• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    Simulation of Underground Reservoir Stability of Pumped Storage Power Station Based on Fluid-Structure Coupling

    2024-03-02 01:31:28PengQiaoShuangshuangLanHongbiaoGuandZhengtanMao

    Peng Qiao,Shuangshuang Lan,?,Hongbiao Gu and Zhengtan Mao

    1Faculty of Architecture,Civil and Transportation Engineering,Beijing University of Technology,Beijing,100020,China

    2College of Transportation Engineering,Nanjing Tech University,Nanjing,210000,China

    ABSTRACT Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitable mechanical model was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.

    KEYWORDS Underground reservoir;fluid-structure coupling;numerical simulation;pumped storage power station;filling and discharge

    1 Introduction

    Compared with other energy storage facilities(such as Li-ion batteries),pumped storage power stations have the advantages of a low installation cost and smaller environmental impact[1–4],and they play the roles of peak load and valley filling in the power grid system.In 2017,Germany successfully built the first pumped storage power station using an abandoned coal mine roadway (Pros Per·H).Following that,many countries started to investigate whether it would be feasible to convert a defunct mining region into a pumped storage power station [5–7].Although some progress has been made in technical research, there is still little research on engineering stability.The engineering safety and timeliness are significantly influenced by the stability of the surrounding rock underground[8–11].The excavation of an underground reservoir will cause the secondary stress field of the surrounding rock to change quickly,which could result in the failure of the surrounding rock[12–14].In addition,through pore pressure and physicochemical interaction,groundwater speeds up the expansion and evolution of nearby rock fissures,worsening the degradation and destruction of the mechanical characteristics of the rock[15,16].As a result,the coupling effect of the stress and seepage may cause serious engineering accidents[17,18].The influence of fluid-structure(HM)coupling must be considered when analyzing the stability of the underground reservoir of a pumped storage power station.

    Terzaghi’s investigation of land subsidence marked the beginning of the study of the interaction between seepage and stress; Terzaghi developed a one-dimensional (1-D) consolidation model and the effective stress principle, which is the theoretical cornerstone of contemporary soil mechanics and the first model of HM coupling [19].Boit solved the three-dimensional (3-D) consolidation problem of saturated soil based on Terzaghi’s 1-D consolidation theory and also established the HM coupling equation for soil and laid the theoretical groundwork for the investigation of the HM coupling problem [20,21].Based on the research of Terzaghi and Biot, further HM coupling model research was conducted.After Truesdell [22] introduced the concept of mixing theory in 1957, the assumptions of macroscopic homogeneity and superposition began to be applied to heterogeneous dielectric materials.Bowen [23,24] developed and improved the coupling equation system for rock mechanics within the framework of hybrid theory and proposed a typical constitutive theory of elastic stress-hydraulic hybrid.On this basis, Noorishad et al.[25] analyzed the rock consolidation theory and the porous continuum numerical model by combining the HM coupling theory and obtained the porous continuum seepage and stress coupling model.Since then, numerical codes capable of simulating HM coupling under a finite element framework have been well developed.Rutqvist and Stephansson [26] introduced a numerical model of HM coupling using the finite element technique and discussed some conceptual methods for representing the HM coupling behavior of fractured rock with an equivalent continuum.Cammarata et al.[27]used the finite element program and the Galerkin weighted residual program to study the HM coupling response in discrete assemblages of rock blocks and seepage cracks.In recent years, based on HM coupling theory and models, many scholars have conducted numerical simulations of the stability of the surrounding rock of underground engineering structures under the action of HM coupling in actual engineering projects [28,29].In the reservoir slope stability,Maihemuti et al.[30]established an equivalent continuum mathematical model for the coupling of the seepage field and stress field and conducted an experimental study on rock deformation and failure under the coupling of seepage and stress on the reservoir slope of an open-pit coal mine hydropower station,providing a reasonable reference for solving the water-rock coupling problem.

    The planned Shidangshan(SDS)pumped storage power station located in Zhenjiang City,China,was once an abandoned copper mine.Its construction can both significantly cut costs and address the area’s energy needs.It is of great significance to study the stability of the underground reservoir for the safe construction of the project.Thus, taking the SDS pumped storage power station as the research object,in this study,we established a continuum mechanical model of this area using the HM coupling theory and the numerical simulation method.Then,we simulated the characteristics of the underground seepage field, stress field, and displacement field after excavation of the underground reservoir.Finally,we analyzed the stability and timeliness of the reservoir under filling and discharge conditions,as well as the anti-seepage reinforcement.Our results provide a scientific basis for the safe operation of this future project and also provide an important reference case for the construction of other pumped storage power stations.

    2 Basic Conditions of the Underground Reservoir

    The planned SDS pumped storage power station is located between Nanjing City and Zhenjiang City, Jiangsu Province (119°7′16.1′′E–119°9′22.1 E, 32°8′41.4′′N–32°9′47.2′′N) (Fig.1; Table S1).The project is planned to be built in an abandoned copper mine covering an area of about 6.6 km2.The abandoned roadway provides enough underground space for the construction of an underground reservoir for the pumped storage power station.The elevation difference between the upper and lower reservoirs can also be fully utilized to construct a pumped storage power station,addressing the issue of the shortage of hydraulic resources caused by the flat terrain.Furthermore,the project is located in the important power consumption areas of Zhenjiang City and Nanjing City and thus plays a key role in solving the power load problem of the entirety of Jiangsu Province.

    Figure 1:The triangle and rectangle represent the location of the pumped storage power station and the research area,respectively

    According to the drilling data, the rock strata in this area mainly consist of Silurian to Triassic sedimentary rocks and Late Yanshan intrusive magmatic rocks (Fig.2), which are primarily hard rock groups (quartz diorite) and reasonably hard rock groups (marble).The rocks surrounding the underground reservoir caverns are dominated by class II and class III rocks [31], the majority of which is breeze-fresh rock with little weathering.The groundwater in this region is buried at a depth of approximately 30 m,primarily as seepage into the goaf.There is no active fault in the project area,and the area has good structural stability and few engineering geological difficulties.The main components of the underground reservoir include the water storage cavity, water inlet and exit, and ventilation cavity,among others.

    Figure 2: (a) Schematic of the strata distribution in the plane in the research area at an elevation of-300 m.I-I through VI-VI are six geological profiles with measured data that provide critical strata data for the development of this regional geological model.The dotted lines indicate the positions of the projected underground reservoir’s caverns.(b)It is composed of eight parallel caverns,totaling 20,460 m in length.(c) Each cavern profile is horseshoe-shaped, with an 18 m span and a height of 29 m.The clear distance between the adjacent caverns is 42 m,and the top and bottom elevations are-271.0 m and-300.0 m,respectively

    3 Numerical Simulation

    3.1 Establishment of 3-D Geological Model

    As a professional modeling software, Rhino has been widely used in the field of geological engineering.It has the advantages of a high modeling accuracy and strong operability.Therefore,the geological model was established in COMSOL with the help of Rhino software.First,the geometry without rock strata interfaces was produced using COMSOL (Fig.3a).The surface elevation data were obtained from the Advanced Land Observing Satellite (ALOS) global 12.5 m precision digital elevation model(DEM)(https://search.asf.alaska.edu).The bottom is at an elevation of-400 m,and the sides of the geometry are vertical planes defined according to the scope of the research area.Then,based on the drilling data and geological profile(Fig.2;Fig.S1),the rock strata interfaces were constructed in Rhino according to the corresponding spatial position(Fig.3b).Finally,the rock strata interfaces(.stl)were successively imported into COMSOL,and the overall geometry was segmented to form a 3-D geological model containing nine domains(union)(Fig.3c).The rock strata of each group were sampled in the field,and the samples were tested in the laboratory in accordance with the rock mass parameter test methods suggested by the International Society for Rock Mechanics(ISRM)[32],including compressive strength test,tensile strength test,elastic modulus test,Poisson ratio test and so on.Among them, two to three groups of samples were collected from each group of rock strata,and the parameters used in the model were the mean values of each group of lithologic parameters.Table 1 displays the physical and mechanical characteristics of each group of rock samples obtained through laboratory testing.

    Table 1: Physical and mechanical parameters of rock strata

    Figure 3:Construction of a 3-D geological model of the research area.The model is 3000 m long(due east direction)and 1200 m wide(due north direction),and the base elevation is-400 m.The different colors represent the different strata.The specific meanings are the same as in Fig.2

    3.2 Establishment and Solution of the Governing Equations

    In the numerical simulation of the stability of the underground reservoir,the simultaneous changes in the rock mass strain and pore pressure due to the bidirectional coupling effect of the stress field and seepage field are taken into account.The corresponding equations of the physical fields are as follows.

    The governing equations of stress field:

    whereGis the shear modulus[L-1MT-2],vis Poisson ratio,αis the Biot consolidation coefficient,pis pore pressure[L-1MT-2],ux,uyanduzrepresent the derivatives of the displacement(u,v,w(L))in the x,y,and z directions[LT-1],respectively.

    The governing equation of seepage field[33]:

    According to the HM coupling equations,the seepage field and stress field are coupled bidirectionally with pore pressure and displacement as transfer terms.As a general multi-physics coupling simulation software [34], COMSOL finite element method has been widely used to solve multiphysics coupling problems.In this paper, Darcy’s law and solid mechanics modules corresponding to the seepage field and stress field are established respectively in the COMSOL software, and the bidirectional coupling of the seepage field and stress field is realized in the multi-physical porous elastic interface.By solving the coupling equations,the characteristics of the seepage field,stress field,and displacement field in the underground reservoir region are obtained.The geometry established using COMSOL is a union,and the mesh and physical quantities at the internal interfaces are continuous.The mesh at the interface is automatically refined by the union in the mesh division,so a solution with a relatively high precision can be obtained[35].

    3.3 Initial Stress Field and Seepage Field

    Before the stability analysis of underground reservoir excavation, the crustal stress field and seepage field are in a stable equilibrium state under the action of natural flow field and gravity.Based on the 3-D geological model established above,the steady state simulation of stress field and seepage field in the research area can be obtained with the help of COMSOL software, and it is used as the initial condition for the stability analysis of the underground reservoir excavation.First,the boundary conditions of the 3-D geological model are set.The bottom border of the 3-D geological model(Fig.4)is set with no displacement,while the side boundaries have no horizontal displacement,and the upper boundary is free.The peripheral boundaries are set as the pressure head according to the measured value of the groundwater level,and the fluid is assumed to be incompressible.It is also assumed that the lower border is not a flow barrier.Before excavation,it is presumable that the underground reservoir’s initial stress field and seepage field have reached a stable condition(Figs.5a–5d).The findings indicate that the first primary stress in the research area is-7.09–1.46 MPa and that the third principal stress is-17.8–0.04 MPa before the excavation of the underground reservoir.The maximum displacement of the rock mass after reaching equilibrium under the action of gravity is 52.6 mm,which occurs at the highest elevation in the research area,and the highest pore pressure in the research area is 4.12 MPa.

    Figure 4: Three-dimensional numerical calculation model of the underground reservoir before excavation.The model has 153,208 domain elements,29,605 boundary elements,and 1615 edge elements after mesh subdivision,and the element quality distribution is shown in Fig.S2

    Hydraulic fracturing testing is one of the recommended methods for measuring rock stress issued by the ISRM in 1987[36],and it is a direct method for measuringin-situstress.Before the excavation of the underground reservoir,20in-situstress tests were conducted at the same elevation as the reservoir in the research area.According to the test results,the maximum stress at this elevation in the horizontal direction isσH= 12.42 MPa (compressive stress), with a direction of N61°E.It can be concluded that the underground reservoir is a medium-stress area.The inversion results of the initial stress field obtained using COMSOL are close to the measured values(Fig.5b).

    3.4 Stress Field and Seepage Field after Excavation

    The geometry of the underground reservoir is generated in the 3-D geological model in accordance with its spatial placement and geometric properties,and the difference set is then processed(Fig.6).The boundary conditions of the 3-D numerical calculation model of the underground reservoir after excavation are consistent with those of the model before excavation.However, the underground reservoir is designed with exhaust holes, so the boundaries of the underground reservoir are set as free and zero pressure head boundaries.The initial conditions for the numerical simulation following excavation are the steady state conditions of the stress field and seepage field of the underground reservoir before excavation.The simulation results show that the underground reservoir can reach a new steady state after excavation,and obvious stress concentration occurs around the caverns(Figs.5e and 5f).The zero pressure head line drops to the vicinity of the underground reservoir(Figs.5h and 5I); that is, driven by the pore pressure, the groundwater penetrates downward in the underground reservoir.

    Figure 5: Three-dimensional numerical simulation results for the underground reservoir before and after excavation in the research area,including the(a–b)initial stress field,(c)displacement field,and(d)seepage field and the calculated(e–f)stress field,(g)displacement field,and(h)seepage field after underground excavation.(i–l) present the results of the 2-D calculation for the typical section (x =1000 m) after underground excavation, including the (i–j) stress field, (k) displacement field, and (l)seepage field.To better show the change in the displacement field caused by the excavation of the underground reservoir,(k)shows the change in the displacement field after excavation relative to the initial displacement field

    Figure 6: In the 3-D numerical calculation model of the underground reservoir after excavation, the inner mesh density is the boundaries of the underground reservoir.The model contains 359,576 domain elements,53,881 boundary elements,and 5582 edge elements,and the element quality distribution is shown in Fig.S2

    Given that the boundary conditions,mesh generation,and other variables may have an influence on the 3-D model’s correctness,in this paper,we further create a 2-D fine model at a typical profile location(x=1000 m)in the research area and conduct more research.The section of the 3-D model can be used to determine the geometry of the 2-D model,and the rock mass’s physical and mechanical properties agree with the 3-D model.The top of the model has a free boundary, the bottom has no displacement,and the two sides have no horizontal displacement.According to the measured value of the groundwater level, the two sides are established as the pressure head boundary, and the bottom is the no-flow border.The numerical simulation results show that in the typical section of the 3-D model, the first principal stress ranges from -6.69 to 5.15 MPa, the third principal stress ranges from-26.1 to 0.311 MPa,and the maximum displacement around the caverns is 3.42 mm(Fig.S3),which are similar to the 2-D numerical simulation results(the first principal stress ranges from-6.9 to 5.35 MPa,the third principal stress ranges from-28.2 to 0.341 MPa,and the maximum displacement around the cavern is 3.56 mm).The displacement mostly affects the top and bottom of the caverns in the underground reservoir,and the displacement on both sides is minimal.

    4 Discussion

    4.1 Stability Analysis after Excavation

    Currently, because the factors affecting the stability of the underground reservoir are very complex,there has not been a consistent method for evaluating the stability of the surrounding rocks[37,38].In this paper,the stability of the underground reservoir of the pumped storage power station is thoroughly evaluated based on the results of the numerical simulation (stress and displacement),the Mohr-Coulomb criterion, and the construction specifications of the nation (Technical code for engineering of ground anchorages and shotcrete support(GB 50086-2015)) in which the project is located.The material yields in accordance with the Mohr-Coulomb yield criterion when the stress state reaches the following thresholds:

    whereτandσare the shear stress and positive pressure on the failure surface,respectively.

    Whenσ1≥σ2≥σ3,Eq.(3)can be rewritten as:

    Then:

    Based on this,the yield surface equation can be written as:

    whereσ1is the first principal stress,σ3is the third principal stress,cis the cohesive force,and?is the internal friction angle.

    From above,the factor of safety defined by Mohr-Coulomb yield criterion in the stress space can be expressed as:

    After the excavation of the underground reservoir,the displacement of the surrounding rock mass around the caverns ranges from 0.1 to 3.56 mm, which are substantially less than the maximum displacement permitted by local national standards (approximately 50.4 mm).Additionally, each component’s factor of safety,as determined by the Mohr-Coulomb criterion,is greater than 1,further indicating that the entire underground reservoir is stable and safe after excavation.

    4.2 Stability Analysis of Filling and Discharge Conditions

    During the operation of the pumped storage power station,the frequent filling and discharge of the underground reservoir with water may affect the local stress field, resulting in deformation and destruction of the surrounding rock mass.Therefore,the stability of the underground reservoir under filling and discharge conditions is numerically simulated under the condition when excavation antiseepage measures are considered in the actual project; that is, the boundaries of the underground reservoir are set as impervious.The draining and filling of the underground reservoir are assumed to be possible working conditions,the bottom of the reservoir is regarded as the dead water level(-300 m),and the arch of the reservoir is regarded as the maximum storage water level(-271 m);that is,the water level fluctuates between-300 and-271 m under the operation conditions of the underground reservoir(Fig.7).

    Figure 7:Filling and discharge conditions of the underground reservoir.At the initial time(t=0 d),there is no water in the reservoir,and the water level is-300 m.At t=0.5 d,the reservoir is filled with water,and the water level is-271 m.At t=1 d,the reservoir is drained,and the water level is restored to-300 m

    Considering the connection between the underground reservoir and the atmosphere,as well as the timely implementation of anti-seepage measures during the excavation process,there is no hydraulic exchange at the boundaries of the underground reservoir in the numerical simulation under the filling and discharge conditions.In addition,the pressure head can be transformed into the boundary load and can change over time.When the groundwater depth is 29 m, the maximum load generated is 0.29 MPa.According to the operating conditions shown in Fig.7, the stability of the underground reservoir after 10 years was numerically simulated using an operation cycle of 1 day and considering anti-seepage measures(Figs.8a–8d).It can be seen that the effect of the water pressure increases the factors of safety of the arch crown and cavern bottom.Compared with the steady state without any protective measures(Fig.5k),the side wall’s factor of safety decreases from 1.123 to 1.118 under the influence of the pressure cycle,a reduction of 0.44%.The maximum displacement of the arch crown decreases from 3.56 to 3.3 mm,a decrease of 7.3%;and the maximum displacement of the arch bottom increases from 2.18 to 3.09 mm,an increase of 41.74%.

    4.3 Stability Analysis of Anti-Seepage Anchorage Measures

    For unsafe phenomena such as rock bursts that may occur in underground engineering, the common treatment measures include bolt support and concrete lining, among others.In this paper,a straightforward anti-seepage anchorage measure was simulated.The steel bars used for anchoring have a prestressing force of 1000 KN,a diameter of 28 mm,a length of 6.5 m,and a bar spacing of 2 m.In Figs.8e–8h,the impacts are also illustrated.The results show that the safety factors of the side wall and bottom increase from 1.2 to 1.3 and from 1.123 to 1.46,respectively,when the subterranean reservoir reaches a stable condition following anti-seepage anchoring(Table 2).The maximum vault displacement decreases from 3.56 to 2.59 mm, by 27.25%, compared with the situation without any measures (Fig.5k).The arch bottom’s maximum displacement decreases from 2.18 to 1.96 mm, by 10.09%.

    Table 2: Fs of the rock surrounding the underground reservoir under various numerical simulation settings

    4.4 Sensitivity Analysis of Parameters

    The chosen rock mechanics parameters frequently have an influence on the effectiveness of the numerical simulation method in the stability analysis of underground engineering.The rock mass characteristics measured via laboratory and field experiments may be slightly different from the actual rock mass because the surrounding rock is affected by the mineral structure and geological structure,which results in a great deal of spatiotemporal variability in its mechanical behavior.Considering that Young’s modulus and Poisson ratio are two important parameters that reflect the deformation degree of a rock mass under stress,in this paper,we examine the sensitivity of Young’s modulus and Poisson ratio to the surrounding rock by using the caverns in theS2frock formation as the research object and the maximum primary compressive stress around the caverns as the evaluation index.As shown in Fig.9,the coefficients of variation of Young’s modulus and Poisson ratio are 0.1,which means that the other characteristics of the rock mass are unaffected,while Young’s modulus can vary between 55.44 and 67.76 MPa,and the Poisson ratio can vary between 0.234 and 0.286.According to the results of the parameter sensitivity analysis,the maximum main compressive stress of the rock surrounding the cavity is more sensitive to Young’s modulus than to the Poisson ratio.Therefore,when determining the maximum compressive stress of the surrounding rock following underground engineering excavation,special attention should be paid to Young’s modulus.

    Figure 8: Numerical simulation results of the stress field, displacement field, and seepage field in a typical section.Images(a–d)present the results for underground reservoir operation for 10 years under the filling and discharge conditions with anti-seepage measures.Images(e–h)present the results for a steady state underground reservoir with simultaneous anti-seepage and anchoring measures

    Figure 9:Results of the analysis of the sensitivity of the maximum compressive stress around the cavern to(a)Young’s modulus and(b)Poisson ratio,E=61.6 MPa,v=0.26

    5 Conclusions

    Taking into account the bidirectional coupling effect of the stress and seepage of porous media,in this study,we used the finite element method in COMSOL to conduct numerical simulations of the stability of the rock surrounding an underground reservoir after excavation and under the operating conditions, and we analyzed the stability and efficiency of the underground reservoir.Due to the good geological conditions of the site,the deformation of the surrounding rock of the underground reservoir is small, and no damage has occurred after the excavation.Even when only anti-seepage measures are considered, the cavern remains stable after 10 years under the filling and discharge conditions.In addition, it was found that the anti-seepage anchorage measures are very effective in reducing the tension stress around the cavern and the deformation of the surrounding rock.Inevitably,in the numerical simulation,the same rock strata are regarded as a homogeneous isotropic material in the stability analysis of the surrounding rock of the cavern, which may lead to some deviation of the simulation results from the actual situation.In addition, because the distribution of the faults and cracks in the project region is quite sparse, their influence on the outcomes was ignored in this numerical simulation.However, the findings of this study can still be used as a general guide for managing and operating projects safely in the future.

    Acknowledgement:Thanks to Dr.Mingqian Li for his careful guidance on model construction in this study.And thanks to Dr.Baoming Chi for providing relevant geological data and guiding the paper in the revision process.

    Funding Statement:This study is funded by the Beijing Natural Science Foundation of China(8222003)and National Natural Science Foundation of China(41807180).

    Author Contributions:The authors confirm contribution to the paper as follows:study conception and design: Hongbiao Gu; data collection: Zhengtan Mao; analysis and interpretation of results: Peng Qiao; draft manuscript preparation: Peng Qiao and Shuangshuang Lan.All authors reviewed the results and approved the final version of the manuscript.

    Availability of Data and Materials:All relevant data are within the paper and its Supplementary Materials files.

    Conflicts of Interest:The authors declare that they have no conflicts of interest to report regarding the present study.

    Supplementary Materials

    Table S1: Location of research area

    Figure S1: (Continued)

    日日撸夜夜添| 高清午夜精品一区二区三区| 国产精品国产三级国产专区5o| 国产永久视频网站| 久久久久久久久久久丰满| 少妇猛男粗大的猛烈进出视频 | 伊人久久精品亚洲午夜| 狠狠精品人妻久久久久久综合| 最后的刺客免费高清国语| 国产成人精品婷婷| 永久免费av网站大全| 一级毛片aaaaaa免费看小| 亚洲最大成人手机在线| 久久久精品94久久精品| 国产 一区精品| 亚洲经典国产精华液单| 欧美一级a爱片免费观看看| 51国产日韩欧美| 99九九线精品视频在线观看视频| 少妇被粗大猛烈的视频| 国产成人精品一,二区| 少妇熟女欧美另类| 亚洲欧美日韩卡通动漫| 久久久久久久久久黄片| ponron亚洲| 不卡视频在线观看欧美| videos熟女内射| 少妇人妻精品综合一区二区| 亚洲欧美日韩卡通动漫| 国产亚洲91精品色在线| 亚洲真实伦在线观看| 一个人看的www免费观看视频| 夜夜爽夜夜爽视频| 免费看av在线观看网站| 欧美xxxx黑人xx丫x性爽| 国产精品三级大全| av免费观看日本| 亚洲第一区二区三区不卡| 国产成人午夜福利电影在线观看| 精品久久久久久成人av| 国产精品久久久久久精品电影小说 | 美女国产视频在线观看| 国内少妇人妻偷人精品xxx网站| 成人高潮视频无遮挡免费网站| 久久久久久久亚洲中文字幕| 在现免费观看毛片| 日本免费a在线| 亚洲精品色激情综合| 久久国产乱子免费精品| 国产免费福利视频在线观看| 高清视频免费观看一区二区 | 亚洲av成人精品一二三区| 国产免费一级a男人的天堂| 成人高潮视频无遮挡免费网站| 亚洲三级黄色毛片| 女的被弄到高潮叫床怎么办| 亚洲最大成人手机在线| 最近中文字幕高清免费大全6| 亚洲自偷自拍三级| 日韩伦理黄色片| 在线观看av片永久免费下载| 国产黄片美女视频| 国产午夜精品一二区理论片| 久久精品国产亚洲av天美| 国产成人aa在线观看| 一个人观看的视频www高清免费观看| 色综合站精品国产| av免费在线看不卡| 亚洲精品,欧美精品| 永久网站在线| 看十八女毛片水多多多| 国产又色又爽无遮挡免| av在线老鸭窝| 国产精品伦人一区二区| 中文乱码字字幕精品一区二区三区 | 一级黄片播放器| 性色avwww在线观看| 青青草视频在线视频观看| 亚洲av成人av| 少妇丰满av| 神马国产精品三级电影在线观看| 老司机影院毛片| 精品久久久久久久人妻蜜臀av| 毛片女人毛片| xxx大片免费视频| 2021天堂中文幕一二区在线观| 亚洲欧美一区二区三区黑人 | 深爱激情五月婷婷| 亚洲综合色惰| 精华霜和精华液先用哪个| 人妻夜夜爽99麻豆av| 国产精品.久久久| 97超碰精品成人国产| 一级爰片在线观看| 欧美高清性xxxxhd video| 日韩一区二区三区影片| 午夜精品在线福利| 天天躁日日操中文字幕| 成人漫画全彩无遮挡| 亚洲av福利一区| www.色视频.com| 欧美日韩精品成人综合77777| 亚洲av中文av极速乱| 国产精品一区二区性色av| 最近中文字幕2019免费版| 久久久久国产网址| 久久久久免费精品人妻一区二区| 久久这里有精品视频免费| 九九在线视频观看精品| 黄片wwwwww| 久久久久久国产a免费观看| 18禁裸乳无遮挡免费网站照片| av国产久精品久网站免费入址| 天美传媒精品一区二区| 97在线视频观看| 777米奇影视久久| 高清日韩中文字幕在线| 亚洲精品日韩av片在线观看| 汤姆久久久久久久影院中文字幕 | xxx大片免费视频| 国产 亚洲一区二区三区 | 深夜a级毛片| 人人妻人人澡欧美一区二区| 中文字幕av成人在线电影| 免费观看av网站的网址| 老司机影院毛片| 国产精品1区2区在线观看.| 久久久久国产网址| 中文字幕av在线有码专区| 国产乱来视频区| 久久久久网色| 国产综合精华液| 草草在线视频免费看| 少妇熟女aⅴ在线视频| 欧美日本视频| a级一级毛片免费在线观看| 精品国内亚洲2022精品成人| 国产日韩欧美在线精品| 极品少妇高潮喷水抽搐| 久久久久久久久久久丰满| 精品久久久久久成人av| 午夜福利成人在线免费观看| 男人狂女人下面高潮的视频| 人妻系列 视频| 麻豆乱淫一区二区| 久久精品夜色国产| 国产成人aa在线观看| 久99久视频精品免费| 国产精品熟女久久久久浪| 国语对白做爰xxxⅹ性视频网站| 欧美成人a在线观看| 亚洲精品影视一区二区三区av| 91久久精品国产一区二区成人| 欧美zozozo另类| 国产免费视频播放在线视频 | 欧美激情国产日韩精品一区| 国产伦理片在线播放av一区| 在线播放无遮挡| 日韩成人伦理影院| 免费av观看视频| 午夜免费男女啪啪视频观看| 80岁老熟妇乱子伦牲交| 可以在线观看毛片的网站| 日韩电影二区| 午夜视频国产福利| 国产精品人妻久久久久久| 国产又色又爽无遮挡免| 国产亚洲精品av在线| 国产毛片a区久久久久| 在线观看av片永久免费下载| ponron亚洲| 亚洲av国产av综合av卡| 国产黄色免费在线视频| 国产永久视频网站| 男女边摸边吃奶| 日韩av不卡免费在线播放| 在线天堂最新版资源| 永久网站在线| 国产精品综合久久久久久久免费| av网站免费在线观看视频 | 国产精品人妻久久久影院| 国产男人的电影天堂91| 高清av免费在线| 亚洲自偷自拍三级| 国产一区亚洲一区在线观看| 国产成人91sexporn| 免费不卡的大黄色大毛片视频在线观看 | 嫩草影院精品99| 在线观看美女被高潮喷水网站| 午夜亚洲福利在线播放| 男女视频在线观看网站免费| 天天躁日日操中文字幕| 一本久久精品| 久久久色成人| 99热6这里只有精品| 啦啦啦啦在线视频资源| 晚上一个人看的免费电影| 亚洲美女搞黄在线观看| 国产高清三级在线| 亚洲丝袜综合中文字幕| 国产精品人妻久久久久久| 特级一级黄色大片| 色综合色国产| 色网站视频免费| 大话2 男鬼变身卡| 男女啪啪激烈高潮av片| 亚洲乱码一区二区免费版| 亚洲精品成人久久久久久| 婷婷六月久久综合丁香| 国产男人的电影天堂91| 狂野欧美激情性xxxx在线观看| 日韩成人av中文字幕在线观看| 欧美zozozo另类| 高清欧美精品videossex| 能在线免费观看的黄片| 干丝袜人妻中文字幕| 久久精品国产鲁丝片午夜精品| 欧美+日韩+精品| 日本午夜av视频| 亚州av有码| av免费在线看不卡| 亚洲在线自拍视频| 亚洲电影在线观看av| 草草在线视频免费看| 亚洲精品国产av成人精品| 中文字幕久久专区| 身体一侧抽搐| 爱豆传媒免费全集在线观看| 日本欧美国产在线视频| 国产淫语在线视频| 精品人妻偷拍中文字幕| 国产高清国产精品国产三级 | 18+在线观看网站| 91av网一区二区| 成人午夜高清在线视频| 蜜桃亚洲精品一区二区三区| 久久精品国产亚洲av涩爱| 亚洲电影在线观看av| 欧美+日韩+精品| 高清毛片免费看| 夜夜爽夜夜爽视频| 日韩国内少妇激情av| 免费观看在线日韩| 亚洲欧美精品专区久久| 九九久久精品国产亚洲av麻豆| 久久久久久国产a免费观看| 69av精品久久久久久| 国产片特级美女逼逼视频| 国产一级毛片在线| 成人综合一区亚洲| 人妻制服诱惑在线中文字幕| 亚洲av日韩在线播放| 少妇人妻一区二区三区视频| av又黄又爽大尺度在线免费看| 在线观看美女被高潮喷水网站| 最近手机中文字幕大全| 国产视频内射| 最近最新中文字幕大全电影3| 人妻一区二区av| 欧美xxⅹ黑人| 精品久久久久久久久亚洲| 一级片'在线观看视频| 69av精品久久久久久| 国产美女午夜福利| 欧美高清性xxxxhd video| 国产在线男女| .国产精品久久| 亚洲精品,欧美精品| 亚洲18禁久久av| 啦啦啦中文免费视频观看日本| 国产精品久久久久久精品电影小说 | 国产欧美日韩精品一区二区| 黄色日韩在线| 午夜日本视频在线| 国产成人免费观看mmmm| 久久久精品欧美日韩精品| 成人无遮挡网站| 欧美丝袜亚洲另类| 欧美日韩亚洲高清精品| 夜夜爽夜夜爽视频| 欧美激情久久久久久爽电影| ponron亚洲| 美女国产视频在线观看| 深爱激情五月婷婷| 一本一本综合久久| 99久国产av精品| 一级毛片aaaaaa免费看小| 国产白丝娇喘喷水9色精品| 国产黄色免费在线视频| 最近最新中文字幕免费大全7| 天美传媒精品一区二区| 在线免费十八禁| 18禁动态无遮挡网站| 亚洲欧美成人精品一区二区| 成年女人看的毛片在线观看| 久久久久久久久大av| 一级黄片播放器| 一个人看的www免费观看视频| 国产成人免费观看mmmm| 狂野欧美白嫩少妇大欣赏| 欧美不卡视频在线免费观看| 97超视频在线观看视频| 国产av国产精品国产| 又黄又爽又刺激的免费视频.| 亚洲精品成人久久久久久| 国产成人aa在线观看| 欧美日韩综合久久久久久| 深爱激情五月婷婷| 日本一本二区三区精品| 1000部很黄的大片| 一二三四中文在线观看免费高清| 成人二区视频| 亚洲av日韩在线播放| 激情 狠狠 欧美| 天堂影院成人在线观看| 中文天堂在线官网| 亚洲高清免费不卡视频| 亚洲无线观看免费| av网站免费在线观看视频 | 欧美成人午夜免费资源| 久久久久久九九精品二区国产| 一级毛片久久久久久久久女| av在线老鸭窝| 国产一区二区三区av在线| 午夜福利在线观看吧| 天堂网av新在线| 免费高清在线观看视频在线观看| 欧美zozozo另类| 可以在线观看毛片的网站| eeuss影院久久| 亚洲av免费高清在线观看| 国产在线男女| 热99在线观看视频| 国产麻豆成人av免费视频| 国产精品.久久久| 九色成人免费人妻av| 欧美日韩亚洲高清精品| 男女啪啪激烈高潮av片| 欧美日韩国产mv在线观看视频 | 国产麻豆成人av免费视频| 欧美日韩综合久久久久久| 一级毛片久久久久久久久女| 亚洲人成网站高清观看| 3wmmmm亚洲av在线观看| 美女内射精品一级片tv| 国产探花在线观看一区二区| 亚洲av成人精品一二三区| 久久久久九九精品影院| a级一级毛片免费在线观看| 亚洲欧洲国产日韩| 国产片特级美女逼逼视频| 国产探花极品一区二区| 欧美精品国产亚洲| 特大巨黑吊av在线直播| 边亲边吃奶的免费视频| 天天躁日日操中文字幕| 亚洲人成网站在线观看播放| 99久久精品热视频| 三级国产精品片| 夜夜看夜夜爽夜夜摸| 日本免费a在线| 又黄又爽又刺激的免费视频.| av播播在线观看一区| 日韩成人av中文字幕在线观看| 成人漫画全彩无遮挡| 亚洲美女搞黄在线观看| 亚洲欧美精品专区久久| 国产精品美女特级片免费视频播放器| 黄色配什么色好看| 超碰av人人做人人爽久久| 国产激情偷乱视频一区二区| av免费在线看不卡| 国产91av在线免费观看| 日韩欧美精品v在线| 国产黄色视频一区二区在线观看| 亚洲国产高清在线一区二区三| 少妇裸体淫交视频免费看高清| 少妇的逼水好多| 少妇被粗大猛烈的视频| 蜜桃亚洲精品一区二区三区| 男女边摸边吃奶| 成人av在线播放网站| 全区人妻精品视频| 久久韩国三级中文字幕| 国产伦一二天堂av在线观看| 国产国拍精品亚洲av在线观看| 尤物成人国产欧美一区二区三区| 午夜福利高清视频| 大片免费播放器 马上看| 久久久久久久久久成人| 97超视频在线观看视频| 亚洲av不卡在线观看| 精品国产一区二区三区久久久樱花 | 美女黄网站色视频| 51国产日韩欧美| 国产男女超爽视频在线观看| 嫩草影院精品99| 欧美一级a爱片免费观看看| 日韩精品有码人妻一区| 三级国产精品片| 身体一侧抽搐| 天天躁日日操中文字幕| av在线亚洲专区| 亚洲国产欧美人成| 日本三级黄在线观看| 亚洲自拍偷在线| 国产精品久久久久久久久免| 九九久久精品国产亚洲av麻豆| 日韩欧美国产在线观看| 高清av免费在线| 国产午夜精品一二区理论片| 99九九线精品视频在线观看视频| 日本熟妇午夜| 亚洲精品影视一区二区三区av| 国产有黄有色有爽视频| 久久久久精品性色| 国产三级在线视频| 欧美高清性xxxxhd video| 亚洲av.av天堂| 黄色欧美视频在线观看| 舔av片在线| 国产成人freesex在线| 一个人观看的视频www高清免费观看| 成人亚洲精品一区在线观看 | 我的女老师完整版在线观看| 青春草视频在线免费观看| a级毛片免费高清观看在线播放| 国产成人午夜福利电影在线观看| 啦啦啦中文免费视频观看日本| 久久久久久久久久久免费av| 国内精品宾馆在线| 亚洲精品久久久久久婷婷小说| 色视频www国产| 亚洲成人中文字幕在线播放| 午夜久久久久精精品| 中文精品一卡2卡3卡4更新| 国产在线男女| 久久精品久久精品一区二区三区| 人体艺术视频欧美日本| 久久久久精品性色| 日韩欧美精品v在线| 内地一区二区视频在线| 777米奇影视久久| 国产又色又爽无遮挡免| 免费观看无遮挡的男女| av.在线天堂| 成人av在线播放网站| 人人妻人人澡欧美一区二区| 亚洲美女搞黄在线观看| 久久人人爽人人爽人人片va| 在线播放无遮挡| 久久97久久精品| 九九在线视频观看精品| 51国产日韩欧美| 国产真实伦视频高清在线观看| 亚洲精品第二区| 乱系列少妇在线播放| 只有这里有精品99| 亚洲在久久综合| 尤物成人国产欧美一区二区三区| 免费av不卡在线播放| 在线观看免费高清a一片| 日韩国内少妇激情av| 亚洲精品成人久久久久久| 非洲黑人性xxxx精品又粗又长| 国产精品一区二区性色av| 毛片女人毛片| 国产精品久久久久久久电影| 18禁裸乳无遮挡免费网站照片| 国产免费又黄又爽又色| 我的女老师完整版在线观看| 久久久a久久爽久久v久久| 在线免费观看的www视频| 欧美97在线视频| 爱豆传媒免费全集在线观看| 日日啪夜夜爽| 男女下面进入的视频免费午夜| 中文字幕亚洲精品专区| 3wmmmm亚洲av在线观看| 中文字幕免费在线视频6| 国产一区二区在线观看日韩| 蜜桃亚洲精品一区二区三区| av播播在线观看一区| 干丝袜人妻中文字幕| 亚洲熟女精品中文字幕| 久久精品久久久久久久性| 亚洲国产精品sss在线观看| 亚洲精品中文字幕在线视频 | 男的添女的下面高潮视频| 精品久久久精品久久久| 人体艺术视频欧美日本| 国产在视频线精品| 精品不卡国产一区二区三区| 国产精品久久久久久av不卡| 在线a可以看的网站| 高清欧美精品videossex| 欧美xxⅹ黑人| 久久久久网色| 久久久久久九九精品二区国产| 亚洲国产色片| 亚洲av中文av极速乱| 欧美3d第一页| 91aial.com中文字幕在线观看| 国产精品国产三级国产专区5o| 免费高清在线观看视频在线观看| 青春草国产在线视频| 亚洲精品,欧美精品| 又爽又黄无遮挡网站| 美女大奶头视频| 秋霞在线观看毛片| 日产精品乱码卡一卡2卡三| 久久久久性生活片| av在线观看视频网站免费| 一级av片app| eeuss影院久久| 成年av动漫网址| 搡女人真爽免费视频火全软件| 欧美成人精品欧美一级黄| 麻豆久久精品国产亚洲av| 免费观看无遮挡的男女| 91精品一卡2卡3卡4卡| 爱豆传媒免费全集在线观看| 亚洲精品第二区| av福利片在线观看| 日本猛色少妇xxxxx猛交久久| 建设人人有责人人尽责人人享有的 | 中文字幕av成人在线电影| 国产精品一区二区三区四区久久| 国产成人aa在线观看| 三级经典国产精品| 久久久精品94久久精品| 成人鲁丝片一二三区免费| 国产老妇女一区| 亚洲熟妇中文字幕五十中出| 成年免费大片在线观看| 精品国产一区二区三区久久久樱花 | 欧美性感艳星| 国产69精品久久久久777片| 岛国毛片在线播放| 丰满人妻一区二区三区视频av| 成年人午夜在线观看视频 | 直男gayav资源| 国产乱人视频| 我要看日韩黄色一级片| 精品99又大又爽又粗少妇毛片| 成人亚洲精品一区在线观看 | 精品久久久久久电影网| 日本三级黄在线观看| 亚洲欧美日韩无卡精品| 在线免费十八禁| 国产免费福利视频在线观看| 亚洲va在线va天堂va国产| 九九在线视频观看精品| 午夜免费激情av| 日本-黄色视频高清免费观看| 久久韩国三级中文字幕| 精品酒店卫生间| 亚洲精品影视一区二区三区av| 夫妻性生交免费视频一级片| 最后的刺客免费高清国语| 欧美日韩一区二区视频在线观看视频在线 | 精品国产一区二区三区久久久樱花 | 久久精品夜色国产| 亚洲精品自拍成人| 欧美3d第一页| 亚洲欧美成人综合另类久久久| 中文在线观看免费www的网站| 精品午夜福利在线看| 看黄色毛片网站| 69av精品久久久久久| 日本免费在线观看一区| 国产在视频线精品| 日韩欧美 国产精品| 最近2019中文字幕mv第一页| 午夜日本视频在线| 免费看av在线观看网站| 2021天堂中文幕一二区在线观| 亚洲成人一二三区av| av免费观看日本| 国产久久久一区二区三区| 亚洲av.av天堂| 欧美一级a爱片免费观看看| 午夜激情久久久久久久| 国产伦精品一区二区三区四那| 搡老乐熟女国产| 特级一级黄色大片| 女人十人毛片免费观看3o分钟| 白带黄色成豆腐渣| 亚洲婷婷狠狠爱综合网| 九九在线视频观看精品| 亚洲av免费高清在线观看| ponron亚洲| 建设人人有责人人尽责人人享有的 | 老师上课跳d突然被开到最大视频| 国产精品国产三级国产av玫瑰| 老师上课跳d突然被开到最大视频| 精品午夜福利在线看| 成人午夜精彩视频在线观看| 国产精品三级大全| 在线播放无遮挡| 91在线精品国自产拍蜜月| 国产精品一区二区三区四区免费观看| 美女内射精品一级片tv| 欧美三级亚洲精品| 国产淫片久久久久久久久| 男人舔奶头视频| 男人狂女人下面高潮的视频| 日韩精品有码人妻一区| 在线观看人妻少妇| 国产亚洲91精品色在线| 国产成人午夜福利电影在线观看| 日本免费a在线| 波野结衣二区三区在线| 国产亚洲精品久久久com| 日韩av不卡免费在线播放|