    Effects of different types of guardrails on sand transportation of desert highway pavement

    2022-09-16 09:27:36GAOLiCHENGJianjunWANGHaifengYUANXinxin
    Journal of Arid Land 2022年9期

    GAO Li, CHENG Jianjun*, WANG Haifeng, YUAN Xinxin

    1 College of Water Resources and Architectural Engineering, Shihezi University, Shihezi 832003, China;

    2 Xinjiang Institute of Ecology and Geography, Chinese Academy of Sciences, Urumqi 830000, China

    Abstract: Guardrail, an important highway traffic safety facility, is mainly used to prevent vehicles from accidentally driving off the road and to ensure driving safety. Desert highway guardrails hinder the movement of wind-blown sand, resulting in the decline of sand transportation by the pavement and the deposition of sand gains on the pavement, and endangering traffic safety. To reveal the influence of guardrails on sand transportation of desert highway pavement, we tested the flow field and sand transport volume distribution around the concrete, W-beam, and cable guardrails under different wind velocities through wind tunnel simulation. Wind velocity attenuation coefficients, sand transportation quantity, and sand transportation efficiency are used to measure sand transportation of highway pavement. The results show that the sand transportation of highway pavement was closely related to the zoning characteristics of flow field and variation of wind velocity around the guardrails. The flow field of the concrete guardrail was divided into deceleration, acceleration, and vortex zones. The interaction between the W-beam guardrail and wind-blown sand was similar to that of lower wind deflector. Behind and under the plates,there were the vortex zone and acceleration zone, respectively. The acceleration zone was conducive to transporting sand on the pavement. The cable guardrail only caused wind velocity variability within the height range of guardrail, and there was no sand deposition on the highway pavement. When the cable,W-beam, and concrete guardrails were used, the total transportation quantities on the highway pavement were 423.53, 415.74, and 136.53 g/min, respectively, and sand transportation efficiencies were 99.31%,91.25%, and 12.84%, respectively. From the perspective of effective sand transportation on the pavement,the cable guardrail should be preferred as a desert highway guardrail, followed by the W-beam guardrail,and the concrete guardrail is unsuitable. The study results provide theoretical basis for the optimal design of desert highway guardrails and the prevention of wind-blown sand disasters on the highway pavement.

    Keywords: desert highway; wind-blown sand; guardrail; sand transportation capacity; wind tunnel test

    1 Introduction

    Wind-blown sand in desert areas poses a serious threat to agriculture, forestry, and transportation industry. Dry climate, strong winds, and abundant sand sources have made highways and railways across the area prone to wind-blown sand disasters (Dong et al., 2004; Lei et al., 2008; Cheng et al., 2014; Li et al., 2021). Subgrade wind erosion and sand deposition on the highway pavement are caused by the passing wind-blown sand. In severe cases, highways are buried by sand, trains are stopped, and highway traffic is blocked (Han et al., 2003; Xiao et al., 2015; Bruno et al.,2018), which have a serious impact on driving safety. At present, the total length of desert highways built in China exceeds 4000 km, and the total length of desert highways under construction exceeds 1000 km. These desert-crossing highways are the main arteries for highway transportation in China. Therefore, wind-blown sand prevention is still a key engineering and technical problem in road construction and maintenance. Through field investigation, we found that most sand deposition on highways crossing wind-blown sand activity areas is located near the guardrail (Fig. 1), indicating that the guardrail has a great effect on sediment transport and sand transportation of desert highway pavement.

    Fig. 1 Sand deposition near the guardrails of desert highways. (a), concrete guardrail; (b), W-beam guardrail (Li et al., 2016); (c), cable guardrail.

    To prevent vehicles from accidentally driving off the road due to faults or accidents, people usually installed concrete guardrails (rigid guardrails), W-beam guardrails (semi-rigid guardrails)or cable guardrails (flexible guardrails) on both sides of the highway subgrade, on the median separator, and on bridges to ensure driving safety (Jason et al., 2005; Wang et al., 2011). In desert areas, different forms of guardrails become obstacles in the process of wind-blown sand movement, which disturb the wind-blown sand to varying degrees, reduce the wind velocity, and change the flow field distribution, resulting in reduced sand transportation and sand grain deposition. Sand deposition on highway pavement will lead to the reduction of road surface friction and skid-resistant performance, vehicle slip, obstruction of drivers' sight, and other effects, which endanger driving safety and increase the difficulty and burden of road maintenance work (Pan et al., 2021).

    Research on prevention of wind-blown sand disasters along highways and railways has a long history, and the existing measures for prevention and control of wind-blown sand disasters can generally be divided into three categories. The first category includes mechanical sand prevention measures, such as high vertical reed sand barriers, polyethylene (PE)-net sand barriers, sheet-type sand fences, etc. (Cheng et al., 2016a, b; Chen et al., 2019; Cheng et al., 2021), and sand stabilization measures, such as low vertical grass squares, PE grids, sand fixation boards, etc.(Wang et al., 2020; Ding et al., 2021). The second category includes biological sand prevention measures, such as planting sand-fixing plants (Haloxylon ammodendron(C. A. Mey.) Bunge,Tamarix, etc.) in a certain area on both sides of the highway to build sand blocking and sand stabilization zones (Li et al., 2021), forming natural protective barriers to prevent mobile dunes from invading the highway. The third category includes chemical sand stabilization measures,such as spraying chemical sand stabilization agents on the sand surface to form a consolidation layer for sand fixation (Han et al., 2003). These three measures have been widely used in the prevention of wind-blown sand disasters for roads in desert areas, which play an important role in reducing sand deposition on the road and ensuring the driving safety of vehicles. The above three types of sand prevention measures are all aimed at off-road sand protection systems, and there is little research conducted on the influence of highway structures and accessory facilities on sediment transport. In the practice of sand prevention on desert highway, due to the smooth highway surface, sand disasters along the road can be effectively controlled by making full use of smooth characteristics of the pavement for sand transportation in combination with sand barrier resistance and sand particle stabilization system. Therefore, how to effectively utilize the pavement for sand transportation and related research is very urgent.

    Methods such as field observations, wind tunnel tests, and numerical simulation are usually used to study wind-blown sand movement. Among them, wind tunnel testing is a powerful tool to study the aerodynamic characteristics of obstacles and sand transport under artificial simulated atmospheric boundary conditions. Li et al. (2020) conducted scaled-down tests in wind tunnels to simulate the destructive process of sand grains on desert highway by taking sand grains with different diameters and subgrades at different gradients as models. Shi et al. (2021) compared and evaluated the sand prevention performance of two concrete sand-prevention barriers along the railways in strong wind areas using wind tunnel tests andin situmonitoring. Wang et al. (2020a,b) preliminarily studied the flow field and sand deposition patterns on both sides of the subgrade and around the median separator of a high-grade highway. Most of studies focused on the characteristics of wind-blown sand fields and sand prevention performance of various sand prevention measures along the highway. Few studies focused on the influence of different types of guardrails on sand transportation of highway pavement using wind tunnel tests.

    In this study, based on the urgent need for sand prevention engineering practices for desert highways, wind velocities around the concrete, W-beam, and cable guardrails, as well as pavement sand transportation quantity, were tested by wind tunnel modulation. Wind velocity isoline maps, wind velocity attenuation coefficients, sand transportation efficiency, vertical distribution of sand transportation quantity, and sand transportation characteristics along the desert highway were obtained. Meanwhile, sand transportation of the highway pavement under three types of guardrails was compared. The results might provide a theoretical basis for type selection, structure design, and parameter optimization of desert highway guardrails.

    2 Materials and methods

    2.1 Materials

    The blow-down wind tunnel utilized in this study is mainly comprised of five parts: power section,rectification section, sand supply section, test section, and diffusion section. The whole length was 38 m, the test section length was 21 m, the cross-section size of the test section was 1.3 m(width)×1.0 m (height), and wind velocity was continuously adjustable from 0 to 20 m/s. Previous experiments showed that the wind turbulence degree was about 1.0%, the airflow stability coefficient was less than 1.0%, and the transverse unevenness was less than 2.5%. Wind velocity measuring device included a pitot tube, micro-pressure sensor, and supporting software for wind tunnel system. The axis wind velocity measuring device at the entrance of a test section was the Hot-Wire Anemometer (HWA). The HWA was calibrated with a pitot tube and differential pressure meter before testing. The guardrail height was at the scale of 1:10 according to the Chinese national standard. The height of the concrete guardrail (Ha) was 8.1 cm, the W-beam guardrail (Hb) 7.5 cm, and the cable guardrail (Hc) 11.3 cm. The concrete guardrail was made from poured concrete, the W-beam guardrail consisted of a pillar and waveform iron sheet (the iron sheet height was 3.1 cm), and the cable guardrail was assembled from pillars and steel cables(5 steel cables, each 0.18 cm in diameter). The three types of guardrails were 80 cm in length to avoid the influence of wind tunnel sidewall on the wind field.

    2.2 Experimental design

    Wind tunnel test was divided into two parts: a flow field test and a sediment transport test. For the convenience of study, an open-field test (with the same wind velocity and sand source, but no guardrail model) was set as a control treatment. When conducting flow field tests in the wind tunnel, wind speeds at different monitoring points were measured using a pitot tube fixed on an adjustable frame, with the monitoring points set at 1.0H, 2.0H, 5.0H, and 10.0H (H is the guardrail height) on the windward side, and 0.0H, 1.0H, 2.0H, 5.0H, 10.0H, 15.0H, and 20.0H on the leeward side of guardrail (Fig. 2). Pitot tube can simultaneously monitor speeds at heights of 1, 2, 3, 5, 7, 10, 15, 30, and 50 cm. After the measured wind velocity data were processed by Surfer software, the wind velocity isoline maps around the three types of guardrails were obtained. The Kriging value was selected as the interpolation.

    Fig. 2 Layout of the flow field test. H is the height of guardrail.

    Fig. 3 Flow field and sediment transport measurement. (a), pitot rube; (b), concrete guardrail; (c), W-beam guardrail; (d), cable guardrail.

    When sand transport tests in the wind tunnel were conducted, the sand was supplied by means of wind blowing, and the amount of sand source supplied under the same wind velocity and the testing time were consistent. Sandpaper was laid flat on the wind tunnel floor to simulate surface roughness. Sandpaper length ranged from 40.0H before the guardrail to 20.0H after the guardrail.Installation position of the guardrail remained unchanged. Dune sand collected from the Taklimakan Desert was tiled at the entrance of wind tunnel test section at 100 cm (length)×80 cm(width)×2 cm (height). The device was run at a wind velocity of 8 m/s for 5 min, and photographs were taken to record sand deposition near the guardrail. Pre-testing showed that when a sand sampler was installed outside 2.0H on the leeward side of guardrail, the influence of the sand sampler on the sand deposition distribution was avoided, and sand grains of different heights were effectively collected. Therefore, sand sampler was installed at 2.0H, 5.0H, 10.0H, 15.0H, and 20.0H on the leeward side. At the end of the test, sand deposition quantities collected at different heights in the sand collecting box on the leeward side of guardrail were weighed, and sand deposition distributions around the three types of guardrail was observed (Fig. 3). The sand samplers had an overall height of 20 cm, and were distributed vertically and evenly across 20 sand collecting holes, which were 1 cm×1 cm. To avoid sand saturation collected by sand samplers due to an excessively long-time test, the test times for 8, 10, 12, and 14 m/s wind velocities in this test were 15, 7, 4, and 3 min, respectively.Figure 4 showed wind velocity profiles of the simulated boundary layer measured in the wind tunnel tests, which conformed to a logarithmic distribution. The boundary layer thickness in the test sections was about 15.0 cm, and the maximum height of the guardrail was 11.3 cm, located in the boundary layer. According to the calculation principle of hydrodynamics, the blocking probability of the tunnel section must be less than 5% in wind tunnel simulation, i.e., the percentage of model area to the whole section area must be less than 5% to avoid a deformation effect. In this study, the blocking probabilities of the concrete, W-beam, and cable guardrails were 4.98%, 1.91%, and 0.55%, respectively, and met all requirements. The lowest wind velocity in the test was 8 m/s, and the Reynolds number (Re) was 6.1×105according to the guardrail height.Previous studies have shown that when Re equals or exceeds the minimum independent value of 1×105, the scale model flow would be dynamically similar to that in the full-size case (White,1996). In the wind tunnel test section, the Froude number (Fr) of grain saltation was 20, which met the minimumFrcriterion proposed by Owen and Gillette (1985):

    Fig. 4 Wind velocity profiles of the simulated boundary layer

    whereFris the Froude number;u∞is the velocity of fluid (m/s);gis the gravitational acceleration (m/s2); andHis the characteristic length (m).

    2.3 Evaluation indicators

    At a certain distance from the leeward side and a certain height above the ground, the wind velocity reduction degree is expressed by the wind velocity attenuation coefficient (WVAC) as follows:

    wherexis the distance between a test point on the leeward side and the guardrail (H: H is the guardrail height);zis the height of a test point from the ground (m);v0(x,z)is the wind velocity at point (x,z) with no guardrail (m/s); andv(x,z)is the wind velocity at point (x,z) with the guardrail(m/s). The larger the value of WVAC, the more severe the wind velocity attenuation, and the weaker the sand transportation capacity (STC) of the airflow. The area with a larger value of WVAC may become a sand unloading area or sand deposition area.

    To reveal the effects of different types of guardrails on sand transportation of desert highway pavement, we used Equation 3 to calculate sand transportation efficiency (STE) of the pavement below 1.0H of the guardrail.

    whereηxis the STE of the pavement at distancex(2.0H, 5.0H, 10.0H, 15.0H, and 20.0H) from the guardrail;Qnxiis the sand interception (g/(cm2?min)) of theithsand collecting box atxwith no guardrail arranged; andQhxiis the sand interception (g/(cm2?min)) of theithsand collecting box atxwith guardrail arranged. The higher the STE, the better the STC, and the less the deposited sand when that type of guardrail is used.

    3 Results

    3.1 Flow field distribution around the guardrail

    The quantity of sand transported on the highway pavement and deposition trends are affected and controlled by the flow field distribution around the guardrail. Figure 5 shows the wind velocity isoline maps of three types of guardrail at a wind velocity of 12 m/s. The positive and negative values represent the leeward and windward sides of guardrail, respectively. It can be seen from Figure 5 that the flow field around the guardrail changed due to their blocking effects, and the velocity isoline maps for the three types of guardrail also differed significantly. The flow field around the concrete guardrail was divided into three areas: a deceleration zone on the windward side, an upper acceleration zone, and a vortex zone on the leeward side (Fig. 5a). The airflow around the W-beam beam was hindered by the corrugated plate, above and below, which produced a detour flow. When the upper airflow was raised, its speed increased, forming an acceleration zone. The separated upper and lower airflow generated a vortex zone on the leeward side of guardrail. When the reverse airflow met the forward airflow accelerated under the plate,the forward wind velocity decreased, forming a deceleration zone (Fig. 5b). The cable guardrail had little influence on the incoming wind velocity, which caused increased airflow pulsation on the windward side and no clear change in flow field distribution on the leeward side (Fig. 5c).

    Fig. 5 Isoline maps of wind velocity distribution around different types of guardrail under the velocity of 12 m/s.The positive and negative values represent the leeward and windward sides of guardrail, respectively. (a),concrete guardrail; (b), W-beam guardrail; (c), cable guardrail.

    Based on the wind tunnel test results and wind velocity isoline maps, the evolution of streamlines and wind patterns around the three types of guardrail are shown in Figure 6. As the airflow approached the concrete guardrail, the cross section decreases, the normal airflow was blocked, and the velocity in front of the guardrail decreased. When the airflow passed through the concrete guardrail, the cross section increased. Airflow accelerated to lift at the top of the guardrail, forming a reverse flow area on the leeward side due to the influence of the reverse pressure gradient, which caused sand deposition (Fig. 6a). The W-beam guardrail surface was not ventilated, and the area under the guardrail was ventilated, so the velocity and direction of airflow through the guardrail changed. The top and bottom airflows were separated by squeezing,accelerating airflow formed at the upper and lower ends of the plate, and a small vortex zone formed on the leeward side. After the airflow under different velocities converged again, sand was deposited at a distance behind the guardrail (Fig. 6b). The cable guardrail had good ventilation and hardly hindered airflow, so its streamlines resumed and remained in the inflow state soon after it was slightly offset near the cable (Fig. 6c).

    Fig. 6 Schematic diagram for streamline distribution around the guardrail. Ru is the clockwise vortex zone on the windward side, and Rd is the reversed flow region on the leeward side. (a), concrete guardrail; (b), W-beam guardrail; (c), cable guardrail.

    3.2 Variation of wind velocity attenuation coefficient (WVAC)

    Wind-blown sand movement is a sand conveying phenomenon close to the surface, and wind is the power source behind sand movement. The change of wind velocity near the surface determines the sand deposition distribution and sand transportation efficiency of the highway pavement on the leeward side of guardrail.

    According to Equation 2, we calculated WVACs for the three types of guardrail at three heights (0.5H, 1.0H, and 3.0H), respectively, as shown in Figure 7. The vertical ordinate is WVAC, and the horizontal ordinate contains the positions of test points (positive values represent the windward side, negative values represent the leeward side, and 0 is the position of the guardrail). It can be seen that WVAC for the concrete and W-beam guardrails varied greatly between –0.230 and 1.000, while the cable guardrail only ranged from –0.080 to 0.207.As wind velocity increased, WVAC curves for the three types of guardrail did not change significantly overall, but the change trends varied greatly at different heights. At 0.5H and 1.0H, the rising and falling sections on the curves clearly changed, while the wind velocity on the leeward side decreased significantly, but at 3.0H, the curve changed smoothly with smaller fluctuation.

    For the concrete guardrail, in the range of 1.0H– –5.0H (shown by the red dotted line in the figure) and at 0.5H and 1.0H, WVAC varied smoothly between 0.859 and 1.000, indicating that the guardrail had a significant weakening effect on airflow at 1.0H height. Wind velocity attenuated sharply, and in the vortex zone, the creeping and saltating sand grains may deposit. In the interval from 0.0H to 10.0H on the leeward side, at a height of 3.0H, WVAC was less than 0.000, with a negative value appearing, suggesting that the airflow was in the acceleration zone.In the range of 5.0H–10.0H on the windward side, WVAC was between 0.000 and 0.140, and the wind velocity was almost equal to the inflow wind velocity. WVAC in the range of 1.0H–5.0H was between –0.028 and 0.430. At heights of 0.5H and 1.0H, WVAC suddenly increased from 0.430 to 1.000 in the range of 0.0H–1.0H, indicating that wind velocity rapidly decreased to 0.

    Fig. 7 Wind velocity attenuation coefficient (WVAC) of different types of guardrail under the wind velocities of 8, 10, 12, and 14 m/s. (a), concrete guardrail; (b), W-beam guardrail; (c), cable guardrail.

    In the range of 1.0H–10.0H on the windward side, WVAC for the W-beam guardrail varied slightly, and wind velocity was consistent with the inflow velocity, while airflow was not affected by the guardrail. However, in the range of 1.0H–2.0H, WVAC below 1.0H rapidly increased above 0.600, indicating that wind velocity on the windward and leeward sides of guardrail decreased significantly; while at 3.0H, it decreased to a negative value and was in the acceleration zone. WVAC decreased rapidly in the range of 2.0H–5.0H and gradually stabilized from 5.0H to 20.0H.

    WVAC curve for the cable guardrail at different heights varied greatly in the range of–1.0H–1.0H, with amplitude changes ranging from –0.100 to 0.200. This result indicated that the incoming flow was affected by slight disturbance from the cable, and wind velocity changed slightly. WVACs at all heights varied smoothly from –0.050 to 0.200 in the range of –5.0H––20.0H on the leeward side.

    3.3 Sand transportation capacity of the highway pavement

    To compare the influence of the three types of guardrail on sand transportation of desert highway pavement, we tested sand transportation quantity (STQ) and sand transportation efficiency (STE)for each guardrail using wind tunnel tests. Then, we summarized distribution characteristics of sand deposition on the highway pavement on the windward side of the guardrail.

    3.3.1 STQ

    STQ is one of the important indices to measure the degree of sand hazards in desert areas and the main basis for the design of sand prevention and control engineering. Desert highway pavement is smooth, and has a certain conveying capacity for sand grains in passing wind-blown sand. In the wind tunnel sand transportation tests, when there was no guardrail, the creeping and leaping sand grains in the height range of 20 cm above the pavement were carried away by the kinetic energy provided by the wind. The passing wind-blown sand moved smoothly to the highway downwind side, with no sand deposition on the highway surface. In this case, the sand sampler intercepted all sand grains transported within its height range. When guardrails were set, the cross-section of wind-blown sand decreased, the wind velocity decreased, the sand transportation capacity of wind-blown sand decreased, and some sand grains stagnated and were deposited on the road surface during transportation process. The sand sampler could only intercept part of the sand grains transported within its height range, i.e., STQ on the leeward side. The more the sand intercepted by the sand sampler, the greater the STQ of the guardrail, the better the sand transportation capacity of the highway pavement, and the less the sand that was deposited on the highway pavement.

    Figure 8 shows STQ with and without guardrails at 5.0H on the leeward side at wind speeds of 8, 10, 12 and 14 m/s. Overall, in the height range of 0–10 cm, the order of STQ from more to less is as follows: empty field test is the most, followed by the cable guardrail, the W-beam guardrail ranked the third, and the concrete guardrail is the least. In the height range of 10–20 cm, there was no clear change in quantity. As height increased, STQ decreased gradually when the cable and W-beam guardrails were used, which indicated that sand transportation capacity decreased with heights. When the concrete guardrail was used, STQ was very low at all heights, less than 3 g/(cm2?min), and there was no obvious change in quantity within the range of 0–10 cm. STQs increased slowly in the range of 10–20 cm. This result can be attributed the fact that the concrete guardrail was similar to a solid sand barrier. Sand grains were raised and suspended after wind-blown sand crossed the guardrail, resulting in the increased STQ above 1.0H. With the increase of wind velocity, the STQs at various heights on the leeward side of guardrail gradually increased.

    Table 1 shows the vertical distribution of STQ at 5.0H on the leeward sides of the three types of guardrail under the wind velocities of 8, 10, 12, and 14 m/s. The results showed that with the increase of wind velocity, STQ and total STQ (TSTQ) of the upper, middle and lower layers under the three types of guardrail increased, the percentage of relative STQ (RSTQ) of the lower layers (0–2 cm) close to the pavement decreased, RSTQ of the middle layers (3–10 cm) changed little, and RSTQ of the upper layers (11–20 cm) gradually increased. The result implied that the increase of wind velocity provided more kinetic energy to the wind-blown sand, and STQ of wind-blown sand increased, which increased the transportation height of sand grains and reduced the quantity of sand transported close to the highway pavement.

    Fig. 8 Sand transportation quantity (STQ) of the highway pavement at 5.0H on the leeward side of guardrail under the wind velocities of 8 (a), 10 (b), 12 (c), and 14 m/s (d)

    Table 1 Distribution of sand transportation quantity (STQ) on the highway pavement at 5.0H on the leeward side of guardrail under the wind velocities of 8, 10, 12, and 14 m/s

    RSTQs with the W-beam and cable guardrails were concentrated in the middle and lower layers(0–10 cm). Under the wind velocities of 8, 10, 12, and 14 m/s, when a cable guardrail was used,RSTQs of the middle and lower layers were 85.10%, 79.73%, 78.19%, and 74.36%, respectively;when a W-beam guardrail was used, they were 83.21%, 75.11%, 76.14%, and 72.34%,respectively. The cable and W-beam guardrails are porous barriers, and sand grains in the height range of the guardrail were transported through the void. When the concrete guardrails were used,STQ was concentrated on the middle and upper layers (3–20 cm), where RSTQs were 91.82%,92.7%, 91.23%, and 93.9%, respectively. Because the concrete guardrail is a solid sand barrier,sand grains of the middle and lower layers within the height of the guardrail were intercepted and deposited on the windward side of the guardrail, resulting in a reduction of STQ in the middle and lower layers of the highway pavement.

    Figure 9 shows a comparison of STQ at different horizontal positions on the leeward side of the three types of guardrail under different wind velocities. It can be seen from Figure 9 that as wind velocity increased, STQ transported at each test point on the leeward side of the three types of guardrail gradually increased. In the range of 2.0H–5.0H, STQ on the highway pavement decreased significantly. STQ on the highway pavement behind the concrete guardrail decreased the most, from 60.60 to 3.74 g/(cm2?min), which indicated that the concrete guardrail might become a potential sand deposition zone. There was no significant change in STQ on the leeward side of the three types of guardrail in the range of 5.0H–20.0H. As wind velocity increased, STQ transported on the highway pavement behind the concrete guardrail did not increase significantly,and was between 3.37 and 23.71 g/(cm2?min), indicating that sand could still be deposited on the highway pavement at a higher wind velocity. STQ on the highway pavement behind the W-beam guardrail was between 15.38 and 94.67 g/(cm2?min), and behind the cable guardrail, it was between 15.16 and 89.27 g/(cm2?min). When the wind velocity was 8 m/s, STQ at each test point on the leeward side of the three types of guardrail was below 20 g/(cm2?min).

    Fig. 9 Sand transportation quantity (STQ) of the highway pavement at different horizontal positions on the leeward side of guardrail. (a), concrete guardrail; (b), W-beam guardrail; (c), cable guardrail.

    Figure 10 shows TSTQ on the leeward side of guardrail under four wind velocities. TSTQ on the highway pavement refers to the sum of quantities at five test points (2.0H, 5.0H, 10.0H,15.0H, and 20.0H) on the leeward side of guardrail. It can be seen from Figure 10 that with the increase of wind velocity, TSTQ on the highway pavement on the leeward side of the three type of guardrail gradually increased, indicating that sand transportation capacity of wind-blown sand and STC of the highway pavement were enhanced. Thus, the sand grains were not easy to deposit.When the cable, W-beam and concrete guardrails were used and the wind velocity was 14 m/s,TSTQs were 423.53, 415.74, and 136.53 g/min, respectively. TSTQ on the highway pavement with the W-beam and cable guardrails was about three times greater than that of concrete guardrail, indicating that sand transportation capacity on the highway pavement with the cable and W-beam guardrails was better.

    Fig. 10 Total sand transportation quantity (TSTQ) of the highway pavement on the leeward side of guardrail

    3.3.2 STE

    According to Equation 3, we calculated STE of desert highway pavement with the three types of guardrail under the wind velocities of 8, 10, 12, 14 m/s, respectively, as shown in Figure 11. It can be seen from Figure 11 that as wind velocity increased, there was no obvious fluctuation in STE curve under the three types of guardrail. From 2.0H to 20.0H on the leeward side of guardrail, STE with cable and W-beam guardrails decreased slowly overall. When a cable guardrail was used, STE of the highway pavement was the highest, ranging from 61.07% to 99.31%, with the best STC. When a W-beam guardrail was used, STE of the highway pavement was between 50.66% and 91.25%, slightly less than that of a cable guardrail. When a concrete guardrail was used, STE curve was more or less unchanged. STE was between 8.96% and 12.84%,with the worst STC.

    Fig. 11 Sand transportation efficiency (STE) of the highway pavement of different types of guardrail under the wind velocities of 8 (a), 10 (b), 12 (c), and 14 m/s (d)

    3.4 Distribution of sand deposition on the highway pavement

    Figure 12 shows sand deposition around the three types of guardrail under a wind velocity of 8 m/s. It can be seen that there were obvious differences in the sand deposition distribution around the three types of guardrail. Concrete guardrail was impervious to wind, and sand deposition was mainly distributed in the vortex zone of the corresponding flow field. The quantity of sand deposition on the windward side was significantly larger than on the leeward side, and deposition on the leeward side was mainly concentrated between 1.0H and 5.0H. This result indicated that when the concrete guardrail was on the roadside of highway, it caused deposition on the shoulder and windward side of the highway pavement, and when it was located in the median separator, it caused sand deposition on both sides of the highway pavement. Deposition on the windward side of the W-beam guardrail formed strips with a small quantity of sand deposition behind 2.0H on the leeward side. The reason for this distribution was attributed to the fact that wind velocity decreased when airflow in the acceleration zone under the plate mixed with airflow in the upper vortex zone, so sand grains were deposited at a distance behind the guardrail. The airflow passing through the cable guardrail only increased the wind velocity variability, which was more conducive to the transport of sand grains. Therefore, there was no sand deposition on either the windward or leeward sides of the cable guardrail.

    Fig. 12 Sand deposition around the guardrail. (a), concrete guardrail; (b), W-beam guardrail; (c), cable guardrail.

    4 Discussion

    To study the influence of different types of guardrails on sand transportation of desert highway pavement, the flow field, STQ, and STE around the guardrail were obtained through wind tunnel testing, and the vertical distribution characteristics of STQ and variability on the leeward side of guardrail were researched. Results showed that when a concrete guardrail was used, STE and TSTQ were the lowest, and the performance was the worst, easily causing sand deposition on the highway pavement. When a cable guardrail was used, the highest STE and TSTQ, and the best performance occurred on the highway pavement with no sand deposition. STC was slightly lower with a W-beam guardrail than with a cable guardrail. Therefore, from the perspective of effective sand transportation on the highway pavement, a cable guardrail should be used, followed by a W-beam guardrail, and a concrete guardrail was not suitable. However, cable guardrails are flexible, which may endanger driving safety in the opposite direction due to the large deformation caused by the low stiffness when a vehicle crashes. Therefore, it is inappropriate to arrange a cable guardrail at the median separator, and a W-beam guardrail would be more appropriate.Therefore, STQ and STE are important parameters to be considered in the design and optimization of desert highway guardrails.

    Desert highway guardrails are traffic safety facilities, and sand barriers are used for wind-blown sand prevention along desert highways. When wind tunnel tests were conducted, the interaction between highway guardrails and wind-blown sand was similar to that of sand barriers,but different aspects were focused on. Sand barriers play the role of sand blocking, and reduce the ability of airflow to carry sand by reducing the kinetic energy of airflow around it, forcing sand grains to deposit nearby and avoiding sand deposition on the pavement. STC affected by the guardrails was mainly concerned with, for example, reducing the resistance along the way during wind-blown sand movement, so that the passing wind-blown sand can smoothly pass through the pavement and move to the downwind side of the highway, producing effective sand transportation.The concrete guardrail was equivalent to pore-free solid sand barriers, while the W-beam and cable guardrails were equivalent to permeable solid sand barriers. There were two flow forms when airflows passed through the sand barrier: one was seepage through the sand barrier pores,and the other was detour flow through the sand barrier. Porosity will change the sand barrier air permeability (Tsukahara et al., 2012). With the change of wind velocity and porosity, the structure and partition of flow field around sand barriers will change (Bruno et al., 2018).

    In this study, the three types of guardrail had different structures, wind resistance areas, wind ventilation areas, and porosity (Table 2). Concrete guardrail had no pore, a larger wake vortex zone, and more sand deposition. Studies have shown that when the sand barrier porositygreater than 20%–40%, the airflow is mainly controlled by flow at the pore, and the wake vortex zone disappears (Li and Sherman, 2015). The porosity of cable guardrail was 92.00%, and the flow field distribution characteristics were the same as the research results by Li and Sherman (2015).The porosity of the W-beam guardrail was 58.66%, and the wake zone behind the corrugated plate still had a small vortex zone, which was inconsistent with previous studies. We inferred that although the corrugated plate had higher porosity, from the structural trait, the upper part was an air-tight plate, and the lower part was fully air-permeable. The structure was similar to a lower wind deflector. A vortex zone occurred behind the plate before the air raised by the wind deflector converges with the air compressed through the plate lower outlet (Cheng et al., 2017; Han et al.,2017). Therefore, the wind ventilation and resistance areas of the guardrail are important factors affecting STC of the desert highway pavement.The subgrade of desert highway mainly includes embankment and cutting, with partial zero-fill subgrade, and half-fill and half-excavation subgrade (Fig. 1). In the design of highway engineering, guardrails must be set on both sides of an embankment and the filling side of a half-fill and half-excavation subgrade. Guardrails of desert highway not only need to ensure traffic safety, but also transport sand effectively on the highway pavement. Optimizing guardrail structure of desert highway pavement, improving STE and reducing the frequency and intensity of sand hazards will be the focus of future studies.

    Table 2 Wind ventilation area, wind resistance area, and porosity of the guardrail

    5 Conclusions

    Wind tunnel tests were used to study the effects of concrete, W-beam and cable guardrails on sand transportation of desert highway pavement. Different types of guardrail had different effects on sand transportation, which were closely related to zoning characteristics of flow fields around the guardrail. Wind velocity isoline map of concrete guardrail showed three typical flow field zones.The interaction between the W-beam guardrail and wind-blown sand was similar to that of lower wind deflector. There was no obvious zoning in wind velocity isoline map around the cable guardrail, which had little disturbance effects on the airflow. WVAC showed that wind velocity on the leeward side of the concrete and W-beam guardrails declined. Wind velocity attenuation amplitude on the leeward side of the W-beam guardrail was small, thus it was hard to deposit sand grains on the highway pavement. Wind velocity changed slightly on both sides of the cable guardrail. As wind velocity increased, STQ on the leeward side of the three types of guardrail gradually increased. Cable guardrail had the highest TSTQ and STE, concrete guardrail had the lowest, and W-beam guardrail was the medium. Sand grains were deposited contiguously on the windward and leeward sides of the concrete guardrail. When a W-beam guardrail was used, small amount of sand grains was deposited on the leeward side. There was no sand deposition on the windward and leeward sides of the cable guardrail. In conclusion, to realize effective sand transportation on the highway pavement and alleviate sand deposition hazards, the W-beam and cable guardrails should be used instead of the concrete guardrail in desert highways. Future research should focus on the influence of subgrade section form, topography, and the angle between dominant wind direction and subgrade. The synergistic effect of pavement sand transportation and sand control measures along the desert highway is also the research field.

    Acknowledgements

    This work was supported by the National Natural Science Foundation of China (52168065). The authors also thank the anonymous reviewers and the editor who helped to improve the quality of this paper.

    久久香蕉精品热| 久久久精品国产亚洲av高清涩受| 狠狠狠狠99中文字幕| 中亚洲国语对白在线视频| 久久九九热精品免费| 三级毛片av免费| 性欧美人与动物交配| 日本在线视频免费播放| 精品国产乱子伦一区二区三区| 9191精品国产免费久久| 精品少妇一区二区三区视频日本电影| www.自偷自拍.com| 宅男免费午夜| 久久精品人人爽人人爽视色| 精品国产美女av久久久久小说| 视频区欧美日本亚洲| 亚洲一码二码三码区别大吗| 亚洲色图 男人天堂 中文字幕| 女人被狂操c到高潮| 国内久久婷婷六月综合欲色啪| 色av中文字幕| 一边摸一边抽搐一进一小说| 欧美大码av| aaaaa片日本免费| 久久香蕉激情| 成年人黄色毛片网站| 高清黄色对白视频在线免费看| 精品国产美女av久久久久小说| 色综合站精品国产| 99riav亚洲国产免费| e午夜精品久久久久久久| 久久午夜亚洲精品久久| 成人三级做爰电影| 中文字幕高清在线视频| 精品国产超薄肉色丝袜足j| 91字幕亚洲| 一级a爱片免费观看的视频| 色综合亚洲欧美另类图片| 国产精品九九99| 国产亚洲精品久久久久5区| 一级,二级,三级黄色视频| 国产欧美日韩一区二区精品| 亚洲精品国产一区二区精华液| 久久午夜综合久久蜜桃| 看免费av毛片| 国产精品国产高清国产av| 999精品在线视频| 美女大奶头视频| 精品乱码久久久久久99久播| 国产成人精品无人区| 久久久久九九精品影院| 大码成人一级视频| 丝袜美足系列| 亚洲精品中文字幕在线视频| 国产免费av片在线观看野外av| 女性生殖器流出的白浆| 制服诱惑二区| 在线播放国产精品三级| 国产成人精品久久二区二区免费| 国产成人欧美| 午夜福利欧美成人| 女性生殖器流出的白浆| 首页视频小说图片口味搜索| 一级毛片高清免费大全| 国产一级毛片七仙女欲春2 | 免费在线观看视频国产中文字幕亚洲| 午夜视频精品福利| 久久天堂一区二区三区四区| 日本a在线网址| 国产亚洲欧美精品永久| 国产成+人综合+亚洲专区| 熟妇人妻久久中文字幕3abv| 巨乳人妻的诱惑在线观看| 国产欧美日韩一区二区三区在线| 村上凉子中文字幕在线| 国产欧美日韩一区二区三| 极品教师在线免费播放| 老司机午夜十八禁免费视频| 日韩国内少妇激情av| 午夜福利高清视频| 天堂√8在线中文| 国产成人精品久久二区二区91| 久久香蕉激情| 最新美女视频免费是黄的| 超碰成人久久| 国产男靠女视频免费网站| 亚洲成人国产一区在线观看| 啪啪无遮挡十八禁网站| 中文字幕色久视频| 中文字幕高清在线视频| 日本免费一区二区三区高清不卡 | 人成视频在线观看免费观看| 成人国语在线视频| 国产激情欧美一区二区| 一级黄色大片毛片| 欧美在线黄色| 亚洲无线在线观看| 91国产中文字幕| 黄色片一级片一级黄色片| 91大片在线观看| 一本大道久久a久久精品| 老司机靠b影院| 日韩欧美一区视频在线观看| 国产成人精品久久二区二区91| 免费在线观看亚洲国产| 亚洲国产日韩欧美精品在线观看 | 99精品在免费线老司机午夜| 欧美日韩黄片免| 日本 av在线| 国产精品av久久久久免费| 好男人在线观看高清免费视频 | 亚洲中文日韩欧美视频| 12—13女人毛片做爰片一| 国产av一区二区精品久久| 香蕉丝袜av| 欧美日韩一级在线毛片| 国产激情欧美一区二区| 12—13女人毛片做爰片一| 国产精品免费一区二区三区在线| 国产精品久久视频播放| 欧美一级毛片孕妇| 丝袜美足系列| 久久久久亚洲av毛片大全| 天堂动漫精品| 69精品国产乱码久久久| av天堂久久9| 亚洲va日本ⅴa欧美va伊人久久| 亚洲伊人色综图| 国产欧美日韩精品亚洲av| 麻豆av在线久日| 人妻久久中文字幕网| 国产亚洲精品综合一区在线观看 | 欧美在线一区亚洲| 成年女人毛片免费观看观看9| 国产1区2区3区精品| 麻豆久久精品国产亚洲av| 久久精品国产清高在天天线| 啪啪无遮挡十八禁网站| 欧美成人免费av一区二区三区| 在线观看舔阴道视频| 欧美国产精品va在线观看不卡| 午夜福利欧美成人| 国产亚洲av嫩草精品影院| 日本三级黄在线观看| 亚洲va日本ⅴa欧美va伊人久久| 午夜影院日韩av| 国产精品爽爽va在线观看网站 | 老司机靠b影院| 女生性感内裤真人,穿戴方法视频| 亚洲人成电影观看| www.精华液| 欧美 亚洲 国产 日韩一| 国产精品久久久久久亚洲av鲁大| 日本欧美视频一区| 久久香蕉激情| 脱女人内裤的视频| 亚洲精品一区av在线观看| 国产精品九九99| 这个男人来自地球电影免费观看| 午夜日韩欧美国产| 国产男靠女视频免费网站| 90打野战视频偷拍视频| 中出人妻视频一区二区| 色婷婷久久久亚洲欧美| 国产高清激情床上av| 亚洲精品久久国产高清桃花| 久久人妻av系列| 国产精品1区2区在线观看.| 日本精品一区二区三区蜜桃| 久99久视频精品免费| 久久久久久久久免费视频了| 乱人伦中国视频| 露出奶头的视频| 无人区码免费观看不卡| 免费在线观看视频国产中文字幕亚洲| 午夜a级毛片| 久久性视频一级片| 色老头精品视频在线观看| 成人三级黄色视频| а√天堂www在线а√下载| 9色porny在线观看| 精品一区二区三区视频在线观看免费| 欧美激情极品国产一区二区三区| 精品国产一区二区久久| 色综合婷婷激情| 日韩精品免费视频一区二区三区| 久久天躁狠狠躁夜夜2o2o| 亚洲男人的天堂狠狠| 不卡一级毛片| 亚洲av电影在线进入| 人人妻人人澡人人看| 亚洲 欧美一区二区三区| 亚洲欧美日韩另类电影网站| 看片在线看免费视频| 亚洲国产欧美日韩在线播放| 精品久久久久久久毛片微露脸| 亚洲男人的天堂狠狠| 国语自产精品视频在线第100页| 国产又色又爽无遮挡免费看| 一本久久中文字幕| 亚洲 欧美一区二区三区| 美女国产高潮福利片在线看| 琪琪午夜伦伦电影理论片6080| 可以在线观看的亚洲视频| 午夜免费鲁丝| 久久婷婷人人爽人人干人人爱 | 国产精品98久久久久久宅男小说| 色综合亚洲欧美另类图片| 十八禁人妻一区二区| 黄色毛片三级朝国网站| 国产真人三级小视频在线观看| 亚洲国产精品成人综合色| 亚洲国产中文字幕在线视频| 亚洲国产高清在线一区二区三 | 999精品在线视频| 19禁男女啪啪无遮挡网站| 欧美日韩一级在线毛片| 老司机深夜福利视频在线观看| av中文乱码字幕在线| 国内毛片毛片毛片毛片毛片| 精品久久蜜臀av无| 一级黄色大片毛片| 长腿黑丝高跟| 免费久久久久久久精品成人欧美视频| 亚洲欧美激情在线| 亚洲第一青青草原| 香蕉国产在线看| 精品久久久久久久久久免费视频| 老司机靠b影院| 国产精品日韩av在线免费观看 | 亚洲电影在线观看av| 在线永久观看黄色视频| 久久久久九九精品影院| 精品久久久久久久久久免费视频| 日韩欧美国产一区二区入口| 午夜免费激情av| 亚洲精品av麻豆狂野| 伊人久久大香线蕉亚洲五| 久久人妻福利社区极品人妻图片| 可以免费在线观看a视频的电影网站| 亚洲av成人一区二区三| 亚洲少妇的诱惑av| 亚洲七黄色美女视频| 欧美中文日本在线观看视频| 老司机深夜福利视频在线观看| 日本欧美视频一区| 麻豆av在线久日| 久久这里只有精品19| 国产高清videossex| 国产精品 欧美亚洲| 黄频高清免费视频| 欧美成人性av电影在线观看| 久久天躁狠狠躁夜夜2o2o| 国产欧美日韩综合在线一区二区| 精品久久久久久久久久免费视频| 亚洲欧美精品综合一区二区三区| 亚洲成人免费电影在线观看| 人人妻,人人澡人人爽秒播| 少妇被粗大的猛进出69影院| 亚洲久久久国产精品| 国产av精品麻豆| 黄片大片在线免费观看| 夜夜夜夜夜久久久久| 精品久久久久久久久久免费视频| 亚洲国产精品合色在线| 97碰自拍视频| 亚洲成av片中文字幕在线观看| 在线观看日韩欧美| 精品高清国产在线一区| 午夜影院日韩av| 人成视频在线观看免费观看| 欧美大码av| 悠悠久久av| 婷婷六月久久综合丁香| 在线观看免费视频日本深夜| 久久久国产欧美日韩av| 国产一区二区激情短视频| 亚洲精品久久国产高清桃花| 99久久精品国产亚洲精品| 自拍欧美九色日韩亚洲蝌蚪91| 亚洲精品av麻豆狂野| 欧美成人午夜精品| 欧美一区二区精品小视频在线| 男女下面进入的视频免费午夜 | 女人精品久久久久毛片| 91老司机精品| 91九色精品人成在线观看| 不卡一级毛片| 露出奶头的视频| 婷婷丁香在线五月| 欧美绝顶高潮抽搐喷水| 国产蜜桃级精品一区二区三区| 黄片大片在线免费观看| 久久精品国产综合久久久| 国产xxxxx性猛交| 中亚洲国语对白在线视频| 黄片播放在线免费| 亚洲成人精品中文字幕电影| 久久久久国内视频| 久久午夜综合久久蜜桃| 欧美一区二区精品小视频在线| 精品久久久久久久毛片微露脸| 久久久久久亚洲精品国产蜜桃av| 岛国在线观看网站| 在线天堂中文资源库| 国产单亲对白刺激| 欧美成人午夜精品| 91av网站免费观看| 50天的宝宝边吃奶边哭怎么回事| 久久人人97超碰香蕉20202| 黄片大片在线免费观看| 不卡av一区二区三区| 999久久久国产精品视频| 久久香蕉国产精品| 99精品久久久久人妻精品| 美国免费a级毛片| 久久精品aⅴ一区二区三区四区| av福利片在线| 搞女人的毛片| 欧美激情 高清一区二区三区| 国产精品秋霞免费鲁丝片| 国产男靠女视频免费网站| 国产精品 国内视频| 夜夜躁狠狠躁天天躁| 亚洲专区中文字幕在线| 欧美成人一区二区免费高清观看 | 日韩精品中文字幕看吧| 少妇被粗大的猛进出69影院| 黄色丝袜av网址大全| 嫩草影视91久久| av网站免费在线观看视频| 国产精品电影一区二区三区| 一级a爱片免费观看的视频| 成人手机av| 精品久久久精品久久久| 欧美午夜高清在线| 别揉我奶头~嗯~啊~动态视频| 超碰成人久久| 久久精品影院6| 成年女人毛片免费观看观看9| 亚洲中文字幕日韩| 51午夜福利影视在线观看| 欧美久久黑人一区二区| 少妇被粗大的猛进出69影院| 欧美成人免费av一区二区三区| 亚洲国产精品合色在线| 99精品欧美一区二区三区四区| 成人手机av| 国产精品电影一区二区三区| 久久久国产欧美日韩av| 香蕉国产在线看| 中文字幕高清在线视频| 亚洲男人天堂网一区| 国产麻豆69| 在线观看免费视频日本深夜| 免费观看人在逋| 国产精品一区二区在线不卡| 亚洲成人精品中文字幕电影| 国产欧美日韩综合在线一区二区| 中文亚洲av片在线观看爽| 国产欧美日韩精品亚洲av| 大码成人一级视频| 老熟妇仑乱视频hdxx| 亚洲精品中文字幕一二三四区| 不卡av一区二区三区| 国产在线观看jvid| 国产熟女午夜一区二区三区| 少妇 在线观看| 亚洲狠狠婷婷综合久久图片| 我的亚洲天堂| 欧美黑人精品巨大| 最新在线观看一区二区三区| 精品国产超薄肉色丝袜足j| 日本免费a在线| 欧美一级a爱片免费观看看 | 国产成人精品久久二区二区免费| 一进一出好大好爽视频| 成人国语在线视频| 不卡一级毛片| 一个人观看的视频www高清免费观看 | 美女高潮喷水抽搐中文字幕| 国产精品亚洲av一区麻豆| 国产精品亚洲一级av第二区| 国产精品,欧美在线| 亚洲精品粉嫩美女一区| 中出人妻视频一区二区| 自线自在国产av| 欧美成人性av电影在线观看| 亚洲 欧美一区二区三区| 日韩成人在线观看一区二区三区| 亚洲色图 男人天堂 中文字幕| www日本在线高清视频| 日本一区二区免费在线视频| 国产精品亚洲美女久久久| 亚洲av日韩精品久久久久久密| 亚洲中文日韩欧美视频| 亚洲精品粉嫩美女一区| 国产亚洲精品av在线| 国产精品av久久久久免费| 搞女人的毛片| 色播亚洲综合网| 国产伦一二天堂av在线观看| 色播亚洲综合网| 久热爱精品视频在线9| 欧美日韩亚洲综合一区二区三区_| 夜夜躁狠狠躁天天躁| 国产午夜精品久久久久久| 级片在线观看| 91精品三级在线观看| 级片在线观看| 欧美日本亚洲视频在线播放| 熟女少妇亚洲综合色aaa.| 99国产极品粉嫩在线观看| av片东京热男人的天堂| 男人舔女人的私密视频| 午夜精品在线福利| 亚洲专区中文字幕在线| 久久性视频一级片| 国产成+人综合+亚洲专区| 大陆偷拍与自拍| 国产av一区在线观看免费| 乱人伦中国视频| 国产单亲对白刺激| 午夜免费成人在线视频| 精品久久蜜臀av无| 午夜视频精品福利| 一区在线观看完整版| 亚洲精品一卡2卡三卡4卡5卡| 亚洲人成电影观看| 午夜激情av网站| 一区二区三区精品91| 岛国在线观看网站| 久久久精品欧美日韩精品| 国产精品亚洲美女久久久| 女性生殖器流出的白浆| 美国免费a级毛片| 琪琪午夜伦伦电影理论片6080| 真人做人爱边吃奶动态| 亚洲中文av在线| 黑人欧美特级aaaaaa片| 欧美老熟妇乱子伦牲交| 国产亚洲欧美精品永久| 97人妻精品一区二区三区麻豆 | 1024视频免费在线观看| 成年版毛片免费区| 久久人妻熟女aⅴ| 欧美性长视频在线观看| 精品免费久久久久久久清纯| 韩国av一区二区三区四区| 免费在线观看完整版高清| 伦理电影免费视频| 国产不卡一卡二| 国产精品亚洲av一区麻豆| av天堂在线播放| 如日韩欧美国产精品一区二区三区| 在线观看66精品国产| 亚洲国产欧美一区二区综合| 国产成+人综合+亚洲专区| 老鸭窝网址在线观看| 中文字幕精品免费在线观看视频| 90打野战视频偷拍视频| 欧美日韩瑟瑟在线播放| 亚洲欧美一区二区三区黑人| 超碰成人久久| 日韩高清综合在线| 一级a爱视频在线免费观看| 一夜夜www| 国产精品野战在线观看| 一夜夜www| 99国产精品99久久久久| 日日干狠狠操夜夜爽| 一级a爱视频在线免费观看| 男人操女人黄网站| 日本黄色视频三级网站网址| 最近最新免费中文字幕在线| 老司机靠b影院| 99在线视频只有这里精品首页| 日韩精品青青久久久久久| 成年女人毛片免费观看观看9| 免费av毛片视频| 中文字幕久久专区| 少妇裸体淫交视频免费看高清 | 午夜免费激情av| 777久久人妻少妇嫩草av网站| 久久午夜亚洲精品久久| 不卡一级毛片| 最近最新免费中文字幕在线| 国产精品亚洲一级av第二区| 人成视频在线观看免费观看| 成人av一区二区三区在线看| 在线观看日韩欧美| 国产真人三级小视频在线观看| 亚洲第一欧美日韩一区二区三区| 国产亚洲精品久久久久久毛片| av超薄肉色丝袜交足视频| 一边摸一边抽搐一进一出视频| 精品免费久久久久久久清纯| 亚洲 欧美 日韩 在线 免费| 男人的好看免费观看在线视频 | 国产精品秋霞免费鲁丝片| 成人三级黄色视频| 欧洲精品卡2卡3卡4卡5卡区| 日韩三级视频一区二区三区| 欧美 亚洲 国产 日韩一| 十八禁人妻一区二区| 久久 成人 亚洲| 国产成人精品久久二区二区91| 国产一级毛片七仙女欲春2 | 老汉色av国产亚洲站长工具| 女人爽到高潮嗷嗷叫在线视频| 久久中文字幕人妻熟女| 国产视频一区二区在线看| 日韩高清综合在线| 午夜免费成人在线视频| 久久久久久亚洲精品国产蜜桃av| 亚洲激情在线av| av天堂久久9| 午夜福利免费观看在线| 国产亚洲精品av在线| 久久久国产精品麻豆| 777久久人妻少妇嫩草av网站| 一级片免费观看大全| 欧美亚洲日本最大视频资源| 99久久综合精品五月天人人| 天堂动漫精品| 欧美精品啪啪一区二区三区| 99在线视频只有这里精品首页| 美女免费视频网站| 久久精品国产99精品国产亚洲性色 | 欧美黄色片欧美黄色片| 黄色丝袜av网址大全| 精品国产美女av久久久久小说| 国产精品亚洲av一区麻豆| 搡老岳熟女国产| 人人妻人人爽人人添夜夜欢视频| 美女高潮到喷水免费观看| 两个人看的免费小视频| 欧美黄色片欧美黄色片| 熟女少妇亚洲综合色aaa.| 久久人人精品亚洲av| 男女下面插进去视频免费观看| 99久久99久久久精品蜜桃| 欧美成人性av电影在线观看| 久热爱精品视频在线9| 国产av又大| 日韩欧美国产一区二区入口| 首页视频小说图片口味搜索| 日韩成人在线观看一区二区三区| 久久草成人影院| 天天躁夜夜躁狠狠躁躁| 久久久久久亚洲精品国产蜜桃av| 亚洲国产精品sss在线观看| 国产成人欧美在线观看| 日本五十路高清| 波多野结衣一区麻豆| 少妇粗大呻吟视频| 免费在线观看亚洲国产| 国产男靠女视频免费网站| www.精华液| 国产欧美日韩精品亚洲av| 一本综合久久免费| 麻豆av在线久日| 身体一侧抽搐| 97超级碰碰碰精品色视频在线观看| 国产精品久久久av美女十八| 免费在线观看亚洲国产| 中文字幕人成人乱码亚洲影| 国产精品一区二区在线不卡| 18禁国产床啪视频网站| 日韩一卡2卡3卡4卡2021年| 12—13女人毛片做爰片一| 久久久久国内视频| 亚洲中文字幕一区二区三区有码在线看 | 欧美一级毛片孕妇| 18禁观看日本| 1024视频免费在线观看| 99国产精品一区二区三区| 18美女黄网站色大片免费观看| 精品卡一卡二卡四卡免费| 黄片小视频在线播放| 在线播放国产精品三级| 日韩精品免费视频一区二区三区| 亚洲精品国产色婷婷电影| 一级a爱片免费观看的视频| 两人在一起打扑克的视频| 午夜精品国产一区二区电影| 满18在线观看网站| 麻豆一二三区av精品| 欧美激情高清一区二区三区| 免费在线观看日本一区| 欧美老熟妇乱子伦牲交| 国产亚洲欧美精品永久| 少妇粗大呻吟视频| 中文字幕人妻熟女乱码| 手机成人av网站| 亚洲一码二码三码区别大吗| 曰老女人黄片| 嫩草影院精品99| 中文字幕av电影在线播放| 91麻豆精品激情在线观看国产| 亚洲av电影不卡..在线观看| 日本免费一区二区三区高清不卡 | 国产成人欧美在线观看| 每晚都被弄得嗷嗷叫到高潮| 国产成人影院久久av| 欧美性长视频在线观看| 日韩欧美免费精品| 亚洲色图综合在线观看| 久久中文字幕人妻熟女| 9191精品国产免费久久| 日韩三级视频一区二区三区| 亚洲天堂国产精品一区在线| 男人舔女人下体高潮全视频| 欧美中文日本在线观看视频| 97碰自拍视频|