    Influence of groundwater drawdown on excavation responses-A case history in Bukit Timah granitic residual soils

    2018-10-17 09:42:24WengangZhangWeiWangDongZhouRunhongZhangGohZhongjieHou

    Wengang Zhang,Wei Wang,Dong Zhou,Runhong Zhang,A.T.C.Goh,Zhongjie Hou

    aNational Joint Engineering Research Center of Geohazards Prevention in Reservoir Area Environment,Chongqing University,Chongqing,400045,China

    bSchool of Civil Engineering,Chongqing University,Chongqing,400045,China

    cSchool of Civil and Environmental Engineering,Nanyang Technological University,639798,Singapore

    Keywords:Braced excavation Bukit Timah granitic(BTG)residual soil Wall deflection Groundwater drawdown Empirical charts

    A B S T R A C T Performances of a braced cut-and-cover excavation system for mass rapid transit(MRT)stations of the Downtown Line Stage 2 in Singapore are presented.The excavation was carried out in the Bukit Timah granitic(BTG)residual soils and characterized by significant groundwater drawdown,due to dewatering work in complex site conditions,insufficient effective waterproof measures and more permeable soils.A two-dimensional numerical model was developed for back analysis of retaining wall movement and ground surface settlement.Comparisons of these measured excavation responses with the calculated performances were carried out,upon which the numerical simulation procedures were calibrated.In addition,the influences of groundwater drawdown on the wall deflection and ground surface settlement were numerically investigated and summarized.The performances were also compared with some commonly used empirical charts,and the results indicated that these charts are less applicable for cases with significant groundwater drawdowns.It is expected that these general behaviors will provide useful references and insights for future projects involving excavation in BTG residual soils under significant groundwater drawdowns.

    1.Introduction

    In recent years,a large number of transportation tunnels and mass rapid transit(MRT)stations have been constructed in densely built-up and populated area of Singapore to meet the requirement of urbanization and continuing population growth.As the fifth MRT line in Singapore,the Downtown Line(DTL)is a major MRT line that links downtown area with the northern and eastern parts of Singapore directly.The DTL is being implemented in 3 stages and the stage 2(DTL2)with 16.6 km twin tunnel and 12 underground stations was completed in December 2015.Fig.1 shows the route of DTL2 and distribution of main geological formations in Singapore.

    A keychallenge of construction in sensitive areas is to assess and control the impact of construction activities on surrounding buildings and infrastructures.Bukit Timah granitic(BTG)residual soil is the main geological formation in the area where DTL2 stations and tunnels were constructed.However,some studies have confirmed that the BTG residual soil properties have a great spatial variability(Rahardjo et al.,2011,2012;Qian et al.,2016;Moon et al.,2017;Zhang et al.,2018).Due to the hot and humid tropical climate in Singapore,the weathering process of the Bukit Timah granite is extensive and rapid.The large amount of rainfall combined with relative high temperature facilitates the weathering of the bedrock to a vertically varying degree,and the regional nature of bedrock and climatic and topographic conditions result in the degree of weathering of residual soil varying from region to region(Rahardjo et al.,2004).Therefore,the hydromechanical properties of BTG residual soil are complicated.

    In Singapore,the groundwater level is about 1-3 m below the ground surface due to the considerable precipitation and the low elevation.Abundant groundwater exerts considerable hydraulic pressure on the underground supporting structure and even flooding accident takes place during underground constructions.Moreover,excessive ground settlement due to dewatering measures of excavation is one of the main reasons for damage of nearby buildings and roads.Some studies focused on underground excavations in permeable strata and analyzed the leakage and seepage problems(Zheng et al.,2014,2018;Goh et al.,2017a,b;2018;Shen et al.,2017;Tan and Lu,2017;Tang et al.,2017;Zhang et al.,2017;Zeng et al.,2018;Xiang et al.,2018),but history cases with significant water level drawdown outside the pit were rarely reported.

    Fig.1.Simplified geological map of Singapore and the location of Cashew station.

    Specially,Zhang and Goh(2016)reported an excavation construction of Cashew station(as indicated in Fig.1),which is one of the 12 stations of DTL2 and subjected to significant groundwater drawdown during construction.Meanwhile,they presented the instrumentation results of measured wall deflections and profiles,ground surface settlements,and groundwater level changes.However,the influences of groundwater drawdown on the wall deflections and ground surface settlements were not systematically and numerically back-analyzed.Based on the reported responses,this paper back-analyzes the most typical cross-sections for planestrain calculations.Numerical model is developed and calibrated according to the instrumentation results.Subsequently,parametric studies of groundwater drawdown influences on excavation responses are carried out.It is expected that both the instrumentation data and the numerical results obtained in this paper will provide helpful references and insights for future projects involving excavations in the BTG residual soils,especially when subjected to significant groundwater drawdowns.

    2.Project overview

    2.1.Site conditions

    The excavation is about 225 m long,up to 60 m wide,and 20 m deep.As shown in Fig.2,the Cashew station is located at the intersection of Cashew Road and Upper Bukit Timah Road,with several adjacent buildings.

    The ground consists mainly of the man-made fill(denoted as fill),Kallang formation(F1 and F2),BTG residual soil(G VI),completely weathered Bukit Timah granite(G V),highly weathered Bukit Timah granite(G IV),moderately to slightly weathered Bukit Timah granite(denoted as G III and G II,respectively),and fresh rock(represented by G I).According to borehole data,the thickness of fill varies from 1 m to 5 m,and the distribution of the Kallang formation is fragmentary.The residual soil,most concerned in this study,is typically described as soft to stiff sandy silt with thickness of 5-25 m,below which lies the G V layer of 5-15 m in thickness.The G IV layer is a transition zone and is less frequently encountered.The top of G III layer is the rockhead together with the G II and G I layers,and they are regarded as the rock bed.Fig.3 shows the typical strata profiles with field and laboratory test data.Shear strength parameters were obtained by triaxial tests,and permeability was measured using variable-head single-packer test.

    2.2.Supporting and monitoring systems

    To prevent the damage of surrounding buildings and roads caused by excavation,the earth retaining support system(ERSS)which consisted of 1 m-thick diaphragm wall with the average length of 29 m,4 layers of HY 700 struts and double waler beam HY700 with bracket HY400 was utilized.Fig.4 plots the layout of the supporting system.

    Field instrumentations were also installed to monitor the excavation responses.The monitoring system,as shown in Fig.5,included settlement markers(monitoring ground settlement),in wall inclinometers(monitoring lateral wall deflection),and vibrating wire piezometers(monitoring pore water pressure).

    2.3.Excavation activities and groundwater response

    The main construction activities and the corresponding dates,as well as the construction days,are summarized in Table 1.Construction day 1 denotes the day of June 3,2011,corresponding to the beginning of the excavation of the first level soil at the project site.

    Fig.2.Plan layout of Cashew station and its surroundings.

    Fig.3.Typical excavation cross-section and borehole profiles with the standard penetration test(SPT)N values.

    Fig.4.Plan layout of supporting system.

    Fig.5.Plan layout of monitoring system.I-in-wall inclinometer;GWV-vibrating wire piezometer;LG-ground settlement marker.

    Table 1Excavation activity schedule.

    During excavation,it was observed that the piezometer head sharply dropped and a large amount of groundwater discharged into the pit from both the leakage points of the diaphram wall and the bottom of the excavation.Fig.6 shows the recorded piezometric level changes versus the construction day.For GWV2009 and GWV2011,which are respectively 6 m and 34 m from the wall,it is surprising that the piezometer level curves of the two points far away from each other are quite similar,indicating that the extent of groundwater drawdown is great.Similarity can be also observed between GWV2007 and GWV2008.The reasons might be attributed to the following aspects:(1)due to the less satisfactory quality of the diaphragm wall,the groundwater leaks through the poor seams and connections of the wall;(2)the diaphragm wall may not penetrate into the impermeable layers fully,therefore,the groundwater could bypass the toe of the wall and seepage into the excavation;and(3)more permeable,porous and loose silty sand of BTG residual soils or sand pocket provides channels for relatively rapid seepage.Meanwhile,significant ground settlements,which are not allowed in densely built-up urban areas,were also observed.

    Fig.6.Piezometer records during excavation.

    3.Numerical back analysis

    3.1.Geometric properties and boundary conditions

    A two-dimensional plane-strain finite element(FE)model was developed using the software PLAXIS 2D(PLAXIS,2018)based on section A(Fig.5)since this section is of better instrumentation and can provide more reasonable and accurate data helpful to validate the numerical model.For simplicity,it was assumed that the length of east and west walls is equal to 29 m and different soil layers are horizontal instead of inclined.Thus only half of the excavation model was built due to symmetry.Fig.7 shows the sketch of the FE model used in this study.Both the left and right side boundaries were constrained by roller fixities which do not allow displacement in the perpendicular direction,i.e.horizontal displacement.The bottom boundary was restrained in all directions while the top boundary was free.Considering extra load from surrounding circumstances,a surcharge of 20 kPa was applied on the ground surface within the zone of 20 m away from the excavation.Initial groundwater level was 2 m below the ground surface,i.e.112 mRL(reduced level).

    Fig.7.Numerical model for back analysis.

    3.2.Constitutive models and parameters

    The soils were simulated by fourth-order 15-node triangular elements with hardening soil(HS)elastoplastic constitutive model adopting Duncan-Chang hyperbolic model and Mohr-Coulomb failure criterion,which is proper in simulation of excavations in view of its hardening behaviors that the stiffness depends on stress and loading-unloading stiffness behaves differently(Schanz et al.,1999).The parameters obtained according to both the soil tests and the numerical back analyses are presented in Table 2.The diaphragm wall was modeled by linear elastic plate element,with EA=2.8×107kN/m and EI=1.8×106kN m2/m,where EA is the axial stiffness,and EI is the bending stiffness.Ignoring the potential bending behavior,struts were considered as liner elastic fixed-end anchors,as listed in Table 3 (negative preloading indicates compression).

    Table 2Material parameters used for numerical simulation.

    Table 3Strut parameters.

    3.3.Simulation of excavation and dewatering

    The groundwater drawdown is significant due to the possible reasons mentioned above.However,it is quite difficult to set the hydraulic boundary conditions during excavation since the real discharge field was unclear in view of the limited number of piezometers installed.Procedure controlling the static pore water pressure was adopted to simulate the process of groundwater drawdown.The excavation procedures are listed in Table 4,the excavation depth H for each stage was 2 m,6.5 m,10.5 m,15.5 m and 19.5 m,respectively,while the corresponding drawdown outside the excavation,Hd,was 4 m,6 m,9.5 m,11 m and 13 m,respectively,which was in accordance with the instrumented piezometer records in Fig.6.

    3.4.Comparison between computed results and field measurements

    Observed lateral wall deflection profile at the middle of west side of the excavation(most typical of plane-strain analysis)was obtained from the in-wall inclinometer I2509(Fig.5).Both the measured and computed wall deflection profiles at the final stage of excavation are shown in Fig.8a.The magnitudes of the computed lateral displacement are generally in good agreement with the measured results.However,the trends of profiles are slightly different.As shown in Fig.8a,for the measured results,the profile shows distinct concave at depths of 1 m and 10 m where the first and third-level struts are located,respectively,while the profile of the computed results is more smooth.The difference is most probably due to the assumption that the diaphragm wall wasassumed as linear elastic in the numerical analysis,but the actual behaviors of the reinforced concrete walls were elastoplastic and the wall was partially yielded.

    Table 4Excavation and dewatering procedures of field case.

    Fig.8.Comparisons of measured and computed excavation responses.

    Data of the measured ground settlements are well documented.Settlement markers denoted by LG2057,LG2058,LG2059,LG2060,LG2061,LG2063 and LG2064(LG2062 was missing),which were 6.2 m,12.2 m,18.5 m,24.2 m,30.2 m,50.2 m and 65.6 m away from the wall(Fig.5),respectively,were adopted for ground settlement monitoring.Fig.8b shows the comparison of the measured and computed ground surface settlements,indicating a slight underestimate of both the maximum ground settlement and the width of the settlement trough.It is probably due to that the seepage force,which influences the ground settlements more or less,was ignored in the numerical calculation.However,considering that the underestimate of the maximum ground settlement is less than 2%,it is deemed that the numerical simulation results are fairly consistent with the measured data.

    3.5.Influences of drawdown depth on wall deflection and ground settlement

    To evaluate the influences of drawdown on excavation responses,4 cases with different dewatering conditions were simulated.In case 1,the groundwater drawdown outside the excavation is 0 and the groundwater level is kept 3 m below the formation level.In cases 2-4,the water drawdowns outside the excavation are 1 m,2 m and 3 m for each stage,respectively,with the total drawdown in the final stage,Hd,of 5 m,10 m and 15 m accordingly.These cases are summarized in Table 5.

    For simplicity,only the results of final stage for different cases are demonstrated in Fig.9.It is obvious that with the increase in groundwater drawdown,less hydraulic pressure is exerted on the retaining wall,resulting in much smaller wall deflections.However,the location(depth)where the maximum wall deflection takes place is almost not influenced by the magnitude of drawdown and the profiles are also similar to each other since the wall penetrates into rock bed(Fig.9a).

    The ground settlement outside the excavation increases by a large amount due to the consolidation induced by the increased effective stresses resulting from the significant groundwater drawdown(Fig.9b).It is obvious that both the maximum settlement and the settlement trough of case 2 are much greater than those of case 1.With the same increase in groundwater drawdown of 5 m,the difference in the maximum settlement and the settlement trough between cases 2 and 3 is less than those between cases 1 and 2.From cases 3 to 4,the maximum settlement increases only by 5 mm and the increase of the settlement trough width iscritical.That is,the first 5 m drawdown induces the largest settlement.With the same increase in effective stress of 50 kPa,the following 5 m drawdown causes less settlement since the thickness of the compressible layer becomes smaller.

    Table 5Cases for parametric study of different drawdown depths.

    Fig.9.Excavation responses under different drawdown depths.

    3.6.Comparison with the empirical methods and case histories

    The measured data and the numerical results of the final stage were compared with the empirical charts.Clough and O’Rourke(1990)indicated thatδhm/H is around 0.2%with the upper bound of 0.5%,whereδhmis the maximum wall deflection.Ou et al.(1993)summarized a large number of historical cases and concluded that δhm/H generally ranges from 0.2%to 0.5%.Wong et al.(1997)reported a braced excavation in residual soils in Singapore and suggested an average value of 0.2%and an upper bound of 0.35%.However,the information of groundwater drawdown was not mentioned in these researches.As shown in Fig.10,the measured and calculated wall deflections are consistent with each other and the values are relatively small,withδhm/H generally less than 0.1%,suggesting that the normalized values in the literature are less applicable for cases considering the groundwater drawdown effect.

    Compared with the large excavation(Tan et al.,2018)conducted in Suzhou stiff clay overlying a sandy confined aquifer with dramatic artesian level drawdown(maximum of 14 m)outside the pit,the magnitude of wall deflection was also much smaller.It was attributed to the more flexible earth retaining system and the unaltered lateral pressure on the wall,because the drawdown did not occur in phreatic layer beyond the wall toe in Suzhou stiff clay.

    Clough and O’Rourke(1990)also summarized the relationship between the maximum ground surface settlement and excavation depth and concluded that δvm/H(where δvmis the maximum ground settlement)is averaged at 0.15%with the upper limit of 0.5%,as shown by the green dashed line in Fig.11.According to the worldwide database compiled by Long(2001),the averageδvm/H is around 0.39%,while Wong et al.(1997)reported that it is almost less than 0.35%.The measuredδvm/H agreed well with that obtained by Long(2001)although the groundwater conditions were treated separately.The result of case 1 agrees with the averageδvm/H value of 0.15%predicted by Clough and O’Rourke(1990).For the measured and numerical results with significant groundwater drawdowns,δvm/H exceeds the line of 0.35%and even moves to the upper bound of 0.5%.

    Fig.10.Comparison of the maximum wall deflection with empirical methods and history cases.

    Fig.11.Comparison of the maximum ground settlement with empirical methods and historical cases.

    For the case in Suzhou stiff clay(Tan et al.,2018),the magnitude of the maximum settlement was smaller than that in BTG residual soil,since the consolidation was mainly performed in a 6 m-thick confined aquifer.For another case conducted in Hong Kong reclamation(Pickles et al.,2003)with a maximum drawdown of 4 m,the maximum normalized settlementδvm/H in old reclamation area is close to 0.35%agreeing with the result of case 2,while in under consolidated new reclamation,δvm/H rises to around 0.6%,which is close to the upper bound in BTG residual soil under the effect of groundwater drawdown more than 10 m.

    4.Conclusions

    This paper presented the numerical back analysis of groundwater drawdown influence on excavation responses based on the case history in BTG residual soils.The numerical procedures were firstly calibrated by the instrumented results and then the parametric analyses were carried out to investigate the influence of water drawdown on the maximum wall deflection as well as the ground surface settlement.Finally,the measured and calculated results were compared with the empirical charts and limited history cases in the literature.The main conclusions of this study are drawn as follows:

    (1)Groundwater drawdown outside the excavation has a considerable impact on magnitudes of maximum wall deflection.The more the drawdown is,the less the wall deflects.Drawdown also has a significant influence on the ground surface settlement,as well as the width of settlement trough.The more the drawdown,the more the ground settlement.

    (2)The magnitudes of deflection and settlement are not linearly proportional to the drawdown magnitude,also depending on the thickness of compressible layers.

    (3)Considering the groundwater drawdown,the ratio ofδhm/H moves to the lower bound line of the empirical charts while δvm/H shifts to the upper bound line.More case histories worldwide with groundwater drawdown records should be compiled for better illustration of the effects of wall type,water drawdown,excavation depth,etc.,on ground movements and wall deflections for the empirical charts.

    Conflicts of interest

    We wish to confirm that there are no known conflicts of interest associated with this publication and there has been no significant financial support for this work that could have influenced its outcome.

    Acknowledgments

    The authors would like to acknowledge the financial support from Land Transport Innovation Fund(LTIF)project funded by the Land Transport Authority(LTA),Singapore.Special thanks are given to Dr.Goh Kok Hun and Mr.Otard Chew Yuen Sin of LTA for the helpful discussions and communications.The first author is also grateful to the support from General Financial Grant of the China Postdoctoral Science Foundation(Grant No.2017M620414),Special Funding for Postdoctoral Researchers in Chongqing(Grant No.Xm2017007),as well as the Advanced Interdisciplinary Special Cultivation Program of Chongqing University (Grant No.06112017CDJQJ208850).

    少妇猛男粗大的猛烈进出视频 | 久久久久久久午夜电影| 高清午夜精品一区二区三区| 午夜精品一区二区三区免费看| 99热6这里只有精品| 一夜夜www| av又黄又爽大尺度在线免费看| 国产一级毛片七仙女欲春2| 国产一区有黄有色的免费视频 | 亚洲精品一区蜜桃| 国产精品一区www在线观看| 国内精品宾馆在线| 一级片'在线观看视频| 久久人人爽人人爽人人片va| 亚洲国产欧美人成| 少妇的逼好多水| 26uuu在线亚洲综合色| 久久国产乱子免费精品| 日日啪夜夜撸| 日韩欧美 国产精品| av福利片在线观看| 亚洲精华国产精华液的使用体验| 日韩视频在线欧美| 99re6热这里在线精品视频| 全区人妻精品视频| 国产亚洲5aaaaa淫片| 最新中文字幕久久久久| 日本午夜av视频| 成人特级av手机在线观看| 中国国产av一级| 人妻夜夜爽99麻豆av| 在线天堂最新版资源| 久久鲁丝午夜福利片| 欧美极品一区二区三区四区| 51国产日韩欧美| eeuss影院久久| 亚洲av日韩在线播放| 欧美潮喷喷水| 少妇熟女欧美另类| 国产男人的电影天堂91| 91狼人影院| 久久人人爽人人片av| 99热全是精品| 午夜激情久久久久久久| 亚洲国产av新网站| 汤姆久久久久久久影院中文字幕 | 国产午夜福利久久久久久| 99久久九九国产精品国产免费| 80岁老熟妇乱子伦牲交| 欧美激情国产日韩精品一区| 欧美激情国产日韩精品一区| 久久精品国产亚洲av涩爱| 亚洲人成网站在线观看播放| 欧美 日韩 精品 国产| 免费黄色在线免费观看| 非洲黑人性xxxx精品又粗又长| 乱系列少妇在线播放| 成年人午夜在线观看视频 | 天堂影院成人在线观看| 欧美成人精品欧美一级黄| 国产单亲对白刺激| 如何舔出高潮| a级毛色黄片| 亚洲成人久久爱视频| 成人性生交大片免费视频hd| 亚洲一区高清亚洲精品| 男人爽女人下面视频在线观看| 一本久久精品| 人妻系列 视频| 91aial.com中文字幕在线观看| 18禁动态无遮挡网站| 久久精品国产鲁丝片午夜精品| 久久这里有精品视频免费| 如何舔出高潮| 三级国产精品片| 成年人午夜在线观看视频 | 十八禁网站网址无遮挡 | 五月伊人婷婷丁香| 国产永久视频网站| 精品国产露脸久久av麻豆 | 成人午夜高清在线视频| 亚洲乱码一区二区免费版| 99热网站在线观看| av国产免费在线观看| 国产精品一区二区在线观看99 | 综合色丁香网| 日日啪夜夜撸| 伦理电影大哥的女人| 不卡视频在线观看欧美| 丝袜喷水一区| 日本三级黄在线观看| 一级毛片我不卡| 激情五月婷婷亚洲| 少妇丰满av| 久久久久久久久久久免费av| 蜜桃久久精品国产亚洲av| 在线 av 中文字幕| 如何舔出高潮| 免费人成在线观看视频色| 亚洲欧美日韩东京热| 国产一区二区三区综合在线观看 | 精品久久久久久电影网| 欧美另类一区| 久久久精品欧美日韩精品| 亚洲四区av| 能在线免费观看的黄片| 久久精品国产亚洲网站| 久久精品夜色国产| 欧美xxxx性猛交bbbb| a级毛色黄片| 成人鲁丝片一二三区免费| 精品久久久久久久久久久久久| 国产精品一区www在线观看| 中文字幕制服av| 欧美激情在线99| 日韩制服骚丝袜av| 身体一侧抽搐| 九草在线视频观看| 两个人的视频大全免费| 美女大奶头视频| 五月玫瑰六月丁香| 欧美成人a在线观看| 国产人妻一区二区三区在| 亚洲av电影不卡..在线观看| av在线老鸭窝| 伦理电影大哥的女人| 日韩av不卡免费在线播放| 国产黄色免费在线视频| 亚洲av成人av| 麻豆国产97在线/欧美| av在线播放精品| 国产精品女同一区二区软件| 中文欧美无线码| 欧美激情国产日韩精品一区| 在线播放无遮挡| 99re6热这里在线精品视频| 精品不卡国产一区二区三区| 高清午夜精品一区二区三区| 蜜臀久久99精品久久宅男| 国产永久视频网站| 七月丁香在线播放| 在线观看美女被高潮喷水网站| 激情五月婷婷亚洲| 成人特级av手机在线观看| 午夜福利在线观看吧| 久久久久精品性色| 女的被弄到高潮叫床怎么办| 黄色欧美视频在线观看| 午夜视频国产福利| av在线亚洲专区| 国产日韩欧美在线精品| 乱系列少妇在线播放| 午夜免费激情av| 一级二级三级毛片免费看| 亚洲怡红院男人天堂| 久久久成人免费电影| 日韩人妻高清精品专区| 不卡视频在线观看欧美| 尤物成人国产欧美一区二区三区| 国产精品久久久久久精品电影小说 | 99视频精品全部免费 在线| 午夜免费观看性视频| 人妻一区二区av| 欧美区成人在线视频| 赤兔流量卡办理| 日韩,欧美,国产一区二区三区| 亚洲av中文字字幕乱码综合| 最近2019中文字幕mv第一页| 午夜福利成人在线免费观看| 赤兔流量卡办理| 人妻夜夜爽99麻豆av| 91aial.com中文字幕在线观看| 欧美日韩精品成人综合77777| 久久精品国产自在天天线| 高清日韩中文字幕在线| 激情 狠狠 欧美| 大片免费播放器 马上看| 三级毛片av免费| videos熟女内射| 国产伦一二天堂av在线观看| 国产免费福利视频在线观看| 日韩一本色道免费dvd| 身体一侧抽搐| 亚洲成人精品中文字幕电影| 成人特级av手机在线观看| 国产精品精品国产色婷婷| 亚洲av一区综合| 一级av片app| 亚洲丝袜综合中文字幕| 91av网一区二区| 性插视频无遮挡在线免费观看| 亚洲av成人精品一区久久| 男人舔奶头视频| 女人十人毛片免费观看3o分钟| 天堂影院成人在线观看| 人人妻人人澡欧美一区二区| 春色校园在线视频观看| 少妇熟女aⅴ在线视频| 国产成人免费观看mmmm| 欧美3d第一页| 全区人妻精品视频| av在线播放精品| 国产色爽女视频免费观看| 在线观看av片永久免费下载| 国精品久久久久久国模美| 观看免费一级毛片| 精品人妻视频免费看| 国模一区二区三区四区视频| 亚洲,欧美,日韩| 亚洲av.av天堂| 秋霞在线观看毛片| 午夜福利在线观看免费完整高清在| 国产精品爽爽va在线观看网站| 丝瓜视频免费看黄片| 22中文网久久字幕| 好男人视频免费观看在线| 十八禁国产超污无遮挡网站| 国产极品天堂在线| 国产精品嫩草影院av在线观看| 国产精品99久久久久久久久| 少妇的逼好多水| 成人亚洲精品av一区二区| 永久网站在线| 少妇猛男粗大的猛烈进出视频 | 九九在线视频观看精品| 搡老妇女老女人老熟妇| 天堂av国产一区二区熟女人妻| av国产免费在线观看| 91精品伊人久久大香线蕉| 亚洲丝袜综合中文字幕| 男女下面进入的视频免费午夜| 五月天丁香电影| 不卡视频在线观看欧美| 噜噜噜噜噜久久久久久91| 99久久人妻综合| 男女啪啪激烈高潮av片| 午夜精品在线福利| 大香蕉久久网| 免费看美女性在线毛片视频| 午夜视频国产福利| 欧美精品国产亚洲| 亚洲久久久久久中文字幕| 男女啪啪激烈高潮av片| 好男人在线观看高清免费视频| 亚洲性久久影院| 国产精品国产三级国产av玫瑰| 久久精品久久久久久久性| 波野结衣二区三区在线| 97在线视频观看| 蜜桃久久精品国产亚洲av| 日韩精品青青久久久久久| av国产久精品久网站免费入址| 免费av观看视频| 97超视频在线观看视频| 九九爱精品视频在线观看| 亚洲精品乱码久久久久久按摩| 久久6这里有精品| 午夜视频国产福利| 国产av不卡久久| 高清毛片免费看| 午夜福利在线在线| 成人性生交大片免费视频hd| 九草在线视频观看| 视频中文字幕在线观看| 欧美高清成人免费视频www| av免费在线看不卡| 免费看日本二区| 成人毛片a级毛片在线播放| 大片免费播放器 马上看| 国产伦在线观看视频一区| 777米奇影视久久| 女的被弄到高潮叫床怎么办| 黄片无遮挡物在线观看| 久久久久性生活片| 国产女主播在线喷水免费视频网站 | 国产精品麻豆人妻色哟哟久久 | 又黄又爽又刺激的免费视频.| 亚洲自拍偷在线| 成人av在线播放网站| 亚洲成色77777| 乱人视频在线观看| 国产欧美日韩精品一区二区| 国产一区二区在线观看日韩| 国产一级毛片在线| 国产精品无大码| 日韩 亚洲 欧美在线| 大陆偷拍与自拍| 青青草视频在线视频观看| 国产免费又黄又爽又色| 日韩欧美三级三区| 精品人妻一区二区三区麻豆| 又大又黄又爽视频免费| 如何舔出高潮| av免费观看日本| 免费黄色在线免费观看| 国产免费福利视频在线观看| 少妇裸体淫交视频免费看高清| 尤物成人国产欧美一区二区三区| 精品一区二区三区人妻视频| 国产高清国产精品国产三级 | 一级片'在线观看视频| 亚洲最大成人手机在线| 美女被艹到高潮喷水动态| 国产精品无大码| 97热精品久久久久久| 国产色婷婷99| 亚洲真实伦在线观看| 午夜福利视频精品| 免费少妇av软件| 久久久午夜欧美精品| 日本爱情动作片www.在线观看| 极品少妇高潮喷水抽搐| 边亲边吃奶的免费视频| av在线天堂中文字幕| 国产在线一区二区三区精| 欧美精品一区二区大全| 最近中文字幕高清免费大全6| 亚洲精品乱码久久久v下载方式| 人妻夜夜爽99麻豆av| 欧美性猛交╳xxx乱大交人| av黄色大香蕉| 日韩人妻高清精品专区| 久久99热这里只频精品6学生| 精品久久久噜噜| 久久久成人免费电影| 欧美极品一区二区三区四区| 少妇丰满av| 男人狂女人下面高潮的视频| 美女大奶头视频| 一本一本综合久久| 久久精品国产亚洲av涩爱| 国产精品国产三级国产av玫瑰| 国内精品宾馆在线| 久久久精品免费免费高清| 亚洲真实伦在线观看| 欧美日韩国产mv在线观看视频 | 视频中文字幕在线观看| 高清毛片免费看| 国产女主播在线喷水免费视频网站 | 在线免费观看不下载黄p国产| 日本熟妇午夜| 国产精品国产三级国产av玫瑰| 国产乱来视频区| 亚洲av二区三区四区| 一级a做视频免费观看| 久热久热在线精品观看| 三级男女做爰猛烈吃奶摸视频| 九色成人免费人妻av| 亚洲国产成人一精品久久久| 国产高潮美女av| 国产高清有码在线观看视频| 久久鲁丝午夜福利片| 午夜亚洲福利在线播放| 国产成人freesex在线| 超碰av人人做人人爽久久| 欧美日本视频| 欧美一区二区亚洲| 麻豆成人av视频| 国产精品精品国产色婷婷| 中文字幕av在线有码专区| 亚洲内射少妇av| 啦啦啦韩国在线观看视频| 亚洲av福利一区| 亚洲在线观看片| 亚洲一级一片aⅴ在线观看| 国产在线一区二区三区精| 日韩不卡一区二区三区视频在线| 蜜桃久久精品国产亚洲av| 少妇丰满av| 精品99又大又爽又粗少妇毛片| 亚洲精品日韩av片在线观看| 亚洲av不卡在线观看| 3wmmmm亚洲av在线观看| 国产久久久一区二区三区| 又大又黄又爽视频免费| 精品亚洲乱码少妇综合久久| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 青春草视频在线免费观看| 爱豆传媒免费全集在线观看| 欧美97在线视频| 亚洲18禁久久av| 真实男女啪啪啪动态图| 亚洲精品乱久久久久久| 久久精品熟女亚洲av麻豆精品 | 中文在线观看免费www的网站| 久久久久久久久大av| 久久精品国产鲁丝片午夜精品| 精品久久久久久电影网| av在线老鸭窝| 精品久久国产蜜桃| 日韩在线高清观看一区二区三区| av一本久久久久| av专区在线播放| 九色成人免费人妻av| 精品国内亚洲2022精品成人| 有码 亚洲区| 小蜜桃在线观看免费完整版高清| 免费看美女性在线毛片视频| 少妇熟女aⅴ在线视频| 69av精品久久久久久| h日本视频在线播放| 亚洲精品影视一区二区三区av| 久久久久久久久久久免费av| 亚洲精品国产av成人精品| 美女脱内裤让男人舔精品视频| 插阴视频在线观看视频| 我的老师免费观看完整版| 亚洲精品日本国产第一区| 中文天堂在线官网| 一级黄片播放器| 国产极品天堂在线| 晚上一个人看的免费电影| 又大又黄又爽视频免费| 国产 一区 欧美 日韩| 国产精品人妻久久久影院| 成人美女网站在线观看视频| 一级毛片电影观看| 亚洲无线观看免费| av在线播放精品| 人人妻人人澡人人爽人人夜夜 | 看免费成人av毛片| 久久精品久久精品一区二区三区| av天堂中文字幕网| 欧美极品一区二区三区四区| 久久久久国产网址| 日本av手机在线免费观看| 日本熟妇午夜| 性色avwww在线观看| 大话2 男鬼变身卡| 51国产日韩欧美| 男人舔奶头视频| 亚洲一区高清亚洲精品| 国产不卡一卡二| 国产在线一区二区三区精| 日韩欧美三级三区| 波多野结衣巨乳人妻| 激情 狠狠 欧美| 日韩国内少妇激情av| av卡一久久| 欧美区成人在线视频| 五月天丁香电影| 亚洲av中文av极速乱| 麻豆av噜噜一区二区三区| 日韩中字成人| 中文字幕人妻熟人妻熟丝袜美| 亚洲精品乱久久久久久| 欧美变态另类bdsm刘玥| 日本爱情动作片www.在线观看| 波野结衣二区三区在线| 国产片特级美女逼逼视频| 亚洲精品亚洲一区二区| 欧美日韩亚洲高清精品| 在线免费观看的www视频| 成年女人在线观看亚洲视频 | 色播亚洲综合网| 欧美日韩综合久久久久久| 高清欧美精品videossex| 国产女主播在线喷水免费视频网站 | 亚洲经典国产精华液单| 亚洲四区av| 亚洲av国产av综合av卡| 色5月婷婷丁香| 少妇裸体淫交视频免费看高清| 欧美不卡视频在线免费观看| 毛片女人毛片| 人人妻人人澡欧美一区二区| av线在线观看网站| 一本—道久久a久久精品蜜桃钙片 精品乱码久久久久久99久播 | 尾随美女入室| 国产精品久久视频播放| ponron亚洲| 免费看日本二区| 亚洲av男天堂| 99久久精品一区二区三区| 一级二级三级毛片免费看| 黄色配什么色好看| 美女cb高潮喷水在线观看| 国产爱豆传媒在线观看| 男人狂女人下面高潮的视频| 免费电影在线观看免费观看| 免费看不卡的av| 日本爱情动作片www.在线观看| 成人亚洲欧美一区二区av| 人妻少妇偷人精品九色| 91av网一区二区| 国产 一区 欧美 日韩| 久久久精品94久久精品| 伦理电影大哥的女人| 免费观看的影片在线观看| 日韩一本色道免费dvd| 特大巨黑吊av在线直播| 亚洲18禁久久av| 中文资源天堂在线| 美女内射精品一级片tv| 天天躁夜夜躁狠狠久久av| 欧美成人精品欧美一级黄| 亚洲av.av天堂| 少妇的逼水好多| av在线播放精品| 亚洲第一区二区三区不卡| 国产精品国产三级国产专区5o| 国产精品av视频在线免费观看| 国产日韩欧美在线精品| 久久综合国产亚洲精品| 国产有黄有色有爽视频| 人妻系列 视频| 久久精品夜夜夜夜夜久久蜜豆| 久久久久久久亚洲中文字幕| 我要看日韩黄色一级片| 成人亚洲精品一区在线观看 | 男女边吃奶边做爰视频| 少妇熟女aⅴ在线视频| 亚洲最大成人手机在线| 日韩欧美精品v在线| 国产亚洲av片在线观看秒播厂 | 国产成人精品一,二区| 青春草亚洲视频在线观看| 成年版毛片免费区| 水蜜桃什么品种好| 热99在线观看视频| 小蜜桃在线观看免费完整版高清| 嫩草影院入口| 午夜日本视频在线| 伊人久久国产一区二区| 搡老乐熟女国产| 大香蕉久久网| 国产精品一区www在线观看| 少妇被粗大猛烈的视频| 欧美97在线视频| 免费观看性生交大片5| 成年版毛片免费区| 国模一区二区三区四区视频| 欧美日韩一区二区视频在线观看视频在线 | 2022亚洲国产成人精品| 韩国av在线不卡| 哪个播放器可以免费观看大片| 亚洲av电影不卡..在线观看| 搡女人真爽免费视频火全软件| 又爽又黄a免费视频| 97超视频在线观看视频| 国产免费又黄又爽又色| 亚洲av成人av| 成人欧美大片| 男女国产视频网站| 欧美日本视频| 免费大片18禁| 十八禁网站网址无遮挡 | 国产精品蜜桃在线观看| av国产免费在线观看| 欧美高清性xxxxhd video| 免费av毛片视频| 亚洲人成网站高清观看| 少妇的逼好多水| 小蜜桃在线观看免费完整版高清| 国产亚洲最大av| 在线播放无遮挡| 一个人免费在线观看电影| 免费大片黄手机在线观看| 69av精品久久久久久| 精品不卡国产一区二区三区| 最近手机中文字幕大全| 精品一区二区三区人妻视频| 国产中年淑女户外野战色| 国产黄频视频在线观看| 免费黄网站久久成人精品| 久久久久久久午夜电影| 成人亚洲欧美一区二区av| 韩国高清视频一区二区三区| 日韩欧美三级三区| 免费看光身美女| 亚洲精品日本国产第一区| 黄片wwwwww| 欧美变态另类bdsm刘玥| 一级毛片我不卡| 少妇人妻一区二区三区视频| 国产色爽女视频免费观看| 一夜夜www| 熟女电影av网| 日韩 亚洲 欧美在线| 亚洲乱码一区二区免费版| 亚洲一区高清亚洲精品| 国内揄拍国产精品人妻在线| 极品少妇高潮喷水抽搐| 高清av免费在线| 91精品一卡2卡3卡4卡| 国产高清有码在线观看视频| 伦理电影大哥的女人| 亚洲va在线va天堂va国产| 国产女主播在线喷水免费视频网站 | 免费少妇av软件| 淫秽高清视频在线观看| 不卡视频在线观看欧美| 国产精品久久视频播放| 人妻夜夜爽99麻豆av| 国产精品一二三区在线看| 国产不卡一卡二| 十八禁国产超污无遮挡网站| 麻豆国产97在线/欧美| 欧美日本视频| 毛片一级片免费看久久久久| 欧美三级亚洲精品| 狂野欧美白嫩少妇大欣赏| 国产真实伦视频高清在线观看| 中文字幕免费在线视频6| 99久久中文字幕三级久久日本| 午夜免费观看性视频| 久久综合国产亚洲精品| 国产精品一区二区在线观看99 | 小蜜桃在线观看免费完整版高清| 日本爱情动作片www.在线观看| 精品熟女少妇av免费看| 日本黄色片子视频| 日韩欧美三级三区| a级一级毛片免费在线观看| 国产黄片视频在线免费观看|