    Ecological operation for Three Gorges Reservoir

    2011-08-16 09:01:08WenxianGUOHongxiangWANGJianxinXUZiqiangXIA
    Water Science and Engineering 2011年2期

    Wen-xian GUO*, Hong-xiang WANG, Jian-xin XU, Zi-qiang XIA

    1. North China University of Water Conservancy and Electric Power, Zhengzhou 450011, P. R. China

    2. State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Hohai University, Nanjing 210098, P. R. China

    Ecological operation for Three Gorges Reservoir

    Wen-xian GUO*1, Hong-xiang WANG1, Jian-xin XU1, Zi-qiang XIA2

    1. North China University of Water Conservancy and Electric Power, Zhengzhou 450011, P. R. China

    2. State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Hohai University, Nanjing 210098, P. R. China

    The traditional operation of the Three Gorges Reservoir has mainly focused on water for flood control, power generation, navigation, water supply, and recreation, and given less attention to the negative impacts of reservoir operation on the river ecosystem. In order to reduce the negative influence of reservoir operation, ecological operation of the reservoir should be studied with a focus on maintaining a healthy river ecosystem. This study considered ecological operation targets, including maintaining the river environmental flow and protecting the spawning and reproduction of the Chinese sturgeon and four major Chinese carps. Using flow data from 1900 to 2006 at the Yichang gauging station as the control station data for the Yangtze River, the minimal and optimal river environmental flows were analyzed, and eco-hydrological targets for the Chinese sturgeon and four major Chinese carps in the Yangtze River were calculated. This paper proposes a reservoir ecological operation model, which comprehensively considers flood control, power generation, navigation, and the ecological environment. Three typical periods, wet, normal, and dry years, were selected, and the particle swarm optimization algorithm was used to analyze the model. The results show that ecological operation modes have different effects on the economic benefit of the hydropower station, and the reservoir ecological operation model can simulate the flood pulse for the requirements of spawning of the Chinese sturgeon and four major Chinese carps. According to the results, by adopting a suitable re-operation scheme, the hydropower benefit of the reservoir will not decrease dramatically while the ecological demand is met. The results provide a reference for designing reasonable operation schemes for the Three Gorges Reservoir.

    ecological operation; environmental flow; Three Gorges Reservoir; particle swarm optimization algorithm

    1 Introduction

    Reservoirs can be used to generate hydroelectric power, supply water, and provide recreational opportunities. They play an important role in promoting social and economic development. However, adverse environmental impacts of reservoirs have also been identified. Damming of the world’s rivers has come at great cost to their ecological health and ecosystemservices valued by the society (Postel and Richter 2003; Richter and Thomas 2007). Reservoirs have considerable influence on downstream river ecosystems (WCD 2000; Richter and Thomas 2007). Ecological impacts of reservoirs include inhibiting migratory animals like anadromous fishes, causing eutrophication by plankton blooming, decreasing flow volumes in tail waters, stabilizing flow regimes by reducing peak flows, changing thermal regimes, altering river beds, and increasing substrate grain size by trapping sediment. Reservoir operation influences river flow regimes, which, in turn, influence river ecosystem health (Bednarek and Hart 2005; Jager and Smith 2008). Healthy river ecosystems provide ecosystem services, including water supply, water reclamation, pollution abatement, and groundwater recharge.

    We envision that in the future, holistic management strategies for reservoir projects will be designed to maximize both ecological benefits and those associated with energy production. In contrast, conventional reservoir management strategies typically optimize energy and economic benefits, and address ecosystem values only as the constraints on reservoir release and elevations (Jager and Smith 2008). Typical objectives are to minimize water deficits or to maximize hydropower production, revenue, or profit (Chaves et al. 2003; Kerachian and Karamouz 2007). To reduce the influence of reservoir construction on river ecological systems and the natural water environment, possibly one of the most valid strategies is modification of reservoir operation, hereafter referred to as ecological operation, for maintaining the natural flow regimes and associated ecosystem health and services (Symphorian et al. 2003; Richter and Thomas 2007; Halleraker et al. 2007; Shiau and Wu 2007).

    The Three Gorges Project, due to its enormous power generation capacity and the fact that hydropower is considered a form of clean energy, plays an indispensable role in China’s energy conservation and emission reduction strategy (Cao et al. 2007). It brings huge benefits in flood control, power generation, and navigation improvement. However, the impoundment of the Three Gorges Reservoir has also altered the hydrological regime of the Yangtze River to some degree, causing changes in the frequency, magnitude and duration of floods, water temperature, discharge, water level, and sediment concentration, and, as a consequence, the structure and function of biological communities associated with the Yangtze River ecosystem have been affected (Xia et al. 2005). Therefore, maximizing both ecological benefits and those associated with energy production has become an urgent issue. In order to reduce the negative influence of reservoir operation, ecological operation of the reservoir should be studied to maintain healthy river ecosystems. This study considered ecological operation targets, including maintaining the river environmental flow and protecting the spawning and reproduction of the Chinese sturgeon and four major Chinese carps. This paper proposes a reservoir ecological operation model that comprehensively considers flood control, power generation, navigation, and the ecological environment. Three typical periods, wet, normal, and dry years, were selected, and particle swarm optimization was used to analyze the model.

    2 Methods and materials

    2.1 Study area

    The Yangtze River is the largest river in China and ranks third in the world in terms of its length and the mean annual volume of water flowing into the East China Sea. Fig. 1 shows a diagram of the Yangtze River. Because of its large catchment area and water volume, the Yangtze River has remarkable features, such as its diversified utilization of water resources and the controlling role of its geographical position in regional climate change. Its water resources, accounting for 36% of China’s total, are 9.619 × 1011m3, of which 99% is surface water. The hydropower resources in the Yangtze River Basin are abundant too. Partly estimated, 45 694 reservoirs with a total storage capacity of 1.586 × 1011m3have been built on the upper main course and tributaries of the Yangtze River, and, of these reservoirs, 134 large-scale ones had a total storage capacity of 1.064 × 1011m3by the end of the year 2000.

    Fig. 1 Diagram of Yangtze River

    The Three Gorges Reservoir, with a huge storage capacity of 3.93 × 1010m3, is located at the upper end of the Yangtze River, just 44 km upstream from the Yichang gauging station (CWRC 1997). Its installed capacity and annual electricity generation are 18 200 MW and 8.47 × 1010kWh, respectively. The rated power of the Three Gorges station is 4 990 MW, and the minimum and maximum releases are 1580 and 98 800 m3/s, respectively. The output coefficient of the Three Gorges power station is 8.5. Table 1 shows the basic parameters of the Three Gorges Reservoir. The reservoir serves multiple purposes of flood control, irrigation, navigation, and power production (Guo and Wang 2010).

    The regulation of the Three Gorges Project is designed such that the reservoir is normally maintained at the flood control limit level of 145 m and operated to store or release floodwater based on the flood control regulation options in the event of a large flood in the flood season from middle June to late September. The reservoir is uniformly impounded from 145 m to 175 m in October and maintained at 175 m in November. If the inflow cannot meet the needs for guaranteed output of the power station afterwards, the reservoir draws down gradually to 155 m by the end of May and to 145 m by June 10.

    Table 1 Characteristic water levels and storage volumes of Three Gorges Reservoir

    After the Three Gorges Reservoir was impounded, many new issues regarding the river environment had to be faced. First, the temperature of the water released from the reservoir was significantly lower than the natural water temperature from late April to early May due to water temperature stratification, which caused about a 10- to 20-day delay in spawning time for four major Chinese carps below the reservoir. Second, the reduction of peak flow released from the reservoir affected the fish spawning and reproduction below the reservoir due to the reservoir operation for power generation. Third, in some cases the released water caused gas bubble disease in fish, particularly in the fry, due to over-saturation of nitrogen. Besides, eutrophication and algal bloom may occur in the reservoir due to low flow and poor water quality. These are the adverse impacts of the Three Gorges Reservoir on the aquatic production in the Yangtze River, and they should be eliminated or alleviated as much as possible by various measures. The negative impacts of the reservoir have attracted special attention of the government and researchers.

    2.2 Targets of ecological operation for Three Gorges Reservoir

    2.2.1 Environmental flow target recommendation for Yangtze River below reservoir

    Environmental flow is a part of the original river flow that should continue to flow down the channel in order to maintain a healthy river ecosystem. The river ecosystem is seen as all components of the landscape directly linked to the river and the life forms (King et al. 1999). The river environmental flow can be classified as minimal environmental flow and optimal environmental flow. The minimal environmental flow is the basic flow that maintains the survival of river aquatic organisms. Under the minimal environmental flow condition, the damage to the stream ecosystem cannot be rectified. The optimal environmental flow is the flow that maintains the stability and biodiversity of the river ecosystem. Now there are numerous methods of assessment of environmental flow worldwide. These methods can be classified as hydrological methods, hydraulic rating methods, habitat simulation methods, and holistic methods. A monthly frequency computation method, one of the hydrological methods, was provided for computation of minimal and optimal environmental flows in this study. First,the dry (with a hydrological frequencyp< 25%), normal (25% 75%) years are identified based on the yearly average flow series. Second, the minimal environmental flow recommendation is set as the 90%-frequency monthly flow and the optimal flow recommendation is set as the 75%-frequency monthly flow.

    The Yichang gauging station is the control point of the upper Yangtze River Basin and is located at the starting point of the middle Yangtze River, 44 km below the Three Gorges Dam. Based on monthly flow data from 1900 to 2006 from the Yichang gauging station, the minimal and optimal river environmental flows were analyzed. Table 2 shows the results of environmental flow recommendations below the Three Gorges Reservoir.

    Table 2 Environmental flow recommendations below reservoir (m3/s)

    2.2.2 Ecological operation targets for fish spawning below reservoir

    The Chinese sturgeon is one of the first-class nationally protected animals in China. The Chinese sturgeon has established a new spawning ground with a length less than 7 km in the main stream of the Yangtze River below the Gezhouba Dam due to the construction of the dam (Wei 2003). The spawning time is October and November each year. The spawning of the Chinese sturgeon requires special hydrological and hydraulic conditions, which directly affect spawning quantity and quality. The Three Gorges Reservoir was impounded in October, reducing the released flow from the reservoir. The reduction of flow directly or indirectly affects the spawning and reproduction. In order to protect the Chinese sturgeon, eco-hydrological targets were determined for ecological operation for the Three Gorges Reservoir. The hydrological indicators include discharge, water level, water temperature, sediment concentration, flow rate, flow recession rate, and water level recession rate, which were calculated with the average value ± the standard deviation. The eco-hydrological targets for spawning grounds for the Chinese sturgeon (Table 3) were calculated according to the hydrological conditions during the spawning periods of the Chinese sturgeon below the Three Gorges Reservoir.

    The four major carps, black carp, grass carp, silver carp, and variegated carp, are traditionally major economic fishes. Proper water temperature and flow conditions are essential for their natural spawning. Normally, from April to July they migrate to the main course of the Yangtze River or its tributaries for breeding, and their spawning is directly related to the river water temperature, flow rates, flow velocity, and their variations. When theriver water temperature falls within the range of 18℃ to 26℃, and the water level is rising over a sufficiently long period, it can promote fish migration, sexual maturity, mating, and spawning. According to investigation, there are 30 spawning grounds in the section from Chongqing to Jiujiang, of which 11 grounds are upstream of Yichang (Li 2001). This study was concerned mainly with May and June, which is the main spawning period of the four major Chinese carps in the middle reach of the Yangtze River. The discharge process can be considered one discharge rising event when the discharge has risen for three consecutive days or more. Based on this definition, relevant annual parameters such as the number and duration of discharge rising events during May to June were calculated. The hydrological indicators include discharge, water level, water temperature, sediment concentration, flush times, flush duration, flow rising rate, and water level rising rate, which were also calculated with the average value ± the standard deviation. The eco-hydrological targets for the spawning grounds for the four major Chinese carps (Table 4) were calculated according to the hydrological conditions during the spawning periods of the carps below the Three Gorges Reservoir.

    Table 3 Eco-hydrological targets for spawning grounds for Chinese sturgeon in October and November

    Table 4 Eco-hydrological targets for spawning grounds for four major Chinese carps in May and June

    2.3 Reservoir ecological operation model

    The ecological operation for a reservoir is a very complex combinatorial operation problem. Operation and management become more complex and more dynamic due to growing conflicts among the competing objectives, including the water quality, endangered species habitat preservation, and various recreational uses in addition to the traditionalobjectives of flood control, water supply, navigation, and hydropower production. The ecological operation model mainly includes the objective function, constraints, and optimization algorithm. The maximum hydropower generation is usually the operation objective and other objectives are constraints.

    2.3.1 Ecological operation model

    2.3.1.1 Objective function

    In this study, the objective function was maximizing the hydropower production. The model was formulated for monthly operation, and, mathematically, the objective function was provided by Guo and Wang (2010):

    whereFis the hydropower produced during the total period,Kis the power coefficient,Qtis the amount of water released to turbines during periodΔT,Htis the average head available during periodΔT, andMis the total number of time periods.

    2.3.1.2 Constraints

    The objective function above of the reservoir optimal operation model is subject to the following constraints:

    (1) Mass balance equation for the reservoir storages and inflows:

    whereVt+1andVtare the final and initial storage volumes, respectively, during period ΔT,Itis the inflow into the reservoir during period ΔT, andStis the overflow or spill from the reservoir during period ΔT.

    (2) Storage bounds for the reservoir:

    whereVtminandVtmaxare the minimum and maximum storages allowed in period ΔT, respectively. These storages are constrained by flood protection rules during the monsoon season. In the remaining periods, the minimum storageVtminis considered equal to the dead storage, while the maximum storageVtmaxis equivalent to the full capacity of the reservoir.

    (3) Turbine capacity constraint:

    whereNminandNmaxare the minimum and the maximum turbine capacities of the power plant, respectively.

    (4) Reservoir release constraint:

    where the reservoir releaseqtis the total release during period ΔTincluding the hydropower production release and the overflow from the reservoir, andqtminandqtmaxare the minimum and maximum releases during periodΔT, respectively.

    (5) Ecological constraint:

    The operation model mainly subject to the released flow from the reservoir satisfies the minimum and optimal environmental flow demands as much as possible and provides the flow conditions for fish spawning and reproduction downstream of the reservoir to protect fish populations.

    (6) Non-negative constraint:

    All values in the ecological operation model are positive.

    2.3.2 Particle swarm optimization algorithm

    Particle swarm optimization (PSO) is an optimization algorithm based on the community intelligence principle, which was originally proposed by Kennedy and Eberhart (1995). The PSO technique can easily handle the nonlinearity of the problem; the search does not depend on the initial population, and it overcomes problems of local optima that are common in some conventional nonlinear optimization techniques (Salman et al. 2002). The PSO technique has successfully demonstrated numerical optimization and shown itself to be an attractive alternative for global optimization problems.

    Each particle has position, velocity, and fitness values decided by an objective function of the problem. The position is a potential solution to the optimization problem. In aD-dimensional search space, the position of particleiis represented asxi=(xi1,xi2,...,xiD)T, the velocity isvi=(vi1,vi2,...,viD)T, its previous best position ispBesti=(pbesti1,pbesti2,...,pbestiD)T, the best position of the entire population isgBest=(gbest1,gbest2,...,gbestD)T, and particleiupdates its velocity and position according to Eqs. (6) and (7):

    whereis the component in dimensiondof theith particle velocity at iteration stepk,is the component in dimensiondof theith particle position at iteration stepk,c1andc2are positive constants,r1andr2are two random functions in the range [0, 1], andwis the inertia weight. A large inertia weight favors a global search, while a small inertia weight favors a local search; usually, it decreases linearly during the iteration of the algorithm.wcan be determined by Eq. (8):

    wherewmaxandwminare the maximum and minimum ofw, respectively,Lmaxis the maximum iteration number, andLis the present iterative number.

    3 Results and discussion

    According to the ecological operation goals, three typical hydrological years were selected for the simulation and optimization model. The operation results were analyzed.

    3.1 Model parameters

    To formulate the PSO model for ecological operation for the Three Gorges Reservoir, it is expedient to consider the problem a combinatorial optimization problem.

    In the model, model parameters were set as follows:K= 8.5,Vtmin= 1.72 × 1011m3,Vtmax= 3.93 × 1011m3,Nmin= 4.99 × 106kW,Nmax= 1.82 × 106kW,qtmin= 1 580 m3/s, andqtmax= 9 880 m3/s. The programs of PSO were compiled by Matlab 7.0 software. After many experiments and comparisons, the parameters were adopted as follows: the size of populations were 50; the range of inertia weight was [wmin,wmax]=[0.4,0.9];c1andc2were all equal to 2.05; the iterations continued until the iteration number was equal to 500; the random noise ofviwas randomly distributed over the range (0, 1); the velocity threshold was equal to 0.1; and the variation coefficient was equal to 0.7.

    The monthly inflow data of the Three Gorges Reservoir from 1900 to 2006 were analyzed, and the initial water level was 145 m. Typical hydrological years were selected to study the ecological operation for the Three Gorges Reservoir: a wet year, 1907, a normal year, 1990, and a dry year, 1978. The monthly inflow data of the three typical years are shown in Table 5.

    Table 5 Monthly inflow data of three typical years for Three Gorges Reservoir (m3/s)

    In this study, three operation schemes of the reservoir were examined: (1) reservoir operation considering river environmental flow, (2) reservoir operation considering the spawning and reproduction of the Chinese sturgeon, for which the simulation period was September, October, and November, and (3) reservoir operation considering the spawning and reproduction of four major Chinese carps, for which the simulation period was May and June.

    3.2 Model results

    3.2.1 Reservoir operation results considering river environmental flow

    Three typical hydrological years were analyzed in the reservoir optimal model. After 500 iterations, the optimization results were obtained. Table 6 shows the results of reservoir ecological operation in three representative years. Fig. 2 is the comparison of released flow and environmental flow in wet, normal, and dry years.

    Table 6 Reservoir ecological operation in three representative years

    According to the operation results, the task of flood control should be considered a priority and the water level remained at 145 m in flood periods.

    Fig. 2 Operation results in different hydrological years

    In the wet year (1907), the guarantee capacity can be satisfied and the minimal and optimal environmental flow demands can be satisfied each month, the influence on power generation is very little due to sufficient inflow to the reservoir mitigating the mismatch between power generation and environmental flow, and the abandoned flow occurs from July to October. In the normal year (1990), the released flow from the reservoir can satisfy the minimal and optimal environmental flow demands except in the storage period of the reservoir (October), the abandoned flow occurs only in July, and the influence on hydropower generation is not significant. In the dry year (1978), the released flow in October cannot satisfy the minimal and optimal environmental flow demands; in November it cannot satisfy the optimal environmental flow demand, but can satisfy the minimal environmental flow demand; in other months it can satisfy the environmental flow demand. Due to the shortage of inflow in February and March, the reservoir cannot satisfy the guaranteed power output limit, the abandoned flow occurs in June, and the influence on the hydropower generation is significant.

    3.2.2 Reservoir operation results considering spawning of Chinese sturgeon

    Fig. 3 shows the operation results from September to November in wet, normal, and dry years. According to Fig. 3(a), in the wet year, the total power generation of September, October, and November are 3.41 × 1010kWh; the released flow can provide the requiredspawning conditions for the Chinese sturgeon and environmental flow. According to Fig. 3(b), in the normal year, the total power generation is 2.49 × 1010kWh; the released flows in September, October, and November are 24 600, 10 785 and 10 375 m3/s, respectively, and the released flow in September and November can satisfy river environmental flow demands except in October; and the recession rates of flow in October and November are, respectively, 103 and 203 m3/(s·d), which can provide the flow recession rate of eco-hydrological targets of the Chinese sturgeon’s spawning periods. According to Fig. 3(c), in the dry year, the total power generation is 1.85 × 1010kWh; the released flows in September, October, and November are 20 487, 6 444, and 7 633 m3/s, respectively, and the released flow in September and November can satisfy the river environmental flow demands except in October; the water level cannot rise to 175 m; and the recession rates of flow in October and November are, respectively, 93 and 92 m3/(s·d) which cannot provide the flow recession rate of eco-hydrological targets for the Chinese sturgeon’s spawning periods. Finally, the operation measure of impounding water in advance was taken in the dry year in order to minimize the adverse effects on the Chinese sturgeon’s spawning.

    Fig. 3 Operation results from September to November in different hydrological years

    3.2.3 Reservoir operation results considering spawning of four major Chinese carps

    Fig. 4 shows the operation results from May to June in wet, normal, and dry years.

    Fig. 4 Operation results from May to June in different hydrological years

    According to Fig. 4(a), in the wet year, the total power generations of May and June are 1.50 × 1010kWh; the released flows in May and June are 10 555 and 18 379 m3/s, respectively, and the released flows in May and June can satisfy the river environmental flow demand; and the hydrological conditions of released flow from the reservoir can provide the spawning conditions of four major Chinese carps. According to Fig. 4(b), in the normal year, the total power generation is 2.29 × 1010kWh; the released flows in May and June are 21 533 and 22 976 m3/s, respectively; and the released flows in May and June can satisfy the river environmental flow demand. The flow rising rates in May and June are, respectively, 2 743 and 2 091 m3/(s·d), which can satisfy the flow rising rates of eco-hydrological targets for four major Chinese carps’ spawning. According to Fig. 4(c), in the dry year, the total power generation is 1.73 × 1010kWh; the released flows in May and June are 10 616 and 26 443 m3/s, respectively, and the released flow can satisfy river environmental flow demands; and the flow rising rates in May and June are, respectively, 1 633 and 1 938 m3/(s·d), which can meet the eco-hydrological targets for four major Chinese carps’ spawning periods.

    The operation results show that the measure of a flood pulse can be used to create appropriate flow conditions during the periods of spawning peaks of four major Chinese carps. Therefore, establishing appropriate flood pulse conditions will be beneficial to four major Chinese carps and will not impair the benefit from power generation.

    4 Conclusions

    In this paper, the ecological operation targets were first provided from the perspectives of maintaining river environmental flow and protecting the spawning of the Chinese sturgeon and four major Chinese carps. In addition, a reservoir ecological operation model was established and a particle swarm optimization algorithm was applied to the operation model. The results show that the minimal and optimal environmental flow demands can be satisfied in wet and normal years, and there are no obvious influences on the power generation; however, in dry years there is an obvious influence on the power generation and the released flow from the reservoir cannot satisfy the environmental flow demands during the periods of impounding water. According to the normal impounding water scheme, the released flow from the reservoir can provide for the spawning of the Chinese sturgeon in wet and normal years but not in dry years. Reservoir ecological operation can simulate a flood pulse for the spawning conditions of the four major Chinese carps. Creating appropriate flood pulse conditions will be beneficial to the ecosystem and will not impair the benefit from power generation. This study provides important information for maintaining healthy river ecosystems. However, ecological operation of the reservoir is very complex. Therefore, more ecological operation issues, such as the water quality of the reservoir, sediment deposition, oxygen saturation, and saltwater intrusion problems, need to be considered in detailed studies.

    Bednarek, A. T., and Hart, D. D. 2005. Modifying dam operations to restore rivers: Ecological responses to Tennessee River dam mitigation.Ecological Applications, 15(3), 997-1008. [doi:10.1890/04-0586]

    Cao, G. J., Cai, Z. G., Liu, Z. W., and Wang, G. Q. 2007. Daily optimized model for long-term operation of the Three Gorges-Gezhouba Cascade Power Stations.Science in China Series E: Technological Sciences, 50(s1), 98-110. [doi:10.1007/s11431-007-6010-x]

    Changjiang Water Resources Commission (CWRC). 1997.Eco-environment Effects of Three Gorges Project. Wuhan: Hubei Science and Technology Press.

    Chaves, P., Kojiri, T., and Yamashiki, Y. 2003. Optimization of storage reservoir considering water quantity and quality.Hydrological Processes, 17(14), 2769-2793. [doi:10.1002/hyp.1433]

    Guo, W. X., and Wang, H. X. 2010. Optimal operation of Three Gorges Reservoir based on ant colony algorithm.International Conference on Intelligent Computing and Cognitive Informatics. Los Alamitos: IEEE Computer Society. [doi:10.1109/ICICCI.2010.101]

    Halleraker, J. H., Sundt, H., Alfredsen, K. T., and Dangelmaier, G. 2007. Application of multi-scale environmental flow methodologies as tools for optimized management of a Norwegian regulated national salmon watercourse.River Research and Applications, 23(5), 493-510. [doi:10.1002/rra.1000]

    Jager, H. I., and Smith, B. T. 2008. Sustainable reservoir operation: Can we generate hydropower and preserve ecosystem values?River Research and Applications, 24(3), 340-352. [doi:10.1002/rra.1069]

    Kennedy, J., and Eberhart, R. 1995. Particle swarm optimization.ProceedingsofIEEE International Confenrence on Neural Networks. 1942-1948. Perth: IEEE. [doi:10.1109/ICNN.1995.488968]

    Kerachian, R., and Karamouz, M. 2007. A stochastic conflict resolution model for water quality management in reservoir-river systems.Advances in Water Resources, 30(4), 866-882. [doi:10.1016/j.advwatres.2006. 07.005]

    King, J. M., Tharme, R. E., and Brown, C. A. 1999. Definition and implementation of instream flows.Thematic Report for the World Commission on Dams. Cape Town: Southern Waters Ecological Researchand Consulting.

    Li, S. F. 2001.A Study on Biodiversity and Its Conservation of Major Fishes in the Yangtze River. Shanghai: Shanghai Scientific and Technical Publishers. (in Chinese)

    Postel, S., and Richter, B. 2003.Rivers for Life: Managing Water for People and Nature. Washington, D.C.: Island Press.

    Richter, B. D., and Thomas, G. A. 2007. Restoring environmental flows by modifying dam operations.Ecology and Society, 12(1), 12. [doi:vol12/iss1/art12/]

    Salman, A., Ahmad, I., and Al-Madani, S. 2002. Particle swarm optimization for task assignment problem.Microprocessors and Microsystems, 26(8), 363-371. [doi:10.1016/S0141-9331(02)00053-4]

    Shiau, J. T., and Wu, F. C. 2007. Pareto-optimal solutions for environmental flow schemes incorporating the intra-annual and interannual variability of the natural flow regime.Water Resources Research, 43(6), 1-12. [doi:10.1029/2006WR005523]

    Symphorian, G. R., Madamombe, E., and van der Zaag, P. 2003. Dam operation for environmental water releases; the case of Osborne dam, save catchment, Zimbabwe.Physics and Chemistry of the Earth, 28(20-27), 985-993. [doi:10.1016/j.pce.2003.08.012]

    Wei, Q. W. 2003.Reproductive Behavioral Ecology of Chinese Sturgeon(Acipenser sinensis)with Its Stock Assessment. Ph. D. Dissertation. Wuhan: Institute of Hydrobiology, Chinese Academy of Sciences. (in Chinese)

    World Commission on Dams (WCD). 2000.Dams and Development: A New Framework for Decision-Making. London: Earthscan.

    Xia, Z. Q., Li, Q. F., and Jiang, C. L. 2005. Exploitation and protection of river natural function.The Symposium on River Ecosystem Restoration Techniques. Beijing: Water Resources and Hydropower Press.

    This work was supported by the National Eleventh Five-Year Water Project Funded Projects of China (Grant No. 2008ZX07209-002-04), the North China University of Water Resources and Electric Power Funded Projects (Grants No. 200907 and 200910), and the Scientific Research Fund for the Returned Overseas Chinese Scholars.

    *Corresponding author (e-mail:guowenxian163@163.com)

    Received Oct.15, 2010; accepted Mar.15, 2011

    久久97久久精品| 黄色视频在线播放观看不卡| 久久免费观看电影| 欧美成人午夜免费资源| 色婷婷av一区二区三区视频| 亚洲经典国产精华液单| 国产视频内射| 男女边吃奶边做爰视频| 制服丝袜香蕉在线| 欧美成人精品欧美一级黄| 九色成人免费人妻av| 人成视频在线观看免费观看| 午夜精品国产一区二区电影| av又黄又爽大尺度在线免费看| 国产成人精品福利久久| 少妇人妻精品综合一区二区| 少妇的逼好多水| 精品熟女少妇av免费看| 日韩视频在线欧美| 简卡轻食公司| 一级片'在线观看视频| 国产在线视频一区二区| 晚上一个人看的免费电影| 97在线视频观看| 午夜av观看不卡| 80岁老熟妇乱子伦牲交| 美女cb高潮喷水在线观看| 日韩伦理黄色片| 全区人妻精品视频| 欧美97在线视频| 亚洲综合精品二区| 777米奇影视久久| 国产av码专区亚洲av| 免费黄频网站在线观看国产| a 毛片基地| 国产精品一国产av| 91精品一卡2卡3卡4卡| 麻豆精品久久久久久蜜桃| 久久人人爽av亚洲精品天堂| 亚洲熟女精品中文字幕| 亚洲精华国产精华液的使用体验| 欧美精品亚洲一区二区| 日韩大片免费观看网站| 中国美白少妇内射xxxbb| 91精品国产九色| 国产黄片视频在线免费观看| 亚洲成人av在线免费| 蜜桃久久精品国产亚洲av| 国产成人a∨麻豆精品| 美女主播在线视频| 少妇的逼水好多| 最近2019中文字幕mv第一页| 九色成人免费人妻av| 伊人亚洲综合成人网| 成人综合一区亚洲| av在线播放精品| 天堂中文最新版在线下载| 久久久久久久久久久丰满| 午夜福利影视在线免费观看| 国产精品三级大全| 日韩av在线免费看完整版不卡| 人妻一区二区av| 欧美成人午夜免费资源| 中文乱码字字幕精品一区二区三区| 精品久久国产蜜桃| 国产一区二区三区av在线| 高清视频免费观看一区二区| 日日啪夜夜爽| 亚洲,一卡二卡三卡| 十分钟在线观看高清视频www| 免费观看在线日韩| 热99久久久久精品小说推荐| 秋霞伦理黄片| 一级毛片我不卡| 欧美日韩精品成人综合77777| 黄色一级大片看看| 国产成人精品一,二区| 久久精品夜色国产| 青青草视频在线视频观看| 国产精品国产三级国产av玫瑰| 欧美亚洲 丝袜 人妻 在线| 91精品三级在线观看| 亚洲精品456在线播放app| 亚洲成人手机| 2018国产大陆天天弄谢| 欧美精品一区二区免费开放| 肉色欧美久久久久久久蜜桃| 一区二区日韩欧美中文字幕 | 美女脱内裤让男人舔精品视频| 午夜福利视频在线观看免费| 51国产日韩欧美| 丰满乱子伦码专区| 男人操女人黄网站| 成人免费观看视频高清| 久久国产精品男人的天堂亚洲 | 最近最新中文字幕免费大全7| 肉色欧美久久久久久久蜜桃| 免费看不卡的av| 亚洲不卡免费看| 亚洲欧美一区二区三区国产| 男女高潮啪啪啪动态图| 亚洲色图 男人天堂 中文字幕 | 午夜91福利影院| 亚洲综合色网址| 少妇被粗大猛烈的视频| 亚洲av日韩在线播放| 欧美变态另类bdsm刘玥| 欧美 日韩 精品 国产| 精品一区在线观看国产| 激情五月婷婷亚洲| 欧美亚洲 丝袜 人妻 在线| 欧美亚洲 丝袜 人妻 在线| 国产成人免费观看mmmm| 欧美最新免费一区二区三区| 亚洲精品一区蜜桃| 久久精品国产亚洲网站| 国产精品嫩草影院av在线观看| 久久青草综合色| 搡老乐熟女国产| 男女国产视频网站| 国产精品人妻久久久影院| 欧美日韩精品成人综合77777| 日韩人妻高清精品专区| 亚洲第一区二区三区不卡| 伦精品一区二区三区| 亚洲精品一区蜜桃| 亚洲精品中文字幕在线视频| 最近2019中文字幕mv第一页| 插阴视频在线观看视频| 国模一区二区三区四区视频| 天堂8中文在线网| 成人国语在线视频| 国产欧美日韩综合在线一区二区| 两个人的视频大全免费| 大香蕉久久网| 色5月婷婷丁香| 久久久精品免费免费高清| 亚洲丝袜综合中文字幕| 成年女人在线观看亚洲视频| 一级毛片aaaaaa免费看小| 亚洲丝袜综合中文字幕| 一级毛片aaaaaa免费看小| 80岁老熟妇乱子伦牲交| 欧美老熟妇乱子伦牲交| 日韩成人伦理影院| 午夜免费男女啪啪视频观看| 久久久精品免费免费高清| 免费看不卡的av| 亚洲性久久影院| 亚洲国产毛片av蜜桃av| 精品亚洲乱码少妇综合久久| 久久精品国产鲁丝片午夜精品| 麻豆精品久久久久久蜜桃| 久久人人爽人人片av| 精品少妇内射三级| 欧美日韩视频高清一区二区三区二| av电影中文网址| 亚州av有码| 亚洲av中文av极速乱| av线在线观看网站| 丝瓜视频免费看黄片| 一区二区三区四区激情视频| 亚洲精品乱久久久久久| 国产精品久久久久久久电影| 日韩,欧美,国产一区二区三区| 亚洲av在线观看美女高潮| 国产精品久久久久久精品电影小说| 日韩强制内射视频| 99热网站在线观看| 一级毛片黄色毛片免费观看视频| 99国产综合亚洲精品| 国产色婷婷99| 超碰97精品在线观看| 五月天丁香电影| 久久97久久精品| 永久网站在线| 久久久久久久久久成人| 国产日韩欧美在线精品| 午夜福利视频在线观看免费| 日本黄色片子视频| 国模一区二区三区四区视频| 免费大片18禁| 18禁裸乳无遮挡动漫免费视频| 美女国产视频在线观看| 精品人妻偷拍中文字幕| 免费高清在线观看日韩| 欧美老熟妇乱子伦牲交| 亚洲av在线观看美女高潮| 夜夜骑夜夜射夜夜干| 久久人人爽av亚洲精品天堂| 青青草视频在线视频观看| 2018国产大陆天天弄谢| 最黄视频免费看| 天堂中文最新版在线下载| 伦理电影大哥的女人| 欧美变态另类bdsm刘玥| 精品久久久噜噜| 秋霞在线观看毛片| 国产精品熟女久久久久浪| 国产 精品1| 国语对白做爰xxxⅹ性视频网站| 亚洲,一卡二卡三卡| 国产伦理片在线播放av一区| 蜜桃久久精品国产亚洲av| 日日啪夜夜爽| 亚洲国产欧美日韩在线播放| 免费观看的影片在线观看| 欧美少妇被猛烈插入视频| 一级片'在线观看视频| 菩萨蛮人人尽说江南好唐韦庄| 亚洲色图 男人天堂 中文字幕 | 少妇人妻 视频| 亚洲av日韩在线播放| 成人亚洲精品一区在线观看| 久久av网站| 国产伦理片在线播放av一区| 亚洲久久久国产精品| 免费看不卡的av| 在线观看免费视频网站a站| 日本91视频免费播放| 亚洲av不卡在线观看| 亚洲精品456在线播放app| 日韩 亚洲 欧美在线| 我要看黄色一级片免费的| 欧美少妇被猛烈插入视频| 午夜免费男女啪啪视频观看| 免费黄网站久久成人精品| 下体分泌物呈黄色| 国产在视频线精品| 国产成人aa在线观看| 中文乱码字字幕精品一区二区三区| 最近手机中文字幕大全| 国产免费一区二区三区四区乱码| 18禁在线播放成人免费| 中国三级夫妇交换| 国产成人91sexporn| 精品国产乱码久久久久久小说| 国产黄色免费在线视频| 国产免费一级a男人的天堂| 久久久久久久久久成人| 中文字幕人妻熟人妻熟丝袜美| 亚洲精品乱码久久久v下载方式| 在线观看一区二区三区激情| 亚洲av不卡在线观看| 日韩 亚洲 欧美在线| 能在线免费看毛片的网站| 久久影院123| 亚洲精品久久午夜乱码| 国产亚洲欧美精品永久| 久久久久久久大尺度免费视频| 少妇的逼好多水| 亚洲美女黄色视频免费看| 国产伦理片在线播放av一区| 色94色欧美一区二区| 欧美+日韩+精品| 午夜免费男女啪啪视频观看| 成年女人在线观看亚洲视频| 一个人免费看片子| 欧美成人午夜免费资源| 欧美日韩亚洲高清精品| 美女视频免费永久观看网站| 老女人水多毛片| 伊人久久国产一区二区| 国产精品久久久久久精品古装| 亚洲精品成人av观看孕妇| 国产精品99久久99久久久不卡 | 伦精品一区二区三区| 久久精品熟女亚洲av麻豆精品| 亚洲少妇的诱惑av| 精品视频人人做人人爽| 又黄又爽又刺激的免费视频.| 国产一区有黄有色的免费视频| 99热这里只有精品一区| 中文字幕制服av| 性色av一级| 熟女人妻精品中文字幕| 亚洲综合精品二区| 日本黄色片子视频| 国产69精品久久久久777片| 亚洲精品456在线播放app| 超碰97精品在线观看| 日本黄色片子视频| 青春草国产在线视频| 久久久久久久亚洲中文字幕| 亚洲图色成人| 精品99又大又爽又粗少妇毛片| 晚上一个人看的免费电影| 欧美日韩亚洲高清精品| 国产爽快片一区二区三区| 久久人人爽人人片av| 亚洲精品中文字幕在线视频| 在线免费观看不下载黄p国产| 熟女人妻精品中文字幕| 下体分泌物呈黄色| 熟妇人妻不卡中文字幕| 亚洲av成人精品一区久久| 人妻 亚洲 视频| kizo精华| 成人午夜精彩视频在线观看| 国产色婷婷99| 老熟女久久久| 丝袜在线中文字幕| 久久精品夜色国产| 2021少妇久久久久久久久久久| 制服人妻中文乱码| 国产欧美另类精品又又久久亚洲欧美| 精品久久国产蜜桃| 国产亚洲最大av| 狂野欧美激情性xxxx在线观看| 国产亚洲最大av| 久久人人爽av亚洲精品天堂| 国产精品一区二区在线不卡| 一本—道久久a久久精品蜜桃钙片| 欧美另类一区| 插逼视频在线观看| 久久午夜综合久久蜜桃| 丝瓜视频免费看黄片| av在线app专区| 如日韩欧美国产精品一区二区三区 | videosex国产| 国产免费又黄又爽又色| 亚洲精品乱码久久久v下载方式| 国产亚洲精品第一综合不卡 | 午夜福利影视在线免费观看| 午夜免费鲁丝| 亚洲精品日本国产第一区| 99久国产av精品国产电影| 最近2019中文字幕mv第一页| 建设人人有责人人尽责人人享有的| 免费看av在线观看网站| 日韩欧美一区视频在线观看| 亚洲欧美一区二区三区黑人 | 伊人久久精品亚洲午夜| 80岁老熟妇乱子伦牲交| 日韩视频在线欧美| 青春草视频在线免费观看| 国产在线视频一区二区| 日韩熟女老妇一区二区性免费视频| 久久久久久久久久久免费av| 欧美xxⅹ黑人| 国产一区二区三区av在线| 亚洲欧洲精品一区二区精品久久久 | 亚洲av国产av综合av卡| 国产免费现黄频在线看| 老司机影院毛片| 91久久精品电影网| 日本与韩国留学比较| 少妇被粗大猛烈的视频| 亚洲国产精品专区欧美| av又黄又爽大尺度在线免费看| 精品一区在线观看国产| 中国国产av一级| 在线 av 中文字幕| 久久99热6这里只有精品| 久久久久久人妻| videos熟女内射| 成人综合一区亚洲| 欧美97在线视频| 欧美日韩综合久久久久久| 欧美精品人与动牲交sv欧美| 精品人妻偷拍中文字幕| 国产午夜精品久久久久久一区二区三区| 精品国产一区二区久久| 国产一区二区在线观看日韩| 视频区图区小说| 色视频在线一区二区三区| 好男人视频免费观看在线| 成年人午夜在线观看视频| 欧美丝袜亚洲另类| 乱码一卡2卡4卡精品| 国产精品人妻久久久久久| 五月开心婷婷网| 国产欧美日韩综合在线一区二区| 国国产精品蜜臀av免费| 美女xxoo啪啪120秒动态图| videossex国产| 免费黄色在线免费观看| 国产亚洲精品第一综合不卡 | 99九九在线精品视频| 久久久久国产精品人妻一区二区| 人妻一区二区av| 伦理电影大哥的女人| 22中文网久久字幕| 五月伊人婷婷丁香| av在线播放精品| 国产 精品1| 极品少妇高潮喷水抽搐| 国产av码专区亚洲av| 69精品国产乱码久久久| 国产精品一区二区在线不卡| 夜夜骑夜夜射夜夜干| 亚洲精品中文字幕在线视频| 亚洲精品久久成人aⅴ小说 | 少妇高潮的动态图| 中文天堂在线官网| 最近最新中文字幕免费大全7| 一区二区三区四区激情视频| 大香蕉97超碰在线| 啦啦啦啦在线视频资源| 国产亚洲精品第一综合不卡 | 亚洲国产最新在线播放| a级毛片黄视频| 欧美 日韩 精品 国产| 亚洲欧美色中文字幕在线| 国产精品不卡视频一区二区| 大陆偷拍与自拍| 看非洲黑人一级黄片| 啦啦啦视频在线资源免费观看| 99久国产av精品国产电影| 999精品在线视频| 成年女人在线观看亚洲视频| 国产白丝娇喘喷水9色精品| 午夜日本视频在线| 黑人欧美特级aaaaaa片| 曰老女人黄片| 久久久国产欧美日韩av| 国产白丝娇喘喷水9色精品| 日韩伦理黄色片| 国产亚洲午夜精品一区二区久久| 久久韩国三级中文字幕| a 毛片基地| 夜夜爽夜夜爽视频| 欧美亚洲 丝袜 人妻 在线| 又粗又硬又长又爽又黄的视频| 校园人妻丝袜中文字幕| 下体分泌物呈黄色| 一级爰片在线观看| av网站免费在线观看视频| 桃花免费在线播放| 在线观看美女被高潮喷水网站| 国产精品久久久久成人av| 国产无遮挡羞羞视频在线观看| 伦理电影大哥的女人| 国产精品成人在线| 日本猛色少妇xxxxx猛交久久| 人人妻人人添人人爽欧美一区卜| 中文乱码字字幕精品一区二区三区| 丝瓜视频免费看黄片| 制服丝袜香蕉在线| 爱豆传媒免费全集在线观看| 精品国产国语对白av| 免费少妇av软件| 免费高清在线观看日韩| 美女主播在线视频| 制服人妻中文乱码| 欧美xxxx性猛交bbbb| 久久亚洲国产成人精品v| 免费观看av网站的网址| 日本wwww免费看| 高清不卡的av网站| 久久99热6这里只有精品| 久热这里只有精品99| 日产精品乱码卡一卡2卡三| 日本猛色少妇xxxxx猛交久久| 最近中文字幕高清免费大全6| 国产精品国产三级国产专区5o| 精品视频人人做人人爽| 国产午夜精品久久久久久一区二区三区| 老女人水多毛片| 精品午夜福利在线看| 亚洲内射少妇av| 国产精品熟女久久久久浪| 九九爱精品视频在线观看| 国产又色又爽无遮挡免| 日韩av在线免费看完整版不卡| 亚洲国产欧美在线一区| 一二三四中文在线观看免费高清| 如何舔出高潮| 99久久精品一区二区三区| 精品视频人人做人人爽| 日本欧美视频一区| 亚洲欧美精品自产自拍| 3wmmmm亚洲av在线观看| 久久午夜综合久久蜜桃| 少妇熟女欧美另类| 80岁老熟妇乱子伦牲交| 免费高清在线观看日韩| 亚洲国产av影院在线观看| 久久人人爽av亚洲精品天堂| 国产亚洲精品第一综合不卡 | 美女主播在线视频| 国产高清国产精品国产三级| 人妻系列 视频| 黄色欧美视频在线观看| 91国产中文字幕| 欧美少妇被猛烈插入视频| 水蜜桃什么品种好| 欧美变态另类bdsm刘玥| 两个人的视频大全免费| 黑人高潮一二区| 美女cb高潮喷水在线观看| 午夜影院在线不卡| 制服丝袜香蕉在线| 97超视频在线观看视频| 91在线精品国自产拍蜜月| 国产爽快片一区二区三区| 少妇高潮的动态图| 少妇人妻 视频| 91精品伊人久久大香线蕉| 嘟嘟电影网在线观看| 久久亚洲国产成人精品v| 欧美精品一区二区免费开放| 国产成人av激情在线播放 | 国语对白做爰xxxⅹ性视频网站| 午夜精品国产一区二区电影| 精品酒店卫生间| 色婷婷av一区二区三区视频| 亚洲欧美清纯卡通| 伊人久久精品亚洲午夜| 亚州av有码| 国产日韩欧美视频二区| 三级国产精品欧美在线观看| 精品久久久久久电影网| 黄色毛片三级朝国网站| 涩涩av久久男人的天堂| 日本免费在线观看一区| 国产一区二区三区av在线| 精品一区在线观看国产| 国产精品一区www在线观看| 国产午夜精品一二区理论片| av在线观看视频网站免费| 国国产精品蜜臀av免费| 美女福利国产在线| 成人二区视频| 亚洲美女搞黄在线观看| 午夜福利,免费看| 日韩欧美一区视频在线观看| 黑人巨大精品欧美一区二区蜜桃 | 不卡视频在线观看欧美| 亚洲精华国产精华液的使用体验| 国产男女超爽视频在线观看| 黑人高潮一二区| 日韩 亚洲 欧美在线| 久久久久久久久久成人| 久久99精品国语久久久| 在线观看美女被高潮喷水网站| 久久婷婷青草| 日本与韩国留学比较| 一区二区三区免费毛片| 91精品三级在线观看| 99九九线精品视频在线观看视频| 亚洲精品久久成人aⅴ小说 | 满18在线观看网站| 99久久中文字幕三级久久日本| 国产一级毛片在线| 色网站视频免费| 亚洲欧洲日产国产| 免费黄色在线免费观看| 伦精品一区二区三区| 一区在线观看完整版| 少妇 在线观看| 日韩,欧美,国产一区二区三区| 十分钟在线观看高清视频www| 国产精品99久久99久久久不卡 | 天堂中文最新版在线下载| 五月玫瑰六月丁香| 国产片特级美女逼逼视频| 亚洲,欧美,日韩| 亚洲国产精品专区欧美| 有码 亚洲区| 亚洲欧美日韩另类电影网站| 岛国毛片在线播放| 国产精品国产三级国产av玫瑰| 午夜激情福利司机影院| 国产在线视频一区二区| 国产精品女同一区二区软件| 久久久久久久大尺度免费视频| 高清午夜精品一区二区三区| 亚洲经典国产精华液单| 久久久久久久久大av| 黄色视频在线播放观看不卡| 国产免费福利视频在线观看| 综合色丁香网| 亚洲国产精品国产精品| 亚洲美女视频黄频| 国产精品嫩草影院av在线观看| a级片在线免费高清观看视频| 国产精品无大码| 黄色毛片三级朝国网站| 午夜福利视频在线观看免费| 亚洲精品久久久久久婷婷小说| 午夜免费鲁丝| 欧美精品高潮呻吟av久久| 男的添女的下面高潮视频| 亚洲四区av| 日日摸夜夜添夜夜添av毛片| 少妇人妻 视频| 热99国产精品久久久久久7| 欧美变态另类bdsm刘玥| 色哟哟·www| 啦啦啦啦在线视频资源| 欧美三级亚洲精品| 久久久精品94久久精品| 狠狠精品人妻久久久久久综合| 一区在线观看完整版| 91精品国产国语对白视频| 国产av一区二区精品久久| 亚洲美女视频黄频| 高清毛片免费看| freevideosex欧美| 春色校园在线视频观看| 国产精品国产av在线观看| 午夜精品国产一区二区电影| 18禁观看日本| 日本免费在线观看一区| 九九久久精品国产亚洲av麻豆| 国产片特级美女逼逼视频| 精品酒店卫生间| 亚洲一级一片aⅴ在线观看| 亚洲欧美一区二区三区国产| 日韩一本色道免费dvd| 黄色视频在线播放观看不卡| 欧美亚洲 丝袜 人妻 在线| 嘟嘟电影网在线观看| 人人妻人人澡人人看|