    Army-Materiel-System-Analysis-Activity Maturity Projection Model Based on a Subsystem Stein Estimator

    2020-12-08 01:09:46LIZhongshengFANJinwei范晉偉PANRi

    LI ZhongshengFAN Jinwei(范晉偉)PAN Ri

    Beijing Key Laboratory of Advanced Manufacturing Technology,Beijing University of Technology,Beijing 100124,China

    Abstract:A reliability-growth test is often used to assess complex systems under development. Reliability-growth models are usually used to quantify the achievable reliability indices and predict the expected reliability values. The Crow army-materiel-system-analysis-activity (Crow-AMSAA) projection model and the AMSAA maturity projection (AMPM)-Stein model are suitable for modelling delayed corrective strategies. The AMPM-Stein model,which involves more failure data and requires limited assumptions,is more robust than the Crow-AMSAA projection model. However,the rationality of the Stein factor introduced in the AMPM-Stein model has always been controversial. An AMPM-Stein extended projection model,derived from data regrouping based on similar failure mechanisms,is presented to alleviate the problem. The study demonstrated that the proposed model performed well,the prediction results were credible,and the robustness of the proposed model was examined. Furthermore,the Stein-shrinkage factors,which are derived from components with similar inherent failure mechanisms,are easier to understand and accept in the field of engineering. An example shows that the proposed model is more suitable and accurate than the Crow-AMSAA model and the AMPM-Stein model,by comparing the projection values based on the failure data of the previous phases with the actual values of the current phases. This study provides a technical basis for extensive applications of the proposed model.

    Key words:reliability projection;army-materiel-system-analysis-activity maturity projection model (AMPM);Stein estimator;subsystem

    Introduction

    The requirement of high reliability for complex systems is obvious,and it is usually reflected in a reliability-growth process.This includes finding failure modes,researching the modes,and incorporating fixes to the occurring modes.The definition of reliability-growth is the process of improving reliability indicators by changing design,manufacturing methods,and testing processes.The ratio of reliability improvement is based on the on-going ratio at which new failure modes occur and the number and effectiveness of the fixes that are incorporated into the system.Thus,the way in which the reliability changes are depicted throughout the growth process is important,because it indicates whether the requirements of the system can be met.

    Reliability-growth models are usually used to quantify the achievable reliability indices after the initial test stage and predict the expected later reliability-growth values,based on assumed fix-effectiveness factors (FEFs) of corrective actions.Some scholars have already done significant research on reliability-growth models in recent decades.

    Weiss[1]attempted to determine the level of reliability,whether the reliability is increasing and,if so,how rapidly,and the desired reliability after the development testing of complex systems.Weiss developed methods to fit special reliability-growth curves for failure data to monitor and extrapolate system-reliability growth.Furthermore,mathematical models for an idealized system development program were developed to present a base for selecting a suitable growth curve.

    Duane[2],from the General Electric Company,observed and measured the accumulative failure rate versus accumulative running hours.This study showed that they approached a direct line when plotted on double logarithmic-coordinate paper.It was concluded that several different and complex systems had apparently similar ratios of reliability improvement under development.As a result,a learning-curve method was presented to control development programs,forecast growth routes,and plan schemes for reliability improvement.

    Crow[3]extended this research to a non-homogeneous Poisson process based on Duane’s hypothesis,with respect to failures that were repaired instantaneously in a repairable system.Then,the army-materiel-system-analysis-activity (AMSAA) model for reliability-growth analyses,also named the tracking model,was presented,irrespective of whether all failures received corrective actions.In 1982,Crow[4]assumed that,considering the effectiveness factor for type-B modes,fixing the occurred failures during the development testing would be implemented as deferred fixes after each test phase.An improved projection model was proposed to project the impact of these fixes.This is called projection model.

    To assess the management strategy of the corrective measures in and after the testing,Crow[5]presented an extended model in which the type-B modes were divided into two different types:type-BC modes and type-BD modes,by combining the tracking model and the projection model.To continuously evaluate and manage system-reliability growth,which include multiple test phases,Crow[6]presented a model that was focused not only on design issues,but also on human factor issues in 2010.This model was named extended continuous evaluation model.

    On account of the Crow projection model,Ellner and Wald[7]derived a rate function for new failure in type-B mode occurrence and presented the AMSAA maturity projection model (AMPM),which utilized this rate function whenever corrective actions were performed.Then,Ellner and Hall[8]observed that type-A failure modes might be switched to type-B modes for a variety of reasons.Thus,a projection model that could regard different failure modes as a uniform style in a situation was developed,where all corrective actions were deferred after the test phase.This was called the AMPM-Stein model.

    As stated above,various reliability-growth models based on different testing strategies have already been provided.The testing strategies are normally driven by the cost and the test duration;however,they are decided by the practical management actions for improving failure modes that have surfaced.A widely recognized method of determining which mode should be fixed and when it is difficult to finalize.Experience shows that it is sufficient to replace,or repair the components when they have failed during a development test and then continue,the implementation of only corrective actions after the test.Design changes or element reselection is reasonable and acceptable.This can be called a test-find-test strategy[9].The deferred corrective actions are normally merged into a group,and the reliability indices of the system generally show an obvious jump.In this sense,both the AMPM-Stein model and Crow-AMSAA projection model are suitable for modelling these situations.The AMPM-Stein model,which involves more failure data and requires limited assumptions,is statistically more robust against the effects of FEFs variability than the Crow-AMSAA model[10].Moreover,the Stein-based approach presents more-exact reliability-assessment results than the latter,given that minimizing the prospective squared error between the estimated and the original failure rates[11].

    Since Stein’s pioneering work[12],the Stein estimator has received increasing attention in the academic and engineering fields[13-14].However,the rationality of the Stein factor introduced in the model has always been controversial[15],the focus of controversy is the rationality of the algorithm of Stein factor.The algorithm does not consider the difference of the failure mechanisms of different type-B failures when solving the Stein factor,so when the failure rates of different type-B failures are significantly different,the calculated shrinkage factor will also have a large deviation.Many scholars have done some effective research based on AMSAA model in recent years[16-19].However the issue in the use of the AMPM model have not been mentioned.

    To alleviate this problem,an algorithm of Stein factor based on similar inherent failure mechanisms and maintenance strategies is proposed.Then an extended AMPM-Stein model,derived from partitioned subsystem failure data,is presented.The main objective of the model proposed is to assess the system-reliability growth continuously in multiple test phases,through dividing the failure data into several sections in which the failure mechanisms are similar.Then,the robustness of the proposed model is examined.Finally,the performances of the three models discussed in this study are compared.

    1 Reliability Projection Techniques

    Reliability projection is a program of evaluating the system reliability indices that can be expected because of the implementation of corrective actions to the observed failure modes.Reliability prediction technology relies on test information and effectiveness assessments of the implemented corrective actions.Other existing projection approaches make a distinction between the failure modes that will be solved if they surface (type-B modes) and those that will not be solved (type-A modes).This mode classification affects the projected results directly.Before discussing the capability of the current and proposed projection models,their backgrounds and assumptions will be provided below.

    1.1 Crow-AMSAA projection model

    The Crow projection model assumes that individual failure numbers in a test occur in terms of a non-homogeneous Poisson process[20-21].The system failure intensity is expressed by

    ρ(t)=abtb-1,

    (1)

    The expected fault-intensity function regarding type-B failure modes is given by

    (2)

    The Crow projection model aims to assess the system reliability before the subsequent test stage by considering the reliability improvement of delayed fixes and the portion of unsurfaced type-B failure modes.However,if the failure modes are reclassified,the projection accuracy degrades.

    1.2 AMPM-Stein projection model

    The AMPM-Stein projection model assigns a value of zero or a positive value to FEFs for surfaced modes,rather than classifying failures into type-A or type-B modes like the Crow projection model.The basis of this model is that the incidences of the following independent failure modes are subject to a gamma random distribution[8].

    (3)

    To compare it intuitively with the Crow projection model,the expanding model of Eq.(3),which covers the type-A and type-B modes,is obtained as

    (4)

    (5)

    (6)

    In this model,only one average failure rate of all type-B failures and one average failure rate of all type-B failure modes are solved,and then a Stein-shrinkage factor is obtained without considering the difference of failure rates between type-B failures.

    1.3 AMPM-Stein extended projection model

    There are two differences between the AMPM-Stein projection model and the Crow-AMASS projection model.First,all the data,both for first and repeat occurrence failures,are used in the model to develop the model projection.Second,to improve the projection accuracy,the shrinkage estimation builds a direct connection to Bayesian modeling using squared error loss functions[22].

    Here,the same assumptions are made as in the AMPM-Stein model.The continuous systems have massive potential fault modes with an original rate of occurrenceλ1,λ2,…,λm0.The failure modes are corrected at the end of the test if they surface during the test,irrespective of which mode results in individual failure and the system fails whenever a mode failure happens,and new failure modes are not created by corrective actions.

    Moreover,it is supposed that there arej(j=1,2,…,q) subsystems of the complex system,in terms of the similar failure mechanisms and corrective strategies.Hence,the Stein factors based on the divided subsystems are easier to understand and accept in the field of engineering.As a result,the Stein projection of the system failure rate developed by divided subsystems is obtained.

    (7)

    (8)

    Similarly,

    (9)

    Meanwhile,

    (10)

    The first term in Eq.(7) is the constant failure intensity resulting from type-A modes.The second term is the prospective failure intensity caused by type-B modes that have surfaced,and finished corrective actions after the testing,according to the distinguished subsystems.The last term is the unconditional prospective failure intensity caused by type-B modes that have not surfaced by timeT.Comparing with Eq.(4),all occurred type-B modes are divided intojdifferent groups in the second term.Considering the difference of failure rates between type-B failures,totallyjdifferent Stein-shrinkage factors need to be solved in the model,that is,three arejfailure rates of type-B failures andjfailure rates of type-B failure models need to be solved.

    2 Illustrative Examples

    The data used in the study consist of type-A and type-B modes.Type-A modes in the Crow model can be considered as type-B modes in the Stein model by considering the FEFs to be zero.The number of occurrences and time to failure for each failure mode which surfaces are from ReliaSoft in 1999.

    Table 1 Failure data

    As shown in Table 1,the experiment lasted 400 h.The total number of failures was 42,and all corrective actions were implemented after the 400 h test.There were 10 type-A failures and 32 type-B failures,which were distinguished into 16 unique modes during the test.The FEFdiis the portion decrease inλi,because a corrective action has been performed for theith type-B mode.Thus,the final failure rate of theith type-B failure mode after corrective actions is(1-di)λi.

    As shown in Table 2,the 16 unique type-B modes are randomly divided into three sections by MATLAB,which can be deemed as the 16 type-B modes derived from three subsystems.

    Table 2 Type-B modes divided into three subsystems

    (Table 2 continued)

    Table 3 shows the computed results of Stein-shrinkage factors and failure intensities for three projection models:Crow,AMPM-Stein,and AMPM-Stein with three subsystems.

    Table 3 System failure intensity results of three subsystems

    The results show that the three models perform well under special test conditions that follow the hypothetical conditions of the models.The failure intensity bias is very small between the AMPM-Stein model and the AMPM-Stein model with three subsystems,even when the Stein-shrinkage factors are different.

    To examine the robustness of the proposed projection model,that is,how the numbers of subsystemsjand Stein-shrinkage factorθS,jvariation impact the failure intensity,two new random data groups were studied additionally.One group was divided as shown in Table 4.

    Table 4 Type-B modes divided into four subsystems

    As shown in Table 4,the 16 unique type-B modes are randomly divided by MATLAB into four groups,which can be considered as the 16 type-B modes from four different subsystems.

    The other group is divided into five groups,as shown in Table 5.

    Table 5 Type-B modes divided into five subsystems

    (Table 5 continued)

    Table 6 System failure intensity comparison

    The AMPM-Stein model,which involves more failure data and requires limited assumptions,is statistically more robust against the effects of fix effectiveness variability than the Crow-AMSAA projection model[10].Thus,the AMPM-Stein model is elected as the baseline for performance comparison.

    The present study indicates that the performances of the three forms of the proposed models are acceptable.With respect to the AMPM-Stein model with three subsystems,the deviation rate is just 0.349% when compared with the baseline.As a result,for the AMPM-Stein model with four subsystems,the deviation rate is 0.871%.Finally,for the AMPM-Stein model with five subsystems,the deviation rate is 1.050%.The results show that the deviation rate is also increasing with the increase of the number of subsystems,but the prediction results of three data reorganization methods are acceptable.This proves the robustness of the proposed AMPM-Stein extended model.

    3 Case Study

    A development test with three testing phases was conducted on a CNC grinder system in sequence in a factory.All corrective actions of the type-B modes that occurred were incorporated after the first test phase,before starting a follow-up test phase.This means that the first test phase was considered to be phase I,and the follow-up test phase was considered to be phase II,then the subsequent test phase was considered as phase III.

    The failure data are shown in Tables 7-9.The CNC grinder system was divided into five subsystems based on different failure mechanisms and management strategies:spindle system,head-stock/feed system,electronic control system,base/body/protection system,and hydraulic/pneumatic/lubrication system.Consequently,the failures that occurred were classified into these five subsystems.

    Table 7 Failure data of CNC grinder in phase I

    The modes that surfaced were still distinguished into type-A and type-B modes to accommodate the Crow projection model.Type-B failure modes shall increase the reliability of the CNC grinder,as they were fixed after the testing.In contrast,type-A failure modes shall not increase the reliability of the CNC grinder,as they were not be solved because of limitations.The AMPM-Stein models do not require distinction,but assigne a positive or zero FEF individually.

    As shown in Table 7,the experiment of phase I continued for 200 h.The total number of failures was 18,and all corrective actions were implemented after the testing.Three type-A failures and 15 type-B failures were found in the experiment.As shown in Table 7,13 different type-B modes were identified which required 13 different corrective actions to be implemented after testing.

    Table 8 Failure data of CNC grinder in phase II

    As shown in Table 8,the experiment in phase II continued for 400 h.The total number of failures was 23,and all corrective actions were implemented after the testing.Four type-A failures and 19 type-B failures were found in the experiment.As shown in Table 8,10 different type-B modes were identified which required 10 different corrective actions to be implemented after testing.

    Table 9 Failure data of CNC grinder in phase III

    (Table 9 continued)

    As shown in Table 9,the experiment of phase III continued for 800 h.The total number of failures was 25,and all corrective actions were implemented after the testing.Three type-A failures and 22 type-B failures were found in the experiment.As show in Table 9,11 different type-B modes were identified which required 11 different corrective actions to be implemented after testing.

    The calculation results of the three phases are shown in Table 10.

    Table 10 Calculation results of three phase data

    The intent of the AMPM-Stein extended model is to present an assessment for system-reliability because of the implementation of deferred fixes.The model also directly evaluates the achievable system failure intensity,which is alleviated by the failure mode.As shown in Table 10,the system-failure intensities show an obvious downward trend between phases.With respect to the AMPM-Stein extended model,the system failure intensity was 0.063 729 after implementing all the corrective actions associated with phase I according to Table 7.In phase II,the system failure intensity decreased to 0.034 200 after implementing all the corrective actions according to Table 8.Finally,the system failure intensity reduced,again to 0.018 353,after implementing all the corrective actions associated with phase III according to Table 9.It meaned that the reliability of this complex system was significantly increased through the development test.

    Fig.1 Projection performance of phase I

    Fig.2 Projection performance of phase II

    Fig.3 Projection performance of phase III

    By comparing the predicted failure rates with the actual value of phase II and,similarly,the predicted failure rates with the actual value of phase III,the prediction results of the proposed AMPM-Stein extended model are found to be more accurate than those of the Crow-AMSAA projection model and AMPM-Stein model.For all three models,the actual intensity rates at a certain stage are less than the predicted intensity rate at the same stage.This is probably because conservative FEFs are used instead of realized FEFs;for instance,in Table 7,the FEF of the eighth type-B mode (B8) is only 0.59.

    Additionally,the Stein-shrinkage factors of the proposed model,which derive from five partitioned subsystems,have similar failure mechanisms.This makes the proposed model easier to understand and more acceptable to engineers than the AMPM-Stein model.

    4 Conclusions

    To alleviate the problem of Stein factor’s algorithm and to effectively evaluate the reliability of the under-development system with a delayed corrective strategy,an AMPM-Stein extended model was proposed based on failure data reconstruction.Then,the Stein-shrinkage factors were calculated based on the divided subsystem data.Finally,the system failure intensities were derived based on the proposed model.Based on the study,the following conclusions can be drawn.

    (1) The Stein-shrinkage factors of subsystems derived from similar inherent failure mechanisms and management strategies are easier to be understood and accepted in the engineering field.This provides a technical basis for the extensive application of the proposed model.

    (2) The presented model is more reliable than the Crow-AMSAA projection model,because more data are involved.Furthermore,the model is more plausible and accurate than the AMPM-Stein model for complex systems,as the Stein factors are solved separately.

    (3) The research indicates that the proposed projection model has optimal performance,regardless of the complex system being randomly divided into three,four,or five subsystems.Furthermore,the performance is still good,even if the Stein-shrinkage factor of partitioned subsystem equals zero.This fully proves the robustness of the proposed model.

    All of the above indicate that the proposed projection model using failure data regrouping according to the similar failure mechanisms seems more reasonable and understandable for the complex systems.The model can provide an assessment for estimated reliability because of the implementation of deferred fixes.It can also directly evaluate the achievable system failure intensity,which is alleviated by the failure mode.

    This model does not consider the difference between the actual FEFs and the theoretical FEFs,which may have a non-negligible influence on the reliability-prediction results.In addition,the goodness-of-fit procedure and confidence interval evaluation of the model are not mentioned.Furthermore,how to control the deviation rate of prediction results if there are too many subsystems are divided.All these need to be studied further.

    精品午夜福利在线看| 草草在线视频免费看| 99热国产这里只有精品6| 少妇人妻久久综合中文| 又粗又硬又长又爽又黄的视频| 综合色av麻豆| 亚洲国产欧美人成| 亚洲自偷自拍三级| 七月丁香在线播放| 免费电影在线观看免费观看| 久久久国产一区二区| 一级a做视频免费观看| 国产高清有码在线观看视频| 欧美激情在线99| 婷婷色综合www| 一级黄片播放器| 国产精品久久久久久精品古装| 涩涩av久久男人的天堂| 日韩一区二区视频免费看| 免费av观看视频| 中文资源天堂在线| 久久久久久久久久成人| 精品国产露脸久久av麻豆| 国产精品一区二区性色av| 麻豆久久精品国产亚洲av| 亚洲精品乱码久久久久久按摩| 久久99蜜桃精品久久| 爱豆传媒免费全集在线观看| 欧美一区二区亚洲| 免费观看无遮挡的男女| 亚洲精品第二区| 最近最新中文字幕大全电影3| 国产高清三级在线| 老女人水多毛片| 成人午夜精彩视频在线观看| 国产一区二区三区综合在线观看 | 18禁在线无遮挡免费观看视频| 一区二区三区免费毛片| 天堂俺去俺来也www色官网| av专区在线播放| 日本熟妇午夜| 美女脱内裤让男人舔精品视频| 久久国产乱子免费精品| 黑人高潮一二区| 91久久精品国产一区二区三区| 在线观看国产h片| 精品久久久久久久末码| 韩国av在线不卡| 国产爽快片一区二区三区| 久久精品国产a三级三级三级| 男女无遮挡免费网站观看| 亚洲无线观看免费| 欧美日韩综合久久久久久| 99精国产麻豆久久婷婷| 在线观看一区二区三区激情| 国产精品久久久久久久久免| 五月天丁香电影| 亚洲av免费高清在线观看| 简卡轻食公司| 极品教师在线视频| 亚洲天堂国产精品一区在线| 中文字幕久久专区| 欧美变态另类bdsm刘玥| 人妻制服诱惑在线中文字幕| 国产精品一区二区性色av| 久久99精品国语久久久| 国产精品一及| 激情五月婷婷亚洲| 国产亚洲精品久久久com| 久久久色成人| 日韩一区二区三区影片| 国产在线一区二区三区精| 久热这里只有精品99| 日本熟妇午夜| 汤姆久久久久久久影院中文字幕| 爱豆传媒免费全集在线观看| 国产高清国产精品国产三级 | 国产成人福利小说| 能在线免费看毛片的网站| 日韩一区二区三区影片| 中文字幕免费在线视频6| 国产高清三级在线| 亚洲最大成人中文| 91久久精品电影网| 国产黄频视频在线观看| 五月伊人婷婷丁香| 精品久久久久久电影网| 搡老乐熟女国产| 婷婷色综合www| 亚洲国产色片| 美女视频免费永久观看网站| 国产欧美日韩精品一区二区| 精品酒店卫生间| 亚洲精品aⅴ在线观看| 国内揄拍国产精品人妻在线| a级毛片免费高清观看在线播放| 国产免费视频播放在线视频| 大香蕉97超碰在线| 国产乱来视频区| 国产亚洲av片在线观看秒播厂| 欧美激情国产日韩精品一区| 久久热精品热| 视频区图区小说| 国产一区二区亚洲精品在线观看| 高清欧美精品videossex| 国产一级毛片在线| 久久久久久久大尺度免费视频| 中文字幕久久专区| 国产精品久久久久久久电影| freevideosex欧美| av又黄又爽大尺度在线免费看| 亚洲av电影在线观看一区二区三区 | 国产精品女同一区二区软件| 亚洲四区av| 亚洲欧美日韩另类电影网站 | 亚洲精品影视一区二区三区av| 亚洲欧美中文字幕日韩二区| 熟妇人妻不卡中文字幕| 国产综合懂色| 高清视频免费观看一区二区| 国产高潮美女av| 国产一区二区三区av在线| 久久人人爽人人爽人人片va| 国产中年淑女户外野战色| 人妻一区二区av| 黄片wwwwww| 日韩欧美精品免费久久| 国产欧美日韩精品一区二区| 日韩伦理黄色片| 婷婷色综合www| 久热这里只有精品99| 欧美日韩在线观看h| 欧美成人a在线观看| 日本三级黄在线观看| 亚洲欧美一区二区三区黑人 | 成人国产av品久久久| 亚洲国产高清在线一区二区三| 国产国拍精品亚洲av在线观看| 免费黄色在线免费观看| 精品酒店卫生间| 七月丁香在线播放| 国产精品国产三级国产专区5o| 十八禁网站网址无遮挡 | 3wmmmm亚洲av在线观看| 插阴视频在线观看视频| 午夜免费男女啪啪视频观看| 亚洲熟女精品中文字幕| 日本一二三区视频观看| 麻豆成人av视频| 日本wwww免费看| 精品一区二区三区视频在线| 欧美激情久久久久久爽电影| 国产成年人精品一区二区| 久久精品国产亚洲网站| 黄色一级大片看看| 国产一区二区亚洲精品在线观看| 亚洲精品乱码久久久v下载方式| 制服丝袜香蕉在线| 亚洲aⅴ乱码一区二区在线播放| 免费黄频网站在线观看国产| 婷婷色麻豆天堂久久| 女人十人毛片免费观看3o分钟| 最近最新中文字幕大全电影3| 日韩一本色道免费dvd| 久久久久久久精品精品| 国产探花在线观看一区二区| 美女主播在线视频| 国产精品久久久久久精品电影小说 | 插阴视频在线观看视频| 午夜免费男女啪啪视频观看| 我的女老师完整版在线观看| 久久99热6这里只有精品| 国产黄片美女视频| 丰满乱子伦码专区| 高清毛片免费看| 国产精品一区二区性色av| 久久综合国产亚洲精品| 天堂网av新在线| 国产黄色免费在线视频| 婷婷色综合www| 午夜视频国产福利| 国产精品av视频在线免费观看| 好男人在线观看高清免费视频| 亚洲欧美成人精品一区二区| 最近最新中文字幕免费大全7| 少妇 在线观看| 亚洲最大成人中文| 亚洲欧洲日产国产| 日本三级黄在线观看| 久久久久久九九精品二区国产| 一区二区三区四区激情视频| a级一级毛片免费在线观看| 黄片wwwwww| 国产片特级美女逼逼视频| 一个人看视频在线观看www免费| 七月丁香在线播放| 国产精品国产三级国产专区5o| 国产老妇女一区| 狂野欧美激情性xxxx在线观看| 免费黄网站久久成人精品| av在线蜜桃| 一级二级三级毛片免费看| 99久久人妻综合| 亚洲av国产av综合av卡| 99久国产av精品国产电影| 日日摸夜夜添夜夜添av毛片| 777米奇影视久久| 免费看日本二区| 麻豆久久精品国产亚洲av| 久久99热这里只频精品6学生| av在线老鸭窝| 少妇人妻 视频| 亚洲成人久久爱视频| 国产成人精品福利久久| 中国国产av一级| 观看免费一级毛片| 看非洲黑人一级黄片| 久久久久网色| 成人亚洲欧美一区二区av| 丰满乱子伦码专区| 日韩视频在线欧美| 亚洲欧美成人综合另类久久久| 久久久久国产精品人妻一区二区| 成年女人看的毛片在线观看| 国产综合精华液| 日本一本二区三区精品| 99久久精品热视频| 女人被狂操c到高潮| 国产精品一区二区性色av| 久久97久久精品| 精品视频人人做人人爽| 美女国产视频在线观看| 特大巨黑吊av在线直播| 亚洲精品亚洲一区二区| 精品一区二区三区视频在线| 欧美日韩一区二区视频在线观看视频在线 | 熟女人妻精品中文字幕| 国产精品久久久久久久电影| 亚洲高清免费不卡视频| 久久精品国产亚洲av涩爱| 五月玫瑰六月丁香| 精品亚洲乱码少妇综合久久| 日韩欧美精品v在线| 日本欧美国产在线视频| .国产精品久久| 国产精品女同一区二区软件| 另类亚洲欧美激情| 九色成人免费人妻av| 蜜桃久久精品国产亚洲av| 亚洲精品乱码久久久久久按摩| 国模一区二区三区四区视频| 日韩,欧美,国产一区二区三区| 国产黄a三级三级三级人| 蜜桃久久精品国产亚洲av| 日日啪夜夜撸| 亚洲人与动物交配视频| 你懂的网址亚洲精品在线观看| 亚洲av一区综合| 亚洲丝袜综合中文字幕| 国产一区亚洲一区在线观看| 中文在线观看免费www的网站| 汤姆久久久久久久影院中文字幕| 国产亚洲精品久久久com| 大香蕉久久网| 91在线精品国自产拍蜜月| 欧美潮喷喷水| 最近最新中文字幕免费大全7| 女的被弄到高潮叫床怎么办| 久久99蜜桃精品久久| 丝袜脚勾引网站| 人体艺术视频欧美日本| av国产久精品久网站免费入址| 国产毛片在线视频| 青春草亚洲视频在线观看| 欧美97在线视频| 日本wwww免费看| 男人狂女人下面高潮的视频| 国产黄色免费在线视频| 欧美xxxx性猛交bbbb| 亚洲国产高清在线一区二区三| 亚洲欧美日韩卡通动漫| 人妻一区二区av| 久久久久久国产a免费观看| 国产色爽女视频免费观看| 免费播放大片免费观看视频在线观看| 特大巨黑吊av在线直播| 免费观看a级毛片全部| 97精品久久久久久久久久精品| 成年女人看的毛片在线观看| 亚洲欧美清纯卡通| 99视频精品全部免费 在线| 天美传媒精品一区二区| 尾随美女入室| 男女边吃奶边做爰视频| 男人添女人高潮全过程视频| 啦啦啦在线观看免费高清www| 97在线人人人人妻| 日本wwww免费看| 18禁动态无遮挡网站| 一区二区三区精品91| 国产成人aa在线观看| 国产精品久久久久久久电影| 性色avwww在线观看| 99久久九九国产精品国产免费| 超碰av人人做人人爽久久| 成人欧美大片| 男女边吃奶边做爰视频| 日韩欧美一区视频在线观看 | 国产精品秋霞免费鲁丝片| 国产一级毛片在线| 免费观看a级毛片全部| 日韩一区二区三区影片| 久久99精品国语久久久| 韩国高清视频一区二区三区| 免费看a级黄色片| 国产黄色视频一区二区在线观看| 精品人妻偷拍中文字幕| 51国产日韩欧美| 国产精品一区二区性色av| 亚洲欧美清纯卡通| 国产午夜福利久久久久久| 成人无遮挡网站| 久久久久国产网址| 久久精品久久精品一区二区三区| 亚洲国产日韩一区二区| 日日摸夜夜添夜夜爱| 亚洲精品一二三| 九色成人免费人妻av| 成人美女网站在线观看视频| 大码成人一级视频| 日韩视频在线欧美| 色哟哟·www| 日韩视频在线欧美| 爱豆传媒免费全集在线观看| 国产大屁股一区二区在线视频| 久久精品国产自在天天线| 国产一级毛片在线| 中文欧美无线码| 国语对白做爰xxxⅹ性视频网站| 人人妻人人爽人人添夜夜欢视频 | 国产av码专区亚洲av| 亚洲婷婷狠狠爱综合网| 国产男女超爽视频在线观看| 丰满少妇做爰视频| 国产精品久久久久久久电影| 久久久色成人| 国产爱豆传媒在线观看| 国产美女午夜福利| 国产极品天堂在线| 亚洲成人一二三区av| 欧美亚洲 丝袜 人妻 在线| 国产中年淑女户外野战色| 日韩av不卡免费在线播放| 国产精品99久久99久久久不卡 | 狂野欧美白嫩少妇大欣赏| 男的添女的下面高潮视频| 在现免费观看毛片| 国产女主播在线喷水免费视频网站| 国内精品宾馆在线| av在线蜜桃| 色婷婷久久久亚洲欧美| 熟女电影av网| 国产精品嫩草影院av在线观看| 插逼视频在线观看| 毛片女人毛片| 人妻夜夜爽99麻豆av| 成年人午夜在线观看视频| 三级国产精品欧美在线观看| 国产美女午夜福利| 一区二区三区精品91| 成年免费大片在线观看| 97人妻精品一区二区三区麻豆| 91精品国产九色| 成人黄色视频免费在线看| 免费看av在线观看网站| 97人妻精品一区二区三区麻豆| 晚上一个人看的免费电影| 欧美日韩精品成人综合77777| 欧美 日韩 精品 国产| 国产一区二区在线观看日韩| 国产在线一区二区三区精| 免费av毛片视频| 尤物成人国产欧美一区二区三区| 国产欧美另类精品又又久久亚洲欧美| 成年女人在线观看亚洲视频 | 亚洲最大成人中文| 欧美成人a在线观看| 国产男女超爽视频在线观看| 毛片女人毛片| 日韩一本色道免费dvd| 亚洲精品成人av观看孕妇| 午夜日本视频在线| 嘟嘟电影网在线观看| 久久精品国产自在天天线| 少妇熟女欧美另类| 一级毛片黄色毛片免费观看视频| 日本爱情动作片www.在线观看| 久久久欧美国产精品| 色吧在线观看| av线在线观看网站| 亚洲天堂av无毛| 最近的中文字幕免费完整| 亚洲av日韩在线播放| 成人无遮挡网站| 国产白丝娇喘喷水9色精品| 久久久久久久精品精品| 国产成人一区二区在线| 欧美另类一区| 国产欧美日韩精品一区二区| 国产av不卡久久| 精品人妻一区二区三区麻豆| 日日啪夜夜撸| 在线免费十八禁| 国产免费福利视频在线观看| 天天躁日日操中文字幕| 熟女av电影| 九色成人免费人妻av| 国产日韩欧美亚洲二区| 亚洲自拍偷在线| av女优亚洲男人天堂| 黄色日韩在线| 欧美性猛交╳xxx乱大交人| 精品一区二区三卡| 免费av毛片视频| 中文字幕制服av| 国产精品国产三级专区第一集| 免费观看的影片在线观看| 国产又色又爽无遮挡免| 久久久午夜欧美精品| 国语对白做爰xxxⅹ性视频网站| 国产成人午夜福利电影在线观看| 91aial.com中文字幕在线观看| 精品久久久精品久久久| 欧美+日韩+精品| 一本色道久久久久久精品综合| 成人二区视频| 神马国产精品三级电影在线观看| 亚洲国产精品成人久久小说| 国产毛片在线视频| 激情 狠狠 欧美| 国产探花极品一区二区| 大片免费播放器 马上看| 夜夜看夜夜爽夜夜摸| 美女cb高潮喷水在线观看| 日本黄大片高清| 九色成人免费人妻av| 久久ye,这里只有精品| 直男gayav资源| 婷婷色麻豆天堂久久| 大香蕉97超碰在线| 白带黄色成豆腐渣| 97在线视频观看| videos熟女内射| 精品久久久久久久久亚洲| 能在线免费看毛片的网站| 久久亚洲国产成人精品v| xxx大片免费视频| 亚洲精品一区蜜桃| 五月伊人婷婷丁香| 午夜激情福利司机影院| 伦理电影大哥的女人| 成人特级av手机在线观看| 又黄又爽又刺激的免费视频.| av国产免费在线观看| av女优亚洲男人天堂| 久久综合国产亚洲精品| 最近2019中文字幕mv第一页| 国产老妇女一区| 男男h啪啪无遮挡| 亚洲精华国产精华液的使用体验| 爱豆传媒免费全集在线观看| 精品99又大又爽又粗少妇毛片| 女的被弄到高潮叫床怎么办| 蜜臀久久99精品久久宅男| 麻豆成人午夜福利视频| 麻豆久久精品国产亚洲av| 日韩一区二区三区影片| 亚洲怡红院男人天堂| 国产探花在线观看一区二区| 色视频在线一区二区三区| 99久久九九国产精品国产免费| 久久国内精品自在自线图片| freevideosex欧美| 亚洲图色成人| 久久精品综合一区二区三区| 精品酒店卫生间| 在现免费观看毛片| 精品人妻视频免费看| 国产日韩欧美亚洲二区| 狂野欧美激情性xxxx在线观看| 伦理电影大哥的女人| 五月天丁香电影| 欧美日韩在线观看h| videos熟女内射| 91久久精品国产一区二区三区| 精品酒店卫生间| 好男人在线观看高清免费视频| 国产精品成人在线| 尤物成人国产欧美一区二区三区| 亚洲精品国产成人久久av| 高清视频免费观看一区二区| 亚洲欧美清纯卡通| 日本与韩国留学比较| 99久久人妻综合| 国产一区二区亚洲精品在线观看| 伦理电影大哥的女人| 麻豆成人午夜福利视频| eeuss影院久久| 成人综合一区亚洲| 69人妻影院| 国产免费福利视频在线观看| 亚洲精品中文字幕在线视频 | 日韩视频在线欧美| 黄色怎么调成土黄色| 九九在线视频观看精品| 午夜激情福利司机影院| 精品久久久久久电影网| 欧美高清成人免费视频www| 国产成人a∨麻豆精品| 欧美精品人与动牲交sv欧美| 国产爽快片一区二区三区| 日韩av免费高清视频| 一个人看视频在线观看www免费| 免费观看的影片在线观看| 日本与韩国留学比较| 在线观看人妻少妇| 一级毛片久久久久久久久女| 天堂中文最新版在线下载 | 在线观看av片永久免费下载| 成人亚洲精品av一区二区| 2018国产大陆天天弄谢| 不卡视频在线观看欧美| 成年人午夜在线观看视频| 婷婷色综合大香蕉| 午夜精品一区二区三区免费看| 黄色怎么调成土黄色| 身体一侧抽搐| 欧美极品一区二区三区四区| 国产亚洲午夜精品一区二区久久 | 亚洲国产色片| 又大又黄又爽视频免费| 小蜜桃在线观看免费完整版高清| 国产精品久久久久久av不卡| 精品人妻偷拍中文字幕| 直男gayav资源| 国产亚洲午夜精品一区二区久久 | 亚洲国产精品成人久久小说| 久久久久精品久久久久真实原创| 中文字幕人妻熟人妻熟丝袜美| 亚洲av免费在线观看| 国产欧美日韩精品一区二区| 欧美成人a在线观看| 亚洲av欧美aⅴ国产| 免费黄色在线免费观看| 欧美日韩视频精品一区| 99热这里只有是精品50| 久久97久久精品| 国产爱豆传媒在线观看| 亚洲av在线观看美女高潮| 91久久精品国产一区二区三区| 三级男女做爰猛烈吃奶摸视频| a级毛色黄片| 亚州av有码| 亚洲欧美日韩东京热| 简卡轻食公司| 菩萨蛮人人尽说江南好唐韦庄| 国产精品不卡视频一区二区| 大香蕉97超碰在线| 日韩中字成人| 另类亚洲欧美激情| 婷婷色综合www| 亚洲精品成人久久久久久| 日韩一区二区视频免费看| 精品久久久久久久末码| 亚洲欧美精品专区久久| 亚洲三级黄色毛片| 亚洲精品影视一区二区三区av| 日产精品乱码卡一卡2卡三| 国产精品麻豆人妻色哟哟久久| av国产精品久久久久影院| 精品人妻偷拍中文字幕| 涩涩av久久男人的天堂| 午夜免费鲁丝| 成人毛片60女人毛片免费| 欧美成人午夜免费资源| 欧美性感艳星| 纵有疾风起免费观看全集完整版| 久久精品国产亚洲av天美| 噜噜噜噜噜久久久久久91| 精品熟女少妇av免费看| 91精品国产九色| 欧美少妇被猛烈插入视频| 九九在线视频观看精品| 国产v大片淫在线免费观看| 久久久久久国产a免费观看| 美女脱内裤让男人舔精品视频| 国产一级毛片在线| 欧美另类一区| 亚洲电影在线观看av| 中文字幕亚洲精品专区| 久久ye,这里只有精品| 日本-黄色视频高清免费观看| 亚洲精品国产av蜜桃| av一本久久久久| 国产精品久久久久久久电影| 女的被弄到高潮叫床怎么办| 日韩强制内射视频| 大话2 男鬼变身卡| 亚洲图色成人| 黄色怎么调成土黄色| 亚洲激情五月婷婷啪啪| 99热这里只有是精品50| 欧美成人a在线观看| 深夜a级毛片| 亚洲人成网站在线观看播放|