    Research on DC Protection Strategy in Multi-Terminal Hybrid HVDC System

    2022-01-26 06:39:14YupingZhengJiweiHeBinLiTonghuWuWeiDiYeLi
    Engineering 2021年8期

    Yuping Zheng,Jiwei He,Bin Li,Tonghu Wu,*,Wei Di,Ye Li

    a State Key Laboratory of Smart Grid Protection and Control,State Grid Electric Power Research Institute(NARI Group Corporation),Nanjing 211106,China

    b Key Laboratory of Smart Grid of Ministry of Education,Tianjin University,Tianjin 300072,China

    c College of Energy and Electrical Engineering,Hohai University,Nanjing 210098,China

    ABSTRACT Multi-terminal hybrid high-voltage direct current(HVDC)systems have been developed quickly in recent years in power transmission area.However,for voltage-source converter(VSC)stations in hybrid HVDC systems,no direct current(DC)filters are required.In addition,the DC reactor is also not installed at the line end because the DC fault can be limited by the converter itself.This means that the boundary element at the line end is absent,and the single-ended protections used in line commutated converter(LCC)based HVDC(LCC-HVDC)systems or VSC-HVDC systems cannot distinguish the fault line in multi-terminal hybrid HVDC systems.This paper proposes a novel singleended DC protection strategy suitable for the multi-terminal hybrid HVDC system,which mainly applies the transient information and active injection concept to detect and distinguish the fault line.Compared with the single-ended protections used in LCC-HVDC and VSC-HVDC systems,the proposed protection strategy is not dependent on the line boundary element and is thus suitable for the multiterminal hybrid HVDC system.The corresponding simulation cases based on power systems computer aided design(PSCAD)/electromagnetic transients including DC(EMTDC)are carried out to verify the superiority of the proposed protection.

    Keywords:Multi-terminal hybrid HVDC system Single-ended protection Transient information Active injection

    1.Introduction

    In recent years,there has been widespread application of highvoltage direct current(HVDC)transmission systems in the field of power transmission because of its outstanding advantages,such as large transmission capacity,long transmission distance,and low power loss[1,2].However,the traditional HVDC system,namely,the line commutated converter(LCC)based HVDC(LCCHVDC)system,has the essential drawback of commutation failure because the used thyristor is half-controlled.Differently,the voltage-source converter(VSC)has no commutation failure problem because of the application of full-controlled power electronic switches,for example,the insulated gate bipolar transistor(IGBT)[3].Nevertheless,the application of full-controlled power electronic switches will lead to a significantly higher economic investment.Therefore,the hybrid HVDC system,which generally applies the LCC at the rectifier terminal and the VSC at the inverter terminal,has the potential for widespread application in the HVDC transmission area,because it can significantly reduce the risk of commutation failure compared with LCC-HVDC systems,and reduce the required investment compared with VSC-HVDC systems[4].

    Generally,there are four types of hybrid HVDC system,that is,the pole-to-pole hybrid system,hybrid multi-infeed system,terminal-to-terminal hybrid system,and multi-terminal hybrid system[5].The pole-to-pole hybrid system and hybrid multiinfeed system can provide reactive power for alternating current(AC)systems by the introduced VSC,and it can thus significantly reduce the commutation failure probability of the LCC[5].The terminal-to-terminal hybrid system uses the LCC at the rectifier side,and the VSC at the inverter side,which can completely prevent commutation failure(the commutation failure mainly occurs at the inverter side)[5].Furthermore,the multi-terminal hybrid system can realize the multi-terminal power supply,thus having wide application potential in the HVDC transmission area.However,the protection of multi-terminal hybrid HVDC systems is a challenge for its engineering application.

    The direct current(DC)protections in LCC-HVDC or VSC-HVDC systems can be considered for using in multi-terminal hybrid HVDC systems.In general,the single-ended protections are mainly used as the primary protection for the DC line in HVDC systems owing to the consideration of operation speed.In LCC-HVDC systems,the single-ended protections based on the fault traveling wave are used as the primary protection for the DC line[6,7].For example,the company ABB proposed to use the change value and rate of change of voltage traveling wave to distinguish the internal fault and external fault in LCC-HVDC systems.The company Siemens used the change value and rate of change of DC voltage in the protection criterion.Both of the above-mentioned protections distinguish the internal and external faults based on the obstacle effect of the DC filter on the fault traveling wave.In addition,in VSC-HVDC systems,DC reactors will be installed at both terminals of each DC line,which also has an obstacle effect on the fault traveling wave.Therefore,the single-ended protections used in LCC-HVDC system are also suitable for VSC-HVDC systems.Furthermore,considering that the higher the frequency the greater will be the obstacle effect of the DC reactor[8],the single-ended protection based on high-frequency transient voltage(or current)was proposed for the VSC-HVDC system to improve the ability against high transition resistance[8–11].

    However,it should be noted that the above-mentioned singleended protections are all based on the obstacle effect of the line boundary elements on the fault traveling wave,such as the DC reactor and DC filters[6–11].However,in the multi-terminal hybrid HVDC system,DC filters are not required for the VSC station.In addition,the DC reactor may only be installed at the converter exit because the multi-terminal hybrid HVDC system primarily uses converters to eliminate and limit the DC fault current,and there is a reduced requirement on the fault current limiting reactor.This indicates that the boundary element at the line terminal is absent.Under this condition,the single-ended DC protections used in the LCC-HVDC and VSC-HVDC systems are no longer suitable.The current differential protection is not dependent on the line boundary,which,however,is severely affected by the line distribution capacitor current,and requires the communication facility.In summary,the DC protection strategy suitable for multiterminal hybrid HVDC systems,particularly the single-ended one,still needs to be researched further.

    In this study,a novel DC protection strategy which is based on the transient variable and active injection concept is proposed for the multi-terminal hybrid HVDC system.The content of this paper is organized as follows.In Section 2,the typical topology of the multi-terminal hybrid HVDC system is introduced,based on which the applicability of the existing single-ended DC protections is discussed.Then,the DC protection strategy suitable for the multiterminal hybrid HVDC system is proposed in Section 3.In Section 4,the corresponding simulation cases are performed to verify the feasibility and superiority of the proposed protection.Finally,Section 5 presents the conclusions of the study.

    2.Challenge of protection in multi-terminal hybrid HVDC system

    2.1.Typical topology of multi-terminal hybrid HVDC system

    There has been widespread application of LCC-HVDC systems in practical engineering.However,the LCC is composed of halfcontrolled thyristors.As is commonly known,while the thyristor can be turned on based on control,its turned-off operation is uncontrollable.This means that the commutation between the bridge arms in the LCC is highly dependent on the AC-system voltage.When the AC-system voltage drops,the commutation between the bridge arms may fail.In engineering practice,the commutation failure of the LCC has become the core technical problem of the LCC-HVDC system,particularly at the inverter side[12].

    In contrast,the VSC is composed of full-controlled power electronic switches,such as the IGBT,and thus have no commutation failure problem.Therefore,hybrid HVDC systems,where the VSC is applied to replace the LCC at the inverter side and where the LCC is still used at the rectifier side,have been applied to the HVDC transmission technique,because it can prevent the commutation failure problem and enhance the interconnected AC system stability[5].

    Fig.1 shows a typical three-terminal hybrid HVDC transmission system,which will be quickly put into operation in China[13].As shown in Fig.1,the rectifier station S3in the hybrid system applies the LCC,while the converter stations S1and S2apply the modular multilevel converters(MMCs).In this way,the commutation failure problem can be avoided effectively as most of the commutation failure problems occur on the inverter side[5].

    In addition,the LCC can itself eliminate the DC fault current by adjusting the trigger angle.However,the conventional VSC,such as the two-level VSC and the half-bridge MMC,does not have any fault-handling capability.Therefore,in the hybrid HVDC system,the hybrid MMC,which consists of half-bridge sub-modules(HBSMs)and full-bridge sub-modules(FBSMs)[14–17],is applied to stations S1and S2,as shown in Fig.1.After the DC fault,the capacitors in the FBSMs are inserted into the fault circuit in reverse to the fault current by turning off the FBSMs.Therefore,the DC fault current can be eliminated quickly.Then,the fault part in the system can be cut off by the corresponding switches(SW1–SW3),which does not have DC fault arc extinguishing capability.

    2.2.Challenge of DC line protection in multi-terminal hybrid HVDC system

    In general,the DC protections in LCC-HVDC systems or VSCHVDC systems are considered for use in multi-terminal hybrid HVDC systems.However,they cannot be directly applied owing to the absence of the boundary element at the line end.

    For example,in LCC-HVDC systems,the smoothing reactor and DC filter are installed at the line end.Owing to the obstacle effect of the reactor and filter,the fault traveling wave under the external fault condition is noticeably smaller than that under the internal fault condition.Therefore,the traveling-wave based protections,which are widely used in LCC-HVDC systems,can use the amplitude or rate of change of the voltage traveling wave(or of the voltage)to distinguish the internal fault and external fault reliably.

    In the VSC-HVDC system,the waveform quality of the MMC is much better than the LCC in the LCC-HVDC system,so the filters are not required anymore.However,in VSC-HVDC systems,a large DC reactor will be installed at each line end to limit the DC fault current.This means that the line boundary still exists,and thus the DC protection can still distinguish the fault line reliably.

    However,in multi-terminal hybrid HVDC systems,the DC fault current can be limited and eliminated by the converters.This means that the requirement on the DC reactor for fault current limitation is reduced significantly.As shown in Fig.1,in the multiterminal hybrid HVDC system,the DC reactors are only installed at the converter exits,and not at the line end.Moreover,for the VSC,the DC filter is no longer required because the output waveform quality is good enough.Under this condition,the traditional single-ended DC protection cannot distinguish the fault line anymore.For example,for the protection P2installed at the exit of station S2,the observed fault traveling wave after the faultf1(Line1end)is almost the same as that after the faultf4(Line2end).This means that when only the local-measured traveling wave is used,the protection P2cannot distinguish the faultsf1andf4.

    In summary,the single-ended protections used in LCC-HVDC or VSC-HVDC systems cannot be used in multi-terminal hybrid HVDC systems directly.And the single-ended protection,which is suitable for multi-terminal hybrid HVDC systems,should be researched further.

    3.Proposed DC protection strategy for multi-terminal hybrid HVDC system

    3.1.Proposed protection strategy

    According to the above-mentioned analysis,the single-ended protections for the LCC-HVDC and VSC-HVDC systems cannot be directly used in the multi-terminal hybrid HVDC system owing to the absence of the boundary elements(such as the DC filter and DC reactor)at the line end.Therefore,in this study,a novel single-ended protection strategy that can reliably distinguish the fault line without a boundary element is proposed,as shown in Fig.2(mainly referring to the protection P1(in Fig.1)at the station S1,which is connected with multiple DC lines).The detailed steps are as follows.

    (1)Measure the DC voltages and currents,that is,the DC voltage at the line side of the reactor at station S1(Udc1_l),the DC voltage at the station side of the reactor at station S1(Udc1_s),the DC current from bus to Line1(Idc12),and the DC current from bus to Line2(Idc13).If |dUdc1_l/dt| >Δ1or |dIdc12/dt| >Δ2or |dIdc13/dt| >Δ2(trepresents the time;Δ1and Δ2are the threshold values of the start criterion;andUdc1_l,Udc2_l,andUdc3_lare the DC voltage at the line side of the reactor at stations S1,S2,and S3,respectively),the protection is started.

    (2)Extract the high-frequency components of the DC voltagesUdc1_land the DC voltage at the station side of the reactor at station S1(Udc1_s),that is,Udc1_l_hfandUdc1_s_hf.

    If max|Udc1_l_hf|/max|Udc1_s_hf|≤kset(ksetis the reliability coefficient,which is a little larger than 1),it indicates that the fault happens at the converter station S1.Block the converter,then open the switch SW3after the fault current is cleared.And the protection algorithm is ended.

    If max|Udc1_l_hf|/max|Udc1_s_hf| >kset,it indicates that the fault happens at the DC side of the reactor(installed at the converter exit).Block the converter.But the protection algorithm is not ended,and the following steps will be implemented.

    (3)Delay Δt1,then inject a controlled current from the converter(research into the current injection method will be presented below).Delay Δt2.Δt1and Δt2are threshold values of the delay times.

    (4)The fault line can be distinguished according to the DC current.

    If the DC current on Line1is larger than the threshold value,namely,Idc12>Iset,it indicates that the fault is on Line1.Block the converter again,then open the switch SW1.After that,restart the converter.The protection is ended.

    If the DC current on Line1is not larger than the threshold value,namely,Idc12≤Iset,but the DC current on Line2is greater than the threshold value,namely,Idc13>Iset,it indicates that the fault is on Line2.Under this condition,block the converter again,then open the switch SW2.Subsequently,restart the converter.And the protection algorithm is ended.

    If neitherIdc12norIdc13is larger than the threshold valueIset,it indicates that the fault is nonpermanent and has disappeared.The converter can be restarted directly.The protection is ended.

    Δ1should be larger than the rate of change of DC voltage that may occur during system normal operation,and Δ2should be larger than the rate of change of DC current that may occur during system normal operation.The delay time Δt1is introduced to guarantee the insulation recovery of the fault line under the nonpermanent fault condition,which is generally 200–500 ms in HVDC systems[18].In the above proposed protection,the used highfrequency transient voltage is a fast-decay signal.Therefore,the wavelet transform is applied to extract this high-frequency transient voltage because the wavelet transform has an outstanding time-domain resolution in the high-frequency range[8,9].In addition,the theoretical basis and corresponding verification of the fault direction criterion based on max|Udc1_l_hf|/max|Udc1_s_hf|,which is used to determine on which side of the reactor the fault occurs,has been studied in Refs.[8]and[10],and is thus not discussed in detail in this study.

    Fig.1.Typical topology of a three-terminal hybrid HVDC transmission system.S1,S2,S3:converter stations;SW1,SW2,SW3:switches;f1–f6:faults;Udc1_s,Udc2_s,Udc3_s:the DC voltage at the station side of the reactor at stations S1,S2,S3,respectively;Udc1_l,Udc2_l,Udc3_l:the DC voltage at the line side of the reactor at stations S1,S2,S3,respectively;Idc31:the DC current at S3 output;Idc13:the DC current from bus to Line2;Idc12:the DC current from bus to Line1;Idc21:the DC current at S2 output;DCCB:DC circuit breaker.

    Fig.2.Flowchart of the proposed protection strategy for the multi-terminal hybrid HVDC system.

    In addition,during the shutdown of the converter,the proposed protection may operate by mistake,because the rate of change of voltage and current will also be very large.However,it should be noted that,in the hybrid HVDC system,the shutdown of the converter is realized by cooperation between different converter stations,which implies that the shutdown signal will be communicated between all the converter stations[19].Therefore,this signal can also be sent to the protection.When the protection receives the converter shutdown signal,it will be blocked for a period of time to prevent the protection from operating by mistake.

    3.2.Control strategy of current active injection

    In the above proposed protection strategy,the core concept is to use a controlled current from the converter to distinguish the fault line(Line1or Line2),and to identify the fault property(to determine whether the fault has disappeared or not).In this section,the control strategy of the converter to inject a controlled current is introduced(taking the converter station S1for instance),as shown in Fig.3.

    According to the working principle of the hybrid MMC,all the IGBTs in the FBSMs and HBSMs are blocked to eliminate the fault current when the DC fault is detected.After a delay time Δt1for insulation recovery,the switches connected in parallel with the starting resistors,which are installed at the converter side in pactical engineering,are opened to connect the resistors into the system.Then,the IGBT T1in each FBSM is turned on,as shown in Fig.3.

    Based on the above control strategy,the operation state of the hybrid MMC is the same as that of an uncontrolled rectifier.Therefore,the AC-side source will feed a current to the AC side when the DC fault point still exists.Moreover,during this period,starting resistors(Rlim)with values of several thousands of ohms at the AC side of the converter are connected,so the current injected to the DC side can be limited to a controlled level,such that it will not damage the devices in the DC system.

    Furthermore,if the fault is on Line1,Idc12>0 andIdc13=0(ignoring the line capacitor current),while if the fault is on Line2,Idc12=0 andIdc13>0.Differently,if the fault point has disappeared,Idc12=0 andIdc13= 0.Therefore,the criterion for fault line discrimination and fault property identification can be designed as

    Fig.3.Control strategy of the converter to inject a controlled current. Rlim:starting resistor;SW:switch;T1,T2,T3,T4:IGBT modules;SM1–SMN:sub-modules.

    It should be noted that,owing to the distribution capacitors of the transmission line,at the initial stage of the current injection,a charging current will also occur on Line2when the fault is on Line1,and it will occur on Line1when the fault is on Line2.And this charging current will occur on Line1and Line2when the fault has disappeared.Therefore,the delay time Δt2is introduced before the criterion to guarantee that the charging current for the line capacitor has disappeared.

    In addition,in the above content,the hybrid MMC consisting of the FBSMs and HBSMs is discussed as an example.In fact,for other types of hybrid MMCs using different self-eliminating sub-modules,such as clamp double sub-modules(CDSMs)and self-blocking submodules(SBSMs),the proposed active injection control strategy is also suitable.For example,for the hybrid MMC consisting of HBSMs and CDSMs as shown in Fig.4(a),the IGBT T5in each CDSM is turned on during the active injection period.Therefore,the hybrid MMC operates as an uncontrolled rectifier to inject a controlled current to the DC side,similar to the condition shown as Fig.3.Fig.4(b)shows the current flowing path during the active injection period under the condition where SBSMs are applied.Similarly,with the IGBTs T5and T6turned on,the hybrid MMC also operates as an uncontrolled rectifier to inject a controlled current.

    Fig.4.Applicability of the designed active current injection control strategy under the condition with different kinds of self-eliminating sub-modules:(a)hybrid MMC consisting of CDSMs and HBSMs,and(b)hybrid MMC consisting of SBSMs and HBSMs.

    3.3.Cooperation with protection at other station terminals

    As mentioned above,the protection strategy proposed in Section 3.1 is configured at station S1in the three-terminal hybrid HVDC system shown in Fig.1.The protections at other two station terminals,namely protections P2and P3,can be much simpler.

    For the protections P2and P3,the steps(1)and(2)in Section 3.1 are also executed.In other words,after the DC fault occurs,the protection P2and protection P3can also be started quickly.Then,the fault direction criterion based on the ratio of transient voltages at two sides of the reactor,that is,max|Udc2_l_hf|/max|Udc2_s_hf| for P2and max|Udc3_l_hf|/max|Udc3_s_hf| for P3,is started to determine at which side of the reactor the fault occurs.If the fault is identified at the station side,the corresponding converter station is blocked,and the protection is ended.Differently,if the fault is identified at the DC side of the reactor,the fault current is eliminated by blocking the converter,which will be restarted when the line voltage recovers(described as follows).

    For the protection P3,if the local line voltage does not recover(e.g.,Udc3_l≤0.8UdcN,UdcNrepresents the rated DC voltage),the converter S2will not be restarted all the time.Differently,for the protection P2,if the local line voltageUdc2_ldoes not recover for a delay time Δt4,further operations will be carried out.According to the working principle of the protection strategy proposed in Section 3.1,only two conditions will cause the line voltage at S2terminal(Udc2_l)to not recover during the delay time Δt4:①The DC fault occurs on Line1,and the switch SW1has been opened;and ②the fault occurs in station S1,and the switch SW3has been opened.

    To distinguish between the above two conditions,the converter station S2will be controlled to inject a limited current.If the measured currentIdc21>Iset,it indicates that the fault is on Line1,and the station S2should be re-blocked.If the currentIdc21≤Iset,it indicates that the fault is not on Line1(i.e.,it belongs to condition ②),and the converter should be restarted.

    With the proposed protection strategy and corresponding cooperation strategy,the DC fault line can be distinguished(for permanent fault)and recovered(for nonpermanent fault)only according to the local information,which means that the communication is no longer required.

    3.4.Threshold value selection

    For engineering applications,the selection of the threshold values used in the proposed protection should be determined,and this is discussed in this section.

    (1)Threshold values of the starting criterion:In the proposed protection,the rates of change of the DC voltage and DC currents are used to distinguish the fault condition and normal operation condition,and then start the protection.Therefore,the threshold value of Δ1should be larger than |dUdc1_l/dt| during normal operation,and smaller than that under the weakest fault(remote high-resistance fault).Similarly,the value of Δ2should be larger than|dIdc12/dt|(or|dIdc13/dt|)during normal operation,and smaller than that under the weakest fault.In engineering practice,the above threshold values should be determined according to the simulation results.

    (2)Threshold value of the fault direction criterion:In the proposed protection,the fault direction criterion based on max|Udc1_l_hf|/max|Udc1_s_hf| is used to identify the fault direction,that is,on which side of the reactor the fault occurs.According to Refs.[8]and[10],when the fault occurs on the line side of the reactor,the value of max|Udc1_l_hf|/max|Udc1_s_hf| is larger than 1,while it is smaller than 1 when the fault occurs on the station side of the reactor.In the proposed protection,the reliability coefficientksetis introduced to improve the operation reliability of the direction criterion.Generally,the selection ofksetis an empirical value,which is a little larger than 1(e.g.,1.2).

    (3)Threshold value of the fault section identification:According to the analysis in Section 3.2,during the active injection period,the DC line current is equal to zero if the fault has disappeared or is not on this line,while the DC line current is greater than zero if the fault point still exists.Therefore,the threshold valueIsetcan be very small,and only help in preventing the influence of measurement error and communication error.

    (4)Threshold values of the delay times(Δt1–Δt3):In the proposed protection,the delay time Δt1is introduced for insulation recovery of the fault line,which is generally 200–500 ms in HVDC systems[18].

    As analyzed above,the delay time Δt2is introduced to prevent the influence of the line-capacitor charging current under the condition that the fault has disappeared.During the active injection period,the converter operates as an uncontrolled rectifier.If the fault is still on the line,the DC current fed from the AC side will occur again,as shown by the blue curve in Fig.5.

    Fig.5.Charge current to the line capacitor when the fault has disappeared or is not on this line.Rline:the equivalent resistance of the line;Cline:the equivalent capacitance of the line;Lline:the equivalent inductance of the line;Udc:output DC voltage of the converter;T:time for one cycle;Ldc:value of inductor at converter DC output;ic:transient charge current.

    Differently,if the fault has disappeared or is not on this line,the steady-state DC current is zero,but there will be a transient charge current to the line capacitor,as shown by the red curve in Fig.5.According to the equivalent circuit in Fig.5,this transient charge current can be expressed as

    For the protection P1,theRline,Lline,andClinevalues of the longer line should be used to determine Δt2,because the longer line has a largerLlineandCline,which indicates a longer charge period.

    In addition,the delay time Δt3should guarantee that the protection installed at station S1(protection P1)has completed the corresponding operation.Therefore,Δt3should be larger than Δt2+ts+twave_dif,wheretsis the operation time of the switch andtwave_difis the initial-wave-arrival time difference between the protection P1and protection P2.Furthermore,Δt3should also include the time for the DC voltage recovery.

    4.Simulation case study

    As shown in Fig.1,the three-terminal hybrid HVDC transmission system is built based on power systems computer aided design(PSCAD)/electromagnetic transients including DC(EMTDC),whose parameters are listed in Table 1.In the built model,the station S1uses the LCC,while the stations S2and S3use the hybrid MMCs(hybrid of the HBSMs and FBSMs).In addition,the frequency-dependent model is used for the DC overhead lines.To verify the working principle and superiority of the proposed protection,the performances of the protection P1,P2,and P3with the sampling rate of 10 kHz are observed under different fault conditions.As explained in Section 3.4 and the parameters of the simulated model,the delay times Δt1,Δt2,and Δt3are set as 200,10,and 50 ms,respectively.The value ofksetused in the fault direction criterion is set as 1.2.The threshold valueIsetis set as 0.3 kA.In addition,it should be noted that the starting criterion based on the rate of change of voltage and the rate of change of current is a typical starting criterion used in the DC protection,and is thus not discussed in the simulation owing to space constraints.

    Table 1 Parameters of three-terminal hybrid HVDC system.

    4.1.Applicability of traditional single-ended protections in multiterminal hybrid HVDC system

    At present,the traveling-wave based protection,rate of change of voltage(ROCOV)-based protection or transient-voltage based protection is generally used as the primary protection in HVDC systems.In this section,the metallic pole-to-ground faults atf1andf4are set to happen att= 6.3 s respectively.The performance ofthe protection P2is observed as shown in Fig.6,to verify the applicability of the traditional single-ended DC protections in the multi-terminal hybrid HVDC system.

    Fig.6(c)shows the simulation results of the backward voltage traveling waves observed at the protection P2respectively after the faultf1andf4.As discussed above,the traveling-wave based protection primarily uses the amplitude of the voltage traveling wave to distinguish the internal and external faults.However,as shown in Fig.6(c),for protection P2,the observed voltage traveling wave after faultf1is almost the same as that after faultf4.This is because there is no boundary between Line1and Line2,and the fault pointsf1andf4are the same point in terms of space.This indicates that the single-ended traveling-wave based protection cannot distinguish the internal fault and external fault reliably in the multi-terminal hybrid HVDC system,owing to the absence of the boundary element at the line end.Similarly,as shown in Figs.6(d)and(e),the ROCOV based protection and transientvoltage based protection are also not suitable for the multiterminal hybrid HVDC system.

    Fig.6.Performances of the traditional single-ended DC protections after the faults f1 and f4 in the multi-terminal hybrid HVDC system:(a)DC voltage Udc2_l,(b)DC current Idc21,(c)voltage traveling wave(TW),(d)ROCOV,and(e)transient voltage.

    4.2.Performance of proposed protection strategy

    In this section,the DC faults atf1andf2are set to happen respectively,to show how the proposed protection strategy distinguishes the fault line without the boundary.

    (1)Faultf1:

    In this case,the faultf1is set to happen att=6.3 s.Fig.7 shows the corresponding simulation results.As shown in Fig.7(a),after the DC faultf1,the ratio of max|Udc1_l_hf|/max|Udc1_s_hf| is 2.99,which is larger than the threshold value 1.2.Therefore,the fault is identified as the line-side fault by the protection P1.In addition,the active injection control strategy is put into operation for converter S1after the delay time Δt1(at approximatelyt= 6.502 s).As shown in Fig.7(b),after the active injection,the DC current on Line1,namelyIdc12,is larger than the threshold valueIset(0.3 kA)after the delay time Δt2.Therefore,Line1is distinguished as the fault line,and is thus cut off by the switch SW1.Subsequently,the station S1is restarted to build the DC voltage.Therefore,the line voltage at the station S3terminal,that is,Udc3_l,also quickly increases above the threshold value 640 kV,as shown in Fig.7(e).The protection P3measures the recovery ofUdc3_l,and the station S3is restarted.At the station S2,the line voltage(Udc2_l)always does not recover,and the DC current(Idc21)increases to exceed the threshold value during the active injection(Fig.7(d)).Therefore,the protection P2determines that the fault is on Line1,and the station S2is not restarted,as shown in Fig.7(e).

    Fig.7.Performance of the proposed protection strategy after the metallic fault f1:(a)transient voltages,(b)DC current Idc12,(c)DC current Idc13,(d)DC current Idc21,and(e)DC voltages.

    In addition,it should be noted that,during the active current injection period,the injected current remains at a controlled level(below the rated DC current,as shown in Figs.7(b)and(d)).This is because the large starting resistor on the AC side of the converter is connected into the system during this period,and the injected current is limited effectively.

    (2)Faultf4:

    In this case,the faultf4is set to happen att=6.3 s.Fig.8 shows the corresponding simulation results.Similarly,the fault is identified as DC-side fault reliably,as shown in Fig.8(a).However,differently,after the active injection,the DC current on Line1(Idc12)is not larger than the threshold valueIset,while the DC current on Line2(Idc13)exceedsIset.Therefore,Line2is distinguished as the fault line,which is cut off by the switch SW2.Subsequently,the station S1is restarted to build the DC voltage.Thus,the protection P2measures the recovery of the line voltage(Udc2_l),as shown in Fig.8(e),and the station S2is also restarted.In addition,the protection P3cannot monitor the recovery of the line voltage(Udc3_l)and therefore the station S3is not restarted.

    The above cases verify that the proposed protection strategy can distinguish the fault line reliably and realize the fast recovery of the healthy network,in the multi-terminal hybrid HVDC transmission system.In addition,it should be noted that,owing to the application of the starting resistor during the active injection period,the injected current is limited at an acceptable range,thus causing no damage to the system.

    Fig.8.Performance of the proposed protection strategy after the metallic fault f4:(a)transient voltages,(b)DC current Idc12,(c)DC current Idc13,(d)DC current Idc21,and(e)DC voltages.

    4.3.Robustness of the proposed protection strategy

    In this case,the performances of the proposed protection strategy after the faults at different positions are observed.As shown in Figs.9 and 10,either after the faultf2at the middle of Line1or after the faultf3at the end of Line1(for the protection P1),the proposed protection strategy distinguishes the fault line(Line1)and recovers the healthy network reliably.This indicates that the proposed protection can reliably operate after the faults at different positions.In addition,in the case of the faultf3,a 300 Ω transition resistor is introduced.As shown in Fig.10,the correct operation verifies that the proposed protection has strong ability against high transition resistance.

    5.Conclusions

    DC protection is an important technique for the engineering application of multi-terminal hybrid HVDC transmission systems.However,the typical single-ended protections used in LCC-HVDC and VSC-HVDC systems are not suitable for multi-terminal hybrid HVDC systems,owing to the absence of the boundary element at the line end.This study proposes a novel single-ended protection strategy suitable for multi-terminal hybrid HVDC transmission systems.The proposed protection uses the transient voltage to identify the fault direction(DC side or converter side),then distinguishes the fault line according to the active injected current.Compared with the single-ended protections used in LCC-HVDC and VSC-HVDC systems,the proposed protection can reliably and correctly operate without the line boundary.Moreover,the communication is not required by the proposed protection,and the investment can thus be reduced when compared with pilot protections(such as the current differential protection).

    Fig.9.Performance of the proposed protection strategy after the metallic fault f2:(a)transient voltages,(b)DC current Idc12,(c)DC current Idc13,(d)DC current Idc21,and(e)DC voltages.

    Fig.10.Performance of the proposed protection strategy after the fault f3 with a 300 Ω transition resistance:(a)transient voltages,(b)DC current Idc12,(c)DC current Idc13,(d)DC current Idc21,and(e)DC voltages.

    Compliance with ethics guidelines

    Yuping Zheng,Jiawei He,Bin Li,Tonghua Wu,Wei Dai,and Ye Li declare that they have no conflict of interest or financial conflicts to disclose.

    嫩草影院新地址| av天堂在线播放| 黄色一级大片看看| 在线a可以看的网站| 黄色日韩在线| 深夜a级毛片| 亚洲激情在线av| 色综合站精品国产| 日本a在线网址| av视频在线观看入口| 国产中年淑女户外野战色| 亚洲第一电影网av| 赤兔流量卡办理| 国产免费男女视频| 黄色日韩在线| 麻豆久久精品国产亚洲av| 少妇人妻一区二区三区视频| 久久精品综合一区二区三区| 男人和女人高潮做爰伦理| 麻豆成人午夜福利视频| 欧美中文日本在线观看视频| 免费看日本二区| 国产在线精品亚洲第一网站| 韩国av一区二区三区四区| av在线蜜桃| 3wmmmm亚洲av在线观看| 亚洲自偷自拍三级| 免费看美女性在线毛片视频| 午夜精品久久久久久毛片777| 国产v大片淫在线免费观看| 亚洲美女搞黄在线观看 | 欧美日韩中文字幕国产精品一区二区三区| 性色avwww在线观看| 精品人妻熟女av久视频| 真实男女啪啪啪动态图| 亚洲一区二区三区不卡视频| 好男人电影高清在线观看| 黄色日韩在线| 国产一区二区在线观看日韩| 我要搜黄色片| 最近在线观看免费完整版| 亚洲人成电影免费在线| 国产色爽女视频免费观看| 伊人久久精品亚洲午夜| 人妻夜夜爽99麻豆av| av国产免费在线观看| 最近中文字幕高清免费大全6 | 99在线视频只有这里精品首页| 成年免费大片在线观看| 淫妇啪啪啪对白视频| 两性午夜刺激爽爽歪歪视频在线观看| 亚洲色图av天堂| 成人三级黄色视频| 亚洲精品粉嫩美女一区| 日韩av在线大香蕉| 男插女下体视频免费在线播放| 亚洲久久久久久中文字幕| 午夜视频国产福利| 小说图片视频综合网站| 97人妻精品一区二区三区麻豆| 搡老妇女老女人老熟妇| 午夜精品久久久久久毛片777| 亚洲精品乱码久久久v下载方式| 国产精品人妻久久久久久| 婷婷精品国产亚洲av| 久久精品久久久久久噜噜老黄 | 日本 av在线| 国产三级黄色录像| 久久久久久久精品吃奶| 欧美另类亚洲清纯唯美| 亚洲国产日韩欧美精品在线观看| 日韩人妻高清精品专区| 亚洲自拍偷在线| 女生性感内裤真人,穿戴方法视频| 97热精品久久久久久| 成年免费大片在线观看| 亚洲成av人片在线播放无| 永久网站在线| 黄色女人牲交| 51午夜福利影视在线观看| xxxwww97欧美| 窝窝影院91人妻| 久久国产精品影院| 少妇人妻一区二区三区视频| or卡值多少钱| 婷婷丁香在线五月| 少妇的逼水好多| 久久精品91蜜桃| 国产乱人视频| 亚洲av电影在线进入| 国产亚洲av嫩草精品影院| 亚洲久久久久久中文字幕| 欧美最新免费一区二区三区 | 一夜夜www| 69av精品久久久久久| 久久99热6这里只有精品| 日韩大尺度精品在线看网址| 久久香蕉精品热| 久久99热这里只有精品18| 精品免费久久久久久久清纯| x7x7x7水蜜桃| 国产在线男女| 精品久久久久久,| 国产三级黄色录像| 国产精品嫩草影院av在线观看 | 给我免费播放毛片高清在线观看| 性欧美人与动物交配| 亚洲av中文字字幕乱码综合| 又粗又爽又猛毛片免费看| 黄片小视频在线播放| 97热精品久久久久久| 国产成人啪精品午夜网站| 国产午夜精品论理片| 老熟妇仑乱视频hdxx| 亚洲熟妇中文字幕五十中出| 久9热在线精品视频| 精品人妻一区二区三区麻豆 | 久久久久九九精品影院| 蜜桃亚洲精品一区二区三区| 欧美绝顶高潮抽搐喷水| 久久亚洲精品不卡| 国产高清有码在线观看视频| 极品教师在线视频| 亚洲国产日韩欧美精品在线观看| 亚洲专区中文字幕在线| 久久人人爽人人爽人人片va | 丰满人妻熟妇乱又伦精品不卡| 中文字幕久久专区| 两个人的视频大全免费| 国产私拍福利视频在线观看| 久久九九热精品免费| 嫩草影视91久久| 久久香蕉精品热| 欧美不卡视频在线免费观看| 免费观看人在逋| 欧美精品国产亚洲| 色吧在线观看| 亚洲自偷自拍三级| 自拍偷自拍亚洲精品老妇| 久久久精品大字幕| 亚洲人成网站在线播| 夜夜夜夜夜久久久久| 十八禁人妻一区二区| 一夜夜www| 国产伦精品一区二区三区视频9| 免费看a级黄色片| 搡老岳熟女国产| 男人舔奶头视频| 日韩欧美 国产精品| 日本成人三级电影网站| 日韩欧美在线乱码| 99久久99久久久精品蜜桃| 91九色精品人成在线观看| 亚洲无线观看免费| 嫩草影视91久久| 色综合站精品国产| 狂野欧美白嫩少妇大欣赏| 日本一本二区三区精品| 人人妻,人人澡人人爽秒播| 成年女人永久免费观看视频| 日韩有码中文字幕| 精品人妻一区二区三区麻豆 | 国产精品,欧美在线| 亚洲黑人精品在线| 亚洲av电影不卡..在线观看| 亚洲一区二区三区不卡视频| 国产欧美日韩精品亚洲av| 好男人在线观看高清免费视频| 九色国产91popny在线| 国产探花极品一区二区| www日本黄色视频网| 欧美bdsm另类| 中文字幕精品亚洲无线码一区| 亚洲中文日韩欧美视频| 又粗又爽又猛毛片免费看| 美女黄网站色视频| 久久久久九九精品影院| 精品久久久久久久久久免费视频| 日本黄大片高清| 欧美在线黄色| 简卡轻食公司| 韩国av一区二区三区四区| 免费看a级黄色片| 黄色视频,在线免费观看| xxxwww97欧美| 看十八女毛片水多多多| 午夜a级毛片| 国产真实乱freesex| 亚洲欧美日韩高清在线视频| 日韩欧美国产一区二区入口| 国产精品一区二区三区四区久久| 国产成人欧美在线观看| 亚洲国产精品合色在线| 最好的美女福利视频网| 国内精品美女久久久久久| 精品久久久久久久末码| 日韩中字成人| 草草在线视频免费看| 国内揄拍国产精品人妻在线| 婷婷精品国产亚洲av在线| 日本精品一区二区三区蜜桃| 国产视频内射| 国产一级毛片七仙女欲春2| 亚洲18禁久久av| 亚洲av免费高清在线观看| 又爽又黄a免费视频| 中文字幕av成人在线电影| 丰满乱子伦码专区| 亚洲一区高清亚洲精品| 少妇的逼水好多| 午夜a级毛片| 久久午夜福利片| 久久人妻av系列| 好男人电影高清在线观看| 男女之事视频高清在线观看| 极品教师在线视频| 免费av不卡在线播放| 变态另类丝袜制服| 国产69精品久久久久777片| 成人永久免费在线观看视频| 搡老岳熟女国产| av女优亚洲男人天堂| 丁香六月欧美| 深夜a级毛片| 好男人在线观看高清免费视频| 亚洲av中文字字幕乱码综合| 国产男靠女视频免费网站| 偷拍熟女少妇极品色| 精品午夜福利视频在线观看一区| 亚洲精品在线美女| 精品免费久久久久久久清纯| 男女那种视频在线观看| 韩国av一区二区三区四区| 免费电影在线观看免费观看| 老司机午夜十八禁免费视频| 免费无遮挡裸体视频| 女生性感内裤真人,穿戴方法视频| 日本撒尿小便嘘嘘汇集6| 在线十欧美十亚洲十日本专区| 免费看a级黄色片| 亚洲最大成人手机在线| 成人欧美大片| 一级a爱片免费观看的视频| 久久久色成人| 欧美日本视频| 一区福利在线观看| 亚洲欧美日韩卡通动漫| 窝窝影院91人妻| 国产野战对白在线观看| 久久6这里有精品| 欧美潮喷喷水| 午夜福利18| 日本 欧美在线| 乱码一卡2卡4卡精品| 精品久久久久久,| 日本 欧美在线| 国内少妇人妻偷人精品xxx网站| 丝袜美腿在线中文| 老女人水多毛片| 中文字幕av成人在线电影| 亚洲aⅴ乱码一区二区在线播放| 在线播放国产精品三级| 成人毛片a级毛片在线播放| 日本免费a在线| 免费黄网站久久成人精品 | 婷婷六月久久综合丁香| 国产成人av教育| 伊人久久精品亚洲午夜| 我的女老师完整版在线观看| 男人狂女人下面高潮的视频| 两个人的视频大全免费| 国产高清有码在线观看视频| 久久久久久久久中文| 在线观看一区二区三区| 男人的好看免费观看在线视频| 色av中文字幕| 午夜福利18| 成人无遮挡网站| 亚洲三级黄色毛片| 亚洲国产精品sss在线观看| 亚洲av成人av| 欧美丝袜亚洲另类 | 午夜精品一区二区三区免费看| 深夜a级毛片| 国产精华一区二区三区| 少妇的逼水好多| 久久精品久久久久久噜噜老黄 | 免费看美女性在线毛片视频| 欧美成狂野欧美在线观看| 国内精品一区二区在线观看| 88av欧美| 亚洲人与动物交配视频| 亚洲电影在线观看av| 亚洲性夜色夜夜综合| 别揉我奶头~嗯~啊~动态视频| 成人永久免费在线观看视频| 亚洲熟妇中文字幕五十中出| 老鸭窝网址在线观看| 国产色婷婷99| 一级a爱片免费观看的视频| 久久天躁狠狠躁夜夜2o2o| 啦啦啦韩国在线观看视频| 亚洲国产精品999在线| 一个人免费在线观看电影| 欧美潮喷喷水| 国产精品久久久久久精品电影| 亚洲欧美日韩卡通动漫| 欧美一级a爱片免费观看看| av中文乱码字幕在线| 老鸭窝网址在线观看| 日本在线视频免费播放| 好男人电影高清在线观看| 亚洲黑人精品在线| 成人高潮视频无遮挡免费网站| 国产高清视频在线观看网站| 午夜精品一区二区三区免费看| 国内少妇人妻偷人精品xxx网站| 99国产综合亚洲精品| 日韩欧美精品免费久久 | 在线十欧美十亚洲十日本专区| 国产精品久久久久久亚洲av鲁大| 九九久久精品国产亚洲av麻豆| 成人特级av手机在线观看| 久久天躁狠狠躁夜夜2o2o| 精品无人区乱码1区二区| 日韩精品中文字幕看吧| 老女人水多毛片| 激情在线观看视频在线高清| 日本免费一区二区三区高清不卡| 宅男免费午夜| 成熟少妇高潮喷水视频| 嫩草影视91久久| 欧美精品国产亚洲| 国产亚洲精品久久久com| 精品久久久久久成人av| 久久国产精品影院| 亚洲最大成人av| 在线播放国产精品三级| 国产爱豆传媒在线观看| 欧美乱妇无乱码| 亚洲人成网站高清观看| 我的老师免费观看完整版| 我的女老师完整版在线观看| 精品免费久久久久久久清纯| 亚洲人与动物交配视频| 99在线视频只有这里精品首页| 亚洲不卡免费看| 欧美最新免费一区二区三区 | 国产精品久久久久久亚洲av鲁大| 亚洲性夜色夜夜综合| 日韩欧美国产在线观看| 国产精品1区2区在线观看.| 国产免费av片在线观看野外av| 性色av乱码一区二区三区2| 欧美色欧美亚洲另类二区| 在线十欧美十亚洲十日本专区| 久久精品影院6| 乱码一卡2卡4卡精品| 丁香欧美五月| 亚洲人与动物交配视频| 久久热精品热| 国产亚洲精品久久久com| 久久草成人影院| 久久欧美精品欧美久久欧美| 国产精品久久久久久人妻精品电影| 欧美丝袜亚洲另类 | 我要搜黄色片| 美女 人体艺术 gogo| 日日摸夜夜添夜夜添小说| 99视频精品全部免费 在线| 亚洲无线在线观看| 别揉我奶头 嗯啊视频| 色噜噜av男人的天堂激情| 无人区码免费观看不卡| 婷婷精品国产亚洲av| 日韩成人在线观看一区二区三区| 毛片一级片免费看久久久久 | 亚洲欧美日韩高清在线视频| 精品不卡国产一区二区三区| avwww免费| 精品一区二区三区人妻视频| 99热只有精品国产| 久久伊人香网站| 精品人妻1区二区| 99riav亚洲国产免费| 亚洲专区国产一区二区| 性色av乱码一区二区三区2| 中文字幕av在线有码专区| 99在线人妻在线中文字幕| 非洲黑人性xxxx精品又粗又长| 亚洲成av人片在线播放无| 人人妻人人澡欧美一区二区| 哪里可以看免费的av片| 国产精华一区二区三区| 亚洲天堂国产精品一区在线| .国产精品久久| 少妇丰满av| x7x7x7水蜜桃| 一进一出抽搐gif免费好疼| 老鸭窝网址在线观看| 最近最新中文字幕大全电影3| 婷婷色综合大香蕉| 97超级碰碰碰精品色视频在线观看| 欧美激情久久久久久爽电影| 国产精品自产拍在线观看55亚洲| 免费一级毛片在线播放高清视频| 综合色av麻豆| 日日夜夜操网爽| 97人妻精品一区二区三区麻豆| 色综合欧美亚洲国产小说| 人人妻,人人澡人人爽秒播| 亚洲av第一区精品v没综合| 国产在视频线在精品| 永久网站在线| 久久精品久久久久久噜噜老黄 | 能在线免费观看的黄片| 亚洲成人免费电影在线观看| 国产精华一区二区三区| 在线观看66精品国产| 69人妻影院| 激情在线观看视频在线高清| 欧美日韩乱码在线| 麻豆一二三区av精品| or卡值多少钱| 内地一区二区视频在线| 小说图片视频综合网站| 丰满人妻一区二区三区视频av| 午夜精品在线福利| 91在线观看av| 久久国产乱子免费精品| 91久久精品国产一区二区成人| 午夜精品一区二区三区免费看| 大型黄色视频在线免费观看| 淫秽高清视频在线观看| 国产精品伦人一区二区| 看十八女毛片水多多多| 波多野结衣高清作品| 很黄的视频免费| 免费无遮挡裸体视频| 一进一出好大好爽视频| 国内精品久久久久久久电影| 国产熟女xx| 天堂动漫精品| 又爽又黄a免费视频| 一二三四社区在线视频社区8| 99热这里只有精品一区| 成年版毛片免费区| 我的女老师完整版在线观看| 欧美在线黄色| 97热精品久久久久久| xxxwww97欧美| 天天一区二区日本电影三级| 我要看日韩黄色一级片| 丰满人妻熟妇乱又伦精品不卡| 日本黄大片高清| 久久人人爽人人爽人人片va | 欧美成人一区二区免费高清观看| 天堂网av新在线| 18禁黄网站禁片免费观看直播| 欧美乱妇无乱码| 午夜精品一区二区三区免费看| 美女大奶头视频| 好男人在线观看高清免费视频| 麻豆成人av在线观看| 免费大片18禁| 欧洲精品卡2卡3卡4卡5卡区| 亚洲第一区二区三区不卡| 亚洲性夜色夜夜综合| 成年免费大片在线观看| 国产精品综合久久久久久久免费| 午夜福利在线观看免费完整高清在 | 日日摸夜夜添夜夜添av毛片 | 日韩成人在线观看一区二区三区| 午夜老司机福利剧场| 国产伦一二天堂av在线观看| 九九久久精品国产亚洲av麻豆| 毛片女人毛片| 麻豆一二三区av精品| 国内揄拍国产精品人妻在线| 一级作爱视频免费观看| 成人永久免费在线观看视频| 超碰av人人做人人爽久久| 黄色日韩在线| 免费搜索国产男女视频| 可以在线观看毛片的网站| 久久人人爽人人爽人人片va | 99久久九九国产精品国产免费| 哪里可以看免费的av片| 欧美成人免费av一区二区三区| 一进一出抽搐gif免费好疼| 青草久久国产| 在线观看免费视频日本深夜| 一区二区三区免费毛片| 亚洲 欧美 日韩 在线 免费| 99热这里只有是精品在线观看 | 成人亚洲精品av一区二区| 91麻豆精品激情在线观看国产| 亚洲av中文字字幕乱码综合| 久久久久久久精品吃奶| 12—13女人毛片做爰片一| 久久精品国产99精品国产亚洲性色| 久久久久久久久大av| 国产在线男女| 欧美黑人巨大hd| 国产精品一区二区性色av| 欧美3d第一页| 18禁黄网站禁片免费观看直播| 91麻豆av在线| 婷婷色综合大香蕉| 成熟少妇高潮喷水视频| 色噜噜av男人的天堂激情| 成人鲁丝片一二三区免费| 99久久九九国产精品国产免费| 国产精品嫩草影院av在线观看 | 桃色一区二区三区在线观看| av福利片在线观看| 乱人视频在线观看| 男插女下体视频免费在线播放| 午夜两性在线视频| 久久久久性生活片| 亚洲真实伦在线观看| 欧洲精品卡2卡3卡4卡5卡区| 国产精品免费一区二区三区在线| 丁香六月欧美| 深爱激情五月婷婷| 国产色婷婷99| 日本精品一区二区三区蜜桃| 国产69精品久久久久777片| 欧美+亚洲+日韩+国产| 精品无人区乱码1区二区| 国产乱人视频| 亚洲av熟女| 日日夜夜操网爽| 亚洲精品色激情综合| 国产精品亚洲av一区麻豆| 婷婷精品国产亚洲av在线| 18禁裸乳无遮挡免费网站照片| 9191精品国产免费久久| 变态另类丝袜制服| 国产白丝娇喘喷水9色精品| 欧美黑人巨大hd| 午夜福利高清视频| 日本撒尿小便嘘嘘汇集6| 国产精品98久久久久久宅男小说| 日本 欧美在线| 免费看光身美女| 成年女人永久免费观看视频| 国产 一区 欧美 日韩| 亚洲精品亚洲一区二区| 国内毛片毛片毛片毛片毛片| 淫妇啪啪啪对白视频| 九色成人免费人妻av| 国产探花在线观看一区二区| 免费人成视频x8x8入口观看| av天堂中文字幕网| 97超级碰碰碰精品色视频在线观看| 亚洲美女黄片视频| 亚洲在线自拍视频| 丰满乱子伦码专区| 国产老妇女一区| 亚洲成av人片免费观看| 久久精品国产亚洲av涩爱 | 国产毛片a区久久久久| 性色av乱码一区二区三区2| 久久精品91蜜桃| 亚洲成人久久爱视频| 国产主播在线观看一区二区| 亚洲在线观看片| 少妇的逼好多水| 欧美激情久久久久久爽电影| www.www免费av| 欧美又色又爽又黄视频| 一卡2卡三卡四卡精品乱码亚洲| 久久99热这里只有精品18| 窝窝影院91人妻| 一个人免费在线观看的高清视频| 中文亚洲av片在线观看爽| 别揉我奶头~嗯~啊~动态视频| 久久精品夜夜夜夜夜久久蜜豆| 最近最新中文字幕大全电影3| 男女之事视频高清在线观看| av天堂中文字幕网| 99热这里只有是精品在线观看 | 久久久国产成人免费| 91av网一区二区| 精品久久久久久久久久久久久| 黄色视频,在线免费观看| 网址你懂的国产日韩在线| 最近最新免费中文字幕在线| 神马国产精品三级电影在线观看| 久久久国产成人精品二区| 人人妻,人人澡人人爽秒播| 欧美成人免费av一区二区三区| 国产精品久久久久久亚洲av鲁大| av在线老鸭窝| 亚洲无线在线观看| 日韩中文字幕欧美一区二区| 成人性生交大片免费视频hd| 免费av毛片视频| 国内精品久久久久精免费| 99国产精品一区二区蜜桃av| 日本黄色视频三级网站网址| 亚洲av熟女| 成人毛片a级毛片在线播放| 日本在线视频免费播放| 国产一区二区在线av高清观看| 欧美不卡视频在线免费观看| 好男人在线观看高清免费视频| 午夜两性在线视频| 欧美中文日本在线观看视频| 免费av毛片视频| 亚洲精品456在线播放app | 神马国产精品三级电影在线观看| 日本撒尿小便嘘嘘汇集6| 欧美精品国产亚洲|