cutter head front face,chamfer,outer circumference,cutting ring on the back as well as the cutting tool seat and cutter head opening,etc.

    By the measures above,we repaired the damaged or worn parts of the cutter head,especially effectively resolved the problem of cutting bit falling during tunneling in the sand-pebble stratum and thus ensured smooth shield tunneling.

    6 Conclusions and discussion

    Based on the comparison between two configurations of cutter head and cutters used in the Connecting Line Project,conclusions can be made as follows:

    1)Effective cutting of the sand-pebble stratum can be achieved through logical configuration of cutters in different lengths such as disc cutters,splitters,and cutting bits,etc.

    2)It is necessary to use disc cutters in configuration of the cutter head and cutters for compact sand-pebble stratum.Furthermore,the disc cutter size as well as the cutter height difference between layer 1 and layer 2 should be increased whenever possible according to the pebble size and compactness so as to promote the cutting penetration and tunneling efficiency.

    3)The interchangeable ability of disc cutters and splitters can ensure adaptability of the shield machine to strata with uneven hardness.

    4)The cutters can be effectively adapted to cutting of the sand-pebble stratum by increasing their quantity and the machine is fit for the sand-gravel geological condition effectively by using more cutters and densifying the cutting tracks.

    5)Increase of height difference between cutters will affect the strength and rigidity of the cutter bodies and cutter head,so their strength and rigidity should be enhanced in the design.

    6)As the wearing of cutters used in the sand-pebble stratum is very serious,periodically entering the chamber with pressure to replace cutters should be managed as one process,and at the same time,automatic testing of cutting tool wearing as well as study on wearing-resistant materials for cutters should be enhanced to effectively lengthen the primary tunneling distance of cutters and reduce their wearing coefficient.

    [1] LIU Jianhang,HOU Xueyuan.Shield tunneling[M].Beijing:China Railway Publishing House,1991.

    [2] HAN Yali,LV Chuantian,ZHANG Ningchuan.Shield machine selection and function design for Beijing Railway Underground Connecting Line Project[J].Engineering Sciences,2010,12(12):29-34.

    [3] WANG Guoyi.Configuration of shield equipment for Chengdu Metro Project[J].Tunnel Construction,2008,28(4):501-504.

    [4] GUO Jiaqing.Selection of shield cutter head and cutters used in Chengdu sand-gravel stratum[J].Construction Mechanization,2009,30(2):56-58.

    [5] LIU Gaofeng,SONG Tiantian.Analysis and Research on Wearing of Shield Cutters Used in Chengdu Metro Project[J].Tunnel Construction,2007,27(6):89-93.

    [6] Lou Ruyue.The latest technology of slurry shield construction[J].Shanghai Tunnel Engineering Co.,Ltd.,2003(3):27-30.

    猜你喜歡
    泥水中鐵刀盤
    基于有限元的盾構機刀盤強度分析
    中鐵銀通支付有限公司
    煤泥水處理智能控制研究現(xiàn)狀
    選煤技術(2022年2期)2022-06-06 09:13:02
    泥水加壓平衡盾構
    北方建筑(2021年3期)2021-12-03 22:19:10
    基于自適應內(nèi)模控制的煤泥水自動加藥控制系統(tǒng)仿真研究
    選煤技術(2021年3期)2021-10-13 07:33:38
    中鐵集裝箱運輸有限責任公司簡介
    鐵道學報(2020年6期)2020-07-13 08:23:40
    某地鐵工程盾構刀盤改造力學分析
    居“高”聲自遠——中鐵一院“走出去”的探索與實踐
    T BM 刀盤驅(qū)動系統(tǒng)單神經(jīng)元模糊同步控制
    大決心
    日本av免费视频播放| 国产女主播在线喷水免费视频网站| 交换朋友夫妻互换小说| 七月丁香在线播放| 好男人视频免费观看在线| 一级a爱视频在线免费观看| av国产久精品久网站免费入址| av天堂久久9| 精品亚洲成国产av| 伦理电影免费视频| 国产精品亚洲av一区麻豆| 久9热在线精品视频| 最近最新中文字幕大全免费视频 | 男女下面插进去视频免费观看| 日韩av在线免费看完整版不卡| 只有这里有精品99| 久久精品久久久久久噜噜老黄| 最新在线观看一区二区三区 | 九色亚洲精品在线播放| 国产精品久久久久久精品古装| 女人高潮潮喷娇喘18禁视频| 精品一品国产午夜福利视频| 国产一区二区激情短视频 | cao死你这个sao货| 多毛熟女@视频| 免费日韩欧美在线观看| 国产成人系列免费观看| 久久中文字幕一级| 亚洲av男天堂| 欧美国产精品va在线观看不卡| 极品少妇高潮喷水抽搐| 国产福利在线免费观看视频| √禁漫天堂资源中文www| 9热在线视频观看99| 国产日韩欧美亚洲二区| 最近最新中文字幕大全免费视频 | 黄片小视频在线播放| 免费看十八禁软件| 人人澡人人妻人| 建设人人有责人人尽责人人享有的| 久久精品aⅴ一区二区三区四区| 高清黄色对白视频在线免费看| 成年女人毛片免费观看观看9 | 日韩熟女老妇一区二区性免费视频| 69精品国产乱码久久久| av国产精品久久久久影院| 亚洲精品国产区一区二| 视频区欧美日本亚洲| 中文字幕人妻熟女乱码| 亚洲成人手机| 国产日韩欧美在线精品| 51午夜福利影视在线观看| 爱豆传媒免费全集在线观看| 欧美精品亚洲一区二区| 亚洲男人天堂网一区| 免费人妻精品一区二区三区视频| 日本av手机在线免费观看| 婷婷成人精品国产| 国产高清不卡午夜福利| 国产男女内射视频| 午夜两性在线视频| 国产欧美亚洲国产| 18禁黄网站禁片午夜丰满| 真人做人爱边吃奶动态| 午夜福利视频在线观看免费| 国产伦人伦偷精品视频| 免费av中文字幕在线| 久热爱精品视频在线9| 国产精品国产av在线观看| 又大又爽又粗| 亚洲色图综合在线观看| 日本91视频免费播放| 久久中文字幕一级| www.熟女人妻精品国产| 亚洲国产欧美日韩在线播放| 最近中文字幕2019免费版| 日韩一卡2卡3卡4卡2021年| 王馨瑶露胸无遮挡在线观看| 国产日韩欧美在线精品| 日韩av在线免费看完整版不卡| 国产高清国产精品国产三级| 18禁观看日本| 久久99一区二区三区| 免费久久久久久久精品成人欧美视频| 亚洲五月色婷婷综合| 另类亚洲欧美激情| 免费观看a级毛片全部| 日日夜夜操网爽| 自线自在国产av| 午夜福利免费观看在线| 91麻豆av在线| 国产日韩欧美视频二区| 亚洲中文av在线| 性少妇av在线| 亚洲国产精品成人久久小说| 久久天堂一区二区三区四区| 久久精品久久久久久噜噜老黄| 大片免费播放器 马上看| 97在线人人人人妻| 日韩人妻精品一区2区三区| 激情五月婷婷亚洲| 亚洲av综合色区一区| 国产欧美亚洲国产| 爱豆传媒免费全集在线观看| 午夜激情av网站| 久久天堂一区二区三区四区| 亚洲av成人精品一二三区| 天天躁日日躁夜夜躁夜夜| 国产精品麻豆人妻色哟哟久久| 天堂中文最新版在线下载| 国产激情久久老熟女| 秋霞在线观看毛片| 九草在线视频观看| 免费不卡黄色视频| 欧美精品亚洲一区二区| 国产三级黄色录像| 99热网站在线观看| 亚洲五月色婷婷综合| 一二三四社区在线视频社区8| 99精品久久久久人妻精品| 日日夜夜操网爽| 亚洲国产精品国产精品| 久久久亚洲精品成人影院| 欧美久久黑人一区二区| 纯流量卡能插随身wifi吗| 国产精品一区二区在线观看99| 成人国语在线视频| 性色av一级| 国产欧美亚洲国产| 国产激情久久老熟女| 建设人人有责人人尽责人人享有的| 久久鲁丝午夜福利片| 久久久精品国产亚洲av高清涩受| 国产精品久久久久久精品电影小说| 亚洲人成网站在线观看播放| 欧美精品一区二区免费开放| 别揉我奶头~嗯~啊~动态视频 | 伊人久久大香线蕉亚洲五| 你懂的网址亚洲精品在线观看| 国产激情久久老熟女| 久久久精品区二区三区| 视频区欧美日本亚洲| 精品久久蜜臀av无| 国产精品一二三区在线看| 九草在线视频观看| 国产精品亚洲av一区麻豆| 国产黄色视频一区二区在线观看| 国产免费现黄频在线看| 欧美中文综合在线视频| 久久久久久久国产电影| 亚洲黑人精品在线| 中文字幕高清在线视频| avwww免费| 青草久久国产| 一本大道久久a久久精品| 国产av一区二区精品久久| 日本av免费视频播放| av国产久精品久网站免费入址| 久久精品熟女亚洲av麻豆精品| 国产精品成人在线| 亚洲av片天天在线观看| 18禁国产床啪视频网站| 国产成人欧美在线观看 | 国产男女超爽视频在线观看| 欧美日韩福利视频一区二区| 国精品久久久久久国模美| 亚洲av成人不卡在线观看播放网 | 美女大奶头黄色视频| 免费av中文字幕在线| 一边摸一边做爽爽视频免费| 亚洲人成网站在线观看播放| 超色免费av| 50天的宝宝边吃奶边哭怎么回事| 欧美日韩av久久| 一区二区日韩欧美中文字幕| 久久久亚洲精品成人影院| 久久午夜综合久久蜜桃| 亚洲欧美一区二区三区国产| 午夜免费成人在线视频| 捣出白浆h1v1| 日韩大码丰满熟妇| 一级毛片电影观看| 一边摸一边抽搐一进一出视频| 波多野结衣av一区二区av| 国产精品av久久久久免费| 国产欧美日韩综合在线一区二区| av国产精品久久久久影院| 晚上一个人看的免费电影| 国产欧美日韩精品亚洲av| 国产精品成人在线| 精品第一国产精品| 国产视频一区二区在线看| 久久精品aⅴ一区二区三区四区| 欧美在线一区亚洲| 午夜久久久在线观看| a 毛片基地| 午夜福利一区二区在线看| 免费人妻精品一区二区三区视频| 久久午夜综合久久蜜桃| 建设人人有责人人尽责人人享有的| 天天影视国产精品| 免费看av在线观看网站| 午夜福利乱码中文字幕| 国产精品偷伦视频观看了| 两人在一起打扑克的视频| 啦啦啦中文免费视频观看日本| 亚洲 国产 在线| 人人妻人人澡人人爽人人夜夜| 十分钟在线观看高清视频www| 天天躁日日躁夜夜躁夜夜| 亚洲精品国产av蜜桃| 成人亚洲精品一区在线观看| e午夜精品久久久久久久| 少妇猛男粗大的猛烈进出视频| 欧美成人精品欧美一级黄| 在线天堂中文资源库| 精品熟女少妇八av免费久了| 国产成人免费无遮挡视频| 丝瓜视频免费看黄片| 亚洲精品国产av蜜桃| 晚上一个人看的免费电影| 宅男免费午夜| av欧美777| 电影成人av| 国产精品人妻久久久影院| 国产成人av激情在线播放| 男人舔女人的私密视频| 中文字幕人妻丝袜制服| 99热网站在线观看| 美国免费a级毛片| 91成人精品电影| 欧美xxⅹ黑人| 婷婷丁香在线五月| 丝袜脚勾引网站| 国产av一区二区精品久久| 肉色欧美久久久久久久蜜桃| 两人在一起打扑克的视频| av不卡在线播放| 丝袜喷水一区| 亚洲人成77777在线视频| 国产黄频视频在线观看| 欧美成狂野欧美在线观看| 啦啦啦中文免费视频观看日本| 国产无遮挡羞羞视频在线观看| 在线精品无人区一区二区三| 如日韩欧美国产精品一区二区三区| 国产亚洲午夜精品一区二区久久| 男人爽女人下面视频在线观看| 午夜免费男女啪啪视频观看| 只有这里有精品99| 国产精品一区二区免费欧美 | 一边摸一边抽搐一进一出视频| 国产91精品成人一区二区三区 | tube8黄色片| 男女之事视频高清在线观看 | 一级黄片播放器| 欧美老熟妇乱子伦牲交| 香蕉国产在线看| 日日夜夜操网爽| 亚洲伊人色综图| 久久精品国产亚洲av高清一级| 国产一区亚洲一区在线观看| 老熟女久久久| av福利片在线| 老司机靠b影院| 电影成人av| 国产1区2区3区精品| 亚洲精品一区蜜桃| 久久精品aⅴ一区二区三区四区| 人妻人人澡人人爽人人| 在现免费观看毛片| 久久国产精品男人的天堂亚洲| 天天操日日干夜夜撸| 亚洲精品国产色婷婷电影| 在线观看www视频免费| 欧美日本中文国产一区发布| 国产97色在线日韩免费| 一边摸一边抽搐一进一出视频| av视频免费观看在线观看| 交换朋友夫妻互换小说| 久久午夜综合久久蜜桃| 丝袜在线中文字幕| 国产高清不卡午夜福利| 免费久久久久久久精品成人欧美视频| 黄网站色视频无遮挡免费观看| 国产一区二区三区综合在线观看| 国产麻豆69| a级毛片黄视频| 亚洲男人天堂网一区| 精品久久久久久电影网| 9191精品国产免费久久| 精品亚洲成a人片在线观看| 欧美日韩综合久久久久久| 亚洲精品一区蜜桃| 亚洲九九香蕉| 在线av久久热| 亚洲国产精品成人久久小说| 欧美人与善性xxx| 少妇的丰满在线观看| 狂野欧美激情性bbbbbb| 国产欧美日韩精品亚洲av| 久久久久久亚洲精品国产蜜桃av| 国产精品欧美亚洲77777| 看免费av毛片| 美女视频免费永久观看网站| 伊人亚洲综合成人网| 91精品伊人久久大香线蕉| 另类亚洲欧美激情| 精品国产一区二区久久| 黄色视频在线播放观看不卡| 亚洲av美国av| 成人国语在线视频| 99久久综合免费| 精品一品国产午夜福利视频| 免费观看a级毛片全部| 国产精品久久久久久精品电影小说| 亚洲国产精品999| 国产极品粉嫩免费观看在线| 午夜福利影视在线免费观看| 99国产精品免费福利视频| xxx大片免费视频| 日韩中文字幕欧美一区二区 | 午夜久久久在线观看| 在线亚洲精品国产二区图片欧美| 51午夜福利影视在线观看| 中国国产av一级| 亚洲精品一区蜜桃| 久久久亚洲精品成人影院| 久久综合国产亚洲精品| 中文字幕制服av| 亚洲av日韩在线播放| 黄色a级毛片大全视频| 91成人精品电影| 国产精品国产三级专区第一集| 啦啦啦中文免费视频观看日本| 91成人精品电影| 国产一区二区在线观看av| 亚洲专区中文字幕在线| 国产麻豆69| 婷婷色av中文字幕| 伊人亚洲综合成人网| 久久精品亚洲熟妇少妇任你| 男女免费视频国产| 男人爽女人下面视频在线观看| 99re6热这里在线精品视频| 爱豆传媒免费全集在线观看| 欧美久久黑人一区二区| 精品高清国产在线一区| 精品视频人人做人人爽| 国产黄色免费在线视频| 高潮久久久久久久久久久不卡| 丰满饥渴人妻一区二区三| 精品人妻熟女毛片av久久网站| 亚洲成国产人片在线观看| 亚洲欧美激情在线| 久久国产精品大桥未久av| 久久久精品94久久精品| 成人国产一区最新在线观看 | 国产成人免费无遮挡视频| 国产精品香港三级国产av潘金莲 | 在线亚洲精品国产二区图片欧美| 欧美在线一区亚洲| 亚洲精品久久午夜乱码| 欧美在线黄色| 后天国语完整版免费观看| 国产片特级美女逼逼视频| 国产一区二区激情短视频 | 国产片内射在线| 三上悠亚av全集在线观看| 亚洲一码二码三码区别大吗| 国产片内射在线| 欧美日韩亚洲高清精品| 亚洲七黄色美女视频| 中文字幕av电影在线播放| 99re6热这里在线精品视频| 人人澡人人妻人| 国产精品国产av在线观看| 一级毛片电影观看| 一本一本久久a久久精品综合妖精| 成人18禁高潮啪啪吃奶动态图| 国产91精品成人一区二区三区 | 在线av久久热| 国产又爽黄色视频| 日本猛色少妇xxxxx猛交久久| 欧美黑人精品巨大| 久久影院123| 欧美变态另类bdsm刘玥| 久久久久久久久免费视频了| 国产欧美日韩精品亚洲av| av在线播放精品| 性高湖久久久久久久久免费观看| 9191精品国产免费久久| 波野结衣二区三区在线| 99国产精品一区二区三区| 亚洲一码二码三码区别大吗| 一级黄片播放器| 久久性视频一级片| 纯流量卡能插随身wifi吗| 一区二区av电影网| 午夜影院在线不卡| 精品一区在线观看国产| 精品少妇黑人巨大在线播放| 国产免费视频播放在线视频| 大香蕉久久网| 91九色精品人成在线观看| 一级毛片黄色毛片免费观看视频| 亚洲午夜精品一区,二区,三区| 国产福利在线免费观看视频| 麻豆乱淫一区二区| 成人黄色视频免费在线看| 中文字幕制服av| 亚洲伊人久久精品综合| 精品国产一区二区三区四区第35| 黑人猛操日本美女一级片| 欧美老熟妇乱子伦牲交| 一级毛片女人18水好多 | 亚洲av片天天在线观看| 精品人妻熟女毛片av久久网站| 日韩大片免费观看网站| 自拍欧美九色日韩亚洲蝌蚪91| 久久人人爽人人片av| 成年美女黄网站色视频大全免费| 久久国产精品人妻蜜桃| 欧美av亚洲av综合av国产av| 欧美人与性动交α欧美精品济南到| 国产精品免费视频内射| 亚洲九九香蕉| 精品少妇内射三级| 国产在线视频一区二区| 欧美精品av麻豆av| 青春草视频在线免费观看| 十分钟在线观看高清视频www| 国产高清视频在线播放一区 | 久久99一区二区三区| 欧美乱码精品一区二区三区| 成年人免费黄色播放视频| svipshipincom国产片| 99久久人妻综合| 日本色播在线视频| 国产一区二区激情短视频 | 国产成人欧美| 亚洲欧美一区二区三区黑人| 精品第一国产精品| av欧美777| 中文字幕色久视频| 亚洲图色成人| 麻豆av在线久日| 一边摸一边抽搐一进一出视频| 国产高清不卡午夜福利| 亚洲 欧美一区二区三区| 水蜜桃什么品种好| 在线观看免费视频网站a站| 亚洲天堂av无毛| 亚洲国产成人一精品久久久| 嫁个100分男人电影在线观看 | 黑丝袜美女国产一区| 国产精品一区二区免费欧美 | 国产不卡av网站在线观看| av又黄又爽大尺度在线免费看| 欧美+亚洲+日韩+国产| 亚洲美女黄色视频免费看| 超碰成人久久| 视频区欧美日本亚洲| 久久久久久久久免费视频了| 成年动漫av网址| 欧美日韩一级在线毛片| 亚洲欧美日韩另类电影网站| 国产免费福利视频在线观看| 国产成人a∨麻豆精品| 欧美黑人欧美精品刺激| 久久ye,这里只有精品| 国产淫语在线视频| 中文字幕色久视频| 精品亚洲乱码少妇综合久久| 操出白浆在线播放| 蜜桃国产av成人99| 欧美日韩成人在线一区二区| 亚洲午夜精品一区,二区,三区| 亚洲一区二区三区欧美精品| 久久人人97超碰香蕉20202| 婷婷丁香在线五月| 国产精品二区激情视频| 午夜福利影视在线免费观看| 日韩大码丰满熟妇| 99久久人妻综合| 亚洲国产中文字幕在线视频| 99国产精品免费福利视频| 欧美乱码精品一区二区三区| 免费看十八禁软件| 老熟女久久久| 丰满人妻熟妇乱又伦精品不卡| 黄色视频不卡| 中文乱码字字幕精品一区二区三区| 国产精品偷伦视频观看了| 精品亚洲乱码少妇综合久久| 男女高潮啪啪啪动态图| 美女高潮到喷水免费观看| 欧美人与性动交α欧美软件| 欧美亚洲 丝袜 人妻 在线| 亚洲精品国产av蜜桃| 国产成人免费观看mmmm| av欧美777| 欧美日韩视频高清一区二区三区二| 99精国产麻豆久久婷婷| 丝袜脚勾引网站| 别揉我奶头~嗯~啊~动态视频 | 18禁观看日本| 国产日韩欧美亚洲二区| 久久久久久久久久久久大奶| 美国免费a级毛片| 久久精品人人爽人人爽视色| av国产精品久久久久影院| 一本一本久久a久久精品综合妖精| 制服人妻中文乱码| 黄片小视频在线播放| 丰满迷人的少妇在线观看| 深夜精品福利| 久久人人爽av亚洲精品天堂| 深夜精品福利| 国产av国产精品国产| 亚洲av日韩精品久久久久久密 | 女人爽到高潮嗷嗷叫在线视频| 最近中文字幕2019免费版| 国产av国产精品国产| 久久精品人人爽人人爽视色| 亚洲中文日韩欧美视频| 国产免费现黄频在线看| 国产成人精品久久二区二区免费| 日韩熟女老妇一区二区性免费视频| 99国产精品99久久久久| 日本黄色日本黄色录像| 国产成人啪精品午夜网站| 99re6热这里在线精品视频| 欧美 亚洲 国产 日韩一| 成人手机av| 国产精品久久久av美女十八| xxxhd国产人妻xxx| 99国产精品一区二区蜜桃av | 狂野欧美激情性xxxx| 久久久欧美国产精品| 国产免费一区二区三区四区乱码| 一级片免费观看大全| 久久久久久久国产电影| 一级毛片电影观看| 老司机影院毛片| 黄色视频在线播放观看不卡| 国产成人av教育| 久久久精品免费免费高清| 啦啦啦视频在线资源免费观看| 男的添女的下面高潮视频| 欧美+亚洲+日韩+国产| 久久久久精品国产欧美久久久 | 久久人妻福利社区极品人妻图片 | 亚洲人成电影免费在线| 国产真人三级小视频在线观看| 黄色a级毛片大全视频| 男女免费视频国产| 999久久久国产精品视频| 欧美少妇被猛烈插入视频| 天天添夜夜摸| 久久久久久免费高清国产稀缺| 大码成人一级视频| 亚洲男人天堂网一区| 热99国产精品久久久久久7| 最黄视频免费看| 精品人妻在线不人妻| netflix在线观看网站| 久久精品成人免费网站| 极品少妇高潮喷水抽搐| 欧美日韩视频高清一区二区三区二| 最近最新中文字幕大全免费视频 | 国产精品亚洲av一区麻豆| 男女床上黄色一级片免费看| 国产片特级美女逼逼视频| 国产成人一区二区三区免费视频网站 | av视频免费观看在线观看| 亚洲国产最新在线播放| av网站免费在线观看视频| 建设人人有责人人尽责人人享有的| 别揉我奶头~嗯~啊~动态视频 | 亚洲国产欧美一区二区综合| 99国产精品一区二区三区| 国产女主播在线喷水免费视频网站| 国产精品99久久99久久久不卡| 国产精品成人在线| 欧美+亚洲+日韩+国产| 日韩大片免费观看网站| 久久亚洲精品不卡| 人人妻人人添人人爽欧美一区卜| 国产精品.久久久| 超碰成人久久| 十八禁人妻一区二区| 999久久久国产精品视频| 亚洲成国产人片在线观看| 人妻 亚洲 视频| 91老司机精品| 老司机影院毛片| 手机成人av网站| 久久九九热精品免费| 午夜免费成人在线视频| 亚洲国产中文字幕在线视频| 中文字幕人妻丝袜一区二区| 亚洲国产欧美网| 男的添女的下面高潮视频| 黄色 视频免费看| 少妇人妻久久综合中文| 日本欧美视频一区| 久久99精品国语久久久| 免费一级毛片在线播放高清视频 | 日本午夜av视频| 久久久国产欧美日韩av| av一本久久久久| 久久精品成人免费网站| 午夜视频精品福利| 成人国产av品久久久|