• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    多年凍土區(qū)空間通風(fēng)殼型基礎(chǔ)設(shè)備技術(shù)

    2014-03-19 03:43:36GoncharovPetrova
    關(guān)鍵詞:多年凍土西伯利亞聯(lián)邦

    Goncharov Y.M.,Petrova Y.M.

    (西伯利亞聯(lián)邦大學(xué) 土木工程學(xué)院,克拉斯諾亞爾斯克 660041,俄羅斯)

    0 Introduction

    In the view of essential novelty of the structure of the surface ventilated shell-type foundation and unusual conditions of its work,with presence of permafrost soils,and a lack of information about the technology of its device and temperature condition of soil base formation,the aim was set to develop and investigate:

    1)The device technology of intermediate layer from different nonfrost-susceptible soils;

    2)The filling technology of internal spaces of shell-type foundation by a low-strength material;

    3)The manufacture of prefabricated shell-type foundation elements outside the factory conditions;

    4)The manufacturing technology of cast in situ thin-walled structures shell-type foundation at the construction site in the North conditions,in particular in reinforcement,and concreting structures;

    5)To investigate the formation of temperature conditions base soils of operated experimental buildings which built at high-temperature and strongly-icy soils.

    1 Materials and Methods

    The design of the spatial ventilated shell-type foundation implements the concept of load transmission and deformation from foundation,combining the functions of bearing structures and freezing soil of device base,through an intermediate layer,realized from nonfrost-susceptible material,which leads to a significant reduction of intensity of cryogenic processes in thermal and mechanical interaction of buildings with frozen soil.

    Possible design schemes of the ground part of building in shell-type foundations are shown in Fig.1.

    Fig.1 Structural scheme of the building cap(a)for a building with technical floor;(b)the same with ventilated underground1-fold;2-insert;3-intermediate layer;4-bearing wall;5– floor slabs;6-foundation ventilated space;7-column;8-;9-brick fencing;10-air hole;11-spandrel beam under the socle panel;12-glass holder under the column.

    Taking into consideration,qualitative device of intermediate layer fill pad is an essential condition for reliable stability of a building;this issue is to be paid great attention.For this purpose,it is necessary to make layering fill and compact to increase its bearing capacity by mechanical methods using rollers.When you select a method of soil compression and soil compression-type machines,you should consider the soil properties(granulometric composition,moisture,degree of homogeneity,required density)and also amount of work and season.

    Work on non-cohesive soils compression(sand,gravel and sand,etc.)necessary to produce at their moisture level closing to the optimum,so that the greatest compression effect is achieved.

    The above mentioned,the device of intermediate layer is based on the experience of building in Igarka and Norilsk.

    Before,experimental works on developing the technology of intermediate layer device from coarse sand were conducted before experimental housing construction in Igarka.Fill was made layer by layer by 20~25 cm.

    To obtain the required density of fill with void ratio of e=0.5~0.55,each layer was sprinkled with water(the watering machine)to a moisture content of W=7%~9%.Pneumatic roller brought about rolling layers.

    The rolling density using a Dorn densitometer was pre-determined after 5~6 trips in one track.The rolling density was considered to be achieved for each layer,if the dive striker occurred at 8~10 dropping weights with mass of 3 kg densitometer.

    Before the fill of the next layer with the help of rings,samples were selected and un laboratory conditions humidity and average density were determined to calculate the void ratio.Sampling was carried out in the entire area of 92.5 m2in the corners of the grid with a side of 150 cm×150 cm.

    Punching tests with A=5 000 cm2were conducted to determine the total deformation modulus E0of a sand bed.Punching test has shown that in compacting using the above method deformation modulus corresponds to 28.5 MPa.

    Later,filled and compacted bed were served for testing the prototype shell-type foundation.

    During the construction of the first three residential buildings and laboratory building in Igarka city on the shell-type foundations,an intermediate layer (bed)was made from sandy gravel.

    Construction of experimental buildings in Igarka was performed at watered taliks in the permafrost zone with deformation modulus of E0=3,4 MPa.This area built was within the old riverbed with silt.Keeping in mind the geological conditions of the building site and the territory relief,works on large-block hard rock fill for the purpose of“reinforcement”of base liquid mass under the bed shell-type foundations and creation of a single mark of territory of development planning were made originally.

    Works to fill a bed of gravel-sand mixture with a moisture between 10%and 12%were carried out for the planned,construction site for development.

    Moistening of soil mixture was made by a watering machine.

    The fill was realized layer by layer by 15~20 cm with compacting by a loaded dump-body truck.The rolling density was determined visually and was considered to be achieved after complete lack of track tread of a wheel dump-truck.After its completion to the designed level,works on the arrangement of sand-cement inserts under internal spaces of shell-type foundation were made for laying-out axis of buildings.Schemes are shown in Fig.2.

    A layer of 10 cm sand was prepared and poured on the prepared base,after that formwork was set on two constraint axes of the building of its transverse direction in the first half of a shift,then the sand-cement solution(M25)was filled and compacted by an internal vibrator.(Fig.2(a)).

    Formwork allowed creating an insert on the internal form of shell-type foundation folds.In 3 hours,the formwork was removed and rearranged to the following foundation folds,and the process was further repeated.

    Leveling course of the same sand-cement mixture was deposited on the inserts surface and after that precast reinforced concrete foundation elementswere mounted,then armatures welding,and joints concreting between them were made.

    Fig.2 Scheme for filling internal spaces shell-type foundation:a-filling using the panel formwork;b-the same after installation of prefabricated elements,c-filling through holes in the horizontal beams mounted prefabricated shell-type foundation1-formwork;2,5-solution;3-board in the places of prefabricated elements are jointed;4-box;5-bucket;6-horizontal beam with holes for grouting.

    The sequence of production for filling the internal foundation spaces changed at laying of the second building,as well as the laboratory building.At the beginning,elements of foundation were installed along the transverse laying-out axis of building.Thereafter,wooden boards and gutters were fastened at the ends of foundation folds(Fig.2(b)).Then through the gutters and gaps between the fold elements,solution was poured and its compacting was produced(Fig.3).

    Fig.3 Filling the internal foundation space

    The degree of filling of the folds internal spaces by the mixture was monitored to displace their surplus from boxes and gaps between elements[1].

    The third scheme was also developed with the aim of filling the internal shell-type foundation spaces by solution.

    The prefabricated elements of foundation along transverse laying-out axes of building are necessary to be erected at the prepared base where in horizontal folds beams,it is necessary to provide two δ=100 mm holes between internal reinforcing stiffening ribs (Fig.2(c)).The injection of complex solution (sand,cement,lime)by M25 hose through the holes above is made after prefabricated elements have been installed in the design position.

    Filling the internal spaces with solution can be controlled by its displacement in a neighbouring hole while compaction by vibrators,which is passed inside after the space complete filling.

    The metal formwork was fabricated for the manufacture of prefabricated elements of the shell-type foundation,in which a reinforcing cage was installed (Fig.4).

    Its sides were closed after installation of the reinforcing cage into the formwork,and the concrete pouring occurred with W/C=0.7 m B20.

    Concrete compaction was made by vibrators,which were fastened to the inclined sides of the formwork,two on each side.

    A steaming cap was used for concrete durability (Fig.5),in which the steam from the concrete section was supplied by a hose.Product Steaming was produced up to 80%of concrete strength,then the cap was raised,the formwork sides were opened and products produced were removed(Fig.6 and Fig.7).The prefabricated elements were delivered and packed at a construction site(Fig.8).During the construction of a 4-storey frame-panel administrative and amenity building(AAB)in the Norilsk industrial district(Oganer) on the surface shell-type foundation,the latter was made in a monolithic form(Fig.9).

    Fig.5 Lifting steaming cap:1-cap;2-formwork with reinforced concrete element

    Fig.6 Opening formwork sides after steaming

    Fig.7 Lifting and entrucking the element

    Fig.8 Prefabricated elements at a construction site

    Fig.9 The monolithic structure of shell-type foundation1-foundation fold;2-horizontal slab;3-vertical stiffening ribs;4-broadening under column base;5-horizontal fold beam;6-insert in the inner foundation spaces;MJ-movement joint.

    Before starting work on filling the intermediate layer under the building,"reinforcement"of upper peat layer has been done.Previously,boraxes heaving was cut,trees were uprooted,a small lake was filled up with the larger particles of rock,which has been under the spot building.

    The arrangement of the intermediate layer was made from rock in two stages.

    At the first stage,keeping in mind the complex relief of the territory in the micro-district Oganer,preliminary works were performed for soil mixture filling (rock fraction size from 10~15 to 50~60 cm with an admixture of loam).The presence in rock the loam allowed creating an impervious layer in the form of" sand-gravel-clay building mixture"as a result of soil mixture compaction.

    The capacity of"sand-gravel-clay building mixture"depending on the construction site relief was 50~80 cm,and in lower areas,including the lake-to 2m.

    The wave motion of backfilled surface was observed while filling and compaction of the first two layers in the first stage,especially in the place where site included the lake area.Therefore,the backfilled soil in this area of the lake was removed to its natural base and rocky ground was poured at the bottom of the formed depression(the size of individual particles was to 30~50 cm),and then with the help of a vibrating roller,the rock was pressed into the pit bottom.Further,several layers of rock were laid(average fraction size to 20~30 cm),and compacted layer by layer.Fill and compaction were made to a surface mark of the surrounding territory site.This work was carried out at a temperature of-10℃.After replacement of the soil and its compaction(for 3 shifts),undulating motion of the surface stopped and the whole site of the first fill phase was additionally compacted by a 12-ton vibrating roller.

    The density analysis of the fill pad was performed by determining the density in pouring and compacting state.Grain composition,humidity,the content of clay particles were also performed.For example,a quarry density in a natural condition was-1.72 g/cm3and in a compacting one-2.34 g/cm3,humidity-5.7% and the content of clay particles-8.7%.

    Later layerwise fill of second stage from pure crushed rocky with fraction sizes of 20~30 cm was carried out at temperature of-20℃,with its compaction by vibrating rollers to the design elevation.Before filling each next layer,the site was cleared from snow in case it had snowed.

    Final vertical planning of site was made by fill of the sandy gravel compacted by BelAz with 400 kN load.

    Before concreting shell-type foundation,the works for arrangement of sand-cement inserts M25 originally were performed under the internal spaces of shell-type foundation,as shown in Fig.2(a),in its turn,the inserts served as the base for reinforcement and concreting of the foundation body.

    Reinforcement of shell-type foundation was performed by separate and bent reinforcing bars which had been delivered to the construction site from the reinforcement section of reinforcement concrete products factory(Fig.10).

    Fig.10 Common view of shell-type foundation reinforcement.

    To provide a continuous concreting of a spatial 25 cm thin-walled shell-type foundation,the latter was divided into three areas each of which corresponding to the temperature size unit(Fig.11).

    Fig.11 Technological schemes of concreting shell-type foundation:

    The laying concrete scheme in the foundation design with two technological breaks was developed for reasons of necessity to constantly alternate works on mounting armature(horizontal beams,wall beam and anvils)with the formwork and concrete works.The necessity of phased concreting was dictated by the condition for achievement the required quality of laying concrete mixture in thin-walled structure of foundation fold of inclined elements which was saturated by armature,with the possibility of further compaction of concrete mixture by vibrators.The first technological place was (Fig.9(a))at the temperature foundation block,including the horizontal slobs,1/3 of the inclined slobs,and the second site 2/3 of the inclined slobs consisted of,the horizontal foundation beams and vertical reinforcing stiffening ribs.After shell-type foundation concreting at the first temperature block,works on the formwork device,installation armature,anvils,wall beam(provided in the initial draft of AAB)and their subsequent concreting,were produced.At the second and third temperature block,all works for reinforcement and concreting of the foundation had the same flow sheet.

    Concreting foundation at the first concreting technological place is shown on Fig.12.

    Fig.12 Concreting foundation at the first concreting technological place

    All works on the site were occurred on the basis of the work production plan developed by the"Promstroi" and"Norilskstroi".

    The compaction of concrete mixture was immediately performed after its laying by hand internal vibrators before appearing the signs of laitance in the surface,lack of bubbling air and ending of settling of concrete mixture.The beginning of setting concrete was in the range of 3~6 hours from the moment of its installation in structure.

    Favorable temperature and humidity weather conditions during concreting(16~17℃)have contributed to a rapid increase in concrete strength and its cube strength,for example,foundation slab was from 30 to 41.4 MPa in 28 daily age.

    The mobility of concrete mixture ranged from 6 to 12 of cone slump.

    The installation of columns and slabs was accomplished after complete ending of works and getting the desired concrete strength.

    Fig.13 shows a photograph of a building erection and Fig.14 shows the general view of AAB.

    Fig.13 Building erection

    Fig.14 The general view of administrative and amenity building

    The experimental building construction and observation of formation temperature soil condition at their bases were carried out according to the above-mentioned technology of arrangement of spatial ventilated shell-type foundations in Norilsk and Igarka.

    A small lake turned out to be under AAB spot while building connection(Fig.15),water being removed from it,and depression filling with rock compaction.

    The presence of positive formation of soil temperature(from 2 to 4℃)below the lake bottom in the future influenced the temperature soil condition of base intermediate layer in the former lake area.Fig.15 shows graphs of temperature soil dynamics under the foundation to a 10 m depth.

    Fig.15 Ground temperature profiles beneath the office/service center,Norilskx—x IX.1989;Δ—Δ—IX.1990,o—o—IX.1991;?—?—IX.1992;----average depth of pad

    Analysis of temperature data showed,first,complete freezing of the fill below the base of the foundation;second,lowering of the ground temperatures in comparison to 1989(before fill placement).At a distance of 7.5 m from the building edge,for example,the ground temperature at 10 m depth decreased from-0.7℃ in September 1989 to-1.0℃in September 1991 and-1.4℃ in September 1992(borehole 7).In borehole10,cooling was respectively from -0.1 to-0.3℃,from 0.1 to-0.7℃ and to-1.15℃(Fig.15).Other boreholes showed similar changes.The talik around BH 10 affected ground temperatures outside the thaw zone:temperatures lowered with increasing distance from the talik.Ground temperatures at 10 m depth in BH 4 located 12.0 m away were- 0.6 and-0.7℃,respectively.Ground temperature profiles also illustrate that in 1989 the depths of seasonal thaw beneath the building were 4 and 3 m in BH 10 and 4,respectively.In 1991 thaw depths were significantly reduced,to 2.3 and 1.8 m.In other boreholes,thaw depths were within 2.0.In 1992,all boreholes measured the same depths of thaw not exceeding 1.8 m.,and then was 1.3 m.

    Along with temperature,settlement observations were conducted which showed that settlements were relatively uniform.The maximum settlement did not exceed 2 cm in 1992.

    In Igarka,a heated parking garage was constructed on a ventilated shell-type foundation.The foundation was built of prefabricated and cast-in-situ sections.It was based on a gravel/sand pad of thickness ranging from 0.5 to 1.5 m in lengthwise direction.The garage was a brick structure 6 m in height and 10.4 by 18.0 m in plan area.

    The subsoil profile at the construction site was as follows:-ice-rich silty clay with ice lenses 3 to 30 cm in thickness;ice content of up to 40%.Permafrost temperature is-0.8 to-0.9℃.

    Details of the foundation are shown in Fig.16.Rectangular ventilating ducts were provided between the folded foundation elements leaning against 160-mm-thick horizontal slabs.

    Fig.16 Cross-section of the heated parking garage on a shell-type foundation,Igarka.1-folded element;2-ventilating duct;3-granular fill pad;4-cast-in-situ slab;5-granular infill;6-insulation;7-concrete floor

    Fig.17 shows changes in the ground temperatures during four years of operation.The figure illustrates that temperature decreased with depth,and the maximum depth of thaw was 1.3 m.The ground temperature at 7 m depth lowered from -0.9 in 1989 to-1.4℃ in 1992.At a distance of 1.5 m from the side wall axis(south),the depth of seasonal thaw was 1 m below the base of the fill.

    Cooling or warming of the subgrade occurs through the inner spaces of folded elements and the ventilating ducts where air temperature is colder than inside and outside the building.This is confirmed by the data presented in Fig.17 for the summer-winter months.

    The thermal regime of the concrete floor has little effect on the subgrade thermal regime[2].Heat exchange with the ground mainly occurs due to air movement through the ventilating spaces in the foundation during the winter(Fig.17(b)).As is seen in the graph,seasonal thaw progression in the subgrade is mainly influenced by a relatively short season whose length and climatic parameters vary from year to year. In 1992,for example,the period of positive temperatures was about 3 months in length.Maximum positive temperatures(13.8 and 14.7℃)were both observed in August.Mean monthly temperatures for July and September were 4.3 and 2.3℃,respectively.The maximum average monthly temperature in the ducts was close to the outside air temperature only during August,while during the other months it was much lower (Fig.17(a)).

    The lower temperatures along the vertical section of the foundation(ducts,beneath the fill pad,and at the top and base of the horizontal slab)compared to the outside air temperature are due to the absence of solar radiation beneath the foundation.An additional effect is from the cold accumulated in the ground during the previous winter,as indicated by±0℃ temperatures in June in the contact zone between the foundation and the fill(Fig.17(a),2,3 and 4).As a result,the depth of seasonal thaw below the foundation was less than 1.3 m.This explains the observed dynamics of subgrade temperatures and rising of the per-mafrost table under the foundation.

    Fig.17 Graphs of mean monthly temperature(a)and air velocity(b)a-temperatures along the foundation's vertical section:1-outside air,2-duct air,3-below the infill,4-beneath the foundation base,5-on the garage floor;b-air velocity:1-outside the building,2-in the duct;c-vertical section of the foundation:2~5-temperature measurement points

    The mean monthly air temperature begins to decrease in September and falls below 0℃ in October (Fig.17(a),1).This results in lowering of temperatures across the foundation(points 2,3 and 4)and in the subgrade.Starting from October,the temperatures across the foundation are warmer than ambient air due to heat exchange between the building and the subgrade(a heating season starts in September).Ground cooling adjacent to the garage is stronger,as illustrated by the temperature profile for October 1995.In the depth interval from 1 to 3 m(the pad and subgrade),temperatures beneath the building are colder than in the surrounding ground due to the absence of solar radiation.Below these depths,the foundation soils are warmer than the surrounding ground.

    The results of field observations presented above suggest that the combination of open spaces in the spatial foundation(at a 6 m spacing of the folds),ventilating ducts and granular fill not only maintain the foundation in a frozen state,but also cool its temperatures provided that no thawing is allowed during building’s service life.

    2 Conclusion

    Building construction can be carried out in areas of permafrost soil distribution on the surface of ventilated shell-type foundations on structurally weak stronglyicy and high-temperature ground.

    The internal spaces of shell-type foundations are necessary to be filled with low strength material with strength quality not above M25.

    The local broadening with outcomes of armature for the design of monolithic glass-holders for the column is need to provide in horizontal beams of shelltype foundation elements for frame buildings with concentrated loads.

    Reinforcement of shell-type foundation elements is reasonable to carry out by enlarged spatial reinforced prefabricated frames.

    The outcomes of work armature for subsequent embedment of joints in prefabricated monolithic variant of production it is necessary to provide in manufacture of prefabricated shell-type foundation elements along the perimeter.

    The gap setting between adjoining foundation elements is assigned according to the axes pitch of the foundation.The minimum size of the gap,welding of armature outcomes is not provided,should be not less than 30 diameters.In a smaller gap,it is necessary to weld the outcomes of armature.

    Shell-type foundations in a prefabricated or cast in situ design are made of heavy-weight concrete classes with compressive strength B20~B30.For the class of buildings on the extent of responsibility:I-B30,and II-IV-B20,and monolithing the joint-from concrete B40 and B30,as appropriate.The reinforcement bar of A-2 and A-3 classes,wire reinforcement is BP used-1 class,for working and structural reinforcement.The grade of concrete in freeze-thaw resistance depends on the class of buildings on the extent of responsibility: for buildings of I class-F300 and F200 for others.The grade of concrete on water permeability must be not less than W6.

    Reinforcement of monolithic foundations by reinforcement bars,as well as using the factory reinforcement frames can be performed in winter conditions in slight precipitation areas,and in areas where there are often large snow drifts during a snowstorm-in the warm season.

    To provide a continuous concreting cast in situ of shell-type foundation the latter must be divided into separated areas within temperature length and movement joint.

    Keeping in mind the necessity of constant alternation of mounting armature,from horizontal beams,wall beams,if they occur,according to the project,and anvils for the columns with erection of formwork is necessary to develop a scheme of foundation concreting with two technological breaks within area.

    Phased concreting is necessary to achieve quality of laying concrete mixture in to thin-walled structure of inclined foundation elements,saturated with reinforcement,and the possibility of subsequent compaction by vibrators.All works should be implemented at a site according to work production plan.

    Laying concrete mixture in the construction of the shell-type foundation needs to be carried out at the entire elements thickness without gaps,consequently with the laying direction from outer edges of area to the center.Laying concrete mixture in the vertical direction needs to be implemented on 1/3 foundation folds height at the beginning,and further to 2/3 of their height.

    Compaction concrete mixture should be carried out immediately after its laying by the deep vibrators before compaction signs(the appearance of laitance at the surface,the lack of air bubbles and finish of settling of concrete mixture).The mobility of the concrete mixture must be between 6-12 cm slump concrete.

    Quality control of concreting monolithic foundation should be in accordance with the instructions for bearing reinforcement concrete structures.

    [1] Goncharov Y M,Construction experience of the buildings in the watered taliks[J].Science and Technology in Yakutia,2006,1 (10):12-16.

    [2] Goncharov Y M,Popovich A P,Surface spatial ventilated foundations at the permafrost[M].Yakutsk:Permafrost institute after P.I.Melinokov Siberian branch of the Russian Academy of Science,2013.

    猜你喜歡
    多年凍土西伯利亞聯(lián)邦
    中國東北多年凍土退化對植被季節(jié)NDVI 的影響研究
    一“炮”而紅 音聯(lián)邦SVSound 2000 Pro品鑒會完滿舉行
    西伯利亞的熊媽媽
    小讀者(2019年20期)2020-01-04 02:13:32
    303A深圳市音聯(lián)邦電氣有限公司
    西伯利亞博亞雷巖畫與歐亞大草原的青銅時代
    太陽能制冷在多年凍土熱穩(wěn)定維護(hù)中的傳熱效果研究
    多年凍土地基隔熱保溫技術(shù)研究綜述
    多年凍土區(qū)鐵路路堤臨界高度研究
    來啦!西伯利亞!
    探索地理(2013年3期)2014-01-09 06:37:28
    20年后捷克與斯洛伐克各界對聯(lián)邦解體的反思
    在线观看美女被高潮喷水网站 | 欧美乱色亚洲激情| 在线观看日韩欧美| 国产成人精品久久二区二区91| 亚洲aⅴ乱码一区二区在线播放 | 高清毛片免费观看视频网站| 在线永久观看黄色视频| av在线播放免费不卡| 亚洲欧美日韩无卡精品| 色在线成人网| 日韩欧美国产一区二区入口| 国产成人系列免费观看| 日本五十路高清| 国内少妇人妻偷人精品xxx网站 | 一二三四在线观看免费中文在| 欧美激情久久久久久爽电影| 欧美乱色亚洲激情| 国产亚洲精品综合一区在线观看 | 香蕉av资源在线| 久久欧美精品欧美久久欧美| 欧美激情久久久久久爽电影| 91在线观看av| 国产人伦9x9x在线观看| 九色国产91popny在线| 狂野欧美激情性xxxx| 99精品久久久久人妻精品| 操出白浆在线播放| 国产成人aa在线观看| 日本 欧美在线| 国产精品久久视频播放| 色精品久久人妻99蜜桃| 99国产精品一区二区蜜桃av| 在线观看美女被高潮喷水网站 | 香蕉久久夜色| 国产69精品久久久久777片 | 免费av毛片视频| 97碰自拍视频| 三级男女做爰猛烈吃奶摸视频| 中文字幕高清在线视频| 国产真实乱freesex| 国产一区二区三区在线臀色熟女| 欧美日韩中文字幕国产精品一区二区三区| avwww免费| 久久婷婷人人爽人人干人人爱| 国产蜜桃级精品一区二区三区| 成人国产一区最新在线观看| 久久欧美精品欧美久久欧美| 此物有八面人人有两片| 18禁黄网站禁片免费观看直播| 在线观看一区二区三区| 精品乱码久久久久久99久播| 麻豆国产97在线/欧美 | 欧美日韩亚洲综合一区二区三区_| 91麻豆精品激情在线观看国产| 国产亚洲精品第一综合不卡| 一本大道久久a久久精品| 两个人看的免费小视频| 精品久久久久久久久久久久久| 精品久久久久久久久久久久久| 一卡2卡三卡四卡精品乱码亚洲| 国产精品永久免费网站| 丰满人妻熟妇乱又伦精品不卡| 人妻丰满熟妇av一区二区三区| 国产伦在线观看视频一区| 成人特级黄色片久久久久久久| 欧美激情久久久久久爽电影| 在线a可以看的网站| 成人av一区二区三区在线看| 亚洲美女黄片视频| 午夜a级毛片| 精品乱码久久久久久99久播| 日韩精品免费视频一区二区三区| 美女黄网站色视频| 听说在线观看完整版免费高清| 亚洲18禁久久av| 91麻豆精品激情在线观看国产| 午夜福利欧美成人| 少妇粗大呻吟视频| 亚洲中文字幕一区二区三区有码在线看 | 久久国产乱子伦精品免费另类| 日本免费一区二区三区高清不卡| 国产精品久久久久久久电影 | 国产精品 欧美亚洲| 精品久久久久久久久久久久久| 免费在线观看日本一区| 国产精品野战在线观看| 真人做人爱边吃奶动态| 精品国产亚洲在线| 日韩欧美国产一区二区入口| 久久天堂一区二区三区四区| 免费看美女性在线毛片视频| 久久午夜亚洲精品久久| 亚洲欧美日韩高清专用| 国产麻豆成人av免费视频| 国产v大片淫在线免费观看| 国产片内射在线| 欧美乱码精品一区二区三区| 黄色成人免费大全| 亚洲 国产 在线| 一进一出好大好爽视频| 久久人妻福利社区极品人妻图片| 欧美乱妇无乱码| 精品久久久久久成人av| 看片在线看免费视频| 精品福利观看| 人人妻人人澡欧美一区二区| 国产精品,欧美在线| 一个人免费在线观看电影 | 亚洲欧美日韩东京热| avwww免费| 又大又爽又粗| 免费在线观看日本一区| 免费看a级黄色片| 丰满的人妻完整版| 99国产精品一区二区蜜桃av| 久久精品国产99精品国产亚洲性色| 久久 成人 亚洲| av中文乱码字幕在线| 久久人妻福利社区极品人妻图片| 日韩欧美国产在线观看| 我的老师免费观看完整版| 琪琪午夜伦伦电影理论片6080| 久99久视频精品免费| 亚洲国产欧美网| 精华霜和精华液先用哪个| av超薄肉色丝袜交足视频| 日本一本二区三区精品| 亚洲真实伦在线观看| 两个人视频免费观看高清| 久久久久精品国产欧美久久久| 身体一侧抽搐| 99国产综合亚洲精品| 成人三级做爰电影| 精品不卡国产一区二区三区| 亚洲av日韩精品久久久久久密| 97超级碰碰碰精品色视频在线观看| 国产免费男女视频| 国产高清激情床上av| 香蕉国产在线看| 麻豆一二三区av精品| 亚洲欧美日韩无卡精品| 18美女黄网站色大片免费观看| 91老司机精品| 久久国产乱子伦精品免费另类| 男女视频在线观看网站免费 | 亚洲av电影在线进入| 91麻豆av在线| 少妇粗大呻吟视频| 免费人成视频x8x8入口观看| 亚洲人成网站高清观看| 国产精品影院久久| 亚洲黑人精品在线| 欧美另类亚洲清纯唯美| 又黄又爽又免费观看的视频| 亚洲欧美日韩高清在线视频| 国产高清videossex| 真人做人爱边吃奶动态| 亚洲电影在线观看av| 深夜精品福利| 亚洲七黄色美女视频| 国产av一区在线观看免费| 亚洲熟女毛片儿| 国产欧美日韩精品亚洲av| 在线观看免费日韩欧美大片| 国产在线精品亚洲第一网站| 国产精品久久久久久久电影 | 成人国语在线视频| 看免费av毛片| 国产三级中文精品| or卡值多少钱| 91av网站免费观看| 国产真实乱freesex| 啦啦啦韩国在线观看视频| 成人国产一区最新在线观看| 亚洲精品国产精品久久久不卡| 嫩草影院精品99| 午夜精品久久久久久毛片777| 黄色成人免费大全| 日本成人三级电影网站| 又粗又爽又猛毛片免费看| av在线天堂中文字幕| 国产成人欧美在线观看| 免费观看精品视频网站| 日韩欧美国产一区二区入口| 欧美成人性av电影在线观看| 正在播放国产对白刺激| 亚洲欧美精品综合一区二区三区| 免费av毛片视频| 制服诱惑二区| 免费一级毛片在线播放高清视频| 亚洲中文字幕日韩| 久久中文看片网| 欧美黑人巨大hd| 国内久久婷婷六月综合欲色啪| 国产精品久久久久久久电影 | 亚洲欧美日韩东京热| 国产又色又爽无遮挡免费看| 男人的好看免费观看在线视频 | 久久久水蜜桃国产精品网| 别揉我奶头~嗯~啊~动态视频| 欧美一级a爱片免费观看看 | 麻豆成人午夜福利视频| 中文字幕久久专区| 99久久久亚洲精品蜜臀av| 国产精品日韩av在线免费观看| 非洲黑人性xxxx精品又粗又长| 国内精品一区二区在线观看| 午夜a级毛片| 中国美女看黄片| 亚洲在线自拍视频| 亚洲精品中文字幕在线视频| 欧美一区二区国产精品久久精品 | 欧美精品啪啪一区二区三区| 美女黄网站色视频| 久久香蕉激情| 国产激情欧美一区二区| 亚洲全国av大片| 久久中文字幕人妻熟女| 人妻久久中文字幕网| 妹子高潮喷水视频| 免费av毛片视频| 最近在线观看免费完整版| 国产精品电影一区二区三区| 我的老师免费观看完整版| 国产av不卡久久| 亚洲色图 男人天堂 中文字幕| 久久人妻av系列| 国产精品久久久久久久电影 | 黑人巨大精品欧美一区二区mp4| 欧美黄色片欧美黄色片| 在线观看免费午夜福利视频| 搡老熟女国产l中国老女人| 少妇人妻一区二区三区视频| cao死你这个sao货| 男女那种视频在线观看| 18禁观看日本| 欧美日韩中文字幕国产精品一区二区三区| 中文字幕精品亚洲无线码一区| 国产亚洲精品综合一区在线观看 | 国产区一区二久久| 亚洲欧美精品综合一区二区三区| 国产av一区二区精品久久| 99riav亚洲国产免费| 国产成人av激情在线播放| 嫩草影视91久久| 19禁男女啪啪无遮挡网站| 黄片大片在线免费观看| 国产激情久久老熟女| 曰老女人黄片| 91麻豆精品激情在线观看国产| 18禁裸乳无遮挡免费网站照片| 91老司机精品| 不卡一级毛片| 国产精品爽爽va在线观看网站| 成年免费大片在线观看| 欧美乱色亚洲激情| 久久久久亚洲av毛片大全| 天天添夜夜摸| 很黄的视频免费| 无限看片的www在线观看| 五月伊人婷婷丁香| 亚洲国产精品成人综合色| 亚洲国产中文字幕在线视频| 小说图片视频综合网站| 中文字幕人妻丝袜一区二区| 午夜激情福利司机影院| 一本综合久久免费| 一a级毛片在线观看| www.www免费av| 国产激情欧美一区二区| 亚洲美女黄片视频| 亚洲黑人精品在线| 精品第一国产精品| 此物有八面人人有两片| 最近最新中文字幕大全免费视频| 国产又黄又爽又无遮挡在线| 好男人电影高清在线观看| 成人午夜高清在线视频| 亚洲国产精品久久男人天堂| 搡老熟女国产l中国老女人| 国产精品综合久久久久久久免费| 女生性感内裤真人,穿戴方法视频| 特大巨黑吊av在线直播| 国产精品久久久久久久电影 | 久久热在线av| 少妇熟女aⅴ在线视频| 国产av在哪里看| 国产成人精品无人区| 精品久久久久久久久久久久久| 老汉色∧v一级毛片| 免费高清视频大片| 亚洲免费av在线视频| 777久久人妻少妇嫩草av网站| 国产私拍福利视频在线观看| 午夜精品在线福利| 精品久久久久久久人妻蜜臀av| www日本黄色视频网| 久久久久国内视频| 亚洲精品av麻豆狂野| 美女大奶头视频| 日韩大码丰满熟妇| 日日爽夜夜爽网站| 亚洲国产看品久久| 麻豆成人午夜福利视频| 亚洲国产精品合色在线| 久久久久久久久久黄片| 午夜老司机福利片| 免费无遮挡裸体视频| 床上黄色一级片| 国产免费av片在线观看野外av| 在线观看免费日韩欧美大片| 91在线观看av| 五月玫瑰六月丁香| 国产精品爽爽va在线观看网站| 国产精品一区二区免费欧美| 一区二区三区激情视频| 国产高清视频在线观看网站| 国产精品亚洲av一区麻豆| 一区二区三区激情视频| 久久人妻福利社区极品人妻图片| 高潮久久久久久久久久久不卡| 国产午夜精品论理片| 国产高清视频在线播放一区| 极品教师在线免费播放| 桃色一区二区三区在线观看| 国语自产精品视频在线第100页| 日本精品一区二区三区蜜桃| 精品久久蜜臀av无| 一本精品99久久精品77| 精品国产亚洲在线| 听说在线观看完整版免费高清| 精品午夜福利视频在线观看一区| 精品国产亚洲在线| 精品免费久久久久久久清纯| 蜜桃久久精品国产亚洲av| 999久久久精品免费观看国产| 日韩 欧美 亚洲 中文字幕| 欧美色视频一区免费| 真人做人爱边吃奶动态| 久久婷婷人人爽人人干人人爱| 精品免费久久久久久久清纯| 亚洲成a人片在线一区二区| 动漫黄色视频在线观看| 亚洲精品粉嫩美女一区| 欧美日韩亚洲国产一区二区在线观看| 男人舔女人的私密视频| 90打野战视频偷拍视频| 亚洲av成人精品一区久久| 国产又色又爽无遮挡免费看| 欧美日韩福利视频一区二区| 精品少妇一区二区三区视频日本电影| 国产精品自产拍在线观看55亚洲| 国产人伦9x9x在线观看| 少妇人妻一区二区三区视频| 国产精品美女特级片免费视频播放器 | 波多野结衣巨乳人妻| ponron亚洲| 一个人观看的视频www高清免费观看 | 欧美日韩亚洲综合一区二区三区_| 国产av一区在线观看免费| 亚洲全国av大片| 男女视频在线观看网站免费 | 日韩av在线大香蕉| 国产伦在线观看视频一区| 床上黄色一级片| 久久久国产成人精品二区| 99久久久亚洲精品蜜臀av| 丝袜人妻中文字幕| 搞女人的毛片| 国产三级黄色录像| 亚洲欧美精品综合久久99| 此物有八面人人有两片| 日韩大码丰满熟妇| 日韩精品中文字幕看吧| 久久久精品欧美日韩精品| 久久久精品大字幕| av在线播放免费不卡| 非洲黑人性xxxx精品又粗又长| 久久精品91蜜桃| 亚洲黑人精品在线| 久久久久久久久中文| 丰满人妻一区二区三区视频av | 麻豆久久精品国产亚洲av| 一级片免费观看大全| 一本综合久久免费| 国产一区二区在线av高清观看| 久久久久精品国产欧美久久久| 啦啦啦免费观看视频1| 非洲黑人性xxxx精品又粗又长| 成人av一区二区三区在线看| 最近最新免费中文字幕在线| 可以免费在线观看a视频的电影网站| 午夜福利高清视频| 亚洲国产欧美一区二区综合| 午夜日韩欧美国产| 两个人免费观看高清视频| 老司机午夜十八禁免费视频| 老司机在亚洲福利影院| 精品国产乱码久久久久久男人| 91老司机精品| 午夜影院日韩av| 嫁个100分男人电影在线观看| 丁香六月欧美| 97人妻精品一区二区三区麻豆| 99国产精品一区二区蜜桃av| 两个人看的免费小视频| 国产真人三级小视频在线观看| 男插女下体视频免费在线播放| 在线十欧美十亚洲十日本专区| 国产主播在线观看一区二区| 免费在线观看亚洲国产| 777久久人妻少妇嫩草av网站| 91av网站免费观看| 国产亚洲精品综合一区在线观看 | 正在播放国产对白刺激| 精品久久久久久,| 在线观看免费日韩欧美大片| 91九色精品人成在线观看| 久久天堂一区二区三区四区| 老司机福利观看| 99国产极品粉嫩在线观看| 亚洲一码二码三码区别大吗| 麻豆一二三区av精品| 黄色女人牲交| 国产成人欧美在线观看| 每晚都被弄得嗷嗷叫到高潮| 国产精品亚洲美女久久久| 午夜视频精品福利| 欧美日韩亚洲综合一区二区三区_| 制服人妻中文乱码| 国产精品久久久av美女十八| 可以在线观看的亚洲视频| 精品国产亚洲在线| 夜夜爽天天搞| 好看av亚洲va欧美ⅴa在| 亚洲激情在线av| 精品日产1卡2卡| 12—13女人毛片做爰片一| 久久久久久久精品吃奶| 国产亚洲精品综合一区在线观看 | 在线观看免费午夜福利视频| 精品不卡国产一区二区三区| 一夜夜www| 日韩欧美在线乱码| 久久香蕉国产精品| 精品久久久久久久久久免费视频| 日本 av在线| 国产v大片淫在线免费观看| 大型黄色视频在线免费观看| 黄片大片在线免费观看| 国产精品一区二区三区四区免费观看 | 亚洲av成人av| www.精华液| 精华霜和精华液先用哪个| av福利片在线| 亚洲色图av天堂| 久久中文字幕一级| 国产激情偷乱视频一区二区| 国产高清视频在线观看网站| 国产久久久一区二区三区| av天堂在线播放| 一本一本综合久久| 777久久人妻少妇嫩草av网站| 淫秽高清视频在线观看| 免费观看精品视频网站| 深夜精品福利| 欧美国产日韩亚洲一区| 草草在线视频免费看| 国产单亲对白刺激| 美女大奶头视频| 色综合欧美亚洲国产小说| 亚洲av成人不卡在线观看播放网| 在线观看免费午夜福利视频| 亚洲 国产 在线| 日本一区二区免费在线视频| 久久久久久人人人人人| 国产成人aa在线观看| 久久久久久九九精品二区国产 | 欧美三级亚洲精品| 1024视频免费在线观看| 日韩国内少妇激情av| 极品教师在线免费播放| 亚洲一区二区三区不卡视频| 老汉色av国产亚洲站长工具| 精品熟女少妇八av免费久了| 国产一级毛片七仙女欲春2| 禁无遮挡网站| 久久香蕉精品热| 免费看十八禁软件| 日韩中文字幕欧美一区二区| 香蕉国产在线看| 夜夜看夜夜爽夜夜摸| 久久久久国内视频| 岛国在线观看网站| av视频在线观看入口| 两性午夜刺激爽爽歪歪视频在线观看 | 欧美乱妇无乱码| 国产99白浆流出| 亚洲一卡2卡3卡4卡5卡精品中文| 午夜视频精品福利| 99在线视频只有这里精品首页| 每晚都被弄得嗷嗷叫到高潮| 18美女黄网站色大片免费观看| 国产乱人伦免费视频| 岛国在线免费视频观看| 午夜日韩欧美国产| 国产亚洲欧美在线一区二区| 看片在线看免费视频| 国产黄a三级三级三级人| 九色国产91popny在线| 久久精品国产清高在天天线| 伦理电影免费视频| www日本黄色视频网| 国产久久久一区二区三区| 免费电影在线观看免费观看| 夜夜躁狠狠躁天天躁| 亚洲中文av在线| 91在线观看av| 成在线人永久免费视频| 欧美乱码精品一区二区三区| 少妇裸体淫交视频免费看高清 | 午夜a级毛片| 色尼玛亚洲综合影院| 一进一出好大好爽视频| 天堂影院成人在线观看| 美女高潮喷水抽搐中文字幕| 国内精品久久久久精免费| 久久精品影院6| 精品高清国产在线一区| 久久久精品欧美日韩精品| 成人永久免费在线观看视频| 夜夜爽天天搞| 精品少妇一区二区三区视频日本电影| 桃红色精品国产亚洲av| 麻豆久久精品国产亚洲av| 可以在线观看的亚洲视频| 波多野结衣高清无吗| e午夜精品久久久久久久| 亚洲成人中文字幕在线播放| 99热这里只有精品一区 | 不卡一级毛片| 日韩有码中文字幕| 欧美+亚洲+日韩+国产| 日本撒尿小便嘘嘘汇集6| 人人妻人人澡欧美一区二区| 老司机午夜福利在线观看视频| 99re在线观看精品视频| 在线播放国产精品三级| 国产精品,欧美在线| 久久久精品大字幕| 久久久久久大精品| 99久久99久久久精品蜜桃| 一个人免费在线观看电影 | 国产在线观看jvid| 欧美最黄视频在线播放免费| 夜夜爽天天搞| av天堂在线播放| 九色国产91popny在线| 国产亚洲精品久久久久5区| 久久久久久免费高清国产稀缺| 国产v大片淫在线免费观看| 床上黄色一级片| 国产精品一区二区精品视频观看| 国内精品久久久久久久电影| 香蕉av资源在线| 无限看片的www在线观看| 最近在线观看免费完整版| 国内揄拍国产精品人妻在线| 中文字幕av在线有码专区| 18禁裸乳无遮挡免费网站照片| 久久国产乱子伦精品免费另类| 欧美一级a爱片免费观看看 | 99久久久亚洲精品蜜臀av| 亚洲国产中文字幕在线视频| 淫秽高清视频在线观看| 一区二区三区激情视频| 成人三级做爰电影| 久久久久久大精品| 一区二区三区激情视频| 老司机福利观看| 九九热线精品视视频播放| 亚洲熟女毛片儿| 精品午夜福利视频在线观看一区| 久久精品综合一区二区三区| 中文亚洲av片在线观看爽| 首页视频小说图片口味搜索| www.999成人在线观看| 成年版毛片免费区| 97超级碰碰碰精品色视频在线观看| 中文字幕人成人乱码亚洲影| 精品久久久久久久久久久久久| 床上黄色一级片| 中文资源天堂在线| 亚洲欧美一区二区三区黑人| 亚洲熟女毛片儿| 在线观看免费午夜福利视频| 大型黄色视频在线免费观看| 狂野欧美激情性xxxx| 在线永久观看黄色视频| 久久久久久久久免费视频了| 亚洲无线在线观看| 九色国产91popny在线| 视频区欧美日本亚洲| 熟妇人妻久久中文字幕3abv| 久久久久国内视频| 日韩欧美国产一区二区入口| 午夜福利成人在线免费观看| 1024香蕉在线观看| 一级毛片高清免费大全| 我要搜黄色片| 精品少妇一区二区三区视频日本电影| 91国产中文字幕| 又粗又爽又猛毛片免费看| 老司机午夜福利在线观看视频| 少妇被粗大的猛进出69影院|