    Startup scheme optimization and flow instability of natural circulation lead-cooled fast reactor SNCLFR-100

    2021-12-15 10:32:02WenShunDuanZeRenZouXiaoLuoHongLiChen
    Nuclear Science and Techniques 2021年11期

    Wen-Shun Duan?Ze-Ren Zou?Xiao Luo?Hong-Li Chen

    Abstract Owing to the inherent instability of the natural circulation system,flow instability can easily occur during the operation of a natural circulation lead-cooled fast reactor,especially during the startup phase.A comprehensive startup scheme for SNCLFR-100,including primary and secondary circuits,is proposed in this paper.It references existing more mature startup schemes in various reactor types.It additionally considers the restriction conditions on the power increase in other schemes and the characteristics of lead-based coolant.On this basis,the multi-scale coupling code ATHLET-Open FOAM was used to study the flow instability in the startup phase under different power-step amplitudes and power duration times.The results showed that obvious flow instability phenomena were found in the different startup schemes,such as the short-term backflow phenomenon of the core at the initial time of the startup.Moreover,an obvious increase in the flow rate and temperature to the peak value at the later stage of a continuous power rise was observed,as well as continuous oscillations before reaching a steady state.It was determined that the scheme with smaller power-step amplitude and a longer power duration time requires more time to start the reactor.Nevertheless,it will be more conducive to the safe and stable startup of the reactor.

    Keywords Natural circulation.Lead-cooled fast reactor.Startup scheme.Flow instability.Multi-scale coupling

    List of symbols

    m Mass flow rate(kg/s)

    T Temperature(°C)

    P Pressure(MPa)

    1 Introduction

    The natural circulation lead-cooled fast reactor has satisfactory passive safety characteristics.However,owing to the lack of a stable driving head provided by a mechanical pump,the precise balance between the driving head and the circuit pressure drop cannot be achieved in the natural circulation system.Wang et al.[1]studied flow oscillation characteristics in a natural circulation system.The use of natural circulation has generated concern regarding operating conditions,especially those relating to the startup phase of the reactor.The two-phase flow instability of the natural circulation boiling water reactor(BWR)was studied at the Indian Institute of Technology[2]during the reactor startup phase.Gesellschaft für Anlagen-und Reaktorsicherheit(GRS)of Germany[3]and the University of Tokyo[4]have studied the startup characteristics of single-phasenatural circulating water circuits and observed the phenomenon at the startup stage.Jiang et al.[5]and Chen et al.[6]carried out experimental studies on the startup instability of nuclear reactors,including the unstable phenomenon of the two-phase natural circulation condition.

    For the safe operation of a natural circulation leadcooled fast reactor,it is important to devise an appropriate startup procedure.The startup of a reactor is a complex process involving many parameter changes,and there are different startup procedures in accordance with different typesof reactors.There are no experimental data to provide are liable startup scheme for natural circulation lead-cooled fast reactors.However,a suitable scheme for primary and secondary circuits can be developed by referencing more mature schemes for existing reactor types.For existing liquid–metal reactors,the sodium-cooled fast reactor has a relatively mature reactor startup scheme,such as the French super phoenix reactor[7].

    For the ALFRED-driven lead-cold fast reactor,Milan Polytechnic University[8]proposed a startup scheme of a linear power rise based on the startup experience of a sodium-cooled fast reactor.Nonetheless,there remains a lack of startup schemes for natural circulation lead-cooled fast reactors.In 2020,Sun Yat-sen University[9],referencing the startup of some natural circulation systems,proposed a startup scheme for the linear power function and step power function for SNCLFR-100.However,there was a lack of secondary circuit models.Coupling between the primary and the secondary circuits will seriously affect the response process of various parameters of the primary circuit;thus,it is necessary to establish a more comprehensive scheme for the startup,which includes both primary and secondary circuits.

    The multi-scale thermo-hydraulic coupling code includes the advantages of the system code and computational fluid dynamics(CFD)code,which can quickly and comprehensively model the various components of the entire reactor loop.In addition,they can capture the locally important three-dimensional phenomena to realize fast and precise numerical simulation of the thermal–hydraulic characteristics of the lead-cooled fast reactor with a pool type structure and local thermo-hydraulic characteristics.In 2020,the ATHLET system code and the multi-scale coupling code were used to calculate and compare the results,respectively,under the condition of the flow instability caused by a continually changing heating power and mass flow rate on the secondary side of the heat exchanger[10].Furthermore,the Shanghai Institute of Applied Physics analyzed the thermal–hydraulic characteristics of a molten salt reactor with a coupling scheme between the open source codes Open MC and Open FOAM[11].

    In this paper,a comprehensive startup scheme that includes primary and secondary circuits for SNCLFR-100 is proposed.The multi-scale coupling code ATHLETOpenFOAM developed by GRS[12]was used to study the flow instability phenomenon in the process of selecting the optimal scheme by comparing different startup schemes.

    2 Geometry and calculation model

    2.1 SNCLFR-100 reactor

    In 2016,the University of Science and Technology of China proposed a small modular natural circulation lead cooled fast reactor(SNCLFR-100)[13].A safety analysis of SNCLFR-100 was also carried out[14].SNCLFR-100 has a design refueling cycle of ten years,a core life of 30 years,and a thermal power of 100 MWth.The primary circuit adopts an integrated pool design with a design height of 4 m of natural circulation.The average temperature of the core inlet coolant was designed to be 400°C and the average temperature of the outlet coolant is480°C.The reactor core adopts a quadrilateral fuel assembly,and it is composed of fuel assemblies,control rod assemblies,safety rod assemblies,reflector layers,and shielding layer assemblies.The fuel consists of mixed oxide(MOX)and the cladding is made of T91.To flatten the power distribution,the core fuel assembly is divided into an inner region(16%PuO2+84%UO2),middle region(19%PuO2+81%UO2),and outer region(24% PuO2+76%UO2).The secondary circuit adopts a water/superheated steam Rankine cycle and the design pressure of the system is 18 MPa.The overall structure design of the SNCLFR-100 is shown in Fig.1a and b.

    2.2 Calculation model

    The coupling model of ATHLET-OpenFOAM is shown in Fig.1c,in which the upper plenum is simulated using OpenFOAM and the rest of the primary and secondary circuits are simulated by ATHLET.The transfer directions of the mass flow rate(m),temperature(T),and pressure(P)are shown in Fig.1c.The core is divided into seven regions:the inner control rod assembly area(CR_In),inner fuel assembly area(FI_Ave),intermediate control rod assembly area(CR_Me),intermediate fuel assembly area(FM_Ave),external control rod assembly area(CR_Out),external hottest assembly(FO_Hot),and external fuel assembly average area(FO_Ave).The model consists of eight coupling interfaces,seven of which are located at the exits of the seven core regions and the last interface at the inlet of the heat exchanger.Owing to the symmetry of the reactor,only a quarter of the entire reactor model was built to simplify the calculation.

    As shown in Fig.1d,the inlet of the upper plenum area simulated by OpenFOAM corresponds to the outlet of the corresponding seven core areas,in which the outlet area of the inner control rod assembly area of the core is equivalent to a circle at the same position and the outlet area of the hottest fuel assembly in the core is equivalent to a quadrilateral.The remaining core exit area is equivalent to the corresponding area of the annular region at the same location.The boundary conditions of the left and right surfaces are symmetric,while the remaining surfaces are wall boundaries;that is,they are all assumed to be adiabatic and non-slip conditions.

    Fig.1 (Color online)The structure and coupling model of SNCLFR-100

    3 Study of startup scheme of natural circulation lead-cooled fast reactor

    3.1 Confirmation of reactor primary circuit startup scheme

    A suitable startup scheme for natural circulation lead cooled fast reactors can currently be established by referencing the more mature schemes of pressurized water reactors(PWRs),natural circulation boiling water reactors,and sodium-cooled fast reactors.In addition,some special physical and chemical properties of the coolant lead should be considered in the power-up scheme.(1)Lead has a stronger thermal conductivity than water and its boiling point is 1740°C at atmospheric pressure.Therefore,it is not necessary to consider that a too rapid power rise will lead to the vaporization of the coolant and the formation of a boiling crisis on the surface of the cladding.(2)Compared with the PWR,BWR,and supercritical water reactor(SWR),the system operating pressure of the lead-cooled fast reactor is at an atmospheric pressure of 0.1 MPa.Moreover,there is no sudden change in thermal conductivity and in the two-phase flow instability caused by sudden changes in pressure.

    Owing to the high boiling point and high thermal conductivity of the coolant lead,the power-step amplitude of the lead-cooled fast reactor can be larger and the power duration time can be shorter than that of the PWR in the startup phase.Therefore,the designed power-step amplitudeis 10%,which is the same as that of the sodium-cooled fast reactor and the power duration time is 2 min.

    For the natural circulation reactor,there is still a large degree of natural circulation in the reactor after the hot shutdown and the mass flow rate remains at a high level.The cold startup of the reactor refers to the process of power starting from zero to full power and the mass flow rate in the reactor is zero at the initial moment of the cold startup.To study the possible backflow and flow oscillation in the startup phase,a cold startup is selected as the research object.To simplify the calculation process,it is assumed that some physical tests and other tests in the startup phase have been completed and the startup time occupied by the test is small compared with the power rise time.In other words,it is assumed that the startup time occupied by the test is not considered in the startup process.

    The initial and transient conditions of the SNCLFR-100 are as follows:(1)Initially,the temperature of the coolant lead of the primary circuit is 380°C,the total mass flow rate of the primary circuit is 0 kg/s,the system pressure is 0.1 MPa,and theinitial power is0 W.(2)Thepower starts from 0 s and gradually increases to full power as a step function.(3)At the initial time,the mass flow rate of the inlet of the secondary side of the main heat exchanger is 0 kg/s,the pressure is 18.05 MPa,and the inlet water temperature is set as the design value of 335°C.

    3.2 Confirmation of reactor secondary circuit startup scheme

    In this section,the mode of mass flow rate and temperature of the inlet water of the secondary circuit are discussed and a more appropriate reactor startup scheme of the secondary circuit is selected.The calculation cases of different secondary circuit schemes are compared with the results calculated separately using the ATHLET system code.Before the calculation,it is necessary to set the judgment criteria to reach a steady state from the start of the reactor.The following judgment criteria are used.(1)The oscillation amplitude of the mass flow of the primary circuit around the design value is less than 1%.(2)The temperature oscillation range of the core outlet and inlet coolant is less than 0.1%.(3)The oscillation amplitude of the steam temperature at the outlet of the secondary side of the heat exchanger is less than 0.2%.When the above parameters all reach the judgment criteria,it is considered that the startup has reached a steady state.

    3.2.1 The different modes of feedwater flow in the secondary circuit

    In this section,it is assumed that the water temperature at the inlet of the secondary circuit is maintained at the design value and the mass flow rate of the water at the inlet of the secondary circuit is selected for studying the respective linear growth and step growth.The two growth modes are shown in Fig.2a.Thestep amplitude of the step type is 10%.The two schemes reach the maximum mass flow rate at the same time point,that is,the time point corresponding to the increase in core power to 100%.The inlet water temperature of the secondary circuit is maintained at the design value of 335°C during the entire reactor startup phase.

    The temperature change of the core inlet coolant during the startup process is shown in Fig.2b.As shown in the figure,compared with the linear growth,the step flow growth in the secondary circuit will cause a greater degree of the core inlet coolant temperature drop.The steam temperature at the outlet of the secondary circuit is shown in Fig.2c.As depicted in the figure,the step-type growth of the secondary circuit will result in the oscillation of the water and steam temperature at the outlet of the secondary circuit in the initial stage of startup and is more severe,which is not conducive to the stable operation of the reactor.

    Fig.2 (Color online)Determination of secondary circuit scheme

    By comparing the two types of feed water flow of the secondary circuit,it can be found that a lower supercooling degree of the lower plenum,a more stable outlet steam temperature of the secondary circuit,and lower peak values of some parameters will appear when the feed water flow of the secondary circuit increases linearly,which is more conducive to the safe and stable startup of the reactor.Therefore,the scheme with linear growth of feed water flow in the secondary circuit is selected to carry out the subsequent analysis.

    3.2.2 The different modes of inlet water temperatures in the secondary circuit

    Based on the given linear growth of the inlet water flow of the secondary circuit,three different inlet water temperatures of the secondary circuit are selected.The three schemes are as follows:(1)the temperature is the design value of 335 °C,(2)the initial value is 350 °C and then decreases linearly,and(3)the initial value is 350°C and then decreases step by step.The water temperature at the inlet of the secondary circuit isshown in Fig.2d.The steptype feedwater temperature falls with the step of power growth with step amplitude of 5°C.The temperature starts to decrease when the power is up to 20%of the full power for schemes 2 and 3.The temperature drop to the design value corresponds to a power of up to 40%of the full power.

    The average temperature variation of the core inlet coolant during the startup process is shown in Fig.2e.As can be observed in the figure,the temperature of the core inlet coolant in the final steady state of the reactor startup in the three calculation schemes is basically the same,reaching the design value of 400°C.However,the coolant temperature at the core inlet will be lower in the initial stage of the reactor startup in scheme 1,which will lead to a higher degree of supercooling at the core inlet.

    The outlet steam temperature of the secondary circuit is shown in Fig.2f.It can be observed that the outlet steam temperature does not change by step type in the process of rising;however,there is a certain degree of oscillation when the core power reaches between 40 and 80%of the full power.At this point,the outlet steam temperature of the secondary circuit in schemes2 and 3 ishigher than that in scheme 1.

    By comparing the three different water temperature schemes,it is determined that the steam temperature at the secondary circuit outlet has almost the same variation trend.The changes in various parameters in schemes 2 and 3 are basically the same;however,the two schemes will reduce the degree of supercooling of the lower plenum coolant,which is more conducive to the safe startup of the reactor.In this study,a scheme with a step-type decline in water temperature at the inlet of the secondary circuit was selected as an example to carry out the subsequent analysis.

    4 Study of SNCLFR-100 instability under different reactor startup schemes

    Based on the selected startup scheme,different groups of startup schemes are added for comparison to determine a more appropriate primary circuit power-step amplitude and duration time.A total of five groups of schemes are listed in Table 1.In all the reactor startup schemes,the reactor is started in a cold startup process;that is,it starts from a power of zero.The total calculation time for all the schemes is 5000 s.The variation in power during the startup process is shown in Fig.3a.

    Fig.3 (Color online)Effects of power-step amplitude

    Table 1 Different schemes for startup

    To evaluate the results of all the reactor startup schemes and the existing flow instability,the multi-scale coupling code ATHLET-OpenFOAM is used to complete all the calculations.The calculation results of all startup schemes are evaluated in terms of the following indicators:

    (1) Whether the maximum temperature of cladding exceeds the design value of 650°C.

    (2) Time from zero to full power t1,time from initial timezero to final steady-stateoperation t2,and time from full power to steady-state operation(t2-t1)in various reactor startup schemes.

    (3) Whether there is a backflow phenomenon in the core and the duration of back flow.

    (4) Frequency,amplitude,and time of flow oscillation in the primary circuit.

    (5) The degree of supercooling in the lower chamber.

    4.1 Study of the effects of power-step amplitude

    In this section,three reactor startup schemes with different power-step amplitudes are selected for calculation under the same power duration time,among which the three types of power-step amplitudes are 5%,10%,and 20%,respectively,and the power duration time is 2 min.The temperature and mass flow rate of water at the inlet of the secondary side of the main heat exchanger are shown in Fig.3b and c,respectively.As shown in Fig.3c,the time point when the water temperature at the inlet of the secondary side of the heat exchanger of the three schemes begins to decrease is not consistent.This is because they all correspond to the time point when the power in each schemerises to 20%.When the core power is at 40%of the full power,the water temperature at the inlet of the secondary side of the heat exchanger drops to the design value of 335°C.As shown in Fig.3c,the mass flow rate of the feedwater at the inlet of the secondary side of the heat exchanger increases linearly and the mass flow ratereaches the design value when the core power reaches 100%full power.

    Figure 3d and e shows the variation in the total core mass flow rate in the three reactor startup schemes with different power-step amplitudes.It can be observed in the figure that the backflow appears in the reactor core and the maximum mass flow rates of the back flow are almost the same.When the mass flow rate approaches the maximum value of the design,the vibration frequency and amplitude begin to increase,and the smaller the power-step amplitude is,the higher the vibration frequency is,the larger the amplitude and the longer the oscillation duration time is.The larger the power-step amplitude,the shorter the back flow duration time,because the larger the power-step amplitude,the higher the cladding temperature in the same time in the initial stage of startup and the higher the coolant temperature in the fuel assembly area.The greater the coolant temperature difference between the inner fuel assembly area and the upper plenum,resulting in a larger density difference and eventually a larger driving pressure head.Therefore,the mass flow rate in the core quickly returns to a positive value.

    As shown in Fig.3f,there is no obvious difference in the supercooling degree of the lower plenum among the three schemes.When the core power reaches more than 50%,the supercooling of the lower plenum will be improved;that is,the core inlet coolant temperature will start to rise rapidly.

    Figure 3g and h shows the maximum cladding temperatures of the three different schemes.According to the figures,the maximum peak temperatures of the cladding in the three schemes are all within the limit value.The larger the power-step amplitude is,the larger the peak temperature is;the smaller the drop after the peak temperature is,the higher the vibration range is.

    Figure 3i shows the temperature of the water and steam at the outlet of the secondary side of the heat exchanger in the three different schemes.It can be observed from the figure that the larger the power-step amplitude is,the more obvious the peak value of the steam temperature at the outlet is at the early stage of startup and the faster it reaches the peak value.

    When the total mass flow rate of the reactor core,the steam temperature at the outlet of the secondary side of the heat exchanger,and the coolant temperature at the inlet of the reactor core reaches the steady state,the entire reactor can be considered to have reached the steady-state operation from the reactor startup.Taken together with the three variables,the time for the three different startup schemes to reach a steady state is shown in Table 2.Moreover,t1,t2,and(t2-t1),respectively,represent the time for the core to reach full power,the time for the reactor to reach steady state from startup,and the time for the reactor from full power to reach a steady state.

    Ascan be observed in Table 2,the larger the power-step amplitude is,the shorter is the total time taken by the reactor from startup to full power and steady-state operation.Meanwhile,the longer is the time from reaching full power to the steady-state operation,the smaller is the power-step amplitude and the faster the startup process stabilizes.

    Table 2 Steady-state time of startup schemes with different powerstep amplitudes

    The above three schemes of different step amplitudes are compared in terms of larger or smaller power-step amplitude.The larger the power-step amplitude,the longer the time is from full power to the steady state,the higher are the coolant flow rate and temperature,and the greater is the degree of supercooling in the lower plenum,which is not conducive to startup,especially after adding the reactivity feedback.However,the shorter is the duration time of the core back flow,which is more conducive to the establishment of natural circulation,the smaller is the frequency and amplitude of the later flow oscillation and the shorter is the oscillation duration time.

    In summary,larger power-step amplitude and smaller power-step amplitude have opposing advantages and disadvantages.According to the comprehensive evaluation index,a compromise power-step range of 10%is selected as the optimal scheme.

    4.2 Study on the effects of power duration time

    In this section,three reactor startup schemes with different power duration times are selected for the calculation under the same power-step amplitude.The three power duration times are 1 min,2 min,and 5 min,respectively,and the power-step amplitude is 10%.The water temperature and mass flow rate at the inlet of the secondary side of the reactor main heat exchanger are shown in Fig.4a and b,respectively.The water temperature at the inlet of the secondary side of the heat exchanger remains at 350°C during the initial startup stage and begins to decline until the end of the stage when the reactor core is 20%of full power.In the three reactor startup schemes,the temperature drop gradient is 5°C and the inlet water temperature drops to the design value of 335°C just after the stage when the core is at 40%full power.

    Fig.4 (Color online)Temperature and mass flow rate of water at the inlet of the secondary side of heat exchanger

    The total mass flow of the reactor core in the three reactor startup schemes with different power duration times is shown in Fig.5a and b.As can be observed from the figures,the core has a certain degree of back flow.The peak mass flow rate of the back flow is almost the same for all three schemes.The longer the power duration time is,the lower the flow oscillation frequency will be in the first half stage before approaching the steady state.At this stage,the power does not reach the design value and the mass flow rate oscillates with the power change.The increase in power increases the temperature difference between the fuel assembly and the coolant,leading to a greater density difference and driving head,thereby increasing the flow rate.The longer the power duration is,the slower the power increase is and the lower is the flow oscillation frequency.

    Fig.5 (Color online)Effects of power duration

    Figure 5c shows the change in the core inlet coolant temperature during reactor startup with three different schemes.As can be observed from the figure,in the scheme with a power duration time of 5 min,the lowest peak temperature of the coolant temperature is 368.5°C,which is significantly higher than that of the other two schemes and will help slow the supercooling of the lower plenum.As the power continues to increase and the coolant temperature at the core outlet continues to rise,the coolant temperature at the core inlet begins to rise.Moreover,the longer is the power duration time,the slower is the rise.This is because the longer is the power duration,the slower is the power rise.

    Figure 5d shows the variation in the maximum cladding temperature during startup.It is evident from the figure that the peak values of the cladding temperature in the three schemes with different power durations are almost the same at approximately 483.1°C and the final stable values are all less than 510°C,which is within the safety limit of cladding.In the process of increasing the cladding temperature,there will be a step rise similar to power,which directly leads to the same rising trend of mass flow rate.

    Figure 5e shows the temperature changes of the water vapor at the outlet of the secondary side of the heat exchanger in three different startup schemes.It is observed in the figure that the longer the power duration time is,the more stable is the temperature of the water vapor at the outlet of the secondary side of the heat exchanger.It will rise at the initial stage of startup;however,the temperature oscillates greatly in the period before the power is close to full power.

    Similarly,the corresponding steady-state times of the three different startup schemes are listed in Table 3.It is shown in the table that the longer the power-step duration time is,the longer is the total time taken by the reactor from startup to steady-state operation.However,the shorter the time is from reaching full power to steady-state operation—indicating that the power duration time is longer—the faster it stabilizes in the startup process.

    Table 3 Steady-state time of startup schemes with different power durations

    The above three schemes with different power duration times,coolant flow rates,and coolant temperatures are compared with the peak temperature of the cladding in the three schemes being all the same and the duration of core backflow being almost the same.The longer the power duration time is,the shorter the stable time is from full power to the final steady state.Although the flow oscillation amplitude in the scheme with a power duration time of 5 min is slightly larger and the oscillation duration time is longer,the flow oscillation frequency is significantly lower and the degree of supercooling of the lower plenum is also significantly improved.

    In summary,although a longer power duration time and a shorter power duration time each have advantages and disadvantages,the longer power duration time scheme has more significant advantages.Therefore,a power duration of 5 min is the optimal scheme.

    5 Conclusion

    In this paper,the startup process and the key focus areas of natural circulation lead-cold fast reactors were briefly described.The startup schemes of natural circulation boiling water reactors,sodium-cold fast reactors,and driven lead-cold fast reactors were referenced.Through research and comparison,a comprehensive startup scheme for a small natural circulation lead-cold fast reactor SNCLFR-100 was determined.The criteria for achieving a steady state were given.The main contents and conclusions are as follows.

    (1) The power in the primary circuit increases as a step function based on the existing reactor types.A secondary circuit scheme was determined in which the mass flow rate at the inlet of the secondary side of the heat exchanger increases linearly and the inlet water temperature decreases step by step.

    (2) Based on the comprehensive reactor startup scheme determined above,the reactor startup schemes with different power-step amplitudes were compared.Under the premise of the same power duration time of 2 min,three reactor startup schemes with power-step amplitudes of 5%,10%,and 20%were selected for calculation and comparative analysis.According to the comprehensive evaluation index,the comprehensive scheme with power-step amplitude of 10%was the optimal scheme.

    (3) Under the premise of the same power-step amplitude of 10%,the three schemes of power duration times of 1 min,2 min,and 5 min were selected for calculation and comparative analysis.According to the comprehensive evaluation index, the scheme with a power retention time of 5 min was the optimal scheme.

    AcknowledgementsThank GRSfor providing the ATHLET-Open-FOAM coupling code.

    Author contributionsAll authors contributed to the study conception and design.Material preparation,data collection,and analysis were performed by Wen-Shun Duan,Ze-Ren Zou,Xiao Luo,and Hong-Li Chen.The first draft of the manuscript was written by Wen-Shun Duan,and all authors commented on previous versions of the manuscript.All authors read and approved the final manuscript.

    中文字幕精品免费在线观看视频 | 午夜免费鲁丝| 成人国产麻豆网| www.av在线官网国产| 曰老女人黄片| 国产精品国产三级国产av玫瑰| 国产欧美亚洲国产| 亚洲av不卡在线观看| 少妇裸体淫交视频免费看高清| 如日韩欧美国产精品一区二区三区 | av免费观看日本| 久热这里只有精品99| 韩国av在线不卡| 久久久久久久精品精品| 最黄视频免费看| 国产精品一区二区三区四区免费观看| 女的被弄到高潮叫床怎么办| 黄色怎么调成土黄色| 欧美精品一区二区大全| av视频免费观看在线观看| 国产精品久久久久久精品古装| 大片电影免费在线观看免费| 最新的欧美精品一区二区| 伊人久久精品亚洲午夜| 伊人久久国产一区二区| 国内精品宾馆在线| 99九九线精品视频在线观看视频| 日韩不卡一区二区三区视频在线| 夫妻性生交免费视频一级片| 久久这里有精品视频免费| 国产精品一二三区在线看| 久久99热这里只频精品6学生| 国产欧美日韩综合在线一区二区 | 色网站视频免费| 中文资源天堂在线| 亚洲av不卡在线观看| 中文乱码字字幕精品一区二区三区| 校园人妻丝袜中文字幕| 亚洲伊人久久精品综合| 男女啪啪激烈高潮av片| 亚洲经典国产精华液单| 两个人免费观看高清视频 | 久久久久久久久久久免费av| 伊人久久国产一区二区| 久久99热6这里只有精品| 18禁在线无遮挡免费观看视频| 国产成人免费观看mmmm| 国产免费一级a男人的天堂| 人妻一区二区av| 大又大粗又爽又黄少妇毛片口| 国产精品一二三区在线看| 久久久久网色| 免费观看性生交大片5| 一边亲一边摸免费视频| 日韩伦理黄色片| 一级,二级,三级黄色视频| 国产男女超爽视频在线观看| av专区在线播放| 人人妻人人看人人澡| av视频免费观看在线观看| 欧美人与善性xxx| 最近中文字幕2019免费版| 黄色配什么色好看| 国产精品人妻久久久久久| 久久久国产精品麻豆| 国产色婷婷99| 亚洲国产成人一精品久久久| 老司机亚洲免费影院| 毛片一级片免费看久久久久| 人人妻人人澡人人看| 高清欧美精品videossex| 国产精品女同一区二区软件| 18禁裸乳无遮挡动漫免费视频| 国产永久视频网站| 久久久久久久久久成人| 日本91视频免费播放| 亚洲av不卡在线观看| 欧美 日韩 精品 国产| 插阴视频在线观看视频| 国产视频首页在线观看| 成人国产麻豆网| 男的添女的下面高潮视频| 内射极品少妇av片p| 日日啪夜夜爽| 韩国高清视频一区二区三区| 美女内射精品一级片tv| 国产精品欧美亚洲77777| 欧美日韩精品成人综合77777| 天堂中文最新版在线下载| 国产精品99久久久久久久久| 国产成人精品一,二区| 99热6这里只有精品| 亚洲综合精品二区| 美女xxoo啪啪120秒动态图| 国产一区二区三区av在线| 人体艺术视频欧美日本| 亚洲丝袜综合中文字幕| 久久精品国产亚洲av天美| 麻豆成人午夜福利视频| 老司机影院成人| 久久 成人 亚洲| 综合色丁香网| 伦理电影免费视频| 久久久国产一区二区| 91午夜精品亚洲一区二区三区| 国产成人精品福利久久| 男人添女人高潮全过程视频| 内地一区二区视频在线| 91精品国产九色| 欧美精品亚洲一区二区| 亚洲国产最新在线播放| 免费大片18禁| 日韩制服骚丝袜av| 亚洲精品,欧美精品| 高清黄色对白视频在线免费看 | av播播在线观看一区| 国产有黄有色有爽视频| 99久久精品一区二区三区| 99久久人妻综合| 秋霞在线观看毛片| 免费看日本二区| 天堂俺去俺来也www色官网| videossex国产| 校园人妻丝袜中文字幕| 亚洲精品国产成人久久av| 久久久久久久久大av| freevideosex欧美| 最近中文字幕2019免费版| 少妇高潮的动态图| 人人妻人人爽人人添夜夜欢视频 | 久久国产精品男人的天堂亚洲 | 国产成人freesex在线| 极品少妇高潮喷水抽搐| 最近的中文字幕免费完整| 热re99久久国产66热| 多毛熟女@视频| 搡女人真爽免费视频火全软件| 日产精品乱码卡一卡2卡三| 成人毛片60女人毛片免费| 色网站视频免费| 日韩成人伦理影院| 欧美3d第一页| 最近2019中文字幕mv第一页| 午夜免费鲁丝| 欧美精品一区二区免费开放| 亚洲国产欧美日韩在线播放 | 观看美女的网站| 只有这里有精品99| 亚洲精品国产成人久久av| a 毛片基地| 亚洲一区二区三区欧美精品| av福利片在线观看| 岛国毛片在线播放| 欧美变态另类bdsm刘玥| a级一级毛片免费在线观看| 美女中出高潮动态图| 亚洲av在线观看美女高潮| 国产精品久久久久久久久免| 亚洲欧美日韩另类电影网站| 狂野欧美激情性bbbbbb| 中文字幕精品免费在线观看视频 | 国产成人aa在线观看| 欧美日韩av久久| 在线 av 中文字幕| 好男人视频免费观看在线| 日韩成人av中文字幕在线观看| 一级毛片电影观看| 欧美精品国产亚洲| 久久久国产一区二区| 精品午夜福利在线看| 亚洲怡红院男人天堂| 69精品国产乱码久久久| 男女边摸边吃奶| 天堂中文最新版在线下载| 亚洲av欧美aⅴ国产| 亚洲欧美精品自产自拍| 亚洲电影在线观看av| 永久免费av网站大全| 男的添女的下面高潮视频| 国产成人精品无人区| 国产高清不卡午夜福利| 99视频精品全部免费 在线| 欧美区成人在线视频| 亚洲欧美精品自产自拍| 亚洲av欧美aⅴ国产| 日产精品乱码卡一卡2卡三| 亚洲欧美精品专区久久| 少妇人妻一区二区三区视频| 精华霜和精华液先用哪个| 只有这里有精品99| 精品久久久久久久久亚洲| 国产熟女午夜一区二区三区 | 亚洲激情五月婷婷啪啪| 男的添女的下面高潮视频| 边亲边吃奶的免费视频| 亚洲av国产av综合av卡| 日产精品乱码卡一卡2卡三| 欧美精品一区二区免费开放| 亚洲天堂av无毛| 久久久久久伊人网av| 国产伦精品一区二区三区视频9| 亚洲av男天堂| 免费久久久久久久精品成人欧美视频 | 人妻 亚洲 视频| 午夜视频国产福利| 欧美高清成人免费视频www| 十八禁网站网址无遮挡 | 成人国产麻豆网| 久久久久视频综合| 少妇的逼好多水| 成人影院久久| 91在线精品国自产拍蜜月| 一级毛片久久久久久久久女| 一区二区三区四区激情视频| 国产综合精华液| 人人澡人人妻人| 亚洲高清免费不卡视频| 婷婷色综合www| 中文乱码字字幕精品一区二区三区| 美女cb高潮喷水在线观看| 亚洲综合精品二区| 我要看黄色一级片免费的| 少妇人妻精品综合一区二区| 在线观看www视频免费| 天堂俺去俺来也www色官网| 国产欧美日韩一区二区三区在线 | 春色校园在线视频观看| 美女cb高潮喷水在线观看| 国产日韩欧美视频二区| 99热这里只有是精品在线观看| 欧美成人精品欧美一级黄| 免费看日本二区| av线在线观看网站| 午夜影院在线不卡| 秋霞伦理黄片| 久久99一区二区三区| 各种免费的搞黄视频| 国产一区亚洲一区在线观看| 亚洲国产精品一区三区| av卡一久久| 久久午夜福利片| 曰老女人黄片| 国产爽快片一区二区三区| 大又大粗又爽又黄少妇毛片口| 在线播放无遮挡| 人人妻人人澡人人爽人人夜夜| 欧美一级a爱片免费观看看| 精品亚洲成a人片在线观看| 国产欧美日韩精品一区二区| 欧美+日韩+精品| 你懂的网址亚洲精品在线观看| 男的添女的下面高潮视频| 如日韩欧美国产精品一区二区三区 | 中国国产av一级| 国产免费视频播放在线视频| 午夜老司机福利剧场| 成年人午夜在线观看视频| 极品教师在线视频| 99久久人妻综合| 91精品一卡2卡3卡4卡| 日日摸夜夜添夜夜添av毛片| .国产精品久久| 高清黄色对白视频在线免费看 | 热99国产精品久久久久久7| 最近2019中文字幕mv第一页| 狠狠精品人妻久久久久久综合| 中文字幕久久专区| 国产精品不卡视频一区二区| 国产精品一区二区三区四区免费观看| 欧美精品一区二区大全| 精品国产乱码久久久久久小说| 亚洲国产精品专区欧美| 狂野欧美激情性xxxx在线观看| 六月丁香七月| 色婷婷久久久亚洲欧美| 在线观看www视频免费| 中文在线观看免费www的网站| 男女无遮挡免费网站观看| 在线精品无人区一区二区三| 国产精品久久久久久久电影| av网站免费在线观看视频| 最新中文字幕久久久久| 欧美国产精品一级二级三级 | 欧美精品高潮呻吟av久久| 国产免费又黄又爽又色| 免费av不卡在线播放| 久久人妻熟女aⅴ| 99视频精品全部免费 在线| 69精品国产乱码久久久| 亚洲精品国产成人久久av| 国产精品久久久久成人av| 嘟嘟电影网在线观看| 亚洲丝袜综合中文字幕| av有码第一页| 91午夜精品亚洲一区二区三区| 日日撸夜夜添| 亚洲欧美日韩卡通动漫| 国产精品国产三级国产专区5o| 欧美一级a爱片免费观看看| 女性生殖器流出的白浆| 国产亚洲5aaaaa淫片| 又粗又硬又长又爽又黄的视频| 国产成人免费无遮挡视频| 大香蕉97超碰在线| 亚洲国产成人一精品久久久| 久久婷婷青草| 全区人妻精品视频| 亚洲精品亚洲一区二区| 日本wwww免费看| 亚洲欧洲精品一区二区精品久久久 | 22中文网久久字幕| 亚洲精品日韩av片在线观看| av天堂久久9| 亚洲高清免费不卡视频| 99热6这里只有精品| 国产深夜福利视频在线观看| videos熟女内射| 高清视频免费观看一区二区| 黄色日韩在线| 久久99精品国语久久久| 国产成人91sexporn| 欧美少妇被猛烈插入视频| 亚洲高清免费不卡视频| 欧美成人精品欧美一级黄| 99久久精品一区二区三区| 亚洲成色77777| 成人黄色视频免费在线看| 激情五月婷婷亚洲| 人妻少妇偷人精品九色| 观看免费一级毛片| 波野结衣二区三区在线| 如日韩欧美国产精品一区二区三区 | 国产69精品久久久久777片| videos熟女内射| 成年人免费黄色播放视频 | 久久国产乱子免费精品| 欧美亚洲 丝袜 人妻 在线| 国产黄色免费在线视频| 国产一区二区三区av在线| 午夜激情久久久久久久| 国产亚洲91精品色在线| √禁漫天堂资源中文www| 女人精品久久久久毛片| 久久久久久久久大av| 久久精品国产自在天天线| 国产精品偷伦视频观看了| 亚洲精品久久久久久婷婷小说| 两个人的视频大全免费| 国产精品福利在线免费观看| av.在线天堂| 看十八女毛片水多多多| 久久鲁丝午夜福利片| 在线精品无人区一区二区三| 国产精品国产av在线观看| 观看免费一级毛片| 黑人巨大精品欧美一区二区蜜桃 | av有码第一页| 深夜a级毛片| 国产精品欧美亚洲77777| 国产亚洲精品久久久com| av在线app专区| 看十八女毛片水多多多| 久久精品国产自在天天线| 成人18禁高潮啪啪吃奶动态图 | 亚洲av国产av综合av卡| 亚洲美女视频黄频| 青春草亚洲视频在线观看| 久久99热这里只频精品6学生| 亚洲国产欧美在线一区| 国产 一区精品| 精品熟女少妇av免费看| av福利片在线观看| 国产白丝娇喘喷水9色精品| 大话2 男鬼变身卡| 一级毛片 在线播放| 久久韩国三级中文字幕| 久久精品国产亚洲av天美| 成人亚洲精品一区在线观看| 观看av在线不卡| 观看美女的网站| 欧美丝袜亚洲另类| 国产成人一区二区在线| 美女主播在线视频| 国精品久久久久久国模美| 亚洲av综合色区一区| 尾随美女入室| 免费人妻精品一区二区三区视频| 搡老乐熟女国产| 国产精品一二三区在线看| 久久毛片免费看一区二区三区| 在线观看免费日韩欧美大片 | 在线观看三级黄色| 在现免费观看毛片| 中文字幕久久专区| 国产成人精品无人区| av一本久久久久| 青春草国产在线视频| 伊人久久精品亚洲午夜| 免费播放大片免费观看视频在线观看| 午夜老司机福利剧场| 老女人水多毛片| 亚洲欧美一区二区三区黑人 | 免费观看a级毛片全部| 综合色丁香网| 午夜精品国产一区二区电影| 99视频精品全部免费 在线| 日韩三级伦理在线观看| 亚洲人与动物交配视频| 中文资源天堂在线| 精华霜和精华液先用哪个| 亚洲高清免费不卡视频| 一级爰片在线观看| 天堂中文最新版在线下载| 国产精品欧美亚洲77777| 国产日韩欧美视频二区| 久久鲁丝午夜福利片| 极品人妻少妇av视频| 男人和女人高潮做爰伦理| 国产欧美日韩精品一区二区| 久久99精品国语久久久| 色视频在线一区二区三区| 九九爱精品视频在线观看| av.在线天堂| 夫妻午夜视频| 国产精品蜜桃在线观看| 成人亚洲精品一区在线观看| 亚洲一级一片aⅴ在线观看| 熟女人妻精品中文字幕| 日韩欧美一区视频在线观看 | 丰满人妻一区二区三区视频av| 我要看日韩黄色一级片| av国产久精品久网站免费入址| 国产乱来视频区| 一个人免费看片子| 黄色配什么色好看| 蜜臀久久99精品久久宅男| 亚洲一级一片aⅴ在线观看| 久久青草综合色| 狂野欧美激情性bbbbbb| 在线观看人妻少妇| 久久鲁丝午夜福利片| 欧美xxⅹ黑人| 极品人妻少妇av视频| 久久97久久精品| 能在线免费看毛片的网站| 国产精品伦人一区二区| 99精国产麻豆久久婷婷| 精品一区在线观看国产| 中文字幕制服av| 边亲边吃奶的免费视频| 精品少妇久久久久久888优播| 又爽又黄a免费视频| 久久免费观看电影| 亚洲色图综合在线观看| 又黄又爽又刺激的免费视频.| 亚洲精品,欧美精品| 欧美bdsm另类| 男人和女人高潮做爰伦理| 人人妻人人爽人人添夜夜欢视频 | 国产高清有码在线观看视频| 国产成人精品一,二区| 欧美精品一区二区免费开放| 能在线免费看毛片的网站| 97超碰精品成人国产| 菩萨蛮人人尽说江南好唐韦庄| 人妻少妇偷人精品九色| 成人免费观看视频高清| 九色成人免费人妻av| 亚洲国产成人一精品久久久| 高清黄色对白视频在线免费看 | 91精品一卡2卡3卡4卡| 亚洲伊人久久精品综合| 一级黄片播放器| 亚洲成人av在线免费| 国产日韩一区二区三区精品不卡 | 美女内射精品一级片tv| 久久这里有精品视频免费| 一区二区av电影网| 日韩一区二区三区影片| 亚洲av二区三区四区| 国产亚洲最大av| 久久久久久久久久久丰满| 国产黄色免费在线视频| 丰满少妇做爰视频| 久久久欧美国产精品| 草草在线视频免费看| 午夜激情福利司机影院| 看十八女毛片水多多多| 男女边吃奶边做爰视频| 国产深夜福利视频在线观看| 久久久午夜欧美精品| 亚洲va在线va天堂va国产| 久久av网站| 中文精品一卡2卡3卡4更新| 亚洲成人一二三区av| 交换朋友夫妻互换小说| 美女内射精品一级片tv| 蜜桃在线观看..| 99热网站在线观看| 亚洲成人一二三区av| 国产女主播在线喷水免费视频网站| av在线播放精品| 久久久精品免费免费高清| 美女国产视频在线观看| 亚洲欧美日韩另类电影网站| 成人亚洲欧美一区二区av| 成人影院久久| 欧美精品高潮呻吟av久久| 亚洲天堂av无毛| 狂野欧美白嫩少妇大欣赏| 99精国产麻豆久久婷婷| 偷拍熟女少妇极品色| 高清在线视频一区二区三区| 最新的欧美精品一区二区| av不卡在线播放| 大香蕉久久网| 狂野欧美激情性xxxx在线观看| 久久久国产欧美日韩av| 欧美日韩视频精品一区| 亚洲欧美一区二区三区国产| 夜夜看夜夜爽夜夜摸| 卡戴珊不雅视频在线播放| 一个人看视频在线观看www免费| 日本猛色少妇xxxxx猛交久久| 99热这里只有精品一区| 欧美亚洲 丝袜 人妻 在线| 高清欧美精品videossex| 黄色配什么色好看| 91久久精品国产一区二区三区| 国产色爽女视频免费观看| 久久精品国产自在天天线| 国产精品一二三区在线看| 永久网站在线| av国产久精品久网站免费入址| 国产精品99久久久久久久久| 午夜激情久久久久久久| 久久久久久久国产电影| 亚洲精品日韩在线中文字幕| 2021少妇久久久久久久久久久| 五月开心婷婷网| 日本av手机在线免费观看| 久久毛片免费看一区二区三区| 亚洲av福利一区| 日本91视频免费播放| 极品人妻少妇av视频| 亚洲不卡免费看| 国产 一区精品| 青春草国产在线视频| 久久免费观看电影| 久久久久网色| 欧美三级亚洲精品| 热re99久久国产66热| 人妻制服诱惑在线中文字幕| 美女xxoo啪啪120秒动态图| 少妇的逼水好多| 亚洲欧洲日产国产| 男女无遮挡免费网站观看| 日韩三级伦理在线观看| 丁香六月天网| 精品一区二区免费观看| 亚洲av不卡在线观看| 亚洲精品乱码久久久久久按摩| 久久久久网色| 一级毛片黄色毛片免费观看视频| 国模一区二区三区四区视频| 国产白丝娇喘喷水9色精品| 高清不卡的av网站| 国产欧美亚洲国产| 啦啦啦中文免费视频观看日本| 日本黄色日本黄色录像| 偷拍熟女少妇极品色| 日韩电影二区| 国产亚洲91精品色在线| 日韩精品免费视频一区二区三区 | 最后的刺客免费高清国语| 三级经典国产精品| 91久久精品国产一区二区成人| 亚洲国产日韩一区二区| 一级毛片久久久久久久久女| 国产伦理片在线播放av一区| 青青草视频在线视频观看| 日日摸夜夜添夜夜添av毛片| 在线观看国产h片| 99久久精品一区二区三区| 大片电影免费在线观看免费| 亚洲av成人精品一区久久| 国产精品人妻久久久影院| 夜夜爽夜夜爽视频| 一边亲一边摸免费视频| 成人午夜精彩视频在线观看| 免费久久久久久久精品成人欧美视频 | 国产深夜福利视频在线观看| 99热国产这里只有精品6| 婷婷色av中文字幕| 国产真实伦视频高清在线观看| 妹子高潮喷水视频| 3wmmmm亚洲av在线观看| 久久久久久人妻| 日本vs欧美在线观看视频 | 69精品国产乱码久久久| 晚上一个人看的免费电影| 亚洲美女视频黄频| 久久精品国产鲁丝片午夜精品| 最近最新中文字幕免费大全7| 精品视频人人做人人爽| 久久ye,这里只有精品| 成年人免费黄色播放视频 | 国产欧美日韩一区二区三区在线 | 日产精品乱码卡一卡2卡三| 丰满饥渴人妻一区二区三| 久久99蜜桃精品久久| 国产精品久久久久久精品古装| 精品久久久久久久久亚洲| 女的被弄到高潮叫床怎么办| 少妇丰满av|