    Commissioning experiences with the spoke-based CW superconducting proton linac

    2021-11-13 01:27:44FangYanHuiPingGengCaiMengYaLiangZhaoHuaShiHuaFuOuyangTongMinHuangFeiSiHeJianLiWangRuiGeYanFengSuiQiangYeRongLiuQunYaoWangShengChangWangJianSheCaoWeiMinPan
    Nuclear Science and Techniques 2021年10期

    Fang Yan· Hui-Ping Geng · Cai Meng · Ya-Liang Zhao · Hua Shi ·Hua-Fu Ouyang· Tong-Min Huang· Fei-Si He· Jian-Li Wang ·Rui Ge· Yan-Feng Sui · Qiang Ye · Rong Liu · Qun-Yao Wang ·Sheng-Chang Wang· Jian-She Cao· Wei-Min Pan

    Abstract The 10-MeV Accelerator-Driven Subcritical(ADS) system Injector-I test stand at the Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrating the feasibility of the spoke-based superconducting (SC) linear accelerator (linac) for the ADS project in China. The injector adopted a four-vane copper structure radio frequency quadrupole(RFQ)with an output energy of 3.2 MeV and an SC section accommodating 14 βg=0.12 single spoke cavities,14 SC solenoids,and 14 cold beam position monitors (BPMs). A 10-MeV pulsed beam with a beam current of 10 mA and a 2-mA continuous wave (CW) beam were successfully shooting through. The commissioning results confirmed the feasibility of using a 325-MHz spoke-type cavity for accelerating the proton beam in the low β and medium β sections. This paper describes the results achieved, the difficulties encountered,and the experiences obtained during commissioning.

    Keywords Superconducting proton linac · Spoke cavity ·High intensity · CW commissioning

    1 Introduction

    The Accelerator-Driven Subcritical (ADS) project was launched in China in 2011 with the intention of developing the concept and design of a 1-GeV high-intensity superconducting (SC) linac with the aim of building a demonstration facility for an accelerator-driven subcritical system(ADS) in multiple phases. The driver linac operates in continuous wave (CW) mode and eventually delivers 10 ~20 MW of beam power[1,2].The linac includes two major sections: the injector and main linac sections. The injectors accelerate the proton beams up to 10 MeV, and the main linac boosts the energy from 10 MeV to 1 GeV.

    To develop key technologies for the design,fabrication,and operation of a high-intensity CW linac and demonstrate the design schemes, two different injectors applying two different frequencies were proposed [3, 4], fabricated,and commissioned in two different institutes independently. The Institute of High Energy Physics (IHEP) was responsible for Scheme I(Injector-I)based on a 325-MHz(the same frequency as the main linac) room-temperature radio frequency quadrupole (RFQ) and SC spoke cavities of the same RF frequency.The Institute of Modern Physics(IMP)was responsible for Scheme II(Injector II)based on 162.5-MHz room-temperature RFQ and SC half-wave resonator (HWR) technology of the same frequency [5].

    The general layout of the ADS Injector-I linac is shown in Fig. 1. Injector-I is composed of an electron cyclotron resonance (ECR) ion source, a low-energy beam transport(LEBT) line, a 4-vane type copper structure RFQ, a medium-energy beam transport(MEBT)line,an SC section,an energy divergence analysis (EDA) system, and a beam dump line.

    Fig. 1 (Color online) The general layout of the ADS Injector-I linac

    Table 1 ADS Injector-I test facility specifications

    The specifications of the Injector-I are listed in Table 1.It was designed to accelerate the proton beam up to 10 MeV based on a frequency of 325 MHz. Although the injector was designed to be operated in CW mode with an average beam current of 10 mA, considering the CW operation difficulty for the high intensity proton linac,CW operation was not an essential goal for the first stage of injector commissioning. However, we still pursue the operation of CW proton beam with an energy of 10 MeV and as high average beam current as possible.

    This contribution presents the challenges faced and experiences obtained during the commissioning of a spokebased SC linac based on the ADS Injector-I developed in IHEP. Section 1 briefly introduces the background of the project. Section 2 then summarizes the design philosophy of using spoke cavities for a 10-MeV CW injector. The commissioning details under pulsed and CW modes are presented in Sects. 3 and 4,respectively.The final section provides a brief summary.

    2 Design philosophy

    CW operation is a critical objective for a high-intensity proton linac used in ADS applications. Although there are no high-intensity SC CW machines operating at the design stage of ADS injector, several proposed CW proton/deuteron linac projects such as Project-X [6, 7], EFIT or MYRRHA [8], IFMIF [9], and EURISOL [10] are good models for the physical and technical designs of the accelerator.The ADS driver linac must be designed with a very high beam power (MW-scale), and the beam losses must be kept as low as possible along the linac with a normal acceptance of 1 W/m for all high-power proton accelerators. It must also be designed with extremely high reliability with limited beam trips at a time scale of seconds(as listed in Table 2),which surpasses those of the existing proton linacs. All of these requirements induce extremely high restrictions on the linac design and commissioning.

    2.1 Why 325 MHz?

    As mentioned in the Introduction, Injector-I was designed based on a frequency of 325 MHz. Compared to 162.5 MHz used by Injector-II,the benefit of choosing 325 MHz for room-temperature RFQ is the acceleration effectiveness and smaller cavity size. In addition, the beam space charge effect with a 325-MHz frequency is also weaker compared with the half frequency because they both have the same average beam current (under the condition in which the beam size is the same to maintain the same acceptance for the downstream linac). The space charge effect is crucial for ADS applications with megawatt beam power because non-relativistic proton beams with stronger space charge effects are more sensitive to the mismatch and have a higher possibility of inducing parameter/structure and coupling resonances, leading to halo growth and particle losses. However, if the space charge effect is kept the same for both frequency choices,the beam size out of the injector must be increased for the half-frequency case.A larger longitudinal beam size means more cavities and more cost to maintain the same acceptance for the downstream linac. Another benefit we considered for choosing 325 MHz,was that no frequency jump will occur for the transition between the injector and main linac.Although the frequency jump can be realized through LLRF control [11], the transition part can easily be a source of halo development because a matched beam is difficult to achieve with strong space charge effect at the low-energy part where the periodic lattice is discontinued,and the situation will be worse if a frequency jump occurs.

    There are also challenges for 325-MHz scheme. While operating in CW mode, the biggest issue of a copper structure RFQ is the power dissipation on the cavity surface. For the copper structure RFQ, the power density is closely related to the frequency (f). The power dissipation is proportional to f3/2, whereas the aperture is inverselyproportional to f. For the same cavity length, the power density will be 5.7-times larger for the 325 MHz RFQ than for the half frequency. This is a significant challenge for both the 325-MHz RFQ and power coupler during CW operation.

    Table 2 Beam strips & availability requirement for ADS-based industrial power generation [1]

    Although there are disadvantages to the choice of 325-MHz, we still selected the higher-frequency scheme.On the one hand, we obtained some experience based on the construction of the previous RFQ (or ‘‘973’’ RFQ: 3.5 MeV,352 MHz,[14]7%duty factor)built at IHEP several years ago. On the other hand, the successful operation of the 325-MHz injector can verify the feasibility of using a spoke-type cavity,not only for the low-energy accelerating part but also for the medium-energy part of the main linac,which is more important for the future China initiative Accelerator Driven System (CiADS) [2] constructions.More details on the Injector-I design can be found in[3, 15] and the references therein.

    2.2 Why spoke cavity

    The main design philosophy for the ADS driver linac is to use as many SC structures as possible. The major difficulty of a CW operation using a room-temperature structure is the large heat deposit on the cavity.If it cannot be effectively removed, the deposited heat will deform the cavity and even destroy the cavity components,leading to a degraded operating gradient and lower cavity efficiency.By contrast, the SC cavity is favored because the cavity loss is very small.This makes a CW operation feasible for high-intensity proton linacs. Meanwhile, the SC cavity is also favored for the independently phased feature, providing the possibility for SC cavities to realize local compensation [16] when the cavity fails during operation.This is very important for ADS accelerators to achieve the extremely strict reliability, as shown in Table 2. In addition,the SC cavity is also favored for much larger apertures than the room-temperature acceleration structure, which leads to largely reduced beam losses. This is a significant benefit for fulfilling the 1 W/m beam loss acceptance for a high-power CW linac.

    Considering all of the advantages listed above, it is commonly understood that the SC proton linac is the best choice as an ADS driver accelerator[16,17],and the lower the input energy of the SC section, the easier it is for the realization of a CW operation. With well-approved SC radio frequency (RF) technology in recent decades, particularly the success of high-beta elliptical cavities at SNS[18, 19], the widely used low-beta QWR cavities [20, 21],the testing results of HWR cavities [22, 23], and most importantly, the test results of spoke cavities for medium and even low betas [24-26], it was thought that a proton linac with SC structures excluding the RFQs is possible.However,although the newly developed spoke-type cavity fills in the gap of the medium-energy part using the SC accelerating structure, and the test results also seem promising, no single cavity has yet been verified by the beam, let alone by a high-intensity CW proton beam.Therefore, a beta equal to 0.12 spoke-type cavity was chosen for Injector-I to verify the key technologies of the design, fabrication, and operation of the spoke cavities.

    3 Beam commissioning at pulsed mode

    Commissioning in pulsed mode is an essential step used to verify the hardware performance and physical design.The injector was commissioned according to the fabrication and installation phases. The first stage was for the ion source, LEBT, and RFQ test stand. After the beam performance of the RFQ was well understood, a test cryomodule(TCM)accommodating two single spoke cavities,two solenoids, and two beam position monitors (BPMs)were installed. The successful commissioning of the TCM verified the design and fabrication of the spoke cavity system. The tuning experiences of the independently phased resonators were obtained during this process. After TCM was dismantled, two new cryomodules (with seven spoke cavities in each)were installed and commissioned in succession. The beam parameters along the linac were carefully measured with a 10-mA pulsed beam to achieve proper optic settings for CW commissioning.

    3.1 Ion source and LEBT

    A schematic diagram of the ECR source and LEBT system is shown in Fig. 2. To have the flexibility of operating in both CW and pulsed modes, the front end needs to have the ability to supply an adjustable beam.The source was designed to provide a 35-keV proton beam(H+).The LEBT chopper was located at the entrance of the RFQ chopping the beam with a pulse width starting from 20 μs and a repetition frequency from 1 to 50 Hz.The rise and down times of the chopper were less than 20 ns. The first AC current transformer (ACCT) located between the chopping system and the RFQ was used for the beam current measurement. A maximum average current of 13 mA was delivered at the entrance of the RFQ.

    The difficulty of the LEBT was to control the emittance growth and achieve a high transport efficiency,particularly for high-intensity beams. Thus, the LEBT was designed to be as short as possible with a total length of 1.67 m. An Alison detector installed in a moveable diagnostic bench was used for the LEBT emittance measurement. Twiss parameters close to the designed values at the entrance of the RFQ were achieved by adjusting the LEBT solenoid settings. Figure 3 shows the horizontal phase space of the beam 8.8-cm downstream of the LEBT exit.Table 3 shows the design and measurement of the beam current, Twiss parameters, and normalized root-mean-square (RMS)emittance. The measurement and design values agreed well, except for the position of the beam shift.

    Fig.2 (Color online)Off-line layout of 2.45-GHz ECR proton source and LEBT [27]

    3.2 RFQ accelerator

    The 325-MHz RFQ bunches and accelerates the 35 keV beam from the ion source to 3.2 MeV. It is a 4-vane type copper structure RFQ with π mode stabilizers. The total length of the RFQ is 4.7 m. It is composed of two resonantly coupled physical segments, and each segment includes two technical modules connected with flanges. In total, four couplers are mounted on the RFQ and two couplers are mounted on one physical segment. A total of 64 tuners are plugged symmetrically on four sections for field flatness tuning and frequency adjustment. In total, 80 main cooling channels were designed for the RFQ vane and wall heat dissipation. There are also auxiliary cooling channels for the inner and outer conductors of the feedingforward power couplers(FPCs)and plug tuners.A detailed design can be found in [28]. The layout of the RFQ test stand is shown in Fig. 4.A movable diagnostic bench with two slits, one DC current transformer (DCCT), two fast current transformers(FCTs),four quadrupoles,four BPMs,and a simple beam dump line were mounted immediately after the RFQ for commissioning.

    A pulsed proton beam with a peak current of 10 mA was used to verify the RFQ performance. To protect the power coupler,the transmission was measured for different cavity powers with a pulsed beam to determine the minimum power needed to obtain the top beam transmission of the RFQ. The power feeding in the RFQ cavity has to be sufficiently large to maintain a good beam transmission;otherwise, the cavity surface might be damaged by the beam lost inside the cavity, leading to a reduced cavity performance and service life. As shown in Fig. 5, the maximum transmission(at ~280 kW)achieved is 97%,in comparison with the design beam transmission of 98.7%,which fits well with the RFQGen [29] simulations. An output energy of 3.2 MeV was detected by two downstream FCTs using the time-of-flight (TOF) method with fine distance measurement with 0.05-mm alignment error. The distance between the two FCTs is 954.04 mm, and the expected time difference of the beam signals between two FCTs is 1.63 ns. The measurement result is 1.66 ns, as shown in Fig. 6, which shows that the RFQ performance meets the design specifications fairly well.

    3.3 The MEBT and test cryomodule

    The MEBT is used to match the RFQ and SC sections.As shown in Fig. 7 (and Fig. 4), it is composed of six quadruples, six steering magnets, and two bunchers. Beam diagnostic devices include six BPMs, two FCTs, one ACCT, and three wire scanners (WSs). Two FCTs with 1.67 m between them were used for the energy measurement. It should be noted that the distance between theFCTs must be sufficiently long to reduce the measurement errors.

    Fig. 3 (Color online) Beam phase space at the measured location (8.8-cm drift downstream of the LEBT exit):Simulation (left) and measurement (right) results

    Table 3 Measurement results versus the design goal of the beam current, Twiss parameters, and normalized RMS emittance at the exit of the LEBT

    Fig. 4 (Color online) Layout of RFQ test stand

    Fig.5 (Color online)RFQ transmission scan at different input power

    Two downstream BPMs were used for the phase scan to determine the buncher settings. For phase scanning, it is necessary to use two BPMs not far away to reduce the measurement error caused by the largely expanded phase spread of the beam. For energy measurements, it is recommended to measure with buncher cavities for the same reason. Figure 8 shows the phase-scanning results for bunchers I and II. The bunchers were scanned at different voltages,and the data were fitted using a cosine curve.The phase with the maximum energy gain corresponds to zero degrees, and -90°was accordingly determined. Because the change in particle velocity during phase scanning of the bunchers can be neglected, the scanning results can be fitted very well using the cosine function. It is worth mentioning that the phase information of the first BPM right after RFQ was used to check the RFQ status after recovery from RF quenches. This method was extended to all downstream BPMs to check the cavity repeatability from any RF quenches.

    Fig. 6 (Color online) Beam energy measurement for RFQ using two FCTs

    Fig. 7 (Color online) Layout of TCM

    To verify the performance of the hardware systems,such as cavity, solenoid, and cryogenic systems, the TCM (as also shown in Fig. 7) housing two periods was installed and commissioned before the formal cryomodules. The commissioning of the TCM turned out to be necessary for the physical design and technical validations of the formal cryomodules. The accelerating gradient achieved for the TCM spoke cavity was 3.1 MV/m with a maximum peak gradient of 14 MV/m. This is far from the design specification of 6.08 MV/m because of the field emissions caused by contamination of the cavity, preventing the accelerating gradient from further increasing. After commissioning the TCM, the power coupler structure was changed to protect the ceramic windows. The diameter of the coupler port and the length of the vacuum part were reduced to help shielding the field emission(FE)electrons.Cleanliness during the assembly was also important for ensuring the cavity high-gradient operation. The power coupler was assembled into the cavity in a class-10 clean room for the formal module. All improved technologies and methods were used for the succeeding cryomodules:CM1 and CM2. More details can be found in [30]. The cavity operating gradient during the following commissioning stages was much higher.

    Fig. 8 (Color online) Phase scanning curves for Buncher I (left) and Buncher II (right)

    3.4 The SC sections

    The SC section consists of two cryomodules. Each cryomodule has seven periods. The first and second cryomodules accelerate the proton beam to 5 and 10 MeV,respectively. The periodic lattice was broken at the interface of the two cryomodules because needed space must be maintained for the cold-to-warm transition. Although the simulated results are promising under an ideal situation, a break of the periodic lattice easily leads to mismatches during commissioning because of an unavoidable input beam mismatch and accumulated static and dynamic errors of the upstream elements.

    Although a long single cryomodule is preferred from a beam dynamics perspective and for a higher cavity efficiency, two cryomodules were selected because they are much easier to install, align, and maintain. To keep the space between the cryomodules as short as possible,diagnostic devices and vacuum pumps were omitted. For the SC section of Injector-I, the space from the end of the last cold element of the upstream cryomodule to the entrance of the first cold element of the downstream cryomodule was minimized to 570 mm because two layers of cold shielding are necessary for the CW operation of the SC section at 2 K.

    After the TCM was commissioned, it was replaced by CM1 and CM2. Each cryomodule includes seven βg=0.12 SC spoke cavities, seven SC solenoids, and seven cold BPMs.Based on TCM operational experience,the pressure stability of the liquid helium (LHe) was improved from±0.6 to ±0.05 mbar (measured during CM1 commissioning)with optimized control and operation parameters of the cryogenic system [31].

    For the βg =0.12 spoke cavity,as shown in Table 4,the df/dp was large at approximately -130 Hz/mbar for the CM1 cavities and-83 Hz/mbar for the CM2 cavities after the improvements were made.This was found to have been caused mainly by the deformation of the beam pipe,which could be solved by adding stiffeners to the helium vessel and applying stronger tungsten inert gas (TIG) welding[31]. Limited improvements were achieved for the CM2 cavities because they were already undergoing fabrications after the TCM commissioning. For the βg = 0.21 cavities installed on the 25-MeV test stand [32] (the last cryomodule with six βg = 0.21 spoke cavities) based on Injector-II in the IMP, the design was further improved,i.e., df/dp was controlled down to approximately 10 Hz/mbar, as shown in Table 5, which makes it possible to operate under a 4-K system. The tuner design was also improved for this cryomodule by eliminating loose gears and joints,based on the operating experiences of CM1 and CM2 [31]. It is worth mentioning that the 25-MeV test linac (with six βg = 0.21 spoke cavities) has also been commissioned with a 2-mA CW beam having a maximum of 14 h without trip and the accumulated CW operation time of 110 h [33].

    The Lorentz detuning factor for the spoke cavity(β=0.12) is approximately 10 Hz/(MV/m)2, as shown in Fig. 10, which is relatively high. So does for the tuning sensitivity, which is approximately 1.1 MHz/mm. These features make the cavity sensitive to external interfaces,such as microphonics and mechanical vibrations.Although the cavity is still controllable, it increases the difficulty of LLRF control.However,for the development of such small gap spoke cavities with a frequency of 325 MHz, it is difficult to increase the stiffness of the structure. But, for higher beta spoke cavities, the sensitivity can be improved much better, which will largely reduce the difficulty of LLRF control. For example, for βg = 0.21 cavities, the tuning sensitivity was reduced to 600 kHz/mm,and for βg= 0.5, the double spoke cavity developed in IHEP is 107 kHz/mm (simulation value) [34]. Of course, as for microphonics isolating or damping from the vibration source (if it can be traced) is always more effective in improving the noise level. During the commissioning of Injector-I, the vibration source was traced to the scroll pump from the cart inside the tunnel. After removal,the noise level is reduced by one order of magnitude [31].

    Table 4 Measurement df/dp of 14 SC β=0.12 spoke cavities in Injector-I [31]

    Table 5 Measurement df/dp of six SC β=0.21 spoke cavities on 25-MeV test linac [31]

    Fig. 9 (Color online) Two cryomodules of Injector-I installed in the tunnel

    A beam energy of 6.05 MeV was obtained at the exit of CM1 with a beam peak current of 10.6 mA, a pulse width of 1 ms,and a repetition frequency of 2 Hz.The maximum cavity operating gradient (Eacc) exceeded 7 MV/m. CM2 was installed immediately after CM1. Figure 9 shows the test stand with both cryomodules installed in the tunnel.A beam energy of 10.67 MeV was obtained at the exit of CM2 with a peak current of 10.6 mA.The cavity operating gradients are listed in Table 6.For the first few cavities and the cavities in the middle, the operating gradients were relatively lower. The low gradient of the first few cavities originates from contamination by an accidental vacuum leak of the warm section upstream.The last two cavities in CM1 and the first two cavities in CM2 were used for longitudinal matching.The operating gradients of the other cavities were all beyond the design specifications and well compensated for the lower gradient cavities.

    The beam transmission through the cryomodule was approximately 100%, as shown in Fig. 11, and the current was measured using two ACCTs,i.e.,ACCT2(upstream of CM1, purple curve) and ACCT3 (downstream of CM2,yellow curve). The beam energy divergence at the exit of the cryomodules was measured by the EDA system,which includes two slits,one 90°magnet,and one Faraday cup,as shown in Fig. 1. The energy divergence was measured by scanning the fields of the upstream magnet after inserting two slits and obtaining signals from the Faraday cup (behind the second slit). Figure 12 shows the Faraday cup current signals versus the magnetic fields for a series of bunches. As shown in this figure, the energy divergences are almost the same for all bunches. The different magnet currents correspond to different beam energies. In Fig. 13,the blue, green, and red curves show the energy evolution for a 20 μs beam at the head,tail,and middle of the bunch.They did not show different energy divergences. The maximum energy difference for the beam with a 20 μs pulse width is 0.06 MeV. The RMS value for 10.67 MeV with a 10.6-mA peak current proton beam is 3.2%, which agrees with the simulation (RMS, 2.8%).

    Fig.10 (Color online)Lorentz detuning factor of 14 spoke cavities in Injector-I [31]

    Table 6 Operating gradients of 14 SC β=0.12 spoke cavities in Injector-I [31]

    Fig. 11 (Color online) ACCT2(purple curve) and ACCT3(yellow curve) signals

    Fig.12 (Color online)Current signals on faraday cup of EDA system versus magnet fields for a series of bunches at the exit of Injector-I

    3.5 Transverse emittance measurement

    Beam loss control is a crucial issue in the commissioning of a high-power proton linac.A mismatch is one of the major sources of beam loss, and thus the Twiss parameters and emittance measurement must be as accurate as possible. In our case, quadruple scan and double slit methods were used on the MEBT section and beam dump line, respectively.

    As is well known, quadruple scan data with beam sizes crossing the waist could yield a much smaller calculation error;thus,the strengths of two upstream quadrupoles were scanned independently to obtain valid data for the horizontal and vertical emittance calculations,respectively.For an error reduction,two bunchers were turned off during the measurements.

    For the quadruple scan, the first problem is the beam size fitting during data processing.A Gaussian curve fitting is typically used for calculating the RMS beam size.However, in our case, because the quadruple setting deviated significantly from the nominal design during the gradient scans,most of the measurement signals deviated fromthe standard Gaussian distribution, as shown in Fig. 14.The direct RMS formula, Gaussian fitting, and generalized Gaussian [35] fitting methods have been applied and compared for an RMS beam size calculation[36].Here,the generalized Gaussian fitting method was used to fit the beam sizes because it can better characterize the RMS size of the non-Gaussian distribution signal compared to the Gaussian fitting method (as shown in Fig. 14), and is less sensitive to the background signal compared to the direct RMS formula calculation method.

    Fig. 13 (Color online) Beam energy divergence at the exit of Injector-I

    Fig.14 (Color online)Fitting results for three typical beam signal distributions with generalized Gaussian(ggGaussian)and standard Gaussian distributions

    After obtaining the beam sizes, to include the space charge effect, the multi-objective genetic algorithm(MOGA) [37, 38] was used to fit the beam parameters by calling the multi-particle tracking code TraceWin [39]. As shown in Fig. 15, the MOGA optimization and measurement results agreed well with each other. The MOGAoptimized beam parameters are listed in Table 7. We can see that, for the measurement results, the horizontal emittance is approximately 20%smaller than that of the vertical plane, whereas roughly equivalent emittances were expected for the two planes. This is possibly due to the unideal beam injecting the RFQ.

    The double slit method was used for the transverse beam parameter measurement out of the 5-MeV test stand. Two issues are critical with this method. One is the number of measurement grids, and the other is the threshold of themeasured signals. Although measurements using more grids are favored owing to their more accurate results,they take more time to conduct. Simulations show that the Twiss parameters converge when the number of grids increases to up to 64 times 64 [40]. Therefore, 64 was defined as the number of slices for the measurement. The second is determination of the background threshold.In our case, a new method is proposed to determine the background threshold [40]: As shown in Fig. 16, the second derivative of the emittance (ε)and Twiss parameter(α and β) is obtained as a function of the threshold, and when the value converges to zero,it is considered to be the threshold of the measurement data. Figure 17 (upper figure) shows the measurement phase space distributions at the exit of the 5-MeV test stand using the double-slit method, and the simulated phase space distributions at the same position(lower figure) are also presented for comparison. During the simulation,the input parameters(at the RFQ exit)were updated with the measurement data using the quadruple scan method, as previously mentioned. Both the simulated and measured Twiss parameters and emittances are presented in Table 8 for comparison.

    Fig. 15 MOGA optimization results with space charge effects included and a comparison with the measurement results

    Table 7 Beam parameters at RFQ exit using MOGA optimization method with space charge included

    Fig. 16 (Color online) Emittance, beta function, alpha (left), and second derivatives (right) as functions of the signal threshold

    4 Beam commissioning in CW mode

    We accumulated significant experiences and collected a large amount of data during the commissioning of Injector-I in pulsed mode. However, CW commissioning is more difficult. As mentioned previously, the most difficult parts were the RFQ and spoke cavities. Although the RFQ and SC cavity could operate stably with full power without a beam or with a small duty factor (e.g.,<1%) beam, they tripped more frequently once the beam duty factor approached the CW.

    Many efforts have been made to keep the machine stable in CW mode. For the RFQ, cooling is critical.Several accidents during commissioning have led to the development of RFQ components.For the spoke cavity,the challenge has been the frequency stability and anti-interference capability for the smallest (βg = 0.12) spoke-type cavity used around in the world. According to the TCM operating experiences, the cavity, coupler structures, and cryogenic system were improved to enhance the stability of the system. In addition, we carefully matched the optics,used a metering probe along the SC section for field emission surveys, attached temperature probes around the small aperture beam pipe to align the beam getting through the step field magnets (SFMs), and monitored the vacuum status at the dump line.The stable CW operation time went from dozen of seconds up to several minutes, and finally more than 20 min with an output energy of 10 MeV and an average beam current of ~2 mA. Details are presented in this section.

    4.1 RFQ

    Several problems occurred during RF conditioning toward a CW, leading to an improvement of several RFQ components and assemblies.A vacuum leakage occurred at the welding port, leading to an upgrade to simplified cooling water channels at the end plates and the coupling plate [41]. An arc accompanied by a very low vacuum pressure at the coupler position turned out to be a burned RF contact spring [42]. We learned from this that the fingers of the loose contact spring could easily cause a discharge under high-power conditioning. Therefore, the RF contact spring was canceled in the new couplers using a copper vacuum flange gasket instead [41, 42]. However, it was retained for the plug tuners of the RFQ. Although a CW operation has been achieved for the RFQ with an average beam current of approximately 2 mA,the spring is still considered to be a weak point affecting the stability operation of the RFQ,which is not an advisable choice for high-power CW machines. Later, the coupler ceramic window cracked because the inner and outer conductors were shortened by the condensate water. The problem was solved by reducing the humidity of the tunnel and increasing the temperature of the cooling water for the coupler [42]. After fixing each of these problems, 90%transmission was achieved for the RFQ with a 90% beam duty factor after shooting in an 11-mA proton beam.

    The CW commissioning of Injector-I was started with a small average beam current (~2 mA), achieving a low beam loading effect because the LLRF feed forward control and frequency control were lacking.To generate such a low beam current, a small aperture, as shown in Fig. 18,was installed right after the first LEBT solenoid, and the wire scanner was replaced, as shown in Fig. 2. However,the measured maximum transmission of the RFQ was 90%,as shown in Fig. 19 (left), which was not as good as expected, the main reason we suspect is that the smallaperture was not at the center of the beam.It is known from the simulation that a 0.5-mm off-center displacement at the entrance of the RFQ will lead to a decrease in transmission from 98.7% to 92.7% (as shown in Fig. 19, right).

    Table 8 Beam parameters at CM1 exit

    Fig. 18 (Color online) Small aperture in the LEBT section

    Fig. 19 (Color online) RFQ transmission scan @2mA (left) and RFQ transmission with transverse displacement (right)[43]

    To achieve CW operation of the RFQ,one critical aspect was to use reflecting power interlock protection.Reflecting power was used to determine the arc at the initial stage.Once an arc signal was sent out, the feed in power was immediately cut. The power was then recovered after a short period (e.g., several hundred microseconds) to prevent the cavity from cooling down(without feed in power).The power stop interval was not fixed but was determined by the status of the arc. When a succeeding arc occurred,the stop period was slightly longer. In this way, the cavity and couplers were effectively protected, and the RFQ recovery efficiency remarkably increased.

    Another critical aspect is the use of the self-excitation function. During commissioning, the operated cavity frequency of the RFQ was fixed by controlling the temperature difference of the cooling water between the cavity vane and wall. However, for CW operation with and without full power,there was a frequency difference of 111 kHz. During the power feeding process, the self-excitation function allows the changing of generator frequency for tracing the RFQ cavity frequency automatically, which greatly increases the efficiency of the field establishment once the cavity needs to be restarted.

    4.2 SC cavity section

    Fig. 20 (Color online) Power density distribution along the SC linac with 2 mA @2.5 ms

    During the commissioning of the SC section,two issues repeatedly appeared.First,the solenoid and corrector at the back end of the linac are frequently tripped. We suspected that this might be caused by the beam loss owing to a longitudinal mismatch; for a transverse mismatch, the beam envelope should be oscillating along the linac such that the beam losses will not concentrate in a single location. However, for a longitudinal mismatch, the transverse beam envelope increases in size gradually with accumulated errors, and beam loss is very likely at the end of the linac. Therefore, the strengths of the 12th and 13th solenoids were increased to control the beam size behind,apparently improving the situation.

    For a longitudinal mismatch, the beam loading effect is a major concern.The TraceWin code was used to study the beam loading effect along with Lorentz detuning during the transient process[44].The simulation starts with a nominal design without errors after setting up the design values for all optics. LLRF control was removed to better understand the mechanism. Thus, although the time of the beam loss was postponed during the simulation, the tendency should be the same. Figure 20 shows the beam power density distributions at 2.5 ms with an average beam current of 2 mA. The results show that the beam is mismatched longitudinally from the very beginning of the SC linac,some of which easily rotated out of the longitudinal bucket with optical errors accumulating along the linac, and is finally lost at the back-end of the linac after coupling to the transverse plane. Notably, the mismatch was quickly magnified after the beam passed through the matching part of two SC sections where the periodical structure was interrupted (although the situation could be improved by increasing the longitudinal acceptance of the injector, the cavity gradient has to be accordingly increased).The losses gradually increased along the linac, and the most serious loss occurred at the very end,as shown in Fig. 21,which is consistent with the experimental results. Later, the strengths of the 12th and 13th solenoids increased from 170 to 180 A,and the trip frequency of the solenoids decreased significantly. Meanwhile, as shown in Fig. 22, the beam loss during the simulation was also greatly improved after changing the settings of these two solenoids. This was treated as an explanation for the experimental phenomenon that occurred.

    Another issue that frequently occurred during the commissioning of the SC cavity section was the deterioration ofthe vacuum status at the beam dump line once the beam duty factor approached the CW, and the interlock system was frequently triggered to stop the ion source.It was noted that once the beam size on the beam dump was reduced,the vacuum status worsened.This verifies that the phenomenon originated from the outgassing of the beam dump target when the high-intensity beam was shot. The problem was mitigated by slowly increasing the beam duty factor and maintaining the vacuum status in the beam dump line under the interlock threshold. However, it would be better if one more vacuum pump could be installed in this section and assist in quickly pumping the vacuum.

    Fig.21 (Color online)RMS phase spread evolution along the Injector-I SC section with 2-mA average beam current and the beam losses along the linac @2.5 ms

    4.3 Beam performance in CW mode

    Fig. 23 (Color online) CW commissioning results of Injector-I [45]

    Fig.24 (Color online)Transmission during CW operation at 10 MeV,DCCT signal on LEBT DCCT at 1.206×2=2.412 mA(left figure),and DCCT at the exit of SC section at 2.128 mA (right figure)

    Numerous efforts have been made to maintain the stability of the machine when shooting a CW beam. The stable operation time ranged from dozen of seconds up to several minutes, and finally, more than 20 min of stable beam time was obtained with an output energy of 10 MeV and an average beam current of ~2 mA using only LLRF feedback control (in which the feed-forward and frequency controls are absent). The maximum stable operation time reached was 23 min with an output energy of 10 MeV and an average CW proton beam current of 1.6 mA.Figure 23 shows the output energy at the exit of the RFQ/cryomodule and the beam current information. Although the RFQ could deliver a higher CW beam current, the SC section could not handle higher intensity beams; in addition,the beam loading effect was not compensated,and the frequency control loop was absent.The transmission of the CW beam from the LEBT to the end of the linac was 88.2%, as shown in Fig. 24, with an input beam current of 2.412 mA at the LEBT section and an output beam current at the exit of the SC section of 2.128 mA.Unfortunately,a few days later, the CW commissioning was stopped by a breakdown of the RFQ klystron, and we have since been unable to continue any further.

    For the operating gradient during CW commissioning,all cavities fulfilled the design specifications (an accelerating gradient of no smaller than 6.08 MV/m)except those near room temperature,and the average peak gradient(Ep)was approximately 27 MV/m [31]. The first four cavities were contaminated by an accidental vacuum leakage at the MEBT section, which led to degraded operating gradients.If the first four cavities are removed, the average Ep is increased to ~30 MV/m. This is roughly half of the gradient reached compared with the vertical test, or even lower. As a good reference to this result, for higher beta spoke cavities, even if a conservative design gradient with a peak gradient of 27 MV/m is used, the accelerating gradient(Eacc)can still be much higher than small β spoke cavities with a smaller Ep/Eacc (for example,Ep/Eacc is 3.4 for a beta equal to a 0.5 spoke cavity,whereas Ep/Eacc is approximately 4.5, for beta equal to a spoke cavity of 0.12).This can serve as a reference for future linac designs with higher beta spoke cavities.

    5 Summary and outlook

    The China ADS injector-I testing facility was commissioned using pulsed and CW beams.A proton beam with an energy level of over 10 MeV and a peak beam current of more than 10 mA was obtained after accelerating through a room-temperature 3.2-MeV RFQ and 14 βg = 0.12 single spoke cavities, which fulfill the design expectations very well.A CW beam with an energy of 10 MeV was also shot through to check the RFQ, and particularly the spoke cavity performance, and an average beam current of approximately 2 mA was successfully obtained at the exit of the linac with LLRF feedback without feed-forward and frequency controls. The small gap gives the βg = 0.12 single spoke cavity a sensitive feature,making it difficult to sufficiently reinforce the structure. This leads to a higher tuning sensitivity and higher Lorentz detuning factor of the cavities, which makes them more sensitive to external interfaces and larger frequency detuning during the transient beam loading process.The situation is much better for βg =0.21 spoke cavities installed in the 25-MeV test stand,and the tuning sensitivity is reduced by almost half.For the βg = 0.5 double spoke cavity developed in the IHEP, the tuning sensitivity is even smaller, which is one order of magnitude smaller compared with the βg = 0.12 single spoke cavity.

    Overall,for higher beta spoke cavities,the cavity would be less sensitive, which caused the difficulty of LLRF control. For higher beta spoke cavities, the operating gradients could be much higher because Ep/Eacc and Bp/Eacc are much smaller than the low β spoke cavities.

    Preliminary experimental results obtained on the basis of spoke type cavities are encouraging. Applying a 325-MHz spoke-type cavity was proven to be a feasible approach to accelerate proton beams in medium and even low β sections. It was also proved that a proton linac with superconducting accelerating structures, excluding the RFQs, is possible, as is the realization of a high-intensity CW proton linac.

    AcknowledgementsThe authors want to thank all the ADS teams in IHEP for their support,especially the beam dynamics group,for their comments,suggestions,and discussions.Special thanks are expressed to Professor Yuan Zhang in IHEP for organizing discussions and reviewing this paper, and also for Zheqiao Geng from PSI for useful discussions on LLRF control and beam loading issues.

    Author ContributionsAll authors contributed to the study conception and design. Material preparation, data collection and analysis were performed by Fang Yan, Hui-Ping Geng, Cai Meng and Ya-Liang Zhao.The first draft of the manuscript was written by Fang Yan and all authors commented on previous versions of the manuscript.All authors read and approved the final manuscript.

    边亲边吃奶的免费视频| 亚洲,欧美,日韩| 中文字幕制服av| 麻豆精品久久久久久蜜桃| 久热久热在线精品观看| 国产色婷婷99| 国产精品麻豆人妻色哟哟久久 | 国产又色又爽无遮挡免| 欧美成人午夜免费资源| 非洲黑人性xxxx精品又粗又长| 水蜜桃什么品种好| 91精品国产九色| 成人午夜精彩视频在线观看| 欧美日韩一区二区视频在线观看视频在线 | 亚洲欧美中文字幕日韩二区| 干丝袜人妻中文字幕| 久久久久久久亚洲中文字幕| 精品酒店卫生间| 蜜臀久久99精品久久宅男| 亚洲自偷自拍三级| 亚洲av一区综合| 午夜老司机福利剧场| 久久97久久精品| 春色校园在线视频观看| 国产精品蜜桃在线观看| 国产精品不卡视频一区二区| 午夜福利网站1000一区二区三区| 精品一区二区免费观看| 嫩草影院新地址| 青春草国产在线视频| 青春草视频在线免费观看| 内射极品少妇av片p| 国产一级毛片七仙女欲春2| 国产真实伦视频高清在线观看| 久久久久久久久久黄片| 最近视频中文字幕2019在线8| 18禁裸乳无遮挡免费网站照片| 午夜免费激情av| 国产中年淑女户外野战色| 亚洲久久久久久中文字幕| 午夜免费观看性视频| 成年版毛片免费区| 91午夜精品亚洲一区二区三区| 九九久久精品国产亚洲av麻豆| 一级毛片电影观看| 18禁在线无遮挡免费观看视频| 少妇人妻精品综合一区二区| 日日啪夜夜爽| 天天一区二区日本电影三级| 大话2 男鬼变身卡| 哪个播放器可以免费观看大片| 国产伦精品一区二区三区视频9| 美女主播在线视频| 亚洲精品成人久久久久久| 一级毛片 在线播放| 美女xxoo啪啪120秒动态图| 国产精品久久视频播放| 狂野欧美白嫩少妇大欣赏| 别揉我奶头 嗯啊视频| 欧美潮喷喷水| 国产精品一区二区三区四区免费观看| 寂寞人妻少妇视频99o| 街头女战士在线观看网站| 丰满人妻一区二区三区视频av| 国产高清国产精品国产三级 | 国产乱人视频| www.色视频.com| 嫩草影院精品99| 禁无遮挡网站| 国产单亲对白刺激| 精品酒店卫生间| 日韩伦理黄色片| 性插视频无遮挡在线免费观看| 蜜桃久久精品国产亚洲av| 日韩,欧美,国产一区二区三区| 亚洲精品日韩av片在线观看| 午夜福利视频精品| 乱码一卡2卡4卡精品| 在线天堂最新版资源| 美女国产视频在线观看| 国产人妻一区二区三区在| 波多野结衣巨乳人妻| 亚洲精品乱码久久久久久按摩| 久久精品综合一区二区三区| 天堂俺去俺来也www色官网 | 久久综合国产亚洲精品| 蜜桃亚洲精品一区二区三区| 国产伦精品一区二区三区四那| 成年版毛片免费区| 国产精品1区2区在线观看.| 你懂的网址亚洲精品在线观看| 国产三级在线视频| 亚洲熟女精品中文字幕| 亚洲欧美中文字幕日韩二区| 三级国产精品片| 欧美成人一区二区免费高清观看| 日韩av在线大香蕉| 国精品久久久久久国模美| 免费观看无遮挡的男女| 熟女人妻精品中文字幕| 一区二区三区四区激情视频| av国产久精品久网站免费入址| 成人性生交大片免费视频hd| 久久精品国产鲁丝片午夜精品| 中文资源天堂在线| 1000部很黄的大片| 国产精品久久久久久精品电影| 青青草视频在线视频观看| 大香蕉97超碰在线| 久久久久久久国产电影| 亚洲人成网站在线观看播放| 成人亚洲欧美一区二区av| 亚洲自拍偷在线| 高清av免费在线| 国产在视频线精品| 亚洲国产精品国产精品| 天天一区二区日本电影三级| 汤姆久久久久久久影院中文字幕 | av卡一久久| 在线观看人妻少妇| 久久99蜜桃精品久久| 啦啦啦中文免费视频观看日本| 国产91av在线免费观看| 成人毛片60女人毛片免费| av一本久久久久| 欧美丝袜亚洲另类| 波野结衣二区三区在线| 麻豆国产97在线/欧美| 非洲黑人性xxxx精品又粗又长| 精品少妇黑人巨大在线播放| 亚洲精品色激情综合| 51国产日韩欧美| kizo精华| 亚洲精品乱久久久久久| 成年免费大片在线观看| 欧美区成人在线视频| 国产男人的电影天堂91| 如何舔出高潮| 男的添女的下面高潮视频| 最近视频中文字幕2019在线8| 中文字幕免费在线视频6| 国产熟女欧美一区二区| 偷拍熟女少妇极品色| 亚洲精品国产av蜜桃| 最近中文字幕2019免费版| 亚洲av成人av| 午夜福利成人在线免费观看| 午夜福利在线观看免费完整高清在| 丰满乱子伦码专区| 亚洲人成网站在线播| 欧美日韩一区二区视频在线观看视频在线 | 在线观看av片永久免费下载| 国产成人a∨麻豆精品| av在线老鸭窝| 亚洲国产精品sss在线观看| 日韩欧美精品免费久久| 熟妇人妻久久中文字幕3abv| 日韩av免费高清视频| 久久精品久久久久久久性| 成人亚洲精品一区在线观看 | 久久久亚洲精品成人影院| 欧美日韩视频高清一区二区三区二| 蜜桃久久精品国产亚洲av| 精品一区二区三区人妻视频| 两个人视频免费观看高清| 十八禁国产超污无遮挡网站| 哪个播放器可以免费观看大片| 一本久久精品| 亚洲,欧美,日韩| 日日撸夜夜添| 免费看日本二区| 欧美日韩综合久久久久久| 日本猛色少妇xxxxx猛交久久| 欧美3d第一页| 国产爱豆传媒在线观看| 六月丁香七月| 国产成人一区二区在线| 天堂√8在线中文| 麻豆av噜噜一区二区三区| av福利片在线观看| 日韩成人av中文字幕在线观看| 日韩欧美国产在线观看| 亚洲欧美日韩无卡精品| 成人av在线播放网站| 国产精品99久久久久久久久| 2018国产大陆天天弄谢| 久久草成人影院| 国产午夜福利久久久久久| 噜噜噜噜噜久久久久久91| 高清毛片免费看| 国内少妇人妻偷人精品xxx网站| 一夜夜www| 成人美女网站在线观看视频| 91aial.com中文字幕在线观看| 好男人视频免费观看在线| 赤兔流量卡办理| 国产一区二区在线观看日韩| 国产精品国产三级国产专区5o| 久久久久久久久久人人人人人人| 国产综合精华液| 国产亚洲av片在线观看秒播厂 | 麻豆成人午夜福利视频| 久久久久久久久久人人人人人人| 噜噜噜噜噜久久久久久91| 亚洲美女搞黄在线观看| 中文字幕av成人在线电影| 少妇猛男粗大的猛烈进出视频 | 日韩av在线免费看完整版不卡| 少妇猛男粗大的猛烈进出视频 | 神马国产精品三级电影在线观看| 97热精品久久久久久| 午夜免费男女啪啪视频观看| 亚洲av免费在线观看| 午夜激情欧美在线| 国产一级毛片七仙女欲春2| 最近中文字幕高清免费大全6| 国产日韩欧美在线精品| 亚洲精品成人久久久久久| 国产片特级美女逼逼视频| 亚洲在久久综合| 一级片'在线观看视频| 国产一级毛片在线| 日韩av不卡免费在线播放| 久久韩国三级中文字幕| 日日摸夜夜添夜夜添av毛片| 国产国拍精品亚洲av在线观看| 女的被弄到高潮叫床怎么办| 亚洲真实伦在线观看| 婷婷色综合www| 久久亚洲国产成人精品v| 亚洲av.av天堂| 三级国产精品片| 肉色欧美久久久久久久蜜桃 | 久久精品夜夜夜夜夜久久蜜豆| 美女cb高潮喷水在线观看| 欧美人与善性xxx| 又粗又硬又长又爽又黄的视频| 蜜桃亚洲精品一区二区三区| 国产亚洲5aaaaa淫片| 久久国内精品自在自线图片| 网址你懂的国产日韩在线| 国产高清国产精品国产三级 | 亚洲图色成人| 亚洲熟女精品中文字幕| 在线免费十八禁| 大香蕉久久网| 亚洲精品久久午夜乱码| 日韩成人伦理影院| 亚洲av免费在线观看| 18禁动态无遮挡网站| ponron亚洲| av国产久精品久网站免费入址| 国产午夜精品论理片| 国产一区亚洲一区在线观看| 国产乱人偷精品视频| 亚洲真实伦在线观看| 日本欧美国产在线视频| 欧美最新免费一区二区三区| 啦啦啦中文免费视频观看日本| 国产在线男女| 久久人人爽人人爽人人片va| 老师上课跳d突然被开到最大视频| 亚洲成人精品中文字幕电影| 少妇人妻精品综合一区二区| 国产爱豆传媒在线观看| 五月天丁香电影| 成人亚洲精品一区在线观看 | 婷婷色综合大香蕉| 国产69精品久久久久777片| 精品一区二区三区人妻视频| 成人无遮挡网站| 内射极品少妇av片p| 精品久久国产蜜桃| 免费观看精品视频网站| 九九久久精品国产亚洲av麻豆| 国产精品国产三级国产专区5o| 大话2 男鬼变身卡| 美女cb高潮喷水在线观看| 精品酒店卫生间| 欧美性感艳星| 赤兔流量卡办理| 亚洲自偷自拍三级| 国产一区有黄有色的免费视频 | 国产69精品久久久久777片| 午夜福利网站1000一区二区三区| 精品久久久精品久久久| h日本视频在线播放| 嫩草影院精品99| 国产淫语在线视频| 一级片'在线观看视频| 精品久久久久久久久久久久久| 亚洲成人中文字幕在线播放| 欧美丝袜亚洲另类| 91午夜精品亚洲一区二区三区| 国产亚洲精品久久久com| 亚洲色图av天堂| 日本免费a在线| 少妇的逼水好多| 国产精品人妻久久久影院| 亚洲精品乱码久久久v下载方式| 黄片无遮挡物在线观看| 国产亚洲一区二区精品| 2021天堂中文幕一二区在线观| 熟女人妻精品中文字幕| 在线观看av片永久免费下载| 国产精品美女特级片免费视频播放器| ponron亚洲| 午夜精品在线福利| 大话2 男鬼变身卡| 精品欧美国产一区二区三| 最近中文字幕2019免费版| 日韩av在线大香蕉| 国产白丝娇喘喷水9色精品| 欧美一区二区亚洲| 高清视频免费观看一区二区 | 伦理电影大哥的女人| 国产精品女同一区二区软件| 欧美+日韩+精品| 亚洲最大成人av| 美女被艹到高潮喷水动态| 亚洲av免费在线观看| 日日啪夜夜爽| 久久久成人免费电影| 精品久久久久久成人av| 热99在线观看视频| 亚洲精品乱码久久久v下载方式| 婷婷色综合大香蕉| 久久久久久久国产电影| 亚洲av成人精品一二三区| 晚上一个人看的免费电影| 黄片无遮挡物在线观看| 亚洲精品中文字幕在线视频 | 国产片特级美女逼逼视频| 免费观看av网站的网址| 亚洲最大成人手机在线| 国产免费福利视频在线观看| 在现免费观看毛片| 亚洲精品aⅴ在线观看| 2021少妇久久久久久久久久久| 国产老妇女一区| 91精品伊人久久大香线蕉| 免费看光身美女| 一级毛片电影观看| 精品久久久久久久久久久久久| 天天躁夜夜躁狠狠久久av| 国产69精品久久久久777片| 蜜桃久久精品国产亚洲av| 91狼人影院| 精品国产三级普通话版| 久久久久网色| 久久草成人影院| 欧美xxⅹ黑人| 日本免费a在线| 天堂网av新在线| 深夜a级毛片| 好男人在线观看高清免费视频| 精品少妇黑人巨大在线播放| 国产男人的电影天堂91| 欧美 日韩 精品 国产| 精品一区二区三区人妻视频| 亚洲精品久久午夜乱码| 国产探花在线观看一区二区| 久久国产乱子免费精品| 亚洲欧美中文字幕日韩二区| 一个人看的www免费观看视频| 成人特级av手机在线观看| 熟妇人妻不卡中文字幕| 亚洲av中文av极速乱| 国产在视频线精品| 伊人久久精品亚洲午夜| 亚洲av福利一区| 成人二区视频| 插逼视频在线观看| 亚洲精品国产成人久久av| 好男人视频免费观看在线| 亚洲va在线va天堂va国产| 久久亚洲国产成人精品v| 九色成人免费人妻av| 国产麻豆成人av免费视频| 国产成人精品久久久久久| 爱豆传媒免费全集在线观看| 亚洲欧美清纯卡通| 看十八女毛片水多多多| 亚洲av福利一区| 乱码一卡2卡4卡精品| 国内揄拍国产精品人妻在线| 成人性生交大片免费视频hd| 色网站视频免费| 久久99蜜桃精品久久| 国语对白做爰xxxⅹ性视频网站| 久久久欧美国产精品| 久久精品国产自在天天线| 亚洲四区av| 国产精品久久久久久久电影| 毛片一级片免费看久久久久| 久久亚洲国产成人精品v| 久久久久久久午夜电影| 国产免费又黄又爽又色| 欧美精品一区二区大全| 九九久久精品国产亚洲av麻豆| 亚洲精品中文字幕在线视频 | 在线天堂最新版资源| 一区二区三区四区激情视频| 日韩电影二区| 亚洲国产精品专区欧美| 成人鲁丝片一二三区免费| 亚洲激情五月婷婷啪啪| 99久国产av精品国产电影| 女人久久www免费人成看片| 国产男人的电影天堂91| 中文字幕亚洲精品专区| 亚洲精品日韩在线中文字幕| 一本久久精品| 少妇高潮的动态图| 亚洲18禁久久av| 成年人午夜在线观看视频 | 我的女老师完整版在线观看| 中文字幕制服av| 国产一区二区三区av在线| 亚洲成人久久爱视频| 肉色欧美久久久久久久蜜桃 | 老司机影院成人| 精品酒店卫生间| 亚洲综合色惰| 中文字幕av成人在线电影| 亚洲av福利一区| 免费在线观看成人毛片| 插阴视频在线观看视频| 日韩成人伦理影院| 日日摸夜夜添夜夜爱| .国产精品久久| 精品久久久精品久久久| 国产爱豆传媒在线观看| 国产亚洲一区二区精品| 热99在线观看视频| 午夜精品一区二区三区免费看| 男女边吃奶边做爰视频| 熟妇人妻久久中文字幕3abv| 国模一区二区三区四区视频| kizo精华| 少妇的逼好多水| 久久久久网色| 在线免费十八禁| 网址你懂的国产日韩在线| 国产精品爽爽va在线观看网站| 精品久久久久久成人av| 日韩欧美一区视频在线观看 | 精品久久久久久电影网| 又黄又爽又刺激的免费视频.| 床上黄色一级片| 国产伦理片在线播放av一区| 丝袜美腿在线中文| 你懂的网址亚洲精品在线观看| 国产精品久久久久久精品电影小说 | 亚洲天堂国产精品一区在线| 日本猛色少妇xxxxx猛交久久| 亚洲无线观看免费| 国产成人a∨麻豆精品| 国产一级毛片七仙女欲春2| 午夜激情福利司机影院| 欧美bdsm另类| 又黄又爽又刺激的免费视频.| 丰满乱子伦码专区| 天天一区二区日本电影三级| 禁无遮挡网站| 国产极品天堂在线| 欧美极品一区二区三区四区| 国产精品人妻久久久影院| 国产午夜精品一二区理论片| 91久久精品国产一区二区成人| 一级毛片黄色毛片免费观看视频| 午夜激情福利司机影院| 又大又黄又爽视频免费| 国产成人a区在线观看| 日韩强制内射视频| 黄色日韩在线| 亚洲国产色片| 日本午夜av视频| 天堂影院成人在线观看| 欧美另类一区| 黄色配什么色好看| 久久久色成人| 欧美日韩在线观看h| 蜜桃久久精品国产亚洲av| 精品午夜福利在线看| 欧美高清成人免费视频www| 91在线精品国自产拍蜜月| 人体艺术视频欧美日本| 少妇熟女欧美另类| 精品久久久久久电影网| 小蜜桃在线观看免费完整版高清| 91久久精品国产一区二区成人| 国产免费福利视频在线观看| 欧美3d第一页| 亚洲精品乱久久久久久| av在线亚洲专区| 97热精品久久久久久| av线在线观看网站| 国产一区二区亚洲精品在线观看| 人妻制服诱惑在线中文字幕| 日韩亚洲欧美综合| 日韩欧美精品v在线| 男人狂女人下面高潮的视频| 欧美日韩精品成人综合77777| 成人亚洲精品av一区二区| 国产伦精品一区二区三区视频9| 精品久久久久久久久久久久久| 国产一区二区三区av在线| 2018国产大陆天天弄谢| 成人美女网站在线观看视频| 亚洲一级一片aⅴ在线观看| 午夜精品一区二区三区免费看| 国产男人的电影天堂91| 18+在线观看网站| 嫩草影院新地址| 女人久久www免费人成看片| 亚洲综合精品二区| 亚洲精品aⅴ在线观看| 国产乱来视频区| 国产一区二区在线观看日韩| 精品亚洲乱码少妇综合久久| 国产真实伦视频高清在线观看| 99久国产av精品| 久久久久精品久久久久真实原创| 亚洲精品一区蜜桃| 九九久久精品国产亚洲av麻豆| 国产色爽女视频免费观看| 国产国拍精品亚洲av在线观看| 国产精品人妻久久久久久| 69人妻影院| 欧美不卡视频在线免费观看| 国产黄色小视频在线观看| 色5月婷婷丁香| 综合色av麻豆| 赤兔流量卡办理| xxx大片免费视频| 国产精品麻豆人妻色哟哟久久 | 国产淫片久久久久久久久| 天堂中文最新版在线下载 | 欧美日韩精品成人综合77777| 婷婷色av中文字幕| 亚洲熟女精品中文字幕| 女的被弄到高潮叫床怎么办| 久久99精品国语久久久| 欧美3d第一页| 男女下面进入的视频免费午夜| 亚洲精品一区蜜桃| 又粗又硬又长又爽又黄的视频| 久久久久久久久中文| 91在线精品国自产拍蜜月| 国产高清不卡午夜福利| 国产成人a∨麻豆精品| av福利片在线观看| 性插视频无遮挡在线免费观看| 在线a可以看的网站| 美女cb高潮喷水在线观看| 大话2 男鬼变身卡| 在线免费十八禁| 日本黄大片高清| 欧美xxxx性猛交bbbb| 国产精品国产三级专区第一集| 天天躁日日操中文字幕| 少妇的逼水好多| 国产视频首页在线观看| 国产精品麻豆人妻色哟哟久久 | 成人漫画全彩无遮挡| 国产成人午夜福利电影在线观看| 九色成人免费人妻av| 久久久a久久爽久久v久久| 亚洲自偷自拍三级| 天堂影院成人在线观看| 精品久久久久久电影网| 日本三级黄在线观看| 26uuu在线亚洲综合色| 婷婷色av中文字幕| 91aial.com中文字幕在线观看| 午夜激情欧美在线| 亚洲欧美精品专区久久| 中文字幕制服av| 国产成人免费观看mmmm| videos熟女内射| 天堂√8在线中文| 久久久欧美国产精品| 观看美女的网站| 成年版毛片免费区| 午夜老司机福利剧场| 一区二区三区高清视频在线| 亚洲精品第二区| 亚洲熟女精品中文字幕| 高清在线视频一区二区三区| 亚洲av成人av| 特级一级黄色大片| 成人av在线播放网站| 久久这里只有精品中国| 国产伦在线观看视频一区| 男人和女人高潮做爰伦理| 国内揄拍国产精品人妻在线| 日韩成人伦理影院| 精品一区二区三区视频在线| 亚洲国产av新网站| 人妻一区二区av| 国产片特级美女逼逼视频| 久久久成人免费电影| 99re6热这里在线精品视频| 熟女人妻精品中文字幕| 国产 亚洲一区二区三区 | 色5月婷婷丁香| 国产淫片久久久久久久久| 亚洲综合色惰| 成人高潮视频无遮挡免费网站| 午夜激情福利司机影院| xxx大片免费视频| .国产精品久久| 国产精品伦人一区二区| 成人特级av手机在线观看|