• <tr id="yyy80"></tr>
  • <sup id="yyy80"></sup>
  • <tfoot id="yyy80"><noscript id="yyy80"></noscript></tfoot>
  • 99热精品在线国产_美女午夜性视频免费_国产精品国产高清国产av_av欧美777_自拍偷自拍亚洲精品老妇_亚洲熟女精品中文字幕_www日本黄色视频网_国产精品野战在线观看 ?

    Probabilistic Performance-Based Optimum Seismic Design Framework:Illustration and Validation

    2019-09-21 08:42:52YongLiJoelConteandPhilipGill

    Yong Li ,Joel P.Conte and Philip E.Gill

    Abstract: In the field of earthquake engineering,the advent of the performance-based design philosophy,together with the highly uncertain nature of earthquake ground excitations to structures,has brought probabilistic performance-based design to the forefront of seismic design.In order to design structures that explicitly satisfy probabilistic performance criteria,a probabilistic performance-based optimum seismic design (PPBOSD) framework is proposed in this paper by extending the state-of-the-art performance-based earthquake engineering (PBEE) methodology.PBEE is traditionally used for risk evaluation of existing or newly designed structural systems,thus referred to herein as forward PBEE analysis.In contrast,its use for design purposes is limited because design is essentially a more challenging inverse problem.To address this challenge,a decision-making layer is wrapped around the forward PBEE analysis procedure for computer-aided optimum structural design/retrofit accounting for various sources of uncertainty.In this paper,the framework is illustrated and validated using a proof-of-concept problem,namely tuning a simplified nonlinear inelastic single-degreeof-freedom (SDOF) model of a bridge to achieve a target probabilistic loss hazard curve.For this purpose,first the forward PBEE analysis is presented in conjunction with the multilayer Monte Carlo simulation method to estimate the total loss hazard curve efficiently,followed by a sensitivity study to investigate the effects of system (design) parameters on the probabilistic seismic performance of the bridge.The proposed PPBOSD framework is validated by successfully tuning the system parameters of the structure rated for a target probabilistic seismic loss hazard curve.The PPBOSD framework provides a tool that is essential to develop,calibrate and validate simplified probabilistic performance-based design procedures.

    Keywords:Performance-based seismic design,optimum seismic design,forward PBEE analysis,inverse PBEE analysis,uncertainty quantification,hazard deaggregation.

    1 Introduction

    The seismic design philosophy has evolved from the safeguard against collapse of structures and loss of life to performance-based seismic design (PBSD).Aimed at improving and ensuring post-earthquake functionality,PBSD has been developed in response to the substantial economic losses due to earthquakes (e.g.,a total loss of $24 billion for the 1994 Mw 6.7 Northridge earthquake [Eguchi,Goltz,Taylor et al.(1998)].However,uncertain structural performance is inevitable because of various sources of uncertainty,i.e.,the randomness in structural loads (e.g.,earthquake loads),the variability in demands imposed on the structural system,and the uncertainties in the capacity of the system to withstand those demands as well as other socio-economic variables (e.g.,uncertainty in repair cost for damaged components).With the highly uncertain nature of earthquake ground motions,the advent of performance-based design philosophy has brought probabilistic PBSD to the forefront of seismic design.The need to account for these uncertainties has prompted the development of a modular probabilistic performance evaluation methodology,the performance-based earthquake engineering (PBEE) methodology,under the auspice of the Pacific Earthquake Engineering Research (PEER) Center [Cornell and Krawinkler (2000)].PBEE aims to evaluate probabilistically the seismic performance of a structure under specific site and soil conditions in an uncertainty propagation framework,herein referred to as forward PBEE analysis.In the last two decades,significant research efforts have been devoted to the development of the PEER PBEE methodology [Cornell and Krawinkler (2000);Porter (2003);Baker (2007);Günay and Mosalam (2013);Lin,Haselton and Baker (2013)].Applications of the PEER PBEE methodology for probabilistic performance assessment of various testbed structures can be found in the literature [Comerio (2005);Kunnath,Larson and Miranda (2006);Zhang (2006);Conte and Zhang (2007);Goulet,Haselton,Mitrani-Reiser et al.(2007);Haselton,Liel,Deierlein et al.(2011);Mosalam and Günay (2014);Li and Conte (2017);Romano,Faggella,Gigliotti et al.(2018);Li and Conte (2019)].With its wide acceptance as a tool for probabilistic performance assessment,the PEER PBEE methodology has formed the basis for structural design codes or evaluation guidelines,e.g.,FEMA P-58 [FEMA (2012)] in which PBEE is specialized to performance-based seismic assessment of new and existing building structures.

    Notwithstanding the significant progress in PBEE for probabilistic performance assessment,more limited research has been performed in inverse PBEE for structural design purposes [Jalayer and Cornell (2003);Mackie and Stojadinovic (2007);Zakeri and Zareian (2017)].This is due to the probabilistic nature of the PBEE methodology,which hinders its application to the design process to achieve a design target explicitly described in probabilistic terms.The design process is essentially a decision-making process.Oldfashioned design was performed through a manual trial-and-error approach,guided by a both a simple design philosophy and engineering experience.Currently,in professional practice,the uncertainties are accounted for by applying a subjective “factor of safety approach” in the allowable stress methodology or a semi-probabilistic “partial safety approach” in the Load and Resistance Factor Design (LRFD) [Ellingwood (2000)].The application of a fully probabilistic and risk-informed approach (e.g.,PBEE) in developing a practical performance-based design methodology requires the inversion of the available probabilistic performance-based assessment methodology,herein referred to as the inverse PBEE analysis.In order to conquer the inverse problem of explicitly satisfying probabilistic performance criteria confronted in the design process,computer-aided structural design using mathematical optimization becomes essential because of the increased complexity in the probabilistic design process [Austin,Pister and Mahin (1987);Haukaas (2008)].

    It is worth noting that significant research has been performed on a closely related topic,i.e.,reliability-based seismic design optimization [Jensen,Valdebenito,Schu?ller et al.(2009);Taflanidis and Beck (2009);Barbato and Tubaldi (2013);Tubaldi,Barbato and Dall’Asta (2016)],which also addresses the inverse problem in the presence of uncertainties.In these studies,the seismic design problem is treated as an inverse problem considering uncertainties associated with the earthquake loading (intensity and time history) and in some cases the structural model parameters.The inverse problem was cast either as a zerofinding problem [Barbato and Tubaldi (2013)] to achieve a target reliability,or as an optimization problem,in which reliability metrics (i.e.,the probability of failure of the system) are used to define the objective/constraint functions.However,these studies focused on the system reliability (or probability of failure) based on a pre-defined critical threshold value of a response quantity,instead of the full probabilistic description of the structural system performance at a continuum of levels of response (demand) and loss and at a discrete set of damage states.It is also worth mentioning that the above studies represent the earthquake ground motions analytically as a random process (e.g.,nonstationary filtered white noise process) linked to a ground motion intensity measure such as the peak ground acceleration (PGA).In contrast,the study reported in this paper uses ensembles of scaled historic earthquake ground motion records to represent the record-torecord variability in the forward PBEE analysis.These earthquake records are selected based on the magnitude-distance deaggregation of the site seismic hazard,the geological and seismological conditions and the local site conditions.This earthquake ground motion characterization is currently predominantly used in performance-based earthquake engineering,both at the level of research and engineering practice.

    The aforementioned need calls for an innovative optimum seismic design framework in the presence of uncertainty by using the versatile and modular probabilistic PBEE methodology.Aiming at promoting the practical application of probabilistic methods for design purposes,this paper proposes a probabilistic performance-based optimum seismic design (PPBOSD) framework.This framework is an extension of the PBEE methodology obtained by wrapping a decision-making layer in the design process around the forward PBEE analysis using mathematical optimization.The PPBOSD framework is illustrated and validated using a simplified nonlinear inelastic single-degree-of-freedom (SDOF) model of a bridge structure as a proof-of-concept study,before applying it to more complex and realistic engineering problems in the future.In the validation example,a well-posed optimization problem of tuning system (design) parameters of the structure to achieve a target probabilistic loss hazard curve is defined and solved using the proposed PPBOSD framework.

    This paper is structured as follows.First,the motivation behind the proposed PPBOSD framework is articulated,and an illustrative example of a SDOF bridge model,which is used to demonstrate conceptually the application of the PPBOSD framework,is presented.

    Second,the steps of the forward PBEE analysis,which is an indispensable component of PPBOSD,are described in the context of quantitatively assessing the seismic performance of the illustrative structure in probabilistic terms.Note that a multilayer Monte Carlo simulation procedure is implemented to estimate efficiently the total seismic loss hazard of the structure,which is needed in the PPBOSD framework.Third,a parametric probabilistic PBEE analysis is conducted to investigate the effects of the system (design) parameters on the probabilistic seismic performance of the structure.Finally,for illustration and validation purposes,the inelastic SDOF bridge model parameters are optimized (i.e.,tuned),using the PPBOSD framework,to achieve a target seismic loss hazard curve of the bridge.The underlying assumptions and limitations of the presented research are critically discussed in the conclusions.

    2 PPBOSD framework and illustrative application

    The well-established PEER PBEE methodology is used primarily to sequentially quantify and analyze the uncertainties in the seismic intensity and earthquake records,structural response (demand),structural capacity,seismic damage (i.e.,limit-state exceedances),and eventually the seismic loss (e.g.,repair cost,down time) for a structure,at a given site,due to future earthquakes.The PBEE methodology (i.e.,forward PBEE analysis) consists of four analytical steps:probabilistic seismic hazard analysis,probabilistic demand hazard analysis,probabilistic damage hazard analysis,and probabilistic loss hazard analysis (Fig.1).Each step determines the probabilistic characteristics of intermediate (or interface) variables,respectively referred to as the earthquake ground motion Intensity Measure (IM),Engineering Demand Parameter (EDP),Damage Measure (DM),and Decision Variable (DV) such as monetary loss.

    Figure 1:Forward PBEE analysis and need for inverse PBEE analysis

    For a newly designed or an existing structure,forward PBEE analysis can be used as a reliable tool to assess its probabilistic seismic performance,which depends on the system parameter vector x consisting of geometric,material and mechanical properties of the various structural components and seismic mitigation devices of the structure.However,the probabilistic performance of the structure may be unacceptable or not optimal according to target seismic design objectives,which are typically defined,based on the public’s expectations,by stakeholders,decision-makers and design code committees.This underlies the motivation behind an inverse PBEE analysis.For example,through the evaluation process using PBEE,an initial structural design is characterized by its seismic demand or loss hazard curve (i.e.,probability of exceedance of any specified value of EDP or DV in 100 years) such as the hazard curve #1 in Fig.2 expressed in terms of the probability of exceedance in 100 years.In contrast,the target performance can be characterized by hazard curve #2,#3,or #4 which would require tuning the design parameter vector x for this target design specification.Ideally,it is desirable to reduce the seismic risk (i.e.,probability of exceedance) across the entire range of EDP or DV values,e.g.,from hazard curve #1 to hazard curve #4.However,if hazard curve #4 is not feasible due to practical design constraints such as the initial construction cost,the decisionmakers (e.g.,engineers,stakeholders,or owners) can aim at improving the design by targeting hazard curve # 2 or hazard curve #3 as an alternative to reducing the seismic risk across all EDP or DV values.Namely,the decisions are made to place more emphasis in the seismic performance either at the low hazard level (or short return period or high probability of exceedance) or at the high hazard level (or long return period or low probability of exceedance),respectively.

    Figure 2:Illustration of the motivation for proposed probabilistic performance-based optimum seismic design framework

    When aiming at improving the seismic performance at low hazard (or short return period or high probability of exceedance) levels,the performance of the initial structural design can be improved from hazard curve #1 to hazard curve #2.As seen from Fig.2,this can be achieved by either minimizing the probability,PV1(x),of exceeding a low threshold value v1of the EDP or DV,or by minimizing the 86thpercentile of the EDP (edp0.86) or DV (dv0.86),both of which may lower the structural performance at high hazard levels (or long return period or low probability of exceedance).Conversely,improving the seismic performance at high hazard levels may reduce the performance at low hazard levels.In such a case,for example,the initial structural design could be altered so that its performance characterized by hazard curve #1 is improved to the performance characterized by hazard curve #3.Similarly,this can be achieved by either minimizing the probability,PV2(x),of exceeding a high threshold value v2of the EDP or DV or by minimizing the 10thpercentile of the EDP (edp0.10) or DV(dv0.10) (see Fig.2).Note that 10% (a high hazard level) and 86% (a low hazard level) probability of exceedance in 100 years correspond to return periods of 945 years and 50 years,respectively,based on the assumption of the Poisson random occurrence model.Alternatively,and more generally,the complete target loss hazard curve (defined by many discrete points at different hazard levels) can be used to express the probabilistic design objectives,as shown later in the illustrative example.

    The above inverse PBEE problem,which is confronted for design improvement or design optimization in the face of uncertainty,can be solved by the innovative optimum structural design framework (i.e.,PPBOSD) proposed in this paper.PPBOSD extends the PBEE evaluation methodology,which can be viewed as an open loop,by wrapping a decision-making layer using optimization around the forward PBEE analysis in order to close the loop as shown in Fig.3.This decision-making layer allows the use of various computational optimization tools,e.g.,OpenSees-SNOPT[Gu,Barbato,Conte et al.(2012)],to update the initial structural design to achieve the performance objectives.The probabilistic seismic design objectives can be defined in terms of demand hazard,damage hazard,and/or loss hazard characteristics (e.g.,hazard curves of EDP or DV,probability of limit-state exceedances,or statistics of EDP,DM,and/or DV in a specified exposure time).These design objectives can be cast into either objective or constraint functions in the optimization problem formulation.Thus,the proposed PPBOSD framework provides a tool to search for either a feasible design that satisfies all constraint functions or an optimum design that minimizes the objective function while satisfying all constraint functions.In PPBOSD,the current design is first assessed using the forward PBEE analysis for its probabilistic performance,which is compared with the design objectives expressed in terms of target hazard levels or statistics.If the design objectives are not satisfied,the current design will be updated in the decision-making layer through optimization by tuning the structural design parameters x.

    This paper focuses on the illustration and validation of the proposed PPBOSD framework,rather than a practical application to a complex large-scale bridge system,which is considered as the next stage of this research.Accordingly,a simple nonlinear bridge structural model is selected herein for simplicity but without loss of generality.This structural model consists of an inelastic SDOF system,which is commonly used to represent macroscopically a bridge behavior in its longitudinal or transverse direction.A nonlinear FE model of the Humboldt Bay Middle Channel Bridge (HBMC,see Fig.4(a)) previously developed inOpenSees[Conte and Zhang (2007)] is used to calibrate the nonlinear SDOF system parameters.The initial stiffness of the SDOF model obtained from the static pushover analysis of the bridge in the longitudinal direction isk0=137,200 kN/m,and the effective lumped mass accounted for ism=6.15×106kg,thus leading to an i nitial fundamental period of vibrationT1=1.33 s.The nonlinear model parameters associated with this inelastic SDOF model (Fig.4(b)) are the yield strengthFy=10,290 kN (i.e.,corresponding to a yield displacementUy=0.075 m),and the post-yield stiffness ratio (=ratio of the post-yield stiffness to the initial stiffness)b=0.10.TheMenegotto-Pintohysteretic material model is used to approximately represent the cyclic forcedisplacement response behavior and energy dissipation capabilities of an inelastic structural system such as a bridge.Furthermore,linear viscous damping with a damping ratio of 2% is incorporated in the SDOF bridge model to account for sources of energy dissipation beyond the hysteretic energy dissipation due to inelastic action of the materials during an earthquake.Note that the nonlinear SDOF bridge model is used in this study only for the purpose of illustrating and validating the proposed PPBOSD framework,these being the main objectives of this paper,without the intention to assess comprehensively the probabilistic seismic performance of the actual bridge.

    Figure 3:Probabilistic performance-based optimum seismic design (PPBOSD) framework

    Figure 4:Humboldt bay middle channel (HBMC) bridge (courtesy of Caltrans):(a) isometric view,and (b) simplified nonlinear SDOF model to represent the longitudinal nonlinear response behavior of the bridge

    In engineering practice,various structural response quantities or parameters,referred to as engineering demand parameters (EDPs),strongly correlated with different types of structural or non-structural damage are of interest.This study considers three EDPs,namely relative displacement ductility,μ,peak absolute acceleration,AAbs.,and normalized hysteretic energy dissipated,EH,as defined in Eqs.(1)-(3),respectively.

    In the equations above,td=earthquake duration (i.e.,the total duration of the ground motion record downloaded from the PEER NGA database),u(t)=displacement response relative to the ground,=relative acceleration response,=earthquake ground acceleration,g=acceleration due to gravity,R(t) =internal resisting force,andEE(td) =elastic strain energy stored in the system at timet=td.The three response parameters defined in Eqs.(1)-(3) are selected as EDPs associated with the following damage/failure or limit-states:first-excursion failure,dynamic stability of vehicles traversing the bridge during the earthquake,and cumulative damage (e.g.,low-cycle fatigue damage),respectively.

    3 Forward PBEE analysis

    The PEER PBEE methodology breaks down the seismic risk assessment procedure into four successive steps.These probabilistic steps sequentially quantify the uncertainty in the earthquake ground motion intensity measure (IM),the engineering demand parameter (EDP),the damage measure (DM) and the decision variable (DV),as implied by the underlying mathematical model expressed in Eq.(4).

    Here,νX(x) denotes the mean annual rate (MAR) of occurrence of the random event {X>x} ,namely the MAR of random variableXexceeding a given valuex,andrepresents the conditional complementary cumulative distribution function (CCDF) of random variableXgiven random variableY=y.In the probabilistic conditioning and deconditioning process,“one-step” forward dependence is assumed,i.e.,This process aims at propagating the uncertainty related to the seismic input and structural capacity,all the way to the EDPs,DMs,and DVs using the total probability theorem.The four steps of the PEER PBEE methodology are described below with select results to illustrate the process of forward PBEE analysis,as well as deaggregation results to increase the transparency of the hazard analysis.A multilayer Monte Carlo simulation method [Zhang (2006);Yang,Moehle,Stojadinovic et al.(2009)] is implemented to estimate efficiently the total loss hazard of the structure.

    3.1 Probabilistic seismic hazard analysis

    Pioneered by the theoretical framework developed by Cornell [Cornell (1968)],probabilistic seismic hazard analysis (PSHA),Step (1) of the PBEE methodology,has become the most accepted approach for assessing the site-specific seismic hazard in a probabilistic manner [Shome,Cornell,Bazzurro et al.(1998);Luco and Cornell (2007);Petersen,Frankel,Harmsen et al.(2008)].The probabilistic seismic hazard,which consists of the uncertainty quantification of the earthquake ground motion IM,is characterized by the MAR of the earthquake ground motion IM exceeding a specified threshold valueim,νIM(im) =νIM(IM>im).Based on the Poisson process assumption for the random occurrence of earthquakes in time,the MAR of exceedance can be converted to the probability of exceedance (PE) in a specified exposure time (e.g.,annual PE or PE in 50 years abbreviated as PE50).The IM is selected as the 5% damped linear elastic pseudo-spectral acceleration at the fundamental period (T1) of the structural systemSa(T1,ξ=5%),which has been shown to be a statistically efficient and sufficient predictor among a family of earthquake ground motion intensity measures [Shome,Cornell,Bazzurro et al.(1998);Luco and Cornel (2007)].

    The PSHA for a specific site location and soil condition can be performed using the 2008 Interactive Deaggregation tool provided by the United States Geological Survey (USGS).The site location in this study is assumed to be in the City of Oakland,California,at latitude=37.803° N and longitude=122.287° W.The soil condition is characterized by the average shear wave velocity in the top 30 meters of soil at the site location (Vs30=360 m/s).The seismic hazard curve obtained from the 2008 Interactive Deaggregation tool will be needed in Step (2) of the forward PBEE analysis.

    The seismic hazard can be deaggregated with respect to the seismological variables,i.e.,magnitude (M) and source-to-site distance (R),to gain additional insight into the contributing earthquakes.This insight will benefit the earthquake ground motion selection for the ensemble time history analyses.Fig.5 shows the M-R deaggregation of the seismic hazard corresponding to PE50=2%,and two modes are observed in the M-R plane.The higher mode is mainly contributed by the Hayward Fault to the east of Oakland,and the lower mode is mainly contributed by the San Andreas Fault to the west of Oakland.This deaggregation information (i.e.,5.9

    Figure 5:M-R deaggregation of the probabilistic seismic hazard corresponding to a probability of exceedance of 2% in 50 years (PE50=2%)

    3.2 Probabilistic demand hazard analysis

    Probabilistic demand hazard analysis (PDeHA) aims at predicting probabilistically the structural response (i.e.,EDP) to future earthquakes.The probabilistic characterization of an EDP is obtained through the corresponding seismic demand hazard curve,which is defined as the MAR ofEDPexceeding a threshold valueedp,νEDP(edp),or alternatively the probability of exceedance in 50 years,PE5 0 =P[EDP>edp] in an exposure time of 50 years.Mathematically,through the total probability theorem,the demand hazard curve is obtained as the convolution ofthe conditional CCDF of theEDPgivenIM=im,and the demand hazard curveνIM(im),thus accounting for all seismic hazard levels,as

    Thus,a crucial step of probabilistic demand hazard analysis is to find the probability distribution of the EDP of interest given a valueimofIM,which is referred to as the probabilistic demand conditional on the seismic hazard level.The conditional probabilistic demand analysis can be performed through the commonly used cloud method [Baker (2005)].In this method,an ensemble of nonlinear dynamic analyses of the structure of interest are performed for the selected suite of earthquake ground motion records,which have various IM values.The corresponding seismic response dataset for the selected earthquakes,is used to build a statistical model ofEDPgivenIMbased on linear regression analysis.The conditional mean value of lnEDPgivenIM,μlnEDP|IM,is estimated as

    and the conditional variance,,is estimated as

    whereandare obtained through regression analysis.Accordingly,the conditional random variable {EDP|IM=im} is fully characterized by the conditional probability density function (PDF) (see Fig.6) or conditional CCDF,GEDP|IM(edp|im),which often,including for the example presented here,is well represented by the lognormal probability distribution,

    where Φ is the standard normal CDF and ln denotes the natural logarithmic function.

    Figure 6:Conditional seismic demand hazard analysis result for EDP=relative displacement ductility

    The conditional probabilistic demand reflects the record-to-record variability when the earthquake IM is fixed.To account for the uncertainty in the earthquake IM,the convolution of the conditional CCDF of the EDP and the seismic hazard curve obtained through PSHA is performed according to Eq.(6).This leads to the (unconditional) probabilistic demand hazard curve,νEDP(edp),as shown in Fig.7(a) for EDP=relative displacement ductility (μ).The demand hazard curve presented shows that the MAR of the relative displacement ductility exceedingμ= 1,2,4,6,8 is 1.84×10-2,0.77×10-2,0.16×10-2,0.04×10-2,and 0.01×10-2,respectively,as indicated by the solid circles in Fig.7(a).Note that the MAR of exceedance of 1.84×10-2corresponds to a mean return period of 55 years (=1/1.84×10-2),i.e.,the relative displacement ductility will exceed 1.0 (i.e.,the structure will yield) at least once every 55 years on average.

    The seismic demand hazard with a given MAR of exceedance arises from a continuous range of seismic hazard levels (or IM values) as expressed by Eq.(6) and the contribution of each seismic hazard level to the demand hazard varies with the demand hazard level.In order to investigate the relative contribution of an IM bin ( Δimi) to a hazard point on the demand hazard curve,νEDP(edp),a demand hazard deaggregation analysis can be performed according to Eq.(9).

    The right-hand term in the above equation is referred to as the deaggregation of the demand hazard (atEDP=edp) with respect to the intensity measure IM,indicating the contribution of the IM bin,Δimi,toνEDP(edp).Fig.7(b) shows the deaggregation results for the five seismic demand hazard points (μ= 1,2,4,6,8) shown on the probabilistic seismic demand hazard curve in Fig.7(a).The deaggregation curves shift towards higher IM values (i.e.,to the right) as the EDP values increase,which reflects the fact that earthquake ground motions of higher intensity levels contribute more to higher values of the EDP.Similarly,the other two EDPs defined in Eqs.(2) and (3) are quantified probabilistically but not presented here due to space limitation [Li (2014)].

    Figure 7:(a) Probabilistic seismic demand hazard curve for the relative displacement ductility (solid circles denoted for the points to be deaggregated),and (b) deaggregation of demand hazard points shown in Fig.7(a) with respect to the intensity measure IM

    3.3 Probabilistic damage hazard analysis

    The third step of the PBEE methodology,probabilistic damage hazard analysis (PDaHA),is to predict probabilistically the seismic damage to the structure of interest due to future earthquakes.Practically,seismic damage is associated to a damage or failure mode (or mechanism).This study considers three damage or failure modes for the illustrative bridge structure,which are associated with the three selected EDPs,respectively.For each damage/failure mode/mechanism,a set of discrete limit-states are considered,corresponding to discrete values of the damage measure,DM=k.In this study,it is assumed that there are three limit-states (=3) for each damage/failure mode,i.e.,k∈( 0,1,2,3),corresponding to slight (k=1),moderate (k=2),and extensive (k=3) damage,respectively.Herein,the structure of interest is said to be in damage (or limit-) stateDSkif {DM=k}and exceedance of thek-th damage (or limit-) state is denoted and defined asEDSk= {DM≥k}.The seismic damage hazard is characterized by the MAR,νEDSk,of exceeding thek-th limit-state for each damage/failure mode.νEDSkis computed through the convolution integral in Eq.(10),

    in which the conditional probabilityP[DM≥k|EDP=edp]is referred to in the literature as probabilistic capacity curve (or function) and characterizes the uncertainty in predicting the structural capacity against thek-th limit-state of the damage/failure mechanism of interest.Probabilistic capacity curves are typically obtained through comparing analytical or empirical capacity models with corresponding experimental data [Gardoni,Mosalam and Der Kiureghian (2002)].For the purpose of this study,the probabilistic capacity curves for each of the three limit-states associated with each of the three damage/failure modes considered (first-excursion failure,dynamic stability of vehicles traversing the bridge,cumulative damage) are postulated (as normal CDFs) and defined in Tab.1;they are also depicted graphically in Fig.8(a).The conditional probability of exceeding a damage (or limit-) state (e.g.,EDSk= {DM≥k}),for a failure mode associated with a specificEDP = edp,P[DM≥k|EDP=edp] ,can be evaluated asThe conditional probability of a damage state exceedance can then be convolved with the seismic demand hazard curve to yield the seismic damage hazard as in Eq.(10).

    Fig.8(b) reports the probability of exceeding damage or limit-states I,II,and III in 50 years for each of the three damage or failure modes considered,as well as the mean return periods (RPs) of damage/limit-state exceedances,which are commonly used to measure their occurrence frequency in engineering practice.

    The seismic damage hazards calculated above contain contributions from a continuous range of EDP bins,as well as a continuous range of IM bins of the earthquake input ground motions.Similar to the demand hazard deaggregation,the damage hazard can be deaggregated with respect to the associated EDP and the IM,respectively.Eqs.(11) and (12) show the contributions to the damage hazardνEDSkof the EDP bins,Δ (edp)i,and IM bins,Δ (im)i,respectively.

    Table 1:Parameters of postulated probabilistic capacity curves defined in terms of the normalized capacity (i.e.,measured-to-predicted capacity ratios)

    The damage hazard deaggregation with respect to EDP and IM,shown in Fig.9,reveals the relative contributions of different EDP or IM bins to the damage hazard.It shows that exceedance of increasingly severe damage/limit-states are predominantly contributed by increasing higher EDP or IM values or bins.

    Figure 9:Damage hazard deaggregation with respect to (a) EDP and (b) IM for different damage/limit-state exceedances associated with EDP=relative displacement ductility (values of MAR of exceedance are indicated for each limit-state)

    3.4 Probabilistic loss hazard analysis

    The objective of the final step of the PBEE methodology,probabilistic loss hazard analysis (PLHA),is to quantify the decision variable (DV) probabilistically.The DV can be the direct economic loss (i.e.,total repair or replacement cost,LT) due to seismic damage,or the loss factor defined as the total loss normalized by the system replacement cost.The total loss hazard can be expressed in the form of a loss hazard curve,which provides the MAR or annual probability of the DV exceeding a threshold value.The total lossLTis defined as the summation of all the component-wise repair costs (Lj,j=1,2,3 here) associated with the three damage/failure modes considered here.In a real-world bridge application,which is more involved/detailed than the illustrative example considered here,the damage/failure modes would consist of:failure of bridge piers,failure of shear keys,failure of abutment,deck unseating,etc.In the present illustrative example,Ljis assumed to lump all the component-wise repair costs associated with thej-th damage/failure mechanism of the bridge.For each component,the loss hazard curve,νLj(l),is obtained according to Eq.(13),

    in which the integration reduces to a summation over the discrete damage states (as favored in practice) considered for thej-th damage/failure mode.The repair cost conditional CCDF,quantifies the uncertainty in the component repair cost related to thej-th damage/failure mode given a damage level between thek-th and (k+1)-th limit-states (i.e.,damage state).Due to lack of statistical data on repair and replacement costs,they are assumed to be normally distributed with the means and coefficients of variation (c.o.v.) presented in Tab.2 to facilitate illustration of the methodology proposed in this paper.

    Table 2:Statistics of repair costs as a function of failure mode and damage states

    With the probabilistic characteristics of the component losses determined in terms of component loss hazard,the total loss hazard can be computed through a multi-fold integration of the joint PDF of the component losses.However,it is computationally prohibitive,if not impossible,to derive that joint PDF and carry out the multi-fold integration,especially when a large number of components and damage/failure modes exist in real-world applications.To address this challenge,a multilayer Monte Carlo Simulation (MMCS) method is implemented and used as a simple yet powerful technique to estimate the total loss hazard.This method can efficiently incorporate and propagate the uncertainties arising at all stages of the PBEE analysis (e.g.,random time occurrences of earthquakes governed by a Poisson process,IM,EDP,and DM) all the way to the final random variable DV=LT.Such a treatment of uncertainty propagation in the forward PBEE analysis empowers the proposed PPBOSD framework,which involves a large number of forward PBEE analyses during the optimization process.The flowchart of the MMCS method developed for this study is shown in Fig.10 and presented in detail below.First,the number of earthquakes in the year being simulated is randomly generated according to the Poisson random occurrence model,and IM for each earthquake ground motion is simulated according to its probabilistic characteristics derived from PSHA.Second,for a given IM level,a set of EDPs is then stochastically simulated according to the joint PDF of the EDPs estimated through the results of an ensemble of FE seismic response analyses of the structure of interest.Note that the conditional joint PDF of the EDPs given IM can be approximated by a NATAF model [Liu and Der Kiureghian (1986)] defined by the marginal PDFs and correlation coefficients of the EDPs estimated from the results of the ensemble of nonlinear time-history analyses performed in the PSDeH analysis.This relaxes the more restrictive assumption,that the EDPs are jointly lognormal,used in FEMA P-58 and by Yang et al.[Yang,Moehle,Stojadinovic et al.(2009)].Third,the damage measure for each component (or lump of components in the illustrative example presented here) is randomly generated from the probabilistic capacity curves,and the component loss is simulated according to the PDF of the corresponding repair cost.For each year simulated,the total loss for that year is obtained by summing the repair costs over all the damaged components and all the earthquakes that occurred during that year.By simulating the seismic activity and resulting structural damage and economic loss for a large number of years (e.g.,100,000),an empirical CDF and CCDF of the total loss can be obtained.The CCDF of the total loss is referred to as the seismic loss hazard curve.

    Figure 10:Flowchart of Multilayer Monte Carlo Simulation (MMCS) method for total loss hazard calculation

    The seismic loss hazard curve shown in Fig.11 for the bridge structure considered in this study was obtained using the MMCS method developed.The total loss hazard curve indicates the annual probability of the repair or replacement costs exceeding a threshold value.For example,from Fig.11,there is 0.3% probability that for a given year,the seismic repair cost for this bridge will exceed 20% of the total bridge replacement cost (i.e.,loss factor of 0.2) or,alternatively,this level of loss for the bridge has a mean return period of exceedance of 330 years (=1/0.003).

    Figure 11:Probabilistic seismic loss hazard curve

    4 Parametric forward PBEE analysis

    Following the forward PBEE analysis procedure presented in the previous section,a parametric study (i.e.,one-at-a-time perturbation-based sensitivity analysis) is performed in order to explore the effects of parametric changes on the forward PBEE analysis results.For the system considered in this paper,the yield strength (i.e.,Fy) and the initial stiffness (i.e.,k0) of the nonlinear SDOF system are each perturbed by -25% and 50%.The effects of varying the yield strength on the demand hazard curves for the relative displacement ductility and peak absolute deck acceleration are shown in Figs.12(a) and 12(b),respectively.Note that an increase in the yield strength reduces the demand hazard for the relative displacement ductility,while it increases the demand hazard for the peak absolute deck acceleration.Consequently,varying the yield strength affects the loss hazard curve as well as shown in Fig.13(a).By comparing Figs.13(a) and 13(b),it is worth noting that the initial stiffness and the yield strength have opposite effects on the loss hazard curve.

    The sensitivity study of the forward PBEE analysis results indicates that the loss hazard changes as a function of the system parameters,thus giving rise to an inverse PBEE problem.For example,it is of interest to the various stakeholders and owner of the structure of interest to tune the system design (i.e.,design parameters) such that an expected performance,expressed in terms of a target or desired probabilistic loss hazard curve,is achieved.

    Figure 12:Probabilistic seismic demand hazard curves for:(a) relative displacement ductility,and (b) peak absolute acceleration of SDOF systems with different yield strengths

    Figure 13:Probabilistic seismic loss hazard curves for SDOF systems with (a) different yield strengths,and (b) different initial stiffnesses

    5 Inverse PBEE analysis using the PPBOSD framework

    5.1 Inverse PBEE problem

    The aforementioned inverse PBEE problem,i.e.,achieving a probabilistic performance objective,is highly challenging as the design objective is probabilistic and defined based on the loss hazard (i.e.,result of the last step of the forward PBEE analysis).As such,this design or inverse PBEE problem can be solved using the PPBOSD framework newly proposed in this paper.

    For validation purposes,a well-posed inverse PBEE problem needs to be set up such that the solution to this problem is known as a priori.Thus,the target loss hazard is defined as the probabilistic loss hazard,corresponding to a set of a priori selected optimum design parameters (e.g.,k0*=137,200 kN/m,Fy*=10,290 kN).The mathematical formulation for the optimization problem is defined in Eq.(14),

    where the implicit objective functionf(k0,Fy) defines the discrepancy between the current loss hazard curveνLT(k0,Fy)and the target loss hazard curve,e.g.,measured by the sum square regression/error (SSR) or L-2 norm squareThe objective function defined here is based on the total loss hazard curve,which involves a complicated implicit function evaluated through executing the simulator (e.g.,the finite element model of the structure of interest subject to an ensemble of earthquake excitations) and evaluating performance objectives (e.g.,the forward PBEE analysis).The proposed PPBOSD framework is expected,by using as a starting point an arbitrary but reasonable initial design,e.g.,k0=100,000 kN/m ,Fy=14,000 kN),to steer the design process such that the loss hazard curve gets as close as possible to the target loss hazard curve and,in this validation example,to recover the optimum design parameters which are known a priori.The validation problem for the proposed PPBOSD framework is illustrated in Fig.14.Note that in this validation case,the optimum parameters are selected a priori with the corresponding loss hazard curve taken as the target loss hazard curve.However,in a regular (real-world) problem,the optimum design is not known in advance and instead is expected to be determined using the PPBOSD framework presented here.

    Figure 14:Illustration of validation problem for the proposed PPBOSD framework

    5.2 Solution to the inverse PBEE problem

    In the PPBOSD framework,tuning the initial design parameters requires computer-aided adjustment in an iterative way through mathematical optimization.Different optimization algorithms can be integrated in the PPBOSD framework,but this issue is beyond the scope of this study.Instead,the sparse nonlinear optimization software SNOPT,which was linked withOpenSeesinto the extended framework denoted asOpenSees-SNOPT[Gu,Barbato,Conte et al.(2012)],is used in the current version of the PPBOSD framework.For the validation example considered here,gradient-based sequential-quadratic programming (SQP) algorithms inSNOPTare used to tune the system parameters for a SDOF structural bridge model optimally rated for the target loss hazard curve.

    The optimization process (which stopped when the relative reduction in the objective function value was less than 1.0 × 1 0-5) and results are summarized in Fig.15,including the iteration path over the plot of the objective function (both the (3D) surface plot and the contour plot).The optimum solution Xendobtained by the PPBOSD framework (=135,774 kN/m,=10,038 kN) is close to the true optimum design point (k0*=137,200 kN/m,Fy*=10,290 kN) with an error of 1.0% for the initial stiffness and 2.4% for the yield strength.The evolutions of the demand hazard and loss hazard curves during the optimization process are shown in Fig.16.It is observed that over six iterations,both the loss hazard and demand hazard curves are driven closer and closer to their respective target hazard curves corresponding to the a priori selected optimum design parameters.Thus,the proof-of-concept example presented successfully illustrates and validates the proposed PPBOSD framework.

    The proposed PPBOSD framework is expected to be applied to more complex real-world problems in the field of earthquake engineering,and to support the decision-making process in structural design/retrofit with probabilistic performance objectives highly pertinent to the various stakeholders.Note that the illustrative example considers the continuous range of hazard levels,while in practice,a finite (small) set of discrete hazard levels can be used to define practical probabilistic performance objectives,e.g.,focusing on a low hazard level and a high hazard level.Additionally,the objective functions of the optimization problems solved using the PPBOSD framework can also be defined in terms of the conditional demand hazard,unconditional demand hazard,and damage hazard,instead of the loss hazard exemplified in this paper.

    Figure 15:Optimization path for the PPBOSD illustrative example:(a) 3D plot,and (b) contour plot of the objective function

    Figure 16:Evolution of the PBEE evaluation results during the optimization process:(a) probabilistic seismic demand hazard curves,and (b) probabilistic seismic loss hazard curves

    6 Conclusions and discussion

    The well-established probabilistic performance-based earthquake engineering (PBEE) methodology has been mainly used for performance evaluation of existing or newly designed structural,geotechnical or soil-foundation-structural systems,thus referred to herein as forward PBEE analysis.In contrast,the use of the PBEE methodology for design purposes in the presence of uncertainty is more limited,because design is strictly a more challenging inverse PBEE analysis problem.To address the performance-based design issue,this paper proposes a probabilistic performance-based optimum seismic design (PPBOSD) framework as an extension to the existing PBEE assessment methodology.In the PPBOSD framework,a decision layer supported by computational optimization is wrapped around the forward PBEE analysis methodology,which is aimed to tune the design parameters of the civil infrastructure system of interest to achieve seismic performance objectives expressed in probabilistic terms.As a first step of promoting the proposed PPBOSD framework,this paper focuses on illustrating and validating the framework using a simple proof-of-concept example,i.e.,a nonlinear inelastic SDOF model representing macroscopically the longitudinal or transverse behavior of a bridge structure with a priori selected optimum design parameters.The PPBOSD framework in conjunction with the combined structural modeling and optimization software OpenSees-SNOPT successfully recovered the a priori selected optimum design parameters from a set of initial parameter values purposely taken away from the optimum values.It shows that a complicated and implicit probabilistic performance objective (e.g.,defined in terms of a targeted probabilistic loss hazard curve) can be achieved using the PPBOSD framework.Note that the illustrative example used in this paper is based on a simple macroscopic structural model with two primary design variables for the purpose of clearly demonstrating the concepts and procedure.However,the design of complex real-world civil infrastructure systems (with more design variables) can also utilize the proposed PPBOSD framework,with the computational cost issue appropriately addressed (e.g.,by using cloud and/or high-performance computing).

    However,when applying the proposed PPBOSD framework to real-world structures,the following potential difficulties or limitations will need to be addressed in future research.(1) A numerically robust nonlinear model of the real-world structure is required.Noncollapse related non-convergence issues during the seismic response analysis need to be resolved using,for example,adaptive switching between nonlinear solution algorithms,integration methods,convergence criteria,etc.,or explicit integration.If a physical collapse related convergence issue occurs,the collapse probability needs to be considered in the overall methodology [Zhang (2006);Romano,Faggella,Gigliotti et al.(2018)].However,distinguishing between lack of convergence due to numerical issues or due to imminent physical failure (collapse) of the structure being analyzed is challenging and can possibly be addressed by artificial intelligence.(2) To render the PBEE analysis and the PPBOSD more practical,fragility curves for various structural members as well as the associated repair/replacement costs need to be developed and compiled for various types of structures as in the FEMA P-58 PACT tool [FEMA (2012)] for buildings.(3) The gradient-based optimization algorithms currently available in OpenSees-SNOPT may lead to a local minimum,and this issue can be addressed by using multiple starting points or using other global optimization methods.It is worth noting that from a practical viewpoint,a local minimum could already be highly beneficial,representing a significant improvement over the initial design.All the challenging issues mentioned above and possibly others can be appropriately tackled and implemented in the versatile architecture of the proposed framework.

    The probabilistic design objective is expressed in terms of the target loss hazard curve in this study,but it can be defined to closely reflect the design objectives of decision-makers in practice.More importantly,this framework provides the proper tool needed to develop,calibrate and validate simplified probabilistic performance-based design procedures for engineering practice.Finally,the proposed PPBOSD framework can be extended to other natural and man-made hazards (e.g.,tsunami,wind/hurricane/tornadoes,storm surge,fire,blast),as well as multi-hazard design problems.

    Acknowledgements:Support of this research by the Pacific Earthquake Engineering Research Center’s Transportation Systems Research Program under Award No.1107-NCTRCJ,with Prof.Stephen Mahin as the Pacific Earthquake Engineering Research center director,is gratefully acknowledged.The authors wish to thank Dr.Andre Barbosa at Oregon State University and Dr.Quan Gu at Xiamen University,China,for their help with the research presented in this paper.Any opinions,findings,conclusions or recommendations expressed in this publication are those of the authors and do not necessarily reflect the views of the sponsors.

    97超碰精品成人国产| 亚洲成人中文字幕在线播放| 日本av手机在线免费观看| 18禁在线播放成人免费| 亚洲欧美日韩另类电影网站 | 免费在线观看成人毛片| 中国美白少妇内射xxxbb| 日韩一本色道免费dvd| 亚洲伊人久久精品综合| 一本久久精品| 中文在线观看免费www的网站| 精品少妇黑人巨大在线播放| 日韩伦理黄色片| av一本久久久久| 人妻少妇偷人精品九色| 赤兔流量卡办理| 国产熟女欧美一区二区| 色吧在线观看| 日本一二三区视频观看| 夜夜爽夜夜爽视频| 中文天堂在线官网| 国产精品爽爽va在线观看网站| 国内精品宾馆在线| 午夜免费观看性视频| 身体一侧抽搐| 一级毛片电影观看| 精品一区二区三区视频在线| 亚洲人成网站在线观看播放| 亚洲精品亚洲一区二区| 欧美性感艳星| 亚洲av不卡在线观看| 久久精品国产亚洲av涩爱| 2021天堂中文幕一二区在线观| a级毛片免费高清观看在线播放| 在线 av 中文字幕| 亚洲av中文字字幕乱码综合| 亚洲天堂国产精品一区在线| 国产精品一区二区在线观看99| 日韩精品有码人妻一区| av国产久精品久网站免费入址| 精品99又大又爽又粗少妇毛片| 免费看光身美女| freevideosex欧美| 亚洲精品久久午夜乱码| 久久精品国产亚洲av天美| 免费大片黄手机在线观看| 亚洲欧美日韩无卡精品| 男男h啪啪无遮挡| 亚洲美女搞黄在线观看| 夜夜看夜夜爽夜夜摸| 久久久久久久久大av| 亚洲高清免费不卡视频| 极品少妇高潮喷水抽搐| 三级国产精品欧美在线观看| 狂野欧美激情性xxxx在线观看| 日韩 亚洲 欧美在线| a级一级毛片免费在线观看| 国产永久视频网站| 在线观看国产h片| 三级国产精品片| 成人午夜精彩视频在线观看| 国产真实伦视频高清在线观看| 欧美日韩视频高清一区二区三区二| 天堂俺去俺来也www色官网| 国产精品不卡视频一区二区| 免费观看a级毛片全部| 久久精品久久精品一区二区三区| 蜜桃久久精品国产亚洲av| 国产白丝娇喘喷水9色精品| 欧美bdsm另类| 免费观看无遮挡的男女| 亚洲天堂国产精品一区在线| av网站免费在线观看视频| 国产成人福利小说| 久久精品久久久久久久性| 欧美日本视频| 日韩精品有码人妻一区| 亚洲综合精品二区| av专区在线播放| 国产乱人视频| 青青草视频在线视频观看| 色视频www国产| 亚洲性久久影院| 亚洲精品成人久久久久久| 国产av国产精品国产| 欧美高清性xxxxhd video| 欧美最新免费一区二区三区| av免费在线看不卡| 亚洲欧美一区二区三区国产| 尾随美女入室| 日本与韩国留学比较| 视频中文字幕在线观看| 日日啪夜夜爽| 亚洲第一区二区三区不卡| 精品午夜福利在线看| 亚洲国产精品成人久久小说| 看黄色毛片网站| 国产精品偷伦视频观看了| 日本av手机在线免费观看| 成年av动漫网址| 夫妻性生交免费视频一级片| 一级毛片 在线播放| 亚洲四区av| 欧美97在线视频| 91久久精品电影网| 国产黄片视频在线免费观看| 久久精品国产鲁丝片午夜精品| 欧美日韩综合久久久久久| 国产欧美另类精品又又久久亚洲欧美| 久久精品国产亚洲网站| 免费av不卡在线播放| 我的女老师完整版在线观看| 国产中年淑女户外野战色| 欧美+日韩+精品| 亚洲熟女精品中文字幕| 最近手机中文字幕大全| 男人添女人高潮全过程视频| 精品人妻视频免费看| 国产成人免费无遮挡视频| av黄色大香蕉| 一级毛片黄色毛片免费观看视频| 国产男人的电影天堂91| 亚洲成人一二三区av| 亚洲最大成人中文| 九九久久精品国产亚洲av麻豆| 最近手机中文字幕大全| 联通29元200g的流量卡| av国产免费在线观看| 六月丁香七月| 亚洲av中文字字幕乱码综合| 91aial.com中文字幕在线观看| 国精品久久久久久国模美| 亚洲精品乱码久久久v下载方式| 99视频精品全部免费 在线| 一边亲一边摸免费视频| 蜜桃亚洲精品一区二区三区| 免费观看av网站的网址| 偷拍熟女少妇极品色| 中文字幕免费在线视频6| 欧美区成人在线视频| 高清av免费在线| 国产视频内射| 大香蕉久久网| 国产亚洲午夜精品一区二区久久 | 久久精品久久久久久噜噜老黄| 亚洲va在线va天堂va国产| 成人一区二区视频在线观看| 亚洲天堂av无毛| 久久午夜福利片| 国产淫语在线视频| 99热国产这里只有精品6| 亚洲综合精品二区| 国产精品99久久久久久久久| 久久久久久伊人网av| 国产人妻一区二区三区在| 亚洲,欧美,日韩| 日韩制服骚丝袜av| 久久精品国产亚洲网站| 全区人妻精品视频| 久久久精品欧美日韩精品| 亚洲人成网站在线播| 免费观看av网站的网址| 免费观看性生交大片5| 97在线人人人人妻| 只有这里有精品99| 国产精品熟女久久久久浪| 欧美老熟妇乱子伦牲交| 七月丁香在线播放| 超碰97精品在线观看| 久久女婷五月综合色啪小说 | 久久久久久久国产电影| 91午夜精品亚洲一区二区三区| 91在线精品国自产拍蜜月| 亚洲天堂国产精品一区在线| 人体艺术视频欧美日本| 免费av毛片视频| 国产成人免费观看mmmm| 欧美xxⅹ黑人| 国产精品无大码| 有码 亚洲区| 国产成人免费无遮挡视频| 内地一区二区视频在线| 日韩成人伦理影院| 久久久亚洲精品成人影院| 中文精品一卡2卡3卡4更新| 大香蕉97超碰在线| 精品人妻一区二区三区麻豆| 不卡视频在线观看欧美| 午夜日本视频在线| 国产av不卡久久| 久久国内精品自在自线图片| av黄色大香蕉| 一个人看的www免费观看视频| 欧美日韩精品成人综合77777| 超碰av人人做人人爽久久| 韩国高清视频一区二区三区| 国产精品不卡视频一区二区| 国产 一区精品| 大片电影免费在线观看免费| 亚洲自拍偷在线| 大陆偷拍与自拍| 久久久国产一区二区| 国产成人a∨麻豆精品| a级毛色黄片| 尾随美女入室| 亚洲精品自拍成人| 亚洲最大成人av| 黄色视频在线播放观看不卡| 国产欧美日韩精品一区二区| 边亲边吃奶的免费视频| 岛国毛片在线播放| 日韩国内少妇激情av| 汤姆久久久久久久影院中文字幕| 国产成人福利小说| 禁无遮挡网站| 日韩电影二区| 婷婷色麻豆天堂久久| 国产精品爽爽va在线观看网站| 极品教师在线视频| 永久网站在线| 国产av不卡久久| 女人被狂操c到高潮| 黄色一级大片看看| 一本色道久久久久久精品综合| 五月天丁香电影| 另类亚洲欧美激情| 纵有疾风起免费观看全集完整版| 男女边吃奶边做爰视频| 国产视频内射| h日本视频在线播放| 亚州av有码| 最近2019中文字幕mv第一页| 亚洲国产日韩一区二区| 美女国产视频在线观看| 午夜福利视频精品| 一级爰片在线观看| 日韩一本色道免费dvd| 噜噜噜噜噜久久久久久91| 亚洲精品中文字幕在线视频 | 身体一侧抽搐| 高清日韩中文字幕在线| 男人和女人高潮做爰伦理| 亚洲无线观看免费| 男女下面进入的视频免费午夜| 毛片女人毛片| 女的被弄到高潮叫床怎么办| 尾随美女入室| av播播在线观看一区| 麻豆国产97在线/欧美| 久久人人爽人人片av| av在线亚洲专区| 亚洲精品久久久久久婷婷小说| 国产国拍精品亚洲av在线观看| 久久99热这里只频精品6学生| 中文在线观看免费www的网站| 婷婷色麻豆天堂久久| 毛片一级片免费看久久久久| 老师上课跳d突然被开到最大视频| 大话2 男鬼变身卡| 在线观看美女被高潮喷水网站| 成年av动漫网址| 交换朋友夫妻互换小说| 日本av手机在线免费观看| 免费少妇av软件| av在线观看视频网站免费| 我要看日韩黄色一级片| 午夜激情福利司机影院| 免费黄频网站在线观看国产| 亚洲自拍偷在线| 午夜福利视频精品| 又黄又爽又刺激的免费视频.| 午夜福利高清视频| 久久久精品欧美日韩精品| 亚洲精品456在线播放app| 欧美日韩一区二区视频在线观看视频在线 | 边亲边吃奶的免费视频| 国产黄片视频在线免费观看| 中文在线观看免费www的网站| 中文字幕av成人在线电影| 国产精品三级大全| 久久人人爽人人片av| 亚洲,欧美,日韩| 亚洲真实伦在线观看| 亚洲va在线va天堂va国产| 精品久久久久久久人妻蜜臀av| 亚洲天堂av无毛| 禁无遮挡网站| 欧美高清成人免费视频www| 亚洲精品亚洲一区二区| 国产精品爽爽va在线观看网站| 高清欧美精品videossex| 日韩成人伦理影院| 日韩制服骚丝袜av| 麻豆乱淫一区二区| 久久久久久久亚洲中文字幕| 久久久亚洲精品成人影院| 色吧在线观看| 狂野欧美白嫩少妇大欣赏| 99re6热这里在线精品视频| xxx大片免费视频| 久久精品久久久久久久性| 大陆偷拍与自拍| 搡老乐熟女国产| 亚洲av不卡在线观看| 亚洲av日韩在线播放| 久久ye,这里只有精品| 精品人妻一区二区三区麻豆| 亚洲精品久久久久久婷婷小说| 亚洲国产精品999| av免费观看日本| 国产精品熟女久久久久浪| 国产成人freesex在线| eeuss影院久久| av在线播放精品| 欧美日韩亚洲高清精品| 免费av不卡在线播放| 男女下面进入的视频免费午夜| 下体分泌物呈黄色| 少妇高潮的动态图| 亚洲av福利一区| 欧美 日韩 精品 国产| 日本-黄色视频高清免费观看| 丰满乱子伦码专区| 国产 精品1| 成人免费观看视频高清| 国产成人福利小说| 免费黄网站久久成人精品| 成人毛片60女人毛片免费| av国产精品久久久久影院| 男女那种视频在线观看| 日韩人妻高清精品专区| 黄色怎么调成土黄色| 夜夜爽夜夜爽视频| 少妇人妻一区二区三区视频| 精品久久久精品久久久| 久久久久久久亚洲中文字幕| 亚洲精品久久久久久婷婷小说| 街头女战士在线观看网站| 亚洲av国产av综合av卡| 国产亚洲最大av| 高清午夜精品一区二区三区| 一级片'在线观看视频| 欧美3d第一页| 夜夜看夜夜爽夜夜摸| 久久99热这里只频精品6学生| 国产精品麻豆人妻色哟哟久久| 国产精品无大码| 丰满少妇做爰视频| 国产成人一区二区在线| 久久久久久久久大av| 中文字幕制服av| 国产精品国产三级专区第一集| 婷婷色综合www| 亚洲性久久影院| 日韩大片免费观看网站| 免费看av在线观看网站| 亚洲精品aⅴ在线观看| 欧美激情在线99| 免费人成在线观看视频色| 免费电影在线观看免费观看| 少妇 在线观看| 日韩国内少妇激情av| 欧美精品国产亚洲| 欧美丝袜亚洲另类| 不卡视频在线观看欧美| 欧美性猛交╳xxx乱大交人| 91精品国产九色| 欧美xxⅹ黑人| 我要看日韩黄色一级片| 国产欧美日韩一区二区三区在线 | 国产成人精品婷婷| 狠狠精品人妻久久久久久综合| 国产高清不卡午夜福利| 日本爱情动作片www.在线观看| 午夜免费男女啪啪视频观看| 色吧在线观看| 晚上一个人看的免费电影| 精品人妻偷拍中文字幕| 国产成人a∨麻豆精品| 麻豆成人av视频| 久久久久久国产a免费观看| 在线观看人妻少妇| 国产一区二区在线观看日韩| 亚洲精品第二区| av.在线天堂| 少妇裸体淫交视频免费看高清| 免费少妇av软件| 91aial.com中文字幕在线观看| 麻豆成人午夜福利视频| 欧美日韩一区二区视频在线观看视频在线 | 久久久国产一区二区| 一级av片app| 亚洲av日韩在线播放| 午夜亚洲福利在线播放| 男人添女人高潮全过程视频| 亚洲美女视频黄频| 麻豆乱淫一区二区| 成年女人看的毛片在线观看| 日日摸夜夜添夜夜爱| 精品久久久久久久人妻蜜臀av| 日日撸夜夜添| 91精品国产九色| 日韩一本色道免费dvd| 18禁裸乳无遮挡免费网站照片| 久久久久久久久久成人| 国产成人福利小说| 国产综合懂色| 在线观看一区二区三区| 亚洲精品成人av观看孕妇| 肉色欧美久久久久久久蜜桃 | 天天一区二区日本电影三级| 国产精品爽爽va在线观看网站| 日韩一区二区视频免费看| 啦啦啦在线观看免费高清www| 欧美高清性xxxxhd video| 街头女战士在线观看网站| 国产v大片淫在线免费观看| 99热国产这里只有精品6| 亚洲av在线观看美女高潮| 亚洲av.av天堂| 国产成人精品一,二区| 大片电影免费在线观看免费| 熟女av电影| 久久99热这里只频精品6学生| 亚洲色图av天堂| 欧美成人一区二区免费高清观看| 永久网站在线| 麻豆乱淫一区二区| 99热国产这里只有精品6| 新久久久久国产一级毛片| 亚洲精品乱久久久久久| 亚洲人成网站在线观看播放| 久久精品久久精品一区二区三区| 国产高清不卡午夜福利| 亚洲欧美中文字幕日韩二区| 国产精品偷伦视频观看了| 成人亚洲精品av一区二区| www.色视频.com| 国产免费又黄又爽又色| 国产视频首页在线观看| 岛国毛片在线播放| 久久国内精品自在自线图片| 神马国产精品三级电影在线观看| 欧美日韩亚洲高清精品| 一本色道久久久久久精品综合| 欧美潮喷喷水| 亚洲精品久久午夜乱码| 欧美日韩综合久久久久久| 男人爽女人下面视频在线观看| 亚洲精品日韩在线中文字幕| 18禁动态无遮挡网站| 久久久久久久久大av| 久久精品熟女亚洲av麻豆精品| 久久影院123| 伦理电影大哥的女人| 国语对白做爰xxxⅹ性视频网站| 国产精品一区二区性色av| 日韩一区二区三区影片| 又大又黄又爽视频免费| 午夜精品一区二区三区免费看| 激情五月婷婷亚洲| 国产成人freesex在线| 午夜老司机福利剧场| 成人毛片a级毛片在线播放| 建设人人有责人人尽责人人享有的 | 国产成人91sexporn| 国产 精品1| 91aial.com中文字幕在线观看| 内地一区二区视频在线| 2018国产大陆天天弄谢| 国产探花极品一区二区| 一本久久精品| 日日啪夜夜撸| 99热这里只有精品一区| 国产精品人妻久久久影院| 欧美高清成人免费视频www| 欧美激情在线99| 欧美三级亚洲精品| 国产精品一二三区在线看| 又大又黄又爽视频免费| 精品人妻一区二区三区麻豆| 成人特级av手机在线观看| 人妻制服诱惑在线中文字幕| 最近手机中文字幕大全| 亚洲真实伦在线观看| 丝瓜视频免费看黄片| 五月玫瑰六月丁香| 亚洲,欧美,日韩| 一级毛片我不卡| 国内少妇人妻偷人精品xxx网站| 国产一级毛片在线| 黑人高潮一二区| 免费av观看视频| 午夜福利视频精品| 国产永久视频网站| 天堂俺去俺来也www色官网| 久久久成人免费电影| 日韩欧美一区视频在线观看 | 舔av片在线| 一个人看的www免费观看视频| 精品一区二区三区视频在线| 日本午夜av视频| 在线观看一区二区三区激情| 18禁在线播放成人免费| 在线天堂最新版资源| 国产中年淑女户外野战色| 日韩不卡一区二区三区视频在线| 日韩电影二区| 欧美zozozo另类| 寂寞人妻少妇视频99o| 国产视频内射| 成人国产av品久久久| 视频中文字幕在线观看| 你懂的网址亚洲精品在线观看| 少妇 在线观看| 少妇人妻 视频| 久久精品熟女亚洲av麻豆精品| 69人妻影院| 亚洲第一区二区三区不卡| 美女高潮的动态| 中国三级夫妇交换| 亚洲,欧美,日韩| 免费观看的影片在线观看| 日本与韩国留学比较| 国产亚洲av片在线观看秒播厂| 听说在线观看完整版免费高清| 99精国产麻豆久久婷婷| 久久99热6这里只有精品| 一级毛片 在线播放| 另类亚洲欧美激情| 97热精品久久久久久| 汤姆久久久久久久影院中文字幕| 新久久久久国产一级毛片| 在线观看国产h片| 99精国产麻豆久久婷婷| 天堂俺去俺来也www色官网| 最近最新中文字幕免费大全7| 欧美日本视频| 禁无遮挡网站| 日本午夜av视频| 青春草视频在线免费观看| 精品少妇久久久久久888优播| 大话2 男鬼变身卡| 国产欧美日韩一区二区三区在线 | 国产欧美亚洲国产| 五月天丁香电影| 看非洲黑人一级黄片| 午夜免费观看性视频| 嫩草影院入口| 欧美亚洲 丝袜 人妻 在线| 观看免费一级毛片| 黄色怎么调成土黄色| 人妻夜夜爽99麻豆av| 午夜精品国产一区二区电影 | 欧美日韩亚洲高清精品| 菩萨蛮人人尽说江南好唐韦庄| 久久久久久久亚洲中文字幕| 国产精品三级大全| a级一级毛片免费在线观看| 在线天堂最新版资源| 深爱激情五月婷婷| 国产白丝娇喘喷水9色精品| 插阴视频在线观看视频| 午夜福利高清视频| 秋霞在线观看毛片| 黄片无遮挡物在线观看| 国产精品伦人一区二区| 少妇人妻久久综合中文| 日韩电影二区| 中国国产av一级| 黄色配什么色好看| 男插女下体视频免费在线播放| 国产熟女欧美一区二区| 亚洲国产色片| 在线播放无遮挡| 一本久久精品| 永久网站在线| 久久人人爽人人片av| 日本与韩国留学比较| 精品99又大又爽又粗少妇毛片| 99久久中文字幕三级久久日本| 久久精品熟女亚洲av麻豆精品| 激情 狠狠 欧美| 内射极品少妇av片p| 欧美成人a在线观看| 国产熟女欧美一区二区| 狂野欧美白嫩少妇大欣赏| 日韩中字成人| 男女那种视频在线观看| 九色成人免费人妻av| 伦精品一区二区三区| 欧美日韩国产mv在线观看视频 | 夜夜看夜夜爽夜夜摸| 一级黄片播放器| 少妇人妻一区二区三区视频| 丝瓜视频免费看黄片| 亚洲一级一片aⅴ在线观看| 另类亚洲欧美激情| 视频中文字幕在线观看| 国产男女超爽视频在线观看| 日韩欧美一区视频在线观看 | 看十八女毛片水多多多| 亚洲高清免费不卡视频| 国产精品久久久久久久电影| 久久久久九九精品影院| 国产免费一级a男人的天堂| 韩国av在线不卡| 欧美日韩视频精品一区| 亚洲国产成人一精品久久久| 少妇人妻 视频| 成人美女网站在线观看视频| 狂野欧美激情性xxxx在线观看| 黄色配什么色好看| 国产老妇伦熟女老妇高清| 亚洲精品视频女|