    Estimation of unloading relaxation depth of Baihetan Arch Dam foundation using long-short term memory network

    2021-09-09 07:55:48MingjieHeHoLiJinrongXuHunlingWngWeiXuShizhungChen
    Water Science and Engineering 2021年2期

    Ming-jie He ,Ho Li ,Jin-rong Xu ,Hun-ling Wng ,Wei-y Xu ,*,Shi-zhung Chen

    a Powerchina Huadong Engineering Corporation Limited,Hangzhou 311122,China

    b Research Institute of Geotechnical Engineering,Hohai University,Nanjing 210098,China

    c Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering,Hohai University,Nanjing 210098,China

    Abstract The unloading relaxation caused by excavation for construction of high arch dams is an important factor influencing the foundation’s integrity and strength.To evaluate the degree of unloading relaxation,the long-short term memory(LSTM)network was used to estimate the depth of unloading relaxation zones on the left bank foundation of the Baihetan Arch Dam.Principal component analysis indicates that rock characteristics,the structural plane,the protection layer,lithology,and time are the main factors.The LSTMnetwork results demonstrate the unloading relaxation characteristics of the left bank,and the relationships with the factors were also analyzed.The structural plane has the most significant influence on the distribution of unloading relaxation zones.Compared with massive basalt,the columnar jointed basalt experiences a more significant unloading relaxation phenomenon with a clear time effect,with the average unloading relaxation period being 50 d.The protection layer can effectively reduce the unloading relaxation depth by approximately 20%.

    Keywords:Columnar jointed basalt;Unloading relaxation;Long-short term memory(LSTM)network;Principal component analysis;Stability assessment;Baihetan Arch Dam

    1.Introduction

    The Baihetan Hydropower Station is located on lower reaches of the Jinsha River.The main rock mass at the dam foundation is columnar jointed basalt.The cross-section of columnar jointed basalt is characterized by a regular array of polygonal prisms or columns,and microcracks often develop in columns.The columnar jointed basalt of the Baihetan Hydropower Station is relatively broken,but the pieces are inlaid with one another.Some studies on the quality evaluation and triaxial mechanical properties of columnar jointed basalt rock mass have been conducted.In engineering construction,there are often excavation procedures.It has been reported that columnar jointed basalt rock mass shows significant excavation-induced unloading relaxation characteristics,and the mechanical properties of the rock mass deteriorate with the increase of the degree of relaxation,which has an important impact on engineering safety(Chen et al.,2014;Meng et al.,2019;Shan and Di,2013;Wei et al.,2011;Xu et al.,2011).

    The unloading mechanics play an important role in the behavior of columnar jointed basalt under excavation conditions.The geometrical structure and failure modes of the columnar jointed basalt exposed at a dam foundation were presented in Jiang et al.(2019).On the other hand,Fei et al.(2018)studied the columnar jointed basalt in a specific test area,and analyzed the differences in the unloading relaxation characteristics of the III1and III2rock masses.It was found that the relaxation depth of the columnar jointed basalt was related to the crustal stress,rock mass quality,and gently dipping shear belts(Fan et al.,2018;Jiang et al.,2014;Lin et al.,2019).A uniform distribution survey line method was proposed to quantitatively describe the spatial structural features of the columnar jointed basalt exposed in limited outcrops(Cui et al.,2018).The unbalanced force is mainly located on the surface of slopes where faults are exposed(Zhong et al.,2019).Previous studies have mostly dealt with direct analysis of laboratory and field test results.

    In recent years,machine learning has been widely used in various communities.Through knowledge of the existing data samples,the relationship between data and internal laws can be established in a specific way.Developed from the model of artificial neural networks(ANN),deep learning is a type of representation learning method based on data in machine learning.The concept was proposed by Hinton et al.(2006)based on ANN research.In geotechnical engineering,the machine learning method has been applied to a different purpose.Xu et al.(1999)developed a deformation analysis and prediction model for the high rock slope of the permanent ship lock of the Three Gorges Project using ANN.Zhang et al.(2018)established a deep-learning migration model of rock images based on Inception-v3.The extent of relaxation zones in tunnels excavated through columnar jointed basalt has been studied with the numerical discontinuous deformation analysis method(Hatzor et al.,2015).The processing and analysis of the acoustic wave test data of the Baihetan Hydropower Station are relatively simple,and long-term engineering data need to be studied using the deeplearning method.

    The development of deep learning,especially with the appearance of long-short term memory(LSTM),offers a good solution for time series with long-term dependencies(Olah,2015).LSTM was first introduced by Hochreiter and Schmidhuber(1997)and subsequently refined and popularized by many researchers,such as Gers et al.(2000),Graves et al.(2005),Greff et al.(2017),and Kalchbrenner et al.(2015).These studies tremendously improved the performance of LSTM,and LSTM networks are now among the most efficient and widely used deep-learning networks.They have already been successfully applied to time-series analysis in prediction(Gers et al.,2002)and recognition(Ordonez and Roggen,2016)when traditional computational intelligence approaches fail.

    In this study,based on five years of acoustic wave test data from observation holes in the left bank foundation of the Baihetan Arch Dam,an LSTM network was established to visualize of the unloading relaxation depth and to explore the influences of time,lithology,the structural plane,the protection layer,and other engineering factors on the unloading relaxation.This study is highly significant to understanding the unloading mechanical behavior of the columnar jointed basalt rock mass in the Baihetan Arch Dam foundation and to optimizing the excavation works.

    2.Study area and data

    2.1.Geological conditions

    The Baihetan Hydropower Station is located downstream of the Jinsha River,at the border of Ningnan County of Sichuan Province and Qiaojia County of Yunnan Province.It is one of the cascade hydropower stations on the Jinsha River,with the Wudongde Hydropower Station upstream and the Xiluodu Hydropower Station 195 km away downstream.

    The site is located to the east of the Zemuhe and Sikai-Jiaojihe fracture zones and to the north of the Xiaojiang fault zone.Although active fault zones exist in this region and the regional seismic activity is intense,no intense earthquake has been recorded within a 40-km range around the dam site,and the seismic risk to the Baihetan Hydropower Station results mainly from the influence of intense seismic activities of nearby seismic zones.

    The Baihetan Arach Dam area is dominated by upper permian Emeishan formation basalts(P2β),as shown in Fig.1.Columnar jointed basalts(P2β33)develop at elevations of 540-730 m.Meanwhile,unfavorable geological structures,such as faults F17 and F16,often develop in this area,which have a significant influence on the stability and safety of the project.

    Based on geological structure analysis and field tests,it has been found that the directions of initial in situ stress fields of both banks of the Baihetan Hydropower Station,which are influenced by factors such as fluvial erosion and slope unloading,deflect partly from NWW to NE(Jin et al.,2010).The faults at the dam site are small in scale,and there is no regional fault.Most are strike-slip faults,and a few are thrust faults.Geological structures are mainly composed of faults with thicknesses less than 1.0 m,fracture zones,and joints,mostly striking NW with a few striking NE and dipping at high angles.Fault zones have developed on both banks,5-20 cm in thickness and extending 20-260 m in length.

    Fig.1.Top view and geological section of Baihetan Arch Dam foundation.

    2.2.Acoustic wave test data

    The acoustic wave test is widely used in rock engineering.In this study,a dual-receiver acoustic wave probe was put into the hole,and a transducer was used to transmit the acoustic wave.Two transducers received the acoustic wave,and the time difference between the two receiving transducers was monitored.

    The distance between the two receiving transducers was divided by the time difference,and the acoustic wave velocity in the pore wall rock mass in this section could be calculated as follows:

    where t1and t2are the times of the same excitation signal received by the two transducers,respectively;L is the distance between two receiving transducers,with L=0.2 m;and vpis the acoustic wave velocity.

    Fig.2 shows the layout of 44 long-term observation holes drilled on the left bank foundation of the Baihetan Arch Dam with elevations of 600-834 m.The criteria for determining the relaxation depth of the rock mass in the excavation surface were as follows:if there was an obvious inflection point on the wave velocity curve,the corresponding depth value at the inflection point was taken as the relaxation depth(Shao et al.,2006);if there was no obvious inflection point on the wave velocity curve,the depth value corresponding to a wave velocity of 4 000 m/s was taken as the relaxation depth.The acoustic wave test data from 44 long-term observation holes were analyzed to obtain relatxation depths of the holes at different times.

    Fig.2.Long-term observation hole distribution in left bank foundation(units:m).

    3.Methodology

    3.1.Long-short term memory network

    The LSTM network is an effective method for solving the problem of gradient disappearance by introducing a gate control unit and linear connection(Meng et al.,2020).The gate control unit can selectively save and output the historical information,while the linear connection can transfer the output historical information unobstructed.Hence,the LSTM network can better capture the strong dependence between time-series data(Ertam,2019;Khokhlova et al.,2019;Michielli et al.,2019).

    The structure of the LSTM network can be found in Greff et al.(2017).First,the input xtat time t and the output ht-1of the hidden layer at time t-1 are copied,with their randomly initialized weights.The forgetting gate,input gate,output gate,and new information after transformation are calculated as follows:

    where ft,it,and Otare the forgetting gate,input gate,and output gate at time t,respectively;is the new information after transformation at time t;Wf,Wi,WO,and WCare the parameter matrices from the input layer to the hidden layer for the forgetting gate,input gate,output gate,and new information,respectively;Uf,Ui,UO,and UCare the self-cycling parameter matrices from the hidden layer to the hidden layer for the forgetting gate,input gate,output gate,and new information,respectively;bf,bi,bO,and bCare the offset parameter matrices for the forgetting gate,input gate,output gate,and new information,respectively;andσis the sigmoid function,which means that the outputs of the three gates are in the range of 0-1.

    The forgetting gate ftand the input gate itare then used to control how much historical information Ct-1at time t-1 is forgotten and how much new information~Ctis saved,to update the internal memory cell state,and Ctat time t is obtained as follows:

    The output gate Otis used to control how much information from the internal memory unit is passed to the hidden layer,and the output htis obtained as follows:

    3.2.Principle component analysis(PCA)method

    Given the complexity of the excavation-induced relaxation mechanism of the Baihetan Arch Dam foundation,the PCA method was adopted to analyze the influences of various factors on the relaxation depth.To represent the time effect,a logarithmic function of the cumulative time,between the current time and the time when monitoring began,was employed,and the cumulative load proportions of the structural plane,lithology,time,and protection layer were calculated,as shown in Table 1.The structural plane factor makes up the largest proportion of all factors,accounting for 28.9%.The second is the time effect factor,accounting for 26.1%.The influences of lithology and the protection layer are also large,accounting for 21.5%and 21.4%,respectively.Support has the least amount of influence on the relaxation depth,accounting for only 3.1%.Therefore,the structural plane,lithology,time,and protection layer have strong correlations with the relaxation depth,and are determined to be the main factors.

    Table 1 Composite score of each factor.

    4.Unloading relaxation depth model based on LSTM

    4.1.LSTM network training and accuracy assessment

    Based on the results of PCA analysis and position information,seven elements,including the geodetic coordinate X,geodetic coordinate Y,geodetic coordinate Z,time,lithology,structural plane distribution,and protective layer,were employed as the inputs of the LSTM model.The flowchart of the network is illustrated in Fig.3.

    Fig.3 shows the structure and training process of the model.The trial-and-error method was used to obtain the parameters of the model after testing and adjusting.Based on the acoustic wave velocity measured at 44 long-term observation holes,65 238 groups of effective data were obtained from 2014 to 2019.Seventy percent of the data were used as a training set,15%were used as a test set,and 15%were used as a verification set.

    After data preprocessing,the LSTMmodel of the unloading relaxation depth was obtained through training and verification testing.Fig.4(a)shows the model test accuracy for the hole LA4-3(at an elevation of 634.5 m).The mean squared error(MSE)of the LSTM model converges with the increase of training iterations.When the number of training iterations reaches 1 000,the qualified accuracy is guaranteed.In Fig.4(b),the LSTM model shows a strong performance for the prediction of the relaxation depth at the holes LA4-3 and LB3-1(at an elevation of 761.0 m),with MSEs of 6.7×10-6and 1.07×10-5,respectively.These results indicate that the LSTM model is highly accurate in predicting the relaxation depth and acoustic wave velocity.

    Fig.3.Flowchart for LSTM-based deep-learning prediction.

    4.2.Unloading relaxation characteristics of left bank foundation

    As shown in Fig.5,a three-dimensional mesh model of the left bank foundation of the Baihetan Arch Dam was created using HyperMesh.Then,12 332 node coordinates on the foundation surface were extracted.This is a sufficient number to reflect the relaxation characteristics.

    Fig.4.Accuracy verification of LSTM model.

    Fig.5.Three-dimensional model of left bank dam foundation.

    To study the unloading relaxation characteristics,the input vector of 12 332 nodes on December 31,2016(after excavation)was fed into the LSTM model,and the distribution of unloading relaxation depth was acquired using spatial interpolation based on discrete points,as shown in Fig.6.After excavation,the relaxation depth of the dam foundation surface is distributed in a uniform bar shape,with a maximum relaxation depth of 2.630 m and a minimum relaxation depth of 0.370 m.Intensely deteriorated rock mass with a relaxation depth of more than 2.0 m is relatively scarce,and is mainly located on the right side at elevations of 800-830 m and on the left side at elevations of 630-660 m,accounting for approximately 17.26%of the dam foundation surface.There is only a small amount of slightly deteriorated rock mass with a relaxation depth less than 0.8 m,mainly in an oval area on the left side at elevations of 800-830 m and on the left side at elevations of 550-580 m.The maximum difference in the relaxation depth reaches 2.26 m,indicating that the unloading relaxation characteristics of rock mass in different areas of the same dam foundation surface are significantly different.The average relaxation depth is 1.57 m,and rock mass with the relaxation depth of 1.4-1.6 m is the most widely distributed,accounting for 46.21%of the left bank foundation surface.According to the Code for Hydropower Engineering Geological Investigation(GB 50287-2006)and project experience,a relaxation depth less then 1.5 m should not affect the project safety,a relaxation depth in the range of 1.5-3.0 m has a slight effect,and a relaxation depth greater than 3.0 m has a significant effect.Although the distribution of the excavationinduced unloading relaxation depth in the left bank foundation surface shows a certain variation,the average value is 1.57 m,meeting the requirements of project construction.

    Fig.6.Relaxation depth distribution in left bank foundation.

    5.Analysis of factors

    5.1.Lithology

    To study the relationship of the unloading relaxation depth with the lithology of the dam bedrock,different areas with different lithologies were selected,and their excavationinduced relaxation depths on January 1,2016 were obtained with the LSTM model,as shown in Fig.7.In the foundation surface with elevations above 660 m where P2β42-P2β33 massive basalts are distributed,areas with different unloading relaxation depths are interlaced with one another,and slightly deteriorated rock mass with a relaxation depth less than 0.8 m dominates.The average unloading relaxation depth is 1.09 m,with a maximum of 2.59 m and a minimum of 0.17 m.In the foundation surface with elevations of 630-660 m where columnar jointed basalts are distributed,areas with different unloading relaxation depths show block distribution.On the left side of the foundation,the rock mass intensely deteriorates with a relaxation depth of more than 2 m.On the right side,the rock mass moderately deteriorates with a relaxation depth of 0.71-1.45 m.The average unloading relaxation depth is 1.76 m,with a maximum of 2.71 m and a minimum of 0.71 m.Areas where columnar jointed basalts are distributed have stronger unloading relaxation effects and are within moderate and intense unloading relaxation zones.The interlacing of excavation-induced unloading relaxation depth is caused by the exposure of rock mass with different lithologies.

    Statistics of the relaxation depth of rock mass with different lithologies are shown in Table 2.The excavation-induced unloading relaxation of cryptocrystalline basalt is relatively slight and the rock mass quality is high,while the columnar jointed basalt has intense unloading relaxation characteristics due to the existence of many joints,and the excavationinduced unloading relaxation depth is larger than that in other areas.

    Table 2 Calculation results of relaxation characteristics for different lithologies in left bank foundation surface.

    Fig.8 shows the distributions of lithology and excavationinduced relaxation depth in the left bank foundation at elevations of 750-770 m,and a strong correlation can also be observed.In the III1rock mass area,the relaxation depth is evenly distributed with little variation,and the value is kept at around 1.46 m.Meanwhile,the relaxation depth is also evenly distributed in the III2rock mass,with the value above 1.56 m.

    Fig.9 shows the distributions of lithology and excavationinduced relaxation depth in the left bank foundation at elevations of 650-660 m.The average relaxation depth in this area is 1.37 m.The relaxation depths in the B2 and C2 areas are the largest,reaching approximately 1.7 m,followed by those in the A1 and A2 areas,with values of 1.5-1.7 m,and the relaxation depths in the B1 and C1 areas are the shallowest.The distribution and boundaries of rock type are similar to the contour lines of the relaxation depth,reflecting the correlation between rock type and unloading relaxation characteristics.However,the areas with the greatest relaxation depth are not completely consistent with the distribution of III2rock mass,indicating that the relaxation depth of the columnar jointed rock mass is also affected by other factors.

    5.2.Structural plane

    To analyze the relationship of the structural plane with excavation-induced unloading relaxation depth,the impact of structural planes on rock mass was first quantized and classified.Based on the in situ exploration of exposed rock mass and faults,the classification criterion of the rock mass was determined:the area within 1.5 m of the intersection of several exposed structural planes was classified as strongly affected;the area within 1.5 m of a single exposed structural plane was classified as moderately affected;the area within 1.5-3.0 m of a single exposed structural plane was classified as slightly affected;and the remaining areas were classified as unaffected.The classification of structural plane-affected areas is shown in Fig.10.

    Fig.8.Rock mass type and relaxation depth distributions in left bank foundation at elevations of 750-770 m.

    Fig.9.Rock mass type and relaxation depth distributions in left bank foundation at elevations of 650-660 m.

    Comparison of Figs.7 and 8 shows a clear correlation between distributions of unloading relaxation depth and structural planes.Strong unloading relaxation zones are distributed in areas strongly affected by structural planes,including areas on the right side of the foundation with elevations above 800 m and the middle area of the foundation with elevations of 680-740 m.The distribution of moderate unloading relaxation zones is also basically consistent with that of areas moderately and slightly affected by structural planes,exhibiting almost the same extension shape and position.The relaxation depth of areas affected by structural planes with different degrees is shown in Table 3.In comparison with that of the non-affected area,the relaxation depths of the strongly,moderately,and weakly affected areas increase by 75.19%,53.49%,and 36.43%,respectively.Therefore,the structural plane has an indispensable influence on the unloading relaxation characteristics of rock mass in the dam foundation.As the rock mass gets closer to the structural plane(especially the intersection of structural planes),the unloading relaxation phenomenon becomes more intense.

    Fig.10.Schematic diagram of structural plane-affected areas on left bank(units:m).

    5.3.Protection layer

    The left bank foundation at elevations of 630-660 m is mainly composed of columnar jointed basalt,and considering its weak quality and unloading mechanical properties,a protection layer and prestressed cables were used during the excavation process in this area.To study the effectiveness of the protection layer,an input vector of node information in this area from February 1,2015(before excavation)to December 31,2016(after excavation)was imported into the LSTM model,and the distributions of unloading relaxation depth before and after the excavation were acquired,as shown in Fig.11.After excavation of the protection layer,the unloading relaxation depth becomes much shallower.Before excavation of the protection layer,the average relaxation depth of the protection layer surface is 1.92 m,with a maximum of 2.71 m and a minimum of 1.20 m.After excavation of the protection layer,the average relaxation depth of the foundation surface is 1.52 m,with a maximum of 1.92 m and a minimum of 1.05 m.The excavation of the protection layer reduced the average relaxation depth by 0.4 m,indicating that the use of a protection layer can relieve the unloading relaxation effect of the columnar jointed basalt.

    The thicknesses of the protection layers in the foundation at elevations of 650-660 m and 630-650 m are 2 m and 5 m,respectively.The relaxation depths before and after excavation of the protection layer in the two test areas are listed in Table 4.In the foundation surface with a 2-m-thick protection layer,the relaxation depth after excavation of the protection layer is 18.84%lower,and the average wave velocity in the relaxation layer increases by 1.07%.In the foundation surface with a 5-m-thick protection layer,the relaxation depth after excavation of the protection layer is25.61%lower,and the average wave velocity in the relaxation layer increases by 1.41%.Therefore,a protection layer with a thickness of 5 m is better than a 2-m-thick protection layer.

    Table 3 Calculation results of structural plane-affected areas at elevations of 600-834 m.

    Fig.11.Relaxation depths before and after excavation of protection layer at elevations of 630-660 m obtained from LSTM model.

    5.4.Time effect

    Under the condition of initial crustal stress,cracks between the columns in the columnar jointed basalt rock mass are closed with high acoustic wave velocity.The excavation of slopes disturbs the microstructure of the rock mass,causing an unloading rebound,and then the cracks gradually open.The development of the cracks results in the time effect of unloading relaxation(Hao et al.,2015).The excavation of the protection layer at elevations of 630-660 m was completed in December 2015.Consolidation grouting started in July 2015,and excavation of the rest of protection layer has been conducted since February 2016.During this process,there was no disturbance other than excavation.Therefore,the distribution and development of the unloading relaxation depth after excavation of the protection layer were chosen for time effect analysis using the LSTM model.

    Fig.12 shows the distributions of unloading relaxation depth at the protection layer surface at different times.The unloading relaxation develops rapidly with time and large changes can be found from 5 to 25 d and from 25 to 35 d:the distribution changes significantly and the relaxation depth increases by 59.33%and 77.38%,respectively.The distribution of the relaxation depth at 35 d is the same as that at 50 d,while the value of the relaxation depth stabilizes after 50 d,indicating that the unloading relaxation time effect period of columnar jointed basalt is approximately 50 d.

    Based on the in situ monitoring data,changing rate curves of the relaxation depth in several long-term observation holes at different elevations are shown in Fig.13.Although the curves for different rocks are not the same,the overall development trend is the same:first growth,and then stabilization.According to the monitoring data,the convergence time is 43-60 d,with an average of 48.5 d,consistent with the LSTM model results listed above.

    Fig.12.Time variation of relaxation depth of left bank dam foundation at elevations of 630-660 m from LSTM model.

    Fig.13.Change rate of relaxation depth in long-term observation holes of left bank dam foundation(EL means the elevation).

    6.Conclusions

    To evaluate the degree of unloading relaxation caused by excavation,an LSTM model was used to predict the depth of unloading relaxation zones in the left bank foundation of the Baihetan Arch Dam.After verification of the LSTM model accuracy,the unloading relaxation characteristics and their factors were analyzed.The conclusions are as follows:

    (1)After excavation of the dam foundation,the exposure of faults and other structural planes severely affected the relaxation characteristics of surrounding rock mass.The distribution of unloading relaxation depth shows that,after the foundation excavation,the overall relaxation depth was about 1.57 m.PCA analysis indicates that the structural plane,protection layer,lithology,and time were the main factors of the excavation-induced unloading relaxation characteristics.

    (2)The LSTMmodel could be developed and was found to be an efficient tool for the prediction of unloading relaxation depth of the Baihetan Arch Dam foundation.The results show that the protection layer could effectively relieve the unloading relaxation phenomenon.The relaxation depths of areas with 2-m and 5-m protection layers were 18.84%and 25.61%shallower than those of areas without protection layers,respectively,indicating that a 5-m protection layer would better control the relaxation depth.Excavation-induced unloading relaxation of the dam foundation rock mass may have a significant time effect,and the relaxation time effect period of the columnar jointed basalt was approximately 50 d.

    (3)Compared with areas without the negative influence of structural planes,the relaxation depth of strongly,moderately,and slightly affected areas increased by 75.19%,53.49%,and 36.43%,respectively.As the rock mass got closer to the structural plane(especially the intersection of structural planes),the unloading relaxation phenomenon became more intense.Therefore,excavation construction should be optimized based on the distribution of structural planes and supporting measures should be strengthened.

    Declaration of competing interest

    The authors declare no conflicts of interest.

    免费人成在线观看视频色| 级片在线观看| 最近最新中文字幕大全电影3| 欧美日韩国产亚洲二区| 国产av在哪里看| 少妇的逼好多水| 欧美xxxx黑人xx丫x性爽| 欧美3d第一页| 中国美白少妇内射xxxbb| 一进一出抽搐gif免费好疼| 日韩欧美三级三区| 国模一区二区三区四区视频| 中文字幕人妻熟人妻熟丝袜美| 久久精品国产亚洲av涩爱 | 免费看a级黄色片| 床上黄色一级片| 久久久久国内视频| 国产在线精品亚洲第一网站| 身体一侧抽搐| 变态另类丝袜制服| 亚洲国产精品成人久久小说 | 女同久久另类99精品国产91| 亚洲欧美成人综合另类久久久 | or卡值多少钱| 99热这里只有是精品在线观看| 亚洲av中文字字幕乱码综合| 亚洲av中文av极速乱| 亚洲内射少妇av| 在现免费观看毛片| 人妻丰满熟妇av一区二区三区| 国产熟女欧美一区二区| 99热只有精品国产| 97热精品久久久久久| 免费黄网站久久成人精品| 亚洲性久久影院| 久久欧美精品欧美久久欧美| 免费看美女性在线毛片视频| 亚洲精品456在线播放app| 日韩成人伦理影院| 国产精品久久久久久久电影| 搡老岳熟女国产| 免费大片18禁| 国产精品久久电影中文字幕| 99视频精品全部免费 在线| 国产精品av视频在线免费观看| 亚洲aⅴ乱码一区二区在线播放| 成人二区视频| 尾随美女入室| 黄片wwwwww| av在线播放精品| 免费看av在线观看网站| 国产毛片a区久久久久| 97人妻精品一区二区三区麻豆| 俄罗斯特黄特色一大片| 精品午夜福利视频在线观看一区| 国产成人freesex在线 | 日韩大尺度精品在线看网址| 免费在线观看影片大全网站| 嫩草影院精品99| 一进一出抽搐动态| 国产激情偷乱视频一区二区| 99国产极品粉嫩在线观看| 中文字幕熟女人妻在线| 91精品国产九色| 两性午夜刺激爽爽歪歪视频在线观看| 国产精品av视频在线免费观看| 18禁在线无遮挡免费观看视频 | 长腿黑丝高跟| 99热全是精品| 午夜日韩欧美国产| 国产午夜精品久久久久久一区二区三区 | 亚洲性夜色夜夜综合| 免费在线观看成人毛片| 91在线观看av| 日本色播在线视频| 最后的刺客免费高清国语| 最近最新中文字幕大全电影3| 亚洲第一区二区三区不卡| 日韩欧美三级三区| 免费在线观看成人毛片| 久久久久国产网址| 热99在线观看视频| 在线观看午夜福利视频| 国产 一区 欧美 日韩| 免费观看在线日韩| 国产男靠女视频免费网站| 此物有八面人人有两片| 亚洲激情五月婷婷啪啪| 蜜臀久久99精品久久宅男| av国产免费在线观看| 精品乱码久久久久久99久播| 欧美性感艳星| 亚洲av免费高清在线观看| 国产单亲对白刺激| 亚洲欧美日韩高清在线视频| 国内精品一区二区在线观看| 91午夜精品亚洲一区二区三区| 国产精品av视频在线免费观看| 中国国产av一级| 在现免费观看毛片| 精品久久久久久成人av| 亚洲欧美成人精品一区二区| av.在线天堂| 欧美一区二区精品小视频在线| 久久精品综合一区二区三区| 女人被狂操c到高潮| 黄色一级大片看看| 亚洲av免费在线观看| 国产精品嫩草影院av在线观看| 成人欧美大片| 亚洲成人中文字幕在线播放| 中国美女看黄片| 成人美女网站在线观看视频| 男人舔奶头视频| 18禁在线播放成人免费| 亚洲久久久久久中文字幕| 国产黄片美女视频| 天堂动漫精品| 日本撒尿小便嘘嘘汇集6| 久久久久免费精品人妻一区二区| 少妇被粗大猛烈的视频| 国产精品嫩草影院av在线观看| a级一级毛片免费在线观看| 婷婷精品国产亚洲av在线| 一夜夜www| 99热全是精品| 看十八女毛片水多多多| av免费在线看不卡| 亚洲婷婷狠狠爱综合网| 国产在线男女| 身体一侧抽搐| 嫩草影视91久久| 午夜久久久久精精品| 国产精品野战在线观看| av天堂中文字幕网| 身体一侧抽搐| 美女大奶头视频| 亚洲无线在线观看| 国产亚洲av嫩草精品影院| 99热这里只有精品一区| 赤兔流量卡办理| 成年女人看的毛片在线观看| 色综合亚洲欧美另类图片| 狠狠狠狠99中文字幕| 最近的中文字幕免费完整| 日本一本二区三区精品| 亚洲色图av天堂| 美女大奶头视频| 精品久久国产蜜桃| 色av中文字幕| 国产高清视频在线播放一区| 91久久精品国产一区二区成人| 老师上课跳d突然被开到最大视频| 色哟哟哟哟哟哟| 国产精品精品国产色婷婷| 亚洲av不卡在线观看| 在线天堂最新版资源| 97在线视频观看| 蜜桃亚洲精品一区二区三区| 悠悠久久av| 欧美一区二区亚洲| 国产又黄又爽又无遮挡在线| 国产精品久久久久久亚洲av鲁大| 午夜老司机福利剧场| av专区在线播放| 深夜a级毛片| 亚洲高清免费不卡视频| 人人妻人人看人人澡| 少妇被粗大猛烈的视频| 十八禁网站免费在线| 性色avwww在线观看| 大又大粗又爽又黄少妇毛片口| 99国产极品粉嫩在线观看| 少妇猛男粗大的猛烈进出视频 | 免费人成在线观看视频色| 最好的美女福利视频网| 性插视频无遮挡在线免费观看| 又黄又爽又刺激的免费视频.| 又粗又爽又猛毛片免费看| 少妇裸体淫交视频免费看高清| 色尼玛亚洲综合影院| 亚洲成人av在线免费| 男女边吃奶边做爰视频| 直男gayav资源| 色哟哟哟哟哟哟| 99九九线精品视频在线观看视频| av在线老鸭窝| 国产真实伦视频高清在线观看| 美女内射精品一级片tv| 小蜜桃在线观看免费完整版高清| 男人舔女人下体高潮全视频| 乱系列少妇在线播放| 中国美白少妇内射xxxbb| avwww免费| 国产欧美日韩一区二区精品| 人人妻人人澡人人爽人人夜夜 | 一卡2卡三卡四卡精品乱码亚洲| 午夜福利在线观看免费完整高清在 | 蜜臀久久99精品久久宅男| 国产一区二区亚洲精品在线观看| 免费在线观看成人毛片| 日本黄色视频三级网站网址| 日本a在线网址| 日本一本二区三区精品| 一区福利在线观看| 国产视频内射| 国产视频一区二区在线看| 亚洲精品国产成人久久av| 国产91av在线免费观看| 波多野结衣高清无吗| 亚洲高清免费不卡视频| 欧美日本视频| 国产精品久久久久久亚洲av鲁大| 亚洲内射少妇av| 美女cb高潮喷水在线观看| 欧美xxxx性猛交bbbb| 日本三级黄在线观看| 亚洲欧美成人精品一区二区| 变态另类成人亚洲欧美熟女| 久久精品国产清高在天天线| 久久午夜福利片| 一本精品99久久精品77| 欧美日韩综合久久久久久| 3wmmmm亚洲av在线观看| 狂野欧美激情性xxxx在线观看| 好男人在线观看高清免费视频| 精品人妻一区二区三区麻豆 | 日韩人妻高清精品专区| 亚洲一区高清亚洲精品| 波多野结衣高清作品| 日韩欧美在线乱码| 熟女人妻精品中文字幕| 美女大奶头视频| 天天一区二区日本电影三级| 亚洲欧美精品综合久久99| 深夜a级毛片| 精品久久久久久久久久久久久| 69av精品久久久久久| 99久久精品热视频| 亚洲精品一卡2卡三卡4卡5卡| 久久久久久久久久久丰满| 日韩高清综合在线| 色吧在线观看| 国产午夜福利久久久久久| 真人做人爱边吃奶动态| 精品人妻熟女av久视频| 欧美国产日韩亚洲一区| 亚洲性久久影院| 国产成年人精品一区二区| 在线观看免费视频日本深夜| 精品一区二区三区av网在线观看| 久久国内精品自在自线图片| 男女边吃奶边做爰视频| 嫩草影视91久久| 国产探花极品一区二区| 亚洲国产精品久久男人天堂| 亚洲欧美清纯卡通| 色哟哟·www| 深夜a级毛片| 在线a可以看的网站| 亚洲三级黄色毛片| 麻豆精品久久久久久蜜桃| 一区二区三区四区激情视频 | 亚洲性久久影院| 又爽又黄a免费视频| 能在线免费观看的黄片| 一个人免费在线观看电影| 久久精品国产亚洲av香蕉五月| 麻豆久久精品国产亚洲av| 国产成人一区二区在线| 国产久久久一区二区三区| 久久久国产成人免费| 偷拍熟女少妇极品色| 99久久精品热视频| 91午夜精品亚洲一区二区三区| 亚洲国产精品合色在线| 中文在线观看免费www的网站| 久99久视频精品免费| 国产高清有码在线观看视频| 97超视频在线观看视频| 99国产极品粉嫩在线观看| 国产黄片美女视频| 美女被艹到高潮喷水动态| 亚洲精品456在线播放app| 午夜免费激情av| 听说在线观看完整版免费高清| 精品国产三级普通话版| 老熟妇仑乱视频hdxx| 不卡视频在线观看欧美| 变态另类成人亚洲欧美熟女| 成年女人永久免费观看视频| 人妻少妇偷人精品九色| 国产精品不卡视频一区二区| 九九在线视频观看精品| 国产午夜精品久久久久久一区二区三区 | 尤物成人国产欧美一区二区三区| 精品熟女少妇av免费看| 亚洲经典国产精华液单| 欧美激情久久久久久爽电影| 久久久色成人| 亚洲高清免费不卡视频| 亚洲国产精品成人综合色| 一个人免费在线观看电影| 激情 狠狠 欧美| 一级毛片电影观看 | 色哟哟·www| 麻豆精品久久久久久蜜桃| 欧美激情久久久久久爽电影| 久久中文看片网| 最近中文字幕高清免费大全6| 国产精华一区二区三区| 国产v大片淫在线免费观看| 国产精品电影一区二区三区| 在线观看免费视频日本深夜| www日本黄色视频网| 日日摸夜夜添夜夜爱| 99在线视频只有这里精品首页| 亚洲国产色片| 国产黄色视频一区二区在线观看 | 99热精品在线国产| 精品一区二区三区av网在线观看| 又黄又爽又刺激的免费视频.| 久久久久精品国产欧美久久久| 国产精品久久久久久久久免| 亚洲精品456在线播放app| 亚洲欧美精品综合久久99| 欧美极品一区二区三区四区| 欧美成人精品欧美一级黄| 成熟少妇高潮喷水视频| 国产精品久久电影中文字幕| 中文字幕免费在线视频6| 成人亚洲精品av一区二区| 色av中文字幕| 在线播放国产精品三级| 精品久久久久久久久久久久久| 最近最新中文字幕大全电影3| 久久久久久久亚洲中文字幕| 亚洲在线观看片| 成人一区二区视频在线观看| 成人精品一区二区免费| 午夜免费男女啪啪视频观看 | 久久婷婷人人爽人人干人人爱| 男女做爰动态图高潮gif福利片| 精品国产三级普通话版| av免费在线看不卡| 亚洲自偷自拍三级| 欧美精品国产亚洲| 国产国拍精品亚洲av在线观看| 天堂√8在线中文| 国产一区二区三区在线臀色熟女| 黄色视频,在线免费观看| 一区二区三区四区激情视频 | 深夜精品福利| 床上黄色一级片| a级毛片a级免费在线| 美女xxoo啪啪120秒动态图| 狠狠狠狠99中文字幕| 欧美成人a在线观看| 99久久精品国产国产毛片| av女优亚洲男人天堂| 免费在线观看成人毛片| 亚洲精品456在线播放app| 中文字幕免费在线视频6| 国产又黄又爽又无遮挡在线| av专区在线播放| 亚洲无线观看免费| 婷婷精品国产亚洲av| 免费在线观看影片大全网站| 欧美又色又爽又黄视频| 村上凉子中文字幕在线| 成人三级黄色视频| 久久精品夜夜夜夜夜久久蜜豆| 免费av毛片视频| 国产国拍精品亚洲av在线观看| 我要看日韩黄色一级片| 校园人妻丝袜中文字幕| 国产成人a∨麻豆精品| 国产亚洲精品久久久com| 狂野欧美白嫩少妇大欣赏| 中出人妻视频一区二区| 午夜久久久久精精品| 亚洲丝袜综合中文字幕| 国产探花极品一区二区| 亚洲电影在线观看av| 国产高清不卡午夜福利| 亚洲国产精品合色在线| 尾随美女入室| 久久久久久久久久成人| 一级黄色大片毛片| 此物有八面人人有两片| 一a级毛片在线观看| 亚洲内射少妇av| 69人妻影院| 成人av在线播放网站| 亚洲精品456在线播放app| 又黄又爽又刺激的免费视频.| 亚洲国产日韩欧美精品在线观看| 亚洲经典国产精华液单| 又粗又爽又猛毛片免费看| 婷婷六月久久综合丁香| 国产精品三级大全| 91久久精品国产一区二区成人| 麻豆国产av国片精品| 成人亚洲精品av一区二区| 亚洲丝袜综合中文字幕| 国产白丝娇喘喷水9色精品| 国产高清视频在线播放一区| 男女下面进入的视频免费午夜| 天堂√8在线中文| 欧美成人a在线观看| 在线看三级毛片| 久久久a久久爽久久v久久| 欧美日韩国产亚洲二区| 99久久中文字幕三级久久日本| 国产精品伦人一区二区| 我的老师免费观看完整版| 卡戴珊不雅视频在线播放| 日本撒尿小便嘘嘘汇集6| 直男gayav资源| 久久久久久久久久成人| 日韩欧美 国产精品| 搡女人真爽免费视频火全软件 | 狠狠狠狠99中文字幕| 免费看美女性在线毛片视频| 久久国内精品自在自线图片| 午夜精品国产一区二区电影 | 夜夜夜夜夜久久久久| 男女那种视频在线观看| 久久久久国产精品人妻aⅴ院| 国产精品综合久久久久久久免费| 两个人视频免费观看高清| 成人亚洲精品av一区二区| 国产精品亚洲一级av第二区| 丰满的人妻完整版| 国产亚洲精品久久久com| 晚上一个人看的免费电影| 国产亚洲精品av在线| 国产成人精品久久久久久| 男女做爰动态图高潮gif福利片| 免费大片18禁| 可以在线观看的亚洲视频| 国产乱人偷精品视频| 男人和女人高潮做爰伦理| 天堂av国产一区二区熟女人妻| 精品人妻偷拍中文字幕| 日韩三级伦理在线观看| 国产精品久久视频播放| 免费看av在线观看网站| 国产成人a区在线观看| 亚洲最大成人中文| 免费看a级黄色片| 变态另类丝袜制服| 99久久无色码亚洲精品果冻| 男人狂女人下面高潮的视频| 在线国产一区二区在线| 国产精品一区二区性色av| 久久久久久久久大av| 丝袜美腿在线中文| 男人狂女人下面高潮的视频| 日韩欧美在线乱码| 国产爱豆传媒在线观看| 国产av不卡久久| 亚洲av免费高清在线观看| 级片在线观看| av福利片在线观看| 国产一区二区在线观看日韩| 国产精品精品国产色婷婷| 别揉我奶头~嗯~啊~动态视频| 中文在线观看免费www的网站| 亚洲色图av天堂| 午夜福利18| 露出奶头的视频| 简卡轻食公司| 人妻丰满熟妇av一区二区三区| 亚洲经典国产精华液单| 久久精品夜夜夜夜夜久久蜜豆| 一夜夜www| 97超级碰碰碰精品色视频在线观看| 中文字幕久久专区| 国产午夜福利久久久久久| 国产精品,欧美在线| 六月丁香七月| 日本三级黄在线观看| 精品福利观看| 日韩制服骚丝袜av| videossex国产| 国产av一区在线观看免费| 国语自产精品视频在线第100页| 搡老岳熟女国产| 亚洲七黄色美女视频| 午夜视频国产福利| 精品午夜福利在线看| 最近最新中文字幕大全电影3| 色综合亚洲欧美另类图片| 美女高潮的动态| 国产免费男女视频| 婷婷色综合大香蕉| 亚洲aⅴ乱码一区二区在线播放| 99热这里只有精品一区| 亚洲av五月六月丁香网| 色噜噜av男人的天堂激情| 精品免费久久久久久久清纯| 美女高潮的动态| 国产探花极品一区二区| 精品久久久久久久久亚洲| av视频在线观看入口| 色av中文字幕| .国产精品久久| avwww免费| 亚洲精品久久国产高清桃花| 在线播放国产精品三级| 在线天堂最新版资源| 国产精品人妻久久久影院| 老司机影院成人| 久久久久久久久中文| 国产男靠女视频免费网站| 18禁在线播放成人免费| 男人狂女人下面高潮的视频| 婷婷亚洲欧美| 国产私拍福利视频在线观看| 午夜福利视频1000在线观看| 99热这里只有是精品50| 亚洲18禁久久av| 天堂影院成人在线观看| 蜜臀久久99精品久久宅男| 色在线成人网| 最近在线观看免费完整版| 欧美区成人在线视频| 99riav亚洲国产免费| 久久久久国产网址| 亚洲性夜色夜夜综合| 在线国产一区二区在线| 久久久久久久久大av| 亚洲成人中文字幕在线播放| 亚洲熟妇熟女久久| 国产真实乱freesex| 久久久久免费精品人妻一区二区| 3wmmmm亚洲av在线观看| 国模一区二区三区四区视频| 精品久久久噜噜| 久久久午夜欧美精品| 成人午夜高清在线视频| 中文字幕久久专区| 亚洲成人中文字幕在线播放| 亚洲四区av| 久久精品国产亚洲av涩爱 | 在线国产一区二区在线| 欧美bdsm另类| 国产淫片久久久久久久久| 亚洲欧美成人精品一区二区| 久久亚洲精品不卡| 亚洲四区av| 国产伦一二天堂av在线观看| 草草在线视频免费看| 久久九九热精品免费| 久久亚洲国产成人精品v| 精品国产三级普通话版| 国产精品美女特级片免费视频播放器| 国产伦在线观看视频一区| 菩萨蛮人人尽说江南好唐韦庄 | 国产淫片久久久久久久久| 国产免费男女视频| 国产精品一及| 日本撒尿小便嘘嘘汇集6| 精品不卡国产一区二区三区| 欧美性猛交╳xxx乱大交人| 久久久久精品国产欧美久久久| 男人舔奶头视频| 亚洲精品久久国产高清桃花| 成人永久免费在线观看视频| 香蕉av资源在线| 成人鲁丝片一二三区免费| 中文亚洲av片在线观看爽| 观看美女的网站| 联通29元200g的流量卡| 久久亚洲精品不卡| 久久人人爽人人片av| 成人特级黄色片久久久久久久| 日韩强制内射视频| 午夜久久久久精精品| 欧美日韩在线观看h| 久久久国产成人免费| 亚洲色图av天堂| 最近视频中文字幕2019在线8| 最近最新中文字幕大全电影3| 人人妻人人澡欧美一区二区| 国产亚洲精品久久久com| 国产成人freesex在线 | 欧美成人精品欧美一级黄| 日韩人妻高清精品专区| 高清毛片免费观看视频网站| 日日摸夜夜添夜夜添av毛片| 色吧在线观看| 精品日产1卡2卡| 日韩av不卡免费在线播放| 男人的好看免费观看在线视频| 少妇熟女aⅴ在线视频| 我要看日韩黄色一级片| 成人综合一区亚洲| 久久久久久伊人网av| 如何舔出高潮| 亚洲美女黄片视频| 久久韩国三级中文字幕| 日韩国内少妇激情av| 久久久久久国产a免费观看| 国产高清三级在线| 色综合亚洲欧美另类图片| 中出人妻视频一区二区| 黄片wwwwww| 国产av一区在线观看免费| 国产成年人精品一区二区| 欧美+日韩+精品| av卡一久久| 国产亚洲精品久久久久久毛片| 俺也久久电影网|