    The First Stage of the Middle-Line South-to-North Water-Transfer Project

    2022-02-16 09:19:44XinqiangNiu
    Engineering 2022年9期

    Xinqiang Niu

    Changjiang Institute of Survey, Planning, Design, and Research (CISPDR) Co., Ltd., Wuhan 430010, China

    1. Introduction

    The Middle-Line South-to-North Water-Transfer Project (also referred to herein as the Middle-Line Project) is a major strategic infrastructure and ecological rehabilitation project intended to alleviate the serious shortage of water resources in China’s Huang–Huai–Hai Plain,optimize the allocation of water resources,and improve the water ecology and water environment in the Beijing, Tianjin, and Hebei areas. The project is being constructed in two stages. In the first stage, the project diverts water from the Danjiangkou Reservoir of the Han River (a tributary of the Yangtze River); in the second stage, the project will be extended to the main stream of the Yangtze River for water transfer. The total length of the main canal of the first stage of the project is about 1432 km, with an average annual water-transfer volume of 9.5 billion cubic meter. The main canal crosses the four major basins (Yangtze River, Huai River, Yellow River, and Hai River)and more than 700 rivers, making the Middle-Line Project the longest large-scale inter-basin water-transfer project in the world.The first stage of the project includes the heightening of the Danjiangkou Dam, along with the construction of the head works of the Taocha canal, the main water-transfer canal, and 2387 different constructions involved in the project(tunnels,aqueducts,concealed culverts, inverted siphons, etc.). The general layout of the project is shown in Fig. 1.

    The first stage of the Middle-Line Project started on 30 December 2003, and its operation officially began on 12 December 2014.Since the project was put into operation,it has been generally safe and stable. By the end of 2021, the cumulative volume of transferred water had reached 44.70 billion cubic meter (including 9.05 billion cubic meter in 2021), benefiting 191 rural and urban areas with 21 large and medium-sized cities along the project,and thereby directly benefiting about 79 million people.The cumulative ecological water replenishment to more than 50 rivers in north China exceeds 7.6 billion cubic meter, which effectively ensures the water safety of national construction strategies area such as the integration of Beijing,Tianjin,and Hebei;the Xiong’an new district; and the Mid-China urban agglomeration. It also creates favorable conditions for underground water-pressure mining and promotes the restoration and protection of the ecological environment in the water-receiving areas, with remarkable social,economic, and ecological benefits.

    The first stage of the Middle-Line Project had a huge scale and complex technology, and faced with many important technical difficulties [1]:

    (1) The project has a long line, spanning four major basins to deliver water to four provinces and many cities.The general layout of the project was affected by various factors,such as the temporal and spatial distribution of water resources in the water-supply and-receiving areas, the economy and ecological environment, flood control, water supply, water quality, and investment. Thus, it was very difficult to determine a scientific and reasonable general layout of the project.

    (2) The Danjiangkou Reservoir, a water-source sub-project,needed to be raised and reinforced under the normal operation conditions of the dam because of its irreplaceable flood-control position in the middle–lower reaches of the Han River.

    (3) An expansive-soil section 387 km in length was distributed along the main canal, so it was difficult to control the stability of the wading expansive soil canal slope.

    Fig. 1. General layout of the first stage of the Middle-Line Project.

    (4) It was difficult to design and construct a shield tunnel for high-pressure water transfer through the wandering Yellow River section in the multistage complex soft soil layer.

    (5)The structural design and construction of the large-span prestressed aqueduct with a design flow of 420 m3?s-1was very difficult.

    By focusing on these technical difficulties, the first stage of the Middle-Line Project has achieved a number of theoretical and technological innovations and has overcome these technical problems through the National Science and Technology Support Project and specific scientific research on the major sub-projects.

    2. Technological achievements

    2.1. General layout

    2.1.1. General scheme of the Middle-Line Project

    The Middle-Line Project crosses the Yangtze River, Yellow River, Huai River, and Hai River basins, and the situation, temporal distribution, and spatial distribution of the water resources in each basin are obviously different. The general layout of the project shall comprehensively consider the temporal and spatial distribution of the water resources in the water-supply and-receiving areas and its impact on the middle–lower reaches of the Han River, covering a wide range of fields such as waterresource utilization, flood control, disaster reduction, water environment,and water ecological protection. In order to scientifically realize the multi-objective optimal allocation of water resources,a cross-basin water-resource allocation theory based on the carrying capacity of water resources and the water environment was proposed. Moreover, a multi-source, multi-objective, multibasin, and super-large-scale optimal allocation model of water resources was constructed to establish the general scheme of the project. This general scheme considered the water use and ecological-environment protection in the water-supply and-receiving areas, and along the water transfer line was put forward for the construction of Middle-Line Project, which required heightening the Danjiangkou Dam in the near future. It was also necessary to increase the capacity of the water-resource dispatching, storage, and utilization of the Han River in order to meet the requirement of transferring an annual average of 9.5 billion cubic meter of water. At the same time, it was necessary to raise the water level of the Danjiangkou Reservoir in order to realize artesian water transfer to Beijing and to improve the flood-control and disaster-reduction capacity in the middle–lower reaches of the Han River. In the long term, the transferred water volume will be greatly increased due to water-source supplementation from the main stream of the Yangtze River in order to realize the water resources complementarity between the south (abundant) and the north (dry), and the joint allocation of multiple water sources,so as to ensure water safety in the water-receiving areas.

    2.1.2. General layout of the main canal of the project

    As mentioned earlier, the total length of the main watertransfer canal is about 1432 km, crossing more than 700 rivers and involving many other constructions. Here, the key problem was how to distribute the water head of each canal section in order to realize free flow in the whole canal, under conditions in which the available water head is less than 100 m.The engineering design proposed a discrete differential dynamic programming method to solve the optimal distribution of the longitudinal slope and water head of the canal, tunnel, and culvert [2]; it also established a dynamic planning model for the longitudinal slope of the main canal. A general layout scheme of the main canal, which involved an all-line artesian flow and overpass, was put forward; this scheme was conducive to ensuring the water quality and protecting the ecological environment while successfully solving the problems of the all-line artesian water transfer and overpass crossing the rivers along the project. The scheme avoided the impact rivers along the project could have on the transferred water quality and the sediment deposition caused by the flat crossing of transferred water, so as to ensure the long-term safety and stable operation of the project. It also considered the flexibility of the large-scale, long-distance, and multi-objective water-transfer and distribution-system scheduling.

    2.2. The Danjiangkou Dam heightening sub-project

    The Danjiangkou Dam is located on the main stream of the Han River in Danjiangkou City, Hubei Province. It has comprehensive utilization benefits such as flood control,water supply,power generation,and shipping,and was the main water-source sub-project of the Middle-Line Project. The dam was built in the 1950s and completed in early 1974. Due to the great differences that occur in the annual water flow amount coming from the Han River, the multi-year dispatching capacity of the Danjiangkou Reservoir needed to be increased in order to ensure an annual average water supply from the Danjiangkou Reservoir to the north about 9.5 billion cubic meter and to increase the water-resource dispatching,storage,and flood-control capacity of the Han River.Therefore,the elevation of the dam top had to be increased from 162.0 m in the initial stage to 176.6 m, and the total storage capacity had to be increased by 11.06 billion cubic meter. The Danjiangkou Dam after completion of the heightening sub-project is shown in Fig. 2.

    For the Danjiangkou Dam,a slope-sticking heightening method with back assistance was adopted, as shown in Fig. 3(a), which depicts the heightening scheme of the right-bank dam section. In general, the heightening of such a dam requires the emptying or significant reduction of the water level in front of the dam.During the heightening period of the Danjiangkou Dam, the dam still needed to undertake tasks such as flood control,power generation,and irrigation, meanwhile blocking floods and cutting the peak of the flood season (Fig. 3(b)). Therefore, the heightening of the dam had to be implemented under normal operation conditions,which presented problems such as the combination and joint load bearing of the old and new dam body.These structural design and construction problems were extremely complex,and no standards were available to refer to; in fact, there was no precedent in the history of engineering construction in China.

    Fig. 2. The Danjiangkou Dam after completion of the heightening sub-project.

    In order to study the combination of new and old concrete,three in situ field tests were successively carried out (Fig. 4(a)).The results showed that a combined surface of new and old concrete has different degrees of opening under various working conditions, and the opening and closing state changes periodically with the temperature [3]. The design of a standard gravity dam assumes that the dam is an integral structure whose stress meets the assumed conditions of a plane section. However, a combined surface is actually in a cracked state. When a force is transmitted by the limited combined part of the combined surface,it is difficult to apply traditional dam design theory based on material mechanics and the rigid-body limit equilibrium method. Therefore, based on in situ field tests and a large quantity of research and analysis,a design theory involving a ‘‘finite combination of the combined surface with back assistance” was proposed for the heightening structure. A mechanical model was established for the tenon and groove shear transmission in the dynamic cracking area of the combined surface of the new and old dam and the joint transmission of pressure and shear in the finite combined area (Fig. 4(b)).Furthermore, a dam design method and a control standard were also established, considering the nonlinear contact between the combined surfaces and the influence of ambient temperature load(Fig. 4(c)). This model was able to truly reflect the actual working state of the dam heightening and solve the problem of the combined load bearing of the new and old dam.

    Fig. 3. (a) The heightening scheme for the right-bank dam section and (b) the heightening of the Danjiangkou Dam during the normal operation period.

    Fig.4. (a)In situ tests of dam heightening;(b)the‘‘finite combination of the combined surface with back assistance”stress-transmission model;(c)stress/time history curve of the dam heel(considering the temperature load);(d)combined surface treatment during dam heightening.δh:tangential displacement;δn:normal displacement;β:angle of combined suface;D:elastic stiffness matrix;αxh,αyh:tangential correction factor of x direction and y direction in local coordinate system,respectively;αn:normal correction factor in local coordinate system; Ks: tangential elastic stiffness; Kn: normal elastic stiffness; N: normal force; T: shear force.

    The Danjiangkou Dam adopted the ‘‘finite combination of the combined surface with back assistance” heightening method. This was supplemented by engineering measures such as concrete temperature control and lock steel bars (Fig. 4(d)) [4–7], which ensured limited dynamic cracking in some areas of the combined surface to release the temperature load. Meanwhile, some combined areas remained in a combined state all the time in order to transmit the loads, so as to enable the joint load bearing of the new and old dam. Observations after the heightening of the dam showed that the actual state of the combined surface was basically consistent with the design, and the minimum combined proportion of the heightening dam was about 50%. In 2021, the Danjiangkou Reservoir was successfully impounded to a normal water level of 170 m after the heightening project was completed,and it has passed the test and is operating normally.

    2.3. Expansive-soil canal-slope treatment

    Expansive soil is a kind of over-consolidated and multi-cracking special soil with a significant expansion and contraction effect. An expansive-soil slope is prone to landslides,due to structural cracks and drying–wetting cycles. Building water-transfer canals on an expansive-soil foundation is a problem worldwide. The first stage of the Middle-Line Project canal involved 387 km of expansive(rock) soil with a maximum excavation depth of about 50 m.During the project construction, different degrees of landslide occurred on more than 150 canal slopes along the expansive-soil canal section, which is one of the key technical problems in the project[8].Figs.5(a)and(b)provide a comparison before and after the construction of the expansive-soil canal in the Middle-Line Project.

    2.3.1. Deformation and failure mechanism of the shallow and deep layers of expansive-soil slopes

    Since the 1970s,many studies have been carried out on the distribution of expansive soil, geotechnical engineering characteristics, slope-failure mechanisms, and engineering treatment measures for the Middle-Line Project [9–12]. It has been revealed that shallow deformation and failure modes are affected by the atmospheric environment and the effect of expansion contraction,and that deep-sliding failure modes are controlled by the cutting of steep and gently inclined fracture structural planes.Shallow deformation and damage are mainly affected by atmospheric drying–wetting cycles in the environment, which cause dense network expansion and contraction cracks to form on the surface of the expansive-soil slope, leading to a broken and cracked soil structure. In this way, multiple tensile cracks are easily generated in the direction parallel to the canal, resulting in shallow sliding deformation and slope damage, as shown in Fig. 6(a).

    Deep-sliding failure is mainly controlled by structural planes such as the stratum interface and lithological interface,and by primary extended fractures existing in deeply buried strata. Canal excavation and unloading will cause such fractures to further connect, forming a multi-fracture combined sliding body (Figs. 6(b)and (c)). Conventional-soil slope-stability analysis methods are not suitable for the failure analysis of a deep expansive-soil slope controlled by a large structural plane.To identify the worst combination of large cracks and stratum structural planes controlling the slope stability in an expansive-soil layer, two methods were proposed. One is the broken-line sliding failure model controlled by the deep structural plane in expansive soil; and the other is the grid-search method, which is used for a stability analysis of adverse combinations of cracks based on the rigid body limit equilibrium method (LEM) (Fig. 6(d)). These methods solved the longterm problem of accurately analyzing the stability of an expansivesoil slope.

    2.3.2. Comprehensive treatment technology for expansive-soil canal slopes

    For shallow damage in expansive soil, the main treatment plan is to isolate the influence of the atmosphere and reduce rainwater scouring. For sliding failure of a deep structural plane, the main idea is to reduce the damage caused by groundwater in the slope and reinforce the soil.Based on these concepts,a new comprehensive treatment technology involving the protection, interception,drainage, and reinforcement of an expansive-soil canal slope is proposed (as shown in Fig. 7). The slope surface is protected by measures such as cement-modified soil to reduce the impact of the atmospheric environment. Intercepting ditches are set at the top of the slope to intercept rainfall or external water in order to reduce confluence and scouring on the surface of the canal slope.Blind ditches and check valves are set within the slope for drainage, to control changes in the soil moisture content. Finally,multiple anti-slide piles are used to reinforce the slope. This comprehensive treatment technology has solved the problems of shallow-surface creep deformation and deep structural planecontrolled landslide stability of an expansive-soil slope [13–16],making it possible to establish corresponding controlled technology standard systems.

    At present, the expansive-soil canal in the Middle-Line Project operates well and has successfully withstood the test of two severe rainstorms in 2016 and 2021.

    Fig. 5. (a) Expansive-soil landslides blocking the canals; (b) expansive-soil canals in the Middle-Line Project.

    Fig. 6. (a) Photo of shallow damage; (b) photo of deep structural plane damage; (c) a broken line sliding failure controlled by a deep structural plane in expansive soil;(d) the grid-search method to identify adverse combinations of multiple cracks.

    Fig. 7. The comprehensive treatment technology of protection, interception, drainage, and reinforcement. PVC: polyvinyl chloride.

    2.4. Yellow River-crossing tunnel sub-project

    The Yellow River-crossing tunnel sub-project is located about 30 km upstream of Zhengzhou City, Henan Province. The main canal crosses the Yellow River through this construction (Fig. 8),which was the key sub-project of the main canal, with the largest scale and the most complex technology. Two tunnels were set up in the Yellow River-crossing sub-project, with a single tunnel length of 4250 m and an inner diameter of 7 m. The shield tunnel crosses the Yellow River through a wandering river section. The riverbed of this section is a saturated layer of sandy soil with complex geological conditions. The water pressure in the tunnel is as high as 0.51 MPa,which presents two key technical problems:preventing high-pressure internal water seepage, and adapting to the large longitudinal dynamic deformation of the tunnel caused by the wandering river regime.

    Fig. 8. Layout of the Yellow River-crossing tunnel sub-project.

    Fig. 9. Structural diagram of the prestressed composite lining of the shield tunnel.

    In order to adapt to the wandering configuration of the Yellow River, it was necessary to prevent the high-pressure water from seeping out from the joints of the tunnel’s shield segments, which would induce seepage failure of the surrounding soil and the unstability of the tunnel. Moreover, an inner lining was needed in the shield-segment assembly structure to bear the internal water pressure while reducing the roughness of the water surface and the tunnel diameter. Because an ordinary reinforced lining shall be equipped with high-density steel bar reinforcement, such construction is difficult and uneconomical.Therefore,a new watertransfer tunnel structure comprising a shield tunnel with a prestressed composite lining was researched and invented (Fig. 9).Design theories and structural analysis methods for the composite structure of the water-transfer tunnel were put forward, and a corresponding design control standard system was established.The outer lining of the tunnel resists the water and soil load outside of the tunnel, while the prestressed inner lining bears the high-pressure internal water load, with a drainage cushion set between the inner and outer lining to reduce the interlaminar water pressure.This composite structure can well adapt to the longitudinal dynamic large deformation caused by the depth change of the covered soil outside the tunnel,which is due to the scouring and silting of the wandering river section.It also solves the problems of the structure stress of the high-pressure water-transfer tunnel passing through the multiphase complex soft soil layer,and of possible instability and damage of the surrounding soil caused by internal water seepage [17,18]. At present, the Yellow River-crossing tunnel runs well,and the deformation,structural stress, and seepage pressure of the tunnel all meet the design requirements.

    2.5. Super-large water-delivery aqueduct

    A total of 27 aqueducts are arranged along the main canal of the first stage of the Middle-Line Project.Among these,the Tuan River aqueduct has a maximum flow of 420 m3?s-1and a single span load of 4800 t (equal to 30 trains), with a minimum wall thickness of only 35 cm. At present, it is the largest U-shaped aqueduct in the world. Thus, there were no standards to follow for the design of this super-large aqueduct. Moreover, this sub-project presented various key technical problems, such as structural load bearing and crack prevention, along with a tight construction period and high technical requirements. These issues were directly related to the realization of the general water-supply goal of the first stage of the Middle-Line Project.

    During the design process of the Tuan River aqueduct, the project put forward a new design idea: that the bowl partition layout of the longitudinal prestress and the circumferential prestress does not need to be concentric with the inner surface (Fig. 10(a)). In addition, a temperature load model simulated by broken-line by zone was developed for the aqueduct sections. A theory and method were formed to create a super-large U-shaped prestressed aqueduct design and to solve technical problems such as structure load bearing with a low thickness and crack control of the superlarge U-shaped prestressed aqueduct [19]. At the same time, a complete set of mechanized construction technologies and methods were developed to fill the technological gap in mechanized construction technology for the large cast-in situ prestressed aqueduct [20,21]. These included installation, operation, and pouring technologies and methods, along with the construction of an aqueduct-building machine for a super-large U-shaped aqueduct with a span of 40 m (Fig. 10(b)).

    2.6. Water regulation and operation control technology

    The water regulation of the Middle-Line Project shall coordinate flood control, power generation of the Danjiangkou Reservoir,ecological and domestic water use in the middle and lower reaches of the Han River, and the development and protection of local water resources in the water-receiving areas. It is also necessary to quickly and accurately respond to changes in the demands of water users in 191 counties or cities along the project, without the use of online regulating reservoirs. For the water regulation and operation control of the project, it is necessary to consider a wide range of factors whose relationships are rather complicated.A key technical difficulty in ensuring that the benefits of the project can be obtained is how to scientifically establish a waterregulation plan and then regulate the check gates and pumps along the project at appropriate times and with appropriate amounts,so as to deliver water to users in a timely and efficient fashion. In order to solve this problem, a multi-objective elaborate waterregulation model that jointly and dynamically allocates water in the waterhead and water-receiving areas was established.Moreover, a real-time self-adaptive operation system that can meet multiple users’ needs was developed.

    2.6.1. A multi-objective elaborate water-regulation model jointly and dynamically allocating water in the waterhead and water-receiving regions

    The water regulation of the first stage of the Middle-Line Project requires an overall consideration about the comprehensive utilization of water resources in the upper and lower reaches of the Han River basin and the Huang–Huai–Hai River basin in the North China Plain,as well as the joint operation of the Danjiangkou Reservoir and 97 water diversions in water-receiving areas along the project. To achieve the multiple water-regulation objectives in an accurate way, a cycle-feedback dynamic water-regulation model was built, which includes the Han River basin, the Danjiangkou Reservoir, and the water diversions and water users of the main canal of the Middle-Line Project. The model considers various factors, such as the transferrable water volume of the Danjiangkou Reservoir, the water demands of 191 counties or cities in water-receiving areas, and the water transportation capacity of each section of the main canal (Fig. 11). By analyzing the different water conditions in each area, it was able to propose a water-regulation scheme covering 97 water diversions along the main canal and realizing the balanced allocation of water resources characterized by multiple objectives,objects,timescales,and space scales. These achievements established a solid foundation for the safe, stable, and efficient operation of the Middle-Line Project.

    Fig. 10. (a) Layout of the prestressed reinforcement of the Tuan River aqueduct and (b) mechanized construction of a super-large U-shaped aqueduct-building machine.R: radius (cm).

    2.6.2.A real-time operation system meeting multiple users’needs with self-regulation

    The real-time control of the first stage of the Middle-Line Project encountered a variety of difficulties: There are a total of 161 water diversions and check gates along the canal,and the hydraulic response of the canal flow to gate regulation is very slow.Furthermore, there are no online regulating reservoirs, and the allowable variation range of the water level is rather small. The regulation capacity of the canal is poor,while the regulation standard is rather high at the same time.

    In order to transport water to users as required in a timely and efficient manner,a real-time operation system for the first stage of the Middle-Line Project was developed that could satisfy multiple users’needs in a self-regulated manner.As the core of the project’s operation and regulation, this system can regulate water diversions and check gates along the canal regularly and quantitatively,in a scientific and effective way. The system regulates check gates in a coordinated manner according to the designed joint operation rules in order to control the water level adaptively in front of the gates within a certain interval, which allows this water volume to be utilized to respond to water users’ needs rapidly, with little adjustment of the check gates. The system can generate the regulation process of each check gate according to different water demands,making it possible to divert water to users at appropriate times and in appropriate amount,while filling and discharging the canal appropriately. It realizes the real-time automatic control of the project under regular tasks and ensures the safe operation of the main canal, as well as the smooth implementation of the annual water-regulation plan.

    Fig. 11. The multi-objective dynamic joint water-regulation model of the first stage of the Middle-Line Project. (a) Water supply of the Danjiangkou Reservoir; (b) the multiple objects of water regulation of the Middle-Line Project; (c) the time scale of water regulation of the Middle-Line Project.

    3. Prospect

    The successful implementation of the first stage of the Middle-Line Project has yielded and accumulated a series of independently developed survey, design, and mature supporting construction technologies. The project has established 42 technical standards for the design and construction of expansive-soil canals and has obtained more than 1000 patents and developed nationally used construction methods, which have effectively guided the survey,design, and construction of the project. The project has now been under operation for more than seven years. During this time, it has withstood the test of natural disasters such as cold waves and extreme heavy rainfalls.During the operation period,the project has been generally stable,and the water-transfer task has been successfully completed every year. The project has become the water-supply lifeline for cities located along the project, such as Beijing and Tianjin, and has powerfully promoted the recovery of the ecological environment of the rivers and lakes along the project, including the Hutuo River, Pu River, and Baiyangdian Lake.

    The technical achievements yielded by the construction and operation of the first stage of the Middle-Line Project have been successfully applied to major domestic water-transfer projects that are currently under construction,such as the Yangtze River to Huai River Project, the Han River to Wei River Project, the Middle Yunnan Water-Transfer Project, and the Pearl River Delta Water Resources Allocation Project, resulting in remarkable social, economic, and ecological benefits

    The temporally and spatially uneven distribution of water resources is a major problem restricting the development of human society. Thus, management of the construction and operation of cross-basin and long-distance water-transfer projects is a hot topic in today’s society and will continue to be critically important for a long time in the future. The series of innovative technologies yielded by the first stage of the Middle-Line Project provide a reference for the construction of important domestic and international water-transfer projects, and thus have broad prospects for popularization and application.

    99久久综合精品五月天人人| 久久久久久亚洲精品国产蜜桃av| 精品国产乱码久久久久久男人| 久久精品aⅴ一区二区三区四区| 女人被躁到高潮嗷嗷叫费观| 可以在线观看毛片的网站| 女人精品久久久久毛片| 男女之事视频高清在线观看| 亚洲视频免费观看视频| 中文字幕人妻丝袜一区二区| 亚洲视频免费观看视频| 国产精品98久久久久久宅男小说| 国产成人精品久久二区二区免费| 午夜久久久在线观看| 欧美一级毛片孕妇| 精品无人区乱码1区二区| 操出白浆在线播放| 久久天躁狠狠躁夜夜2o2o| 欧美激情极品国产一区二区三区| 美女高潮喷水抽搐中文字幕| 12—13女人毛片做爰片一| av网站在线播放免费| 久久天躁狠狠躁夜夜2o2o| 亚洲精品久久成人aⅴ小说| 一边摸一边抽搐一进一出视频| 久久午夜综合久久蜜桃| av网站在线播放免费| 黄片大片在线免费观看| 91精品三级在线观看| 一区二区三区激情视频| 欧美性长视频在线观看| 级片在线观看| 亚洲人成电影观看| 亚洲精品一二三| 亚洲欧美激情在线| 99精品在免费线老司机午夜| 成人国语在线视频| 中国美女看黄片| 日本黄色日本黄色录像| 免费在线观看影片大全网站| 欧美日韩国产mv在线观看视频| 国产精品永久免费网站| 国产国语露脸激情在线看| 日韩高清综合在线| 日韩欧美免费精品| 亚洲久久久国产精品| av在线播放免费不卡| 欧美一区二区精品小视频在线| 一级黄色大片毛片| 香蕉久久夜色| av国产精品久久久久影院| 国产精品永久免费网站| 国产精品亚洲av一区麻豆| av福利片在线| 在线观看免费日韩欧美大片| 亚洲aⅴ乱码一区二区在线播放 | av天堂在线播放| 亚洲精品国产区一区二| 国产精品98久久久久久宅男小说| 一本大道久久a久久精品| 国产1区2区3区精品| 久久人妻av系列| 校园春色视频在线观看| 免费在线观看亚洲国产| 一区在线观看完整版| 1024视频免费在线观看| 日本a在线网址| 国产免费现黄频在线看| 美女高潮喷水抽搐中文字幕| 精品人妻在线不人妻| 无遮挡黄片免费观看| 日韩精品青青久久久久久| 久久久久久免费高清国产稀缺| 精品福利观看| 一本大道久久a久久精品| 精品卡一卡二卡四卡免费| 亚洲欧美日韩高清在线视频| 国产av一区在线观看免费| 久久草成人影院| 久久精品91蜜桃| 欧美日韩瑟瑟在线播放| 亚洲av成人一区二区三| 啦啦啦在线免费观看视频4| xxx96com| 国产av一区在线观看免费| 熟女少妇亚洲综合色aaa.| 亚洲第一欧美日韩一区二区三区| 国产麻豆69| 别揉我奶头~嗯~啊~动态视频| 桃红色精品国产亚洲av| 中亚洲国语对白在线视频| 亚洲黑人精品在线| 久久人妻熟女aⅴ| 亚洲九九香蕉| 91成年电影在线观看| 亚洲精品国产精品久久久不卡| 亚洲av美国av| 亚洲精品一二三| 免费av毛片视频| 男女做爰动态图高潮gif福利片 | 色婷婷久久久亚洲欧美| 午夜91福利影院| 丝袜美足系列| 精品高清国产在线一区| 日日夜夜操网爽| 亚洲精品久久午夜乱码| 精品一区二区三区av网在线观看| 黑人猛操日本美女一级片| 夫妻午夜视频| 法律面前人人平等表现在哪些方面| 国产成人欧美在线观看| 欧美丝袜亚洲另类 | 亚洲在线自拍视频| 国产在线精品亚洲第一网站| 中文字幕最新亚洲高清| 久久午夜综合久久蜜桃| 欧美大码av| 久久影院123| 久久人妻av系列| 亚洲在线自拍视频| 黄色怎么调成土黄色| 精品国产乱子伦一区二区三区| 午夜免费鲁丝| 亚洲 欧美一区二区三区| 精品国内亚洲2022精品成人| 日日夜夜操网爽| 国产1区2区3区精品| 亚洲av片天天在线观看| 韩国av一区二区三区四区| 国产伦一二天堂av在线观看| 中文字幕精品免费在线观看视频| 两性午夜刺激爽爽歪歪视频在线观看 | av视频免费观看在线观看| 日本 av在线| 亚洲激情在线av| 精品乱码久久久久久99久播| 国产精品一区二区三区四区久久 | 久久久久国产精品人妻aⅴ院| 人人妻,人人澡人人爽秒播| 午夜福利在线免费观看网站| 国产成人精品在线电影| 俄罗斯特黄特色一大片| 日本a在线网址| 久久亚洲真实| 亚洲一区二区三区欧美精品| 高清毛片免费观看视频网站 | 9色porny在线观看| 黄色怎么调成土黄色| 在线观看免费高清a一片| 国产熟女xx| 亚洲国产精品合色在线| 欧美日韩av久久| 精品少妇一区二区三区视频日本电影| 一边摸一边抽搐一进一出视频| 亚洲专区国产一区二区| 欧美日韩黄片免| 国产精品综合久久久久久久免费 | 日韩免费高清中文字幕av| 欧美性长视频在线观看| 一二三四在线观看免费中文在| 国产亚洲精品久久久久久毛片| 妹子高潮喷水视频| 日韩免费av在线播放| 精品人妻1区二区| 国产真人三级小视频在线观看| 国产av一区二区精品久久| 99热只有精品国产| 女性生殖器流出的白浆| 亚洲国产毛片av蜜桃av| 巨乳人妻的诱惑在线观看| av视频免费观看在线观看| 国产精品二区激情视频| 国产精品日韩av在线免费观看 | 俄罗斯特黄特色一大片| 高清黄色对白视频在线免费看| 中国美女看黄片| 99在线视频只有这里精品首页| 国产成人一区二区三区免费视频网站| 国产区一区二久久| 国产精品久久电影中文字幕| 亚洲情色 制服丝袜| 亚洲国产欧美网| 国产精品国产高清国产av| 精品国产亚洲在线| 国产深夜福利视频在线观看| 国产真人三级小视频在线观看| 国产91精品成人一区二区三区| 亚洲精品国产精品久久久不卡| 日韩欧美免费精品| 久久天躁狠狠躁夜夜2o2o| 国产国语露脸激情在线看| 久久九九热精品免费| 午夜精品在线福利| 免费在线观看黄色视频的| 亚洲人成伊人成综合网2020| 久久这里只有精品19| 国产亚洲欧美98| 国产单亲对白刺激| 国产成人一区二区三区免费视频网站| 99精品久久久久人妻精品| 欧美日韩福利视频一区二区| 超色免费av| 午夜免费激情av| 1024视频免费在线观看| 亚洲五月天丁香| 久久精品亚洲av国产电影网| av福利片在线| 在线av久久热| 国产精品一区二区免费欧美| 妹子高潮喷水视频| 日韩三级视频一区二区三区| 午夜福利在线观看吧| 精品乱码久久久久久99久播| 麻豆av在线久日| 午夜老司机福利片| 成年人黄色毛片网站| 亚洲aⅴ乱码一区二区在线播放 | 国产欧美日韩综合在线一区二区| 看免费av毛片| 色综合站精品国产| 欧美乱码精品一区二区三区| 黄色片一级片一级黄色片| 婷婷六月久久综合丁香| 午夜日韩欧美国产| 老司机午夜十八禁免费视频| 亚洲男人天堂网一区| 亚洲精品粉嫩美女一区| 国产精品自产拍在线观看55亚洲| 大型av网站在线播放| 久99久视频精品免费| 国产黄色免费在线视频| 国产精品 国内视频| 一夜夜www| 国产一卡二卡三卡精品| 欧美日韩亚洲高清精品| 国产成+人综合+亚洲专区| 在线观看免费视频网站a站| 韩国av一区二区三区四区| 精品一区二区三区四区五区乱码| 人成视频在线观看免费观看| 18禁美女被吸乳视频| 国产精品成人在线| 国产亚洲欧美98| 亚洲人成伊人成综合网2020| 美女扒开内裤让男人捅视频| 精品国内亚洲2022精品成人| 法律面前人人平等表现在哪些方面| 亚洲人成电影免费在线| 成年人免费黄色播放视频| 国产成人精品在线电影| 免费高清在线观看日韩| 色在线成人网| 亚洲av日韩精品久久久久久密| 亚洲七黄色美女视频| 一进一出抽搐动态| 我的亚洲天堂| 女同久久另类99精品国产91| 纯流量卡能插随身wifi吗| 又紧又爽又黄一区二区| 久久热在线av| 精品久久久久久成人av| 中文字幕av电影在线播放| 久久香蕉精品热| 久久国产精品男人的天堂亚洲| 99精品欧美一区二区三区四区| 淫秽高清视频在线观看| av有码第一页| 超碰97精品在线观看| a级毛片黄视频| 欧美最黄视频在线播放免费 | 久久午夜综合久久蜜桃| 真人做人爱边吃奶动态| 午夜激情av网站| 精品电影一区二区在线| 免费在线观看完整版高清| 90打野战视频偷拍视频| 亚洲五月婷婷丁香| 高清av免费在线| 咕卡用的链子| 18禁观看日本| 精品一区二区三卡| 久久中文字幕人妻熟女| 男女下面插进去视频免费观看| 性少妇av在线| 精品国产乱子伦一区二区三区| 女人爽到高潮嗷嗷叫在线视频| 久久久久久免费高清国产稀缺| 在线视频色国产色| 99精品欧美一区二区三区四区| 久久久久国内视频| 成人三级做爰电影| 男女高潮啪啪啪动态图| 国产乱人伦免费视频| 亚洲人成电影观看| www.999成人在线观看| 99精品欧美一区二区三区四区| 99国产极品粉嫩在线观看| a级毛片黄视频| 免费看十八禁软件| 久热这里只有精品99| 国产精品av久久久久免费| 大型av网站在线播放| 99国产极品粉嫩在线观看| 久久久久亚洲av毛片大全| 在线观看www视频免费| 日韩高清综合在线| av福利片在线| 色婷婷av一区二区三区视频| 可以在线观看毛片的网站| 国产亚洲av高清不卡| 一级a爱片免费观看的视频| 久久久国产精品麻豆| 亚洲av熟女| 少妇的丰满在线观看| 成人亚洲精品av一区二区 | 亚洲中文字幕日韩| 欧美激情 高清一区二区三区| www.www免费av| 成人18禁在线播放| 手机成人av网站| 在线观看一区二区三区| 国产精品爽爽va在线观看网站 | 免费在线观看黄色视频的| 好看av亚洲va欧美ⅴa在| 黄色女人牲交| 国产成人一区二区三区免费视频网站| www日本在线高清视频| 久久中文看片网| 亚洲免费av在线视频| 老司机在亚洲福利影院| 99精品欧美一区二区三区四区| 欧美日韩视频精品一区| 在线观看午夜福利视频| 亚洲一卡2卡3卡4卡5卡精品中文| 黄色毛片三级朝国网站| 色在线成人网| 99在线视频只有这里精品首页| 成人永久免费在线观看视频| 美女高潮喷水抽搐中文字幕| 亚洲一区高清亚洲精品| 亚洲精品中文字幕在线视频| 啪啪无遮挡十八禁网站| 丁香六月欧美| 午夜精品国产一区二区电影| 亚洲 欧美 日韩 在线 免费| 叶爱在线成人免费视频播放| 高清在线国产一区| 一边摸一边做爽爽视频免费| 十八禁网站免费在线| 欧美丝袜亚洲另类 | 人成视频在线观看免费观看| 日韩一卡2卡3卡4卡2021年| 亚洲欧美一区二区三区久久| 三上悠亚av全集在线观看| 黑丝袜美女国产一区| 国产精品一区二区在线不卡| 悠悠久久av| av网站免费在线观看视频| 看片在线看免费视频| 国产一区在线观看成人免费| 18禁裸乳无遮挡免费网站照片 | 97碰自拍视频| 亚洲九九香蕉| 成人18禁高潮啪啪吃奶动态图| 不卡一级毛片| 精品久久久久久久毛片微露脸| 亚洲avbb在线观看| 身体一侧抽搐| cao死你这个sao货| 美女福利国产在线| 黄色女人牲交| 最新在线观看一区二区三区| 少妇 在线观看| 国产精品一区二区三区四区久久 | 免费观看精品视频网站| 男女高潮啪啪啪动态图| 亚洲av成人不卡在线观看播放网| 中国美女看黄片| 不卡av一区二区三区| 欧美激情 高清一区二区三区| aaaaa片日本免费| 嫁个100分男人电影在线观看| 成人三级做爰电影| 91字幕亚洲| cao死你这个sao货| 国产成人精品久久二区二区免费| 日韩 欧美 亚洲 中文字幕| 国产av又大| 精品久久久久久成人av| 久久久久久免费高清国产稀缺| 日本a在线网址| 黄色怎么调成土黄色| 国产在线观看jvid| 99精品久久久久人妻精品| 色老头精品视频在线观看| 激情在线观看视频在线高清| 国产免费现黄频在线看| 国产av一区在线观看免费| 91成人精品电影| 日韩av在线大香蕉| 国产av又大| 亚洲中文字幕日韩| 国产有黄有色有爽视频| 久久香蕉激情| 欧美精品啪啪一区二区三区| 国产欧美日韩精品亚洲av| 日韩有码中文字幕| 欧美日韩国产mv在线观看视频| 亚洲第一青青草原| 美女扒开内裤让男人捅视频| 99久久久亚洲精品蜜臀av| 最近最新免费中文字幕在线| 啦啦啦在线免费观看视频4| 婷婷六月久久综合丁香| 精品久久久久久电影网| 欧美日韩av久久| 国产精品自产拍在线观看55亚洲| 50天的宝宝边吃奶边哭怎么回事| 亚洲国产看品久久| 久久久精品国产亚洲av高清涩受| 欧美亚洲日本最大视频资源| 亚洲国产欧美一区二区综合| 看黄色毛片网站| 日本 av在线| 久久精品国产99精品国产亚洲性色 | 一边摸一边做爽爽视频免费| 午夜福利在线观看吧| 亚洲国产精品合色在线| 精品免费久久久久久久清纯| 欧美乱码精品一区二区三区| 19禁男女啪啪无遮挡网站| 天堂影院成人在线观看| 日韩 欧美 亚洲 中文字幕| 少妇的丰满在线观看| www.自偷自拍.com| 波多野结衣一区麻豆| 欧美成人午夜精品| 国产成人系列免费观看| 久久香蕉精品热| 一a级毛片在线观看| 精品国产一区二区久久| 免费在线观看影片大全网站| 亚洲aⅴ乱码一区二区在线播放 | 91精品三级在线观看| 日本wwww免费看| 丰满饥渴人妻一区二区三| 久久久久久久精品吃奶| 91九色精品人成在线观看| 亚洲av成人av| 国产极品粉嫩免费观看在线| 在线观看www视频免费| 精品福利永久在线观看| 一区二区三区国产精品乱码| 精品久久久久久,| 国产成人av教育| 亚洲成人久久性| 欧洲精品卡2卡3卡4卡5卡区| 亚洲狠狠婷婷综合久久图片| 国产成人av激情在线播放| 人人妻,人人澡人人爽秒播| 久久久精品国产亚洲av高清涩受| 伊人久久大香线蕉亚洲五| 国产精品偷伦视频观看了| 精品国产超薄肉色丝袜足j| 嫁个100分男人电影在线观看| 侵犯人妻中文字幕一二三四区| 欧美成人性av电影在线观看| 啦啦啦在线免费观看视频4| 久久久久久久午夜电影 | 精品久久久久久,| 极品人妻少妇av视频| 久久婷婷成人综合色麻豆| 又大又爽又粗| 搡老乐熟女国产| 欧美不卡视频在线免费观看 | 亚洲av日韩精品久久久久久密| 亚洲av五月六月丁香网| 黄色视频不卡| 日韩高清综合在线| 免费观看精品视频网站| 日本黄色日本黄色录像| 成人三级做爰电影| 精品一区二区三卡| 91麻豆av在线| 亚洲国产看品久久| 久99久视频精品免费| 久久久久久人人人人人| 久久久久久免费高清国产稀缺| 亚洲一码二码三码区别大吗| 久久国产亚洲av麻豆专区| a级片在线免费高清观看视频| 精品久久蜜臀av无| 97碰自拍视频| 欧美乱妇无乱码| 国产高清视频在线播放一区| 亚洲色图 男人天堂 中文字幕| 三上悠亚av全集在线观看| 99香蕉大伊视频| 妹子高潮喷水视频| 后天国语完整版免费观看| 悠悠久久av| 90打野战视频偷拍视频| 在线观看免费日韩欧美大片| 老司机亚洲免费影院| 99国产综合亚洲精品| 9色porny在线观看| 在线免费观看的www视频| 久久久久精品国产欧美久久久| 久久精品国产亚洲av香蕉五月| 日本撒尿小便嘘嘘汇集6| 久久国产精品影院| 亚洲一码二码三码区别大吗| 亚洲精品av麻豆狂野| 亚洲熟妇熟女久久| 怎么达到女性高潮| 国产精品一区二区三区四区久久 | 夜夜躁狠狠躁天天躁| 99re在线观看精品视频| 精品欧美一区二区三区在线| 午夜影院日韩av| 一本一本综合久久| 欧美区成人在线视频| 久久天躁狠狠躁夜夜2o2o| 免费无遮挡裸体视频| 欧美成人a在线观看| 久久久久国产精品人妻aⅴ院| 丰满乱子伦码专区| 免费观看精品视频网站| 国产高清视频在线观看网站| 日本一本二区三区精品| 国产欧美日韩精品亚洲av| 国产精品一区二区免费欧美| 国产精品一及| 国产aⅴ精品一区二区三区波| 搡老岳熟女国产| 国产精品亚洲av一区麻豆| av中文乱码字幕在线| 国产麻豆成人av免费视频| 好男人电影高清在线观看| 欧美日韩福利视频一区二区| 动漫黄色视频在线观看| 桃红色精品国产亚洲av| 小说图片视频综合网站| 俺也久久电影网| 亚洲成人免费电影在线观看| 国产av不卡久久| 毛片女人毛片| 婷婷精品国产亚洲av| 在线观看舔阴道视频| 香蕉av资源在线| 欧美国产日韩亚洲一区| 在线免费观看的www视频| 免费在线观看日本一区| 亚洲熟妇中文字幕五十中出| 亚洲天堂国产精品一区在线| 久久精品影院6| 中文资源天堂在线| 亚洲av美国av| 国产探花在线观看一区二区| 国产三级黄色录像| 天堂av国产一区二区熟女人妻| 舔av片在线| 黄色配什么色好看| 色精品久久人妻99蜜桃| 白带黄色成豆腐渣| 69av精品久久久久久| 一个人看的www免费观看视频| 99久久无色码亚洲精品果冻| 看十八女毛片水多多多| 国产亚洲精品久久久com| 一进一出抽搐gif免费好疼| 能在线免费观看的黄片| av中文乱码字幕在线| 老司机福利观看| 国产私拍福利视频在线观看| 中文字幕久久专区| 90打野战视频偷拍视频| 亚洲国产精品合色在线| 欧美日本亚洲视频在线播放| aaaaa片日本免费| 少妇被粗大猛烈的视频| 舔av片在线| 欧美不卡视频在线免费观看| 18禁在线播放成人免费| 啦啦啦观看免费观看视频高清| 国产精品日韩av在线免费观看| 国产成+人综合+亚洲专区| 日韩欧美免费精品| 国产精品亚洲一级av第二区| 午夜精品久久久久久毛片777| 国产精品1区2区在线观看.| 好男人在线观看高清免费视频| 午夜福利高清视频| 别揉我奶头~嗯~啊~动态视频| 又紧又爽又黄一区二区| 欧美色视频一区免费| 国产三级在线视频| 欧洲精品卡2卡3卡4卡5卡区| 欧美黄色片欧美黄色片| 麻豆一二三区av精品| 90打野战视频偷拍视频| 亚洲欧美日韩东京热| 午夜老司机福利剧场| 午夜视频国产福利| 亚洲国产精品999在线| 高清在线国产一区| 国产三级黄色录像| 国产色婷婷99| 嫩草影院新地址| 全区人妻精品视频| 国产美女午夜福利| 亚洲国产日韩欧美精品在线观看| 在线免费观看的www视频| 最近最新中文字幕大全电影3| www.999成人在线观看|