    Construction Technology of Roof Membrane for World Cup Main Stadium

    2021-02-18 01:51:38ZHANGJianSHENJiayongLIBai
    施工技術(中英文) 2021年24期

    ZHANG Jian, SHEN Jiayong, LI Bai

    (China Railway Construction International Group Co., Ltd., Beijing 100039, China)

    Abstract: Based on the installation of the roof membrane of Lusail Stadium which is the main stadium of Qatar World Cup in 2022, a series of key technical challenges in the design and construction of the roof PTFE membrane of large stadiums are studied. Based on the analysis of the roof cable net system, the study formulated the overall sequence of membrane installation, and defined the construction method of membrane lifting and unfolding. Focusing on membrane fixing techniques with the tension rings, compression rings, and horizontal cable nodes, it also optimized membrane connection methods with arch and horizontal cable, and provided waterproof construction methods. According to the findings, the construction of stadium roof membranes should follow a logical sequence. The membranes’ fixing, connection and waterproof construction will have an important impact on the final quality.

    Keywords: roof membrane;World Cup stadium;roof cable net;membrane construction;Lusail stadium

    0 Introduction

    The full name of PTFE is Poly tetra fluoro ethylene, which is a high molecular polymer created by polymerizing tetra fluoro ethylene as a monomer[1]. Because of the excellent properties such as high temperature resistance, corrosion resistance, and aging resistance, PTFE membranes are increasingly being employed in the construction industry[2]. The roof structure of the World Cup stadium has a vast span and high-altitude operation risks. Many challenges exist in the construction method and deformation control of the roof membrane. Since China has never hosted World Cup and has never undertaken the construction of a World Cup stadium project, it still lacks sufficient experience in the construction of the roof membrane structure of the super-large World Cup stadium, and a series of major technical problems must be solved urgently[3].

    1 Project profile

    1.1 Project overview

    The Lusail Stadium is the main stadium for the 2022 Qatar World Cup. It will undertake the major events such as the World Cup group stage, semi-final, final and closing ceremony[4]. The stadium is located in Doha, the capital of Qatar, and spans a total area around 1 million m2with a construction area of about 190,000 m2. The stadium can accommodate 92,100 spectators, which is 1,000 more than the “Bird’s Nest” stadium[5]. It is currently under construction as the world’s largest and most technologically equipped professional stadium. The project is undertaken by a joint venture formed by CRCC and local enterprises in Qatar[6]. It is the world’s first top World Cup main stadium built by a Chinese company. Fig.1 depect a rendering of the stadium and the actual construction scene.

    Fig.1 The stadium scene

    1.2 Roof cable net system

    The main structure of the Lusail Stadium is mainly composed of Curved V steel frame columns, compression ring and roof cable nets[7]. For secondary cable structure, the projection of compression ring upper chord center point is a circle with a diameter of 274m, while the projection of tension ring cable center point is a circle with a diameter of 122m[8]. The stadium resembles a bowl with a saddle-shaped edge. The elevation of west and east exterior edges is 76.600m, while the elevation of the north and south outer edges is 61.035m. The pitch is at a height of 5.000m. The plan view of the roof and the sectional elevation view of Lusail Stadium are shown in Fig.2 and 3.

    Fig.2 The plan of the roof

    Fig.3 The sectional elevation of Lusail Stadium

    The roof structure of the Lusail Stadium has a spoke-type radial main cable with a total of 48 spokes, which is a cross-fishtail structure. The spoke wheel type cable net roof system, consisting of two inner tension rings and one outer compression ring truss connected by radial spokes, is the lightest, the most structurally efficient, and the most cost-effective system for large span roofs. A complete form-finding analysis and optimisation were provided for the revised dimension of the stadium roof structure. The Lusail Stadium cable net roof system consists of a range of primary element types as shown in Fig.4. The roof exploded view and the component weight is shown in Fig.5.

    Fig.4 Roof structure components

    Fig.5 Roof exploded view and component weight

    1.3 Main roof PTFE membrane system

    A PTFE membrane cladding system is adopted as the roof which covers all the seats and provides shade from rain and sunlight to the spectators in the seating bowl. Fig.6 shows an exploded view of the membrane system. The roof secondary arches, which operate as the membrane skeleton and provide the final phyllotaxis type pattern to the membrane surface, supported and formed the membrane cladding system.

    Fig.6 The exploded view of the membrane system

    The Main roof membrane covers 56,300m2and is divided into 96 panels along the radial direction of the roof, as shown in Fig.7. Each panel is about 586m2in size and weights approximately 1,065kg. It also includes about 3,500m2of canopy membrane, bringing the total area of the membrane close to 60,000m2.

    Fig.7 The roof membrane panels

    The membrane installation requires aluminum profile and some accessories such as T-connector and stainless stain fastener. Tab.1 lists the required aluminum profile and accessories.

    Table 1 The required aluminum profile and accessories

    2 Membrane lifting and unfolding

    2.1 The overall sequence of membrane installation

    The installation of the membrane is mainly divided into the following:①membrane lifting;②membrane unfolding;③fix membrane with tension ring;④fix membrane with compression ring;⑤fix membrane with horizontal cable nodes;⑥membrane connect with arch;⑦membrane connect with horizontal cable;⑧bridging membrane installation.Before starting membrane installation, the rope net access and life line must be ensured to have been installed by a professional trade according to the rope net installation approved method statement.

    2.2Membrane lifting

    After being manufactured in a factory in China, the membrane must be folded as shown in Fig.8. The roof membrane will be installed on a proprietary lifting frame and then will be lifted from the ground onto the standing seamed roof (in the specified zone) by a crane of suitable capacity, where it will be disconnected from the crane by the rigger in place. All lifting operations will be overseen by the lifting supervisor.

    Fig.8 The dimension of membrane panel

    For each 1/96 bay, all material will be divided into 3 components (membrane, aluminum profile, accessories) and lifted separately. Each portion will be lifted by a tower crane, and unloaded near the upper inner chord of the compression ring and temporarily tied to the roof with a steel frame before unfolding. According to calculations, the force acting on a single belt by the heaviest component is about 13kN. The safety is enhanced by using a 3t bearing capacity belt.

    Membrane and accessories will be stored on the metal roof, and the contractor will double-check the bearing capacity of metal roof and take the necessary measurements to protect the metal roof based on the material’s self-weight and unloaded layout. According tostructuralsteeldesignreportforLusailStadium(Ref. SC-C01-CAG-HBC-RED-ST-00075), the live load has been assessed and combined with other loads for standing seam roof system design, as shown in Fig.9. The weight of material kept on standing seam roof should not exceed 1kN/m2.

    Fig.9 Roof uniform live load

    2.3 Membrane unfolding

    2.3.1The measurement for keeping arch stabilization

    When only one membrane panel is attached with arch and horizontal cable system before the membrane is unfolded, the tension belt should be taken prior to the membrane installation to keep the arch stabilization. The temporary belt is subjected to a maximum force of 34kN (to keep the arch stabilization with one membrane panel attached).

    2.3.2Membrane unfolding method

    The membrane will be unfolded using one of the following two methods: Method 1 will be selected for unfolding the membrane on the rope net access, and Method 2 will unfold the membrane on the installed membrane panel.

    Unfolding the membrane above the horizontal cable is Method 1.The tension belt mentioned above will be adjusted as shown in Fig.10, for arch stabilization prior to membrane unfolding.

    Fig.10 Membrane unfolding method 1

    Method 2 unfolds the membrane on the adjacent installed membrane panel and moves it to the installation area.

    2.3.3Membrane unfolding equipment

    The machine for unfolding the membrane (hand winch) will be attached to a gutter frame which installed above the tension ring. The maximum load of the hand winch is 1t. The feasibility of unfolding method has been proved during the mock up installation process in the factory. According to the winch frame installation procedure, the canopy bridging membrane and handrail should be erected when the related roof membrane has unfolded completely.

    3 Membrane fixing

    3.1 Fix membrane with tension ring

    When the membrane has been unfolded and pulled towards the inner tension ring, the operatives will then maneuver the membrane to be attached to the inner tension ring. An aluminum profile is inserted into the membrane to facilitate the process. Then connection points are installed, and a ratchet strap is used from the membrane to the tension ring, in order to pull it to the designed position. Once at this position, a secondary profile will be installed on the tension ring, where a bottle connection will be achieved and the ratchet strap is removed.

    To facilitate the membrane connect to the tension ring, the membrane edge that is fixed with tension ring should be dragged to reach the cable. During the membrane unfolding process, the membrane will be connected to the tension ring by the following three steps shown in Fig.11.

    Fig.11 The steps of fixing membrane with tension ring

    3.2 Fix membrane with compression ring

    To facilitate the connection to the compression ring, the same process as connecting to the tension ring will be followed. This can be achieved by walking on the safety net. Considering the effect of the membrane self-weight, membrane boundary cannot reach the compression ring at the initial status, about 1.6m far away from the upper inner chord of compression ring. A puller belt (capacity: 2t) will connect the membrane with the roof steel structure, and drag the membrane to reach the compression ring. The fixing details of the membrane and the compression ring are shown in Fig.12.

    Fig.12 The fixing details of the membrane with the compression ring

    3.3 Fix membrane with horizontal cable nodes

    The membrane will then be maneuvered by the operatives and then pulled towards the bottoms of the horizontal cable node and the strut node, positioned within the primary and secondary arches respectively. The aluminum profile will then be inserted into an open clap connector and attached to the structure by threading a bolt through the clamp and aluminum profile and into the threaded connection of the structure. All of this can be achieved by working on the safety nets, at this point, operatives will work under the membrane. For each membrane panel, a total of 11 points must be fixed. The fixing details of the membrane and the horizontal cable nodes are shown in Fig.13.

    Fig.13 The fixing details of the membrane with the horizontal cable nodes

    Before connecting to the cable node, the membrane edge should be clamped by the specific Al Profile. The combined profile will use M12 Bolt to drag the membrane panel to cable node.

    4 Membrane connection and waterproofing

    4.1 Membrane connect with arch

    The membrane will have an aluminum profile attached, with bolts located in specified locations on the profile. Ratchet straps will then be used to pull towards the final position and achieve alignment. Once the membrane is located in the final fix position, the bolt will be inserted through a connection hole and then a retaining nut installed, and the ratchet straps will then be removed.

    4.1.1Tools preparation for lift membrane up

    A new tool is designed for lifting membrane and shifting the membrane edge on the plane. Two winches (each capacity: 1t) are fixed on the tools, one fixed on the top of steel pipe to pull the membrane up, and the other to adjust the membrane edge on the plane. According to the test results from the mock-up installation process, the lifting force is 115kg/m .

    4.1.2Work platform preparation

    1)Fabricated ladder access To reach the top of arch to fix the membrane with arch, the Al ladder and panel will be assembled as the working platform. The ladder will be fabricated in accordance with the design and calculations, and will consist of a two ladders with an intermediate platform in between. As a mobile system, a mobile ladder with a hooking system will be used to provide access to the associated access platforms. The system connection point to the arches will be easier by the arch’s alternate connection holes that are not in use. The system will be inspected weekly, according to theProjectTemporaryWorksProcedure.A life line will be installed to the top of the arch, so that when transferring from the ladder to the platform, a life line can be attached.

    2)Soft ladder access Once the membrane panel is installed completely at one side of the arch, the soft ladder will be mounted on the panel for the opposite side panel fixing with arch. Carabiner will be installed each 1.5m along the arch to connect the soft ladder with arch. Soft ladder access is shown in Fig.14.

    Fig.14 The soft ladder access

    4.1.3Connection design details

    The Al profile will be attached with membrane along the arch from both ends on the rope net access, and the length of profile will be set as 1.5~2m/pcs based on the feasibility of operation. As shown in Fig.15, the membrane and Al profile will be dragged by winch fixed on the lifting tool in the plane, and an M12 stainless steel bolt will lock the profile on the arch according to the design details.

    Fig.15 Connection design details

    4.2 Membrane connect with horizontal cable

    Each membrane panel should have 12 pieces of membrane edge fixed with horizontal cable , as illustrated in Fig.16. These edges will be fixed from the upper tension ring to the compression ring. The membrane will then be attached to the horizontal cabling system with an aluminum profile and pulled down.

    Fig.16 The membrane connection with horizontal cable

    According to the practice of the mock up installation in factory, the membrane edge that connects to the horizontal cable will be lifted up when the membrane panel is attached to the arch. The distance between membrane valley edge and horizontal cable is greater than 1m. The space between the membrane and the rope net access is enough for the operation to connect the membrane to the horizontal cable.

    Before the membrane is connected to the arch, the Al profile fixed the membrane valley edge with the horizontal cable should be attached to the membrane. The length of the profile will be set about 2m each piece. The hand winch (1t) and puller (1t) will be used to pull the membrane valley edge down. The final distance between the membrane valley edge and the horizontal cable must be adjusted to match the 3D geometry of the roof membrane. According to the analysis, the force acting on the strip under the dead load and pretension load combination is about 1.6~2.1kN/400mm. The final stress when the membrane is connected to the horizontal cable is shown in Fig.17.

    Fig.17 The final stress after membrane and horizontal cable connection

    4.3 Waterproofing installation

    Considering the arch will shift during the installation of the roof membrane units, the waterproofing will be installed on side after 6 continuous bays have been completed. The scope of waterproofing includes membrane connect with arch, membrane connect with compression ring, membrane connect with gutter installed on the upper tension ring, and membrane connect with cable node.

    Bridging membrane welding at 380 degrees is essential to create a fully sealed, weather tight and free draining roof. The actual temperature will be shown on the monitor and automatically controlled by welding machine. For bridging membrane installation, a rope ladder will be installed from both ends of an arch to the middle, with a carabiner used to fix rope ladder with stainless steel bolts. During the bridging membrane welding process, the bridging membrane will be welded from the middle point to both ends for each arch and the rope ladder will be dismantled step by step. The waterproofing details are depicted in Fig.18.

    Fig.18 The waterproofing details

    5 Conclusion

    Lusail Stadium is one of the buildings with the largest roof membrane area in the world. This project solved a series of technical problems in the design and construction of large-span roof membranes.

    The construction of stadium roof membranes should be completed in a systematic manner. The fixing, connection and waterproof construction of the membranes will have an important impact on the final quality of the membranes. The roofing membrane construction sequence and fixed connection method developed in this project have accumulated valuable experience for Chinese companies to conduct similar projects in the future.

    亚洲国产精品一区三区| 亚洲精品第二区| 中文字幕亚洲精品专区| 黄色一级大片看看| 国产色视频综合| 成人国语在线视频| 一本综合久久免费| 亚洲专区中文字幕在线| 在线天堂中文资源库| 在线观看免费日韩欧美大片| 色综合欧美亚洲国产小说| 啦啦啦中文免费视频观看日本| 国产免费视频播放在线视频| 久久精品久久精品一区二区三区| 91老司机精品| 美国免费a级毛片| av天堂久久9| 亚洲精品av麻豆狂野| 人人澡人人妻人| 超碰成人久久| 亚洲成人免费电影在线观看 | 亚洲国产av新网站| 久久精品国产综合久久久| 亚洲熟女毛片儿| 午夜免费观看性视频| 免费观看av网站的网址| 桃花免费在线播放| 欧美性长视频在线观看| 亚洲国产看品久久| 欧美激情高清一区二区三区| 中文字幕色久视频| 男人爽女人下面视频在线观看| av在线老鸭窝| 大型av网站在线播放| av片东京热男人的天堂| 丝袜美足系列| tube8黄色片| 亚洲精品美女久久av网站| 欧美日韩成人在线一区二区| 免费高清在线观看视频在线观看| 日韩制服丝袜自拍偷拍| www日本在线高清视频| 欧美精品亚洲一区二区| 丝袜脚勾引网站| 免费在线观看视频国产中文字幕亚洲 | 精品国产超薄肉色丝袜足j| 老司机靠b影院| 99久久人妻综合| 欧美激情极品国产一区二区三区| 日本午夜av视频| 色视频在线一区二区三区| 丰满饥渴人妻一区二区三| 91麻豆精品激情在线观看国产 | 日本猛色少妇xxxxx猛交久久| 成年人午夜在线观看视频| 自拍欧美九色日韩亚洲蝌蚪91| 人人澡人人妻人| 另类精品久久| 国产在线免费精品| 日本一区二区免费在线视频| 男男h啪啪无遮挡| 国产欧美日韩一区二区三区在线| 岛国毛片在线播放| 首页视频小说图片口味搜索 | 亚洲av国产av综合av卡| 国产人伦9x9x在线观看| 亚洲欧美精品综合一区二区三区| 黄片小视频在线播放| 欧美日韩成人在线一区二区| 亚洲精品久久午夜乱码| 18禁观看日本| 午夜福利免费观看在线| 久久久久国产一级毛片高清牌| 最近手机中文字幕大全| 欧美在线黄色| 欧美黑人欧美精品刺激| 90打野战视频偷拍视频| 久久久久久久久久久久大奶| 日韩一本色道免费dvd| 最黄视频免费看| 欧美日韩亚洲国产一区二区在线观看 | 国产爽快片一区二区三区| 手机成人av网站| 一本久久精品| 国产精品一二三区在线看| 成年av动漫网址| 久久久久久免费高清国产稀缺| 亚洲精品第二区| av在线app专区| 日韩制服丝袜自拍偷拍| 久久狼人影院| 丝袜喷水一区| 免费黄频网站在线观看国产| 午夜免费观看性视频| 午夜福利免费观看在线| 久久精品国产亚洲av高清一级| kizo精华| 叶爱在线成人免费视频播放| 久久精品国产亚洲av高清一级| 国产精品一区二区在线观看99| 久久鲁丝午夜福利片| 在线观看免费视频网站a站| 三上悠亚av全集在线观看| 天天躁狠狠躁夜夜躁狠狠躁| 搡老岳熟女国产| 国产精品二区激情视频| 中文字幕另类日韩欧美亚洲嫩草| 成人黄色视频免费在线看| 2018国产大陆天天弄谢| 亚洲熟女毛片儿| 国产不卡av网站在线观看| 亚洲欧美精品自产自拍| 人人妻,人人澡人人爽秒播 | 久久国产亚洲av麻豆专区| 搡老乐熟女国产| 色播在线永久视频| 日韩制服丝袜自拍偷拍| 一区福利在线观看| 国产又色又爽无遮挡免| 黑丝袜美女国产一区| 欧美精品一区二区免费开放| 国产亚洲午夜精品一区二区久久| av电影中文网址| 久久精品亚洲熟妇少妇任你| 一区二区三区激情视频| 国产高清视频在线播放一区 | 美女视频免费永久观看网站| 777久久人妻少妇嫩草av网站| 国产日韩欧美视频二区| 亚洲国产精品国产精品| 欧美黄色片欧美黄色片| 欧美亚洲 丝袜 人妻 在线| 最新在线观看一区二区三区 | 老汉色av国产亚洲站长工具| 观看av在线不卡| 精品卡一卡二卡四卡免费| 精品亚洲成a人片在线观看| 一区福利在线观看| 又粗又硬又长又爽又黄的视频| 久久九九热精品免费| 欧美日韩视频精品一区| 制服人妻中文乱码| 97人妻天天添夜夜摸| 日韩欧美一区视频在线观看| 五月开心婷婷网| 亚洲人成电影免费在线| 精品第一国产精品| 麻豆乱淫一区二区| 精品视频人人做人人爽| cao死你这个sao货| 女人精品久久久久毛片| 国产99久久九九免费精品| a 毛片基地| 国产深夜福利视频在线观看| 日韩熟女老妇一区二区性免费视频| 最近最新中文字幕大全免费视频 | 一本大道久久a久久精品| 中文字幕制服av| 欧美日本中文国产一区发布| 欧美精品一区二区大全| 精品久久久久久电影网| 国产av国产精品国产| 国产精品久久久久久精品古装| 天天影视国产精品| 美女脱内裤让男人舔精品视频| 国产精品偷伦视频观看了| 成人国产av品久久久| 久久精品国产亚洲av涩爱| 18在线观看网站| 日本猛色少妇xxxxx猛交久久| 在现免费观看毛片| 久久国产精品影院| 久久久久久免费高清国产稀缺| av在线老鸭窝| 视频区欧美日本亚洲| 国产精品偷伦视频观看了| 激情五月婷婷亚洲| 欧美性长视频在线观看| 国产成人欧美| 老汉色∧v一级毛片| 国产精品国产av在线观看| 精品人妻一区二区三区麻豆| 少妇被粗大的猛进出69影院| 老司机影院毛片| 麻豆av在线久日| 国产精品秋霞免费鲁丝片| 国产99久久九九免费精品| 国产精品久久久久久精品古装| 国产一卡二卡三卡精品| 老鸭窝网址在线观看| 亚洲人成电影免费在线| 国产成人免费无遮挡视频| 啦啦啦在线免费观看视频4| 咕卡用的链子| 999久久久国产精品视频| 尾随美女入室| cao死你这个sao货| 国产精品成人在线| 欧美另类一区| 亚洲欧美日韩另类电影网站| 亚洲伊人色综图| 老汉色av国产亚洲站长工具| 中国美女看黄片| 亚洲综合色网址| 国产在视频线精品| 亚洲欧美色中文字幕在线| 男女免费视频国产| 欧美日韩亚洲国产一区二区在线观看 | 亚洲欧美色中文字幕在线| www.av在线官网国产| 嫁个100分男人电影在线观看 | 久久人人爽人人片av| 精品国产一区二区三区四区第35| 国产伦人伦偷精品视频| 91国产中文字幕| 两个人看的免费小视频| 老汉色∧v一级毛片| 在线精品无人区一区二区三| 国产精品偷伦视频观看了| 黄色怎么调成土黄色| 中文字幕亚洲精品专区| 国产亚洲欧美在线一区二区| 精品国产乱码久久久久久小说| 亚洲精品av麻豆狂野| 婷婷成人精品国产| 欧美精品高潮呻吟av久久| 人人妻人人澡人人爽人人夜夜| 国产精品成人在线| 久久影院123| 亚洲五月色婷婷综合| 日韩精品免费视频一区二区三区| 欧美精品人与动牲交sv欧美| 日本猛色少妇xxxxx猛交久久| 亚洲欧美中文字幕日韩二区| 99久久人妻综合| 蜜桃在线观看..| 免费高清在线观看视频在线观看| 亚洲国产精品一区三区| 丰满饥渴人妻一区二区三| 亚洲第一青青草原| 超色免费av| 9色porny在线观看| 丰满饥渴人妻一区二区三| 热99久久久久精品小说推荐| 国产黄色免费在线视频| 色94色欧美一区二区| 欧美日韩综合久久久久久| 亚洲av国产av综合av卡| 国产精品亚洲av一区麻豆| 精品国产国语对白av| 精品亚洲成国产av| 99精国产麻豆久久婷婷| 中文精品一卡2卡3卡4更新| 97精品久久久久久久久久精品| 亚洲成人国产一区在线观看 | 欧美人与性动交α欧美软件| 波多野结衣av一区二区av| 黄色一级大片看看| 波多野结衣一区麻豆| 久久热在线av| 日本欧美国产在线视频| 午夜影院在线不卡| 黄色视频不卡| 亚洲五月婷婷丁香| 丰满人妻熟妇乱又伦精品不卡| 97精品久久久久久久久久精品| 亚洲成人国产一区在线观看 | 久久精品久久久久久久性| 精品人妻熟女毛片av久久网站| 欧美日韩福利视频一区二区| 国产av国产精品国产| 考比视频在线观看| 国产精品人妻久久久影院| 午夜视频精品福利| 日本色播在线视频| 性色av一级| 人成视频在线观看免费观看| 一本大道久久a久久精品| 久久鲁丝午夜福利片| 精品一区在线观看国产| 国产主播在线观看一区二区 | 成人午夜精彩视频在线观看| 国产一区亚洲一区在线观看| 国产野战对白在线观看| bbb黄色大片| 性色av一级| 亚洲av欧美aⅴ国产| 咕卡用的链子| 亚洲人成77777在线视频| 两个人看的免费小视频| 亚洲精品一二三| 婷婷丁香在线五月| 新久久久久国产一级毛片| 日本av免费视频播放| 亚洲欧美一区二区三区国产| 纵有疾风起免费观看全集完整版| 中文字幕精品免费在线观看视频| 欧美日韩亚洲综合一区二区三区_| 高潮久久久久久久久久久不卡| 在线观看免费视频网站a站| 在线av久久热| 无遮挡黄片免费观看| 操出白浆在线播放| 午夜精品国产一区二区电影| 亚洲一卡2卡3卡4卡5卡精品中文| 啦啦啦啦在线视频资源| 免费高清在线观看视频在线观看| 一级黄片播放器| 天天操日日干夜夜撸| 精品卡一卡二卡四卡免费| 亚洲精品美女久久av网站| 制服人妻中文乱码| 宅男免费午夜| av天堂久久9| 亚洲精品久久成人aⅴ小说| 亚洲av男天堂| 精品人妻一区二区三区麻豆| 99久久精品国产亚洲精品| 中文字幕亚洲精品专区| av福利片在线| 亚洲精品国产av蜜桃| 嫁个100分男人电影在线观看 | 中文字幕人妻熟女乱码| 97人妻天天添夜夜摸| 熟女av电影| 成年人黄色毛片网站| 丰满迷人的少妇在线观看| 成年av动漫网址| videosex国产| 精品久久久久久电影网| 欧美精品啪啪一区二区三区 | 老汉色∧v一级毛片| 国产熟女欧美一区二区| 欧美另类一区| 一区二区日韩欧美中文字幕| 熟女少妇亚洲综合色aaa.| 在线观看人妻少妇| 一级毛片 在线播放| 国产深夜福利视频在线观看| 亚洲国产av新网站| 涩涩av久久男人的天堂| 操美女的视频在线观看| 丝瓜视频免费看黄片| 99精品久久久久人妻精品| 亚洲精品国产区一区二| 亚洲美女黄色视频免费看| 一级黄片播放器| 麻豆av在线久日| 午夜激情av网站| 男女下面插进去视频免费观看| 99久久99久久久精品蜜桃| 女人久久www免费人成看片| xxxhd国产人妻xxx| 欧美人与善性xxx| 中文字幕最新亚洲高清| 亚洲av美国av| 黄色怎么调成土黄色| 国产成人一区二区在线| 黄色怎么调成土黄色| 亚洲成av片中文字幕在线观看| 亚洲情色 制服丝袜| 国产欧美日韩一区二区三 | 人人妻人人添人人爽欧美一区卜| 中文字幕人妻丝袜一区二区| 黄色a级毛片大全视频| 黄片小视频在线播放| 国产高清国产精品国产三级| 高清视频免费观看一区二区| 精品一区二区三区av网在线观看 | 日韩中文字幕欧美一区二区 | 国产深夜福利视频在线观看| 99热网站在线观看| 国产在线观看jvid| 高清av免费在线| 久久狼人影院| 伦理电影免费视频| 欧美黄色片欧美黄色片| 啦啦啦中文免费视频观看日本| 久久精品国产亚洲av涩爱| 精品少妇久久久久久888优播| 亚洲,欧美,日韩| 色视频在线一区二区三区| 亚洲男人天堂网一区| 9色porny在线观看| 九草在线视频观看| 99久久综合免费| 五月开心婷婷网| 日日爽夜夜爽网站| 成在线人永久免费视频| 欧美性长视频在线观看| 母亲3免费完整高清在线观看| 婷婷色综合www| 五月开心婷婷网| 久久久国产一区二区| 性色av一级| 99国产精品一区二区蜜桃av | 久久精品久久久久久久性| 国产福利在线免费观看视频| 曰老女人黄片| 国产成人影院久久av| 国产精品一二三区在线看| 91国产中文字幕| 欧美亚洲日本最大视频资源| 久久精品久久久久久噜噜老黄| 自线自在国产av| 日韩av不卡免费在线播放| 免费日韩欧美在线观看| a级毛片在线看网站| 秋霞在线观看毛片| 亚洲色图 男人天堂 中文字幕| 欧美成人精品欧美一级黄| 美女主播在线视频| 国产日韩欧美亚洲二区| 欧美日韩亚洲国产一区二区在线观看 | 亚洲精品美女久久av网站| 日日爽夜夜爽网站| 国产精品av久久久久免费| 91九色精品人成在线观看| 免费女性裸体啪啪无遮挡网站| 热99国产精品久久久久久7| 欧美在线一区亚洲| 精品少妇一区二区三区视频日本电影| 亚洲熟女精品中文字幕| 老熟女久久久| 中文精品一卡2卡3卡4更新| h视频一区二区三区| 欧美国产精品一级二级三级| 亚洲久久久国产精品| 免费一级毛片在线播放高清视频 | 欧美老熟妇乱子伦牲交| 看免费av毛片| 波野结衣二区三区在线| 在线 av 中文字幕| 久久99精品国语久久久| 久久久久久久国产电影| 七月丁香在线播放| 一区福利在线观看| 欧美日韩视频高清一区二区三区二| 捣出白浆h1v1| 久久精品国产综合久久久| 亚洲欧美一区二区三区黑人| 97人妻天天添夜夜摸| 免费人妻精品一区二区三区视频| 18禁观看日本| 欧美黄色淫秽网站| 国产精品久久久人人做人人爽| 天堂8中文在线网| 女性生殖器流出的白浆| 99国产精品一区二区三区| 天天躁夜夜躁狠狠久久av| 国产精品一二三区在线看| 欧美日韩福利视频一区二区| 无遮挡黄片免费观看| 国产精品免费大片| 在线精品无人区一区二区三| 午夜91福利影院| 国产成人精品久久二区二区91| 一级黄片播放器| 美女主播在线视频| 亚洲国产毛片av蜜桃av| 久久ye,这里只有精品| 欧美日本中文国产一区发布| 天天躁日日躁夜夜躁夜夜| 亚洲欧美一区二区三区黑人| 亚洲熟女毛片儿| 国产欧美日韩综合在线一区二区| 免费看av在线观看网站| 男人操女人黄网站| 自线自在国产av| 中文字幕色久视频| 国产欧美日韩一区二区三 | 国产在视频线精品| 亚洲激情五月婷婷啪啪| 国产欧美日韩一区二区三区在线| 成年女人毛片免费观看观看9 | 各种免费的搞黄视频| 午夜免费观看性视频| 亚洲情色 制服丝袜| 国产免费现黄频在线看| 曰老女人黄片| 一区在线观看完整版| videos熟女内射| 国产男女内射视频| 精品人妻熟女毛片av久久网站| 99国产精品99久久久久| 高清黄色对白视频在线免费看| 黄网站色视频无遮挡免费观看| 欧美日韩一级在线毛片| 国产欧美日韩一区二区三区在线| 69精品国产乱码久久久| 999精品在线视频| 亚洲人成电影观看| 又紧又爽又黄一区二区| 最近最新中文字幕大全免费视频 | 日韩av在线免费看完整版不卡| 欧美日韩精品网址| 麻豆av在线久日| 午夜两性在线视频| 日本av免费视频播放| 中文字幕制服av| 亚洲伊人久久精品综合| av在线app专区| xxx大片免费视频| 巨乳人妻的诱惑在线观看| e午夜精品久久久久久久| 一个人免费看片子| 成年女人毛片免费观看观看9 | 美女中出高潮动态图| 大码成人一级视频| 国产精品久久久av美女十八| 成年女人毛片免费观看观看9 | 韩国精品一区二区三区| 亚洲国产av新网站| 国产一级毛片在线| 国产精品国产三级专区第一集| 国产视频一区二区在线看| 亚洲黑人精品在线| 国产精品熟女久久久久浪| 丝袜美腿诱惑在线| 天天躁日日躁夜夜躁夜夜| 国产高清不卡午夜福利| 搡老乐熟女国产| 国产不卡av网站在线观看| av天堂久久9| 1024香蕉在线观看| 亚洲国产精品一区三区| 欧美人与善性xxx| 高潮久久久久久久久久久不卡| 99国产精品免费福利视频| 校园人妻丝袜中文字幕| 国产精品一区二区在线观看99| 777久久人妻少妇嫩草av网站| 亚洲人成电影免费在线| 一区福利在线观看| 少妇猛男粗大的猛烈进出视频| 99国产综合亚洲精品| 女人爽到高潮嗷嗷叫在线视频| 夫妻性生交免费视频一级片| 亚洲国产中文字幕在线视频| 国产精品一区二区免费欧美 | 丁香六月天网| 久久这里只有精品19| 伊人久久大香线蕉亚洲五| 波多野结衣一区麻豆| 97人妻天天添夜夜摸| 日韩人妻精品一区2区三区| 国产精品一区二区精品视频观看| 国产成人精品无人区| 一本大道久久a久久精品| 久久精品国产亚洲av高清一级| 一边摸一边抽搐一进一出视频| 美女大奶头黄色视频| 亚洲五月色婷婷综合| 91国产中文字幕| 久久久久久久大尺度免费视频| 在线观看免费午夜福利视频| 晚上一个人看的免费电影| 后天国语完整版免费观看| 91精品国产国语对白视频| 亚洲av综合色区一区| 国产女主播在线喷水免费视频网站| 最近手机中文字幕大全| 国产男女超爽视频在线观看| 一本综合久久免费| 色精品久久人妻99蜜桃| 手机成人av网站| 午夜福利影视在线免费观看| 久久鲁丝午夜福利片| 热re99久久国产66热| 成人亚洲精品一区在线观看| 国产成人a∨麻豆精品| 久久女婷五月综合色啪小说| 午夜91福利影院| 成年美女黄网站色视频大全免费| 中文字幕精品免费在线观看视频| 国产成人精品无人区| 一级黄片播放器| 日本午夜av视频| 自线自在国产av| 日韩大片免费观看网站| 亚洲国产看品久久| 国产精品一区二区在线不卡| 视频区欧美日本亚洲| 国产视频一区二区在线看| 亚洲精品乱久久久久久| 黄色视频不卡| 一级黄色大片毛片| 七月丁香在线播放| 亚洲精品美女久久久久99蜜臀 | 视频区欧美日本亚洲| 欧美成人午夜精品| 日韩中文字幕视频在线看片| 国产三级黄色录像| 一级黄片播放器| 少妇的丰满在线观看| 19禁男女啪啪无遮挡网站| 国产精品99久久99久久久不卡| 操美女的视频在线观看| 一二三四社区在线视频社区8| 久久久久网色| 菩萨蛮人人尽说江南好唐韦庄| 亚洲,欧美,日韩| 丝袜脚勾引网站| 两人在一起打扑克的视频| 日本黄色日本黄色录像| 少妇 在线观看| 成年女人毛片免费观看观看9 | 国产日韩一区二区三区精品不卡| 免费女性裸体啪啪无遮挡网站| 纯流量卡能插随身wifi吗| 亚洲欧洲精品一区二区精品久久久| 黄频高清免费视频| 91字幕亚洲| 青青草视频在线视频观看| 一级片免费观看大全|