    Flexibility Prediction of Aggregated Electric Vehicles and Domestic Hot Water Systems in Smart Grids

    2022-01-26 06:39:18JunjieHuHuynrnZhouYihongZhouHijingZhngLrsNordstrmdGungyYng
    Engineering 2021年8期

    Junjie Hu,Huynrn Zhou,Yihong Zhou,Hijing Zhng,Lrs Nordstr?md,Gungy Yng

    a State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources(North China Electric Power University),Beijing 102206,China

    b Division of Electric Power and Energy Systems,School of Electrical Engineering and Computer Science,KTH Royal Institute of Technology,Stockholm 10044,Sweden

    c Center for Electric Power and Energy Department of Electrical Engineering,Technical University of Denmark,Kgs Lyngby 2800,Denmark

    ABSTRACT With the growth of intermittent renewable energy generation in power grids,there is an increasing demand for controllable resources to be deployed to guarantee power quality and frequency stability.The flexibility of demand response(DR)resources has become a valuable solution to this problem.However,existing research indicates that problems on flexibility prediction of DR resources have not been investigated.This study applied the temporal convolution network(TCN)-combined transformer,a deep learning technique to predict the aggregated flexibility of two types of DR resources,that is,electric vehicles(EVs)and domestic hot water system(DHWS).The prediction uses historical power consumption data of these DR resources and DR signals(DSs)to facilitate prediction.The prediction can generate the size and maintenance time of the aggregated flexibility.The accuracy of the flexibility prediction results was verified through simulations of case studies.The simulation results show that under different maintenance times,the size of the flexibility changed.The proposed DR resource flexibility prediction method demonstrates its application in unlocking the demand-side flexibility to provide a reserve to grids.

    Keywords:Load flexibility Electric vehicles Domestic hot water system Temporal convolution network-combined transformer Deep learning

    1.Introduction

    Environmental concerns have largely promoted the use of renewable energy in recent decades[1].This transition brings challenges to power system operation owing to the intrinsic uncertainty of renewable generation and distributed energy resources.The main challenge is the increasing power imbalance between demand and supply,which leads to an increasing demand for controllable resources to be deployed in the system,while the magnitudes of conventional ancillary service resources are decreasing[2].In addition,the increasing number of connected distributed energy resources at medium and low voltage levels may cause congestion issues[3].

    With the development of smart grids and electricity markets,demand response(DR)resources can be an integral part of the system operation.Thus,a promising solution to preserve the ancillary service provision resource is to aggregate the flexibility of DR resources[4].Note that,according to the definition of the International Energy Agency(IEA),flexibility in the power system is the ability to maintain reliability by adjusting the generation or load during large disturbances[5].Therefore,this study defined flexibility as the ability of DR resources to increase and decrease electricity demand.The flexibility of DR resources can be employed by the aggregator through price compensation or economic incentives,which allows the DR resources to modify their own electricity consumption behavior according to the needs of the system operation[6,7].The aggregator can then trade the flexibility of DR resources in the ancillary service market to provide controllable resources for power system operation.

    To date,many studies have been conducted on how to make full use of the flexibility of DR resources in providing ancillary services to grids.To achieve the peak load shifting effect,Li et al.[8]established a model for aggregated electric vehicles(EVs)to participate in price-based DR.Sanandaji et al.[9]employed the electricity consumption flexibility of aggregated residential heating,ventilation,and air conditioning loads to regulate reserve services with a certain ramping rate.Hu et al.[10]proposed the idea of using DR resources to achieve a power balance between supply and demand for a multi-area power system.The approach presented in Ref.[11]established reward rules for DR participants who provide flexibility and use the DR flexibility to realize load shifting as well as voltage improvement in supply feeder.

    As can be seen in Refs.[8–11],the flexibility of aggregated distributed energy resources determines the effect of the implementation of the DR program[12].However,considering the stochastic feature of end-user behaviors and the complex physical characteristics of DR resources,the aggregated flexibility of DR resources is usually uncertain before the implementation of the DR program.Therefore,several risk control strategies are widely adopted in DR programs to handle the uncertainties of the flexibility of DR resources.Ref.[13]introduced a conditional value-at-risk into EVs problems,thereby providing reserve in the ancillary service market to deal with the uncertainty of EV flexibility.Ref.[14]established a robust optimization problem for the optimal scheduling problem of aggregated EVs to obtain a conservative frequency regulation market participation strategy.To deal with the deviation between the actual and pre-scheduled flexibility of grid-connected EVs in the DR grogram,Ref.[15]formulated an optimization model based on the predictive control-based rolling horizon method.Han et al.[16]used a multiple-scenario-based stochastic programming method to handle the uncertainties of EV flexibility in the DR program.Although the risk control method used in Refs.[13–16]can help the aggregator consider the uncertainties in the day-ahead DR planning,the results may be highly conservative,which may lead to loss of economic benefits of the DR users and even prevent the full flexibility of DR resources in grid operations.

    An accurate flexibility prediction model for aggregators is essential for dealing with uncertainty when participating in grid operations.However,only a few studies have been conducted on the flexibility prediction problem.Many studies have mainly focused on electricity demand prediction rather than directly predicting flexibility.Wang et al.[17]and Chen et al.[18]proposed a probabilistic load forecast method that is used in system planning and dispatch.The authors in Ref.[19]reviewed the current energy forecast method and provided future directions.However,they failed to discuss the direct representation and forecast of the flexibility method.At present,most of the research on flexibility is limited to the definition and evaluation of flexibility.Ref.[20]provided a representation method for EV flexibility,considering the participation of EVs in frequency regulation,and evaluated the flexibility of EVs in frequency regulation using three-year data.For residential DR load,the authors in Ref.[21]established a binomial probability distribution model of demand change and used maximum likelihood estimation to evaluate the flexibility of demand increase,demand decrease,or demand immobility.

    In Ref.[22],a recurrent neural network(RNN)based flexibility prediction method was proposed to acquire the flexibility of aggregated domestic hot water system(DHWS).Using the flexibility prediction results of DHWS,the load shift scheduling problem in day-ahead and real-time can be carried out with certain accuracy.However,the proposed RNN-based flexibility prediction method can only predict the size of the aggregated flexibility,but cannot present the maintenance time of flexibility.Furthermore,normal RNN-based methods may show poor performance in complex problems.For example,they may suffer from gradient exploration,and the gradient vanishes when the input sequence is sufficiently long;thus,they cannot be applied to general cases[23,24].

    Building on the previously developed RNN-based flexibility prediction method in Ref.[22],an advanced deep learning network,the temporal convolution network(TCN)-combined transformer,was adopted in this study to predict the real-time aggregated flexibility of two typical DR resources,EV and DHWS multi-stepahead.This method considers the physical characteristics as well as the different power consumption strategies.The main contributions of this study are twofold.First,the study provided a general multi-step-ahead flexibility prediction method for DR resources.Through the proposed flexibility prediction method,the size of the aggregation flexibility and the maintenance time of flexibility can be obtained.Second,we applied the TCN-combined transformer model to address the flexibility prediction of aggregated EVs and DHWSs.The TCN-combined transformer-based prediction model is one of the most advanced models for modeling long-timedependency problems.The accuracy of the flexibility prediction with a long predicted slot was verified through simulation of a case study.The DR planning and operation problem in,for example,offering reserve service to power grids,can be supported by the proposed flexibility prediction method.

    The remainder of this paper is organized as follows:Section 2 provides the preliminaries of our work,including the description of the problem,system framework,and some important definitions.Subsequently,the TCN-combined transformer-based prediction method is described in detail in Section 3.Section 4 presents the simulation results and discussion.Finally,the conclusions are presented in Section 5.

    2.Preliminaries

    2.1.Definition of DR resources flexibility

    In a broad sense,flexibility refers to the ability of the system to respond to internal and external uncertainties,that is,the response ability of the system when internal or external variables change[25].However,in power systems,there is no uniform definition of flexibility.Currently,a widely accepted definition comes from IEA.It defines power system flexibility as the ability to maintain reliability by adjusting the generation or load during large disturbances[5].According to IEA’s definition of flexibility,for the DR resources on the load side,flexibility is reflected in the ability to increase or decrease electricity demand.

    Fig.1 illustrates the flexibility of DR resources.In terms of the base power demand(Pbase)of DR resources,that is,the power consumption in normal use,the power demand can be increased toPmaxor reduced toPmin,wherePmin<0 indicates that the DR resources can provide power to the grid.The values ofPmaxandPminare constrained to the physical characteristics and user requirements of the DR resource,which are discussed in detail in Section 2.3.The distance betweenPbaseandPmin/Pmaxis the capacity to reduce or increase the electricity demand,that is,flexibility.

    Fig.1.The flexibility of DR resources.

    This flexibility can be used as a reserve for power systems.In the traditional sense,reserves have an additional generation capacity above the expected load[16].The reserve capacity setting protects the power system against the uncertain occurrence of future operating events,including loss of energy or load forecasting errors.When such operating events occur,the DR resources can also cover the imbalance between the supply and demand by increasing or decreasing its electricity demand.Accordingly,the capacity of DR to reduce/increase electricity demand can be called the up/down reserve capacity,as shown in Fig.1.

    A reasonable way for DR resources to provide reserves is to allow them to declare the capacity of up and down reserves asymmetrically.However,the uncertainties and coupling in energy and power make the description of DR flexibility a complex problem.To better use the flexibility of DR resources in power systems,the flexibility prediction method needs to be explored.

    2.2.Problem formulation and DR system framework

    The main aim of our study was to predict the flexibility of two typical DR resources,that is,EV and DHWS,in multi-step-ahead by processing realistic electricity consumption data using the recorded historical end-users’ behavior database.

    In our prediction,we studied the DR flexibility in the form of aggregation as it can offset the uncertainty of internally distributed DR resources,and the existing electricity market rules do not allow the participation of individual customers.Considering the different electricity consumption characteristics of EVs and DHWSs,an EV aggregator(EVA)and a DHWS aggregator(DHWSA)were used to aggregate EVs and DHWSs,respectively.

    The flexibility of EVA and DHWSA at time steptcan be denoted asFEVA(t)andFDHWSA(t),respectively,which can be derived from Eq.(1).PEVA(t)andPDHWSA(t)represent the base power demand of EVs and DHWSs at time stept,respectively,which are equivalent toPbasein Section 2.1.^PEVA(t)and ^PDHWSA(t)represent the aggregated power of EVs and DHWSs at time steptwhen engaging in the DR program,respectively,which are further discussed in detail in the following section.

    Fig.2 shows the DR system framework.Note that we defined the power direction from the grid to the demand side as the positive direction.The EVA and DHWSA can participate in the electricity energy market and ancillary services market for reserve bidding.To assist the prediction and application of flexibility,the EVA and DHWSA can coordinate and schedule the power of all the distributed EVs and DHWSs,respectively,by sending a DR signal(DS,discussed in detail in Section 2.4)as an instruction.They can offer attractive discounts in the DR users’ electricity bill when they change the electricity consumption behavior according to the DR signal instructions.To carry out the flexibility prediction of distributed EVs and DHWSs,both EVA and DHWSA use TCN-combined transformer-based technology.The TCN-combined transformer model is described in detail in Section 3.

    2.3.Base power demand of EV and DHWS

    As mentioned in Section 2.1,the flexibility of aggregated DR resources is closely related to the base power demand,and the base power demand of aggregated DR resources is influenced by the physical characteristics of DR resources and end-users’electricity consumption strategies.

    2.3.1.Physical characteristics of each DR resource

    Our study considered three operational modes of each EV,that is,fast-charging with rated fast-charging powerPfast,slowcharging with rated slow-charging powerPslow,and discharging with rated discharging powerPdis.We formulated the following constraints to represent the characteristics of a single EV,as shown in Eqs.(2)–(8):

    wherePEV(t)represents the power of EV at time stept.PEVA(t)=∑

    Fig.2.System framework.Pb:the power consumption of the boiler in the DHWS;Pdis:discharging with rated discharging power;Pfast:fast-charging with rated fast-charging power; Pslow:slow-charging with rated slow-charging power.

    EV∈EVAPEVA(t)represents the relationship betweenPEV(t)andPEVA(t).The state of charge(SOC)of EV at time steptis denoted asE(t).The energy transfer efficiency between the charging pile(grid)and the EV battery is indicated as η.We used Δtto represent the sampling timescale.The initial SOC of a single EV when EV is plugged in at the charging start timetstartis represented asEstart.The expected SOC at the time of departuretdepis denoted asEexp.The maximum limitation of SOC is represented asEmax.The EV must be charged to a certain SOC to meet the driving demand,which is described in Eq.(6).The EV charging demand can be ensured whenEmsis set,which means that the EV must be in charging state when its SOC is lower thanEms.

    The DHWS user’s requirement is to keep the water tank temperatureTtankclose to a predefined temperatureTref,with a maximum allowed deviation equal to the deadbandTdb,as described in Eq.(9).The power consumption of the boiler in the DHWS is represented asPbin this study,and the DHWS operation model is formulated as follows:

    whereTtank(t)is the temperature of the tank in the DHWS at time stept.The DHWS keeps theTtank(t)close to the set valueTrefby controlling the heat emittedQheat(t)from the thermostatically controlled boiler.Qdrain(t)andQloss(t)are the heat losses from the hot water usage of the end users and the insulated tank to the surroundings at time stept,respectively.CpandVtankare the specific heat capacity of water and volume of the water tank,respectively.Pbrefers to the power consumption of the boiler in the DHWS,and Δtrepresents the sampling time scale.The power of DHWS at time steptcan be denoted asPDHWS(t),andPDHWSA(t)=∑DHWS∈DHWSAPDHWS(t).TinletandToutletare the temperatures of the inlet and outlet water,respectively.Vflow(t)is the total hot water flow used to serve the current DHWS activity of the household member.Λtankis the insulation coefficient of the water tank,andTamb(t)is the ambient air temperature at time stept.

    2.3.2.Power consumption strategies for DR resources

    In addition to the characteristics of DR resources,the user’s preferred power consumption strategies also have a significant impact on the base power demand.In this study,two typical power consumption strategies are considered to investigate the impact on flexibility:Strategy 1 is the most primitive electricity consumption method,which is completely dependent on the users’ electricity demand and strategy 2 is the most economical way to consume electricity.The user in this way would fully take the electricity tariff into consideration,and tend to consume more electricity when the tariff is low.In the period when the time of use(ToU)tariff is not favorable,strategy 1 is the main power consumption strategy of DR users.However,with the common use of ToU tariffs,strategy 2 becomes increasingly common among DR users.

    In strategy 1,the EV starts charging as soon as it parks,and the water heater is only heated when the tank temperature reaches the lower limit.

    However,as ToU tariff has been widely used in EV parking lots as well as in residential areas,the power consumption of EVs and DHWSs may be guided by the ToU tariff.Thus,in strategy 2,we consider an optimization power-consumption mode under the ToU tariff.The optimization objectives in strategy 2 for aggregated EVs and DHWSs are shown in Eq.(15).

    wherecToU(t)represents the ToU tariff.

    Compared with strategy 1,some DR flexibility is activated by ToU at some time steps under strategy 2;however,the DR resources still have additional flexibility based on strategy 2.If the power grid has emergency reserve demand,predicting the DR flexibility in advance using strategy 2 would be helpful for DR resources to provide reserve for the power grid.This type of demand responds process can be motivated by additional subsidies.

    Both power consumption strategies are constrained by the physical characteristics of each EV(Eqs.(2)–(8))and DHWS(Eqs.(9)–(14)),and we assume that the fast-charging mode of the EV is only enabled when engaging in the DR program.

    2.4.Demand response signal

    In this section,we used the DS to predict DR flexibility and help in the implementation of DR management.As per the instructions in DR management,the DS is sent from the EVA or DHWSA to the distributed EVs or DHWSs.The different values of DS represent the different DR requirements,and the distributed EVs and DHWSs need to switch their electricity consumption according to the different values of DS they received.We defined three DS values to represent the corresponding responses of the EV and DHWS,as listed in Table 1.To better clarify the electric power and state changes of a single EV and DHWS corresponding to different DS values,a schematic diagram is shown in Fig.3.Note that the same DS was sent from the EVA or DHWSA to all the distributed EVs and DHWSs in this study.

    Table 1 DS value and the corresponding reaction of single EV and DHWS.

    2.5.DS-based flexibility formulation

    Fig.3.The power consumption and state of a single EV and DHWS under different values of DS for two time steps:(a)DS = 1;(b)DS = -1;and(c)DS = 0.

    DR programs usually require the flexibility of DR resources to provide a certain value that can be maintained for a period.Thus,a DS-based flexibility calculation method was proposed to derive flexibility under different maintenance times.First,we should fully activate the flexibility value of all the distributed EVs and DHWS forktime steps.Thus,the EVA and DHSWA can send DS(t)=1,DS(t+1)=1,...,DS(t+k)=1(or DS(t)=-1,DS(t+1)=-1,...,DS(t+k)=-1)to all the distributed EVs and DHWS,which means increasing(or decreasing)electricity consumption at minimumremainktimesteps.Then,theflexibilityF(t),F(xiàn)(t+1),...,F(xiàn)(t+k)can be derived based on the DS signal.Based on the value ofF(t),F(xiàn)(t+1),...,F(xiàn)(t+k),the flexibility remaining at minimumktime stepsFkcan be obtained by finding the minimum value ofas illustrated in Eq.(17),where the subscript indicates whether it is applied to EVA or DHWSA.Note that the physical meaning of finding the minimum value is to ensure that the flexibility can be presented in a block form with a constant value over several consecutive time steps.From Eq.(17),we can infer that,in addition to the base schedule,the maintenance time is also causes variation in flexibility as the energy of the DR resources is constrained.If the power causes the SOC reach the boundary of the EV battery capacity or the tank temperature of the DHWS to reach the boundary of the reference temperature,the DR resources cannot flow power to and from the grid.Thus,the flexibility decreases accordingly.

    Thus,the corresponding flexibility of the aggregated EVs and DHWSs can be obtained based on the above analysis and modeling method.To explain the proposed DS-based flexibility calculation process more intuitively,we draw an illustration in Fig.3,which gives an example of a single EV and DHWS under different values of DS lasting for two time steps.The flexibility calculation results for the example shown in Fig.3 can be found in Table 2.

    Table 2 Flexibility calculation results corresponding to Fig.3.

    As defined in Eq.(16),when DS =1,the flexibility of the example EV in Fig.3 isPfast-Pslow,and the flexibility can maintain two time steps.When DS = -1,the scheduling flexibility isPdis-Pslow;however,considering the energy demand of EV users,the flexibility can only maintain one time step.Thus,if we calculate the flexibility of the example EV for two time steps,then its flexibility is 0 according to Eq.(16).

    As for the example DHWS in Fig.3,when DS=1,it can provide a scheduling flexibility ofPband maintenance time of two time steps.Owing to the tank temperature constraint,the DHWS cannot provide any flexibility when DS=-1.Considering that both EV and DHWS have time-coupling constraints,as shown in Eqs.(3)and(10),the flexibility of the next time step is affected by the flexibility of the previous time steps.Thus,if the state of the tank is heating water rather than losing heat when DS = -1,the DHWS can interrupt the heating to provide scheduling flexibility.

    3.Flexibility prediction method and algorithm

    3.1.Sequence to sequence(Seq2Seq)-based flexibility prediction method

    3.2.Transformer

    ‘‘Transformer”was first introduced in 2017[29].Prior to that,to achieve a Seq2Seq model,various types of RNNs and convolutional neural networks(CNNs)were the major choices.However,these RNN/CNN-based models are associated with many problems,particularly RNN-based models.One of the most severe problems in RNN-based models is the long-time dependency.When proceeding with long-sequence input,RNN-based models could suffer gradient exploration and gradient vanish[23,24],which results in poor performance.Although some updated RNN structures such as long short-term memory(LSTM)[30]and gate recurrent unit[31]have been proposed,these updated RNNs also fail as the sequence becomes longer.

    The transformer shows its great ability in proceeding with longtime dependency due to its multi-head attention and self-attention mechanisms,which are the core of the model.These mechanisms enable the model to determine the inputs that are more important and those that are less dynamic.It is easy for the transformer to learn the time-coupling relationship through the training dataset.In our study,one day was divided into 96 time steps,which made the input sequence longer;thus,there is no doubt that the transformer would be a suitable model to solve this problem.In addition,the multi-head attention and self-attention mechanisms also make the transformer applicable to more general cases.As we need to predict the flexibility of two DR resources,we used this stronger tool.

    The structure of the transformer is relatively complex;therefore,we will not explain the detailed mechanism.More details about the transformer model can be found in Ref.[29].

    3.3.TCN-based input embedding modul e

    In ordinary transformer,the input needs to pass through an‘‘input embedding layer” before it is sent to the internal structure.In NLP,the function of the input embedding layer is to use a much lower-dimensional vector to represent the relatively highdimensional one-hot encoding of words.More generally,this can be regarded as a type of feature extraction method.Based on this,we found a way to achieve feature extraction of the input in our study.

    CNN may be a good choice for our study,as the convolution operation is a strong tool for extracting information from the original input.Considering that the inputs in this study are time-series,it is natural that a structure that can capture sequence information may work.Among different kinds of CNNbased models,the model called ‘‘TCN” proposed in 2018[32]is one of the most advanced CNN-based models to handle temporal sequence.In the later section of this paper,we show how to use a type of TCN that could achieve such feature extractions in the original transformer model.

    The core structures of TCN are shown in Fig.4.The left figure,which is called‘‘dilated causal conv,”represents the integration of causal convolution and dilated convolution,which enables a shorter sequence to represent a longer sequence.The number of blue lines connected to a square is ‘‘kernel size”(in this figure,the kernel size = 3).‘‘d” refers to dilation factors,representing the distance between two adjacent blue lines connected to a square.As we can see,when the kernel size is 3,a network of depth 4(the number of layers)makes the final output(the blue square on the top layer)contains all the information of the input.The right figure,which is called ‘‘residual block in TCN,” represents a designed structure to make the network deeper without suffering degradation[33].This structure is called ‘‘residual connection,” which is proposed in Ref.[33].Weight norm[34]scales the layer parameters,and thus improves the model’s performance.

    Fig.4.The core structures of TCN.ReLU:rectified linear unit.

    Finally,by connecting several residual blocks in series,we got the overall model of TCN,namely ‘‘TCN-based input embedding module.”

    It should be noted that in the TCN model,the lengths of the input and output are identical;however,we could only choose the outputs of the last 96 time steps on the top of the TCN structure as the input of the transformer.There are two reasons for this.On the one hand,the last 96 outputs contained all the information of the input sequence by reasonable design;on the other hand,a shorter sequence could decrease the computational burden of the transformer.We call the overall structure the TCN-combined transformer model,which is plotted in Fig.5.It can be seen that this model structure exactly achieves the form of Eqs.(25)and(26).

    3.4.Training details

    3.4.1.Model inputs and outputs

    3.4.2.Model inputs and outputs for the EVA

    3.4.3.Model inputs and outputs for DHWSA

    The characteristics of DHWSA were similar to those of EVA;thus,for strategy 1,the input and output were the same as those of EVA,as shown in Eqs.(32)and(33).

    3.4.4.Hyperparameter settings

    To train the model,the hyperparameters must be specified.The hyperparameters used in this study are listed in Table 3.The Adam algorithm performs well in network training,and can be easily applied to many machine learning tasks[35].We chose the Adam optimizer to train the proposed network.

    Table 3 Hyperparameter for our TCN-combined transformer model.

    3.4.5.Training dataset

    We needed to specify the training dataset.We created the training dataset according to the required variables,namely,the inputs and outputs in Eqs.(27)–(36).The training dataset for the flexibility prediction of EVA and DHWSA is introduced as follows.Please note that we needed to train several different models as the characteristics are different for different scenarios(EVA or DHWSA under different strategies).

    Fig.5.TCN-combined transformer.

    3.4.6.Training dataset for EVA

    To train the TCN-combined transformer model,we assumed that the historical information of all the distributed EVs,including the arrival time,departure time,battery capacity,and state of charge,can be collected by EVA.Then,based on Eqs.(2)–(8),we generated the base electricity consumption power under strategy 1.Based on Eqs.(2)–(8)and(15),we obtained the base electricity consumption power under strategy 2.Thus,we obtained the base schedule powerPEVAwith no DS in strategies 1 and 2.Based on the base power,according to Table 1,EVA can derive the EV charging/discharging powerunder DS = 1 and -1 on each day.

    3.4.7.Training dataset for DHWSA

    The basic information of DHWS,including physical parameters,water temperature,and switching information,was needed for the training of the DHWSA network.After collecting the historical data of the DHWS,based on Eqs.(9)–(14),we produced the base electricity consumption power under strategy 1.Based on Eqs.(9)–(15),we produced the base electricity consumption power under strategy 2.Thus,we can obtain the base schedule powerPDHWSAwith no DS in strategies 1 and 2.Based on the base power,according to Table 1,EVA can derive the EV charging/discharging powerunder DS = 1 and -1 on each day.

    Please note that for strategy 2,the ToU tariff on each day needed to be collected for both EVA and DHWSA.

    3.5.Application

    After training,our TCN-combined transformer model could provide accurate predictions.In real time,once we want to predict the flexibility multi-step-ahead,a new set of EV/DHWS data is used as input to the training process of EVA/DHWSA under different electricity consumption strategies.The corresponding power of EVA/DHWSA activated by different values of DS(including DS = 0 and DS ≠0)can be generated for one-step-ahead.For example,if we need to predict the up-regulation flexibility at time stept+k,we can make DS(t+k)=-1 as the decoder inputs,and obtain the network output of the prediction power att+kunder DS(t+k)= -1.Next,we make DS(t+k)= 0 as the decoder inputs,and obtain the network output of the prediction power att+kunder DS(t+k)=0.Using Eq.(16),we obtain the up-regulation flexibility using the prediction power under DS(t+k)=-1 and by subtracting the prediction power under DS(t+k)= 0.Then,using the output as the next input,the corresponding power multi-step-ahead can be derived.The multi-step-ahead flexibility can be easily obtained using Eqs.(16)and(17).

    3.6.Summary of proposed algorithm

    In this section,we introduce Algorithm 1 as a summary of the overall procedure of the proposed TCN-combined transformerbased flexibility prediction.Note that in application,the EVA/DHWSA only needs to repeat step 6 after the models are trained.

    Algorithm 1.Algorithm for the TCN-combined transformerbased DR flexibility prediction.1.Prepare 4 TCN-combined transformer models to predict the flexibility of EVA and DHWS under strategies 1 and 2,respectively.2.Get historical dataset of EVA and DHWSA considering their characteristics for strategy 2;ToU tariff should also be collected.3.Specify the inputs and outputs of the model for EVA and DHWSA under different strategies based on Eqs.(27)–(36).4.Set the model hyperparameters for EVA and DHWSA under different strategies.5.Train the 4 models.6.Input the real-time data of EV/DHWS to the network and achieve a one-step-ahead prediction.Then,repeatedly use the output as the next input to achieve the multistep-ahead prediction;thus,the multi-step-ahead flexibility can be predicted using Eqs.(16)and(17).

    4.Case study

    To demonstrate the effectiveness of the proposed TCNcombined transformer-based method in the flexibility prediction of EVs and DHWs,simulations of case studies were carried out,and results are presented in this section.We used a computer with an Intel?CoreTMi7-7500U CPU@2.70–2.90 GHz,8 GB of RAM,and RTX2060,as well as a cloud server with 6 × Intel?Xeon?CPU E5-2678 v3 @ 2.50 GHz,11 GB of RAM,and RTX2080 Ti to run all the simulations.

    4.1.Basic dat a

    The simulation was based on a residential area with 2000 DHWSs and 1000 EVs.The data and parameters of the parking behavior of the EVs were obtained from Ref.[36].The data and parameters of the usage behavior of the DHWSs were obtained from Ref.[37].The key parameters mentioned above are listed in Table 4.The two strategies data came from 256 weekdays per year.We selected the first 196 days to form the training dataset of the transformer network.To avoid over-fitting of the network,the remaining 197–226 days were selected as the validation data set.Finally,the 30 days from 227th to 256th days were randomly selected to test the performance of the proposed algorithm.The ToU tariffs for EV charging stations and residential areas are shown in Fig.6.

    Table 4 Some Parameters of EVs and DHWSs.

    Owing to the differences between EVs and DHWSs in power consumption time,the studied horizon for DHWSs in one day was from 00:00 to 24:00,while the studied horizon for EVs was from 12:00 to 12:00 on the next day.In this study,one time step was 15 min;thus,one day can be divided into 96 time steps.

    4.2.Convergence performance of the transformer network

    In this study,the mean square error between the target values and the network outputs in the training dataset was used as the loss function.Fig.7 illustrates the network learning performances under the two strategies of the two loads.As shown in Fig.7,all loss functions experienced a steep drop over the previous period of epochs,and as epochs increased,they decreased marginally and steadily at approximately 10-5.Despite the slight fluctuations,the validation loss functions maintained a downward trend without any abnormal surge,which indicates that the learning processes avoided overfitting.Overall,considering the total training time of 4 h(600 epochs)and 6 h(1000 epochs)as well as a high-grade convergence performance,it was proven that the proposed network structure achieved a balance between complexity and performance.

    4.3.Flexibility prediction results analysis

    To evaluate the prediction performance of EVA and DHWSA flexibility under different maintenance times,we compared the results under strategy 1(without considering optimization power consumption)and strategy 2(considering optimization power consumption)in six scenarios:①DS = -1 maintained for 15 min;②DS = -1 maintained for 30 min;③DS = -1 maintained for 60 min;④DS = 1 maintained for 15 min;⑤DS = 1 maintained for 30 min;⑥D(zhuǎn)S=1 maintained for 60 min.Moreover,to validate if our proposed multi-step-ahead flexibility prediction method can predict a long-range slot,we selected a 1-day predicted slot,which means we needed to test the accuracy of the 96-time-step-ahead prediction;hence,k= 96.Thus,our multi-step-ahead prediction was achieved by repeatedly making a one-step-ahead prediction.In real time,it can be used to predict any-step-ahead flexibility at any time,depending on the situation.

    Fig.6.ToU tariff for EV charging station and residential area.

    To illustrate the superiority of the proposed TCN-combined transformer-based algorithm,we also used the LSTM method(a type of updated RNN structure,as introduced in Section 3.2)to predict the flexibility described in this section.The trained LSTM contained one input layer,two hidden layers,and 128 nodes in each hidden layer.

    4.3.1.Flexibility prediction results in one day

    Figs.8–11 demonstrate the flexibility prediction results of a randomly selected day in the test dataset.It can be seen from the figures that the peak values of flexibility are slightly more difficult to predict than with other values by both the TCN-combined transformer and LSTM.However,in general,compared with the real value,the predictions of the TCN-combined transformer were more accurate than those of the LSTM.Note that the real value was derived by sending DS to EVs and DHWSs in real time,as discussed in Sections 2.4 and 2.5.

    As shown in Figs.8–11,different maintenance times had different flexibility values.Flexibility size decreased with an increase in maintenance time.As the DR resources are decentralized,and with large uncertainty,it is difficult for them to provide aggregated stable flexibility over a long period of time.Thus,the maintenance time of DR resources in the DR program should be set at a smaller value,which is conducive to activate more potential DR flexibility.

    In addition,the flexibilities using strategies 1 and 2 were different between periods.For EVA,the flexibility mainly appeared between 16:00 and 8:00.The positive flexibility(absorbing power from the grid)under strategy 2 was greater than that under strategy 1,while the negative flexibility(releasing power to the grid)under strategy 2 was less than that under strategy 1.For DHWSA,the flexibility appeared all day.The period between 8:00 and 24:00 for strategy 2 provided more positive flexibility and less negative flexibility,while the period between 0:00 and 8:00 for strategy 2 provided less positive flexibility and more negative flexibility.Furthermore,the lower the maintenance time,the more significant is the difference.

    Moreover,under the same strategy,DR resources exhibited different characteristics in different scenarios.For EVA,an EV has the potential to discharge once it is charged higher than the minimum SOC.However,when it is close to the departure time,discharging would hardly exist to meet the EV energy demand.Thus,when DS = -1,there was a negative flexibility between 16:00 and 8:00,with a maximum of -4.5 MW/15 min.When DS = 1,the EV SOC increased rapidly in the fast-charging mode;however,the EV did not continue to provide flexibility owing to the limitation of the maximum battery capacity.Therefore,the EVA provided a maximum flexibility of approximately 3 MW/15 min from 16:00 to 24:00 when DS = 1.For DHWSA,the positive and negative flexibilities were distributed relatively uniformly during the predicted slot.Due to the changes in the use of the DHWS(e.g.,bathing in the evening,showering in the morning,barely no usage between 13:00 and 16:00,and delay of temperature after usage),which were described in Ref.[37],the negative flexibility reached low points of approximately -4.5 to-4.8 MW/15 min at around 17:00,while the positive flexibility reached a peak point of approximately -5 MW/15 min between 00:00 and 8:00.

    Fig.7.Loss function of EVA and DHWSA under two scenarios.

    Fig.8.The flexibility prediction results of EVA under strategy 1.

    Fig.9.The flexibility prediction results of EVA under strategy 2.

    Fig.10.The flexibility prediction results of DHWSA under strategy 1.

    4.3.2.Prediction accuracy for 30 consecutive days

    Fig.11.The flexibility prediction results of DHWSA under strategy 2.

    Tables 5–8 provide information on the mean absolute error(MAE,the average absolute value of the error between the predicted and real values)of the 30-day prediction under different strategies and scenarios.In Figs.8–11 and Tables 5–8,it can be seen that the predicted flexibility of the proposed TCN-combined transformer was closer to the real value than that of the LSTM.In the simpler scenario,that is,EVA prediction under strategy 1,the TCN-combined transformer performed slightly better than the LSTM.As the scenario became more complex,such as EVA prediction under strategy 2 and DHWSA prediction under both strategies 1 and 2(the DHWSA experienced greater complexity owing to the large number of DHWS users),the prediction accuracy of the TCNcombined transformer was relatively better than that of the LSTM.As described in Section 3.2,LSTM is an updated RNN structure,which can significantly improve the long-time dependency problem of the RNN.With the increase in influencing factors,such as the ToU tariff,number of users,and randomness of user behavior,the LSTM still experienced difficulty of fully capturing the information in the input sequence.In general cases,with the multi-head attention and self-attention mechanisms,the TCN-combined transformer can easily learn time-series information through the input sequence.It was found that the predicted flexibility of the TCNcombined transformer was close to the real value with high accuracy,and that the TCN-combined transformer is more suitable for flexibility prediction of DR resources in different electricity consumption scenarios.

    Table 5 MAE for 30 d of the EVA prediction results under strategy 1.

    Table 6 MAE for 30 d of the EVA prediction results under strategy 2.

    Table 7 MAE for 30 d of DHWSA prediction results under strategy 1.

    Table 8 MAE for 30 d of DHWSA prediction results under strategy 2.

    4.4.Future application prospect for the proposed flexibility prediction method

    As discussed in Section 2.1,the negative flexibility could provide up reserve,and the positive flexibility could provide down reserve.From the prediction,the flexibility of aggregated DR resources is obtained through multi-step-ahead,and the schedulable flexibility of the aggregator’s owned resources can be predicted at the day-ahead and real-time levels.The obtained prediction results can provide a reference for the decision-making of aggregator or superior scheduling organizations,thus achieving further cooperation between the aggregator and operators of different levels of electric power systems,such as transmission system operators(TSOs)and distribution system operators(DSOs).

    At the day-ahead level,by inputting different DS signals,the amount and maintenance time of the flexibility can be obtained and used to grasp the overall distribution of flexibility and make a general assessment of resource flexibility.The aggregator can trade the flexibility of DR resources in the electrical energy and ancillary service markets based on the day-ahead forecast results.For DR users,electricity cost savings can be achieved.For the power system operator,the power consumption of DR resources and the reserve capacity of the power system can be ensured in advance,which is conducive for reducing the impact of random electricity consumption behavior of DR resources and uncertain renewable energy production on the power system,thereby promoting load balance and ensuring part of the emergency reserve.For example,according to Fig.11,under strategy 2,there was adequate downward reserve flexibility of EVs in the period of 20:00 and 24:00.The upward reserve flexibility was adequate between 4:00 and 8:00 in short maintenance time(15–30 min),distributing uniformly and decreasing between 24:00 and 8:00 when the maintenance time reached 60 min.Thus,in the day ahead,based on this projected result,aggregators are inclined to offer downward reserve between 20:00 and 24:00 and upward reserve between 4:00 and 8:00 in the reserve market,as a more robust decision.Thus,the reserve capacity can be used for system operation,such as frequency regulation at the TSO level or congestion alleviation at the DSO level.

    At the real-time level,the flexibility and maintenance time of DR resources defined in the day ahead can be updated by continuously rolling the prediction.As real-time prediction is an ultrashort-term prediction,it can achieve a more accurate prediction than that at the day-ahead stage.The updated flexibility is reported to the system operator accordingly;thus,the system operator is aware of the available reserve in a timely manner.In addition,the aggregator may need to participate in intra-day market,balancing market,and real-time operation;thus,the updated flexibility is necessary in the aggregator optimization problem,which defines the upper and lower boundaries of power of distributed energy resources.

    5.Conclusions

    A TCN-combined transformer-based algorithm was developed in this study to predict both the size and maintenance time of EV and DHWS flexibility in the DR program.The prediction is based on the network training of historical power consumption behaviors of EVs and DHWS,as well as the DSs.The accuracy of the flexibility prediction was verified through the case study of a group of residential EV and DHWS end-users under different power consumption strategies.We can infer that the flexibility size would decrease with an increase in maintenance time.In general,the proposed TCN-combined transformer-based flexibility prediction method can support DR scheduling in the daily grid operation.

    The main challenge in the application of deep learning technology in the field of power grids is the lack of sufficient data as there is usually not enough data in engineering for such a learning-based method.Most of the measured data were of low quality.To further apply our proposed flexibility method,we should take advantage of the rapid development of smart meters and actively consider and carry out beneficial attempts to obtain real-world data.In addition,a further development in data generation technology is highly important to supplement a large amount of data when obtaining accurate data is difficult.As some real-world data can be lost in the transmission process,corresponding data repair technology can also be helpful in improving the quality of data.

    Acknowledgements

    This work was supported by the National Natural Science Foundation of China(51877078 and 52061635102)and the Beijing Nova Program(Z201100006820106).

    Compliance with ethics guidelines

    Junjie Hu,Huayanran Zhou,Yihong Zhou,Haijing Zhang,Lars Nordstr?md,and Guangya Yang declare that they have no conflicts of interest or financial conflicts to disclose.

    欧美极品一区二区三区四区| 91久久精品电影网| 观看免费一级毛片| 如何舔出高潮| 一本久久精品| 九色成人免费人妻av| a级毛片a级免费在线| .国产精品久久| 欧洲精品卡2卡3卡4卡5卡区| 成人亚洲精品av一区二区| 亚洲人与动物交配视频| 18禁裸乳无遮挡免费网站照片| 国产精品一区二区三区四区久久| 在线观看免费视频日本深夜| 欧美高清成人免费视频www| 午夜久久久久精精品| 国产成人aa在线观看| 精品久久久久久久末码| 亚洲国产精品成人综合色| 免费不卡的大黄色大毛片视频在线观看 | 18+在线观看网站| 国产av一区在线观看免费| 国产老妇伦熟女老妇高清| 精品久久久久久久末码| 亚洲精品国产av成人精品| 美女cb高潮喷水在线观看| 日本一二三区视频观看| 国产片特级美女逼逼视频| 国产美女午夜福利| 一本一本综合久久| 日本一二三区视频观看| 青春草亚洲视频在线观看| 色综合站精品国产| 床上黄色一级片| 26uuu在线亚洲综合色| 最新中文字幕久久久久| av免费观看日本| 亚洲自拍偷在线| 男人舔女人下体高潮全视频| 亚洲成人中文字幕在线播放| 亚洲精品色激情综合| 国产成年人精品一区二区| 亚洲18禁久久av| 日韩强制内射视频| 超碰av人人做人人爽久久| 在线观看美女被高潮喷水网站| 免费看美女性在线毛片视频| 淫秽高清视频在线观看| 国产黄片视频在线免费观看| 97在线视频观看| 长腿黑丝高跟| 精品久久久久久久久av| 看片在线看免费视频| 日本欧美国产在线视频| 干丝袜人妻中文字幕| 亚洲三级黄色毛片| 成人美女网站在线观看视频| 蜜桃久久精品国产亚洲av| 99热这里只有是精品50| 色尼玛亚洲综合影院| 精品久久久久久成人av| 啦啦啦啦在线视频资源| 亚洲一区高清亚洲精品| 激情 狠狠 欧美| 久久人人爽人人爽人人片va| 亚洲成人中文字幕在线播放| 久久人人精品亚洲av| 男人舔奶头视频| 精品熟女少妇av免费看| 欧美日韩综合久久久久久| 国产成人一区二区在线| 亚洲欧美日韩高清专用| www.色视频.com| 久久人人精品亚洲av| 美女脱内裤让男人舔精品视频 | 婷婷精品国产亚洲av| 两性午夜刺激爽爽歪歪视频在线观看| 欧美潮喷喷水| 老女人水多毛片| 亚洲第一电影网av| 久久人妻av系列| 国产av麻豆久久久久久久| 晚上一个人看的免费电影| 午夜激情欧美在线| 一本一本综合久久| 午夜爱爱视频在线播放| 久久久久网色| 日韩 亚洲 欧美在线| 亚洲精品国产av成人精品| 国产精品久久久久久av不卡| 超碰av人人做人人爽久久| 久久综合国产亚洲精品| 中文字幕熟女人妻在线| 午夜亚洲福利在线播放| 成人漫画全彩无遮挡| 我要搜黄色片| 亚洲高清免费不卡视频| 18禁在线无遮挡免费观看视频| 能在线免费看毛片的网站| 18禁在线无遮挡免费观看视频| 色播亚洲综合网| 日日干狠狠操夜夜爽| 深爱激情五月婷婷| 少妇裸体淫交视频免费看高清| 日韩成人av中文字幕在线观看| 天美传媒精品一区二区| 美女xxoo啪啪120秒动态图| 99九九线精品视频在线观看视频| 亚洲av第一区精品v没综合| 久久久久久久久久黄片| 久久中文看片网| 国产一区二区在线av高清观看| 噜噜噜噜噜久久久久久91| 最近中文字幕高清免费大全6| 一边摸一边抽搐一进一小说| 国产亚洲精品久久久com| 亚洲最大成人手机在线| 亚洲国产色片| 毛片女人毛片| 久99久视频精品免费| 国产精品蜜桃在线观看 | 一本一本综合久久| 99久久无色码亚洲精品果冻| 亚洲aⅴ乱码一区二区在线播放| 日韩中字成人| 亚洲精品久久久久久婷婷小说 | 国产亚洲精品久久久com| 国产成人影院久久av| 亚洲av熟女| 舔av片在线| 亚洲无线在线观看| 99九九线精品视频在线观看视频| 一级毛片久久久久久久久女| 久久韩国三级中文字幕| 毛片一级片免费看久久久久| 国产精品一区二区三区四区久久| 长腿黑丝高跟| 中国国产av一级| 日韩成人av中文字幕在线观看| 91久久精品国产一区二区成人| 国产亚洲精品久久久com| 校园人妻丝袜中文字幕| 深夜a级毛片| 免费观看在线日韩| 国产黄片美女视频| 少妇熟女aⅴ在线视频| 不卡视频在线观看欧美| 欧美日韩综合久久久久久| 黄色一级大片看看| 日韩在线高清观看一区二区三区| 黄色配什么色好看| 一个人看视频在线观看www免费| 久久精品国产亚洲av涩爱 | 天堂√8在线中文| 我要看日韩黄色一级片| 免费人成视频x8x8入口观看| 麻豆国产av国片精品| 日韩 亚洲 欧美在线| 男人狂女人下面高潮的视频| 一级黄片播放器| 成年av动漫网址| 亚洲美女搞黄在线观看| 又黄又爽又刺激的免费视频.| 日韩一区二区视频免费看| 成人综合一区亚洲| 乱码一卡2卡4卡精品| 别揉我奶头 嗯啊视频| 一夜夜www| 岛国在线免费视频观看| 亚洲av熟女| 热99re8久久精品国产| 成人鲁丝片一二三区免费| 国内久久婷婷六月综合欲色啪| 国产色婷婷99| 麻豆成人av视频| 国产午夜福利久久久久久| 男女啪啪激烈高潮av片| 自拍偷自拍亚洲精品老妇| 少妇丰满av| 色吧在线观看| 国产成人精品婷婷| 亚洲精品国产成人久久av| 日本爱情动作片www.在线观看| 国产麻豆成人av免费视频| 99久久精品国产国产毛片| 高清毛片免费观看视频网站| 乱系列少妇在线播放| 欧美高清性xxxxhd video| 中文字幕久久专区| 久久久久国产网址| ponron亚洲| 久久久午夜欧美精品| 精品国产三级普通话版| 菩萨蛮人人尽说江南好唐韦庄 | 内地一区二区视频在线| 国产精品永久免费网站| 欧美日韩国产亚洲二区| 国产午夜福利久久久久久| 久久精品久久久久久噜噜老黄 | 日韩欧美 国产精品| 91aial.com中文字幕在线观看| 美女大奶头视频| 国产高清视频在线观看网站| 日韩成人av中文字幕在线观看| 久久国内精品自在自线图片| 人妻久久中文字幕网| 99热精品在线国产| 国产黄片美女视频| 日本熟妇午夜| 国产白丝娇喘喷水9色精品| 成人永久免费在线观看视频| .国产精品久久| 网址你懂的国产日韩在线| 大型黄色视频在线免费观看| 亚洲激情五月婷婷啪啪| 久久亚洲精品不卡| 天堂√8在线中文| 91久久精品国产一区二区成人| 在线免费观看不下载黄p国产| 日本在线视频免费播放| 看黄色毛片网站| 婷婷精品国产亚洲av| 成人毛片a级毛片在线播放| 国产真实伦视频高清在线观看| 国产成年人精品一区二区| 免费人成视频x8x8入口观看| 黄色视频,在线免费观看| 日日撸夜夜添| 亚洲内射少妇av| АⅤ资源中文在线天堂| 成人三级黄色视频| 只有这里有精品99| 国产女主播在线喷水免费视频网站 | 国产三级在线视频| 午夜a级毛片| 变态另类丝袜制服| 毛片一级片免费看久久久久| 免费在线观看成人毛片| 国产色爽女视频免费观看| 亚洲欧美日韩东京热| 神马国产精品三级电影在线观看| 欧美bdsm另类| av在线天堂中文字幕| 麻豆成人午夜福利视频| 国产精品永久免费网站| 国产精品99久久久久久久久| 91午夜精品亚洲一区二区三区| 亚洲美女视频黄频| 听说在线观看完整版免费高清| 丝袜美腿在线中文| 夜夜夜夜夜久久久久| 亚洲在线自拍视频| 久久久久免费精品人妻一区二区| 寂寞人妻少妇视频99o| 欧美bdsm另类| 噜噜噜噜噜久久久久久91| 麻豆成人午夜福利视频| 乱码一卡2卡4卡精品| 国产精品不卡视频一区二区| 久久精品人妻少妇| 舔av片在线| 午夜激情福利司机影院| 99精品在免费线老司机午夜| 成人亚洲欧美一区二区av| 中文欧美无线码| 青春草亚洲视频在线观看| 99久国产av精品国产电影| 成年av动漫网址| 麻豆成人av视频| 一区二区三区高清视频在线| 国产成人91sexporn| 99九九线精品视频在线观看视频| 一级黄片播放器| 亚洲国产欧洲综合997久久,| 超碰av人人做人人爽久久| 久久人人爽人人片av| 国产精品野战在线观看| 亚洲精品亚洲一区二区| 99在线人妻在线中文字幕| 成人无遮挡网站| 久久精品久久久久久久性| 久久久欧美国产精品| 欧美精品一区二区大全| 丰满的人妻完整版| 欧美激情在线99| 国产91av在线免费观看| 国产伦在线观看视频一区| 国产乱人视频| 久久精品影院6| 午夜老司机福利剧场| 婷婷色av中文字幕| 免费av观看视频| 国产高潮美女av| 国产男人的电影天堂91| 免费看美女性在线毛片视频| 男人狂女人下面高潮的视频| 三级经典国产精品| 亚洲精品色激情综合| 最后的刺客免费高清国语| 中文字幕制服av| 永久网站在线| 深爱激情五月婷婷| 亚洲欧美精品综合久久99| 少妇高潮的动态图| 日韩中字成人| 插阴视频在线观看视频| 国产综合懂色| 国产高清不卡午夜福利| 99热网站在线观看| 一个人观看的视频www高清免费观看| 久久精品国产99精品国产亚洲性色| 99精品在免费线老司机午夜| 精品熟女少妇av免费看| 日韩制服骚丝袜av| 能在线免费看毛片的网站| 99热这里只有精品一区| 麻豆成人av视频| 九九久久精品国产亚洲av麻豆| 在线观看午夜福利视频| 成人亚洲精品av一区二区| 波野结衣二区三区在线| 国产男人的电影天堂91| 日韩欧美精品免费久久| 国产av一区在线观看免费| 亚洲欧美精品自产自拍| av又黄又爽大尺度在线免费看 | 亚洲激情五月婷婷啪啪| 色综合站精品国产| 99热6这里只有精品| 国内精品一区二区在线观看| 精品国产三级普通话版| 精品无人区乱码1区二区| 女同久久另类99精品国产91| 国产成人精品婷婷| 桃色一区二区三区在线观看| 亚洲成av人片在线播放无| 日韩欧美精品v在线| 两个人视频免费观看高清| 国产老妇伦熟女老妇高清| 内地一区二区视频在线| 国产精品野战在线观看| 美女脱内裤让男人舔精品视频 | 26uuu在线亚洲综合色| 亚洲精品影视一区二区三区av| 晚上一个人看的免费电影| 天天一区二区日本电影三级| 日本色播在线视频| av在线播放精品| 国内久久婷婷六月综合欲色啪| 身体一侧抽搐| 亚洲av第一区精品v没综合| 麻豆一二三区av精品| 久久精品国产亚洲av香蕉五月| 国产麻豆成人av免费视频| 日韩国内少妇激情av| 欧美bdsm另类| 国产老妇伦熟女老妇高清| 亚洲人成网站在线观看播放| 人人妻人人澡欧美一区二区| 少妇裸体淫交视频免费看高清| 性欧美人与动物交配| 天天一区二区日本电影三级| 国产一区二区在线观看日韩| 好男人视频免费观看在线| 老师上课跳d突然被开到最大视频| 高清午夜精品一区二区三区 | 啦啦啦啦在线视频资源| 内射极品少妇av片p| 少妇被粗大猛烈的视频| 国产成人影院久久av| 精品久久久噜噜| 国产精品一区二区性色av| av在线天堂中文字幕| 欧美另类亚洲清纯唯美| 三级经典国产精品| 久久久久久久久大av| 禁无遮挡网站| 美女被艹到高潮喷水动态| 午夜福利在线在线| 97热精品久久久久久| 国产亚洲精品av在线| 精品午夜福利在线看| 午夜精品国产一区二区电影 | 91久久精品电影网| 免费人成视频x8x8入口观看| 国产成人精品一,二区 | 99热这里只有精品一区| 此物有八面人人有两片| 欧美xxxx黑人xx丫x性爽| 少妇的逼水好多| 色噜噜av男人的天堂激情| 麻豆精品久久久久久蜜桃| 国内精品美女久久久久久| 免费看美女性在线毛片视频| 一级毛片aaaaaa免费看小| 91aial.com中文字幕在线观看| 女人十人毛片免费观看3o分钟| 国产精品美女特级片免费视频播放器| 国产白丝娇喘喷水9色精品| a级毛片免费高清观看在线播放| 日本三级黄在线观看| 国产女主播在线喷水免费视频网站 | 欧美成人精品欧美一级黄| 久久久久久久久久久免费av| 久久这里只有精品中国| 欧美3d第一页| 精品一区二区三区人妻视频| 日本免费a在线| 午夜久久久久精精品| 麻豆久久精品国产亚洲av| 日日干狠狠操夜夜爽| 大又大粗又爽又黄少妇毛片口| av免费观看日本| 午夜爱爱视频在线播放| 国产黄片美女视频| 亚洲av成人av| 一卡2卡三卡四卡精品乱码亚洲| 日韩精品青青久久久久久| 中国美女看黄片| 久久精品国产亚洲av涩爱 | 又爽又黄无遮挡网站| 日本五十路高清| 国产精品美女特级片免费视频播放器| 老熟妇乱子伦视频在线观看| 国产一区二区在线av高清观看| 高清在线视频一区二区三区 | 看十八女毛片水多多多| 国产精品免费一区二区三区在线| 成人性生交大片免费视频hd| 日韩国内少妇激情av| 久久久久久久久久黄片| 在线免费观看不下载黄p国产| 亚洲国产精品合色在线| 亚洲精品色激情综合| 久久精品国产99精品国产亚洲性色| 成年女人看的毛片在线观看| 免费观看人在逋| 日韩视频在线欧美| 国产伦精品一区二区三区视频9| videossex国产| 小蜜桃在线观看免费完整版高清| ponron亚洲| 91在线精品国自产拍蜜月| 国产大屁股一区二区在线视频| 男人舔奶头视频| 亚洲五月天丁香| 日日摸夜夜添夜夜添av毛片| 国产伦精品一区二区三区视频9| 能在线免费观看的黄片| 天天一区二区日本电影三级| 国产高清视频在线观看网站| 成人鲁丝片一二三区免费| 国产极品精品免费视频能看的| 国产视频首页在线观看| 色噜噜av男人的天堂激情| 国产一区二区激情短视频| 国产一级毛片在线| 国产精品综合久久久久久久免费| 日本av手机在线免费观看| 成人一区二区视频在线观看| 亚洲美女视频黄频| 国产成人aa在线观看| 看十八女毛片水多多多| 久久精品综合一区二区三区| 内地一区二区视频在线| 最好的美女福利视频网| 麻豆国产av国片精品| 国产精品1区2区在线观看.| 在线观看美女被高潮喷水网站| 亚洲在线自拍视频| 日韩制服骚丝袜av| 国产精品一区www在线观看| 99久久精品一区二区三区| 日韩中字成人| 狂野欧美白嫩少妇大欣赏| 亚洲经典国产精华液单| 综合色av麻豆| 高清在线视频一区二区三区 | 午夜久久久久精精品| 国产三级在线视频| 99久国产av精品国产电影| 人妻制服诱惑在线中文字幕| 九色成人免费人妻av| 国产精品久久电影中文字幕| 亚洲av中文av极速乱| 亚洲欧美日韩高清专用| 国产老妇女一区| 欧美性感艳星| 国产精品野战在线观看| 少妇的逼好多水| 国产在视频线在精品| 少妇被粗大猛烈的视频| 亚洲精品456在线播放app| 2022亚洲国产成人精品| 精品人妻熟女av久视频| 一区二区三区高清视频在线| 亚洲国产精品成人久久小说 | 国产黄色视频一区二区在线观看 | 一区福利在线观看| 久久精品夜色国产| 国产精品福利在线免费观看| 日本撒尿小便嘘嘘汇集6| 亚洲色图av天堂| 搡老妇女老女人老熟妇| 日韩在线高清观看一区二区三区| 婷婷六月久久综合丁香| 人妻少妇偷人精品九色| 婷婷亚洲欧美| 少妇的逼好多水| 亚洲第一电影网av| 国产亚洲5aaaaa淫片| 久久午夜亚洲精品久久| 免费看光身美女| 国产精品爽爽va在线观看网站| 精品久久久久久久久久久久久| 日韩人妻高清精品专区| 禁无遮挡网站| 高清午夜精品一区二区三区 | 国产一级毛片七仙女欲春2| 国产老妇伦熟女老妇高清| 身体一侧抽搐| 欧美色视频一区免费| 两个人的视频大全免费| 久99久视频精品免费| 亚洲精品亚洲一区二区| 国产成人aa在线观看| 人人妻人人澡欧美一区二区| 国产精品蜜桃在线观看 | 能在线免费看毛片的网站| 国产高清不卡午夜福利| 狠狠狠狠99中文字幕| 国产精品.久久久| 午夜福利在线观看吧| 你懂的网址亚洲精品在线观看 | 国产成人影院久久av| 美女脱内裤让男人舔精品视频 | 日韩一区二区视频免费看| a级毛片免费高清观看在线播放| av在线观看视频网站免费| 99热全是精品| 哪个播放器可以免费观看大片| 久久精品久久久久久久性| 日韩欧美精品v在线| 成熟少妇高潮喷水视频| 精华霜和精华液先用哪个| 九九爱精品视频在线观看| 亚洲av.av天堂| 十八禁国产超污无遮挡网站| 99久久中文字幕三级久久日本| 又爽又黄a免费视频| 国产一区亚洲一区在线观看| 欧美最黄视频在线播放免费| a级毛片a级免费在线| 欧美日本视频| 99九九线精品视频在线观看视频| 国产伦一二天堂av在线观看| 欧美激情在线99| av天堂中文字幕网| 男人的好看免费观看在线视频| 国产一级毛片七仙女欲春2| 国产精品美女特级片免费视频播放器| 日产精品乱码卡一卡2卡三| 久久精品国产99精品国产亚洲性色| 国产不卡一卡二| 中文在线观看免费www的网站| 亚洲国产欧洲综合997久久,| 看片在线看免费视频| 免费看美女性在线毛片视频| 国产精品国产高清国产av| 在线观看午夜福利视频| 寂寞人妻少妇视频99o| 少妇人妻精品综合一区二区 | 天美传媒精品一区二区| 国产精品.久久久| 久久九九热精品免费| 日韩人妻高清精品专区| 日本黄色片子视频| 精品国产三级普通话版| 又黄又爽又刺激的免费视频.| 国产成人福利小说| 99久久九九国产精品国产免费| 最近的中文字幕免费完整| 我的女老师完整版在线观看| 国产伦一二天堂av在线观看| 精品一区二区三区视频在线| 国产伦精品一区二区三区视频9| 国产精品不卡视频一区二区| 日本欧美国产在线视频| 国内揄拍国产精品人妻在线| kizo精华| 久久午夜亚洲精品久久| 久久精品夜夜夜夜夜久久蜜豆| 欧美日本视频| 99在线视频只有这里精品首页| 国产精品av视频在线免费观看| 国产伦理片在线播放av一区 | 在线观看免费视频日本深夜| 一级av片app| 97在线视频观看| 亚洲国产高清在线一区二区三| 亚洲av不卡在线观看| 久久精品综合一区二区三区| 成人特级黄色片久久久久久久| 国产精品蜜桃在线观看 | 国产探花在线观看一区二区| 六月丁香七月| 亚洲欧美日韩无卡精品| 国产伦精品一区二区三区四那| 一本久久精品| 男人舔女人下体高潮全视频| 91精品一卡2卡3卡4卡| 国产老妇伦熟女老妇高清| 日韩欧美一区二区三区在线观看| 内射极品少妇av片p| 最近的中文字幕免费完整|